Sample BCP

Embed Size (px)

Citation preview

  • 8/6/2019 Sample BCP

    1/26

    ABC Company Limited

    Business Continuity Plan

    For

    XYZ UNIT

    Date Created: _________

    Date Revised: ___________

  • 8/6/2019 Sample BCP

    2/26

    Table of Contents

    Emergency Management Team.......................................................................................................3

    Emergency Operations Centre.........................................................................................................4Primary Site................................................................................................................................4

    Alternate Site..............................................................................................................................4

    Scope and Objectives.......................................................................................................................5FUNCTION Order Fulfillment.....................................................................................................6

    Order Fulfillment - Business Continuity Plan (BCP) Team.......................................................7

    Scenario 1 - No Access to Main Warehouse, Backup Site Available........................................8Scenario 2 - No Access to Main Warehouse, Backup Site Not Available...............................18

    Scenario 3 Staff Shortages.....................................................................................................20

    FUNCTION Order Entry............................................................................................................21Order Entry - Business Continuity Plan (BCP) Team..............................................................22

    Scenario 1 - No Access to Main Warehouse, Backup Site AvailableScenario 2 - No Access to Main Warehouse, Backup Site Not Available...................................Scenario 3 Staff Shortages.........................................................................................................

    FUNCTION Stock Replenishment.............................................................................................23

    Stock Replenishment - Business Continuity Plan (BCP) Team...............................................24

    Scenario 1 - No Access to Main Warehouse, Backup Site AvailableScenario 2 - No Access to Main Warehouse, Backup Site Not Available...................................

    Scenario 3 Staff Shortages.........................................................................................................

    Exercise Log...............................................................................Error: Reference source not foundDocument Revision History..........................................................................................................26

  • 8/6/2019 Sample BCP

    3/26

    T e r e s a W a t s o n

    C o m m u n i c a t i o n s

    M a n a g e r

    P a t t i R e i s b u r g

    P l a n n i n g

    M a n a g e r

    D o n S m i t h

    F i n a n c e

    O p e r a t i o n

    T a r a Y o u n g

    L o g i s t i c s

    M a n a g e r

    W a y n e C o n e

    O p e r a t i o n s

    M a n a g e r

    D o u g S m a l l

    T e a m

    L e a d e r

    S e n i o r

    M a n a g e m e n t

    T e m

    L e a d e r T e m

    L e a d e r T e m

    L e a d e r T e mL e a d e r B C P T e a m

    L e a d e r s

    M E R G E N C Y M A N A G E M E N T T E A M( E M T )

    Business Continuity Plan Page 3XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    Emergency Management Team

    If a major incident/disaster occurs, the Emergency Management Team (EMT) will be convened and the

    situation assessed. It will be the responsibility of this team to decide whether or not to implement theindividual department/business unit Business Continuity Plans. The format of the EMT is illustrated in

    the following diagram:

    This Business Continuity Plan (BCP) will be activated by the BCP Team Leader, as identified in the

    plan, when he/she receives instructions from the Operations Manager on the Emergency Management

    Team (EMT).

    When an

    emergency

    has beendeclared

    by

    the BCP

    TeamLeader

    will report

    directly tothe EMT

    Operations Manager for the duration of the emergency. All ad hoc requests for decisions, assistance

    with facilities, acquiring outside services, etc. will be directed by the BCP Team Leader to the EMT

    through the Operations Manager.

    It will be the BCP Team Leaders responsibility to contact all team members or their alternates andensure that they convene at the Emergency Operations Centre as defined in this plan.

    The BCP Team Leader will be responsible for the successful implementation of this plan.

  • 8/6/2019 Sample BCP

    4/26

    Emergency Operations Centre

    Primary Site

    In the event that the XYZ UNIT is not accessible, the Business Continuity Teams will meet in the

    conference room at ABC Company Limiteds head office facility in Hamilton. The address of thisfacility is:

    ABC Company Limited25 King Street West

    6th Floor, Suite 645

    Hamilton, Ontario L8N 3T5Telephone: (905) 555-3983

    FAX: (905) 555-3988

    Directions: from the Mississauga area, take the QEW west to Burlington. In Burlington, at the

    QEW/403 junction, take Highway 403 West to the Main Street East exit. FollowMain Street east to the Hamilton Convention Centre. Underground parking is

    available at the convention centre. Exit the parking garage onto King Street and walkeast to the Head Office facility.

