44
Report run on: April 7, 2011 5:20 PM RECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A St. Albert Greater St. Albert Catholic Regional Division No. 29

RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Embed Size (px)

Citation preview

Page 1: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM

RECAPP Facility Evaluation Report

Neil M. Ross Catholic SchoolB4074A

St. Albert

Greater St. Albert Catholic Regional Division No. 29

Page 2: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 2 of 44

B4074ABuilding Id:

Neil M. Ross Catholic SchooBuilding Name:

St. AlbertLocation:60 Woodlands Road Address:

4,355.57Gross Area (sq. m): $10,902,412Replacement Cost:1981Construction Year:

Evaluation Date: November 23 2010

Robert Irlam Consulting Inc.Evaluation Company:

J. R. IrlamEvaluator Name:

The 4,300m2 single storey school was constructed in 1981. In 1982 two free standing portable class rooms wereadded one of which was recently removed. In 1989 a pod of eight portable class rooms was added to the east side ofthe school with a further two portable class rooms added in 1994. In 2000 a link was constructed connecting the 1982portable to the 1989 pod. The school serves a student compliment of 449 in grades K to 6 and a staff of 48. The school has a program ofintegration of special needs students.

General Summary:

Structural Summary:The foundation system consists of concrete friction piles carrying grade beams which support interior walls of concreteblock and wood studs. The roof structure is wood trusses and Glulam beams over the gymnasium and adjacent areas. Overall the structural condition is acceptable.

Envelope Summary:The exterior walls are brick veneer with a back wall of wood studs incorporating insulation and vapour barrier. The atticspace created by the wood trusses has batt insulation and a vapour barrier. The wood roof joists spanning Glulambeams over the gymnasium also have batt insualtion and a vapour barrier. The windows are aluminum frames withopening lights and an insulation prefinished aluminum panel below sill level. Overall the envelope condition is acceptable.

Interior Summary:Walls are painted concrete block in corridors and wash room and shower areas and gypsum board elsewhere. Ceilingare a mix of cement plaster in shower areas, T-bar acoustic ceilings in corridors and textured gypsum board in classrooms. Floors are predominantly resilient vinyl tiles and sheet flooring. Overall the interior condition is acceptable.

Mechanical Summary:A cast iron branch water main from the municipal service enters the facility at the north face and is metered. Thewater service extend throughout the facility via the the ceiling spaces to service the domestic and process loads. Plumbing fixtures are floor mounted tank type and flush valve water closets, floor mounted urinals, countertoplavatories and stainless steel sinks. Waste from the various plumbing fixtures drain to cast iron piping under the main floor slab and a sanitary service exitsthe west face of the building and connects to a municipal manhole. Storm drainage from the perimeter roof troughs drain to an underslab storm drainage system. A cast iron storm mainexits the building at the west face and connects to a municipal manhole. A municipal fire hydrant is located at the south property line adjacent to the school. Natural gas is metered in the Metering Room at the north face of the building where it is routed via the corridor ceilingspaces to the Boiler Room and extended to serve the Portables at the east end of the school.

9.95%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $1,085,100

St. Albert - Neil M. Ross Catholic School (B4074A)

Page 3: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 3 of 44

The building is heated by a perimeter hot water heating system from two natural gas fired hydronic boilers. A hotwater to glycol converter is located in the Mechanical Room to provide heated glycol to serve the air handling unitheating coils. Three air handling units provide ventilation to the various areas of the facility. Fire extinguishers are located throughout the school. Overall the school is well maintained and the mechanical systems are currently in an acceptable condition. Items ofimmediate concern are the need to replace the domestic hot water heaters, replace the heating pumps and a Codeupgrade of the emergency generator diesel fuel day tank.

Electrical Summary:The building has a 1200A, 120/208V, 3 phase, 4 wire service. Branch circuit panelboards are located throughout theschool. The lighting has recently been upgraded to energy efficient T8 and T5HO lamps with electronic ballasts.Emergency lighting and exit signs are powered by an emergency diesel generator. The school is equipped with aSimplex 2001 fire alarm system that is in need of an upgrade. Cat 5 and Cat 5E data networking cabling is installedthroughout the school. The electrical systems are in an acceptable condition.

St. Albert - Neil M. Ross Catholic School (B4074A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 4: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 4 of 44

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.01 Floor Structural Frame (Building Frame)*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.03 Floor Decks, Slabs, and Toppings*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

St. Albert - Neil M. Ross Catholic School (B4074A)S1 STRUCTURAL

The foundation consists of poured reinforced concrete piles 400mm diameter at the perimeter and along corridors wallsranging from 4500mm to 12000mm in length and 700mm diameter at the perimeter of the gym ranging in length from7000mm to 12000mm. The piles carry reinforced concrete grade beams along the perimeter, corridor walls and underwash rooms walls ranging in width from 250mm to 350mm wide and from 400mm to 1200mm in depth.

There is a concrete slab on grade throughout the school consisting of 100mm thick concrete slab reinforced with 10mmbars at 400mm centres each way on poly vapour barrier on compacted fill.

The single storey building frame consists of Glulam beams at 4150mm centres spanning 300mm wide concrete blockwall over the central gym. The upper level mechanical room to the north of the gym also has Glulam beams spanning thegym wall and a parallel 250mm concrete block wall. The central gym is surrounded by sloped wood roof trusses at 600mm maximum centres spanning the exterior walls andcorridor wall.

Structural interior walls supporting the upper level mechanical room and the roof are reinforced concrete block walls250mm and 300mm thick.

The floor deck throughout the school is the troweled concrete slab on grade. The floor deck for the upper levelmechanical room is a troweled reinforced poured concrete floor slab spanning concrete block walls.

Page 5: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 5 of 44

B1010.05 Mezzanine Construction*

B1010.06 Ramps: Exterior*

B1010.07 Exterior Stairs*

B1010.09 Floor Construction Fireproofing*

4 - Acceptable

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Intall steel hand rail to comply with Code

Code Repair 2012 $4,000 Medium

The 2 riser poured concrete stair at the south east entrancehas no hand rail and is adjacent to a road curb and potentiallydangerous.

