UNDERGROUND CONSTRUCTION MANUAL
EARTHING Go to SECTION INDEX Back to MAIN INDEX
DESCRIPTION DWG
INDEX
60 5132 11
CONSTRUCTION CONSTRUCTION DESCRIPTION DWG
C. Noel
A. Bletchly
C
F
03.06.11 EARTHING03/06/11
T.Borg
5161/1
5161/2
11kV PADMOUNTED SUBSTATION
EARTHING CONSTRUCTION
EPM11/COM
EAU
EARU
EADDCU
5013/1
5013/2
EPM11/SEP
EAU
EARU
EADDCU
5014/1
5014/2
11kV & LV cable connection & GPO separate
5014/4
5014/3
22kV PADMOUNTED SUBSTATION
EARTHING CONSTRUCTION
EPM22/COM
EAU
EARU
EADDCU
22kV Padmounted substation common earth 5123/1
5123/2
EPM22/SEP
EAU
EARU
EADDCU
5125/1
5125/2
22kV Padmounted substation separate earth
22kV & LV cable connection & GPO separate 5125/3
PILLAR / DISTRIBUTION CABINET
EARTHING CONSTRUCTION
EAU
EARU
EMEN Electricity supply pillar and distribution cabinet 5085
5250
EARTHING CONSTRUCTION
ERMU11/COM
EAU
EARU
EADDCU
5221/1
5221/2
11kV Ring Main Unit common earth
D 14.01.14
5294/1
11kV Padmounted substation
Construction code guide - MEN and additional
earthing
Construction code guide - Padmounted
Substation & Ring Main Unit earthing
Minimum separation between Ergon earthing
systems, Telstra plant & fire hydrants
common earth arrangement - material
11kV Padmounted substation
common earth arrangement - material
separate earth arrangement - material
separate earth arrangement - material
earthing modifications Contract QESI No.30/98
11kV & LV cable connection separate earthing
modifications Contract No.2004/037/T
arrangement - material
22kV Padmounted substation common earth
arrangement
arrangement - material
22kV Padmounted substation separate earth
arrangement
earthing modifications Contract QESI No.30/98
arrangement - material
11/22kV Ring Main Unit common earth
arrangement
11/22kV Ring Main Unit separate earth
arrangement
11kV Padmounted substation
11kV Padmounted substation
5294/211/22kV Ring Main Unit separate earth
arrangement
E 19.05.16
EARTHING CONSTRUCTION
22/11kV PADMOUNTED AUTO TRANSFORMER
5353/1
5353/2
EPM22-11 22/11kV Padmounted Auto Transformer
earth arrangement - material
22/11kV Padmounted Auto Transformer
earth arrangement
5340/1
5340/2
11kV Padmounted substation
11kV Padmounted substation
common earth arrangement - material - community title
common earth arrangement - community title
22kV Padmounted substation common earth 5341/1
community title - materials
5341/3
5341/222kV Padmounted substation common earth
community title
22kV Padmounted substation common earth
community title
5125/4Separate earthing modifications
F 11.04.18
11kV RING MAIN UNIT
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EARTHING
5161
EXAMPLE:-
EARTH
E
21/11/01
E PM11/COM
SYSTEMVOLTAGEEQUIPMENT
PM = Padmount Substation
E PM11/COM = Earthing 11kV padmounted substation with common earth system
CONSTRUCTION CODE GUIDE
SEP = Separate Earth
COM = Common Earth
60 5161 22
detail drawings in this manual.
