    Appendix E: Sample CMMI Compliance Matrix

    The following table can be used to plan and track completion of artifacts and

    implementation associated with CMMI process area practices and goals. See Chapter15for more information.

    Appendix E: Sample CMMI Compliance Matrix

    The following table can be used to plan and track completion of artifacts and

    implementation associated with CMMI process area practices and goals. See Chapter

    15for more information.

    No.Practice or Activity Associated

    Procedure/Document

    Assigned

    To

    Date

    Due

    Date

    Reviewed

    Status

    Process Area: RM

    Process Area: GG2 Institutionalize a Managed Process

    1 G!.1 "C#1$%&stablish an

    organi'ational polic(

    olic(

    )*+)!+)! ,ppro-ed

    ! G!.! ",1$% lanthe process

    lan

    rocess description

    Schedule

    &stimates

    )*+)!+)! Complete

    * G!.* ",!$%

    ro-ide resources

    See lan

    Complete

    / G!./ ",*$% ,ssignresponsibilit(

    See lan

    Complete

    5 G!.5 ",/$% Train

    people

    See lan and training

    materials

    In progress

    0 G!.0 "I1$% Manageconfigurations

    T

    In progress

  • 8/14/2019 SCAMI radni prilozi.doc

    2/68

    No.Practice or Activity Associated

    Procedure/Document

    Assigned

    To

    Date

    Due

    Date

    Reviewed

    Status

    2 G!.2 "I!$% Identif(and in-ol-e rele-ant

    stakeholders

    See Implementationlan

    Complete

    3 G!.3 "I*$% Monitorand control the

    process

    T

    eferred

    4 G!.4 "&1$%

    #b6ecti-el( e-aluate

    adherence

    rocedure I5

    rocedure I2

    Complete

    1) G!.1) "&!$%

    7e-iew status with

    higher8le-elmanagement

    rocedure I0

    Complete

    Process Area: SG1: Manage Reuirements

    11 S1.1% #btain an

    understanding of

    re9uirements

    rocedure 7M1

    &G

    re-iew

    1! S1.!% #btaincommitment to

    re9uirements

    rocedure 7M!

    &Gre-iew

    1* S1.*% Managere9uirements changes

    rocedure 7M*: 7M/

    rocedure CM/

    ending

    1/ S1./% Maintain

    bidirectionaltraceabilit( of

    re9uirements

    rocedure 7M/

    7e6ected

    15 S1.5% Identif(

    inconsistenciesbetween pro6ect work

    rocedure 7M5

    ending

  • 8/14/2019 SCAMI radni prilozi.doc

    3/68

    No.Practice or Activity Associated

    Procedure/Document

    Assigned

    To

    Date

    Due

    Date

    Reviewed

    Status

    and re9uirements

    Appendix !: Sample CMM Compliance Matrix

    The following table can be used to plan and track completion of artifacts and

    implementation associated with CMM process area practices and goals. See Chapter 15for more information.

    No.Process Area

    CMM

    Reference Document

    Assigned

    To

    Date

    Due/ReviewedStatus

    1 Infrastructure

    SI lan

    ! Infrastructure

    Implementation lan

    * Infrastructure

    #rgani'ation;s Standard

    Software rocess"#SS$

    / Infrastructure

    S&G Charter

    5 Infrastructure

    S&G resentation

    Template

    0 Infrastructure

    rocedure Template

    2 Infrastructure

    Training acket

    Guidelines for ilots

    3 7e9uirementsManagement

    7M Charter

    4 7e9uirementsManagement

    7M ,ction lan

    1) 7e9uirements 7M

  • 8/14/2019 SCAMI radni prilozi.doc

    4/68

    No.Process Area

    CMM

    Reference Document

    Assigned

    To

    Date

    Due/ReviewedStatus

    Management

    11 7e9uirements

    Management

    7M Schedule

    1! 7e9uirements

    Management

    C#1: ,1:

    ,*: ,/

    olic( for managing

    s(stem re9uirements

    allocated to software%includes establishing

    responsibilit(: pro-iding

    ade9uate resources and

    re9uired 7M training

    1* 7e9uirements

    Management

    ,!: ,C1 rocedure for

    7e9uirementsSpecification and

    7e-iew

    1/ 7e9uirements

    Management

    ,!: ,C! rocedure for

    completing

    7e9uirements

    Traceabilit( Matri="7TM$% includes use as

    basis for S and workproducts

    15 7e9uirements

    Management

    ,C* rocedure for S7S and

    7TM changes

    10 7e9uirements

    Management

    M&1 rocedure for 7M

    metrics

    12 7e9uirements

    Management

    &1: &! rocedure for ro6ect

    and Senior Managementre-iews

    13 Softwarero6ect

    lanning

    S Charter

  • 8/14/2019 SCAMI radni prilozi.doc

    5/68

    No.Process Area

    CMM

    Reference Document

    Assigned

    To

    Date

    Due/ReviewedStatus

    14 Softwarero6ect

    lanning

    S ,ction lan

    !) Softwarero6ect

    lanning

    S

  • 8/14/2019 SCAMI radni prilozi.doc

    6/68

    No.Process Area

    CMM

    Reference Document

    Assigned

    To

    Date

    Due/ReviewedStatus

    !3 Softwarero6ect

    lanning

    ,ct84 rocedure for estimatingsi'e of software work

    products

    !4 Softwarero6ect

    lanning

    ,ct81) rocedure for estimatingeffort and cost for the

    software pro6ect

    *) Software

    ro6ect

    lanning

    ,ct811 rocedure for estimating

    critical computer

    resources

    *1 Software

    ro6ect

    lanning

    ,ct81! rocedure for deri-ing

    software pro6ect

    schedule

    *! Software

    ro6ectlanning

    ,ct81* 7isk identification and

    assessment documentfor each software

    pro6ect

    ** Softwarero6ect

    lanning

    ,ct81/ lans for softwarefacilities and tools for

    each software pro6ect

    */ Software

    ro6ectlanning

    ,ct815 &stimates and basis for

    estimates data isrecorded for each

    software pro6ect

    *5 Software

    ro6ectlanning

    M&1 Measurements are made

    to determine status ofsoftware planning

    acti-ities "rationale formeasurements and how

    to collect and anal('e

    them$

    *0 Software &1 &! The acti-ities of S

  • 8/14/2019 SCAMI radni prilozi.doc

    7/68

    No.Process Area

    CMM

    Reference Document

    Assigned

    To

    Date

    Due/ReviewedStatus

    ro6ectlanning

    pro6ect planning arere-iewed with Senior

    Management and

    ro6ect Management ?

    procedures for both

    *2 Software

    ro6ectlanning

    &* S@, audit of

    ,cti-ities ? proceduresfor 9ualit( re-iews ?

    ma( be found in S@,

    A,

    Appendix G: C"ec#list $or t"e Staged Representation o$ t"e CMMI

    %&er&ie'

    This checklist displa(s the specific goals and specific practices for each process area. Bor

    process impro-ement efforts: this checklist can be used to document whether proceduresha-e been written for a practice: what stage the documentation is in: and who is

    responsible. Bor appraisals: the appraisal team can use this checklist to determine whether

    the practices ha-e been institutionali'ed in order to achie-e the goals for each processarea. Beel free to add columns or rows to insert comments: tasks: status indicators:

    subpractices: artifacts: or an(thing else (ou feel will help structure and track (our efforts.

    The process areas are arranged b( Maturit( e-els ! through 5.

  • 8/14/2019 SCAMI radni prilozi.doc

    8/68

    The purpose of 7e9uirements Management is to manage the re9uirements of the pro6ect;s

    products and product components: and to identif( inconsistencies between those

    re9uirements and the pro6ect;s plans and work products.

    Specific ractices b( Specific Goal%

    SG1

    Manage 7e9uirements

    7e9uirements are managed and inconsistencies with pro6ect plans and work products

    are identified.

    S1.1

    #btain an Dnderstanding of 7e9uirements

    e-elop an understanding with the re9uirements pro-iders on the meaning of

    the re9uirements.

    S1.!

    #btain Commitment to 7e9uirements

    #btain commitment to the re9uirements from the pro6ect participants.

    S1.*

    Manage 7e9uirements Changes

    Manage changes to the re9uirements as the( e-ol-e during the pro6ect.

    S1./

    Maintain idirectional Traceabilit( of 7e9uirements

    Maintain bidirectional traceabilit( among the re9uirements and the pro6ect

    plans and work products.

    S1.5

    Identif( Inconsistencies between ro6ect

  • 8/14/2019 SCAMI radni prilozi.doc

    9/68

    &stablish and maintain estimates of the attributes of the work products and

    tasks.

    S1.*

    efine ro6ect ife C(cle

    efine the pro6ect life8c(cle phases upon which to scope the planning effort.

    S1./

    etermine &stimates of &ffort and Cost

    &stimate the pro6ect effort and cost for the work products and tasks based on

    estimation rationale.

    SG!

    e-elop a ro6ect lan

    , pro6ect plan is established and maintained as the basis for managing the pro6ect.

    S!.1

    &stablish the udget and Schedule

    &stablish and maintain the pro6ect;s budget and schedule.

    S!.!Identif( ro6ect 7isks

    Identif( and anal('e pro6ect risks.

    S!.*

    lan for ata Management

    lan for the management of pro6ect data.

    S!./

    lan for ro6ect 7esources

    lan for necessar( resources to perform the pro6ect.

    S!.5

    lan for Eeeded Anowledge and Skills

    lan for knowledge and skills needed to perform the pro6ect.

    S!.0

    lan Stakeholder In-ol-ement

    lan the in-ol-ement of identified stakeholders.

    S!.2

    &stablish the ro6ect lan

    &stablish and maintain the o-erall pro6ect plan content.

    SG*

    #btain Commitment to the lan

    Commitments to the pro6ect plan are established and maintained.

    S*.17e-iew lans that ,ffect the ro6ect

    7e-iew all plans that affect the pro6ect to understand pro6ect commitments.

    S*.!

    7econcile

  • 8/14/2019 SCAMI radni prilozi.doc

    10/68

    #btain commitment from rele-ant stakeholders responsible for performing

    and supporting plan e=ecution.

