PIPE RACK ERECTION PIPE RACK ERECTION Using Using Precast Precast Concrete Elements Concrete Elements and Structural Steel: and Structural Steel:

Pipe Rack Erection modified and Presentation

Embed Size (px)

Citation preview

Page 1: Pipe Rack Erection modified and Presentation

PIPE RACK ERECTIONPIPE RACK ERECTION

Using Using PrecastPrecast Concrete Elements Concrete Elements and Structural Steel:and Structural Steel:

Page 2: Pipe Rack Erection modified and Presentation

Erection of columnsErection of columns

Page 3: Pipe Rack Erection modified and Presentation

Erected ColumnsErected Columns

Page 4: Pipe Rack Erection modified and Presentation

Erection of Erection of PrecastPrecast BeamsBeams

Page 5: Pipe Rack Erection modified and Presentation

Types of Types of PrecastPrecast BeamsBeams

Page 6: Pipe Rack Erection modified and Presentation

Continuation: (Continuation: (PrecastPrecast Beams)Beams)

Page 7: Pipe Rack Erection modified and Presentation

Erection of Erection of PrecastPrecast BeamsBeams

Page 8: Pipe Rack Erection modified and Presentation

Grouting of beamGrouting of beam--column column connection:connection:

Page 9: Pipe Rack Erection modified and Presentation

Grouting with NonGrouting with Non--shrink shrink grout:grout:

Page 10: Pipe Rack Erection modified and Presentation

Grout Mixing:Grout Mixing:

Page 11: Pipe Rack Erection modified and Presentation

Grouted beamGrouted beam--column column connection:connection:

Page 12: Pipe Rack Erection modified and Presentation
Page 13: Pipe Rack Erection modified and Presentation

Erection of Structural Steel ModuleErection of Structural Steel Module

Page 14: Pipe Rack Erection modified and Presentation

Steel ColumnsSteel Columns

Page 15: Pipe Rack Erection modified and Presentation

Structural Steel Columns:Structural Steel Columns:

Page 16: Pipe Rack Erection modified and Presentation

Continuation:Continuation:

Page 17: Pipe Rack Erection modified and Presentation

Erection of one complete structural steel Erection of one complete structural steel module:module:

Page 18: Pipe Rack Erection modified and Presentation

During Erection:During Erection:CHECK FASTENING MATERIALS (12CHECK FASTENING MATERIALS (12--SAMSSSAMSS--007 SEC. 4.6)007 SEC. 4.6)

-- HIGH STRENGTH BOLTS, ASTM A325, TYPE 1 , GALVANIZED.HIGH STRENGTH BOLTS, ASTM A325, TYPE 1 , GALVANIZED.-- HEAVY HEX NUTS, ASTM A563 GR DHHEAVY HEX NUTS, ASTM A563 GR DH-- WASHER, ASTM F436WASHER, ASTM F436

•• THE MINIMUM NUMBER OF BOLTS IN A FRAMED CONNECTION SHALL BE TWO THE MINIMUM NUMBER OF BOLTS IN A FRAMED CONNECTION SHALL BE TWO BOLTS (12BOLTS (12--SAMSSSAMSS--007 SEC. 6.2.5.7)007 SEC. 6.2.5.7)

•• MINIMUM DIAMETER OF BOLT 20 MM SHALL BE USED IN ALL BOLTED MINIMUM DIAMETER OF BOLT 20 MM SHALL BE USED IN ALL BOLTED STRUCTURAL CONNECTION (12STRUCTURAL CONNECTION (12--SAMSSSAMSS--007 SEC. 6.2.5.3)007 SEC. 6.2.5.3)

•• ERECTION SHALL BE IN ACCORDANCE WITH THE DRAWINGS AND OTHER ERECTION SHALL BE IN ACCORDANCE WITH THE DRAWINGS AND OTHER CONTRACT DOCUMENTSCONTRACT DOCUMENTS

•• DURING ASSEMBLY, ALL JOINT SURFACES, INCLUDING THOSE ADJACENT TODURING ASSEMBLY, ALL JOINT SURFACES, INCLUDING THOSE ADJACENT TOTHE BOLT HEADS, NUTS OR WASHERS, SHALL BE FREE OF BURRS, DIRT ANTHE BOLT HEADS, NUTS OR WASHERS, SHALL BE FREE OF BURRS, DIRT AND D OTHER FOREIGN MATERIALS THAT WOULD PREVENT SOLID SEATING OF OTHER FOREIGN MATERIALS THAT WOULD PREVENT SOLID SEATING OF PARTS (12PARTS (12--SAMSSSAMSS--008 PAR. IV, MOD. PIP STS05130 SEC. 6.5.8)008 PAR. IV, MOD. PIP STS05130 SEC. 6.5.8)

