PROPOSAL and METHOD STATEMENTBy
Post & Precast CO.,LTD.
68/866-867 Moo.8 , Soi.Rattanathibet 28 , Rattanathibet Road , T.Bangkarsor ,
Muang Nonthaburi , Nonthaburi 11000.
Tel.. 02-965-8500-2 Fax.. 02-965-8499#1
E - Mail : [email protected] ( for Sale & Marketting) , [email protected]
Post Tensioned Systems & Precast Concrete Products By Post & Precast CO.,LTD.
PROPOSAL and METHOD STATEMENT
PRODUCT
Precast Concrete
Post & Precast Co.,Ltd.
.
Shop Drawing
,
, ,
, ,
,
( POST & PRECAST CO.,LTD. )
, ( Joint )
- ,
,
1
3
1 12
2 13
OPERATION CHART
3 14
SHOP DRAWING
4 15
Post & Precast Co.,Ltd. Page 1
1.
1.1 1.1.1 28 280 ./ . .
15 . 30 .
1.1.2
1) 6-9 . . 20-2527
2) 12-16 . . 24-2527 SD-40
3) ( Wire Mesh) fy = 5,500 ./ . . . 737-2531
1.1.3 . 116-2527
1.1.4 Polyurethane,Acrylic Sealant
1.1.5
1) E60 ,
2) E70 , ,
1.2 1.2.1 ( Plain Concrete )
1.2.2 ( Exposed Aggregate )
1.2.3 ( Brick , Ceramic ,etc )
1.2.4 ( Natural Stone )
Post & Precast Co.,Ltd. Page 2
1.3
+4 .
+4 .
+4 .
+3 .
+3 .
+L/360
+5 .
+5 .
+5 .
Post & Precast Co.,Ltd. Page 3
2.
2.1 Shop Drawing
2.1.1 Shop Drawing ,
2.1.2 ,
2.1.3
2.1.4
1) -
2) ,
3) -
4)
2.2
(Deflection)
Post & Precast Co.,Ltd. Page 4
2.3 -
-
Main Cont. or Post & Precast
Other Sub Cont.
1) - 2) - 3) Shop Drawing 4) ( Post-Tension) 5) , 6) 7)
2.4 - , Shop
Drawing
2.4.1 - ,
2.4.2 , Topping
2.4.3
2.4.4 4.1-4.3 , Shop Drawing
2.4.5 ,
Post & Precast Co.,Ltd. Page 5
2.5 Shop Drawing
, , , , (Wire Mesh) , , 1) 2)
3) , (Wire Mesh) Shop Drawing
,
4) , - , , , , ,
5)
6)
7)
8)
2.6
2.6.1 Offset, Gridline,
2.6.2 - ,
2.6.3 , Tower Crane
2.6.4
Post & Precast Co.,Ltd. Page 6
2.7 2 2.7.1
, , ,
2.7.2
1) Tower Crane .
, Tower Crane
2)
3) Shop Drawing
4) Shop Drawing
Post & Precast Co.,Ltd. Page 7
Post & Precast Co.,Ltd. Page 8
Post & Precast Co.,Ltd. Page 9
Post & Precast Co.,Ltd. Page 10
Post & Precast Co.,Ltd. Page 11
2.8
Main Cont. or Post & Precast
Other Sub Cont.
1) 2) - Topping
2.9
2.9.1 Backing Foam Backing Foam
1 .
2.9.2 Sealant
Post & Precast Co.,Ltd. Page 12
1
1.
2.
3.
4.
5.
6. Tower Crane
7. Offset Line
8. Level Line
9. –
Post & Precast Co.,Ltd. Page 13
2
OPERATION CHART
Company Profile1 Company Name Post & Precast Co.,Ltd.
