5
MAPUA INSTITUTE OF TECHNOLOGY MURALLA ST. INTRAMUROS MANILA CITY SCHOOL: WATER, FITNESS AND RECREATIONAL GREEN PARK PROJECT TITLE: RIVERA, ELIEZER C. 2011180033 - AR4 STUDENT NAME & STUDENT NUMBER: SCHOOL OF ARCHITECTURE, INDUSTRIAL DESIGN AND BUILT ENVIRONMENT DEPARTMENT: AR200-2F & AR200-2S ARCHITECTURAL THESIS 11 AR1 COURSE CODE AND SECTION: ARCH. JUNAR PAKINGAN TABLAN, UAP, MSAE ADVISER / INSTRUCTOR: SITE DEVELOPMENT PLAN DRAWING TITLE: PARTIAL SDP SHEET CONTENTS: REMARKS: SHEET NO. 1/5 ALLOCATED SITE EXIT ALLOCATED SITE ENTRY MULTI-PURPOSE SPORTS FIELD TERRACED SEATING + GRANDSTAND KIOSK ALLOCATED ACCESS TO BASEMENT WATER, HEALTH AND FITNESS FACILITY CHANGING ROOMS LANDSCAPE & VEGETATION MOUNDS LANDSCAPE & VEGETATION MOUNDS LANDSCAPE & VEGETATION MOUNDS WOODLANDS WOODLANDS PROMENADE WALKWAY POCKET PARK POCKET PARK PLAYGROUND EXERCISE PICNIC AREAS SAND FIELD LANDSCAPE AND VEGETATION LAND SCAPE AND VEGETA TION 50M MAIN POOL BEACH POOL 25M PROGRAM POOL LANDSCAPE AND VEGETATION DROP-OFF AREA SITE DEVELOPMENT PLAN SCALE 1:500M

Revised Blueprints of Plans and SDP

Embed Size (px)

DESCRIPTION

Floor Plans and SDP Revised

Citation preview

  • MAPUA INSTITUTE OF TECHNOLOGYMURALLA ST. INTRAMUROS

    MANILA CITY

    SCHOOL:

    WATER, FITNESS AND RECREATIONAL GREEN PARK

    PROJECT TITLE:

    RIVERA, ELIEZER C.2011180033 - AR4

    STUDENT NAME & STUDENT NUMBER:

    SCHOOL OF ARCHITECTURE, INDUSTRIAL DESIGN AND BUILT ENVIRONMENT

    DEPARTMENT:

    AR200-2F & AR200-2SARCHITECTURAL THESIS 11

    AR1

    COURSE CODE AND SECTION:

    ARCH. JUNAR PAKINGAN TABLAN, UAP, MSAE

    ADVISER / INSTRUCTOR:

    SITE DEVELOPMENT PLAN

    DRAWING TITLE:

    PARTIAL SDP

    SHEET CONTENTS: REMARKS: SHEET NO.

    1/5

    ALLOCATED SITE EXIT

    ALLOCATED SITE ENTRY

    MULTI-PURPOSESPORTS FIELD

    TERRACED SEATING +GRANDSTAND

    KIOSK

    ALLOCATED ACCESS TOBASEMENT

    WATER, HEALTH AND FITNESS FACILITY

    CHANGINGROOMS

    LANDSCAPE &VEGETATION

    MOUNDS

    LANDSCAPE &VEGETATION

    MOUNDS

    LANDSCAPE &VEGETATION

    MOUNDS

    WOODLANDS

    WOODLANDS

    PROMENADEWALKWAY

    POCKET PARK

    POCKET PARK

    PLAYGROUNDEXERCISE

    PICNICAREAS

    SANDFIELD

    LANDSCAPE AND

    VEGETATIONLAND

    SCAPE AND

    VEGETATION

    50M MAINPOOL

    BEACH POOL

    25M PROGRAMPOOL

    LANDSCAPE AND

    VEGETATION

    DROP-OFFAREA

    SITE DEVELOPMENT PLAN

    SCALE 1:500M

  • MAPUA INSTITUTE OF TECHNOLOGYMURALLA ST. INTRAMUROS

    MANILA CITY

    SCHOOL:

    WATER, FITNESS AND RECREATIONAL GREEN PARK

    PROJECT TITLE:

    RIVERA, ELIEZER C.2011180033 - AR4

    STUDENT NAME & STUDENT NUMBER:

    SCHOOL OF ARCHITECTURE, INDUSTRIAL DESIGN AND BUILT ENVIRONMENT

    DEPARTMENT:

    AR200-2F & AR200-2SARCHITECTURAL THESIS 11

    AR1

    COURSE CODE AND SECTION:

    ARCH. JUNAR PAKINGAN TABLAN, UAP, MSAE

    ADVISER / INSTRUCTOR: DRAWING TITLE: SHEET CONTENTS: REMARKS: SHEET NO.

