7/21/2019 Water Hamme http://slidepdf.com/reader/full/water-hamme 1/30 17 Parcel , ITCC Project KB-01,02 Water hammer Design criteria : H = 31.0 m Pump head 28.0 m Static head L = 500.0 m Pipeline length D = 250 mm Pipeline diameter = 0.250 m t = 9.3 mm Pipe wall thickness = 0.0093 m 403.9 Total flow ( pump delivery capacity ) = 0.11220 Pipe material : 3289.25 1- water velocity in the pipe : S = S =  3.14 x 0.250 x 0.250 0.04909 --------------------- ------------------------------------------- = 4 4 V =  V = 0.11220 2.285!9 m " s --------- ---------------------- = .  =   #  = m 3  " h m 3  " sec   #  = V x S  3.14 x D m

Water Hamme

Embed Size (px)

DESCRIPTION

Water Hammer

Citation preview

Page 1: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 1/30

17 Parcel , ITCC Project

KB-01,02

Water hammer 

Design criteria :

H = 31.0  m Pump head

28.0  m Static head 

L = 500.0  m Pipeline length

D = 250  mm Pipeline diameter = 0.250  m

t = 9.3 mm Pipe wall thickness = 0.0093 m

403.9 Total flow ( pump delivery capacity ) = 0.11220 

Pipe material : 3289.25 

1- water velocity in the pipe :

S = S =  3.14 x 0.250 x 0.250

0.04909--------------------- ------------------------------------------- =4 4

V = 

V =0.11220 

2.285!9 m " s--------- ---------------------- =.

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 2: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 2/30

2- Wave velocity :

a =1

 ----------------------------------------------------- 

1

 $D

)

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

12!4.31 m"sec  ----------------------------------------------------------------

1000 x ( 1  + 0.250 )2.1E+009 0.0093 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 500.00

0.!8  sec ------------------ -------------------------- =  a 12!4.3

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$&  sec 

'ec(mmen)ati(n

  r x ( * water 

   pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 3: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 3/30

17 Parcel , ITCC Project

KB-03

Water hammer 

Design criteria :

H = 31.0  m Pump head

32.0  m Static head 

L = 420.0  m Pipeline length

D = 200  mm Pipeline diameter = 0.200  m

t = 8.2  mm Pipe wall thickness = 0.0082  m

1!4.4 Total flow ( pump delivery capacity ) = 0.04845 

Pipe material :

1- water velocity in the pipe :

S = S =  3.14 x 0.200 x 0.200

0.03142 --------------------- -------------------------------------------

V = 

V =0.04845 

1.54226  m " s--------- ----------------------.

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1286.!!  m"sec ----------------------------------------------------------------

1000 x (1

 +0.200

)2.1E+009 0.00/2 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 420.00

0.65  sec ------------------ -------------------------- =  a 1286.8  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

  r x ( * water 

  pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm#  )

m"sec 2 

&  : eriod o! vi"ration

Page 4: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 4/30

17 Parcel , ITCC Project

KB-04

Water hammer 

Design criteria :

H = 24.0  m Pump head

16.0  m Static head 

L = 300.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m96.5  Total flow ( pump delivery capacity ) = 0.02680 

Pipe material :

1- water velocity in the pipe :

S = S =

  3.14 x 0.150 x 0.150

0.01!6! --------------------- -------------------------------------------

V = 

V =0.02680 

1.51661 m " s--------- ----------------------.

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m

Page 5: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 5/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 300.00

0.46  sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$+ sec 

'ec(mmen)ati(n

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminate

h)ra/ic hammer in the chie) ater sstem

Page 6: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 6/30

17 Parcel , ITCC Project

KB-05

Water hammer 

Design criteria :

H = 2!.0  m Pump head

15.0  m Static head 

L = 220.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m

116.6  Total flow ( pump delivery capacity ) = 0.03240 

Pipe material :

1- water velocity in the pipe :

S = S =  3.14 x 0.150 x 0.150

0.01!6! ----- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --- -- -- -- -- -- -- -- -- -- -- -- -- -- -- =

V = 

V =0.03240 

1.83352  m " s--------- ---------------------- =.

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 7: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 7/30

2- Wave velocity :

a =

1

  ----------------------------------------------------- 1

 $D

)

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec   ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 220.00

0.34 sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$,+ sec 

'ec(mmen)ati(n

  r x ( * water 

  pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 8: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 8/30

17 Parcel , ITCC Project

KB-06Water hammer 

Design criteria :

H = 28.0  m Pump head

20.0  m Static head 

L = 280.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m

119.5  Total flow ( pump delivery capacity ) = 0.03320 

Pipe material :

1- water velocity in the pipe :

S = S =  3.14 x 0.150 x 0.150

0.01!6! ----------- ---------- --- ----------------- ----------------- ------

V = 

V =0.03320 

1.8!8!9 m " s--------- ---------------------- =.