2 Office Address 68/861 Moo 8 Ratanathibet Soi 28, Ratanathibet Road,
Tambon Bangkasor, Amphur Muang-Nonthaburi,
Nonthaburi 11000, Thailand
Tel. 02-965-8500-2 Fax. 02-965-8499
Email : [email protected] , [email protected]
3 Factory Address 3/3 Moo 5, Tambon Nongsamwang, Amphur Nongsuer,
Pratumtani, Thailand (Rangsit Klong 13, Nakornnayok)
Tel. 02-581-7488 Fax. 02-581-7512
4 Contact Person Mr. Wiroj Atipornwanich (Managing Director)
Mr. Santi Tangjitsatiankul (Sales & Marketing Director)
Mr. Satit Jungjaroensuk (Engineering Director)
Mr. Worrasit Nusato (Factory & Operation Director)
5 Factory Area 90,000 sq.m.
6 Production Area 30,000 sq.m.
7 Products and Services Post-Tensioned Slab
Precast Concrete Wall Panel
Precast Structure Element
Precast Load Bearing Wall
8 Products Capacity Post-Tensioned Slab 150,000 sq.m./month
Precast Concrete Wall Panel 15,000 sq.m./month
Post & Precast CO., LTD.
.
* . .( ) ,
* M.Eng.Asian Institute of Technology (AIT) , Thailand
* M.S. Georgia Institute of Technology (GT) , Georgia,USA
* Ph.D. Rensselaer Polytechnic Institute (RPI) , New York, USA
. . ( ) ,
. . ( ) ,
. . ( ) ,
. . ( ) ,
2536 ( )
2546 – : Post & Precast CO.,LTD.
Post Tension , Precast Concrete Prefab House
Post Tension , Precast Concrete Prefab House
- 16 .
- . (ABAC) .
- . . . 7 . .
- 6 2 . 122
- 5 .
- 8 . 9
- Big - A .
- PSI HOLDING .
- .
- .
- PEARL VILLAGE .
- GRAND DIAMOND CITY
- .
- . 26
- 4
- 9
- .
- THE PEAKS
-
- .
- 4 .
- Table Tennis . (ABAC) .
-
- BIG - C
-
- Maxxis International 112, 118, 121, 128
- SC Homemart
- . (ABAC) . - 15 .
- .
-
- Tennis . (ABAC) .
- . (ABAC) .
- SEAGATE TECHNOLOGY .
- Twin Peaks 15
- 2 ( )
- 6 ( )
- ( )
- 5 ( )
2540 – 2545 - : C- Post CP.,LTD.
Precast Concrete ( . .2545)
Precast Concrete ( . .2543-2545)
( . .2540-2543)
Post Tension Precast Concrete
- (ABAC) .
- , 8
- .
- BIG - C
-
- .
- .
- 2
-
-
-
-
- ( )
- (SBAC)
-
- .
-
-
- .
- .
- Lee Gardens Plaza & Hotel . .
-
- TSE. Refrigerator .
2536 – 2540 ( ) Post Tension
Post Tension
- ,
- , . -
- 8 ,
- . 39-49 ,
- ,
- 2 ,
- ,
- ,
- ,
- 2 ( ) ,
- 3 ,
- ,
- ,
- ,
- ,
- ,
- , .
- ,
- . . . ,
- ,
- ,
-
- ,
- ,
- ,
- ,
- ,
- ,
- 8 . ,
- - ,
- 2 ,
- EGCO ,
- ,
2538 ( )
2546 – : Post & Precast CO.,LTD.
Precast Concrete Prefab House
Main Contractor
1 Teble
Tennis
(ABAC)
1 100 . .
. . . 46 . . 46
2
11 8,300 . .
. . . 46 . . 46
3 Big-C 6 35 . .
2 5
. - . . 46 . . 46
4 1 1,600 . .
. . . 46 . . 46
5 Maxxiss International
112,118,121,128
2 1,000 . . 2 . . 46 . . 46
6 SC Homemart 1 300 . . . . 46 . . 46
7
(ABAC)
1 100 . .
. . . 46 . . 46
8 15 ,
15 10,455 . .
