RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

"" RMIS View/Print Document Cover Sheet""

This document was retrieved from the Boeing ISEARCH System.

Accession #: Dl9611571 9

Document #: SD-W252-FDC-001

TitlelDesc:

TREATMENT & DISPOSAL FDC FOR PROJECT W-252 PHASE II LIQUID EFFLUENT

Page 2: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 3: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

1. ECN (use no. from pg. 1)

ENGINEERING CHANGE NOTICE Page 2 of 2 622864 15. Design 16. cost Inpact 17. Schedule Impact (days)

V e r i f i c a t i o n ENGINEERING CONSTRUCTION Required

[ X I NO

*hat w i l l be a f fec ted bv the chanae described in Block 12. Enter the affected docunent nrmber i n Block 19.

[ I l n p r o v n n t [ I 4 Addi t ional

[ I [ I 416.4M Delay [ I N J A [ I Addi t ional

Savings $2.6M Savings [ I Yes

18. Change Impact Revieu: I nd i ca te the re la ted docunnts (other than the engineering docunents i d e n t i f i e d on Side 1)

SDD/DD

Functional Design c r i t e r i a

Operating Spec i f i ca t i on

c r i t i c a l i t y Spec i f i ca t i on

Conceptual Design Report

E q u i p n e n t Spec. Const. Spc .

P r o c u r n n t Spec.

Vendor In format ion

w Manual

FSAR/SAR

Safety Equipnent L i s t Radiat ion Work Permit

E n v i r o m n t a l Inpact Statement E n v i r o m n t a l Report

E n v i r o m n t a l Permit L l

[ I

Seismic/Stress Analysis

StresslDesign Report

I n te r face Control Drauing

Cal ibrat ion Procedure

I n s t a l l a t i o n Procedure

Maintenance Procedure

Engineering Procedure

operating I n s t r u c t i o n

Operating Procedure

Operational Safety Requirmnt IEFD Drauing

Ce l l Arrangement Drauing Essential Mater ia l Speci f icat ion Fac. Proc. Sanp. Schedule

Inspection Plan

Inventory Adjustment nm,-rr t

Tank Ca l i b ra t i on Manual Health Physics Procedure Spares M u l t i p l e U n i t L i s t i n g Test Procedures lspeci f icat io n Conponent Index

ASME Coded Item Hunan Factor Consideration Campllter Softuare

E l e c t r i c C i r c u i t Schedule ICRS Procedure

Process Control Manual/Plan Process Flou Chart Purchase Requis i t ion

T i ck le r F i l e

19. Other Affected Doc-nts: (NOTE: Doctmnts l i s t e d below u i l l not be revised by t h i s ECN.) Signatures belou i nd i ca te t h a t t he s ign ing organization has been n o t i f i e d o f other a f fected d o c m t s l i s t e d btlou.

