2
Waverley Underpass For addional informaon please contact Lea Hase, Dillon Consulng Ltd, [email protected], 204-453-2301 or visit: www.winnipeg.ca/waverleyunderpass The 2019 summer construcon season is well underway and we are looking forward to opening the Waverley Underpass this August! Construcon Work to Date Significant progress has been made on major project components including underpass excavaon, land drainage, paving, and intersecon work. We are now nearly ready to transion traffic under the new underpass. Temporary Weekend Road Closure To complete construcon necessary to restore traffic to Waverley and under the new rail bridge there will be a temporary weekend road closure of the project area. Closure starts Friday, August 16, 2019 at 5:30pm Closure ends Monday, August 19, 2019 at 6:00am Waverley Street will be closed to all vehicles from Wilkes to Mathers and Taylor will be closed from the Reh-Fit approach to Cambridge, refer to map at right for details An addional full closure of the Wilkes intersecon will occur on Saturday August 17, 2019 during the aſternoon and evening for paving The new sidewalk and bike path along the east side of Waverley will be open to pedestrians and cyclists during the weekend road closure Property owners will have access via other routes and access points Addional communicaons will occur if closure dates change or the closure dates need to be extended Construcon Update #9 - Temporary Weekend Closure & Underpass Opening Summer 2019 Issued August 2, 2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Tim Hortons The Chamois Storageville Piazza De Nardi Reh-Fit CN Mainline WAVERLEY STREET CAMBRIDGE STREET WILKES AVENUE TAYLOR AVENUE MATHERS AVENUE HURST WAY VEHICULAR TRAFFIC PEDESTRIAN/CYCLIST TRAFFIC LANE CLOSED SIDEWALK CLOSED TEMPORARY CROSSING SIGNALS X X Temporary Weekend Closure Map August 16-19, 2019 page 1 of 2 Temporary Closure - West Boundary Temporary Closure - East Boundary Sidewalk and bike path open to pedestrians and cyclists during weekend closure Temporary Closure - South Boundary Intersecon Closure - Saturday August 17, 2019 aſternoon and evening only for paving Temporary Closure - North Boundary DETOUR

Wavere nderss - winnipeg.ca · Underpass Opening On Monday, August 19, 2019 immediately following the weekend closure, traffic will begin operating on the Waverley Underpass. A sidewalk

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wavere nderss - winnipeg.ca · Underpass Opening On Monday, August 19, 2019 immediately following the weekend closure, traffic will begin operating on the Waverley Underpass. A sidewalk

10/31/2014

Waverley Underpass

For additional information please contact Lea Hastie, Dillon Consulting Ltd, [email protected], 204-453-2301 or visit:

www.winnipeg.ca/waverleyunderpass

The 2019 summer construction season is well underway and we are looking forward to opening the Waverley Underpass this August!

Construction Work to DateSignificant progress has been made on major project components including underpass excavation, land drainage, paving, and intersection work. We are now nearly ready to transition traffic under the new underpass.

Temporary Weekend Road ClosureTo complete construction necessary to restore traffic to Waverley and under the new rail bridge there will be a temporary weekend road closure of the project area.

• Closure starts Friday, August 16, 2019 at 5:30pm• Closure ends Monday, August 19, 2019 at

6:00am• Waverley Street will be closed to all vehicles

from Wilkes to Mathers and Taylor will be closed from the Reh-Fit approach to Cambridge, refer to map at right for details

• An additional full closure of the Wilkes intersection will occur on Saturday August 17, 2019 during the afternoon and evening for paving

• The new sidewalk and bike path along the east side of Waverley will be open to pedestrians and cyclists during the weekend road closure

• Property owners will have access via other routes and access points

• Additional communications will occur if closure dates change or the closure dates need to be extended

Construction Update #9 - Temporary Weekend Closure & Underpass Opening

Summer 2019Issued August 2, 2019

X

X

XX

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

XXXX

XX

X

X

X

X

X

X

XX

X

XX

X

X

X

X

X

XX

X

X

Tim Hortons

The Chamois

Storageville

Piazza De Nardi

Reh-Fit

CN M

ainline

WAVERLEY STREET

CAMBRIDGE STREET

W

ILKES AVENU

E

TAYLO

R AVENU

E

M

ATHERS AVENU

E

HURST W

AY

VEHICULAR TRAFFIC

PEDESTRIAN/CYCLISTTRAFFIC

LANE CLOSED

SIDEWALK CLOSED

TEMPORARYCROSSING SIGNALS

XX

Temporary Weekend Closure Map August 16-19, 2019

page 1 of 2

Temporary Closure - West Boundary

Temporary Closure - East Boundary

Sidewalk and bike path open to pedestrians and cyclists during weekend closure

Temporary Closure - South Boundary

Intersection Closure - Saturday August 17, 2019 afternoon and

evening only for paving

Temporary Closure - North Boundary

DETOUR

Page 2: Wavere nderss - winnipeg.ca · Underpass Opening On Monday, August 19, 2019 immediately following the weekend closure, traffic will begin operating on the Waverley Underpass. A sidewalk

10/31/2014

Waverley Underpass

For additional information please contact Lea Hastie, Dillon Consulting Ltd, [email protected], 204-453-2301 or visit:

www.winnipeg.ca/waverleyunderpass

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

XX

X

X

X

X

X X XX

XX

X

X

XX

Underpass Opening

On Monday, August 19, 2019 immediately following the weekend closure, traffic will begin operating on the Waverley Underpass.

A sidewalk and bike path for pedestrians and cyclists will be provided along the east side of the underpass.

Temporary turning movement restrictions will be in place at the Taylor intersection. Refer to the Underpass Opening Map at right for details. Turning restrictions include:

• Eastbound Taylor at Waverley, no left turn• Northbound Waverley at Taylor, no left turn• Southbound Waverley at Taylor, no left turn• Limited through lanes (intermittent 1 lane

closures throughout site)

Future Construction Work

With traffic moved to the Waverley underpass, construction works will continue. Refer to map. Major roadworks are required to remove the detour road and reconstruct the Taylor intersection. Construction is expected to be completed in November 2019 and landscaping will be completed in Spring 2020.

Construction Update #9 - Temporary Weekend Closure & Underpass Opening

Summer 2019

Tim Hortons

The Chamois

Storageville

Piazza De Nardi

Reh-Fit

CN M

ainline

WAVERLEY STREET

DETOUR

W

ILKES AVENU

E

TAYLOR AVENUE

HURST W

AY

VEHICULAR TRAFFIC

PEDESTRIAN/CYCLISTTRAFFIC

LANE CLOSED

SIDEWALK CLOSED

TEMPORARYCROSSING SIGNALS

XX

Underpass Opening Map (following the weekend closure)

page 2 of 2

Issued August 2, 2019

Median and curb construction

Detour removal

Sidewalk and bike path

Taylor intersection reconstruction