11

Click here to load reader

Professional Resume Achmad Firdaus (Dec 2015 )

Embed Size (px)

Citation preview

Page 1: Professional Resume Achmad Firdaus (Dec 2015 )

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

CURRICULUM VITAEPersonal Data

Name : Achmad FirdausPlace/Date of Birth : Samarinda, January 09th 1979

Gender : Male

Marital Status : Married (K1)

Nationality : Indonesian

Religion : Moslem

Recent Address : Jl. Andi Mukmin Raya – Handil Permai Housing Complex, District

Kutai Kertanegara East Kalimantan 75261

Phone number : 081-346-220-999 / 0812-8323-0879E-mail address : [email protected]

Educational Background

State Polytechnic of Samarinda Majoring in Civil Engineering (Diploma-3),

Samarinda, East Kalimantan. Graduated on October 2000

Work Experiences

1. PT. Meindo Elang Indah (March 2008 – Now :)

Position : Heavy Equipment Maintenance & Operation Supervisor General Responsiblity :

- Supporting all Project Construction Activities by providing Project Required

Equipments in term of Schedule, Capacity, Quantity & mandatory certifcation,

including manpower alllocation for Operator, Supporting Crew & Maintenance

Team.

Daily Job description :

Liase with project user for upcoming project planning execution & current activity in

accordance of Equipment Allocation, Preparation (Repair & Modification), Mobilization,

Page 2: Professional Resume Achmad Firdaus (Dec 2015 )

Certification & Maintenance/ repair programs as per Yard Manager & Heavy equipments

manager approval

Follow-up finding of Heavy Equipment in daily basis & coordinate with Project User for

immediate repair, improvement & spare parts replacement in accordance with

manufacturer & project requirements

Monitoring result of Equipments Regular (Weekly & Monthly) Inspection yet collecting

information of actual performance & function of Equipments which noted in daily

checklist in order of repair, improvement & unit/ spare parts replacement.

Maintain proper communication with Dealer (OEM) & supplier of Equipments in order

reference of Repair, Improvement & Parts Replacement .

Ensure Commisioning Test of brand new equipments conducted properly in order

Warranty Claims, Insurance & Documentation of asset for master data record.

Issue Master list of Hot Moving Parts & Particular requirements parts in accordance of

equipments Project Usage Schedule & Qualification for budgeting approval from

management & project user.

Prepare & Issue Weekly Report of Equipments usage & Certification Status to all

project user & head office, for feedback of Weekly Maintenance Schedule, Spare parts/

consumable delivery & Supporting Personnel (Operator, Mechanic & Techniciant) Job

Allocation

Coordinate & supervise Major Equipments Regular Certification which performed by

third party for Annual & MIGAS Certification purpose.

Coordinate with Legal & Papers Division to ensure Validity & Availability of Mobile

Equipments & Vehicles of Required Registration & other mandatory complementary

documents as per goverment rules.

Review Repair/ Service Report of Equipment from Mechanic/ Electric for reference

of spare parts stock & consumable purchasing & storage.

Coordinate with project user for efficient equipment usage according to each

project current activity & upcoming construction phases including manage

mobilization & demobilization of equipment both onshore & offshore.

Compile & Review Inspection Report which issued by third party prior submission/

distribution to Client, Project User & Internal Audit purpose.

Page 3: Professional Resume Achmad Firdaus (Dec 2015 )

Socialize Company Policy & Regulation for Standard Operation Procedure of

Equipments & Suppporting Equipments including perform Training to Operator, Techniciant & Supervisor in charge

Responsible for managing maintenance programs of following equipments:

Telescopic Mobile Crane : Kato type MR-130-R Capacity 13 Ton – 1 unit

Kato type SR-300-R Capacity 30 Ton – 6 units

Kato type SR-700-R Capacity 70 Ton – 5 units

Kato type SR-250- Capacity 25 Ton – 4 units

Kato type SR-500- Capacity 45 Ton – 3 units

Link belt type RTC-8050-II Capacity 50 tons – 2 units

Mobile Crawler Crane : Hitachi Sumitomo type SLX-6000 (capacity 600 ton) – 1 unit