appears on relevant construction
Code shown within dashed box
A
B 18.3.11
C
RMU = Ring Main Unit
PADMOUNTED SUBSTATION & RING MAIN UNIT EARTHING - CONSTRUCTION CODE
PADMOUNTED SUBSTATION & RING MAIN UNITA.Bletchly
T.Borg
C.Noel
C 19.05.16
22-11 = 22kV to 11kV
22 = 22kV
11 = 11kV
}Omit for 22kV to 11kV
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
�L. Burton
��������������
20.4.11��������������
�
���������� ����� �
���������� ����� �
525060 5250 1
EARTHING
SYSTEMS, TELSTRA PLANT & FIRE HYDRANTS
MINIMUM SEPARATION BETWEEN ERGON EARTHING
2.0 meters
0.3 meters
0.3 meters
0.3 meters
10.0 meters0.3 meters
10.0 meters
10.0 meters
0.3 meters 0.3 metersPillar 1.0 meters
2.0 meters 0.3 meters
0.3 meters
10.0 meters
10.0 meters
2.0 meters
0.3 meters
0.3 meters
0.3 meters
0.3 meters
10.0 meters
10.0 meters
10.0 meters
A. Bletchly
C. Noel
Type of Earthing System
Communication Pillars / Cabinets
Cable pits / Manholes
Miscellaneous Earths
Payphones In Plastic Conduit
Cable Plastic Sheathed /
Jacketed
Telephone Exchange
Radio Sites
Street mounted
equipment housings
Padmount Transformer
CMEN
Ground Mounted
Transformer CMEN
SEPARATE
LV
HV
SEPARATE
LV
HV
Free Standing Switchgear
With HV earth bonded
to CMEN
Without HV earth bonded
to CMEN
Fire Hydrants
QUICK REFERENCE MINIMUM SEPARATIONS BETWEEN ERGON EARTHING SYSTEMS & COMMUNICATION PLANT
Communication Plant Types Communication Cable Types
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
15.0 meters - Note 1
NOTES:
1. NBN FDH site to be minimum 10.0m as per NBN Co. requirements.
�
B 13.02.12
B
HARD COPYUNCONTROLLED
�
�
�
�
�
�
�
�
�
�
�
�
A ORIGINAL ISSUE
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
�
�
�
�
��
�
�
�
�
���
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
������
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
Connection grid to earth bar
Earth rod additional
Earth rod additional depthAR
1
41.
2.
3.
EARTHING
2
5013
MATERIAL - COMMON EARTH
ASSY
525-1
526-1
ASSY
524-1
524-2
525-2
MATERIAL - ADDITIONAL EARTH
DESCRIPTION QTY
QTYDESCRIPTION
Earth - deep drilled526-2
Earth connector additional
COMMON EARTH - MATERIAL
Earth padmounted substation
160 5013 1
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
SEPARATION FROM COMMUNICATIONS:
5/2/03
For separation from other communications assets refer Standards Section.
ADDITIONAL EARTHING:
- Bare earth cable = 2.0m
- Earth rod = 2.0m
cabinets, cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/
B 28.04.14
C
C. Noel
A. Bletchly
T. Borg
Refer design.
Sites with high fault current may require less than 1.0 ohm connected.
of 200mm from the R.P. Street Alignment.
If required, locate in the Electricity Footpath Allocation at a minimum
communications.
below ground if necessary to achieve the required separation to
Bury at 200mm deep and provide orange caution tape laid 100mm
or
below ground if required separation to communications is achievable;
Bury at 500mm deep and provide orange caution tape laid 250mm
- Bare earth cable = 0.3m
- Earth rod = 0.3m
(conduit):
Provide the following minimum separation to communications cable
11kV PADMOUNTED SUBSTATION
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
35mm bare copper cable deep drilled to moisture.
Provide orange caution tape laid 250mm below ground over grading ring.
Site grading ring on footpath shall be laid 500mm below ground.
Refer drawing no 5014.
earth grid is connected to MEN then Separate LV earthing is required.
If the required resistance specified by design cannot be achieved when
C 22.10.15
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
PLAN
FO
OTP
AT
H
F FF
F F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
FF
F
F
F
FF F
FF
FF
F
F
F
F
F
F
F
F
F
F
F
1200-
A
if required shown thus.
Additional earthing
526-2
524-1 and 2 or
Assy selection
Alignment
R.P. Street
250(ref)
500
100
Assy 525-1
100
Boundary
Site
3000 b
oundary
100
100250
2800 boundary600
(Additional)
(Additional Rod)
(Deepdrilled, Cable)
A
-
Assy 525-2
Assy 525-1
edge beam
under concrete
Earth grid
50
Assy 526-1
Earth Bar
Substation
Earth Bar
Substation
Bar
LV Earth
Bar
Neutral
MEN.
N
DISCONNECTED
10 ohm Max.CONNECTED
Earth Bar
Substation
Assy 526-1
LV
HV
100
SECTION
5013
EARTHING
COMMON EARTH ARRANGEMENT
and 525-2
Assy 525-1
Construction Type
EPM11/COM
EAU
EARU
EADDCU
60 5013 22
Earth Grid
5/2/03B 28.04.14
D
C. Noel
A. Bletchly
T. Borg
11kV PADMOUNTED SUBSTATION
Deep drill 2
0.0
m Min.
