Singapore Training

1

Page 2: Singapore Training  - Copy

Singapore Training

T- CARD System

Page 3: Singapore Training  - Copy

Separating the delegates to 4 Teams each team contain -Mechanical Members

-Process Members -Electrical Members

-Instrument membersThen give each team a task to do theory and each team must work together to finish it with all needed paper work PTW, JSA, Isolation……etc

Singapore Training

Page 4: Singapore Training  - Copy

Singapore Training

-Mechanical apply for the PTW & JSA

-Process check the PTW and review the JSA then if approved proceed with needed isolation Process isolation, Electrical, Instrument if needed

-JSA to do the isolation was a must

Page 5: Singapore Training  - Copy

Singapore Training

Pre Job Safety meeting after approving the PTW and PH ensured that isolation done properly and Power was Zero

Page 6: Singapore Training  - Copy

Singapore Training

Start the job

Page 7: Singapore Training  - Copy

Singapore Training

Inspection from Process team to close the PTW and remove the isolation

Page 8: Singapore Training  - Copy

Singapore Training

Workshop training for pumps and mechanical seals

Page 9: Singapore Training  - Copy

Singapore Training

Page 10: Singapore Training  - Copy

Singapore Training