•• ALL PREASSEMBLIES SHALL BE LIFTED IN A MANNER THAT WILL NOT IMPAALL PREASSEMBLIES SHALL BE LIFTED IN A MANNER THAT WILL NOT IMPAIR IR THE STRUCTURAL INTEGRITY OF THE MEMBERS. ASSEMBLED STRUCTURAL THE STRUCTURAL INTEGRITY OF THE MEMBERS. ASSEMBLED STRUCTURAL MEMBERS SHALL BE LIFTED IN A COMPLETE FRAME.MEMBERS SHALL BE LIFTED IN A COMPLETE FRAME.

Page 19: Pipe Rack Erection modified and Presentation

INSPECTION OF STRUCTURAL ALIGNMENT INSPECTION OF STRUCTURAL ALIGNMENT DURING ERECTION:DURING ERECTION:

IMPORTANT CHECK POINTS:IMPORTANT CHECK POINTS:

VERTICAL TOLERANCES FOR STRAIGHT COMPRESSION STRUCTURAL VERTICAL TOLERANCES FOR STRAIGHT COMPRESSION STRUCTURAL MEMBERS MEMBERS < 1/1000 OF THE AXIAL LENGTH, (AISC PAR. 6.4.2 & PIP STS05130 1/1000 OF THE AXIAL LENGTH, (AISC PAR. 6.4.2 & PIP STS05130 PAR. 6.2.1)PAR. 6.2.1)

THE STRUCTURE SHALL BE PLUMBED, LEVELED, AND BRACED BEFORE ANY THE STRUCTURE SHALL BE PLUMBED, LEVELED, AND BRACED BEFORE ANY FINAL BOLTED OR WELDED CONNECTIONS ARE MADE, PIP STS05130 PAR. FINAL BOLTED OR WELDED CONNECTIONS ARE MADE, PIP STS05130 PAR. 6.3.2.6.3.2.

LEVELING PLATES, LEVELING NUTS AND WASHERS, LOOSE BASE PLATES ANLEVELING PLATES, LEVELING NUTS AND WASHERS, LOOSE BASE PLATES AND D BEARING PLATES ARE SET IN ITS CORRECT ALIGNMENT AND ELEVATION. BEARING PLATES ARE SET IN ITS CORRECT ALIGNMENT AND ELEVATION. VARIATION IN ELEVATION RELATIVE TO THE ESTABLISHED GRADE VARIATION IN ELEVATION RELATIVE TO THE ESTABLISHED GRADE < +/+/-- 3 MM 3 MM (AISC PAR. 7.6 & PIP STS05130 PAR. 6.4.1)(AISC PAR. 7.6 & PIP STS05130 PAR. 6.4.1)

ALL COLUMN SPLICES SHALL BE FIELD BOLTED AND CONFORM TO AISC ALL COLUMN SPLICES SHALL BE FIELD BOLTED AND CONFORM TO AISC DETAILING FOR STEEL CONSTRUCTION APPENDIX D (12DETAILING FOR STEEL CONSTRUCTION APPENDIX D (12--SAMSSSAMSS--007 PAR. 007 PAR. 6.2.5.20)6.2.5.20)

REFERENCE REFERENCE -- AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDING AND BRIDGESAISC CODE OF STANDARD PRACTICE FOR STEEL BUILDING AND BRIDGES-- PROCESS INDUSTRY PRACTICES PIP STS05130, ERECTION OF STRUCTURAPROCESS INDUSTRY PRACTICES PIP STS05130, ERECTION OF STRUCTURAL L

AND MISCELLANEOUS STEEL SPECIFICATION

<

<

AND MISCELLANEOUS STEEL SPECIFICATION

Page 20: Pipe Rack Erection modified and Presentation

REPAIR/CORRECTION OF ERRORS OF STRUCTURAL ALIGNMENT REPAIR/CORRECTION OF ERRORS OF STRUCTURAL ALIGNMENT DURING ERECTIONDURING ERECTION

IMPORTANT CHECK POINTS:IMPORTANT CHECK POINTS:

FITFIT--UP BOLTS AND DRIFT PINS SHALL NOT BE USED TO BRING IMPROPERLY UP BOLTS AND DRIFT PINS SHALL NOT BE USED TO BRING IMPROPERLY FABRICATED MEMBERS AND PARTS INTO PLACE (SPRINGING). (PIP STS051FABRICATED MEMBERS AND PARTS INTO PLACE (SPRINGING). (PIP STS05130 30 PAR. 6.7.1)PAR. 6.7.1)

STANDARD BOLT HOLES SHALL NOT BE ENLARGED BY MORE THAN 1 MM TO STANDARD BOLT HOLES SHALL NOT BE ENLARGED BY MORE THAN 1 MM TO MAKE CONNECTIONS RESULTING FROM MINOR MISFIT (PIP STS05130 PAR. MAKE CONNECTIONS RESULTING FROM MINOR MISFIT (PIP STS05130 PAR. 6.7.2). 6.7.2).