Earth rod 8.0
m Min.
Additio
nal if req’d.
8.0
m Min. (R
od)
20.0
m Min. (D
eep Drilled)
(ref. note 2)
1 ohm Max.
orange
Caution tape
250
500
22.10.15C
11.04.18D
(ref)
365
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
Connection grid to earth bar
Earth rod additional
Earth rod additional depthAR
41.
2.
3.
EARTHING
2
MATERIAL - COMMON EARTH
ASSY
525-1
526-1
ASSY
524-1
524-2
525-2
MATERIAL - ADDITIONAL EARTH
DESCRIPTION QTY
QTYDESCRIPTION
Earth - deep drilled526-2
Earth connector additional
Earth padmounted substation
1
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
SEPARATION FROM COMMUNICATIONS:
For separation from other communications assets refer Standards Section.
ADDITIONAL EARTHING:
- Bare earth cable = 2.0m
- Earth rod = 2.0m
cabinets, cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/
C. Noel
A. Bletchly
T. Borg
Refer design.
Sites with high fault current may require less than 1.0 ohm connected.
of 200mm from the R.P. Street Alignment.
If required, locate in the Electricity Footpath Allocation at a minimum
- Bare earth cable = 0.3m
- Earth rod = 0.3m
(conduit):
Provide the following minimum separation to communications cable
11kV PADMOUNTED SUBSTATION
Provide orange caution tape laid 250mm below ground over grading ring.
Site grading ring on footpath shall be laid 500mm below ground.
Refer drawing no 5014.
earth grid is connected to MEN then Separate LV earthing is required.
If the required resistance specified by design cannot be achieved when
534060 5340 1
25/08/15
COMMON EARTH - MATERIAL - COMMUNITY TITLE
2
below ground.
Bury at 500mm deep and provide orange caution tape laid 250mm
separation shall be minimum 40m.
twice the depth of the drilled hole, e.g. for 20m hole
The separation between earth rods shall be at least
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
35mm bare copper cable deep drilled to moisture.
4.
side-by-side, but not using the same bolt.
Tails for earth mat are to be connected to substation earth bar
5.
be spaced minimum 4m.
2 x earth rods depth from previous rods, e.g. single earth rods shall
Additional earth rods should be installed with minimum separation of
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
F FF
F F
F
(Additional)
(Additional Rod)
(Deepdrilled, Cable)A
-
Assy 525-2 Assy 525-1
orange
Caution tape
50
Assy 526-1
Earth Bar
Substation
Earth Bar
Substation
Bar
LV Earth
Bar
Neutral
MEN.
N
DISCONNECTED
10 ohm Max.CONNECTED
SECTION
EARTHING
Construction Type
EPM11/COM
EAU
EARU
EADDCU
2
Earth Grid
5/2/03B 28.04.14
C. Noel
A. Bletchly
T. Borg
11kV PADMOUNTED SUBSTATION
(ref. note 2)
1 ohm Max.
C 6.8.15
earth grid
HV / LV
alignment
R.P. street
5000
4800
PLAN
300
534060 5340 2
COMMON EARTH ARRANGEMENT - COMMUNITY TITLE
1300 1300
400
1065
1065
500
250
earth bar
Substation
526-2
524-1 & 2 or
Assy Selection
Assy 525-1 & 2
(refer note 4)
Assy 526-1
Assy 525-1
A
of note 5
shall be as per requirements
Separation between earth rods
Additional earthing as req’d.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EARTHING
5014
Connection grid to earth bar
Connection L.V. earth to earth bar
Earth rod additional
Earth rod additional depthAR
1
1
5
1.
2.
MATERIAL - SEPARATE EARTH
ASSY
525-1
526-1
545-1
MATERIAL - ADDITIONAL EARTH
ASSY
524-1
524-2
525-2
DESCRIPTION
DESCRIPTION QTY
QTY
Earth - deep drilled526-2
Earth connector additional
SEPARATE EARTH - MATERIAL
NOTES:
3.Refer sheet 3 for separate earthing modifications.
Earth padmounted substation
60 5014 11
4.1
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
2
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
1.
SEPARATION FROM COMMUNICATIONS:
For separation from other communications assets refer Standards Section.
