EV GroupTemporary Bonding – HVM Concerns

Markus WimplingerCorporate Technology Development and IP [email protected]

To be presented at the “Enabling 3D: Temporary Bonding Workshop” by Sematech, July 11th 2011

Page 2: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

EVG TB/DB History of Innovation

2000

EVG850TBthermal release Tapes

up to 8“

EVG850DBthermal release Tapes

up to 8“ EVG850TB/DBFilmFrame Mounting

up to 6“

EVG850TBWax-Bonder

up to 6“

EVG850TBLw/ Tape Lamination

up to 4“ EVG850DBSlide-Off DeBonder

up to 4“

EVG850TB/DBBrewer HT 8“

EVG850TB/DBBrewer HT 12“

2002 20082004 2006 2010

ZoneBONDTM2010

Page 3: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Customer’s Requirements

Low Cost TB / DB does not add value to the product. The potential for differentiation of TB / DB technology

lies in its capability to enable cost reduction for 3D IC related process steps

Very High Yield Mature Technology Integrates well with Customer Process Flow Infrastructure / Supply Chain established

Page 4: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Temporary Bonding / Debonding Process Flow

EVG850TB EVG850DB

(Immediate) Re-use of Carrier Wafer

Proc

ess

Inte

grat

ion

Page 5: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Choices to be made…

In what order shall the choices be made? …From fundamental issues to more specific

issues… Carrier Selection Adhesive Selection TB / DB Method Handling Strategy for Debonding Edge Protection Strategy Metrology Strategy

Page 6: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Easy, any Si-wafer can be used

Challenging, usage of new material required

Logistics, further internal use

OK. Standard and qualifiedtoday

Backside alignment via IR light

multiple times typically > 100x

75-200 Wx(mxK)-1

Perfect match to Si

Silicon

ChallengingElectrostatic Chucking

Backside alignment via visible light

Double Side Lithography

multiple times typically > 100x

Re-usability

1,2 Wx(mxK)-1Thermal Conductivity

Good match to SiThermal Expansion

Glass (Borofloat, Pyrex)

Comparison of Si and Glass Carriers for Thinned Si Wafers

Page 7: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Carrier Selection

Si or Reclaim Si IntegrationSi or Reclaim Si Infrastructure

Si or Reclaim Si Maturity AnyHigh YieldReclaim Si Low Cost Options:

• Glass Carrier• PerforatedGlass

• Si Carrier • Reclaim Si

Si carriers or reclaim Si carriers seem to become thepreferred option by customers due to the benefitsprovided. Not all TB / DB technologies are compatible with Si carriers however.

Page 8: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Adhesive Selection

ThermoplasticIntegrationThermoplasticInfrastructure

? Maturity ? High Yield? Low Cost Options:

• Thermoplastic• Cross-linking

• EVG‘s focus is on thermoplastic adhesives mainlydue to advantages with regards to process integration.

• A broad supply chain for thermoplastic adhesiveshas always been available and is available foradvanced, high temperature thermo-plastic adhesives.

(i.e. Brewer Science Inc.)

good chance!

good chance!

good chance!

Page 9: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Thermoplastic Adhesive TB DB Technologies

Solvent Release DBTechnology with perforatedcarriers

Slide DB Technology with blankedwafers

ZoneBondTM DB Technology with blanked (treated) carriers

Limitations:- Expensive carriers - Perforated carriers- Typically glass carriers- Slow DB process- Risk of adh. squeeze through during bonding- High solvent consumption

Limitations: - DB process at elevated

temperature - Thermal stability of adhesive

linked to DB temperature- Scalability to larger wafer size (450mm)

Limitations:- None

Potential: Development of specialized adhesives

Page 10: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Untie Max Process Temp. from Debond Temp.30

0

Technology

200

100

T[°C]

Slide-off Debond RT DebondZoneBondTM

DB Temp

Max Process Temp

ZoneBONDTM

Page 11: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Carrier Selection & Preparation:

• Si and glass as carrier materials are feasible

• Flexibility on dimensions

• Simple surface treatment to reduce adhesion to adhesive in center zone.