    Alternate Site

    No official EOC alternate site has been defined at this time. If during an emergency, the primary site

    defined above is not available, the Emergency Management Team will inform all relevant BCP teams as

    to the location and contact numbers of the EOC when initial contact is made.

  • 8/6/2019 Sample BCP

    5/26

    Business Continuity Plan Page 5XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    Scope and Objectives

    This plan covers a limited number of scenarios under which Business Continuity Plans would be

    implemented. They are as follows:

    1. No Access to Main Warehouse, Backup Site Available

    2. No Access to Main Warehouse, Backup Site Not Available3. Staff Shortages

    As determined by the Business Impact Analysis (see document A645-3), the following businessfunctions are addressed by this plan.

    1. Order Entry2. Order Fulfillment

    3. Stock Replenishment

  • 8/6/2019 Sample BCP

    6/26

    FUNCTION Order Fulfillment

    The XYZ UNIT warehouse picks and ships stock from a computer printed pick list. When the

    order has been shipped, the final quantities are entered into the local computer system. Eachevening shipped order information is transmitted to the Head Office system for billing or back

    ordering purposes.

  • 8/6/2019 Sample BCP

    7/26

    Business Continuity Plan Page 7XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    Order Fulfillment - Business Continuity Plan (BCP) TeamTeam Leader

    Sam Yong

    Address: 185 Sycamore Cres., Mississauga, ON

    Contacts:

    Office Tel: Ext: 8577

    Home Tel: 555-9847

    Cottage Tel: (519) 555-0934 (Haliburton area)

    Cell Phone: (416) 555-4399

    Personal E-Mail: [email protected]

    First Alternate

    Sarah Winters

    Second Alternate

    Jim Borochuk

    Team Member

    Sarah Winters

    Address: 2456 Watson Blvd., Apt. 216,

    Brampton, ON

    Contacts:

    Office Tel: Ext: 8573Home Tel: 555-5643

    Cell Phone: 555-4833

    Pager: 555-3039

    Personal E-Mail:[email protected]

    First Alternate

    Jenny Crukshank

    Address: 876 Foxtail Dr., Mississauga, ON

    Contacts:

    Office Tel: Ext: 8534

    Home Tel: 555-4555Personal E-Mail:[email protected]

    Second Alternate

    Dan Smith

    Address: RR#1, Norval, ON

    Contacts:

    Office Tel: Ext: 8544

    Home Tel: (905)555-3443

    Personal E-Mail: [email protected]

    Team Member

    Jim Borochuk

    Address: 764 Cardinal Cres, Mississauga, ON

    Contacts:

    Office Tel: Ext: 8545

    Home Tel: 555-6635

    Cell Phone: 555-9877

    Pager: 555-4342

    Personal E-Mail: [email protected]

    First Alternate

    Wendy Groggins

    Address: 876 Foxtail Dr., Mississauga, ON

    Contacts:

    Office Tel: Ext: 8533

    Home Tel: 555-5597

    Home FAX: 555-3833

    Personal E-Mail: [email protected]

    Second Alternate

    Rob Benson

    Address: 77 Windemere Ave, Etobicoke, ON

    Contacts:Office Tel: Ext: 8595

    Home Tel: (905)555-3443

    Cell Phone: 555-3980

    Personal E-Mail: [email protected]

  • 8/6/2019 Sample BCP

    8/26

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Recovery Procedure

    The recovery procedure consists of implementing a manual procedure at a third party warehouse

    to pick, ship and bill orders until computer systems are available. When computer systems areavailable, picking, shipping and billing input will continue at the third party warehouse location

    until the XYZ UNIT facility is again available.

    Recovery Time Objective (RTO)

    This plan is based on the fact that 80% of our revenues are generated by 20% of our products.The products that make up this 20% are stored as safety stock in an ACME Warehousing Ltd

    facility located in Mississauga.

    During an incident our RTO is 4 hours after an emergency is declared. We will operate at an

    80% revenue level until full access to our main warehousing facility is restored.

    Recovery Location

    ACME Warehousing Ltd.

    76 Matheson Blvd.

    Mississauga, Ontario

    L8U 4T5

    Phone: (905) 555-7745

    Directions to Backup Warehouse:

    From QEW:North on Highway 10 to Matheson Blvd.

    Turn left on Matheson facility is on the left hand side, 1.4 kms from Highway

    10.

    From Highway 401:

    South on Highway 10 to Matheson Blvd.