Hitachi Sumitomo type SCX-2800 (capacity 280 ton) – 1 unit

Hitachi Sumitomo type SCX-1500 (capacity 150 ton) – 1 unit

Hitachi Sumitomo type SCX-1200 (capacity 120 ton) – 1 unit

TEREX-DEMAG type: CC-2500-1 (capacity 500 ton) – 1 unit

KOBELCO type 7250-2F (capacity 250 ton) – 4 units

KOBELCO type CKE-1800 (capacity 180 ton) – 2 units

KOBELCO type CKS-900 (capacity 90 ton) – 2 units

KOBELCO type 7055-2F (capacity 55 ton) – 2 units

SUMITOMO type SC-1500-2 (capacity 150 ton) – 1 unit

SUMITOMO type LS-468 (capacity 100 ton) – 1 unit

SUMITOMO type SC-650-2 (capacity 65 ton) – 2 units

HITACHI type KH-850-3 (capacity 150 ton) – 1 unit

HITACHI type KH-500-3 (capacity 100 ton) – 2 units

HITACHI type KH-180-3 (capacity 50 ton) – 1 unit

HITACHI type KH-100-D (capacity 30 ton) – 1 unit

HITACHI type CX-650 (capacity 65 ton) – 1 unit

HITACHI type CX-500 (capacity 50 ton) – 2 units

MANITOWOC type 1200 (Capacity 120 ton) – 1 unit

Offshore Pedestal Crane : LIEBHER type: BOS-4200-100 Litronic, (capacity 100 ton) – 1 unit

HUISMAN type HUISMAN-300 (capacity 300 ton) – 1 unit

Page 4: Professional Resume Achmad Firdaus (Dec 2015 )

Mounted Truck Crane (articulated) : PALFINGER type PK-15500 (capacity 6 ton) – 1 unit

HIAB type PK-15500 (capacity 10 ton) – 2 units

FERRARI type PK-15500 (capacity 6 ton) – 2 units

Crawler & Swamp Buggy Excavator: KOBELCO type SK-200-8 (crawler type) – 36 units

KOBELCO type SK-210-8 (Swamp Buggy type) – 8 units

Caterpillar type Cat-320C – 4 units

Caterpillar type Cat-320D – 4 units

KOMATSU type PC-200-7 - 4 units

Whell Loader, Bulldozer, Forklift & Vibro Compactor : Whell Loader TCM type L-16-3 – 1 unit

Whell Loader Caterpillar type W908 – 1 unit

Whell Loader XIANJIN type XJ-953 – 2 units

Bulldozer Caterpillar D6XR-L – 1 unit

Bulldozer CASE type SK-650-3 – 1 unit

Vibrator Roller SAKAI SV-512-DD – 3 Units

Vibrator Roller LIUGONG CLG-6120 – 4 units

Telescopic Forklift MANITOU MLT-732 (cap. 3,2ton) – 2 units

Telescopic Forklift MANITOU MLT-845 (cap. 4,5ton) – 8 units

Masted Forklift MANITOU MX-50-4 (cap. 5 ton) – 2 units

Masted Forklift TOYOTA FD30-8 (cap. 3 ton) – 3 units

Truck Trailer (Prime Mover), Flat Bed, Dump Truck & Truck Mixer : Prime Mover HINO type FM-500-320P – 12 units

Prime Mover RENAULT type KERAX-440-DXi – 4 units

Dump Truck HINO type FM-500-260P – 8 units

Dump Truck NISSAN type EURO Turbo 220ps – 6 units

Truck Mixer HINO type FM-500-320P – 4 units

Truck Mixer SANY type SYM-1250-T4 – 2 units

Flat bed truck HINO type FM-500-260P – 2 units

Flat bed truck MITSUBISHI type PS-120-HD – 6 units

Light bus HINO type 300HD – 4 units

Page 5: Professional Resume Achmad Firdaus (Dec 2015 )