Page 12: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Compatibility with Product Wafers:

• Compatibility to product wafers with varying topographyTypical wafer topography:

• <10µm / ~40µm / ~80µm

• The same adhesive will work for different product wafer surfaces. No adhesive modification required.

Page 13: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Edge Protection Strategy:

• For same size carrier wafers, edge trimming is highly recommended to ensure optimized edge quality

Page 14: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Adhesive Coating:

• Either carrier wafer or product wafer may be coated with adhesive

• Adhesive selection based on process requirements

• Adhesive thickness may be adjusted according to product wafertopography.

Aspects of the

concept are both

patent pending

and patented

Page 15: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Bonding:

• Thermal bonding process

4µm3µm1µm

Q4 2011

3µm6 ~ 8µm100µm2µm4µm50µm1µm2µm20µm

Q2 2012TTV todayBondline

Page 16: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Wafer Thinning:

• Usually performed by rough grinding and fine grinding & stress relief (wet / dry etching and / or polishing).

• Rigid support during backgrinding and polishing is critical. Only fulfilled by thermoplastic adhesives and non-perforated

carriers today.

Page 17: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Backside processing – typical process steps:- Reflow- Cleaning- CMP

- W2W Bonding- (PE) CVD- Sputtering- Electroplating

- Etching- Lithography- Dielectric curing- C2W attach

Thermo-mechanical stability of adhesives is the biggest challenge today.

Page 18: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Dicing Frame mounting of entire bonded stack prior to Debond:

• Most reliable way of handling thin wafer during Debondingoperation.

Patented

Process Flow

Page 19: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Edge Zone Release - EZR® Process:

• Dissolve adhesive at the wafer edge using solvent

• Dissolution speed enhanced by Megasonics

• 10 to 15 uph* per process module are achievable. * For optimized processes.

Hardware & process

solution patent

pending

Page 20: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Edge Zone DeBond - EZD® Process:

• Load assembly onto EZD® station

• Lift off carrier wafer

• Cycle time < 90 sec. feasible

• Separation always between adhesive and carrier. Separation process independent of device wafer surface!

Hardware & process

solution patent

pending

Page 21: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Cleaning & Spin Drying:

• Thermo-plastic adhesive may be cleaned with solvent

This enables:

• Optimized cleanliness

• Gentle to device wafer topography

Page 22: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Process Requirements – Example ZoneBondTM

Thin product wafer ready for backend assembly process

Page 23: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

In-line Metrology for TB

Wafer thinning is an operation that results in a non-reworkablecondition. Therefore, it is critical to ensure that criticalparameters of the thin wafer support system are withinspecification prior to thinning. Of interest are: Excursion in adhesive thickness uniformity & absolute value Excursion of carrier thickness uniformity & absolute value Bonding voids

Strategy: Employ in-line metrology to detect such issuesbefore further processing of the wafers downstream to: Enable rework before wafers are in a non-reworkable state Reduce the material that is mis-processed.

Page 24: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

In-line Metrology for TB

- 100% inspection of bonded wafers prior to thinning is desired.

- EVG has developed an in-line metrology solution that offers a throughput that is compatible with 100% in-line inspection of bonded wafers in an automated Temporary Bonding system

- Details will be presented in the “SEMATECH 3D Interconnect Metrology Workshop” on Wednesday this week.

- Adhesive thickness and TTV

- Carrier thickness and TTV

- Voids

Page 25: Temporary Bonding – HVM Concerns - SEMATECH€¦ · Temporary Bonding – HVM Concerns ... w/ Tape Lamination up to 4“ EVG850DB Slide-Off DeBonder up to 4 ... Handling Strategy

EV Group

Summary: How are we doing?

Customer Requirements: Low Cost Very High Yield Mature Technology Integrates well with Customer Process Flow Infrastructure / Supply Chain established