    Pro*ect Monitoring and Control

    The purpose of ro6ect Monitoring and Control is to pro-ide an understanding of the

    pro6ect;s progress so that appropriate correcti-e actions can be taken when the pro6ect;sperformance de-iates significantl( from the plan.

    Specific ractices b( Specific Goal%

    SG1

    Monitor ro6ect against lan

    ,ctual performance and progress of the pro6ect are monitored against the pro6ectplan.

    S1.1Monitor ro6ect lanning arameters

    Monitor the actual -alues of the pro6ect planning parameters against the

    pro6ect plan.

    S1.!

    Monitor Commitments

    Monitor commitments against those identified in the pro6ect plan.

    S1.*

    Monitor ro6ect 7isks

    Monitor risks against those identified in the pro6ect plan.

    S1./

    Monitor ata Management

    Monitor the management of pro6ect data against the pro6ect plan.

    S1.5

    Monitor Stakeholder In-ol-ement

    Monitor stakeholder in-ol-ement against the pro6ect plan.

    S1.0

    Conduct rogress 7e-iews

    eriodicall( re-iew the pro6ect;s progress: performance: and issues.

    S1.2

    Conduct Milestone 7e-iews

    7e-iew the accomplishments and results of the pro6ect at selected pro6ectmilestones.

    SG!

    Manage Correcti-e ,ction to Closure

    Correcti-e actions are managed to closure when the pro6ect;s performance or resultsde-iate significantl( from the plan.

    S!.1

    ,nal('e Issues

  • 8/14/2019 SCAMI radni prilozi.doc

    11/68

    Collect and anal('e the issues and determine the correcti-e actions necessar(

    to address the issues.

    S!.!

    Take Correcti-e ,ction

    Take correcti-e action on identified issues.

    S!.*

    Manage Correcti-e ,ction

    Manage correcti-e actions to closure.

    Supplier Agreement Management

    The purpose of Supplier ,greement Management is to manage the ac9uisition of

    products from suppliers for which there e=ists a formal agreement.

    Specific ractices b( Specific Goal%

    SG1

    &stablish Supplier ,greements

    ,greements with the suppliers are established and maintained.

    S1.1

    etermine ,c9uisition T(pe

    etermine the t(pe of ac9uisition for each product or product component to be

    ac9uired.

    S1.!

    Select Suppliers

    Select suppliers based on an e-aluation of their abilit( to meet the specified

    re9uirements and established criteria.

    S1.*

    &stablish Supplier ,greements

    &stablish and maintain formal agreements with the supplier.

    SG!

    Satisf( Supplier ,greements

    ,greements with the suppliers are satisfied b( both the pro6ect and the supplier.

    S!.1

    7e-iew C#TS roducts

    7e-iew candidate C#TS products to ensure the( satisf( the specified

    re9uirements that are co-ered under a supplier agreement.

    S!.!

    &=ecute the Supplier ,greement

    erform acti-ities with the supplier as specified in the supplier agreement.

    S!.*

    ,ccept the ,c9uired roduct

    &nsure that the supplier agreement is satisfied before accepting the ac9uiredproduct.

  • 8/14/2019 SCAMI radni prilozi.doc

    12/68

    S!./

    Transition roducts

    Transition the ac9uired products from the supplier to the pro6ect.

    Measurement and Anal(sis

    The purpose of Measurement and ,nal(sis is to de-elop and sustain a measurement

    capabilit( that is used to support management information needs.

    Specific ractices b( Specific Goal%

    SG1

    ,lign Measurement and ,nal(sis ,cti-ities

    Measurement ob6ecti-es and acti-ities are aligned with identified information needs

    and ob6ecti-es.

    S1.1

    &stablish Measurement #b6ecti-es

    &stablish and maintain measurement ob6ecti-es that are deri-ed from

    identified information needs and ob6ecti-es.

    S1.!

    Specif( Measures

    Specif( measures to address the measurement ob6ecti-es.

    S1.*

    Specif( ata Collection and Storage rocedures

    Specif( how measurement data will be obtained and stored.

    S1./

    Specif( ,nal(sis rocedures

    Specif( how measurement data will be anal('ed and reported.

    SG!

    ro-ide Measurement 7esults

    Measurement results that address identified information needs and ob6ecti-es are

    pro-ided.

    S!.1

    Collect Measurement ata

    #btain specified measurement data.

    S!.!

    ,nal('e Measurement ata

    ,nal('e and interpret measurement data.

    S!.*

    Store ata and 7esults

    Manage and store measurement data: measurement specifications: and

    anal(sis results.

    S!./

    Communicate 7esults

    7eport results of measurement and anal(sis acti-ities to all rele-ant

  • 8/14/2019 SCAMI radni prilozi.doc

    13/68

    stakeholders.

    Process and Product +ualit( Assurance

    The purpose of rocess and roduct @ualit( ,ssurance is to pro-ide staff andmanagement with ob6ecti-e insight into processes and associated work products.

    Specific ractices b( Specific Goal%

    SG1

    #b6ecti-el( &-aluate rocesses and

  • 8/14/2019 SCAMI radni prilozi.doc

    14/68

    S1.1

    Identif( Configuration Items

    Identif( the configuration items: components: and related work products that

    will be placed under configuration management.

    S1.!

    &stablish a Configuration Management S(stem

    &stablish and maintain a configuration management and change management

    s(stem for controlling work products.

    S1.*

    Create or 7elease aselines

    Create or release baselines for internal use and for deli-er( to the customer.

    SG!

    Track and Control Changes

    Changes to the work products under configuration management are tracked and

    controlled.

    S!.1

    Track Change 7e9uests

    Track change re9uests for the configuration items.

    S!.!

    Control Configuration Items

    Control changes to the configuration items.

    SG*

    &stablish Integrit(

    Integrit( of baselines is established and maintained.

    S*.1

    &stablish Configuration Management 7ecords

    &stablish and maintain records describing configuration items.

    S*.!

    erform Configuration ,udits

    erform configuration audits to maintain integrit( of the configuration

    baselines.

    Reuirements ,e&elopment

    The purpose of 7e9uirements e-elopment is to produce and anal('e customer: product:and product8component re9uirements.

    Specific ractices b( Specific Goal%

    SG1

    e-elop Customer 7e9uirements

    Stakeholder needs: e=pectations: constraints: and interfaces are collected and

    translated into customer re9uirements.

  • 8/14/2019 SCAMI radni prilozi.doc

    15/68

    S1.1

    &licit Eeeds

    &licit stakeholder needs: e=pectations: constraints: and interfaces for allphases of the product life c(cle.

    The following specific practice appears in the continuous representation as S1.181:

    but is subsumed in the staged representation b( S1.1: &licit Eeeds. The specific

    practice is presented here in gra( onl( as informati-e material.

    S1.181

    Collect Stakeholder Eeeds

    Identif( and collect stakeholder needs: e=pectations: constraints: and

    interfaces for all phases of the product life c(cle.

    S1.!

    e-elop the Customer 7e9uirements

    Transform stakeholder needs: e=pectations: constraints: and interfaces into

    customer re9uirements.

    SG!

    e-elop roduct 7e9uirements

    Customer re9uirements are refined and elaborated to de-elop product and product8component re9uirements.

    S!.1

    &stablish roduct and roduct8Component 7e9uirements

    &stablish and maintain product and product8component re9uirements:

    which are based on the customer re9uirements.

    S!.!

    ,llocate roduct8Component 7e9uirements

    ,llocate the re9uirements for each product component.

    S!.*

    Identif( Interface 7e9uirements

    Identif( interface re9uirements.

    SG*

    ,nal('e and alidate 7e9uirements

    The re9uirements are anal('ed and -alidated: and a definition of re9uired

    functionalit( is de-eloped.

    S*.1

    &stablish #perational Concepts and Scenarios

    &stablish and maintain operational concepts and associated scenarios.

    S*.!

    &stablish a efinition of 7e9uired Bunctionalit(

    &stablish and maintain a definition of re9uired functionalit(.

    S*.*

    ,nal('e 7e9uirements

  • 8/14/2019 SCAMI radni prilozi.doc

    16/68

    ,nal('e re9uirements to ensure that the( are necessar( and sufficient.

    S*./

    ,nal('e 7e9uirements to ,chie-e alance

    ,nal('e re9uirements to balance stakeholder needs and constraints.

    S*.5

    alidate 7e9uirements with Comprehensi-e Methods

    alidate re9uirements to ensure the resulting product will perform as

    intended in the user;s en-ironment using multiple techni9ues asappropriate.

    The following specific practice appears in the continuous representation as S*.581:but is subsumed in the staged representation b( S*.5: alidate 7e9uirements with

    Comprehensi-e Methods. The specific practice is presented here in gra( onl( as

    informati-e material.

    S*.581

    alidate 7e9uirements

    alidate re9uirements to ensure the resulting product will perform

    appropriatel( in its intended8use en-ironment.

    -ec"nical Solution

    The purpose of Technical Solution is to design: de-elop: and implement solutions tore9uirements. Solutions: designs: and implementations encompass products: product

    components: and product8related life8c(cle processes either singl( or in combinations: as

    appropriate.

    Specific ractices b( Specific Goal%

    SG1

    Select roduct8Component Solutions

    roduct or product8component solutions are selected from alternati-e solutions.

    S1.1

    e-elop etailed ,lternati-e Solutions and Selection Criteria

    e-elop detailed alternati-e solutions and selection criteria.

    The following specific practice appears in the continuous representation as S1.181:but is subsumed in the staged representation b( S1.1: e-elop etailed ,lternati-eSolutions and Selection Criteria. The specific practice is presented here in gra( onl(

    as informati-e material.

    S1.181

    e-elop ,lternati-e Solutions and Selection Criteria

    e-elop alternati-e solutions and selection criteria.

  • 8/14/2019 SCAMI radni prilozi.doc

    17/68

    S1.!

    &-ol-e #perational Concepts and Scenarios

    &-ol-e the operational concept: scenarios: and en-ironments to describe the

    conditions: operating modes: and operating states specific to each productcomponent.

    S1.*Select roduct8Component Solutions

    Select the product8component solutions that best satisf( the criteria

    established.

    SG!

    e-elop the esign

    roduct or product8component designs are de-eloped.

    S!.1

    esign the roduct or roduct Component

    e-elop a design for the product or product component.

    S!.!