Light Vehicle (4WD) : Mitsubishi PAJERO Sport – 12 units

Mitsubishi STRADA TRITON – 16 units

TOYOTA HILUX – 4 units

TOYOTA FORTUNER – 4 units

ISUZU D-MAX – 2 units

Diesel AC Generator : CATERPILLAR type 550 (cap. 550 KVA) – 2 Units

DENYO type 600SP (Cap. 550 KVA) – 2 units

DENYO type 400SP (Cap. 350 KVA) – 12 units

DENYO type 300SP (Cap. 250 KVA) – 4 units

DENYO type 150SP (Cap. 125 KVA) – 12 units

DENYO type 125SP (Cap. 100 KVA) – 14 units

DENYO type 60SP (Cap. 50 KVA) – 10 units

DENYO type 45SP (Cap. 35 KVA) – 2 units

HARTECH type HT-350-C (Cap. 300KVA) – 4 units

HARTECH type HT-175-C (Cap. 150 KVA) – 4 units

HARTECH type HT-135-C (Cap. 125 KVA) – 6 units

HARTECH type HT-60-P (Cap. 50 KVA) – 3 units

Electric Gantry Crane : - Demag EKDR 5 (5 ton)

o Demag EKDR 3 (3 ton) -

o Demag EKDR 10 (10 ton)

o HITACHI TLU-5 (5 ton)

2. PT. Meindo Elang Indah (October 2006 – February 2008)

Position : Site Engineer Client & Project : 1. Total E & P Indonesie, for projects :

Main Oil Line 20” Repair Campaign 2006 - 2007

Tunu Riser Repair Campaign 2007 - 2008

Scope of work :

Preparing Procedure prior work execution including Calculation Notes, Drawing, Job

Risk Assessment and Master Planning of Work Execution for Company Review and

Approval

Page 6: Professional Resume Achmad Firdaus (Dec 2015 )

Prepare Shop Drawing for Approval by Company Site Representative including Issue

approved drawing for Site Supervisor and Site Personnel

Prepare Daily Job Reports, Weekly Progress Report and Monthly Progress Reports

including Three Week Look Ahead Planning.

Coordinate With Site Supervisor and Surveyor to Determine Exact Repair Location

as per Pigging Data Result and Approved Shop Drawing

Coordinate with QC Inspector to Issue Welding Map and Standard NDT Inspection

which Required as per Approved Procedure

Compile all Reports and Documentation from Site Personnel including NDT Sub-

Contractor Reports

Coordinate with Draftsman to Issue As Built Report

Coordinate with Document Controller to Manage booth Soft Copy and Hard Copy of

all Final Reports Data for Final Dossier Submission.

3. PT. Antasena Rekayasa Mandiri (March 2005 – October 2006)

Position : Project Engineer Client & Project : 1. Total E & P Indonesie, for projects :

Tambora Tunu Various Civil Work & Maintenance Project 2005

CPU Shoreline Protection & Site Reinstatement

CPU Main Office Security Reinstatement & Enlargement

NPU Logistic Acces road & Jetty Area Repavement

Scope of work :

Analyze shop drawing & Bill of Quantity to estimate Material, Equipment & Man

Power including Marine Transport schedule

Prepare shop drawing & issue to Site Supervisor / Foreman for daily material

preparation of material, tool & equipment

Coordinate with Safety Officer to prepare Job Risk Assessment for work permit

attachment prior job execution to fulfill company HSE rules & specification

Estimate actual quantity of work including prepare As Built Drawing as per Site

Supervisor Record for Final Bill of Quantity prior Hand Over Acceptance

Acting as Deputy Site Manager during Absence of Site Manager related to Daily

Work Planning & upcoming job execution with Client Representative.