D o c M m t Nunber/Revision

NJA Docunent Nunber/Revi s i on D o c m n t Nunber Revision

~~~

20. Approvals Signature

Cog. Eng. CE Hatch

cog. Mgr. JD

QA JA P e l t i e r

Environ. YE T

Tank Farms RA Uahlqui

Pro jects KS Pederse

Pro jects JR K e l l y

0-Plant RD Ueisennfel

TEDF Ops. Mu Peres TEDF ECO DL Flyckt b -

Date Signature ARCHITECT-ENGINEER

c / 7 , I?> DEPARTMENT OF ENERGY

D I T I ONAL

Date

A-7900-013-3 (11/94) GEF096

Page 4: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

RELEASE AUTHORIZATION

Document Number: WHC-SD-W252-FDC-001, Rev. 2

Funct ional Design C r i t e r i a f o r P r o j e c t W-252, "Phase 11. L i q u i d E f f l u e n t Treatment and Disposal" Document Title:

~

Release Date: 10/27/95

This document was reviewed following the procedures described in WHC-CM-3-4 and is:

APPROVED FOR PUBLIC RELEASE

WHC Information Release Administration Specialist:

A . P , . L u 4 e - 7 , 10/27/95 I

/ Janis Bishop d

TRADEMARK DISCLAIMER. Reference h e r e i n t o any s p e c i f i c commercial product , process, o r s e r v i c e by t r a d e name. trademark, manufacturer, o r o therwise, does n o t necessar i l y c o n s t i t u t e or imply i t s endorsement, recommendation, o r f a v o r i n g by t h e Uni ted States Government o r any agency t h e r e o f o r i t s con t rac tors o r subcontractors.

Th is r e p o r t has been reproduced from t h e best a v a i l a b l e copy. DaDer CODY. P r i n t e d i n t h e Uni ted States of America. To o b t a i n coDies o f

A v a i l a b l e i n r ~ r -

t h i s r e p o r t . con tac t : Westi nghouse Hanford Company - Document Contro l Services P . O . Box 1970. Ma i ls top H6-08. Richland. WA 99352 Telephone: (509) 372-2420: Fax: (509) 376-4989

A-6001-400.2 (09194) YEF256

Page 5: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 6: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 7: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 8: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 9: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

TIILS PAGE INTENTIONALLY LEFF B U N K

Page 10: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

FUNCTIONAL DESIGN CRITERIA

f o r

PROJECT W-252

PHASE I1 L I Q U I D EFFLUENT TREATMENT AND DISPOSAL

Prepared by

C . E. Hatch

May 1995

Westinghouse Hanford Company Remediat ion and R e s t o r a t i o n

L i q u i d Waste D isposa l

for t h e

U n i t e d S t a t e s Department o f Energy R i c h l a n d O p e r a t i o n s O f f i c e

R i c h l a n d , Washington

Page 11: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 12: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 13: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 14: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 15: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 16: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev . 2

TABLE OF CONTENTS

1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

2.0 FUNCTIONAL CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 SITE LOCATION . . . . . . . . . . . . . . . . . . . . . . . . 5 2.2 PROJECT INTERFACES . . . . . . . . . . . . . . . . . . . . . . 5

3.0 PROCESS DESIGN CRITERIA . . . . . . . . . . . . . . . . . . . . . . 6 3.1 INSTRUMENTATION AND CONTROL . . . . . . . . . . . . . . . . . 6

3.1.1 BAT/AKART 1NSTRUMENTATION.AND CONTROL . . . . . . . . 6 3.1.2 B POND/TEDF TIE-IN INSTRUMENTATION . . . . . . . . . . 7

3.2 PIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 3.3 GENERAL MECHANICAL/CHEMICAL PROCESS . . . . . . . . . . . . . . 8

3.3.1 B P l a n t Coo l ing Water . . . . . . . . . . . . . . . . . 8 3.3.2 C o l l e c t i o n System . . . . . . . . . . . . . . . . . . . 9 3.3.3 Disposal System . . . . . . . . . . . . . . . . . . . 10 3.3.4 Sample C o l l e c t i o n and Ana lys i s . . . . . . . . . . . . . 10 3.3.5 Support Systems . . . . . . . . . . . . . . . . . . . 10

4.0 FACILITY DESIGN CRITERIA . . . . . . . . . . . . . . . . . . . . . . . 10 4.1 ARCHITECTURAL . . . . . . . . . . . . . . . . . . . . . . . . 11 4.2 HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) . . . . . . 11 4.3 UTILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 4.4 LIGHTING . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4.5 ELECTRICAL . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4.6 ENERGY CONSERVATION . . . . . . . . . . . . . . . . . . . . . 12 4.7 MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . 12

4.7.1 Equipment . . . . . . . . . . . . . . . . . . . . . . 12 4.7.2 M a t e r i a l s . . . . . . . . . . . . . . . . . . . . . . 13

4.8 SITE IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . 13 4.9 DESIGN LIFE . . . . . . . . . . . . . . . . . . . . . . . . . 13 4.10 RELIABILITY . . . . . . . . . . . . . . . . . . . . . . . . . 14

-

5.0 GENERAL REQUIREMENTS . . . . . . . . . 5.1 SAFETY . . . . . . . . . . . . .

5.1.1 C r i t i c a l i t y . . . . . . 5.1.2 Sa fe ty Ana lys i s . . . . 5.1.3 Contamination Cont ro l . 5.1.4 S h i e l d i n g . . . . . . . 5.1.5 I n d u s t r i a l . . . . . . . 5.1.6 F i r e P r o t e c t i o n . . . . .

5.2 ENVIRONMENTAL PROTECTION . . . . 5.2.1 A i r . . . . . . . . . . 5.2.2 P e r m i t t i n g Documentation

. . . . . . . . . . . . . . . 14 . . . . . . . . . . . . . . . 14

. . . . . . . . . . . . . . . 14 . . . . . . . . . . . . . . . 14 . . . . . . . . . . . . . . . 14 . . . . . . . . . . . . . . . 15 . . . . . . . . . . . . . . . 15 . . . . . . . . . . . . . . . . 15 . . . . . . . . . . . . . . . 15 . . . . . . . . . . . . . . . 15 . . . . . . . . . . . . . . . 16

v i i

Page 17: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev . 2

5.2.3 Hazardous M a t e r i a l Usage . . . . . . . . . . . . . . . 16 5.3 SAFEGUARDS AND.SECURITY . . . . . . . . . . . . . . . . . . . 16 5.4 NATURAL FORCES . . . . . . . . . . . . . . . . . . . . . . . . 17 5.5 DESIGN FORMAT . . . . . . . . . . . . . . . . . . . . . . . . 17 5.6 QUALITY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . 17 5.7 DECONTAMINATION AND DECOMMISSIONING . . . . . . . . . . . . . 18 5.8 OPERATING PERSONNEL AND SERVICES . . . . . . . . . . . . . . . 18 5.9 COMMUNICATIONS . . . . . . . . . . . . . . . . . . . . . . . . 18

6.0 CODES AND STANDARDS . . . . . . . . . . . . . 20

7.0 REFERENCES . . . . . . . . . . . . . . . . . . .

APPENDIX G B PLANT COOLING HATER BAT/AKART SYSTEM . . . . . . . APPENDIX J PROCESS AND SUPPORT FACILITY DESIGN CONSIDERATIONS . .

. 23

. 29

. 3 1

v i i i

Page 18: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

LIST OF FIGURES

F igu re G-1 B P l a n t Coo l ing Water System Flow Diagram . . . ,

LIST OF TABLES

Table 1 P r o j e c t W-252 Wastestreams . . . . . .

. 30

2

i x

Page 19: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

T h i s page intentionally left blank.

X