Concern:

Install steel hand rail to comply with Code.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

There is a 3 level mezzanine floor in the upper level mechanical room consisting of steel checker plate floors on a steelbeam and column frame and steel cat ladder access. There is also a mezzanine floor in the gym store consisting of wood floor on wood joists spanning concrete block wallsand a steep wood stair access.

There is a poured concrete ramp at main entrance 200mm tick, 10% slope and steel pipe decorative hand rails.

There are poured concrete at the entrances: 6 riser stair at main entrance with decorative painted steel pipe hand rail; a 2riser stair at the south east entrance with no hand rail; an 8 riser stair with intermediate landing at the west entrance withdecorative painted steel pipe hand rail.

The floor throughout the school is concrete slab on grade which is non-combustible and has integral fire proofing. Thefloor to the upper level mechanical room is poured concrete, non-combustible construction and has integral fire proofing.

Consequences of Deferral:Lack of proper Code compliant hand rails will persist.

Unprotected grade transition adjacent concrete steps

Page 6: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 6 of 44

B1010.10 Floor Construction Firestopping*

B1020.04 Canopies*

B1020.06 Roof Construction Fireproofing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

St. Albert - Neil M. Ross Catholic School (B4074A)

There was no missing floor construction fire stopping observed or reported at the time of the building audit.

The canopy over the front entrance consists of a sloped skylight with single glazing in an aluminum frame spanning brickpillars with concrete fill and a brick gable over the main entrance.

Fire proofing to the wood roof structure is provided by two layers of gypsum board on a poly vapour barrier to theunderside of the wood roof trusses. .

Page 7: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 7 of 44

B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

B2010.01.06.04 Wood Siding**

B2010.01.09 Expansion Control: Exterior Wall Skin*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

0

40

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 300m2 wood fascia

Stain 300m2 wood fascia

Lifecycle Replacement

Preventative Maintenance

2021

2012

$45,000

$10,000

Unassigned

Medium

The wood fascia is faded and requires re-staining.Concern:

Re-stain wood fascia.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

There is a brick skin on the exterior of the school consisting of 100mm brick, 30mm air space, building paper on 9mmplywood sheathing on 50mm x 200mm wood studs at 400mm centres with batt insulation and an interior finish of 16mmfire guard gypsum board on a poly vapour barrier.

There is a 1200mm deep 19mm x 200mm t & g cedar fascia on building paper on 9mm plywood sheathing on 50mm x100mm wood framing around the school.

There are vertical control joints in the brick skin with flexible caulking.

Consequences of Deferral:The wood fascia will deteriorate further.

Page 8: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 8 of 44

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*

B2010.06 Exterior Louvers, Grilles, and Screens*

B2010.09 Exterior Soffits*

4 - Acceptable

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

20

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 350m caulking

Stain 150m2 wood soffits

Lifecycle Replacement

Preventative Maintenance

2014

2012

$10,000

$10,000

Unassigned

Low

The stain on the cedar soffits has faded.Concern:

Re-stain cedar soffits.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

There is flexible caulking to frames of windows, doors and grilles where the meet the brick veneer.

Exterior wall construction consists of 100mm brick, 30mm air space, building paper on 9mm plywood sheathing on 50mmx 200mm wood studs at 400mm centres with batt insulation and an interior finish of 16mm fire guard gypsum board on apoly vapour barrier.

There are aluminum louvres in aluminum frames on the exterior walls of the upper level mechanical room.

There are wood soffits under the wood fascia around the school consisting of 38mm wide cedar strips with 38mm spacesbetween over an insect screen on 50mm x 100mm wood framing at 600mm centres .

Consequences of Deferral:Cedar soffits will deteriorate further.

Page 9: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 9 of 44

B2020.01.01.02 Aluminum Windows (Glass & Frame)**

B2030.01.02 Steel-Framed Storefronts: Doors**

4 - Acceptable

4 - Acceptable

Rating

Rating

1981

1981

Installed

Installed

40

30

Design Life

Design Life

APR-11

APR-11

Updated

Updated

Replace 100m2 aluminum window units

Replace 3 sets double hollow metal doors

Lifecycle Replacement

Lifecycle Replacement

2021

2014

$100,000

$12,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The windows are aluminum double glazed with bottom hopper opening lights, Glasweld prefinished insulated aluminumpanel from sill to floor level and integral Venetian blinds.

Entrance doors are painted double hollow metal doors in pressed steel store front frames with piano hinges and wiredglass side lights.

Typical aluminum frame windows with operable vent,double-glazed panels with integral venetian blinds betweenpanes. Replacement parts an issue. Some unitsinoperable.

Page 10: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 10 of 44

B2030.01.06 Automatic Entrance Doors**

B3010.01 Deck Vapor Retarder and Insulation*

B3010.02.02 Roofing Tiles**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

30

0

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace set 3 doors with automatic opener

Replace 3000m2 concrete tiles

Lifecycle Replacement

Lifecycle Replacement

2014

2031

$15,000

$450,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The main entrance doors are triple painted hollow steel doors with wired glass viewing slots, aluminum kick plates, pianohinges, wired glass side lights and automatic opener with barrier free push plate for one door.

There is roof felt under the concrete tiles on the pitched roof over all the school. The insulation for the roof consists ofblown in loose fill insulation in the attic space which has a polyethylene vapour barrier.

The concrete roofing tiles are nailed to wood strapping and counter strapping over roofing felt on 12mm plywoodsheathing with H-clips on wood trusses at 600mm centres.

Damaged or missing concrete tiles from vandalism

Page 11: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 11 of 44

B3010.08.02 Metal Gutters and Downspouts**

B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

4 - Acceptable

4 - Acceptable

Rating

Rating

1981

1981

Installed

Installed

30

0

Design Life

Design Life

APR-11

APR-11

Updated

Updated

Replace 240m metal gutters

Lifecycle Replacement 2014 $10,000 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

There are 150mm x 150mm galvanized metal eaves troughs around the school. The rain water leaders are cast iron andare routed through the fascia into the school. The metal eaves troughs have been heat taped to prevent ice dams.