.CES . . 46 . . 47
9
.
8 5,600 . .
.PKT INTERNATIONAL . . 46 . . 47
10
1 2,828 . .
. - . . 46 . . 46
11 Tennis
(ABAC)
1 1,200 . .
. . . 47 . .. 47
12
(ABAC)
. . . . 47 . . 47
13 Seagate Technology
.
1 . .
. . . 47 . . 47
Main Contractor
14 Thai jareon jewely 1 350 . .
. . . 47 . . 47
15 Twin Peaks 15
8 1 100 . .
.SIAM ZOKEI . . 47 . . 47
Main Contractor
1 2 ( ) 2 168 . ( ) . . 46 . . 47
2 6 ( ) 2 64 . ( ) . . 46 . . 46
3 ( ) 2 60 .
. . 47 . . 47
4 5 ( ) 2 64 . ( ) . . 47 . . 47
2540 – 2545 - : C-Post CO.,LTD
Precast Concrete
1 - . 2 415 . . . . 40 . . 40
2 7 680 . . . . 40 . . 40
3 Lee Gardens Plaza & Hotel .
.
33 7,232 . . . . 40 . . 42
4
9 900 . . . . 41 . . 41
5 25 4,339 . . . . 41 . . 43
6
(ABAC) .
.
11 25,809 . .
. . 42 . . 42
7 First Bangkok Property .
9 1,176 . . . . 42 . . 42
8 .
(ABAC) .
.
5 1,600 . . . . 42 . . 43
9 .
(ABAC) .
.
55 . 3,500 . . Load Bearing Wall . . 43 . . 43
10
-
10 2,158 . . . . 43 . . 43
11 5
5 1,800 . . . . 43 . . 44
12
1 (SBAC)
6 1,926 . .
. . 43 . . 44
13
2 (SBAC)
6 3,035 . . . . 43 . . 43
14
. . 40 .
550 . . . . 43 . . 44
15
. .
2 2,00 . . Precast Shell Structure
(Dome Shell)
. . 43 . . 44
16 -
9 1,125 . . . . 43 . . 44
17 11 2,159 . . . . 43 . . 44
18
13 4,200 . . . . 43 . . 44
19 6 762 . . . . 44 . . 44
20 31 15,000 . . . . 43 . . 45
21
1
5 3,130 . . . . 44 . . 44
22
6
6 2,180 . . . . 44 . . 44
23 12 11,000 . . . . 44 . . 44
24 4 . 5 1,000 . . . . 45 . . 45
25 1 1,000 . . Precast Gutter . . 45 . . 45
26 Observation Deck – 8
160
.
300 . . . . 45 . . 45
27
14 2,000 . . . . 44 . . 45
28
8 500 . . . . 45 . . 45
29
ABAC .
1 1,700 . . Precast Stair . . 45 . . 45
Big-C 6 12,000 . . . . 45 . . 45
31 6 1,050 . . . . 45 . . 45
32
7 479 . . . . 45 . . 45
33 ABAC GYMNASIUM , ABAC
.
1 710 . . Precast Gutter . . 45 . . 45
34 2( Podium)
12 12,000 . . . . 45 . . 45
35 30 19,000 . . . . 45 . . 45
36 Long Beach Hotel . 17 12,000 . .
Precast Stair
. . 45 . .
37 ( Podium)
11 2,500 . . . . 45
38 Scandinavian Village A,B,C
(3 ) .
96 6,000 . . . . 45
39 Microchip . 2 3,500 . . . . 45 . . 45
2538 – 2539 (1985) ( )
- 8
Post & Precast Co.,Ltd. Page 14
3
OPERATION CHART
OWNER
CONSULTANT DESIGNER
MAIN CONTRACTOR
Post & Precast
Post & Precast
PROJECT ENGINEER TECHICAL
DESIGN SUPPORT
PRODUCTION PLANT
FOREMAN
SHIPPING ERECTION SEALING