DPWandYOU.com | Making a difference, together DPWandYOU.com | Making a difference, together TRAIL FEASIBILITY STUDY BWI TO ODENTON Feasibility Study, Route Selection, and Conceptual Design September 2020

TRAIL FEASIBILITY STUDY BWI TO ODENTON...Feasibility Study Objectives 5 1. Introduce Potential Alignment and Gather Community Input 2. Evaluate & Quantify Impacts: A. Right of Way;

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • DPWandYOU.com | Making a difference, togetherDPWandYOU.com | Making a difference, together

    TRAIL FEASIBILITY STUDYBWI TO ODENTON

    Feasibility Study, Route Selection, and Conceptual Design

    September 2020

  • DPWandYOU.com | Making a difference, together

    1. Purpose of Study2. Project Goals and Objectives3. Project Limits and Potential

    Routes4. Trail Connectivity5. How Potential Trail Routes

    will be Compared6. Study Schedule and Next

    Steps7. Public Input and Survey

    Presentation Outline

    2

  • DPWandYOU.com | Making a difference, together

    Study Project PurposeSelect a route and a conceptual design for a separated and dedicated shared use path to provide bike/pedestrian travel between the BWI Trail and the existing & planned Odenton Town Center master-planned trail system and the adjacent WB&A trail.

  • DPWandYOU.com | Making a difference, together

    Project Goals & Benefits

    • Build a comfortable and accessible trail connecting Odenton and the WB&A trail to the BWI trail that is buffered from any adjacent roadway.

    4

    Project Goal

    • Providing walking/biking alternatives to work, school, recreation, and bus stops that are dedicated and separated from any adjacent roadway

    • Promote health and increased physical activity• Provide alternative options to driving

    • Environmental benefits• Lower car ownership costs

    • Enhanced recreational options for residents and visitors

    Benefits

  • DPWandYOU.com | Making a difference, together

    Feasibility Study Objectives

    5

    1. Introduce Potential Alignment andGather Community Input

    2. Evaluate & Quantify Impacts:A. Right of Way; Safety at roadway

    crossings; Environmental;3. Choose a Preferred Alignment4. Develop several potential neighborhood

    Connecting Routes5. Develop Conceptual Design plan6. Document Process for Next Steps

    A. Community InputB. AnalysisC. Design AssumptionsD. Cost and Potential Phasing of path segments

  • DPWandYOU.com | Making a difference, together

    Project Limits and Route Alternatives

    6

    North Project Limit – BWI TrailSouth Project Limit – WB&A Trail at Odenton Road

    A

    B

    B4B5

    B1 B2 B3

    Two Potential Routes A. Telegraph RoadB. WB&A Road

    B1 – Odenton Road to WB&A Road via TelegraphB2 – Odenton Road to WB&A Road via MD 32 CulvertsB3 – Odenton Road to WB&A Road via Sappington Station / Burns Crossing / Old Mill RdB4 – Crossing MD 100 along WB&A Road overpassB5 – Crossing MD 100 along Queenstown Road overpass

    Detailed PDF Maps on Website

  • DPWandYOU.com | Making a difference, together

    ARUNDEL MILLS

    7

    Study Area & Trail Network

    Study Area

    End of WB&A Trail

    MD 175 Shared-use

    Path

    Arundel Mills Blvd Shared-Use Path

    Odenton Town Center Shared-use

    Path

    Planned Reece Road Trail

    Planned South Shore Trail Extension

    WB&A Road Route

    Telegraph Road Route

    OTC / MARC

    Planned Dorsey Rd Trail

  • DPWandYOU.com | Making a difference, together

    Proposed Trail Cross-sectionFeatures IncludeA. 10’ wide PathB. Buffer from Roadway

    1. ≥6' preferred (4' min.)2. Planted swale for stormwater management

  • DPWandYOU.com | Making a difference, together

    Analyzing Each Route

    9

    • Analyze the following impacts and needs for each route alignment option

    • Public Feedback and Preference• Safety of path users crossing at-grade

    roadways / intersections • Overall Cost to Construct

    • Utility Relocation• Drainage / Structures

    • Right of Way • Stormwater needs• Environmental• Ability to Connect to:

    • Neighborhoods • Commercial/Recreational/Institutional

    Amenities• Other Regional Existing/Planned trails

  • DPWandYOU.com | Making a difference, together

    Next Steps and Project Phases

    10

    Overall Project Approach Steps1. Planning Phase

    a) Preferred Route Selection, Public Input, Rough Details.

    b) Determine Impacts on Property, Traffic, Environment.

    2. 30% Design Phasea) Public Input on Design / trail head

    locationsb) Property and Utility Survey c) Detailed Design. d) Obtain all Permits.

    3. Final Construction Drawings4. Obtain Funding5. Phasing of Construction

    a) Entirety of Project is Unlikely to be Funded and/or Constructed at Once.

    b) Prioritization within all other trail projects.

    Construction

    Study

    Design

    Funding

    2 to 10Years Away

    PublicInput

    PublicInput

    Fall 2019 to Spring 2020

    • Preferred Route• Conceptual

    Design• Study Report

  • DPWandYOU.com | Making a difference, together

    We Want to Hear From You

    Let us know your ThoughtsSafety ConcernsEnvironmental ConcernsRight of Way ImpactsLikes / Dislikes

    Your Feedback will Shape:Preferred Route AlignmentDesign DetailsFuture Construction Phases / Which Parts Should get Built first?

    11

    Multiple Ways to Provide FeedbackContact DPW Directly

    Mailing AddressAttn: Adam Greenstein,Anne Arundel County Capital Project2525 Riva Road, Suite 120, Mailstop 5116Annapolis, MD 21401Email: [email protected]: (443) 569-9587

    On-line FeedbackCounty Project Website SURVEY

    mailto:[email protected]

  • DPWandYOU.com | Making a difference, together

    Survey

    12

    Take our Survey:CLICK HERE FOR SURVEY

    @AACoDPW

    www.facebook.com/annearundeldpw

    http://survey.constantcontact.com/survey/a07ehbl24zbkffv3evq/starthttps://twitter.com/aacodpw?lang=enhttp://www.facebook.com/annearundeldpw

    Slide Number 1Presentation OutlineStudy Project PurposeProject Goals & BenefitsFeasibility Study ObjectivesProject Limits and Route AlternativesSlide Number 7Proposed Trail Cross-sectionAnalyzing Each RouteNext Steps and Project PhasesWe Want to Hear From YouSurvey