    &stablish a Technical ata ackage

    &stablish and maintain a technical data package.

    S!.*

    esign Interfaces Dsing Criteria

    esign comprehensi-e product8component interfaces in terms of

    established and maintained criteria.

    The following specific practice appears in the continuous representation as S!.*81:but is subsumed in the staged representation b( S!.*: esign Interfaces Dsing

    Criteria. The specific practice is presented here in gra( onl( as informati-e material.

    S!.*81

    &stablish Interface escriptions

    &stablish and maintain the solution for product8component interfaces.

    S!./

    erform Make: u(: or 7euse ,nal(ses

    &-aluate whether the product components should be de-eloped: purchased:

    or reused based on established criteria.

    SG*

    Implement the roduct esign

    roduct components and associated support documentation are implemented fromtheir designs.

    S*.1Implement the esign

    Implement the designs of the product components.

    S*.!

    e-elop roduct Support ocumentation

    e-elop and maintain the end8use documentation.

    Product Integration

  • 8/14/2019 SCAMI radni prilozi.doc

    18/68

    The purpose of roduct Integration is to assemble the product from the product

    components: ensure that the product: as integrated: functions properl(: and deli-er the

    product.

    Specific ractices b( Specific Goal%

    SG1

    repare for roduct Integration

    reparation for product integration is conducted.

    S1.1

    etermine Integration Se9uence

    etermine the product8component integration se9uence.

    S1.!

    &stablish the roduct Integration &n-ironment

    &stablish and maintain the en-ironment needed to support the integration of

    the product components.

    S1.*&stablish roduct Integration rocedures and Criteria

    &stablish and maintain procedures and criteria for integration of the productcomponents.

    SG!

    &nsure Interface Compatibilit(

    The product8component interfaces: both internal and e=ternal: are compatible.

    S!.1

    7e-iew Interface escriptions for Completeness

    7e-iew interface descriptions for co-erage and completeness.

    S!.!

    Manage Interfaces

    Manage internal and e=ternal interface definitions: designs: and changes for

    products and product components.

    SG*

    ,ssemble roduct Components and eli-er the roduct

    erified product components are assembled and the integrated: -erified: and

    -alidated product is deli-ered.

    S*.1

    Confirm 7eadiness of roduct Components for Integration

    Confirm: prior to assembl(: that each product component re9uired to assemble

    the product has been properl( identified: functions according to itsdescription: and that the product8component interfaces compl( with the

    interface descriptions.

    S*.!

    ,ssemble roduct Components

    ,ssemble product components according to the product integration se9uence

    and a-ailable procedures.

  • 8/14/2019 SCAMI radni prilozi.doc

    19/68

    S*.*

    &-aluate ,ssembled roduct Components

    &-aluate assembled product components for interface compatibilit(.

    S*./

    ackage and eli-er the roduct or roduct Component

    ackage the assembled product or product component and deli-er it to theappropriate customer.

    .eri$ication

    The purpose of erification is to ensure that selected work products meet their specified

    re9uirements.

    Specific ractices b( Specific Goal%

    SG1

    repare for erification

    reparation for -erification is conducted.

    S1.1

    Select

  • 8/14/2019 SCAMI radni prilozi.doc

    20/68

    S*.1

    erform erification

    erform -erification on the selected work products.

    S*.!

    ,nal('e erification 7esults and Identif( Correcti-e ,ction

    ,nal('e the results of all -erification acti-ities and identif( correcti-e action.

    .alidation

    The purpose of alidation is to demonstrate that a product or product component fulfills

    its intended use when placed in its intended en-ironment.

    Specific ractices b( Specific Goal%

    SG1

    repare for alidation

    reparation for -alidation is conducted.

    S1.1

    Select roducts for alidation

    Select products and product components to be -alidated and the -alidation

    methods that will be used for each.

    S1.!

    &stablish the alidation &n-ironment

    &stablish and maintain the en-ironment needed to support -alidation.

    S1.*

    &stablish alidation rocedures and Criteria

    &stablish and maintain procedures and criteria for -alidation.

    SG!

    alidate roduct or roduct Components

    The product or product components are -alidated to ensure that the( are suitable foruse in their intended operating en-ironment.

    S!.1

    erform alidation

    erform -alidation on the selected products and product components.

    S!.!

    ,nal('e alidation 7esults

    ,nal('e the results of the -alidation acti-ities and identif( issues.

    %rganizational Process !ocus

    The purpose of #rgani'ational rocess Bocus is to plan and implement organi'ationalprocess impro-ement based on a thorough understanding of the current strengths and

    weaknesses of the organi'ation;s processes and process assets.

    Specific ractices b( Specific Goal%

  • 8/14/2019 SCAMI radni prilozi.doc

    21/68

    SG1

    etermine rocess8Impro-ement #pportunities

    Strengths: weaknesses: and impro-ement opportunities for the organi'ation;s

    processes are identified periodicall( and as needed.

    S1.1

    &stablish #rgani'ational rocess Eeeds

    &stablish and maintain the description of the process needs and ob6ecti-es for

    the organi'ation.

    S1.!

    ,ppraise the #rgani'ation;s rocesses

    ,ppraise the processes of the organi'ation periodicall( and as needed tomaintain an understanding of their strengths and weaknesses.

    S1.*

    Identif( the #rgani'ation;s rocess Impro-ements

    Identif( impro-ements to the organi'ation;s processes and process assets.

    SG!

    lan and Implement rocess8Impro-ement ,cti-ities

    Impro-ements are planned and implemented: organi'ational process assets are

    deplo(ed: and process8related e=periences are incorporated into the organi'ational

    process assets.

    S!.1

    &stablish rocess ,ction lans

    &stablish and maintain process action plans to address impro-ements to theorgani'ation;s processes and process assets.

    S!.!

    Implement rocess ,ction lans

    Implement process action plans across the organi'ation.

    S!.*

    eplo( #rgani'ational rocess ,ssets

    eplo( organi'ational process assets across the organi'ation.

    S!./

    Incorporate rocess87elated &=periences into the #rgani'ational rocess

    ,ssets

    Incorporate process8related work products: measures: and impro-ementinformation deri-ed from planning and performing the process into the

    organi'ational process assets.

    %rganizational Process ,e$inition

    The purpose of #rgani'ational rocess efinition is to establish and maintain a usable set

    of organi'ational process assets.

    Specific ractices b( Specific Goal%

  • 8/14/2019 SCAMI radni prilozi.doc

    22/68

    SG1

    &stablish #rgani'ational rocess ,ssets

    , set of organi'ational process assets is established and maintained.

    S1.1

    &stablish Standard rocesses

    &stablish and maintain the organi'ation;s set of standard processes.

    S1.!

    &stablish ife8C(cle Model escriptions

    &stablish and maintain descriptions of the life8c(cle models appro-ed for use

    in the organi'ation.

    S1.*

    &stablish Tailoring Criteria and Guidelines

    &stablish and maintain the tailoring criteria and guidelines for the

    organi'ation;s set of standard processes.

    S1./

    &stablish the #rgani'ation;s Measurement 7epositor(

    &stablish and maintain the organi'ation;s measurement repositor(.

    S1.5

    &stablish the #rgani'ation;s rocess ,sset ibrar(

    &stablish and maintain the organi'ation;s process asset librar(.

    %rganizational -raining

    The purpose of #rgani'ational Training is to de-elop the skills and knowledge of people

    so the( can perform their roles effecti-el( and efficientl(.

    Specific ractices b( Specific Goal%

    SG1

    &stablish an #rgani'ational Training Capabilit(

    , training capabilit( that supports the organi'ation;s management and technical roles

    is established and maintained.

    S1.1

    &stablish the Strategic Training Eeeds

    &stablish and maintain the strategic training needs of the organi'ation.

    S1.!

    etermine

  • 8/14/2019 SCAMI radni prilozi.doc

    23/68

    needs.

    SG!

    ro-ide Eecessar( Training

    Training necessar( for indi-iduals to perform their roles effecti-el( is pro-ided.

    S!.1eli-er Training

    eli-er the training following the organi'ational training tactical plan.

    S!.!

    &stablish Training 7ecords

    &stablish and maintain records of the organi'ational training.

    S!.*

    ,ssess Training &ffecti-eness

    ,ssess the effecti-eness of the organi'ation;s training program.

    Integrated Pro*ect Management $or IPP,

    The purpose of Integrated ro6ect Management is to establish and manage the pro6ect andthe in-ol-ement of the rele-ant stakeholders according to an integrated and defined

    process that is tailored from the organi'ation;s set of standard processes.

    Bor Integrated roduct and rocess e-elopment: Integrated ro6ect Management also

    co-ers the establishment of a shared -ision for the pro6ect and a team structure forintegrated teams that will carr( out the ob6ecti-es of the pro6ect.

    Specific ractices b( Specific Goal%

    SG1Dse the ro6ect;s efined rocess

    The pro6ect is conducted using a defined process that is tailored from theorgani'ation;s set of standard processes.

    S1.1

    &stablish the ro6ect;s efined rocess

    &stablish and maintain the pro6ect;s defined process.

    S1.!

    Dse #rgani'ational rocess ,ssets for lanning ro6ect ,cti-ities

    Dse the organi'ational process assets and measurement repositor( forestimating and planning the pro6ect;s acti-ities.

    S1.*

    Integrate lans

    Integrate the pro6ect plan and the other plans that affect the pro6ect to describe

    the pro6ect;s defined process.

    S1./

    Manage the ro6ect Dsing the Integrated lans

    Manage the pro6ect using the pro6ect plan: the other plans that affect the

  • 8/14/2019 SCAMI radni prilozi.doc

    24/68

    pro6ect: and the pro6ect;s defined process.

    S1.5

    Contribute to the #rgani'ational rocess ,ssets

    Contribute work products: measures: and documented e=periences to the

    organi'ational process assets.

    SG!

    Coordinate and Collaborate with 7ele-ant Stakeholders

    Coordination and collaboration of the pro6ect with rele-ant stakeholders is

    conducted.

    S!.1

    Manage Stakeholder In-ol-ement

    Manage the in-ol-ement of the rele-ant stakeholders in the pro6ect.

    S!.!

    Manage ependencies

    articipate with rele-ant stakeholders to identif(: negotiate: and track critical

    dependencies.