5/2/03
ADDITIONAL L.V. EARTHING:
ADDITIONAL H.V. EARTHING:
B 10.10.05
D
564-50
558-10 Conduit bend H.D. 40 dia. 300R
Conduit UPVC 40dia. H.D. orange AR
C 28.04.14
C. Noel
A. Bletchly
T. Borg
11kV PADMOUNTED SUBSTATION
- HV earth cable (site earth) = 15.0m
- HV earth rod = 15.0m
- LV earth rod or cable = 0.3m
cabinets, cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/
- HVearth cable (site earth) = 0.3m
- LV earth rod or cable = 0.3m
(conduit):
Provide the following minimum separation to communications cable
If required, Refer detail on sheet 2.
resistance to earth values shown. Refer design.
"Frequented" or "Special" sites - Earth system may require less than the
Extend conduit and bend 300mm beyond H.V. earth cable.
L.V. earth cable in 40mm dia. heavy duty PVC conduit and 90� 300R
from the R.P. Street Alignment.
If required, locate in the Electricity Footpath Allocation at a minimum of 200mm
ground if necessary to achieve the required separation to communications.
Bury at 200mm deep and provide orange caution tape laid 100mm below
or
ground if required separation to communications is achievable;
Bury at 500mm deep and provide orange caution tape laid 250mm below
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
35mm bare copper cable deep drilled to moisture.
Provide orange caution tape laid 250mm below ground over grading ring.
Site grading ring on footpath shall be laid 500mm below ground.
D 23.05.16
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
Connection grid to earth bar
6
2
Earth rod additional
Earth rod additional depthAR
EARTHING
22kV PADMOUNTED SUBSTATION
MATERIAL - COMMON EARTH
ASSY
525-1
526-1
DESCRIPTION QTY
QTYDESCRIPTIONASSY
524-1
524-2
525-2
MATERIAL - ADDITIONAL EARTH
5123
Earth - deep drilled526-2
Earth connector additional
COMMON EARTH - MATERIAL
Earth padmounted substation
60 5123 11
2513-1 Connection earth bar to cover plate
AR
QTYDESCRIPTIONASSY
513-5
MATERIAL - PLATFORM EARTH
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
2
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
NOTES:
1.
2.
3.
of 300mm from the R.P. Street Alignment.
If required, locate in the Electricity Footpath Allocation at a minimum
communications.
below ground if necessary to achieve the required separation to
Bury at 200mm deep and provide orange caution tape laid 100mm
or
below ground if required separation to communications is achievable;
Bury at 500mm deep and provide orange caution tape laid 250mm
SEPARATION FROM COMMUNICATIONS:
- Bare earth cable = 0.3m
- Earth rod = 0.3m
(conduit):
Provide the following minimum separation to communications cable
- Bare earth cable = 2.0m
- Earth rod = 2.0m
cabinets, cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/
For separation from other communications assets refer Standards Section.
ADDITIONAL EARTHING:
Connection earth bar to service platform
B
D
10.10.055/2/03
C 28.04.14
C. Noel
A. Bletchly
T. Borg
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
35mm bare copper cable deep drilled to moisture.
Refer design.
Sites with high fault current may require less than 1.0 ohm connected.
is required. Refer drawing No. 5125.
the earth grid is connected to the system MEN then separate LV earthing
If the required resistance specified by design cannot be achieved when
D 22.10.15
over grading ring.
below ground. Provide orange caution tape laid 250mm below ground
cable (conduit) lay the section of grading ring on the footpath 500mm
If necessary to achieve the required separation to communications
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
PLAN
FO
OTP
AT
H
-
-
F
FF
F
F
FF
FF
F
F
F
F
F
F
F
F
F
F
F
F
F
FF
EARTHING
22kV PADMOUNTED SUBSTATION
COMMON EARTH ARRANGEMENT
Assy 525-2 Assy 525-1
Alignment
R.P.Street
Assy 525-1
6000 boundary
526-2
524-1 and 2 or
Assy selection
if required shown thus.
Additional earthing if required.
Additio
nal
4000 b
oundary
orange
tape
Caution
Boundary
Site
Earth Bar
Substation
Bar
L.V. Earth
MEN.
DISCONNECTED
10 ohm Max.
CONNECTED
500
250
SECTION A
A
5123
and 525-2
Assy 525-1
N
60 5123 22
EPM22/COM
EAU
EARU
EADDCU
Construction Type
(Additional)
(Additional Rod)
(Deepdrilled, Cable)
Assy 513-1
Assy 513-5
Earth Grid Earth Grid
Neutral Bar
F
Refer Note 1.