The roof space is accessed through a metal door in the upper level mechanical room. The roof is access by a ladder atgrade. The roof penetrations have been minimized the main penetration being the flue for the heating boilers which hasflashings and counter flashings over a built up wood curb.

Page 12: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 12 of 44

C1010.01 Interior Fixed Partitions*

C1010.05 Interior Windows*

C1010.06 Interior Glazed Partitions and Storefronts*

C1010.07 Interior Partition Firestopping*

C1020.01 Interior Swinging Doors (& Hardware)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Replace 12 solid core doors

Failure Replacement 2012 $12,000 Low

There are solid core doors throughout the school which aredamaged and require replacement.

Concern:

Replace damaged doors.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: APR-11

Interior fixed partitions are concrete block in corridors, wash rooms and shower areas. Interior fixed partitions elsewhereare 5t0mm x 100mm wood studs walls with 16mm Fireguard gypsum board both sides.

There are interior windows in the general office and audio visual room 135 consisting of wired glass in pressed steelframes. The interior window in principal's office is clear glass in a wood frame.

Doors into the general office, library and class room 121b consist of solid core wood doors in pressed steel store frontframes with wired glass side lights.

There was no missing fire stopping observed or reported during the building audit.

Interior swinging doors into class rooms and other areas are typically solid core veneered wood doors in pressed steelframes.

Consequences of Deferral:Doors will deteriorate further.

Page 13: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 13 of 44

C1020.02 Interior Entrance Doors*

C1020.03 Interior Fire Doors*

C1030.01 Visual Display Boards**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1995

Installed

Installed

Installed

0

0

20

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 140 visual display boards

Lifecycle Replacement 2014 $70,000 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

There are interior doors at the north and south entrance vestibules consisting of hollow metal slab doors with vinyl kickplates in pressed steel store front frames with wired glass side lights.

Fire doors in corridors consist of double hollow metal slab doors in pressed steel frames with electromagnetic hold opendevices tied into the fire alarm system.

There are white boards, tack boards and electronic Smart boards in class rooms throughout the school.

Page 14: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 14 of 44

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.08 Interior Identifying Devices*

C1030.10 Lockers**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

30

0

30

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 10 toilet compartments

Replace 4 toilet compartments

Replace 300 lockers in 2 tiers

Lifecycle Replacement

Failure Replacement

Lifecycle Replacement

2014

2011

2014

$10,000

$5,000

$180,000

Unassigned

Medium

Unassigned

Toilet compartments are damaged and hardware isunoperable.

Concern:

Replace damaged toilet compartments.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are prefinished metal toilet compartments in student wash rooms and change areas.

There are metal and plastic room numbers and designations on doors throughout the school.

There are prefinished metal lockers in two tiers in corridors in the east section of the school.

Consequences of Deferral:Toilet compartments will deteriorate further.

Page 15: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 15 of 44

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C2010 Stair Construction*

C3010.04 Gypsum Board Wall Finishes (Unpainted)*

C3010.06 Tile Wall Finishes**

C3010.11 Interior Wall Painting*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1981

1981

1981

1981

1981

1981

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

40

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Updated

Replace 90m2 glazed wall tiles

Lifecycle Replacement 2021 $22,000 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

There are wood storage shelves with laminate counters in class rooms and store rooms throughout the school.

There are mirrors, touchless electronic paper towel dispensers, hand blowers and laminate vanities in student washrooms.

There are concrete stairs down to class room 121b with rubber finish to treads and risers and wood hand rails on steelposts.

Interior partitions between class rooms, offices and other spaces are 50mm x 100mm wood studs with Fire Guardgypsum board both sides.

There are glazed tile wall finishes in wash rooms, change rooms, shower areas, kitchen and behind drinking fountains incorridors.

Gypsum board partitions and concrete block walls are painted throughout the school.

Page 16: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 16 of 44

C3020.01.02 Paint Concrete Floor Finishes*

C3020.02 Tile Floor Finishes**

C3020.07 Resilient Flooring** - General

C3020.07 Resilient Flooring** - Gymnasium

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2000

1981

2005

2008

Installed

Installed

Installed

Installed

0

50

20

20

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 100m2 ceramic floor tiles

Replace 1500m2 resilient flooring

Replace 490m2 resilient cushion floor

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2031

2025

2028

$17,000

$90,000

$50,000

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

The concrete floor in the upper level mechanical room is painted.

There are ceramic floor tiles in wash rooms and kitchen.

There are vinyl tiles and sheet vinyl in class rooms and corridors throughout the school.

There is a cushioned sheet resilient floor in the gymnasium.

Page 17: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 17 of 44

C3020.08 Carpet Flooring**

C3030.03 Plaster Ceiling Finishes (Unpainted)*

C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*

3 - Marginal

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1995

1981

1981

Installed

Installed

Installed

15

0

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 190m2 carpet

Replace 65m2 carpet

Lifecycle Replacement

Failure Replacement

2014

2012

$20,000

$6,500

Unassigned

High

Carpet in offices is worn and damaged.Concern:

Replace remaining (6) carpeted classrooms with lino flooring.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

There is carpet in offices, conference room, class room 130 and library.

There are textured cement plaster on metal lath ceilings in shower areas.

There are gypsum board ceilings with a textured finish in class rooms and library and smooth finish in wash rooms.

Classroom carpet seams worn and delaminating.

Page 18: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 18 of 44

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

4 - AcceptableRating

1981Installed

25Design Life

APR-11Updated

Replace 1000m2 acoustic tiles

Lifecycle Replacement 2014 $45,000 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

There are acoustic ceiling tiles in a T-bar grid in corridors, office areas and vestibules. There are also acoustic tiles adhered to gypsum board ceilings in class rooms 121a and 121b.

Page 19: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 19 of 44

D2010.04 Sinks**

D2010.05 Showers**

D2010.08 Drinking Fountains/Coolers**

D2010.09 Other Plumbing Fixtures*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

30

30

35

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 16 Sinks

Replace 9 Showers

Replace 7 Drinking Fountains

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2016

$28,000

$14,000

$24,000

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are 12 single compartment stainless steel sinks, 1 double compartment stainless steel sink, 1 deep triplecompartment kitchen stainless steel sink and 2 janitor room mop service basins installed in the school.