    S!.*

    7esol-e Coordination Issues

    7esol-e issues with rele-ant stakeholders.

    SG*

    Dse the ro6ect;s Shared ision for I

    The pro6ect is conducted using the pro6ect;s shared -ision.

    S*.1

    efine ro6ect;s Shared8ision Conte=t

    Identif( e=pectations: constraints: interfaces: and operational conditionsapplicable to the pro6ect;s shared -ision.

    S*.!

    &stablish the ro6ect;s Shared ision

    &stablish and maintain a shared -ision for the pro6ect.

    SG/

    #rgani'e Integrated Teams for I

    The integrated teams needed to e=ecute the pro6ect are identified: defined: structured:and tasked.

    S/.1

    etermine Integrated Team Structure for the ro6ect

    etermine the integrated team structure that will best meet the pro6ect

    ob6ecti-es and constraints.

    S/.!

    e-elop a reliminar( istribution of 7e9uirements to Integrated Teams

    e-elop a preliminar( distribution of re9uirements: responsibilities:

    authorities: tasks: and interfaces to teams in the selected integrated team

    structure.

    S/.*

    &stablish Integrated Teams

  • 8/14/2019 SCAMI radni prilozi.doc

    25/68

    &stablish and maintain teams in the integrated team structure.

    Ris# Management

    The purpose of 7isk Management is to identif( potential problems before the( occur: sothat risk8handling acti-ities ma( be planned and in-oked as needed across the life of the

    product or pro6ect to mitigate ad-erse impacts on achie-ing ob6ecti-es.

    Specific ractices b( Specific Goal%

    SG1

    repare for 7isk Management

    reparation for risk management is conducted.

    S1.1

    etermine 7isk Sources and Categories

    etermine risk sources and categories.

    S1.!

    efine 7isk arameters

    efine the parameters used to anal('e and categori'e risks: and the parameters

    used to control the risk management effort.

    S1.*

    &stablish a 7isk Management Strateg(

    &stablish and maintain the strateg( to be used for risk management.

    SG!

    Identif( and ,nal('e 7isks

    7isks are identified and anal('ed to determine their relati-e importance.

    S!.1

    Identif( 7isks

    Identif( and document the risks.

    S!.!

    &-aluate: Categori'e: and rioriti'e 7isks

    &-aluate and categori'e each identified risk using the defined risk categories

    and parameters: and determine its relati-e priorit(.

    SG*

    Mitigate 7isks

    7isks are handled and mitigated: where appropriate: to reduce ad-erse impacts on

    achie-ing ob6ecti-es.

    S*.1

    e-elop 7isk Mitigation lans

    e-elop a risk mitigation plan for the most important risks to the pro6ect: as

    defined b( the risk management strateg(.

    S*.!

    Implement 7isk Mitigation lans

    Monitor the status of each risk periodicall( and implement the risk mitigation

  • 8/14/2019 SCAMI radni prilozi.doc

    26/68

    plan as appropriate.

    Integrated -eaming

    The purpose of Integrated Teaming is to form and sustain an integrated team for thede-elopment of work products.

    Specific ractices b( Specific Goal%

    SG1

    &stablish Team Composition

    , team composition that pro-ides the knowledge and skills re9uired to deli-er the

    team;s product is established and maintained.

    S1.1

    Identif( Team Tasks

    Identif( and define the team;s specific internal tasks to generate the team;se=pected output.

    S1.!

    Identif( Eeeded Anowledge and Skills

    Identif( the knowledge: skills: and functional e=pertise needed to perform

    team tasks.

    S1.*

    ,ssign ,ppropriate Team Members

    ,ssign the appropriate personnel to be team members based on re9uired

    knowledge and skills.

    SG!

    Go-ern Team #peration

    #peration of the integrated team is go-erned according to established principles.

    S!.1

    &stablish a Shared ision

    &stablish and maintain a shared -ision for the integrated team that is aligned

    with an( o-erarching or higher8le-el -ision.

    S!.!

    &stablish a Team Charter

    &stablish and maintain a team charter based on the integrated team;s shared-ision and o-erall team ob6ecti-es.

    S!.* efine 7oles and 7esponsibilities

    Clearl( define and maintain each team member;s roles and responsibilities.

    S!./

    &stablish #perating rocedures

    &stablish and maintain integrated team operating procedures.

    S!.5

    Collaborate among Interfacing Teams

  • 8/14/2019 SCAMI radni prilozi.doc

    27/68

    &stablish and maintain collaboration among interfacing teams.

    Integrated Supplier Management

    The purpose of Integrated Supplier Management is to proacti-el( identif( sources ofproducts that ma( be used to satisf( the pro6ect;s re9uirements and to manage selected

    suppliers while maintaining a cooperati-e pro6ect8supplier relationship.

    Specific ractices b( Specific Goal%

    SG1

    ,nal('e and Select Sources of roducts

    otential sources of products that best fit the needs of the pro6ect are identified:

    anal('ed: and selected.

    S1.1

    ,nal('e otential Sources of roducts

    Identif( and anal('e potential sources of products that can be used to satisf(

    the pro6ect;s re9uirements.

    S1.!

    &-aluate and etermine Sources of roducts

    Dse a formal e-aluation process to determine which sources of custom8madeand off8the8shelf products to use.

    SG!

    Coordinate

  • 8/14/2019 SCAMI radni prilozi.doc

    28/68

    SG1

    &-aluate ,lternati-es

    ecisions are based on an e-aluation of alternati-es using established criteria.

    S1.1

    &stablish Guidelines for ecision ,nal(sis

    &stablish and maintain guidelines to determine which issues are sub6ect to aformal e-aluation process.

    S1.!

    &stablish &-aluation Criteria

    &stablish and maintain the criteria for e-aluating alternati-es: and the relati-e

    ranking of these criteria.

    S1.*

    Identif( ,lternati-e Solutions

    Identif( alternati-e solutions to address issues.

    S1./

    Select &-aluation Methods

    Select the e-aluation methods.

    S1.5

    &-aluate ,lternati-es

    &-aluate alternati-e solutions using the established criteria and methods.

    S1.0

    Select Solutions

    Select solutions from the alternati-es based on the e-aluation criteria.

    %rganizational En&ironment $or Integration

    The purpose of #rgani'ational &n-ironment for Integration is to pro-ide an Integrated

    roduct and rocess e-elopment "I$ infrastructure and manage people forintegration.

    Specific ractices b( Specific Goal%

    SG1

    ro-ide I Infrastructure

    ,n infrastructure that ma=imi'es the producti-it( of people and affects the

    collaboration necessar( for integration is pro-ided.

    S1.1

    &stablish the #rgani'ation;s Shared ision

    &stablish and maintain a shared -ision for the organi'ation.

    S1.!

    &stablish an Integrated

  • 8/14/2019 SCAMI radni prilozi.doc

    29/68

    Identif( the uni9ue skills needed to support the I en-ironment.

    SG!

    Manage eople for Integration

    eople are managed to nurture the integrati-e and collaborati-e beha-iors of an

    I en-ironment.

    S!.1

    &stablish eadership Mechanisms

    &stablish and maintain leadership mechanisms to enable timel( collaboration.

    S!.!

    &stablish Incenti-es for Integration

    &stablish and maintain incenti-es for adopting and demonstrating integrati-eand collaborati-e beha-iors at all le-els of the organi'ation.

    S!.*

    &stablish Mechanisms to alance Team and Fome #rgani'ation

    7esponsibilities

    &stablish and maintain organi'ational guidelines to balance team and homeorgani'ation responsibilities.

    Maturit( )e&el /

    %rganizational Process Per$ormance

    The purpose of #rgani'ational rocess erformance is to establish and maintain a

    9uantitati-e understanding of the performance of the organi'ation;s set of standard

    processes in support of 9ualit( and process8performance ob6ecti-es: and to pro-ide theprocess performance data: baselines: and models to 9uantitati-el( manage the

    organi'ation;s pro6ects.

    Specific ractices b( Specific Goal%

    SG1

    &stablish erformance aselines and Models

    aselines and models that characteri'e the e=pected process performance of theorgani'ation;s set of standard processes are established and maintained.

    S1.1

    Select rocesses

    Select the processes or process elements in the organi'ation;s set of standard

    processes that are to be included in the organi'ation;s process performanceanal(ses.

    S1.!

    &stablish rocess erformance Measures

    &stablish and maintain definitions of the measures that are to be included in

    the organi'ation;s process performance anal(ses.

  • 8/14/2019 SCAMI radni prilozi.doc

    30/68

    S1.*

    &stablish @ualit( and rocess8erformance #b6ecti-es

    &stablish and maintain 9uantitati-e ob6ecti-es for 9ualit( and process

    performance for the organi'ation.

    S1./

    &stablish rocess erformance aselines

    &stablish and maintain the organi'ation;s process performance baselines.

    S1.5

    &stablish rocess erformance Models

    &stablish and maintain the process performance models for the organi'ation;s

    set of standard processes.

    +uantitati&e Pro*ect Management

    The purpose of the @uantitati-e ro6ect Management process area is to 9uantitati-el(

    manage the pro6ect;s defined process to achie-e the pro6ect;s established 9ualit( and

    process8performance ob6ecti-es.

    Specific ractices b( Specific Goal%

    SG1

    @uantitati-el( Manage the ro6ect

    The pro6ect is 9uantitati-el( managed using 9ualit( and process8performance

    ob6ecti-es.

    S1.1

    &stablish the ro6ect;s #b6ecti-es

    &stablish and maintain the pro6ect;s 9ualit( and process8performance

    ob6ecti-es.

    S1.!

    Compose the efined rocess

    Select the subprocesses that compose the pro6ect;s defined process: based on

    historical stabilit( and capabilit( data.

    S1.*

    Select the Subprocesses that

  • 8/14/2019 SCAMI radni prilozi.doc

    31/68

    S!.1

    Select Measures and ,nal(tic Techni9ues

    Select the measures and anal(tic techni9ues to be used in statisticall(

    managing the selected subprocesses.

    S!.!

    ,ppl( Statistical Methods to Dnderstand ariation

    &stablish and maintain an understanding of the -ariation of the selected

    subprocesses using the selected measures and anal(tic techni9ues.