B
D
513-5
Assy
F
H.V.
F
F
L.V.513-1
Assy
F
Assy 513-5
Bar
L.V. Earth
F
Earth Bar
StationF
Assy 513-1
Assy 513-5 Assy 526-1
Assy 526-1
F
F
Earth Bar
Station
Assy 513-1
F
21.4.045/2/03
C 28.04.14
C. Noel
A. Bletchly
T. Borg
8.0
m Min. (R
od)
20.0
m Min. (D
eep Drilled)
Deep drill 2
0.0
m Min.
Earth rod 8.0
m Min.
(ref. note 2)
1 ohm Max.
F
F
300
F
F300
F
F
Line
Ground
1390
F
F
300
F 1800F
D 15.06.15
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
Connection grid to earth bar
6
2
Earth rod additional
Earth rod additional depthAR
EARTHING
22kV PADMOUNTED SUBSTATION
MATERIAL - COMMON EARTH
ASSY
525-1
526-1
DESCRIPTION QTY
QTYDESCRIPTIONASSY
524-1
524-2
525-2
MATERIAL - ADDITIONAL EARTH
Earth - deep drilled526-2
Earth connector additional
Earth padmounted substation
1
2513-1 Connection earth bar to cover plate
AR
QTYDESCRIPTIONASSY
513-5
MATERIAL - PLATFORM EARTH
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
NOTES:
SEPARATION FROM COMMUNICATIONS:
For separation from other communications assets refer Standards Section.
ADDITIONAL EARTHING:
Connection earth bar to service platform
C. Noel
A. Bletchly
Refer design.
Sites with high fault current may require less than 1.0 ohm connected.
is required. Refer drawing No. 5125.
the earth grid is connected to the system MEN then separate LV earthing
If the required resistance specified by design cannot be achieved when
HARD COPYUNCONTROLLED
534160 5341 1L. Burton
25/8/15
COMMON EARTH - MATERIAL - COMMUNITY TITLE
- Bare earth cable = 0.3m
- Earth rod = 0.3m
(conduit):
Provide the following minimum separation to communications cable
- Bare earth cable = 2.0m
- Earth rod = 2.0m
cabinets, cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/
of 300mm from the R.P. Street Alignment.
If required, locate in the Electricity Footpath Allocation at a minimum
1.
2.
shall be minimum 40m
the depth of the drilled hole. E.G. for 20m hole spearation
The separation between earth rods shall be at least twice
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
35mm† bare copper cable deep drilled to moisture.
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
below ground.
Bury at 500mm deep and provide orange caution tape laid 250mm
3.
be spaced min 4.0m.
2 x earth rods depth from previous rods. E.G. Single earth rods shall
Additional earth rods should be installed with minimum separation of
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
PLAN
FO
OTP
AT
H
-
F
F
F
FF
F
F
F
EARTHING
22kV PADMOUNTED SUBSTATION
Assy 525-1A
2
H.V.
F
F
L.V.F
Assy 513-5
F
F
Assy 513-1
Assy 513-5 Assy 526-1
Assy 526-1
F
F
C. Noel
A. Bletchly
HARD COPYUNCONTROLLED
L. Burton
26/8/15
4600 b
oundary
Alignment
R.P.Street
526-2
524-1 and 2 or
Assy selectionBoundary
Site
and 525-2
Assy 525-1
513-1
Assy
Bar
L.V. Earth
Earth Bar
Station
COMMON EARTH - COMMUNITY TITLE
Refer sheet 3 for Section A.
6700 boundary
300
300
400
300
534160 5341 2
be as p
er re
quire
ments of note 3.
Separation b
etw
een e
arth rods s
hall
Additio
nal earthin
g as required.
F
FF
MEN.
DISCONNECTED
10 ohm Max.
N
Earth Grid Earth Grid
Neutral Bar
(ref. note 2)
1 ohm Max.
Earth Bar
Substation
Bar
L.V. Earth
CONNECTED
1100
2100
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
-
EARTHING
22kV PADMOUNTED SUBSTATION
Assy 525-2 Assy 525-1
SECTION A
EPM22/COM
EAU
EARU
EADDCU
Construction Type
(Additional)
(Additional Rod)
(Deepdrilled, Cable)
Assy 513-1
Assy 513-5
Assy 513-1
C. Noel
A. Bletchly
L. Burton
26/8/15
G.L.