    Turn right on Matheson facility is on the left hand side, 1.4 kms from Highway10.

  • 8/6/2019 Sample BCP

    9/26

    Business Continuity Plan Page 9XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    Dependencies

    This plan is dependent upon Acme Warehousing Ltd. having the designated backup warehouse

    available during the time that our facility is inaccessible. We are currently using this facility forsafety stock for the products that constitute 80% of our revenue stream.

    This plan is dependent on the Head Office computer system being able to run the order entry and

    billing functions no later than 5 days after a disaster has been declared.

    Other Considerations

    If the Acme site is out of operation because of some wide scale disaster, we will revert to the

    BCP scenario that takes this into account.

  • 8/6/2019 Sample BCP

    10/26

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Recovery Steps - Summary

    Step 1 Contact Business Continuity team members and arrange for a meeting.

    Step 2 Business Continuity team meets and reviews plan.

    Step 3 Contact backup warehouse.

    Step 4 Contact warehouse staff and set up information meeting.

    Step 5 Review staffing requirements.

    Step 6 Meet with warehouse staff and inform of situation.

    Step 7 Visit backup warehouse and ensure FAX and telephone equipment is working.

    Step 8 Contact shipping companies and inform them of new pickup and drop-offlocation.

    Step 9 Contact purchasing and stop delivery of identified products.

    Step 10 Contact sales to instruct customers of situation.

    Step 11 Meet with warehouse staff and review operating procedure.

    Step 12 Run a test order through the system.

    Step 14 Order additional shipping supplies.

    Step 15 Contact IT and determine when computer services will be restored.

    Step 16 Arrange for implementation of warehouse PC and printer.

  • 8/6/2019 Sample BCP

    11/26

    Business Continuity Plan Page 11XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 1. Contact Business Continuity team members and arrange meeting.

    Contact team members (see BCP Team page for contact numbers) or their alternates and arrange a

    meeting time at the EOC.

    Responsibility: Sam Yong

    Date Completed ______________ Initials: ____

    Equipment/Office Supplies:Description Where Contact

    Telephone/FAX/Internet

  • 8/6/2019 Sample BCP

    12/26

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 2. Contact Business Continuity team members and arrange meeting.

    Meet with BCP team members and assess the situation. Review the plan and determine whether or not

    all steps need to be taken. Based on the situation, do other steps need to be implemented. If sodocument and assign responsibility. Prepare an implementation plan and submit to the Operations

    Manager of the EMT.

    Responsibility: Sam Yong

    Date Completed ______________ Initials: ____

    People/Services:Description Function Contact

    Emergency ManagementTeam Operations Manager

    EMT Main Contact Bob Salesworth

    555 3983 (Hamilton)

    555 8746 (Mississauga)

  • 8/6/2019 Sample BCP

    13/26

    Business Continuity Plan Page 13XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 3 Contact backup warehouse.

    Contact the backup warehouse and inform them that we are invoking our Business Continuity Plan.

    Arrange a time for an on site visit.

    Responsibility: Sarah Winters

    Date Completed ______________ Initials: ____

    Facilities:Description Where Contact

    Backup Warehouse ACME Warehousing Ltd.

    76 Matheson Blvd.

    Mississauga, Ontario

    L8U 4T5

    Henry Watson

    General Manager

    (905) 555-7745

  • 8/6/2019 Sample BCP

    14/26

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 4 Contact warehouse staff and set up information meeting.

    Contact all warehouse staff and invite them to a situation status meeting. Unless otherwise determined

    by the Business Continuity Team, this meeting will occur at the EOC.

    Responsibility: Jim Borochuk

    Date Completed ______________ Initials: ____

    Vital Records:Description Where Contact

    List of WarehouseEmployees

    EOC Backup Media Room Walt Smith

    555-8383 (Hamilton)

    555-9483 (Mississauga)

    Equipment/Office Supplies:Description Where ContactTelephone/FAX/Internet

  • 8/6/2019 Sample BCP

    15/26

    Business Continuity Plan Page 15XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 5 Review staffing requirements.

    Review warehouse staffing requirements based on the BCP. Our agreement with ACME states that their

    current staff will assist in order picking. We will provide a manager, quality control, shipping, andadministrative personnel. Set up shift schedules and determine whether any of our employees are

    considered redundant. Be prepared to inform redundant employees of their status until full operations

    are resumed.