Page 20: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 21: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 22: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

0 C r i t e r i o n 4, Disposal F a c i l i t y Life--The du ra t i on o f t h e f a c i l i t y miss ion exceeds t h e minimum est imated l i f e o f t h e d isposal s i t e .

Wastestreams designated as a Phase I1 e f f l u e n t d i d no t meet any o f t h e above c r i t e r i a . Add i t i ona l in fo rmat ion regard ing t h e p r i o r i t i z a t i o n and c r i t e r i a are i n t h e Plan and Schedule (RL 1987) and the 1988 and 1989 s ta tus r e p o r t s (WHC 1988a and WHC 1989).

A key element o f t h e p lan i s t h e s e l e c t i o n o f BAT/AKART f o r t h e e f f l u e n t streams. discharged e f f l u e n t s meet environmental standards. The completed BAT/AKART s tud ies have been incorporated i n t o a Washington Admin i s t ra t i ve Code (WAC) 173-240 Engineer ing Report and submit ted t o t h e Sta te o f Washington Department o f Ecology (Ecology) and t h e U.S. Environmental P ro tec t i on Agency (EPA).

I n 1989, t h e DOE entered i n t o an in teragency agreement w i t h Ecology and EPA. Th is agreement i s r e f e r r e d t o as the "Hanford Federal F a c i l i t y Agreement and Consent Order" (Tr i -Par ty Agreement) (Ecology, e t a l . 1989). P r o j e c t W-252 i s one o f t h e p r o j e c t s requ i red t o achieve the mi lestones se t f o r t h i n t h e T r i - P a r t y Agreement. implementat ion f o r Phase I1 streams by October 1997. The wastestreams inc luded i n P ro jec t W-252 are t h e Phase I1 streams t h a t are no t addressed as p a r t o f t h e 200 Area Treated E f f l u e n t Disposal F a c i l i t y (TEDF), P r o j e c t W-049H and Pro jec t W-291H.

Th is Funct ional Design C r i t e r i a (FDC) document prov ides the techn ica l base1 i n e requ i red t o i n i t i a t e P ro jec t W-252 t o meet the T r i -Pa r t y Agreement mi les tone f o r t h e a p p l i c a t i o n o f BAT/AKART t o t h e Phase I1 e f f l u e n t s . I n A p r i l 1995 t h e BAT/AKART determinat ion was rev i sed per ECN #609363 t o cu r ren t s ta tus .

These s tud ies determine the best management p rac t i ces t o assure

One o f t h e mi lestones, M-17-00B, requ i res BAT/AKART

1.2 SCOPE

With in t h e scope o f P ro jec t W-252 i s BAT\AKART A l t e r n a t i v e #3 implementat ion a t B P lant , i n c l u d i n g t h e Waste Encapsulat ion and Storage F a c i l i t y (WESF).

Some of t h e equipment and systems o f t h i s f a c i l i t y t o be impacted by P r o j e c t W-252 may inc lude, but are no t l i m i t e d to , m o d i f i c a t i o n o f e f f l u e n t producing systems such as heat ing, v e n t i l a t i n g , and a i r cond i t i on ing (HVAC), replacement o f e f f l u e n t producing equipment, replacement o r m o d i f i c a t i o n o f once-through c o o l i n g water systems, m o d i f i c a t i o n o f p i p i n g systems, and/or a d d i t i o n a l ins t rumenta t ion .

BAT/AKART implementation f o r the 241-A Tank Farms c o o l i n g water wastestream (Table 1) i s excluded from t h i s p r o j e c t . BAT/AKART f o r t h i s stream s h a l l be prov ided by Tank Farms V e n t i l a t i o n Upgrade, P r o j e c t W-030. C o l l e c t i o n and t r a n s p o r t o f the wastestream remaining a f t e r

The systems necessary t o implement

3

Page 23: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

Project W-030 has implemented BAT/AKART will be in the scope of Project W-252. This will be accomplished by utilizing existing B-Pond piping, and the TEDF Tie-in. (Subject to funding restrictions identified in the Introduction.)

Project W-252 will provide the facilities and equipment to collect, sample, monitor, and transport to TEOF for disposal the effluent from E-Plant. addition the project will collect and transfer to TEDF the remaining Phase I1 streams by a single downstream connection. (Subject to funding restrictions identified in the Introduction.) interface of those streams will be done by others, except for pump interface signals.

The project will include the necessary utilities, communications, fire protection, and other safety-related items or features to make the project operational. In addition, these utilities will be designed to allow this project to be integrated with the 200 Area TEDF. provided by the project where necessary to construct, maintain, or operate the provided systems.

The final treatment and disposal of secondary solid radioactive mixed waste (RMW), dangerous waste (DW), and/or radioactive waste (RW) is excluded from the scope of this project. utilize existing or planned Hanford Site facilities including:

In

Required sampling, monitoring and signal

Site improvements will be

Treatment and disposal of these wastes shall

0 0 0

200 East Burial Grounds 200 West Central Waste Complex (WRAP) 616 Facility.

2.0 FUNCTIONAL CRITERIA

Project W-252 shall provide the necessary systems, components, facility modifications, and buildings required to implement BAT/AKART Alternative #3 at B-Plant, including the Waste Encapsulation and Storage Facility (WESF). If funding is available Project W-252 will provide the necessary systems, components, and buildings to collect, and transport the effluents (Table 1) to a common disposal system. negotiated permit discharge requirements through the application of BAT/AKART, in accordance with WHC-EP-0137, "Best Available Technology Guidance Document," (WHC 198Ej), as modified by ECN #609363. Interface points for application of BAT/AKART and connection of the generating facility to the PTECS will be identified during the project definitive design. The project shall include the necessary utilities, communications, fire protection, safety related systems, features, and site improvements required to make the project operational as required to comply with this Functional Design Criteria (FDC), as well as applicable local, state, and federal codes, regulations, statutes,

The effluents collected for discharge are to meet

4

Page 24: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 25: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 26: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

0

0

0

Position indication on all actuated valves and on any manual valves which are critical to providing routing or process information. Separate on/off confirmation, indication of all positions of multi-way valves, and 0-100% position indication for modulating valves . On/off confirmation for all motor starters, contractors, etc.

Current equipment status indication (e.g., rotating equipment).

Placement and location of local operator interfaces, calibration equipment, and maintenance access areas shall strictly comply with human factors requirements specified in the DOE Orders, Westinghouse Hanford Company (WHC) manual WHC-CM-4-9, "Radio1 ogical Design, ' I

(WHC 1988c), and NUREG 0700.