Earth Bar
Station
Orange
Caution Tape
Assy 513-5
250500
COMMON EARTH - COMMUNITY TITLE
Refer sheet 2 for plan view
360 5341 3
5341
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
EARTHING
22kV PADMOUNTED SUBSTATION
1.
2.
Earth - deep drilled
Earth rod additional depth
Earth rod additional
AR
1
1
7
MATERIAL - SEPARATE EARTH
ASSY
525-1
526-1
545-1
MATERIAL - ADDITIONAL EARTH
ASSY
524-1
524-2
526-2
DESCRIPTION QTY
QTYDESCRIPTION
5125
SEPARATE EARTH - MATERIAL
Earth padmounted substation
Connection grid to earth bar
Connection L.V. earth to earth bar
3.Refer sheet 3 for separate earthing modifications.
60 5125 11
AR
QTYDESCRIPTIONASSY
513-5
MATERIAL - PLATFORM EARTH
2513-1 Connection earth bar to cover plate
1
4.
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
2
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
SEPARATION FROM COMMUNICATIONS:
For separation from other communications assets refer Standards Section.
5/2/03
Connection earth bar to service platform
B
D
ground if necessary to achieve the required separation to communications.
Bury at 200mm deep and provide orange caution tape laid 100mm below
or
ground if required separation to communications is achievable;
Bury at 500mm deep and provide orange caution tape laid 250mm below
- HV earth cable (site earth) = 15.0m
- HV earth rod = 15.0m
- LV earth rod or cable = 0.3m
cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/cabinets,
from the R.P. Street Alignment.
If required, locate in the Electricity Footpath Allocation at a minimum of 300mm
Extend conduit and bend 300mm beyond H.V. earth cable.
L.V. earth cable in 40mm dia. heavy duty PVC conduit and 90� 300R
resistance to earth values shown. Refer design.
"Frequented" or "Special" sites - Earth system may require less than the
- HVearth cable (site earth) = 0.3m
- LV earth rod or cable = 0.3m
Provide the following minimum separation to communications cable (conduit):
If required, Refer detail on sheet 2.
ADDITIONAL L.V. EARTHING:
ADDITIONAL H.V. EARTHING:
10.10.05
564-50 Conduit UPVC 40 dia. H.D. orange
558-10 Conduit bend H.D. 40 dia. 300R
AR
C. Noel
A. Bletchly
T. Borg
C 28.04.14
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
35mm bare copper cable deep drilled to moisture.
D 23.05.16
grading ring.
ground. Provide orange caution tape laid 250mm below ground over
(conduit) lay the section of grading ring on the footpath 500mm below
If necessary to achieve the required separation to communications cable
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
PLANF
OO
TP
AT
H
F
F
F
F
F
F
F
F
F
F
EARTHING
22kV PADMOUNTED SUBSTATION
SEPARATE EARTH ARRANGEMENT
Assy 525-1
LV E
arth
if required.
Additio
nal
4000 b
oundary
526-2
524-1 and 2 or
Assy selection
Alignment
R.P.Street
6000 boundary
L.V.
Bar
Neutral N
CONNECTED
(ref. note 2)
10 ohm Max.
5125
Assy 526-1
Assy 525-1 2 700
F
F
Bar
LV Earth
Bar
Main Earth
F
F
H.V.
F
F
EPM22/SEP
EAU
EARU
EADDCU
Construction Type
(Additional)
(Additional Rod)
(Deepdrilled, Cable)
60 5125 22
545-1
Assy
F
Assy 513-1
F
MEN.
DISCONNECTED
10 ohm Max.
F
F
F
F
Deep drill 2
0.0
m Min.
Earth rod 8.0
m Min.
F
F
F
Grid
Earth
Earth
L.V.
513-1
Assy
F
Assy 513-5
F
barrier kerb
Outline of concrete
5/2/03
Refer note 1F
35mm
hard drawn
Cable, PVC
B
D
F
Earth Bar
Station
F
Assy 513-5
526-2
524-1 and 2 or
Assy selection
F
FF
F
F
to earth cable/rod/deep drill hole.
Provide min.2.0m from site side & rear boundries
PADMOUNTED SUBSTATIONS dwg No. 5177.
Confine within clearance zone as shown in
Additional HV earthing if required shown thus.
10.10.05
2.2
mif required
Additio
nal
Min.