    S!.*

    Monitor erformance of the Selected Subprocesses

    Monitor the performance of the selected subprocesses to determine theircapabilit( to satisf( their 9ualit( and process8performance ob6ecti-es: and

    identif( correcti-e action as necessar(.

    S!./

    7ecord Statistical Management ata

    7ecord statistical and 9ualit( management data in the organi'ation;s

    measurement repositor(.

    Maturit( )e&el 0

    %rganizational Inno&ation and ,eplo(ment

    The purpose of #rgani'ational Inno-ation and eplo(ment is to select and deplo(

    incremental and inno-ati-e impro-ements that measurabl( impro-e the organi'ation;sprocesses and technologies. The impro-ements support the organi'ation;s 9ualit( and

    process8performance ob6ecti-es as deri-ed from the organi'ation;s business ob6ecti-es.

    Specific ractices b( Specific Goal%

    SG1

    Select Impro-ements

    rocess and technolog( impro-ements that contribute to meeting 9ualit( andprocess8performance ob6ecti-es are selected.

    S1.1

    Collect and ,nal('e Impro-ement roposals

    Collect and anal('e process8 and technolog(8impro-ement proposals.

    S1.!

    Identif( and ,nal('e Inno-ations

    Identif( and anal('e inno-ati-e impro-ements that could increase theorgani'ation;s 9ualit( and process performance.

    S1.*

    ilot Impro-ements

    ilot process and technolog( impro-ements to select which ones to

    implement.

  • 8/14/2019 SCAMI radni prilozi.doc

    32/68

    S1./

    Select Impro-ements for eplo(ment

    Select process8 and technolog(8impro-ement proposals for deplo(ment across

    the organi'ation.

    SG!

    eplo( Impro-ements

    Measurable impro-ements to the organi'ation;s processes and technologies are

    continuall( and s(stematicall( deplo(ed.

    S!.1

    lan the eplo(ment

    &stablish and maintain the plans for deplo(ing the selected process andtechnolog( impro-ements.

    S!.!

    Manage the eplo(ment

    Manage the deplo(ment of the selected process and technolog( impro-ements.

    S!.*

    Measure Impro-ement &ffects

    Measure the effects of the deplo(ed process and technolog( impro-ements.

    Causal Anal(sis and Resolution

    The purpose of Causal ,nal(sis and 7esolution is to identif( causes of defects and other

    problems and take action to pre-ent them from occurring in the future.

    Specific ractices b( Specific Goal%

    SG1

    etermine Causes of efects

    7oot causes of defects and other problems are s(stematicall( determined.

    S1.1

    Select efect ata for ,nal(sis

    Select the defects and other problems for anal(sis.

    S1.!

    ,nal('e Causes

    erform causal anal(sis of selected defects and other problems and propose

    actions to address them.

    SG!

    ,ddress Causes of efects

    7oot causes of defects and other problems are s(stematicall( addressed to pre-ent

    their future occurrence.

    S!.1

    Implement the ,ction roposals

    Implement the selected action proposals that were de-eloped in causal

    anal(sis.

  • 8/14/2019 SCAMI radni prilozi.doc

    33/68

    S!.!

    &-aluate the &ffect of Changes

    &-aluate the effect of changes on process performance.

    S!.*

    7ecord ata

    7ecord causal anal(sis and resolution data for use across the pro6ect andorgani'ation.

    Generic Practices ( Generic Goal

    GG!

    Institutionali'e a Managed rocess

    The process is institutionali'ed as a managed process.

    Commitment to Per$orm

    G!.1 "C#1$&stablish an #rgani'ational olic(

    &stablish and maintain an organi'ational polic( for planning andperforming the "process area name$ process.

    Ailit( to Per$orm

    G!.! ",1$

    lan the rocess

    &stablish and maintain the plan for performing the "process area name$

    process.

    G!.* ",!$ro-ide 7esources

    ro-ide ade9uate resources for performing the "process area name$ process:

    de-eloping the work products: and pro-iding the ser-ices of the "process

    area name$ process.

    G!./ ",*$

    ,ssign 7esponsibilit(

    ,ssign responsibilit( and authorit( for performing the process: de-eloping

    the work products: and pro-iding the ser-ices of the "process area name$

    process.

    G!.5 ",/$

    Train eople

    Train the people performing or supporting the "process area name$ process

    as needed.

    ,irecting Implementation

  • 8/14/2019 SCAMI radni prilozi.doc

    34/68

    G!.0 "I1$

    Manage Configurations

    lace designated work products of the "process area name$ process under

    appropriate le-els of configuration management.

    G!.2 "I!$

    Identif( and In-ol-e 7ele-ant Stakeholders

    Identif( and in-ol-e the rele-ant stakeholders of the "process area name$

    process as planned.

    G!.3 "I*$

    Monitor and Control the rocess

    Monitor and control the "process area name$ process against the plan forperforming the process and take appropriate correcti-e action.

    .eri$(ing Implementation

    G!.4 "&1$

    #b6ecti-el( &-aluate ,dherence

    #b6ecti-el( e-aluate adherence of the "process area name$ process against

    its process description: standards: and procedures: and addressnoncompliance.

    G!.1) "&!$

    7e-iew Status with Figher8e-el Management

    7e-iew the acti-ities: status: and results of the "process area name$ process

    with higher8le-el management and resol-e issues.

    Generic Practices ( Generic Goal

    GG*Institutionali'e a efined rocess

    The process is institutionali'ed as a defined process.

    Ailit( to Per$orm

    G*.1 ",1$

    &stablish a efined rocess

    &stablish and maintain the description of a defined "process area name$

    process.

    ,irecting Implementation

    G*.! "I/$

    Collect Impro-ement Information

    Collect work products: measures: measurement results: and impro-ement

    information deri-ed from planning and performing the "process area name$

    process to support the future use and impro-ement

  • 8/14/2019 SCAMI radni prilozi.doc

    35/68

  • 8/14/2019 SCAMI radni prilozi.doc

    36/68

    Appendix : C"ec#list $or t"e Continuous Representation o$ t"e CMMI

    %&er&ie'

    This checklist displa(s the specific goals and specific practices for each process area. Borprocess impro-ement efforts: this checklist can be used to document if procedures ha-ebeen written for a practice: what stage the documentation is in: and who is responsible.

    Bor appraisals: the appraisal team can use this checklist to determine if the practices ha-e

    been institutionali'ed in order to achie-e the goals for each process area. Beel free to add

    columns or rows to insert comments: tasks: status indicators: subpractices: artifacts: oran(thing else (ou feel will help structure and track (our efforts.

    The process areas are arranged b( categor(: to include%

    rocess Management

    ro6ect Management

    &ngineering

    Support

  • 8/14/2019 SCAMI radni prilozi.doc

    37/68

    SG1

    etermine rocess8Impro-ement #pportunities

    Strengths: weaknesses: and impro-ement opportunities for the organi'ation;s

    processes are identified periodicall( and as needed.

    S1.181

    &stablish #rgani'ational rocess Eeeds

    &stablish and maintain the description of the process needs and ob6ecti-es

    for the organi'ation.

    S1.!8

    1

    ,ppraise the #rgani'ation;s rocesses

    ,ppraise the processes of the organi'ation periodicall( and as needed tomaintain an understanding of their strengths and weaknesses.

    S1.*8

    1

    Identif( the #rgani'ation;s rocess Impro-ements

    Identif( impro-ements to the organi'ation;s processes and process assets.

    SG!

    lan and Implement rocess8Impro-ement ,cti-ities

    Impro-ements are planned and implemented: organi'ational process assets are

    deplo(ed: and process8related e=periences are incorporated into the organi'ational

    process assets.

    S!.18

    1

    &stablish rocess ,ction lans

    &stablish and maintain process action plans to address impro-ements to theorgani'ation;s processes and process assets.

    S!.!8

    1

    Implement rocess ,ction

    lans Implement process action plans across the organi'ation.

    S!.*81

    eplo( #rgani'ational rocess ,ssets

    eplo( organi'ational process assets across the organi'ation.

    S!./8

    1

    Incorporate rocess87elated &=periences into the #rgani'ational rocess

    ,ssets

    Incorporate process8related work products: measures: and impro-ementinformation deri-ed from planning and performing the process into the

    organi'ational process assets.

    %rganizational Process ,e$inition

    The purpose of #rgani'ational rocess efinition is to establish and maintain a usable set

    of organi'ational process assets.

    Specific ractices b( Specific Goal%

  • 8/14/2019 SCAMI radni prilozi.doc

    38/68

  • 8/14/2019 SCAMI radni prilozi.doc

    39/68

    needs.

    SG!

    ro-ide Eecessar( Training

    Training necessar( for indi-iduals to perform their roles effecti-el( is pro-ided.

    S!.181

    eli-er Training

    eli-er the training following the organi'ational training tactical plan.

    S!.!8

    1

    &stablish Training 7ecords

    &stablish and maintain records of the organi'ational training.

    S!.*8

    1

    ,ssess Training &ffecti-eness

    ,ssess the effecti-eness of the organi'ation;s training program.

    %rganizational Process Per$ormance

    The purpose of #rgani'ational rocess erformance is to establish and maintain a9uantitati-e understanding of the performance of the organi'ation;s set of standard

    processes in support of 9ualit( and process8performance ob6ecti-es: and to pro-ide the

    process performance data: baselines: and models to 9uantitati-el( manage theorgani'ation;s pro6ects.

    Specific ractices b( Specific Goal%

    SG1

    &stablish erformance aselines and Models

    aselines and models that characteri'e the e=pected process performance of theorgani'ation;s set of standard processes are established and maintained.

    S1.18

    1

    Select rocesses

    Select the processes or process elements in the organi'ation;s set of standard

    processes that are to be included in the organi'ation;s process performance

    anal(ses.

    S1.!81

    &stablish rocess erformance Measures

    &stablish and maintain definitions of the measures that are to be included in

    the organi'ation;s process performance anal(ses.

    S1.*8

    1

    &stablish @ualit( and rocess erformance #b6ecti-es

    &stablish and maintain 9uantitati-e ob6ecti-es for 9ualit( and processperformance for the organi'ation.

    S1./8

    1

    &stablish rocess erformance aselines

    &stablish and maintain the organi'ation;s process performance baselines.