Real-time level indication and high level alarms.

Real-time indication and historical record of influent and effluent wastestream indicating parameters (e.g., flow, conductivity, pH, total beta).

o

o All information concerning the general functions of packaged sampling systems shall be integrated into each respective LCU.

Primary leak detection alarms where required.

3.1.2 B-Pond/TEDF Tie-in Instrumentation

Provide pump operation signals to the TEDF control room.

3.2 PIPING

Piping systems shall be provided by Project W-252 for the collection, transport, and disposal of wastewater as required to meet the functional design requirements of the project. shall be compatible with wastestream characteristics, intended service, and existing piping, if applicable.

All piping shall be designed to drain freely with features incorporated for leak detection (as required), location, and repair of failures. will use gravity flow whenever practical and be designed to minimize accumulation of contaminants.

Piping system materials of construction

Pipe systems

7

Page 27: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 28: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SO-W252-FDC-001 Rev. 2

All pumps used to circulate coolant in a closed-loop system shall be redundant. shall also be redundant. The redundant pump shall be capable of supplying 100% of the required capacity. connected to the standby power system. capable of remote operation and monitoring.

Other pumps used to supply makeup water or secondary loop cooling

The pumps shall be electrically powered and Pumps and associated valves shall be

All contributors remaining after BAT/AKART implementation shall be combined, sampled, monitored, and discharged to the PTECS for transport to a disposal site. Flow proportional sampling capabilities and required monitoring shall be provided. A description of a proposed system to implement BAT/AKART for the cooling water stream is contained in Appendix G.

3.3.2 Collection System

The 200 East Area PTECS will utilize existing piping wherever practical. Collected wastestreams shall require no additiollal treatment before disposal. The wastestreams continuing to be discharged to the 6-Pond are listed in Table 1. These combined streams shall be routed to the TEDF in the most cost effective manner.

The collection system at B-Plant shall be designed to minimize impacts to the generating facilities through compliance with the following minimum requirements:

o Pumps shall be redundant to prevent unforeseen interruption or shutdown of either the PTECS or generating facility operations. redundant pump shall be capable o f providing 100% of the design capacity.

required.

Pumps and motors shall be equipped with monitoring and control features to permit remote operation and surveil 1 ance from the control room.

Sumps shall have liquid levels monitored on a real-time basis with high level alarms and other overflow protection, as required to meet the functional requirements of the PTECS.

o Provision for clean-out and verification of sump integrity shall be provided by design.

o Flow-proportional composite sampling capability shall be provided at each generator waste interface to the PTECS through the implementation of BAT/AKART.

The

o Pumps shall be electric-powered and connected to standby power, as

o

o

9

Page 29: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 30: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 31: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

electrical power, and communications systems. delivery systems for process and ancillary services as required. compressors, air dryers, and dew point monitoring shall be provided for the instrument air supply, if needed.

The project shall provide air Oil-less air

4.4 LIGHTING

Occupied areas shall use white light with water resistant NEMA 4 installations. rendition is not required for safety or operation. be provided as required.

Exterior areas may be lighted by low-pressure sodium, if color Emergency lighting shall

4.5 ELECTRICAL

Electric power for the BAT/AKART implemented systems shall be provided from existing services located in the 200 East Area as required by the project design. Electrical modifications shall comply with national and Hanford Site requirements.

Standby electric power at B-Plant only for the systems shall be provided from existing sources where practical and shall comply with the National Electrical Code, ANSI/NFPA 70 and NFPA 110, "Emergency and Standby Power Systems." will be provided, where required, to maintain safe operations, compliance with environmental regulations, or where loss of power could require excessive effort for recovery and restart.

UPS

4.6 ENERGY CONSERVATION

The systems provided shall comply with the energy conservation requirements and shall be justified by Life Cycle Cost Analysis (LCCA) as defined in DOE Order 6430.1A, 110-12.

4.7 MAINTENANCE

The project will provide the documentation, and the initial complement of equipment and services required, to initiate operation of all systems. This shall include, but not be limited to: equipment identification tags, and necessary computer software development for operations and maintenance activities.

4.7.1 Equipment

Ease of maintenance will be a design goal. piping, process and ancillary equipment, for regular maintenance, repair, and

12

Access will be provided for all

Page 32: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

replacement. completed i n p lace t o minimize exposure, i n accordance w i t h ALARA gu ide l i nes . The des ign s h a l l p rov ide f o r equipment l o c k ou t c a p a b i l i t i e s where app l icab le . Replacement o f equipment o r p i p i n g w i l l occur w i t h minimal r e l o c a t i o n o r removal o f o the r equipment and p i p i n g . Regular maintenance w i l l i nc lude l u b r i c a t i o n , c a l i b r a t i o n , and t e s t i n g o f t h e equipment and p i p i n g . Regular maintenance, r e p a i r , and replacement w i l l be completed i n a manner t o minimize cos t o f disassembly and i n t e r r u p t i o n o f serv ice.

The design s h a l l p rov ide f o r maintenance a c t i v i t i e s t o be

4.7.2 M a t e r i a l s

A l l equipment w i l l be const ructed o f m a t e r i a l s se lected f o r c o m p a t i b i l i t y w i t h t h e in tended serv ice . Special p r o t e c t i v e coat ings w i l l be considered per DOE Order 6430.1A, 0900-99. Construct ion ma te r ia l s w i l l be se lec ted t o minimize t h e p o t e n t i a l f o r t h e bu i ldup o f hazardous and/or r a d i o a c t i v e m a t e r i a l s .

4.8 SITE INPROVEMENTS

Road access t o the process and support serv ices systems and f a c i l i t i e s , const ructed by t h i s p r o j e c t , s h a l l be provided. Fencing a t impacted f a c i l i t i e s may r e q u i r e mod i f i ca t i on . P ro jec t W-252 s h a l l p rov ide f o r fence r e l o c a t i o n and m o d i f i c a t i o n o f i n s t a l 1 a t i o n .