300
300
300 Min.
Assy 558-10
F
Refer note 4
Assy 564-50
C 06.05.14
C. Noel
A. Bletchly
T. Borg
8.0
m Min. (R
od)
20.0
m Min. (D
eep Drill)
D 23.05.16
F
F2100
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
22/11/01
1
Assy 552-2
EARTHING
5125
ASSY
552-2
MATERIAL
DESCRIPTION QTY
SEPARATE EARTHING MODIFICATIONS
Attach CAUTION label Assy 552-3 to inside face of LV door.
WARNING
EARTHINGSEPARATE HV & LV
TO THIS TRANSFORMER
NOT BE USED ADJACENT
240V APPLIANCES MUST
NOT BE REPLACED BY A GPO
THIS WARNING NOTICE MUST
FRAME TO ANY METALLIC SURFACE
CLEARANCE FROM TRANSFORMER
MAINTAIN A TWO METRE MIN.
1552-3
Warning label
Caution label
Neutral Bar
required and the following modifications shall be made.
earth value is not achieved, separate LV earthing is
Where the specified combined HV and LV resistance to
Neutral Bar
F
F
60 5125 33
22kV AND LV CABLE CONNECTION AND GPOB 30.06.15
B
C. Noel
A. Bletchly
T. Borg
Connect LV earth (insulated cable) to LV Earth Bar.
Station Earth Bar.
HV earth (bare cable) is to remain connected to the
1.
2.
3.
4.
5.
Remove link between station earth bar and LV earth bar.
F
label Assy 552-2 near GPO mounting position.
insulating panel to cover openings and fit WARNING
Remove lights and make wiring safe. Install
from frame
insulated
LV Earth Bar
F
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
23/05/16EARTHING
5125
SEPARATE EARTHING MODIFICATIONS
C. Noel
A. Bletchly
T. Borg 460 5125 4
22kV PADMOUNT SUBSTATION
SECTIONLV
SECTIONTRANSFORMER
TRANSFORMER FRAME LV FRAME
RM6 MV SECTION
RM6 FRAME
KIOSK EARTH BAR
F
Refer note 1, sheet 3.Link to be removed.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
Earth rod additional
Earth rod additional depthAR
1
1.
524-2
524-1
ASSY
MATERIAL - ADDITIONAL EARTH
505-1
ASSY
MATERIAL - COMMON EARTH
DESCRIPTION QTY
DESCRIPTION QTY
EARTHING
5085
ELECTRICITY SUPPLY PILLAR AND
DISTRIBUTION CABINET
1505-2
Earth MEN to LV pillar
2.
NOTES:
60 5085 1
5/2/03
1.
SEPARATION FROM COMMUNICATIONS:
B 10.09.14
D
C. Noel
A. Bletchly
T. Borg
- 2 & 6 module or Flood zone pillar
Earth MEN to LV distribution cabinet
C 15.06.15
LV connected resistances apply at all locations.
1
3.
f
f
f
f
F
f
F
F
F
F
Finished Ground Line
Caution Tape
250
4.0m Min. (Single rod)
8.0m Min. (Double rod)
N
End of feeder - 10 ohm Max.
Elsewhere - 30 ohm Max.
L.V. DISCONNECTED
Min
500
524-1 and 2
524-2 or
Assy Selection
505-1 or 2
Assy Selection
(shown)
Electricity Supply
Pillar (tall)
Common MEN System - 1 ohm Max.
Separate MEN System - 10 ohm Max.
- Distribution Cabinet
- Commercial and Industrial Pillar
- Linking Pillar
An earth must be fitted at every:
customer’s switchboard.
circuit, but be no further than 180m from the furthermost
An earth must be fitted at every 4th supply pillar on a
pillars are not normally earthed.
radial feed of the main’s cable. 240mm† Al. crossroad
An earth must be fitted at the end supply pillar of each
allocation at a minimum 200mm from the R.P. street alignment.
All earthing shall be located in the electricity footpath
EMEN
EAU
EARU (Additional Rod)
(Additional)
Construction Type
23.02.17D
L.V. CONNECTED
if required (refer note 4)
Additional earthing
refer Standards Section.
For separation from other communications assets
- LV earth rod or cable = 0.3m
miscellaneous earths:
cable pits/manholes, payphones or
communications cable (conduit), pillars/cabinets,
Provide the following minimum separation to
4.
however can be just the earth cable buried in the trench.