  • 8/14/2019 SCAMI radni prilozi.doc

    40/68

    S1.58

    1

    &stablish rocess erformance Models

    &stablish and maintain the process performance models for the organi'ation;s

    set of standard processes.

    %rganizational Inno&ation and ,eplo(ment

    The purpose of #rgani'ational Inno-ation and eplo(ment is to select and deplo(incremental and inno-ati-e impro-ements that measurabl( impro-e the organi'ation;s

    processes and technologies. The impro-ements support the organi'ation;s 9ualit( and

    process8performance ob6ecti-es as deri-ed from the organi'ation;s business ob6ecti-es.

    Specific ractices b( Specific Goal%

    SG1

    Select Impro-ements

    rocess and technolog( impro-ements that contribute to meeting 9ualit( andprocess8performance ob6ecti-es are selected.

    S1.181

    Collect and ,nal('e Impro-ement roposals

    Collect and anal('e process8and technolog(8impro-ement proposals.

    S1.!8

    1

    Identif( and ,nal('e Inno-ations

    Identif( and anal('e inno-ati-e impro-ements that could increase the

    organi'ation;s 9ualit( and process performance.

    S1.*8

    1

    ilot Impro-ements

    ilot process and technolog( impro-ements to select which ones toimplement.

    S1./8

    1

    Select Impro-ements for eplo(ment

    Select process8and technolog(8impro-ement proposals for deplo(mentacross the organi'ation.

    SG!

    eplo( Impro-ements

    Measurable impro-ements to the organi'ation;s processes and technologies are

    continuall( and s(stematicall( deplo(ed.

    S!.181

    lan the eplo(ment

    &stablish and maintain the plans for deplo(ing the selected process and

    technolog( impro-ements.

    S!.!8

    1

    Manage the eplo(ment

    Manage the deplo(ment of the selected process and technolog(impro-ements.

  • 8/14/2019 SCAMI radni prilozi.doc

    41/68

    S!.*8

    1

    Measure Impro-ement &ffects

    Pro*ect Management

    Pro*ect Planning

    The purpose of ro6ect lanning is to establish and maintain plans that define pro6ectacti-ities.

    Specific ractices b( Specific Goal%

    SG1

    &stablish &stimates

    &stimates of pro6ect planning parameters are established and maintained.

    S1.18

    1

    &stimate the Scope of the ro6ect

    &stablish a top8le-el work breakdown structure "

  • 8/14/2019 SCAMI radni prilozi.doc

    42/68

    1 lan for necessar( resources to perform the pro6ect.

    S!.58

    1

    lan for Eeeded Anowledge and Skills

    lan for knowledge and skills needed to perform the pro6ect.

    S!.081

    lan Stakeholder In-ol-ement

    lan the in-ol-ement of identified stakeholders.

    S!.28

    1

    &stablish the ro6ect lan

    &stablish and maintain the o-erall pro6ect plan content.

    SG* #btain Commitment to the lan Commitments to the pro6ect plan are established and

    maintained.

    S*.18

    1

    7e-iew lans that ,ffect the ro6ect

    7e-iew all plans that affect the pro6ect to understand pro6ect commitments.

    S*.!8

    1

    7econcile

  • 8/14/2019 SCAMI radni prilozi.doc

    43/68

    Monitor risks against those identified in the pro6ect plan.

    S1./81

    Monitor ata Management

    Monitor the management of pro6ect data against the pro6ect plan.

    S1.581Monitor Stakeholder In-ol-ement

    Monitor stakeholder in-ol-ement against the pro6ect plan.

    S1.081

    Conduct rogress 7e-iews

    eriodicall( re-iew the pro6ect;s progress: performance: and issues.

    S1.281

    Conduct Milestone 7e-iews

    7e-iew the accomplishments and results of the pro6ect at selected pro6ectmilestones.

    SG!

    Manage Correcti-e ,ction to Closure

    Correcti-e actions are managed to closure when the pro6ect;s performance or results

    de-iate significantl( from the plan.

    S!.181

    ,nal('e Issues

    Collect and anal('e the issues and determine the correcti-e actions

    necessar( to address the issues.

    S!.!81

    Take Correcti-e ,ction

    Take correcti-e action on identified issues.

    S!.*81 Manage Correcti-e ,ction

    Manage correcti-e actions to closure.

    Supplier Agreement Management

    The purpose of Supplier ,greement Management is to manage the ac9uisition of

    products from suppliers for which there e=ists a formal agreement.

    Specific ractices b( Specific Goal%

    SG1 &stablish Supplier ,greements

    ,greements with the suppliers are established and maintained.

    S1.18

    1

    etermine ,c9uisition T(pe

    etermine the t(pe of ac9uisition for each product or product component to

    be ac9uired.

  • 8/14/2019 SCAMI radni prilozi.doc

    44/68

    S1.!8

    1

    Select Suppliers

    Select suppliers based on an e-aluation of their abilit( to meet the specified

    re9uirements and established criteria.

    S1.*81

    &stablish Supplier ,greements

    &stablish and maintain formal agreements with the supplier.

    SG!

    Satisf( Supplier ,greements

    ,greements with the suppliers are satisfied b( both the pro6ect and the supplier.

    S!.181

    7e-iew C#TS roducts

    7e-iew candidate C#TS products to ensure the( satisf( the specified

    re9uirements that are co-ered under a supplier agreement.

    S!.!8

    1

    &=ecute the Supplier ,greement

    erform acti-ities with the supplier as specified in the supplier agreement.

    S!.*81

    ,ccept the ,c9uired roduct

    &nsure that the supplier agreement is satisfied before accepting the ac9uired

    product.

    S!./8

    1

    Transition roducts

    Transition the ac9uired products from the supplier to the pro6ect.

    Integrated Pro*ect Management $or IPP,

    The purpose of Integrated ro6ect Management is to establish and manage the pro6ect andthe in-ol-ement of the rele-ant stakeholders according to an integrated and defined

    process that is tailored from the organi'ation;s set of standard processes.

    Bor Integrated roduct and rocess e-elopment: Integrated ro6ect Management also

    co-ers the establishment of a shared -ision for the pro6ect and a team structure forintegrated teams that will carr( out the ob6ecti-es of the pro6ect.

    Specific ractices b( Specific Goal%

    SG1

    Dse the ro6ect;s efined rocess

    The pro6ect is conducted using a defined process that is tailored from theorgani'ation;s set of standard processes.

    S1.18

    1

    &stablish the ro6ect;s efined rocess

    &stablish and maintain the pro6ect;s defined process.

  • 8/14/2019 SCAMI radni prilozi.doc

    45/68

    S1.!8

    1

    Dse #rgani'ational rocess ,ssets for lanning ro6ect ,cti-ities

    Dse the organi'ational process assets and measurement repositor( for

    estimating and planning the pro6ect;s acti-ities.

    S1.*81

    Integrate lans

    Integrate the pro6ect plan and the other plans that affect the pro6ect to

    describe the pro6ect;s defined process.

    S1./8

    1

    Manage the ro6ect Dsing the Integrated lans

    Manage the pro6ect using the pro6ect plan: the other plans that affect thepro6ect: and the pro6ect;s defined process.

    S1.58

    1

    Contribute to the #rgani'ational rocess ,ssets

    Contribute work products: measures: and documented e=periences to the

    organi'ational process assets.

    SG!Coordinate and Collaborate with 7ele-ant Stakeholders

    Coordination and collaboration of the pro6ect with rele-ant stakeholders is

    conducted.

    S!.18

    1

    Manage Stakeholder In-ol-ement

    Manage the in-ol-ement of the rele-ant stakeholders in the pro6ect.

    S!.!8

    1

    Manage ependencies

    articipate with rele-ant stakeholders to identif(: negotiate: and track critical

    dependencies.

    S!.*81

    7esol-e Coordination Issues

    7esol-e issues with rele-ant stakeholders.

    SG*

    Dse the ro6ect;s Shared ision for I

    The pro6ect is conducted using the pro6ect;s shared -ision.

    S*.18

    1

    efine ro6ect;s Shared8ision Conte=t

    Identif( e=pectations: constraints: interfaces: and operational conditionsapplicable to the pro6ect;s shared -ision.

    S*.!8

    1

    &stablish the ro6ect;s Shared ision

    &stablish and maintain a shared -ision for the pro6ect.

    SG/

    #rgani'e Integrated Teams for I

    The integrated teams needed to e=ecute the pro6ect are identified: defined: structured:and tasked.

  • 8/14/2019 SCAMI radni prilozi.doc

    46/68

    S/.18

    1

    etermine Integrated Team Structure for the ro6ect

    etermine the integrated team structure that will best meet the pro6ect

    ob6ecti-es and constraints.

    S/.!81

    e-elop a reliminar( istribution of 7e9uirements to Integrated Teams

    e-elop a preliminar( distribution of re9uirements: responsibilities:

    authorities: tasks: and interfaces to teams in the selected integrated team

    structure.

    S/.*81

    &stablish Integrated Teams

    &stablish and maintain teams in the integrated team structure.

    Ris# Management

    The purpose of 7isk Management is to identif( potential problems before the( occur: so

    that risk8handling acti-ities ma( be planned and in-oked as needed across the life of theproduct or pro6ect to mitigate ad-erse impacts on achie-ing ob6ecti-es.

    Specific ractices b( Specific Goal%

    SG1

    repare for 7isk Management

    reparation for risk management is conducted.

    S1.18

    1

    etermine 7isk Sources and Categories

    etermine risk sources and categories.

    S1.!81

    efine 7isk arameters

    efine the parameters used to anal('e and categori'e risks: and the

    parameters used to control the risk management effort.

    S1.*8

    1

    &stablish a 7isk Management Strateg(

    &stablish and maintain the strateg( to be used for risk management.

    SG!

    Identif( and ,nal('e 7isks

    7isks are identified and anal('ed to determine their relati-e importance.

    S!.18

    1

    Identif( 7isks

    Identif( and document the risks.

    S!.!81

    &-aluate: Categori'e: and rioriti'e 7isks

    &-aluate and categori'e each identified risk using the defined risk categories

    and parameters: and determine its relati-e priorit(.

  • 8/14/2019 SCAMI radni prilozi.doc

    47/68

    SG*

    Mitigate 7isks

    7isks are handled and mitigated: where appropriate: to reduce ad-erse impacts on

    achie-ing ob6ecti-es.