Page 7: Professional Resume Achmad Firdaus (Dec 2015 )

4. PT. Inti Platindo Perdana (December 2003 – February 2005)

Position : Site Supervisor

Client & Project : 1. Total E & P Indonesie, for projects :

Tambora Various Civil Work & Maintenance Project 2003

CPU Workshop Reinstatement Project

Scope of work :

Analyze shop drawing & Bill of Quantity to estimate Material, Equipment & Man

Power including Marine Transport schedule

Prepare shop drawing & job risk assessment for work permit attachment prior job

execution including other necessary precaution preparation.

Perform Work Order & Estimate actual quantity of work prior Hand Over Acceptance

with client

Coordinate with Safetyman to perform work phases based on HSE Rules & Quality

Standard which approved by Client & listed in scope of work

5. CV. Mahir Jaya (February 2002 – September 2002)

Position : Quality Control Client & Project : Site Development Central Government of Kutai Timur District –

Sangatta East Kalimantan Scope of work :

Estimate & plan work phases for Mechanical Earth Moving Work (Cut & Fill of Soil)

including Heavy Equipment distribution for each location

Coordinate with surveying team and Heavy Equipment Foreman for preparation

work (topographic survey & site clearing) & Erath Works (cut & fill, top grading,

compaction & temporary drainage system)

Estimate actual quantity of work including prepare As Built Drawing for Final Bill of

Quantity prior Hand Over acceptance with Client.

6. PT. Luhribu Naga Jaya (December 2000 – January 2002)

Position : Site Supervisor

Client & Project : 1. VICO Indonesia, for projects :

Various Civil Work & Maintenance Project 2000-2001

Samberra Control Room Refurbishment

Page 8: Professional Resume Achmad Firdaus (Dec 2015 )

Drainage Recovery System of Badak Field Process Area

Scope of work :

Analyze & plan work phases of Work Order that issued by Client to submit Cost

Estimation & Work Procedure to fulfill Company HSE standard & specification prior

job execution

Estimate material & manpower for Site Manager approval of cost budgeting.

Perform Work Order & Estimate actual quantity of work including prepare As Built

Drawing for Final Bill of Quantity prior Hand Over acceptance with Client.

Practical Skills

Able to communicate in English both written & spoken

Familiar with computer program such as : Microsoft Word, Microsoft Excel, Power

Point, Internet Explorer, Microsoft Project & AutoCAD 2010 Supporting all Project Construction Activities by providing Project Required

Equipments in term of Schedule, Capacity, Quantity & mandatory certifcation,

including manpower alllocation for Operator, Supporting Crew & Maintenance Team.

Able to analyze, plan, estimate & perform various civil & mechanical works up to

completion phases

Familiar with standard of Lifting Gears & Equipment Inspection, Maintenance &

Certification as per Government (MIGAS) & International Standard

Able to work under pressure both in a team or individually to reach target of Job

Completion yet leadership skills & adaptable in many cultures

Training & Courses

Job Risk Assesment & Work Permit Procedure of TOTAL E&P Indonesie (2004) –

CPU Tambora

In House Training for Basic Diesel Engine & Heavy Equipment Maintenance (2008) – Handil Yard

Trouble Shoot & Maintenance Program of Air Compressor & Pneumatic

Equipment for Oil & Gas Industry (2008) by Intraco Penta Balikpapan

In House Training of Risk Assesment for Supervisor (ISO 14001 & OHSAS 18001

Implementation) – (2009)

Page 9: Professional Resume Achmad Firdaus (Dec 2015 )

Sea Survival Training & Basic Fire Fighting Technique of TOTAL E&P Indonesie

for PECIKO – 7 Development Project (2009) ISO 18000 & 14000 Implementation Standard for Supervisor (2009) Rigging & Crane Inspector Training by LPK Mandiri Balikpapan (DEPNAKER

Certification) – (2011)