Additional earthing can include additional earth electrodes,
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
EARTHING
529460 5294 2
11/22kV RING MAIN UNIT
SEPERATE EARTH ARRANGEMENT
C. Noel
29.04.14
A. Bletchly
T. Borg 2
PLAN
FO
OTP
AT
H
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
Grid
Earth
Assy 526-1
526-2
524-1 and 2 or
Assy selection
Alignment
R.P. Street
100
Assy 525-1
100
3000 b
oundary
100
100
2800 boundary
100CONNECTED
and 525-2
Assy 525-1
ERMU22/SEP
EAU
EARU
EADDCU
(Additional)
(Additional Rod)
(Deepdrilled, Cable)
Construction Type
surround slab
Outline of concreteF
2.0
m
if required
Additio
nal
FEarth Bar
Switchgear
ERMU11/SEP
Assy 526-1
875F
F100
715
F250
(ref. note 1)
10 ohm Max.
HARD COPYUNCONTROLLED
B 05.08.14
B
edge beam
under concrete
Earth grid
Assy 525-1
Assy 525-2
SECTION A
-
200
100
Assy 526-1
orange
Caution tape
Assy 526-1
boundaries to earth cable/rod/deep drill hole.
Provide min. 2.0m from site side & rear
HV SWITCHGEAR dwg No. 5290.
Confine within clearance zone as shown in
Additional HV earthing if required shown thus.
A
-
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
6
2
AR
EARTHING
MATERIAL - COMMON EARTH
ASSY DESCRIPTION QTY
QTYDESCRIPTIONASSY
525-2
MATERIAL - ADDITIONAL EARTH
Earth connector additional
COMMON EARTH - MATERIAL
1
DEEP DRILL EARTHING:
DEEP DRILL EARTH TESTING:
2
earthing added as necessary.
installation shall be tested after 7 days and additional
is not achieved prior to completion of work on site the
days after earthing is installed. Where specified resistance
Specified earth resistance may not be achieved for some
NOTE:
1.
SEPARATION FROM COMMUNICATIONS:
For separation from other communications assets refer Standards Section.
ADDITIONAL EARTHING:
C. Noel
A. Bletchly
T. Borg
enhancing compound. Do not add water.
The holes are to be refilled immediately with dry earth
A drilling rig using 75mm bit is required.
(minimum of 20m unless good moisture is reached).
70mm bare copper cable deep drilled to moisture.
Refer design.
Sites with high fault current may require less than 1.0 ohm connected.
535360 5353 1
22/11kV PADMOUNTED AUTO TRANSFORMER05.02.16
- Bare earth cable = 0.3m
- Earth rod = 0.3m
(conduit):
Provide the following minimum separation to communications cable
524-2
524-3
Earth rod additional depth
Earth rod additional - suit 70mm† cable
526-4 Earth - deep drilled to suit 70mm† cable
525-3 Earth Padmounted Auto Transformer
526-3 Connection grid to earth bar - 70mm† cable
earth cable / rod / deep drilled hole.
Provide minimum 2.0m from site side and rear boundaries to
clearance zone as shown in Padmounted Substation drawing no. 5357.
Additional earthing if required shall be as per sheet 2. Confined within
- Bare earth cable = 15.0m
- Earth rod = 15.0m
cabinets, cable pits/manholes, payphones or miscellaneous earths:
Provide the following minimum separation to communications pillars/
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION
PLAN
-
F F
F
F
EARTHING
COMMON EARTH ARRANGEMENT
Earth Bar
Substation
10 ohm Max.
SECTION A
2
EAU
EARU
EADDCU
Construction Type
(Additional)
(Additional Rod)
(Deepdrilled, Cable)
Earth Grid Earth Grid
C. Noel
A. Bletchly
T. Borg 535360 5353 2
05.02.1622/11kV PADMOUNTED AUTO TRANSFORMER
F
F
F
F
if required shown thus.
Additional earthing
7000 boundary
Line
Ground
500
250
F
F
F
orange
tape
Caution
F
F
FO
OTP
AT
H
-
A
6000 b
oundary
Assy 525-2 Assy 525-3
526-2
524-2 and 3 or
Assy selection
and 525-2
Assy 525-3
F
Assy 525-3
F
Assy 526-3
Earth Bar
Substation
CONNECTED
(ref. note 1)
barrier kerbOutline of concrete
EPM22-11
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
FILE: 5
UNDERGROUND DISTRIBUTION