There are 9 institutional type showers installed in the school. The showers are not used and have been taken out ofservice.

There are 7 wall hung drinking fountains installed in the facility.

There is one shower 3-way mixing valve station and 1 kitchen sink grease interceptor installed.

Page 20: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 20 of 44

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

D2020.01.02 Valves: Domestic Water**

D2020.01.03 Piping Specialties (Backflow Preventors)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

35

0

40

20

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 46 Washroom Fixtures

Replace 150 1/2" to 2" Valves

Replace 1 Backflow Preventor

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2016

2021

2014

$83,000

$45,000

$3,000

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are 6 floor mounted tank type water closets, 13 floor mounted flush valve water closets, 8 floor mounted stall typeurinals, 14 oval stainless steel countertop lavatories, 4 enameled steel countertop lavatories and 1 ceramic wall hunglavatory installed in the school washrooms.

Where observed, copper piping is provided for domestic hot, cold and recirculation water lines.

Isolation valves are provided throughout the school for the domestic water system.

A backflow preventor is provided for the boiler water connection to the potable water system.

Page 21: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 21 of 44

D2020.02.02 Plumbing Pumps: Domestic Water**

D2020.02.06 Domestic Water Heaters**

D2020.03 Water Supply Insulation: Domestic*

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

2006

2000

1981

Installed

Installed

Installed

20

20

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 1 DHW Recirculation Pump

Replace 1 Domestic Hot Water Heater

Replace 1 Domestic Hot Water Heater

Lifecycle Replacement

Failure Replacement

Lifecycle Replacement

2026

2012

2020

$1,200

$11,000

$11,000

Unassigned

Low

Unassigned

The Jetglass natural gas fired domestic hot water heater hasfailed and is not in service.

Concern:

Replace domestic hot water heater.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

A Grundfos Model UPS26-99 inline circulation pump is provided for the domestic hot water recirculation system.

There are two domestic hot water heaters installed in the Mechanical Room. One is a circa 2000 State Model J9271903rated for 70 gallons of storage and 272 gph recovery with an input of 327,000 btuh on natural gas. The other heater is aJetglas Commercial Heater that has failed and is currently out of service.

Where observed, domestic water piping is fiberglass insulated and canvas jacketed.

Consequences of Deferral:Very little consequence since the showers have been takenout of service.

Page 22: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 22 of 44

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

D2040.01 Rain Water Drainage Piping Systems*

D3010.01 Oil Supply Systems (Fuel, Diesel)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Install vent & curb for Diesel Tank

Code Upgrade 2012 $4,000 Low

There is no exterior vent for the diesel fuel supply day tank,nor is there any method of containment of fuel should a leakoccur in the room.

Concern:

Provide a vent line to the exterior of the building and provide acurb to contain a fuel spill.

Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

Where observed, waste piping is cast iron and vent piping is copper.

Floor drains with brass trim are provided in shower areas and mechanical rooms.

Storm drainage from perimeter roof troughs drain to cast iron rain water leaders to an under slab cast iron storm main.The 12" cast iron storm main exits the west face of the building and connects to the municipal main under WoodlandsRoad.

A small diesel day tank is provided in the emergency generator room. .

Consequences of Deferral:Possibility will remain of vapour leakage into the room and aleak in the fuel storage or supply line will not be containedwhich is a fire hazard.

Page 23: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 23 of 44

D3010.02 Gas Supply Systems*

D3020.02.01 Heating Boilers and Accessories: H.W.**

D3020.02.01 Heating Boilers and Accessories: H.W.** - Pumps

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

0

35

35

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 2 Hydronic Heating Boilers

Replace 3 HWH Pumps

Lifecycle Replacement

Failure Replacement

2016

2011

$79,000

$20,000

Unassigned

Medium

Facilities Management reports that these original pumps areunreliable and are in need of replacement.

Concern:

Replace 3 in-line 5 HP hot water heating pumps.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

A natural gas service from the municipal main under Woodlands Road enters the Metering Room on the north face of thebuilding. A steel natural gas main from this room is routed to the Mechanical Room via an above corridor piping system.The natural gas service also extends above the corridors to the east end of the facility to serve the Science Room(service abandoned in this room) and the Portable Classroom furnaces at the east end of the building.

There are two copper water tube hot water heating boilers installed in the Mechanical Room. Each boiler is a RaypakModel 1353WTD rated for 1,352,900 btuh input on natural gas.

There are 3 in-line Bell & Gossett Series 80S hot water heating circulation pumps with 5 HP motors. Two of the pumpsserve the hot water system, and one serves the glycol system for the ventilation unit heating coils.

Consequences of Deferral:If pumps fail there would be no method of providing heat tothe school or the ventilation unit heating coils.

Page 24: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 24 of 44

D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**

D3020.02.03 Water Treatment: H. W. Boiler*

D3040.01.01 Air Handling Units: Air Distribution**

D3040.01.04 Ducts: Air Distribution*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

35

0

30

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 20m Type 'B' Gas Vent

Replace 3 Air Handling Units

Lifecycle Replacement

Lifecycle Replacement

2016

2014

$11,000

$113,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Each of the two boilers is provided with an 18" breeching to a combined 24" Type 'B' gas vent up through the roof.

Water treatment services are contracted to Guardian Chemicals who are responsible for the school water treatmentprogram and schedule.

There are three air handling units in the Mechanical Room: Air handling unit AS-1 serves the Gymnasium area of the school. The system is complete with a Canadian Blower ModelJ120B return air fan, mixing box section, 2" disposable filter section, glycol heating coil, steam grid humidifier (not used)and a Mark Hot MVT-107 supply air fan. Air handling unit AS-2 was originally designed to serve the Cafeteria Area which is now converted into two Classrooms.The system is complete with a mixing box section, 2" disposable filter section, glycol heating coil, steam grid humidifier(not used) and a Mark Hot MVT-50 supply air fan. Air handling unit AS-3 is the main air handling unit serving the Classroom and Administration areas of the school. Thesystem is complete with a mixing box section, 2" disposable filter section, glycol heating coil, steam grid humidifier (notused) and a Mark Hot MVT-8E supply air fan.