    2/5

    SITE DEVELOPMENT PLAN

    SCALE 1:500M

    TENNIS COURT TENNIS COURT

    BLEACHERS BLEACHERS

    BASKETBALL COURTBASKETBALL COURT

    BASKETBALL COURTBASKETBALL COURT

    ALLOCATED PARKING OPEN ACTIVITY FIELDPOSSIBLE FOR FUTURE DEVELOPMENT

    LANDSCAPE AND VEGETATIONS

    ALLOCATED SITE

    ENTRY &EXIT

    SITE DEVELOPMENT PLAN PARTIAL SDP

  • MAPUA INSTITUTE OF TECHNOLOGYMURALLA ST. INTRAMUROS

    MANILA CITY

    SCHOOL:

    WATER, FITNESS AND RECREATIONAL GREEN PARK

    PROJECT TITLE:

    RIVERA, ELIEZER C.2011180033 - AR4

    STUDENT NAME & STUDENT NUMBER:

    SCHOOL OF ARCHITECTURE, INDUSTRIAL DESIGN AND BUILT ENVIRONMENT

    DEPARTMENT:

    AR200-2F & AR200-2SARCHITECTURAL THESIS 11

    AR1

    COURSE CODE AND SECTION:

    ARCH. JUNAR PAKINGAN TABLAN, UAP, MSAE

    ADVISER / INSTRUCTOR:

    BASEMENT PLANUTILITY, ELECTRICAL, MECHANICAL, ETC.

    DRAWING TITLE:

    1 DETAILED FLOOR PLAN

    SHEET CONTENTS: REMARKS: SHEET NO.

    3/5

    BASEMENT FLOOR PLAN

    SCALE 1:250M

    ELECTRICAL&

    MECHANICAL ROOM

    WATER PUMP, SEWAGE AND WATER TREATMENT

    STAFF AND DISABLED PARKINGBICYCLE

    MOTORCYCLEPARKING

    STAIRACCESS

    STO.

    ELEV.

    MECH.

    BICYCLEMOTORCYCLE

    PARKING

    DRIVEWAY TO STREET

    GENERAL PLANTPOOL PLANT

    BALANCE TANK

    BALANCE TANK

    BALANCE TANK

    ACCESS TO STREET

    ABOVE

  • MAPUA INSTITUTE OF TECHNOLOGYMURALLA ST. INTRAMUROS

    MANILA CITY

    SCHOOL:

    WATER, FITNESS AND RECREATIONAL GREEN PARK

    PROJECT TITLE:

    RIVERA, ELIEZER C.2011180033 - AR4

    STUDENT NAME & STUDENT NUMBER:

    SCHOOL OF ARCHITECTURE, INDUSTRIAL DESIGN AND BUILT ENVIRONMENT

    DEPARTMENT:

    AR200-2F & AR200-2SARCHITECTURAL THESIS 11

    AR1

    COURSE CODE AND SECTION:

    ARCH. JUNAR PAKINGAN TABLAN, UAP, MSAE

    ADVISER / INSTRUCTOR:

    GROUND FLOOR PLANSWIMMING CENTER

    DRAWING TITLE:

    1 DETAILED FLOOR PLAN

    SHEET CONTENTS: REMARKS: SHEET NO.

    4/5

    GROUND FLOOR PLAN

    SCALE 1:250M

    ENTRANCECOURT

    ENTRANCEFOYER

    RECEPTIONLOBBY

    CAFETERRACE

    CAFEWET LOUNGE

    CAFEDRY

    LOUNGE

    SERVINGKITCHEN

    FOODPRE/BAR

    CAFESTORE

    CAFETOILETS

    POOLOPERATIONS

    OFFICE

    MEETINGROOM

    STAFFOFFICE

    OFFICELOBBY

    OFFICERECEPTION

    STAFFROOM

    FILINGSTO.