Cross-country pipe1 ines s h a l l be prov ided w i t h graded, gravel -sur faced access roads t o f a c i l i t a t e p e r i o d i c inspec t ion , maintenance, o r emergency access, as requ i red . Access t o outdoor p i p e l i n e s w i l l be adjacent t o t h e p i p e l i n e r i g h t - of-way t o f a c i l i t a t e su rve i l l ance and r e p a i r . f a c i l i t i e s w i l l be provided. S p e c i f i c a l l y , road access must be inc luded f o r operat ions, maintenance, and waste removal.

New roads o r extensions w i l l be designed f o r economical maintenance and upkeep based on t h e i r expected se rv i ce and use. E x i s t i n g s t r e e t s and roads d i s tu rbed by t h e i n s t a l l a t i o n o f t h e p r o j e c t are t o be res to red t o a c o n d i t i o n a t l e a s t equ iva len t t o t h a t e x i s t i n g p r i o r t o t h e p r o j e c t . E x i s t i n g roads w i l l be used t o t h e maximum ex ten t p r a c t i c a l .

Road access t o t h e PTECS

4.9 DESIGN LIFE

A l l systems s h a l l be designed t o f u n c t i o n f o r a minimum o f 30 years. Equipment, ins t rumenta t ion , and consumable components may have a des ign l i f e l e s s than 30 years i f designed t o accommodate r e p a i r and/or replacement, and are economical ly j u s t i f i e d .

13

Page 33: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

4 .10 RELIABILITY

The degree o f r e l i a b i l i t y prov ided s h a l l be s u f f i c i e n t t o ensure t h e systems, equipment, and components f u n c t i o n e f f i c i e n t l y and s a f e l y throughout t h e use fu l l i f e o f the f a c i l i t y w i thout undue maintenance and r e p a i r . des ign s h a l l p rov ide f o r ease-of- and c o s t - e f f e c t i v e upgrades t o ma in ta in f l e x i b i l i t y t o se rv i ce f u t u r e miss ion needs.

The p r o j e c t

5.0 GENERAL REQUIREMENTS

5 . 1 SAFETY

5 .1 .1 C r i t i c a l i t y

The p r o j e c t des ign goa w i l l 2 t o Dreven a c r i t i c a l i t y event, o r any o the r unacceptable sa fe ty consequence through imp1 ementation o f BAT\AKART. c r i t e r i a t h a t a t l e a s t two u n l i k e l y , independent, and concurrent changes (cont ingencies) i n processing and/or opera t ing cond i t i ons must happen be fore a c r i t i c a l i t y acc ident i s poss ib le i s met f o r systems o f t h i s p r o j e c t . c r i t i c a l i t y event i s a n t i c i p a t e d t o be an u n l i k e l y event f o r t h i s p r o j e c t . Designs w i l l be i n accordance w i t h DOE Order 6430.1A, 1300.4

The

A

5.1.2 Safe ty Ana lys is

New o r rev i sed sa fe ty documentation w i l l v e r i f y t h e design features, opera t ing requirements, and admin i s t ra t i ve c o n t r o l s requ i red o f t h e f a c i l i t i e s p r i o r t o operat ion. The documentation s h a l l i nc lude as a minimum: a P re l im ina ry F i r e Hazards Ana lys is and F i n a l F i r e Hazards Analysis, a P re l im ina ry Safety Eva lua t ion (PSE), P re l im inary Safety Ana lys is Document (PSAD) o r P re l im ina ry Safe ty Ana lys is Report (PSAR), F ina l Safety Analys is Document (FSAD) o r F i n a l Safe ty Ana lys is Report (FSAR).

New s a f e t y documentation t o be prepared by the opera t ing and engineer ing con t rac to r w i l l v e r i f y t h e sa fe ty des ign features, opera t ing requirements, and a d m i n i s t r a t i v e c o n t r o l s requ i red o f t h e f a c i l i t i e s be fore operat ion. The i n t e r a c t i o n s o f systems, components, and s t ruc tu res between TEDF and PTECS w i l l be analyzed t o ensure requ i red sa fe ty func t i ons su rv i ve under normal and unplanned cond i t i ons du r ing W-252 operat ions. A t f a c i l i t i e s mod i f ied by BAT/AKART implementat ion t h e respons ib le opera t ing o rgan iza t i on w i l l be respons ib le f o r updat ing t h e a f f e c t e d s a f e t y documentation.

5.1 .3 Contamination Contro l

Contamination r i s k s du r ing cons t ruc t i on are expected t o be r e l a t i v e l y low, however, some work s h a l l be performed i n and near e x i s t i n g non-reactor nuc lear f a c i l i t i e s . E x i s t i n g work procedures w i l l be implemented as appropr ia te t o ensure t h e s a f e t y o f t h e cons t ruc t i on and operat ions personnel .

14

Page 34: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 35: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

Compliance Manual," WHC-CM-7-5 (WHC 1988). requirements:

The f o l l o w i n g w i l l d e f i n e permi t

o Nat iona l Emission Standards f o r Hazardous Ai rborne P o l l u t a n t s (NESHAPS) requirements per 40 CFR 61 (EPA 1991b).

o Prevent ion o f S i g n i f i c a n t D e t e r i o r a t i o n (PSD) permi t per 40 CFR 52 (EPA 1991a).

o Requirements generated under t h e Sta te o f Washington per WAC 173-400, 173-460, 173-480, and 246-247, and t h e A i r P o l l u t i o n Contro l A u t h o r i t y o f Benton, Frank l in , and Wal la Wal la Counties.

5.2.2 P e r m i t t i n g Documentation

The repo r t s , ca l cu la t i ons , s p e c i f i c a t i o n s , and drawings s h a l l be prepared, as requ i red , t o support t h e p e r m i t t i n g submi t ta l requirements o f t h e system. p e r m i t t i n g o f t h e streams addressed by P ro jec t W-252 w i l l be accomplished by mod i fy ing t h e e x i s t i n g 200 Area TEDF S t a t e I n d u s t r i a l Waste Discharge Permi t # ST4502 t o accept these streams a f t e r t h e appropr ia te BAT/AKART has been appl i ed.

The

5.2.3 Hazardous Ma te r ia l .Usage

The p r o j e c t design s h a l l minimize t h e use and generat ion o f hazardous substances f o r t h e cons t ruc t ion , maintenance, operat ion, and decommissioning o f t h e p r o j e c t . Hazardous substances s h a l l be noted, o r o therwise i d e n t i f i e d , i n t h e d e f i n i t i v e design media and, i f used, s h a l l be encapsulated t o prevent contaminat ion w h i l e p e r m i t t i n g recovery, recyc le , and/or reuse wherever f e a s i b l e . Encapsulated hazardous m a t e r i a l s s h a l l be permanently marked i d e n t i f y i n g contents . Ma te r ia l sa fe ty data sheets (MSDS) s h a l l be prov ided f o r a l l m a t e r i a l s u t i l i z e d i n t h e cons t ruc t i on and opera t ion o f t h e f a c i l i t y as requ i red . Examples o f ma te r ia l s r e q u i r i n g data sheets inc lude, bu t are no t l i m i t e d t o , pa in ts , sealants , o i l s , l ub r i can ts , chemicals, and ins t rumenta t ion f l u i d s . A c t i v i t i e s a t each o f t h e f a c i l i t i e s w i l l f o l l o w t h e app l i cab le Hazardous Communication Program.

5.3 SAFEGUARDS AND SECURITY