A galvanized steel supply air ducting system is located above the corridor ceiling area. Exposed painted galvanized steelexposed ductwork is located at the ceiling area of the Gymnasium.

Page 25: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 25 of 44

D3040.01.07 Air Outlets & Inlets: Air Distribution*

D3040.03.01 Hot Water Distribution Systems**

D3040.04.01 Fans: Exhaust**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

0

40

30

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace Distribution System (3650 m2 gfa)

Replace 9 Exhaust Fans

Lifecycle Replacement

Lifecycle Replacement

2021

2014

$340,000

$16,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Square cone ceiling diffusers and linear supply air grilles are used throughout the school. For the Gymnasium collaredlinear grilles are directly attached to the exposed supply air ductwork.

A steel piping hot water heating distribution system is located above the corridor ceilings and serves the perimeterradiation and entranceway force flow units.

There are 6 in-line exhaust fans in the Mechanical Room: F-1 serves the Gymnasium wash rooms. F-2 serves the Kitchen. F-3 serves the main school wash rooms. F-4 serves the duplicating room F-5 serves the Science Room exhaust hood. F-6 serves the Science Prop Room. There are also 3 exhaust fans located in the attic area for forced attic ventilation.

Page 26: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 26 of 44

D3040.04.03 Ducts: Exhaust*

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3040.05 Heat Exchangers**

D3050.03 Humidifiers**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

0

0

30

25

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace Shell and Tube Heat Exchanger

Replace 2 Electric Steam Grid Humidifiers

Lifecycle Replacement

Lifecycle Replacement

2014

2014

$6,000

$11,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Above corridor ceiling galvanized steel exhaust ductwork is provided from the exhausted areas to the Mechanical Roomexhaust fans. An above corridor stainless steel exhaust duct is provided from the Science Room Fume Hood to theMechanical Room exhaust fan. This fume hood system is no longer used.

Egg crate type exhaust grilles are provided throughout the school.

There is one Bell & Gossett shell and tube heat exchanger located in the Mechanical Room to provide heated glycol tothe ventilation unit heating coils.

There are two electric steam grid humidifiers in the Mechanical Room to serve the air handling units. Humidifier HU-2 isa Condair Nortec Model 500 and serves air supply units AS-1 and AS-2. Humidifier HU-1 for the Gymnasium air supplyunit AS-3 has been removed from the system, but remains in the Mechanical Room. This unit is a Condair Nortec ModelES-700. All humidification for the school has been shut down as Facilities Management does not humidify the school.

Page 27: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 27 of 44

D3050.05.02 Fan Coil Units**

D3050.05.03 Finned Tube Radiation**

D3050.05.06 Unit Heaters**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

30

40

30

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 7 Fan Coil Units

Replace Perimeter Radiation (3650 m2 gfa)

Replace 4 Unit Heaters

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2021

2014

$36,000

$170,000

$13,000

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are 7 fan coil units serving the entrances vestibule to the school. Four of the units are above ceiling mounted and3 are wall mounted with 1 of the wall mounted units being electric.

Perimeter radiation.

There are four unit heaters installed in the school with 1 serving the Metering Room, 2 serving the Gymnasium and 1serving the Mechanical Room.

Page 28: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 28 of 44

D3060.02.01 Electric and Electronic Controls**

D3060.02.02 Pneumatic Controls**

D3060.02.05 Building Systems Controls (BMCS, EMCS)**

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

2002

1981

Installed

Installed

Installed

Installed

30

40

20

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 11 Line Voltage Controllers

Replace Pneumatic Controls ( 3650 m2 gfa)

Replace Building Management Controls (3650 m2gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2021

2022

$6,600

$21,000

$72,000

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are line voltage thermostats controlling the fans for the unit heaters and force flows heating units.

A pneumatic control system is provided throughout the school to control thermostats, mixing valves, damper motors andcontrollers. A duplex control air compressor and refrigerated after dryer is installed in the Mechanical Room.

An Invensys BMCS system was installed in 2002 with I/P transducers to interface with the pneumatic control system.

Universal ABC and water type fire extinguishers are provided throughout the school.

Page 29: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 29 of 44

D5010.01 Main Electrical Transformers**

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1981

1981

1981

Installed

Installed

Installed

40

40

30

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace main distribution panel

Replace panelboards (9 units)

Lifecycle Replacement

Lifecycle Replacement

2021

2015

$40,000

$36,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)S5 ELECTRICAL

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Utility pad mount transformer is located northeast of the school with an incoming service of 1200A, 120/208V, 3 phase, 4wire.

Main distribuition panel is a Sylvania 1200A, 120/208V, 3 phase, 4 wire located in the electrical room.

Sylvania branch circuit panelboards are located throughout the school.

Page 30: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 30 of 44

D5010.07.02 Motor Starters and Accessories** - 1981

D5010.07.02 Motor Starters and Accessories** - 2008

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

3 - Marginal

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

2008

1981

1981

Installed

Installed

Installed

Installed

30

30

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace motor starters (25 units)

Replace motor starters (2 units)

Failure Replacement

Lifecycle Replacement

2012

2038

$16,000

$1,300

Medium

Unassigned

Sylvania motor starters spare parts are no longer available.Concern:

Replace motor starters.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Sylvania magnetic motor starters are located near the equipment.

Telemecanique motor starters are are used to control CAC-1 and CAC-2

Wiring is copper in conduit throughout the school.

There is line voltage switching in the classrooms and offices. Corridor lighting is controlled by line voltage switchinglocated in the custodian's room.

Consequences of Deferral:When the motor starter fails the associated equipment cannotbe controlled.

Page 31: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 31 of 44

D5020.02.02.02 Interior Fluorescent Fixtures** - 2006

D5020.02.03 Emergency Lighting*

D5020.02.03.03 Exit Signs*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

4 - Acceptable

4 - Acceptable

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

2006

1981

2005

1981

1981

Installed

Installed

Installed

Installed

Installed

30

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Replace fixtures (475 units)

Lifecycle Replacement 2036 $180,000 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

There was a lighting upgrade was in 2006, with recessed, surface mounted and suspended fluorescent lighting with T8lamps and electronic ballasts installed throughout the school. Classrooms are generally surface mounted fixtures andcorridors are generally recessed ones. Gymnasium lighting fixtures have T5HO lamps and electronic ballasts.