    LOCKERROOMS

    OFFICEKITCHENETTE

    PANTRYSTAFFT&B

    GYMACCESS

    ELEV.

    STAIRACCESS

    TICKET-ING

    OUTDOOR COURTYARD

    INDOOR FUNCTION

    ROOM

    MALE WET LOCKER

    & SHOWERROOM

    KITCHENNETTE

    TOILETS

    RECEPTION

    FAMILY/ACCESIBLECHANGEROOMS

    FAMILY/ACCESIBLECHANGEROOMS

    FAMILY/ACCESIBLECHANGEROOMS

    FAMILY/ACCESIBLECHANGEROOMS FAMILY/

    ACCESIBLECHANGEROOMS

    MALEURINAL

    UTILITY

    LOCKERS

    FAMILY/ACCESIBLECHANGEROOMS

    FAMILY/ACCESIBLECHANGEROOMS

    FEMALE WET LOCKER

    & SHOWERROOM

    FIRSTAID

    FIRSTAID

    BEACHKIOSK

    JANITORIAL

    HALLCONCIERGE

    UTILITY

    FIRSTAID

    HYDROTHERAPHY

    CHANGEROOMS

    HYDROTHERAPHYSUPPORT

    HYDROTHERAPHY

    POOL

    HYDROTHERAPHY

    STORE

    HYDROTHERAPHYPOOL DECK

    HYDROTHERAPHY

    POOL PLANT

    POOLHALL

    LEISUREPOOL

    25M POOL

    SPECTATORSEATING

    VIEWINGDECKS

    ENTRYEXIT

    BEACHPOOL

    MAIN 50M POOL

    BEACHVIEWING DECK

    MAINPOOL

    STORAGE

    GARBAGEDISPOSAL

    MRF

    ACCESS TO2ND LEVELACCESS TO

    SUBSTATIONS

    DOCK

    VIEWINGDECKS

    VIEWINGDECKS

    OUTDOOR POOL LOUNGE

    DROP-OFFAREA

    F.E.

    LANDSCAPE &VEGETATION MOUNDS

    LANDSCAPE &VEGETATION MOUNDS

    LANDSCAPE &VEGETATION MOUNDS

    VEHICLE ACCESS

    TO BASEMENT

    STO.

  • MAPUA INSTITUTE OF TECHNOLOGYMURALLA ST. INTRAMUROS

    MANILA CITY

    SCHOOL:

    WATER, FITNESS AND RECREATIONAL GREEN PARK

    PROJECT TITLE:

    RIVERA, ELIEZER C.2011180033 - AR4

    STUDENT NAME & STUDENT NUMBER:

    SCHOOL OF ARCHITECTURE, INDUSTRIAL DESIGN AND BUILT ENVIRONMENT

    DEPARTMENT:

    AR200-2F & AR200-2SARCHITECTURAL THESIS 11

    AR1

    COURSE CODE AND SECTION:

    ARCH. JUNAR PAKINGAN TABLAN, UAP, MSAE

    ADVISER / INSTRUCTOR:

    SECOND FLOOR PLANFITNESS GYM AND WEIGHT LIFTING

    DRAWING TITLE:

    1 DETAILED FLOOR PLAN

    SHEET CONTENTS: REMARKS: SHEET NO.

    5/5

    SECOND FLOOR PLAN

    SCALE 1:250M

    RECEPTION

    FAMILY/ACCESIBLECHANGEROOMS

    FAMILY/ACCESIBLECHANGEROOMS

    FAMILY/ACCESIBLECHANGEROOMS

    ELEV.STAIR

    ACCESS

    OFFICES & CONSULTATION

    ROOM

    FEMALEDRY

    CHANGEROOMS

    MALEDRY

    CHANGEROOMS

    GREENPATCH

    GREENPATCH

    GREENPATCH

    GREENPATCH

    GREENPATCH

    F.E.

    WEIGHTS &CARDIO

    WEIGHTS &CARDIO

    WEIGHTS &CARDIO

    WEIGHTS &CARDIO

    ACCESS TO POOLS BELOW

    SPINROOM

    MULTI-PURPOSEFITNESSSTUDIO

    MULTI-PURPOSEFITNESSSTUDIO

    SERVICEMAINTENANCE WALK/JOG WAY