METHOD OF CORRECTING BOLT HOLE CONNECTIONS THAT MISFIT BY MORE METHOD OF CORRECTING BOLT HOLE CONNECTIONS THAT MISFIT BY MORE THAN 1 MM MUST BE APPROVED BY SAUDI ARAMCO.THAN 1 MM MUST BE APPROVED BY SAUDI ARAMCO.

ENLARGEMENT OF HOLES SHALL BE MADE BY REAMING OR DRILLING ONLY ENLARGEMENT OF HOLES SHALL BE MADE BY REAMING OR DRILLING ONLY (PIP STS05130 PAR. 6.7.3)(PIP STS05130 PAR. 6.7.3)

THE ERECTOR SHALL MAKE NO MODIFICATIONS OR REPAIRS TO STEEL THE ERECTOR SHALL MAKE NO MODIFICATIONS OR REPAIRS TO STEEL JOIST, AND CORRECTION OF FAULTY WORKS SHALL REQUIRE APPROVAL JOIST, AND CORRECTION OF FAULTY WORKS SHALL REQUIRE APPROVAL FROM SAUDI ARAMCO (PIP STS05130 PAR. 6.7.4 & 6.8.2)FROM SAUDI ARAMCO (PIP STS05130 PAR. 6.7.4 & 6.8.2)

ONE FILLER PLATE UP TO 1/8 INCH (3 MM) THICKNESS MAY BE USED AS ONE FILLER PLATE UP TO 1/8 INCH (3 MM) THICKNESS MAY BE USED AS REQUIRED IN SPACES BETWEEN MEMBERS TO BE BOLTED (PIP STS05130 REQUIRED IN SPACES BETWEEN MEMBERS TO BE BOLTED (PIP STS05130 PAR. 6.7.5)PAR. 6.7.5)

Page 21: Pipe Rack Erection modified and Presentation

HIGH STRENGTH BOLTS TIGHTENING INSPECTION & TESTING:

IMPORTANT CHECK POINTS:

BOLTS SHALL HAVE FULL THREAD ENGAGEMENT WITH THE NUT. THE BOLT LENGTH USED SHALL BE SUCH THAT THE END OF THE BOLT EXTENDS BEYOND OR IS AT LEAST FLUSH WITH THE OUTER FACE OF THE NUT WHEN PROPERLY INSTALLED (AISC SPECS. FOR STRUCTURAL JOINTS USING ASTM A325 or A490 BOLTS PAR. 2.3.2)

ALL NUTS FOR HIGH STRENGTH BOLTS SHALL BE WAX-DIPPED TO REDUCE TORQUE DURING INSTALLATION (12-SAMSS-007 PAR. 6.2.5.22).

THE ERECTOR SHALL COLOR CODE, DIE PUNCH, OR OTHERWISE MARK THE ENDS OF TORQUED BOLTS INDICATING THAT THE BOLTS HAVE BEEN PROPERLY TENSIONED AND ARE READY FOR INSPECTION (PIP STS05130 PAR. 6.5.7)

FAYING SURFACES AND SURFACES ADJACENT TO THE BOLT HEAD AND NUT FOR SNUG-TIGHTENED OR PRETENSIONED JOINTS SHALL BE FREE OF DIRT AND OTHER FOREIGN MATERIAL (AISC SPECS. FOR STRUCTURAL JOINTS USING ASTM A325 or A490 BOLTS PAR. 3.2.1 & PIP STS05130 PAR. 6.5.1)

Page 22: Pipe Rack Erection modified and Presentation

THREE TYPES OF BOLTED JOINT: (MUST BE CLEARLY IDENTIFIED & INDICATED IN THE IFC OR ERECTION DRAWINGS)

1.) ST – SNUG-TIGHTENED JOINT, A CONDITION WHERE FAYING SURFACES IN A BOLTED JOINT ASSEMBLY ARE IN FIRM CONTACT AFTER A FEW IMPACTS OF AN IMPACT WRENCH OR WITH THE FULL EFFORT OF A WORKER USING A SPUD WRENCH.