    Responsibility: Sam Yong

    Date Completed ______________ Initials: ____

  • 8/6/2019 Sample BCP

    16/26

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 6 Meet with warehouse staff and inform of situation.

    Meet with the warehouse staff and review the situation. Inform them of the immediate plans, shif

    schedules and assigned duties. Review redundancy policy if applicable.

    Responsibility: Sam Yong

    Date Completed ______________ Initials: ____

  • 8/6/2019 Sample BCP

    17/26

    Business Continuity Plan Page 17XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 7 Visit Backup warehouse.

    Do an on site inspection of the backup warehouse facility. Ensure that all required equipment (see table

    below) is present and in working order. Ensure all required support supplies (see table below) arepresent.

    Responsibility: Sarah Winters

    Date Completed ______________ Initials: ____

    Equipment/Office Supplies:

    Description Where Contact

    FAX Machine

    Telephone

    Order receiving room asdefined in our contract with

    ACME. West side of

    building near front entrance.

    FAX Operations Guide and

    Service Manual

    In bookcase next to FAX

    Machine.

    EZ Communications Ltd.

    FAX Servicing &

    Maintenance

    (905) 555-3838

    500 Shipping Cartons

    12 x 12 x 12

    Aisle 10, Bin 45

    1000 Shipping Cartons Aisle 10, Bin 46

    5000 Shipping Labels Aisle 10, Bin 47

    Pens, paper, Order Receiving Room

    Stapler Order Receiving Room

    Order Shipping Log Order Receiving Room

  • 8/6/2019 Sample BCP

    18/26

    ORDER FULFILLMENT

    Scenario 1 - No Access to Main Warehouse, Backup Site Available

    Step 8 Contact Shipping Companies.

    Contact shipping companies (see table below) and advise them of the new pickup and delivery location.

    If new schedules are required, advise accordingly.

    Responsibility: Jim Borochuk

    Date Completed ______________ Initials: ____

    People/Services:Description Function Contact

    Purolator Courier Courier Service Sally WentworthMississauga

    Phone: (905) 555-3933

    FAX: (905) 555-3934

    Trans-Border Freight Product Shipping (USA) Kent Harrelson

    Hamilton

    Phone: (905) 555-9982

    FAX: (905) 555-9980E-mail: [email protected]

    Rite Time Trucking Product Shipping (Canada) Lori Kent

    Toronto

    Phone: (416) 555-8474

    FAX: (416) 555-1982

    ACEs Delivery Local Delivery

    (Small shipments)

    Ed Campinos

    Toronto

    Phone: (416) 555-5564

    FAX: (416) 555-3999

    ORDER FULFILLMENT

    Scenario 2 - No Access to Main Warehouse, Backup Site Not Available

  • 8/6/2019 Sample BCP

    19/26

    Business Continuity Plan Page 19XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    Recovery Procedure

    The recovery procedure consists of ..

  • 8/6/2019 Sample BCP

    20/26

    ORDER FULFILLMENT

    Scenario 3 Staff Shortages

    Recovery Procedure

    The recovery procedure consists of ..

  • 8/6/2019 Sample BCP

    21/26

    Business Continuity Plan Page 21XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    FUNCTION Order Entry

    The XYZ UNIT takes orders which are phoned or Faxed into the CSR (Customer Service

    Representative) department. These orders are keyed into the Head Office order entry system

    Depending on stock availability, orders are backordered by the system, or a picking slip isprinted in the Saville warehouse.

  • 8/6/2019 Sample BCP

    22/26

    Order Entry - Business Continuity Plan (BCP) Team

  • 8/6/2019 Sample BCP

    23/26

    Business Continuity Plan Page 23XYZ UNIT

    ---------------------------------------------------------------------------------------------------------------------------

    FUNCTION Stock Replenishment

    The XYZ UNIT warehouse is replenished automatically by output from the automated

    warehouse replenishment system (WRS) which resides on the head office computer systemsReplenishment requirements are reviews by Head Office purchasers and orders then placed with

    our suppliers.

  • 8/6/2019 Sample BCP

    24/26

    Stock Replenishment - Business Continuity Plan (BCP) Team

  • 8/6/2019 Sample BCP

    25/26

  • 8/6/2019 Sample BCP

    26/26

    Document Revision History

    Date Author Revision

    Aug 12, 2000 G. Mohr Document Created

    Oct. 25, 2000 G. Mohr Updated telephone numbers after communications

    exercise.