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $

D)

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 280.00

0.43 sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5 )i*e o! clos're t :

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm#  )

m"sec 2 

&  : eriod o! vi"ration

Page 9: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 9/30

17 Parcel , ITCC Project

WH-01,04

Water hammer 

Design criteria :

H = 2!.0  m Pump head

2!.0  m Static head 

L = 390.0  m Pipeline length

D = 250  mm Pipeline diameter = 0.250  m

t = 9.3 mm Pipe wall thickness = 0.0093 m2!0.0  Total flow ( pump delivery capacity ) = 0.0!500 

Pipe material :

1- water velocity in the pipe :

S = S =   3.14 x 0.250 x 0.250 0.04909--------------------- -------------------------------------------4 4

V = 

V =0.0!500 

1.52!93 m " s--------- ---------------------- =S 0.04909

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 10: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 10/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

12!4.31 m"sec  ----------------------------------------------------------------

1000 x (1

 +0.250

)2.1E+009 0.0093 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 390.00

0.61 sec ------------------ -------------------------- =  a 12!4.3

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$1 sec 

'ec(mmen)ati(n

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 11: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 11/30

17 Parcel , ITCC Project

WH-05

Water hammer 

Design criteria :

H = 26.0  m Pump head

2!.0  m Static head 

L = 320.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m95.0  Total flow ( pump delivery capacity ) = 0.02640 

Pipe material :

1- water velocity in the pipe :

S = S =   3.14 x 0.150 x 0.150 0.01!6! --------------------- -------------------------------------------4 4

V = 

V =0.02640 

1.49398  m " s--------- ---------------------- =S 0.01!6!  

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 12: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 12/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 320.00

0.49 sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$+% sec 

'ec(mmen)ati(n

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

Page 13: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 13/30

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 14: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 14/30

17 Parcel , ITCC Project

WH-06

Water hammer 

Design criteria :

H = 23.0  m Pump head

18.0  m Static head 

L = 310.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m96.!  Total flow ( pump delivery capacity ) = 0.02685 

Pipe material :

1- water velocity in the pipe :

S = S =   3.14 x 0.150 x 0.150 0.01!6! --------------------- -------------------------------------------4 4

V = 

V =0.02685 

1.51944 m " s--------- ---------------------- =S 0.01!6!  

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 15: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 15/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 310.00

0.48  sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$+& sec 

'ec(mmen)ati(n

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

Page 16: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 16/30

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 17: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 17/30

17 Parcel , ITCC Project

RD-03

Water hammer 

Design criteria :

H = 2!.0  m Pump head

29.0  m Static head 

L = 280.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m

103.1 Total flow ( pump delivery capacity ) = 0.02865 

Pipe material :

1- water velocity in the pipe :

S = S =  3.14 x 0.150 x 0.150

0.01!6! --------------------- ------------------------------------------- =

4 4

V = 

V =0.02865 

1.62131 m " s--------- ---------------------- =S 0.01!6!  

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 18: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 18/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1  $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =

1

1303.65  m"sec   ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 280.00

0.43 sec ------------------ -------------------------- =

  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$+, sec 

'ec(mmen)ati(n

  r x ( * water 

  pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm#  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

Page 19: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 19/30

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 20: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 20/30

17 Parcel , ITCC Project

RD-04

Water hammer 

Design criteria :

H = 22.0  m Pump head

16.0  m Static head 

L = 420.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m135.5  Total flow ( pump delivery capacity ) = 0.03!65 

Pipe material :

1- water velocity in the pipe :

S = S =   3.14 x 0.150 x 0.150 0.01!6! --------------------- -------------------------------------------4 4

V = 

V =0.03!65 

2.13062  m " s--------- ---------------------- =S 0.01!6!  

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 21: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 21/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 420.00

0.64 sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$+ sec 

'ec(mmen)ati(n

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

Page 22: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 22/30

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 23: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 23/30

17 Parcel , ITCC Project

IT-01

Water hammer 

Design criteria :

H = 29.0  m Pump head

24.0  m Static head 

L = 220.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m108.!  Total flow ( pump delivery capacity ) = 0.03020 

Pipe material :

1- water velocity in the pipe :

S = S =   3.14 x 0.150 x 0.150 0.01!6! --------------------- -------------------------------------------4 4

V = 

V =0.03020 

1.!0902  m " s--------- ---------------------- =S 0.01!6!  