The diesel generator provides emergency power to several lighting fixtures throughout the building. The portableclassrooms are provided with battery pack emergency lights.

LED exit signs are installed throughout the school.

HPS wall pack fixtures from 70W to 250W are installed around the perimeter of the school. Pole mounted 400W HPSfixtures are installed in the parking lot and at the entrance.

Exterior lighting is photoelectric cell controlled.

Page 32: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 32 of 44

D5030.01 Detection and Fire Alarm**

3 - MarginalRating

1981Installed

25Design Life

APR-11Updated

Add a bell and 8 strobes

Replace Fire Alarm System

Code Upgrade

Failure Replacement

2012

2012

$2,000

$30,000

Medium

Medium

There is no fire alarm bell in the electrical room. There are nostrobes in the wash rooms and change rooms. When the firealarm goes into alarm, the sound pressure level may not besufficient in these rooms.

The fire alarm panel is past its life expectancy and spare partsate no longer available.

Concern:

Concern:

Add a fire bell in the electrical room and strobes in thewashrooms and change rooms.

Replace fire alarm panel and system to addressable one.Bells should be replaced with a horn complete with a strobe toadd a visual signal.

Recommendation:

Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The SIMPLEX 2001 fire alarm panel is installed at the front entrance. Smoke detectors and bells are installed throughoutthe corridors. Heat detectors are installed in service/storage rooms. Fire pull stations are located at the exits. The firealarm system is not addressable and was last tested July 15, 2010.

Consequences of Deferral:

Consequences of Deferral:

There is a life safety concern, if the occupants in the buildingare not aware of a fire alarm.

The fire alarm system may fail, leaving the school with a lifesafety issue.

Page 33: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 33 of 44

D5030.02.02 Intrusion Detection**

D5030.02.04 Video Surveillance**

D5030.03 Clock and Program Systems*

D5030.04.01 Telephone Systems*

3 - Marginal

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

2009

1981

1995

Installed

Installed

Installed

Installed

25

25

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace intrusion detection (4355m2 gfa)

Replace video surveillance (Program, 14 camerasand 2 TV monitors)

Failure Replacement

Lifecycle Replacement

2012

2034

$25,000

$15,000

Medium

Unassigned

The intrusion detection system is past its life expectancy andspare parts are no longer available.

Concern:

Replace the intrusion detection system.Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

GEMINI security system is installed in the school. A Gemini keypad and Kantech card access are installed in the mainentrance. Motion sensors are installed throughout the hallways.

There are 14 Ascendent cameras installed throughout the interior and exterior of the school. There is a TV monitor in themain office and in the server room showing the areas in which the video surveillance covers.

Battery operated clocks are installed in the classrooms and corridors.

The telephone system is a Nortel Meridian with handsets in each classroom.

Consequences of Deferral:Intrusion detection system may fail.

Page 34: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 34 of 44

D5030.04.02 Paging Systems*

D5030.04.04 Data Systems*

D5030.04.05 Local Area Network Systems*

D5030.04.09 Intercommunication Systems*

D5090.01 Uninterruptible Power Supply Systems**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

2005

2010

2000

2005

2000

Installed

Installed

Installed

Installed

Installed

0

0

0

0

30

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Replace two UPS units

Lifecycle Replacement 2030 $2,500 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

Rauland Telecenter paging system is installed in the school. The main panel is located in the work room 110. Thepaging system is connected to the telephone system.

Cat 5 and Cat 5E cabling is installed in the school. Wireless internet is installed throughout the school.

Supernet is installed in the electrical room 111. APC Smart UPS 750 is installed for the server backup power.

Tortech or interM PA-920 FM system is installed in the classrooms.

The network system has backup power from a UPS APC Smart UPS 750. The video surveillance has backup powerfrom 800AVR UPS.

Page 35: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 35 of 44

D5090.02 Packaged Engine Generator Systems (Emergency Power System)**

4 - AcceptableRating

1981Installed

35Design Life

APR-11Updated

Replace diesel generator

Lifecycle Replacement 2016 $25,000 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

The emrgency generator is a Waterous Generator 15U2U diesel engine, Brown Boveri Canada 120/208V, 60A, 17kW,21.2 kVA, 3 phase. In 2009 the block heater and radiator were repaired. In 2010, the battery was replaced.

Page 36: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 36 of 44

E1090.03 Food Service Equipment*

E1090.07 Athletic, Recreational, and Therapeutic Equipment*

E2010.02 Fixed Casework**

E2010.03.01 Blinds**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1995

Installed

Installed

Installed

Installed

0

0

35

30

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace fixed casework (3000m2 gfa)

Replace 10m2 blinds

Lifecycle Replacement

Lifecycle Replacement

2016

2025

$265,000

$1,000

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The staff kitchenette is equipped with: Frigidaire fridge, Concept II fridge, Whirlpool range and dish washer, doublestainless steel sink, laminate counter with cupboards above and below. The school kitchen is equipped with: 2 Kenmore fridges, Beaumark range, Frigidaire chest freezer, triple stainless steelsink, laminate counter with cupboards above and below. The servery to class room 212a (formerly the lunch room) hasbeen blocked off with a gypsum board and wood stud infill.

The gymnasium is equipped with 4 retractable basket ball hoops, floor markings for games and collapsible metalbleaches with wood seating.

There is fixed casework throughout the school including laminate counters with cupboards and wood shelves in classrooms, laminate vanities in wash rooms, control desks in library and general office.

There are Venetian blinds on interior windows in offices.