P r o j e c t W-252 w i l l be i n t h e 200 East Area and may be i n t h e 600 Area i f t h e B-Pond t o TEDF t i e - i n i s constructed. comply w i t h requirements o f DOE Order 6430.1A and WHC s e c u r i t y procedures.

Design and cons t ruc t i on a c t i v i t i e s w i l l A

16

Page 36: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

cons t ruc t i on s e c u r i t y p lan w i l l be prepared f o r t h i s p r o j e c t . w i l l no t con ta in accountable q u a n t i t i e s o f spec ia l nuc lear m a t e r i a l .

5.4 NATURAL FORCES

The systems

The f a c i l i t y s t ruc tu res prov ided by t h i s p r o j e c t a l l comply w i t h t h e c r i t e r i a de f i ned i n DOE Order 6430.1A, paragraph 0110-5.2. i n accordance w i t h "Hanford P lan t Standard," SDC 4.1, Design Loads f o r F a c i l i t i e s .

Analys is s h a l l be performed

5.5 DESIGN FORMAT

A s - b u i l t drawings f o r t h e 200 East Area PTECS, i n c l u d i n g mod i f i ca t i ons t o TEDF f a c i l i t i e s and systems, s h a l l be prov ided by P ro jec t W-252. As -bu i l t drawings fo r t h e BAT/AKART implementation systems, i n c l u d i n g mod i f i ca t i ons t o t h e impacted f a c i l i t y , s h a l l a l so be prov ided by P ro jec t W-252. E x i s t i n g drawings and p r o j e c t drawings s h a l l be consol idated t o t h e ex ten t p r a c t i c a l t o enhance f a c i l i t y con f igu ra t i on . Other f a c i l i t y drawings a f fec ted -by t h e p r o j e c t s h a l l a l so be a s - b u i l t , as requ i red by t h e DOE and con t rac to r procedures. diagrams requ i red f o r t h e MCS s h a l l be i n t h e same format as those prov ided by TEDF. Drawings prov ided s h a l l be v e r i f i e d a f t e r complet ion o f cons t ruc t i on as " as- bu i 1 t . "

Logic

5.6 QUALITY ASSURANCE

Q u a l i t y Assurance (QA) a c t i v i t i e s f o r a l l con t rac tors invo lved i n t h e design, cons t ruc t ion , t e s t i n g , and inspec t i on o f t h e proposed p r o j e c t s h a l l be formulated and executed through the use o f a P ro jec t S p e c i f i c Q u a l i t y Assurance Program Plan (QAPP). The QAPP s h a l l e s t a b l i s h q u a l i t y assurance program requirements used f o r v e r i f i c a t i o n , inspect ion, and t e s t i n g a c t i v i t i e s . The QAPP s h a l l p rov ide t h e means t o ensure t h e f a c i l i t y complies w i t h program requirements; t h e p r o j e c t p lans and s p e c i f i c a t i o n s are adequate; and t e s t s and inspec t ions are s u f f i c i e n t t o conf i rm t h e adequacy o f des ign and t h e q u a l i t y o f cons t ruc t i on and manufactured components. assurance program requirements w i l l be i n accordance w i t h DOE Order 6430. l A , 0140, " Q u a l i t y Assurance;" CFR Par t 830.120, " Q u a l i t y Assurance Requirements"; and WHC-CM-4-2, " Q u a l i t y Assurance Manual ," (WHC 1989d).

The QA program requirements are based on impact l e v e l s and s a f e t y c l a s s i f i c a t i o n s t h a t are es tab l i shed i n accordance w i t h documented procedures. Safety c l a s s i f i c a t i o n o f systems, components, and s t ruc tu res w i l l be determined by r i s k analyses i n accordance w i t h WHC-CM-1-3, MRP 4.46. D e t a i l s on s a f e t y c l a s s i f i c a t i o n w i l l be l i s t e d i n the QAPP and v e r i f i e d i n subsequent sa fe ty documentation. A f i n a l sa fe ty equipment l i s t w i l l be inc luded i n a F i n a l Safety Ana lys is Document/Final Safety Analys is Report (FSAD/FSAR). A l l

The q u a l i t y

17

Page 37: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SO-W252-FDC-001 Rev. 2

safety classifications are to be supported by documented analysis. levels are determined in accordance with WHC-CM-1-3, MRP 5.43.

Impact

5.7 DECONTAHINATION AND DECOMMISSIONING

The design will incorporate ease of decontamination and decommissioning of all project systems, in accordance with DOE Order 6430.1A and other referenced standards. The project shall minimize the buildup of residual contamination by avoiding practices (such as socket weld fittings) which promote accumulation of contamination irl piping or equipment. All equipment and components provided by the project shall be designed to facilitate eventual decontamination and decommissioning. All underground piping removed from service by this project shall be isolated in an environmentally acceptable manner.

5.8 OPERATING PERSONNEL AND SERVICES

The design will consider human factors for maintenance and operations activities, including equipment, valve location and orientation, secondary waste handling, and building layout. To the extent practical, design will follow the guidelines and standards of DOE Order 6430.1A, 1300-12, NUREG 0700, Mil-STD 14721) and WHC-SD-GN-DGS-30011, "Radiological Design."

o Rapid, safe, economical operations and maintenance.

o Anthropometric design for male and female personnel.

o Minimal distraction, discomfort, stress, and fatigue during operations and maintenance.

The completed project will, to the extent possible, accommodate physical limitations such as hearing impairment and color blindness. instruments, etc., shall be placed in accordance with the human factors requirements of the referenced standards.

Gauges,

5.9 COMMUNICATIONS AND TELECOMMUNICATIONS SYSTEMS

Radio station communications, telephones, and extensions to the private automatic exchange (PAX) associated with each facility shall be provided, as required to support the functional requirements of the project. Telephones will be installed in the occupied work areas to permit communications within the new facilities and with other area facilities. The number of telephones installed will be determined in the definitive design. Crash alarm phones,

18

Page 38: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 39: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

6.0 CODES AND STANDARDS

The project will be designed to handle low-level radioactive wastestreams which are below the requirements of secondary containment found in DOE Order 5820.2A. applicable provisions of DOE Order 6430.1A and DOE Order 5400.1.

Design criteria for Project W-252 are to be based upon the

The following list identifies the appropriate codes, standards, regulations, guidelines, orders, etc., which are not defined within DOE Order 6430.1A. Revisions to the codes and standards during the project shall be administered by the project, with assessments prepared to identify the impact of these revisions. project specific requirements and procedures.

Utilize the codes and standards established for the 200 Area TEDF for interconnecting piping and instrumentation and as much as possible for all other comparable equipment.

Impacts shall be managed in accordance with DOE, contractor, and

0

0

0

0

0

0

0

RL Imp1 ementing Procedure 4700. lA, "Project Management System, I' (RL 1991)

