PIPE RACK / WAYS
&
RACK PIPING By,
Akshaya Sharma
Associate Engineer Piping Department
Date 16thNov 2006
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
2/23
2
INTRODUCTION
PIPE RACK Pipe Rack design criteria
Shapes Future Space Width o Pipe Rack
C!earance Pipe Rack "oading
RACK PIPIN# Positions o "ines $Process % Uti!ities& 'ot "ines % Co!d "ines (igger Si)e "ines Pipe Spacing Anchor (a* Unit (atter* "i+it E,pansion "oops Pipe Route
Tra*s
Contents
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
3/23
3
A pipe rack is the +ain arter* o a process unit- It connects a!! e.uip+ent /ith !ines that cannot run through ad0acent areas- (ecauseit is !ocated in the +idd!e o the +ost p!ants1 the pipe rack +ust 2eerected irst1 2eore it 2eco+es o2structed 2* ro/s o e.uip+ent- Pipe racks carr* process1 uti!it* piping and a!so inc!ude instru+ent a
nd e!ectrica! ca2!e tra*s as /e!! as e.uip+ent +ounted o3er a!! o these-
The pri+ar* data re.uired or detai!ed de3e!op+ent o a pipe rack45
P!ot P!an P%ID6s C!ient Speciication Construction 7ateria!s
Fire prooing re.uire+ents Statutor* re.uire+ents
INTRODUCTION
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
4/23
4
FOUNDATION
LONGITUDINAL BEAM
RANSVERSE BEAM
PORTAL
COLUM
N
OCESS TIER
ILITY TIER
ILITY TIER
BLE TRAYS
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
5/23
5
Shapes There are 3arious shapes o pipe rack !ike "8T8U8'89- These s
hapes sha!! 2e considered 2ased on the area a3ai!a2!e-
Future Space The tota! /idth o the pipe rack sha!! inc!ude :;< e,tra space
or uture e,pansion8+odiication in unit or rack5/idth upto=>+ and =?< or rack5/idth a2o3e =>+- The uture space +1 @+ or =?+ or sing!e 2a* and =:+1 =>+ or :?+ or dou2!e 2a* ha3ing tiers +a,i+u+-The spacing 2et/een pipe rack porta!s sha!! 2e taken as >+ ingenera!- 'o/e3er it can 2e increased to @+ depending on the si)e o the pu+ps to 2e housed 2e!o/ pipe rack-
PIPE RACK DESIGN CRITERIA
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
6/23
6
RACK WIDTH SELECTION CRITERIA
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
7/23
DIFFERENT SHAPES OF PIPE RACKS
DEAD END YARD LINES ENTER &
LEAVE ONE END OF THE RACK
STRAIGHT THROUGH YARD LINES
CAN ENTER & LEAVE BOTH ENDS
OF THE RACK
L-SHAPED YARD LINES CAN
ENTER & LEAVE NORTH & EASTOF THE RACK
T-SHAPED RACK PIPING CAN
ENTER & LEAVE THREE SIDES OF
THE RACK
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
8/23
!