    S*.181

    e-elop 7isk Mitigation lans

    e-elop a risk mitigation plan for the most important risks to the pro6ect: as

    defined b( the risk management strateg(.

    S*.!8

    1

    Implement 7isk Mitigation lans

    Monitor the status of each risk periodicall( and implement the riskmitigation plan as appropriate.

    Integrated -eaming

    The purpose of Integrated Teaming is to form and sustain an integrated team for the

    de-elopment of work products.

    Specific ractices b( Specific Goal%

    SG1

    &stablish Team Composition

    , team composition that pro-ides the knowledge and skills re9uired to deli-er the

    team;s product is established and maintained.

    S1.18

    1

    Identif( Team Tasks

    Identif( and define the team;s specific internal tasks to generate the team;s

    e=pected output.

    S1.!8

    1

    Identif( Eeeded Anowledge and Skills

    Identif( the knowledge: skills: and functional e=pertise needed to perform

    team tasks.

    S1.*81

    ,ssign ,ppropriate Team Members

    ,ssign the appropriate personnel to be team members based on re9uired

    knowledge and skills.

    SG!

    Go-ern Team #peration

    #peration of the integrated team is go-erned according to established principles.

    S!.181

    &stablish a Shared ision

    &stablish and maintain a shared -ision for the integrated team that is aligned

    with an( o-erarching or higher8le-el -ision.

    S!.!8

    &stablish a Team Charter

  • 8/14/2019 SCAMI radni prilozi.doc

    48/68

    1 &stablish and maintain a team charter based on the integrated team;s shared

    -ision and o-erall team ob6ecti-es.

    S!.*8

    1

    efine 7oles and 7esponsibilities

    Clearl( define and maintain each team member;s roles and responsibilities.

    S!./8

    1

    &stablish #perating rocedures

    &stablish and maintain integrated team operating procedures.

    S!.58

    1

    Collaborate among Interfacing Teams

    &stablish and maintain collaboration among interfacing teams.

    Integrated Supplier Management

    The purpose of Integrated Supplier Management is to proacti-el( identif( sources of

    products that ma( be used to satisf( the pro6ect;s re9uirements and to manage selectedsuppliers while maintaining a cooperati-e pro6ect8supplier relationship.

    Specific ractices b( Specific Goal%

    SG1

    ,nal('e and Select Sources of roducts

    otential sources of products that best fit the needs of the pro6ect are identified:anal('ed: and selected.

    S1.18

    1

    ,nal('e otential Sources of roducts

    Identif( and anal('e potential sources of products that can be used to satisf(the pro6ect;s re9uirements.

    S1.!8

    1

    &-aluate and etermine Sources of roducts

    Dse a formal e-aluation process to determine which sources of custom8made

    and off8the8shelf products to use.

    SG!

    Coordinate

  • 8/14/2019 SCAMI radni prilozi.doc

    49/68

    1 7e-ise the supplier agreement or relationship: as appropriate: to reflect

    changes in conditions.

    +uantitati&e Pro*ect Management

    The purpose of the @uantitati-e ro6ect Management process area is to 9uantitati-el(

    manage the pro6ect;s defined process to achie-e the pro6ect;s established 9ualit( andprocess8performance ob6ecti-es.

    Specific ractices b( Specific Goal%

    SG1

    @uantitati-el( Manage the ro6ect

    The pro6ect is 9uantitati-el( managed using 9ualit( and process8performanceob6ecti-es.

    S1.18

    1

    &stablish the ro6ect;s #b6ecti-es

    &stablish and maintain the pro6ect;s 9ualit( and process8performance

    ob6ecti-es.

    S1.!81

    Compose the efined rocess

    Select the subprocesses that compose the pro6ect;s defined process based on

    historical stabilit( and capabilit( data.

    S1.*8

    1

    Select the Subprocesses that

  • 8/14/2019 SCAMI radni prilozi.doc

    50/68

    S!.*8

    1

    Monitor erformance of the Selected Subprocesses

    Monitor the performance of the selected subprocesses to determine their

    capabilit( to satisf( their 9ualit( and process8performance ob6ecti-es: andidentif( correcti-e action as necessar(.

    S!./8

    1

    7ecord Statistical Management ata

    7ecord statistical and 9ualit( management data in the organi'ation;s

    measurement repositor(.

    Engineering

    Reuirements Management

    The purpose of 7e9uirements Management is to manage the re9uirements of the pro6ect;s

    products and product components: and to identif( inconsistencies between those

    re9uirements and the pro6ect;s plans and work products.

    Specific ractices b( Specific Goal%

    SG1

    Manage 7e9uirements

    7e9uirements are managed: and inconsistencies with pro6ect plans and work

    products are identified.

    S1.18

    1

    #btain an Dnderstanding of 7e9uirements

    e-elop an understanding with the re9uirements pro-iders on the meaning

    of the re9uirements.

    S1.!8

    !

    #btain Commitment to 7e9uirements

    #btain commitment to the re9uirements from the pro6ect participants.

    S1.*8

    1

    Manage 7e9uirements Changes

    Manage changes to the re9uirements as the( e-ol-e during the pro6ect.

    S1./8

    !

    Maintain idirectional Traceabilit( of 7e9uirements

    Maintain bidirectional traceabilit( among the re9uirements and the pro6ect

    plans and work products.

    S1.581

    Identif( Inconsistencies between ro6ect

  • 8/14/2019 SCAMI radni prilozi.doc

    51/68

    The purpose of 7e9uirements e-elopment is to produce and anal('e customer: product:

    and product8component re9uirements.

    Specific ractices b( Specific Goal%

    SG1e-elop Customer 7e9uirements

    Stakeholder needs: e=pectations: constraints: and interfaces are collected and

    translated into customer re9uirements.

    S1.181

    Collect Stakeholder Eeeds

    Identif( and collect stakeholder needs: e=pectations: constraints: andinterfaces for all phases of the product life c(cle.

    In the staged representation: this specific practice is onl( included as informati-e

    material and appears after the &licit Eeeds specific practice.

    S1.18!

    &licit Eeeds

    &licit stakeholder needs: e=pectations: constraints: and interfaces for all

    phases of the product life c(cle.

    In the staged representation: this specific practice takes the place of the CollectStakeholder Eeeds specific practice.

    S1.!81

    e-elop the Customer 7e9uirements

    Transform stakeholder needs: e=pectations: constraints: and interfaces intocustomer re9uirements.

    SG!

    e-elop roduct 7e9uirements

    Customer re9uirements are refined and elaborated to de-elop product and product8

    component re9uirements.

    S!.181

    &stablish roduct and roduct8Component 7e9uirements

    &stablish and maintain product and product8component re9uirements: whichare based on the customer re9uirements.

    S!.!81 ,llocate roduct8Component 7e9uirements

    ,llocate the re9uirements for each product component.

    S!.*81

    Identif( Interface 7e9uirements

    Identif( interface re9uirements.

  • 8/14/2019 SCAMI radni prilozi.doc

    52/68

    SG*

    ,nal('e and alidate 7e9uirements

    The re9uirements are anal('ed and -alidated: and a definition of re9uiredfunctionalit( is de-eloped.

    S*.181

    &stablish #perational Concepts and Scenarios

    &stablish and maintain operational concepts and associated scenarios.

    S*.!81

    &stablish a efinition of 7e9uired Bunctionalit(

    &stablish and maintain a definition of re9uired functionalit(.

    S*.*81

    ,nal('e 7e9uirements

    ,nal('e re9uirements to ensure that the( are necessar( and sufficient.

    S*./8*

    ,nal('e 7e9uirements to ,chie-e alance

    ,nal('e re9uirements to balance stakeholder needs and constraints.

    S*.581

    alidate 7e9uirements

    alidate re9uirements to ensure that the resulting product will perform

    appropriatel( in its intended8use en-ironment.

    In the staged representation: this specific practice is onl( included as informati-ematerial and appears after the alidate 7e9uirements with Comprehensi-e Methods

    specific practice.

    S*.58!

    alidate 7e9uirements with Comprehensi-e Methods

    alidate re9uirements to ensure the resulting product will perform as

    intended in the user;s en-ironment using multiple techni9ues as appropriate.

    In the staged representation: this specific practice takes the place of the alidate

    7e9uirements specific practice.

    -ec"nical Solution

    The purpose of Technical Solution is to design: de-elop: and implement solutions to

    re9uirements. Solutions: designs: and implementations encompass products: productcomponents: and product8related life8c(cle processes either singl( or in combinations as

    appropriate.

    Specific ractices b( Specific Goal%

  • 8/14/2019 SCAMI radni prilozi.doc

    53/68

    SG1

    Select roduct8Component Solutions

    roduct or product8component solutions are selected from alternati-e solutions.

    S1.18

    1

    e-elop ,lternati-e Solutions and Selection Criteria

    e-elop alternati-e solutions and selection criteria.

    In the staged representation: this specific practice is onl( included as informati-e

    material and appears after the e-elop etailed ,lternati-e Solutions and Selection

    Criteria specific practice.

    S1.18!

    e-elop etailed ,lternati-e Solutions and Selection Criteria

    e-elop detailed alternati-e solutions and selection criteria.

    In the staged representation: this specific practice takes the place of the e-elop

    ,lternati-e Solutions and Selection Criteria specific practice.

    S1.!8

    !

    &-ol-e #perational Concepts and Scenarios

    &-ol-e the operational concept: scenarios: and en-ironments to describe theconditions: operating modes: and operating states specific to each product

    component.

    S1.*8

    1

    Select roduct8Component Solutions

    Select the product8component solutions that best satisf( the criteriaestablished.

    SG!

    e-elop the esign

    roduct or product8component designs are de-eloped.

    S!.18

    1

    esign the roduct or roduct Component

    e-elop a design for the product or product component.

    S!.!8*

    &stablish a Technical ata ackage

    &stablish and maintain a technical data package.

    S!.*8

    1

    &stablish Interface escriptions

    &stablish and maintain the solution for product8component interfaces.

    In the staged representation: this specific practice is onl( included as informati-e

    material and appears after the design interfaces using criteria specific practice.

    S!.*8

    *

    esign Interfaces Dsing Criteria

    esign comprehensi-e product8component interfaces in terms of established

    and maintained criteria.