RL Order 5440.1A, "Implementation of the National Environmental Policy Act at the Richland Operations Office," (RL 1987)

DOE Order 5440.1D, "National Environmental Policy Act Compliance Program," (DOE 1991a)

DOE Order 5400.2A, "Environmental Compliance Issue Coordination," (DOE 1989a)

RL Order 5480.1A, "Environmental Safety and Health Program for Department of Energy Operations for Richland Operations," (RL 1988)

RL Order 5480.3, "Safety Requirements for the Packaging of Hazardous Materials, Hazardous Substances, and Hazardous Wastes," (DOE 1985)

RL Order 5480.48, "Environmental Protection, Safety and Health Protection Standards," (RL 1989)

RL Implementation Procedure 5480.7, "Fire Protection," (RL 1990b)

RL Order 5480.10, "Industrial Hygiene Program," (RL 199Oc)

DOE Order 5400.1, "General Environmental Protection Program," (DOE 1988) RL Order 5481.1, "Safety Analysis and Review System," (RL 1983)

20

Page 40: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 41: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 42: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 43: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

DOE 1990b, Radiation Protection o f the Public and the Environment, DOE Order 5400.5,

DOE 1991a, National Environmental Policy Act Compliance Program DOE Order 5440.1D.

DOE 1991b, Quality Assurance, DOE Order 5700.6C, U . S . Department of Energy,

DOE 1992, Imposition of Proposed Nuclear Safety Requirements, DOE Order 5480.5,

U . S . Department of Energy, Washington, D.C.

U . S . Department of Energy, Washington, D.C.

Washington, D.C.

U . S . Department of Energy, Washington, D.C.

Ecology 1990a, "Submission of Plans and Reports for Construction of Wastewater Facilities," Washington Administrative Code, Chapter 173-240, as amended, Washington State Department of Ecology, Olympia, Washington.

Ecology 1990b, "Dangerous Waste Regulations," Washington Administrative Code, Chapter 173-303, as amended, Washington State Department of Ecology, Olympia, Washington.

Ecology 199Oc, "State Waste Discharge Permit Program," Washington Administrative Code, Chapter 173-216, as amended, Washington State Department of Ecology, Olympia, Washington.

Administrative Code, Chapter 173-400 through 495, as amended, Washington State Department of Ecology, Olympia, Washington.

Administrative Code, Chapter 173-460, as amended, Washington State Department of Ecology, Olympia, Washington (1991).

"Ambient Air Quality Standards and Emission Limits for Radionuclides," Washington Administrative Code, Chapter 173-480, as amended, Washington State Department of Ecology, Olympia, Washington.

Administrative Code, Chapter 173-200, as amended, Washington State Department of Ecology, Olympia, Washington.

Ecology 1990h, "Minimum Functional Standards for Solid Waste Hand1 ing," Washington Administrative Code, Chapter 173-304, as amended, Washington State Department of Ecology, Olympia, WashingtoCcology 199Oi, "Implementation of Regulations for Air Containment Sources," Washington Administrative Code, Chapter 173-403, as amended, Washington State Department of Ecology, Olympia, Washington.

Ecology 1990d, "General Regulations for Air Pollution Sources," Washington

Ecology 1990e, "Controls for New Sources of Toxic Air Pollutants," Washington

Ecology 1990f,

Ecology 19909, "Water Quality Standards of the State of Washington," Washington

24

Page 44: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

Ecology 19903, "Permits f o r Developments on Shore1 ines o f t h e State," Washington A d m i n i s t r a t i v e Code Chapter 173-14, Washington S ta te Department o f Ecology, Olympia, Washington.

Washington," Washington Admin i s t ra t i ve Code Chapter 173-201, Washington S t a t e Department o f Ecology, Olympia, Washington.

Ecology, EPA, and DOE 1989, Hanford Federal Fac i l i t y Agreement and Consent Order, 2 vo l s . , as amended, Washington State Department o f Ecology, U.S. Environmental P r o t e c t i o n Agency, and U.S. Department o f Energy, Olympia, Washington.

SW-846, 3 r d Ed i t i on , U.S. Environmental P ro tec t i on Agency, Washington, D.C.

o f D e l i s t i n g P e t i t i o n s Submitted Under 40 CFR 260.00 and 260.22, Science App l i ca t i ons I n t e r n a t i o n a l Corporat ion f o r U.S. Environmental P r o t e c t i o n Agency, Washington, D.C.

EPA 1991a, "Approval and Promulgation o f Implementation Plans," T i t l e 40, Code of Federal Regulat ions, Pa r t 52, as amended, U.S. Environmental P r o t e c t i o n Agency, Washington, D.C.

Ecology 1990k, "Water Q u a l i t y Standards f o r Surface Waters o f t h e S t a t e o f

EPA 1986, Test Methods f o r Eva lua t i ng S o l i d Waste:

EPA 1989, Docket Report on Health-Based Levels and S o l u b i l i t i e s Used i n the E v a l u a t i o n

Physical lChemical Methods,

EPA 1991b, "Nat ional Emission Standards f o r Hazardous Airborne Po l l u tan ts , " T i t l e 40, Code o f Federal Regulat ions, Par t 61, as amended, U.S. Environmental P r o t e c t i o n Agency, Washington, D.C.

EPA 1991c, "S ta te C e r t i f i c a t i o n o f A c t i v i t i e s Requi r ing a Federal License o r Permit , T i t l e 40, Code o f Federal Regulat ions, Pa r t 121, as amended, U.S. Environmental P r o t e c t i o n Agency, Washington, D.C.

EPA 1991d, "EPA Administered Permit Programs: The Nat ional P o l l u t a n t Discharge E l i m i n a t i o n System", T i t l e 40, Code o f Federal Regulat ions, Pa r t 122, as amended, U.S. Environmental P ro tec t i on Agency, Washington, D.C.

EPA 1991e, "State Program Requirements," T i t l e 40, Code o f Federal Regulat ions, P a r t 123, as amended, U.S. Environmental P ro tec t i on Agency, Washington, D.C.

EPA 1991f, "Procedures f o r Decis ion Making," T i t l e 40, Code o f Federal Regulat ions, Pa r t 124, as amended, U.S. Environmental P ro tec t i on Agency, Washington, D.C.

EPA 19919, " C r i t e r i a and Standards f o r t h e Nat ional P o l l u t a n t Discharge E l i m i n a t i o n System," T i t l e 40, Code o f Federal Regulat ions, Pa r t 125, as amended, U . S . Environmental P r o t e c t i o n Agency, Washington, D.C.

25

Page 45: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

EPA 1991h, "Tox i c P o l l u t a n t E f f l u e n t Standards," T i t l e 40, Code o f Federal Regulat ions, P a r t 129, as amended, U.S. Environmental P r o t e c t i o n Agency, Washington, D.C.

EPA 1991i, "Standards f o r Owners and Operators o f Hazardous Waste Treatment, Storage, and D isposa l F a c i l i t i e s , " T i t l e 40, Code o f Federal Regulat ions, P a r t 264, as amended, U.S. Environmental P r o t e c t i o n Agency, Washington, D.C.

EPA 19915, "Land Disposal R e s t r i c t i o n s , " T i t l e 40, Code o f Federal Regulat ions, P a r t 268, as amended, U.S. Environmental P r o t e c t i o n Agency, Washington, D .C .