Page 37: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 37 of 44

F1010.02.04 Portable and Mobile Buildings** - 1982 Portable Class Room

4 - AcceptableRating

1982Installed

30Design Life

APR-11Updated

Replace building envelope (104m2 gfa)

Replace class room interior (104m2 gfa)

Replace electrical system (104m2 gfa)

Replace mechanical system (104m2 gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

2014

$55,000

$12,000

$10,000

$10,000

Unassigned

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

APR-11

In 1982 two free standing portable class rooms were installed to the east of the school and in 2000 a wood frame link wasconstructed to connect it to the 1989 portable class room pod. The west portable class room was removed in the summerof 2010. The remaining portable class rooms has a gross floor area of 104m2. Architectural: The portable class room is wood frame construction with a built up membrane roof on plywood deck on wood joists withbatt insulation and an interior finish of gypsum board over a poly vapour barrier. Exterior walls consist of stucco on meshon building paper on plywood sheathing on wood studs with batt insulation and an interior finish of gypsum board over apoly vapour barrier. Floors are plywood sheathing on wood joists with poly vapour barrier and batt insulations and aplywood soffit. There is no information available on the foundation system. This class room is currently used for storage. Electrical: The portable class room is equipped with power, data, telephone, paging, fire alarm devices, and lighting. Power is fedfrom the main building into 125 Amp, three phase, 4 wire, 120/208V Square D panel. Data, telephone, paging, and firealarm devices are tied to the main building systems. Lighting has T8 fluorescent lamps and electronic ballasts. Theportable classroom is provided with battery pack emergency lights. Mechanical: This portable class room has a natural gas Flamemaster EM-170-CF-SS furnace installed rated for 170,000 btuh input.The furnace is provided with mix air control and 1" pleated filters. A roof mounted exhaust fan is also provided.

Page 38: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 38 of 44

F1010.02.04 Portable and Mobile Buildings** - 1989 Portable Class Rooms

4 - AcceptableRating

1989Installed

30Design Life

APR-11Updated

Replace building envelope (990m2 gfa)

Replace building interior (990m2 gfa)

Lifecycle Replacement 2019 $545,000 Unassigned

Recommend installing open type (heavy duty meshing) insections around the portables. Estimate ($20,000) Provide 1970/1982 portables with new furnaces andventilation system. Estimate ($20,000) Provide 1970/1982 portables with new furnace chimneys.Estimate ($1000) Provde separate exhaust system for portable washrooms forimproved air quality Estimate ($3000) Provide new handrails to exit stais. Estimate ($2000)

Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type Year Cost Priority

Updated: APR-11

In 1989 a pod of 8 portable class rooms was installed on the east side of the school with a total gross area of 990m2including cirulation. The pod includes 4 half size class room units for mud rooms and storage areas one of which is usedas a special needs class room. Architectural: The portable class rooms were built on site and consist of: exterior wall construction of stucco on wire mesh on buildingpaper on 10mm plywood sheathing on 38mm x 140mm wood studs at 400mm centres with batt insulation and an interiorfinish of two layers of gypsum board (13mm rated & 13mm vinyl covered) over a polyethylene vapour barrier; floorconstruction of sheet vinyl floor finish on 6mm plywood underlay on 16mm plywood subfloor on poly vapour barrier on38mm x 235mm wood joists with batt insulation and a soffit of 7mm exterior grade plywood; roof construction consistingof concrete roof tiles to match the school on 19mm x 89mm wood strapping on 19mm x 89mm counter strapping at400mm centres on roof membrane on 16mm ply deck over perimeter gang nail trusses sloped to the eaves with 250mmloose fill insulation and an interior finish of gypsum board over a poly vapour barrier with T-bar acoustic ceilings andtextured gypsum board ceilings. The central roof area are flat with SBS roofs and sloped insulation; the foundationsconsist of 400mm diameter reinforced concrete friction piles 5.3m and 6m long with pile caps carrying 130mm x 418mmGlulam beams. Electrical: The portable classrooms are equipped with power, data, telephone, paging, fire alarm devices, and lighting. Power is fedfrom the main building into each portable equipped with 100 Amp, single phase, 3 wire, 120/208V Commander panel.Data, telephone, paging, and fire alarm devices are tied to the main building systems. Lighting is T8 fluorescent lampsand electronic ballasts. The connecting corridor to the portable class rooms has emergency lighting installed. Theportable classrooms are provided with battery pack emergency lights. Mechanical: Each portable class room has a natural gas Carrier Model 58DH0075-GC forced air furnace rated for 92,000 btuh input.The furnaces have mix air control and 1" pleated filters. There are also roof mounted exhaust fans for each class room.

Consequences of Deferral:Potential reduced lifecycle of portables and health issues islikely. Potential furnace failure (1970/1982 portables) Potentialsafety hazards at exit stairs.

Water staining of wood fascia at eavestrough joints

Page 39: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 39 of 44

Replace electrical systems (990m2 gfa)

Replace mechanical systems (990m2 gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2019

2014

$110,000

$95,000

$100,000

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

Page 40: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 40 of 44

F1010.02.04 Portable and Mobile Buildings** - 1994 Portables Class Rooms

4 - AcceptableRating

1994Installed

30Design Life

APR-11Updated

Replace building envelope (190m2 gfa)

Replace building interior (190m2 gfa)

Replace electrical systems (190m2 gfa)

Replace mechanical systems (190m2 gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2024