  • 8/14/2019 SCAMI radni prilozi.doc

    54/68

    In the staged representation: this specific practice takes the place of the &stablish

    Interface escriptions specific practice.

    S!./8

    *

    erform Make: u(: or 7euse ,nal(ses

    &-aluate whether the product components should be de-eloped: purchased:or reused based on established criteria.

    SG*

    Implement the roduct esign

    roduct components: and associated support documentation are implemented from

    their designs.

    S*.18

    1

    Implement the esign

    Implement the designs of the product components.

    S*.!8

    1

    e-elop roduct Support ocumentation

    e-elop and maintain the end8use documentation.

    Product Integration

    The purpose of roduct Integration is to assemble the product from the productcomponents: ensure that the product: as integrated: functions properl(: and deli-er the

    product.

    Specific ractices b( Specific Goal%

    SG1

    repare for roduct Integration

    reparation for product integration is conducted.

    S1.18

    1

    etermine Integration Se9uence

    etermine the product8component integration se9uence.

    S1.!8

    !

    &stablish the roduct Integration &n-ironment &stablish

    and maintain the en-ironment needed to support the integration of the

    product components.

    S1.*8*

    &stablish roduct Integration rocedures and Criteria

    &stablish and maintain procedures and criteria for integration of the product

    components.

    SG!

    &nsure Interface Compatibilit(

    The product8component interfaces: both internal and e=ternal: are compatible.

    S!.18

    7e-iew Interface escriptions for Completeness

  • 8/14/2019 SCAMI radni prilozi.doc

    55/68

    1 7e-iew interface descriptions for co-erage and completeness.

    S!.!8

    1

    Manage Interfaces

    Manage internal and e=ternal interface definitions: designs: and changes for

    products and product components.

    SG*

    ,ssemble roduct Components and eli-er the roduct

    erified product components are assembled and the integrated: -erified: and

    -alidated product is deli-ered.

    S*.181

    Confirm 7eadiness of roduct Components for Integration

    Confirm: prior to assembl(: that each product component re9uired to

    assemble the product has been properl( identified: functions according to its

    description: and that the product8component interfaces compl( with the

    interface descriptions.

    S*.!8

    1

    ,ssemble roduct Components

    ,ssemble product components according to the product integration se9uence

    and a-ailable procedures.

    S*.*8

    1

    &-aluate ,ssembled roduct Components

    &-aluate assembled product components for interface compatibilit(.

    S*./8

    1

    ackage and eli-er the roduct or roduct Component

    ackage the assembled product or product component and deli-er it to the

    appropriate customer.

    .eri$ication

    The purpose of erification is to ensure that selected work products meet their specifiedre9uirements.

    Specific ractices b( Specific Goal%

    SG1

    repare for erification

    reparation for -erification is conducted.

    S1.18

    1

    Select

  • 8/14/2019 SCAMI radni prilozi.doc

    56/68

    S1.*8

    *

    &stablish erification rocedures and Criteria

    &stablish and maintain -erification procedures and criteria for the selected

    work products.

    SG!

    erform eer 7e-iews

    eer re-iews are performed on selected work products.

    S!.18

    1

    repare for eer 7e-iews

    repare for peer re-iews of selected work products.

    S!.!81

    Conduct eer 7e-iews

    Conduct peer re-iews on selected work products and identif( issues

    resulting from the peer re-iew.

    S!.*8

    !

    ,nal('e eer 7e-iew ata

    ,nal('e data about preparation: conduct: and results of the peer re-iews.

    SG*

    erif( Selected

  • 8/14/2019 SCAMI radni prilozi.doc

    57/68

  • 8/14/2019 SCAMI radni prilozi.doc

    58/68

    S!.!8

    1

    Control Configuration Items

    Control changes to the configuration items.

    SG*

    &stablish Integrit(

    Integrit( of baselines is established and maintained.

    S*.18

    1

    &stablish Configuration Management 7ecords

    &stablish and maintain records describing configuration items.

    S*.!8

    1

    erform Configuration ,udits

    erform configuration audits to maintain integrit( of the configurationbaselines.

    Process and Product +ualit( Assurance

    The purpose of rocess and roduct @ualit( ,ssurance is to pro-ide staff andmanagement with ob6ecti-e insight into processes and associated work products.

    Specific ractices b( Specific Goal%

    SG1

    #b6ecti-el( &-aluate rocesses and

  • 8/14/2019 SCAMI radni prilozi.doc

    59/68

    Measurement and Anal(sis

    The purpose of Measurement and ,nal(sis is to de-elop and sustain a measurement

    capabilit( that is used to support management information needs.

    Specific ractices b( Specific Goal%

    SG1

    ,lign Measurement and ,nal(sis ,cti-ities

    Measurement ob6ecti-es and acti-ities are aligned with identified information needs

    and ob6ecti-es.

    S1.18

    1

    &stablish Measurement #b6ecti-es

    &stablish and maintain measurement ob6ecti-es that are deri-ed fromidentified information needs and ob6ecti-es.

    S1.!81

    Specif( Measures

    Specif( measures to address the measurement ob6ecti-es.

    S1.*81

    Specif( ata Collection and Storage rocedures

    Specif( how measurement data will be obtained and stored.

    S1./8

    1

    Specif( ,nal(sis rocedures

    Specif( how measurement data will be anal('ed and reported.

    SG!

    ro-ide Measurement 7esults

    Measurement results that address identified information needs and ob6ecti-es are

    pro-ided.

    S!.18

    1

    Collect Measurement ata

    #btain specified measurement data.

    S!.!8

    1

    ,nal('e Measurement ata

    ,nal('e and interpret measurement data.

    S!.*81

    Store ata and 7esults

    Manage and store measurement data: measurement specifications: and

    anal(sis results.

    S!./8

    1

    Communicate 7esults

    7eport results of measurement and anal(sis acti-ities to all rele-antstakeholders.

    ,ecision Anal(sis and Resolution

  • 8/14/2019 SCAMI radni prilozi.doc

    60/68

    The purpose of ecision ,nal(sis and 7esolution is to anal('e possible decisions using a

    formal e-aluation process that e-aluates identified alternati-es against established

    criteria.

    Specific ractices b( Specific Goal%

    SG1

    &-aluate ,lternati-es

    ecisions are based on an e-aluation of alternati-es using established criteria.

    S1.18

    1

    &stablish Guidelines for ecision ,nal(sis

    &stablish and maintain guidelines to determine which issues are sub6ect to aformal e-aluation process.

    S1.!8

    1

    &stablish &-aluation Criteria

    &stablish and maintain the criteria for e-aluating alternati-es: and the

    relati-e ranking of these criteria.

    S1.*81

    Identif( ,lternati-e Solutions

    Identif( alternati-e solutions to address issues.

    S1./8

    1

    Select &-aluation Methods

    Select the e-aluation methods.

    S1.58

    1

    &-aluate ,lternati-es

    &-aluate alternati-e solutions using the established criteria and methods.

    S1.08

    1

    Select Solutions

    Select solutions from the alternati-es based on the e-aluation criteria.

    %rganizational En&ironment $or Integration

    The purpose of #rgani'ational &n-ironment for Integration is to pro-ide an Integrated

    roduct and rocess e-elopment "I$ infrastructure and manage people forintegration.

    Specific ractices b( Specific Goal%

    SG1

    ro-ide I Infrastructure

    ,n infrastructure that ma=imi'es the producti-it( of people and affects the

    collaboration necessar( for integration is pro-ided.

    S1.181

    &stablish the #rgani'ation;s Shared ision

    &stablish and maintain a shared -ision for the organi'ation.

  • 8/14/2019 SCAMI radni prilozi.doc

    61/68

    S1.!8

    1

    &stablish an Integrated

  • 8/14/2019 SCAMI radni prilozi.doc

    62/68

    their future occurrence.

    S!.18

    1

    Implement the ,ction roposals

    Implement the selected action proposals that were de-eloped in causal

    anal(sis.

    S!.!8

    1

    &-aluate the &ffect of Changes

    &-aluate the effect of changes on process performance.

    S!.*8

    1

    7ecord ata

    7ecord causal anal(sis and resolution data for use across the pro6ect andorgani'ation.

    Generic Goals and Generic Practices

    GG1,chie-e Specific Goals

    The process supports and enables achie-ement of the specific goals of the process

    area b( transforming identifiable input work products to produce identifiable output

    work products.

    G1.1

    erform ase ractices

    erform the base practices of the process area to de-elop work products and

    pro-ide ser-ices to achie-e the specific goals of the process area.

    GG!

    Institutionali'e a Managed rocess

    The process is institutionali'ed as a managed process.

    G!.1

    &stablish an #rgani'ational olic(

    &stablish and maintain an organi'ational polic( for planning and performing

    the process.

    G!.!

    lan the rocess

    &stablish and maintain the plan for performing the process.

    G!.*

    ro-ide 7esources

    ro-ide ade9uate resources for performing the process: de-eloping the workproducts: and pro-iding the ser-ices of the process.

    G!./

    ,ssign 7esponsibilit(

    ,ssign responsibilit( and authorit( for performing the process: de-eloping

    the work products: and pro-iding the ser-ices of the process.

    G!.5

    Train eople

  • 8/14/2019 SCAMI radni prilozi.doc

    63/68

    Train the people performing or supporting the process as needed.

    G!.0

    Manage Configurations

    lace designated work products of the process under appropriate le-els of

    configuration management.

    G!.2

    Identif( and In-ol-e 7ele-ant Stakeholders

    Identif( and in-ol-e the rele-ant stakeholders as planned.

    G!.3

    Monitor and Control the rocess

    Monitor and control the process against the plan for performing the processand take appropriate correcti-e action.

    G!.4

    #b6ecti-el( &-aluate ,dherence

    #b6ecti-el( e-aluate adherence of the process against its process

    description: standards: and procedures: and address noncompliance.

    G!.1)

    7e-iew Status with Figher8e-el Management

    7e-iew the acti-ities: status: and results of the process with higher8le-el

    management and resol-e issues.

    GG*

    Institutionali'e a efined rocess

    The process is institutionali'ed as a defined process.

    G*.1

    &stablish a efined rocess

    &stablish and maintain the description of a defined process.

    G*.!

    Collect Impro-ement Information

    Collect work products: measures: measurement results: and impro-ement

    information