F i s h e r i e s 1990, "Hydrau l i c Code Rules," Washington Admin i s t ra t i ve Code, Chapter 220-110, Washington S t a t e Department o f F i she r ies , Olympia, Washington.

Jackson, R. L., 1990, Stra tegy f o r Handl ing and Disposing o f Purgewater on the Hanford S i t e , Washington, WHC-MR-0039, Westinghouse Hanford Company, Richland, Washington.

Quincy, Massachusetts.

Regul a t o r y Commi ssion, Washington, D. C . OSHA 1991, Code o f Federal Regulat ions, T i t l e 29, P a r t 1926, as amended, Occupat ional

Sa fe ty and Hea l th A d m i n i s t r a t i o n - Labor, Washington, D . C .

RL 1983a, Environmental P ro tec t i on , Sa fe ty , and Heal th P ro tec t i on In fo rma t ion Repor t ing Requirements, RL Order 5484.1, U.S. Department o f Energy, R ich land F i e l d O f f i c e , R i c h l and, Washington .

NFPA 1990, I a t i o n a l E l e c t r i c a l Code, NFPA 70, Na t iona l F i r e P r o t e c t i o n Assoc ia t i on ,

NRC 1981, Guide l ines f o r Contro l Room Design Reviews, NUREG 0700, U . S . Nuc lear

RL 1983b, Safe ty Ana lys is and Review System, RL Order 5481.1, U.S. Department o f Energy, R ich land F i e l d O f f i c e , Richland, Washington.

RL 1987a, F i r e P r o t e c t i o n , RL Order 5480.7, U.S. Department o f Energy, R ich land F i e l d

RL 1987b, Implementat ion o f t he Nat ional Environmental P o l i c y Act a t t h e Richland

RL 1987c, Plan and Schedule t o Discont inue Disposal o f Contaminated L iqu ids i n t o the

O f f i c e , Rich1 and, Washington.

Operat ions O f f i c e , RL Order 5440.1A, U.S. Department o f Energy, R ich land F i e l d O f f i c e , Richland, Washington.

S o i l Column a t t he Hanford S i t e , unnumbered, U . S . Department o f Energy, R ich land F i e l d O f f i c e , Richland, Washington.

RL 1988, Environment, Sa fe ty , and Hea l th Program f o r DOE-RL Operat ions, RL Order 5480.1A, U.S. Department o f Energy, R ich land F i e l d O f f i c e , Richland, Washington.

26

Page 46: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 47: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 48: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 49: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status
Page 50: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

APPENDIX J

PROCESS AND SUPPORT FACILITY DESIGN CONSIDERATIONS

The design o f t h e P r o j e c t W-252 systems s h a l l consider t h e f o l l o w i n g design features:

0

0

0

0

0

0

0

Heating, v e n t i l a t i o n , and a i r c o n d i t i o n i n g (HVAC) systems w i l l be i n s t a l l e d i n f a c i l i t i e s as requ i red f o r BAT/AKART implementation and PTECS support f a c i l i t i e s . The purpose o f t h e HVAC systems w i l l be t o c o n t r o l a i rborne contamination, prov ide environmental c o n t r o l f o r i ns t rumen ta t i on and e l e c t r i c a l systems, and ma in ta in human comfort i n areas o f personnel occupancy.

Equipment and serv ices requ i red t o f l u s h and decontaminate i n t e r n a l components and e x t e r i o r surfaces o f P r o j e c t W-252 systems and support f a c i l i t y b u i l d i n g i n t e r i o r surfaces w i l l be provided t o ma in ta in them i n a r e l a t i v e l y c lean cond i t i on .

Safety showers and eyewash s t a t i o n s i n compliance w i t h DOE Order 6430.1A requirements w i l l be i n s t a l l e d .

Permanent and/or po r tab le b rea th ing a i r systems w i l l be prov ided where requ i red t o support maintenance a c t i v i t i e s o r recovery f rom pos tu la ted accident cond i t i ons .

Posts, guards, and o the r types o f p r o t e c t i o n needed t o prevent damage t o equipment, p ip ing , and s t r u c t u r e s w i l l be i n s t a l l e d .

Guard r a i l s , o r o the r f a l l p ro tec t i on , around a l l p i t s , p la t forms, and surfaces where a f a l l from more than f o u r f e e t could occur w i l l be i n s t a l l e d .

A system o f cranes and/or h o i s t s ( i n c l u d i n g monorai l systems) and equipment f o r equipment handl ing and t r a n s p o r t w i l l be i n s t a l l e d as necessary f o r maintenance.

A network o f stairways, walkways, and maintenance p la t fo rms f o r access t o equipment and inst rumentat ion where r o u t i n e o r f requent maintenance and s u r v e i l l a n c e inspect ions w i l l be requi red. E levators w i l l be considered f o r use when frequent and r a p i d access i s needed t o h ighe r e leva t i ons i n f a c i l i t i e s where bu lky o r heavy i tems must be moved. The use o f ladders s h a l l be minimized.

Serv ice doors w i l l be i n s t a l l e d t o enable movement o f equipment t o and from the f a c i l i t y .

31

Page 51: RMIS View/Print Document Cover Sheet - Digital Library/67531/metadc674292/m2/1/high_res... · On/off confirmation for all motor starters, contractors, etc. Current equipment status

WHC-SD-W252-FDC-001 Rev. 2

o The f o l l o w i n g f l o w i n f o r m a t i o n r e f l e c t s c u r r e n t system des ign i n f o r m a t i o n as o f t h e da te o f REV 2 o f t h i s FDC.

The f a c i l i t i e s addressed by t h i s FDC are t h e 241-A, 242-A, 244-AR, B-Plant, and t h e 284-E. per REV 2 i s t o d e l e t e a l l o f t h e source c o n t r o l scope on a l l b u t t h e B-Plant. d i f f e r e n t l y , t he re fo re , by a d i r e c t t i e t o t h e TEDF l i n e downstream of a l l t h e f a c i l i t i e s , (except B-Plant which w i l l be t i e d i n t o TEDF E-Line a t B-P lan t ) . be ing tabu la ted i n two p a r t s :

The changes being made t o t h i s p r o j e c t

The t i e - i n t o the 200 Area TEDF i s be ing handled

The f l o w i n f o r m a t i o n i s thus

B-Plant ...... With c o o l i n g towers runn ing ...... Approx 30-50 GPM B-P1 ant . . .. .Emergency Raw water. . ............ .Normal .600 GPM

Design Max. 1300GPM

Others t h a t w i l l d ischarge through t h e c u r r e n t B-Pond l i n e , b u t be c o l l e c t i v e l y t i e d i n are:

241-A ....................... 10-2OGPM (evapora t ive c o o l e r

244-AR.. ... Descoped.. . .no f l o w 284-E ........................ 11OGPM 242-A ........................ 2725GPM When evaporator

To ta l 2855 GPM

b l owdown)

operates, 0 GPM when n o t .

The B-Plant emergency raw water f l o w w i l l occur r a r e l y , i f ever . I n t h e event t h i s occurs, o t h e r streams such as t h e evaporator w i l l be c u r t a i l e d u n t i l t he emergency s i t u a t i o n i s cor rec ted .

The des ign o f t h e t i e - i n w i t h a pump a s s i s t can be accomplished i n two ways, on t h e B-Pond l e g o n l y o r on the combined l e g . des ign i s on t h e B-Pond leg , t h e pump capac i t y w i l l be s i zed pe r t h e 2855GPM f l o w va lue. I f t h e combined l e g des ign i s used, t h e maximum f l o w va lue s h a l l be 4000GPM.

I f t h e

Th is Appendix f o r A/E In fo rma t ion Only