DIFFERENT SHAPES OF PIPE RACKS
COMPBINATION OF I & T SHAPEDRACK
U-SHAPED YARD LINE CAN ENTER& LEAVE ALL FOUR SIDES OF THE
RACK
COMPLEX RACK PIPING ARRANGEMENT
FOR VERY LARGE CHEMICAL PLANT
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
9/23
"
C!earance For units1 c!earance 2eneath pipe rack sha!! 2e + +ini+u+ 2oth in !ongitudina! and trans3ersedirections-
For Osite1 c!earance 2eneath pipe rack sha!! 2e:-:+ +ini+u+ 2oth in !ongitudina! and trans3erse directions-
Road c!earance sha!! 2e B+ or +ain road and ;+ or secondar* road-
PIPE RACK DESIGN CRITERIA
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
10/23
10
Pipe rack !oads sha!! 2e gi3en 2* stress group to Ci3i!% structura! discip!ine or pipe rack design-
Sustain "oad $Dead "oad& Weight o piping1 3a!3e and !oad insu!ation
Ther+a! "aod "oad 2* ther+a! e,pansion o piping % Reaction orce 2
* interna! pressure o e,pansion 2e!!o/s
D*na+ic "aod "oad 2* 3i2ration o piping % 2* /ind and earth.uake
Sustained "oad $"i3e "oad& "i.uid !oad or h*drostatic pressure test
PIPE RACK LOADING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
11/23
11
Position o "ines Predo+inant!* process !ines are to 2e kept at !o
/er tier and1 uti!it* % hot process !ines on upper tier-
'ot "ines % Co!d "ines #enera!!* hot !ines % co!d !ines are to kept at dierent tiers or at dierent groups on a tier-
Pipe Spacing 7ini+u+ spacing 2et/een ad0acent !ines sha!! 2e decide
d 2ased on O-D- o 2igger si)e !ange $+ini+u+ rating ?? to 2e considered&1 O-D- o the s+a!!er pipe1 indi3idua! insu!ation thickness and additiona! :;++ c!earance- E3en i !ange is not appearing the +in- spacing sha!! 2e 2ased on a2o3e 2asis on!*- Actua! !ine spacing1 especia!!*
at "6 2end and !oop !ocations1 sha!! take care ther+a! e,pansion8ther+a! contraction8non5e,pansion o ad0ace
RACK PIPING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
12/23
12
(igger Si)e "ines "arge si)e !ines $= and !arger& sha!! 2e arranged c!ose to t
he co!u+n in order to decrease the 2ending +o+ent o 2ea+- Water !ines +ore than ? sha!! not 2e routed o3er piperack1 these sha!! 2e routed underground-
Anchor (a* Anchors on the racks are to 2e pro3ided on the anchor 2a*i the concept o anchor 2a* is adopted- Other/ise anchorsha!! 2e distri2uted o3er t/o to three consecuti3e 2a*s-
Anchors sha!! 2e pro3ided /ithin unit on a!! hot !ines !ea3ing the unit-
Pipe Route Racks sha!! 2e designed to gi3e the piping shortest possi2!e
run and to pro3ide c!ear head roo+s o3er +ain /a!k/a*s1secondar* /a!k/a*s and p!ator+s-
RACK PIPING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
13/23
13
Tra*s #enera!!* top tier is to 2e kept or E!ectrica! ca2!e tra*s $i
not pro3ided in underground trench& and Instru+ent ca2!educts8tra*s- Ca2!e tra* !a*ing to take care o necessar* c!earances or the ire prooing o structure-
(atter* "i+it $IS("& Process !ines crossing units $/ithin units or ro+ unit to +ain pipe/a*& are nor+a!!* pro3ided /ith a 2!ock 3a!3e1 spectac!e 2!ind and drain 3a!3e- (!ock 3a!3es are to 2e grouped and !ocations o 2!ock 3a!3es in 3ertica! run o pipe are preered- I the 2!ock 3a!3es ha3e to 2e !ocated in an o3erhead pipe5/a*1 staircase access to a p!ator+ a2o3e the !inessha!! 2e pro3ided-
RACK PIPING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
14/23
14
RACK PIPING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
15/23
15
RACK PIPING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
16/23
16
RACK PIPING
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
17/23
1
EXPANSION LOOPS
MAKE LINES INTO A GROUP AND INSTALL A
LARGE SIE PIPING AND HIGH TEMPERATURE
PIPING TO THE EDGE OF THE RACK
E,pansion !oop is pro3ided on the high te+perature !ines- This inor+ation sha!! 2e gi3en 2* stress group- A!! the !oops sha!! 2e !ocated around one co!u+n on!*-
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
18/23
1!
EXPANSION LOOPS
When necessar* to insta!! an e,pansion !oop on the condensate !ine1 do it hori)onta!!* to pre3ent /ater ha++ering- (ut do as a2o3e i hori)onta! !oop is i+possi2!
e-
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
19/23
1"
PIPE RACK DESIGN CRITERIA
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
20/23
20
PIPE RACK DESIGN CRITERIA
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
21/23
21
PIPE RACK DESIGN CRITERIA
7/25/2019 Pipe Rack Rack Piping SAMSUNG Presentation SLIDE
22/23
22
PIPE RACK DESIGN CRITERIA