2014

2024

2019

$105,000

$20,000

$18,000

$20,000

Unassigned

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

In 1994 two additional portable class rooms were constructed on site to the east end of the 1989 pod. The a total grossarea is 190m2 including circulation space. Architectural: The foundations consist of 400mm diameter reinforced concrete friction piles with pile caps and lengths of 5.3m and 4.6mcarrying 130mm x 418mm Glulam beams and the floor structure consisting of sheet vinyl finish on 6mm plywood underlayon poly vapour barrier on 16mm plywood subfloor on 38mm x 235mm joists at 400mm centres with batt insulation and astained 7mm plywood soffit. The walls consist of stucco on wire mesh on building paper on 10mm plywood sheathing on38mm x 140mm wood studs at 400mm centres with batt insulation and an interior finish of two layers of gypsum board(13mm rated & 13mm vinyl covered) over a polyethylene vapour barrier. The roof construction consisting of concrete rooftiles to match the school on 19mm x 89mm wood strapping on 19mm x 89mm counter strapping at 400mm centres onroof membrane on 16mm ply deck over perimeter gang nail trusses sloped to the eaves with 250mm loose fill insulationand an interior finish of gypsum board over a poly vapour barrier with textured gypsum board ceilings on Z-bars. Thecentral roof area are flat with SBS roofs and sloped insulation. There are exterior concrete stairs at the end of the corridorserving the 1989 and 1994 pods. Electrical: The portables class rooms are equipped with power, data, telephone, paging, fire alarm devices, and lighting. Power isfed from the main building into each portable class room equipped with a 225 Amp, single phase, 3 wire, 120/240VFederal Pioneer panel. Data, telephone, paging, and fire alarm devices are tied to the main building systems. Lighting isT8 fluorescent lamps and electronic ballasts. The connecting corridor to the portable class rooms has emergency lightinginstalled. The portable classrooms are provided with battery pack emergency lights. Mechanical: Each portable class room has a natural gas Lennox Model G24M3/4-100S/2 forced air furnace rated for 100,000 btuhinput. The furnaces have mix air control and 1" pleated filters. There are roof mounted exhaust fans for each class room.

Page 41: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 41 of 44

F1010.02.04 Portable and Mobile Buildings** - 2000 Link

4 - AcceptableRating

2000Installed

30Design Life

APR-11Updated

Replace Link electrical (40 sq-m gfa)

Replace Link envelope (40 sq-m gfa)

Replace Link interior (40 sq-m gfa)

Replace Link mechanical (40 sq-m gfa)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2030

2030

2020

2025

$4,000

$25,000

$5,000

$5,000

Unassigned

Unassigned

Unassigned

Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

APR-11

APR-11

In 2000 a 40m2 link was constructed to connect the 1982 portable class rooms to the 1989 portable class room pod. Architectural: The link is frame construction: exterior walls are stucco on mesh on building paper on ply sheathing on wood studs withbatt insulation and an interior finish of vinyl covered gypsum board over a poly vapour barrier. The roof is an SBSmembrane on plywood deck on 50mm x 225mm joists with batt insulation and an interior finish of gypsum board over polyvapour barrier. The foundations are built up wood sections. Electrical: The connecting corridor to the portable class rooms has emergency lighting battery packs and T8 lamps with electronicballasts. Mechanical: The link is heated by 2 wall mounted forced flow units.

Page 42: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 42 of 44

K3020.03 Air Conditioning/Cooling*

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

K4010.03 Barrier Free Interior Circulation*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1981

1981

1981

1981

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Provide 2 Split Air Conditioning Systems

Indoor Air Quality Upgrade 2012 $35,000 Medium

The Computer Lab (31 work stations) and the Server Roombecome very hot and uncomfortable to the occupants.

Concern:

Install stand alone split air conditioning systems for eachroom.

Recommendation:

St. Albert - Neil M. Ross Catholic School (B4074A)S8 FUNCTIONAL ASSESSMENT

Event:

Type Year Cost Priority

Updated: APR-11

Computer Room 134 and the Server Room 135 require air conditioning to offset the heat loads from the computerstations and server equipment.

There is a barrier free route from the parking area at the front of the school to the main entrance with a curb cut.

There is a barrier free concrete ramp with painted steel pipe handrails to the main school entrance. The main entrancedoors have an automatic opener with interior and exterior push plates.

Interior circulation is barrier free throughout the school. There is an interior concrete ramp with rubber floor finish andwood hand rails on steel posts down to class room 121a.

Consequences of Deferral:The rooms will continue to be hot and uncomfortable to theoccupants.

Page 43: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 43 of 44

K4010.04 Barrier Free Washrooms*

K4030.01 Asbestos*

K4030.02 PCBs*

K4030.04 Mould*

K4030.09 Other Hazardous Materials*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

2006

1981

2006

1981

1981

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

St. Albert - Neil M. Ross Catholic School (B4074A)

There are boys and girls barrier free wash rooms with extra large toilet compartments with stainless steel grab bars andvanities with undercut sections and lower sections. There is also a special needs wash room with a person lift for transfer to and from wheel chairs.

A 2004 consultant's report identified asbestos content in sheet flooring in the science preparation room now used forstorage. The report also indicated the potential asbestos containing materials in pie fittings in wash rooms and kitchenareas. The consultant's report also recommended staff training in the management, handling and appropriate disposal ofasbestos containing materials. School division staff displayed an awareness of the dangers of exposure to asbestosfibres and are familiar with abatement requirements.

Lights in the school have been upgraded to T8 lamps with electronic ballasts. The 2004 consultant's hazardous materialssurvey report indicated that all light ballasts should be checked for PCBs content when they are removed and disposed ofappropriately.

There was no mould reported nor observed during the building audit.

A 2004 consultant's hazardous materials survey of the school indicated the presence of asbestos in sheet flooring, smokedetectors in the portable class room corridors containing radioactive matter, lead pint on lockers, doors and frames. Theconsultant recommended managing that the asbestos flooring, lead paint and radioactive material be managed in placeand if removed during building projects for upgrading or maintenance should be recycled or disposed of according toprovincial and federal regulations.

Page 44: RECAPP Facility Evaluation Report - · PDF fileRECAPP Facility Evaluation Report Neil M. Ross Catholic School B4074A ... Simplex 2001 fire alarm system that is in need of an upgrade

Report run on: April 7, 2011 5:20 PM Page 44 of 44

K5010 Reports and Studies*

4 - AcceptableRating

1981Installed

0Design Life

APR-11Updated

Plans and Drawings

Study 2010 $0 Unassigned

St. Albert - Neil M. Ross Catholic School (B4074A)

Event:

Type Year Cost Priority

Updated: APR-11

The 4,300m2 single storey school was constructed in 1981. In 1982 two free standing portable class rooms were addedone of which was recently removed. In 1989 a pod of eight portable class rooms was added to the east side of the schoolwith a further two portable class rooms added in 1994. In 2000 a link was constructed connecting the 1982 portable to the1989 pod. The school serves a student compliment of 449 in grades K to 6 and a staff of 48. The school has a program ofintegration of special needs students. The prime consultant for this facility evaluation carried out on November 23, 2010, is Robert Irlam Consulting Inc.