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 24: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 24/30

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $ D )

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.150

)2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 220.00

0.34 sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$,+ sec 

'ec(mmen)ati(n

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

Page 25: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 25/30

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 26: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 26/30

17 Parcel , ITCC Project

IT-02

Water hammer 

Design criteria :

H = 2!.0  m Pump head

24.0  m Static head 

L = 350.0  m Pipeline length

D = 150  mm Pipeline diameter = 0.150  m

t = !.1 mm Pipe wall thickness = 0.00!1 m

131.0  Total flow ( pump delivery capacity ) = 0.03640 

Pipe material :

1- water velocity in the pipe :

S = S =  3.14 x 0.150 x 0.150

0.01!6! --------------------- -------------------------------------------4 4

V = 

V =0.03640 

2.05988  m " s--------- ----------------------S 0.01!6!  

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

Page 27: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 27/30

2- Wave velocity :

a =1

 ----------------------------------------------------- 

1

 $D

)

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1303.65  m"sec  ----------------------------------------------------------------

1000 x ( 1  + 0.150 )2.1E+009 0.001 x 2.1 E+11

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 350.00

0.54 sec ------------------ -------------------------- =  a 1303.6  

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave

%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph : ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$*+ sec 

'ec(mmen)ati(n

  r x ( * water 

   pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

&  : eriod o! vi"ration

 t = T =

,hie) ater #/m# VD se/ence ( (#erati(n hae t( tae the time ( res#(nse t( eiminateh)ra/ic hammer in the chie) ater sstem

Page 28: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 28/30

Water hammer 

Design criteria :

H = 40.0  m Pump head

35.0  m Static head 

L = 500.0  m Pipeline length

D = 250  mm Pipeline diameter = 0.250  m

t = 4.0  mm Pipe wall thickness = 0.0040  m

80.0  Total flow ( pump delivery capacity ) = 0.02222 

Pipe material :

1- water velocity in the pipe :

S = S =  3.14 x 0.250 x 0.250

0.04909--------------------- -------------------------------------------

V = 

V =0.02222 

0.452!2  m " s--------- ---------------------- =S 0.04909

2- Wave velocity :

a =1

  ----------------------------------------------------- 

1 $

D)

a : Wave velocity ( m sec )

1!!!  Water density

2E+009 %a compression elastisity modulus ( young"s modulus ) for water ( pa = nm#)$

2E+011 %a

g = %$&1  'cceleration of gravity 

a =1

1128.36  m"sec  ----------------------------------------------------------------

1000 x (1

 +0.250

)2.1E+009 0.00# x 2.1 E+11

H 0   =

  #  = m3 " h m3 " sec 

  #  = V x S 

  3.14 x D2 

m2 

  r x ( * water 

  x pipe

r = +g"m3

* water 

=

*  pipe

= Tension elastisity modulus ( young"s modulus ) for pipe material $( pa = nm #  )

m"sec 2 

Page 29: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 29/30

3- eriod o! vi"ration :

& =  2 x L

& =  2 x 500.00

0.89 sec ------------------ -------------------------- =  a 1128.4

#- Wave propa$ation :

%ta$e 1 : &epression wave

%ta$e 2 : &epression ret'rn wave%ta$e 3 : i$h press're wave

%ta$e # : i$h press're ret'rn wave

5- )i*e o! clos're t :

e!erin$ to the previo's para$raph :

 ,t sta$es 1 and 2 o! wave propa$ation a depression persist at one side o! chec valve

so that the chec valve still open at these sta$es .

)his *ean : !$&% sec 

- axi*'* press're variation :

  a x V  11#&$+ - !$+*,*#$1 m------------------  ......................... =

  g  %$&1

&  : eriod o! vi"ration

 t = T =

T  : eriod o! vi"ration

t  : hec valve closin$ ti*e .

4't in reality ( t  will "e less than ( T   "eca'se o! p'*p and chec valve inertia .

6! ( t   is less or e7'al to ( T   then the *axi*'* press're is $iven "y the !ollowin$ !or*'la :

Dh = Dh =

Page 30: Water Hamme

7/21/2019 Water Hamme

http://slidepdf.com/reader/full/water-hamme 30/30

- %teady state head !riction loss :

----- x ---------  D 2 g 

!$!##  1"1 8riction coe!!icient o! the pipe

L = 500  m Pipeline length

D = 250  mm Pipeline diameter = 0.250  m

V = 0.453 m " sec  /ean water velocity in the pipe

g = %$&1  'cceleration of gravity 

!$!## - 

  *!!$ !$+*, -!$+*,

!$+ m------------- x -------------------- =  !$#*! # - %$&1

)his press're is s'pposed to "e added to the static press're pl's the !riction head loss :

,*$!! 0 *#$! 0 !$+ = &$* m

Dhh!riction=

l  x 

 L V 2 

l  =

m"sec 2 

Dhfriction  =

H *ax

  H static

 + Dhha**er

+ Dh

 !riction

H *ax