Page 23: Pipe Rack Erection modified and Presentation

2.) PT – PRETENSIONED JOINT:

A JOINT THAT TRANSMIT SHEAR AND/OR TENSILE LOAD, WHERE THE BOLT ASSEMBLY IS FULLY TIGHTENED TO WHICH THE TENSION IN THE BOLT WILL BE EQUAL TO A MINIMUM OF 70 PERCENT OF THE SPECIFIED TENSILE STRENGTH (AS PER TABLE 8.1 & COMMENTARY – SPECS. FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS).

Page 24: Pipe Rack Erection modified and Presentation

3.) SC – SLIP CRITICAL JOINT:

SIMILAR TO PRETENSIONED JOINTS BUT THE FAYING SURFACES HAVE BEEN PREPARED TO PROVIDE A CALCULABLE RESISTANCE AGAINST SLIP.

ONLY ST & PT JOINT TYPES ARE USED IN THE STRUCTURAL STEEL PIPE RACKS

PRETENSIONING METHOD ACCEPTED BY SAUDI ARAMCO:- TURN-OF-NUT PRETENSIONING- CALIBRATED WRENCH PRETENSIONING- DIRECT TENSION INDICATOR (DTI) PRETENSIONING

PRIOR TO PRETENSIONING OF BOLTS, THE BOLTED JOINT ASSEMBLY WAS BROUGHT TO A SNUG TIGHT CONDITION.

WHEN IMPACT WRENCHES ARE USED; IT SHALL BE OF ADEQUATE CAPACITY WITH SUFFICIENT AIR SUPPLY TO PERFORM THE REQUIRED TIGHTENING OF EACH BOLT (12-SAMSS-008 SEC. IV)

Page 25: Pipe Rack Erection modified and Presentation

TURN-OF THE NUT PRETENSIONING METHOD:

Page 26: Pipe Rack Erection modified and Presentation

DTI PRETENSIONING METHOD:

Page 27: Pipe Rack Erection modified and Presentation

Direct Tension IndicatorDirect Tension Indicator

Specially designed washers, called direct tension indicators, or load-indicating devices, have a series of protrusions that compress during tightening of the bolt. When you tighten the nut fully, the washer compresses and the protrusions will flatten, leaving a small gap under the head or nut. You verify the amount of tightening by inserting a thin metal stick into the gap. This method is the least preferred by Saudi Aramco for tightening and verifying the installation of high-strength bolts.

Page 28: Pipe Rack Erection modified and Presentation

CALIBRATED WRENCH PRETENSIONING METHOD

Page 29: Pipe Rack Erection modified and Presentation

CALIBRATED WRENCH PRETENSIONING METHOD

TORQUE VALUE CALCULATION (USING AISC TABLE 8.1):TV = db X Tm X COEFF. FACTOR X1000

SAMPLE CALCULATON FOR 1-1/2” DIA. BOLT

TV = 1.5/12 X 103 X 0.21 X1000 = 2700 FT.-LBS.

TO CONVERT TO NEWTON-METER:

2700 FT.LBS. / 0.7376 = 3660 N-M

WHERE; TV = TORQUE VALUE IN FT.-LB.db = BOLT DIAMETER IN FT.Tm = MINIMUM BOLT

TENSION ( Table 8.1)

PRETENSION IN KIPSCOEFFICIENT OF FRICTION (Nut Factor) = 0.21 1 KIP = 1000 LBS.

Page 30: Pipe Rack Erection modified and Presentation

CALIBRATED WRENCH PRETENSIONING METHOD(AS PER SAUDI ARAMCO REQUIREMENT` - VERIFICATION OF TORQUE VALUES)

THE TORQUE REQUIRED FOR TIGHTENING SHALL BE DETERMINED IN THE PRE-INSTALLATION PROCEDURE VERIFICATION TESTING OF THE FASTENER ASSEMBLY AS PER (12-SAMSS-008 SEC. I)

A CALIBRATED TENSION CALIBRATOR SHALL BE ONSITE WHEN TIGHTENING IS TO BE PERFORMED ON PRETENSIONED JOINTS AND SLIP-CRITICAL JOINTS.

A REPRESENTATIVE SAMPLE OF THREE COMPLETE FASTENER ASSEMBLIES OF EACH COMBINATION OF DIAMETER, LENGTH, GRADE AND LOT TO BE USED IN THE WORK SHALL BE CHECKED AT THE SITE OF INSTALLATION IN A TENSION CALIBRATOR.

THE PRETENSION THAT DEVELOPED DURING THE PRETENSIONING METHOD SHALL BE EQUALTO OR GREATER THAN 1.05 TIMES THAT SPECIFIED FOR INSTALLATION AND INSPECTION IN TABLE 8.1

Page 31: Pipe Rack Erection modified and Presentation

TENSION CALIBRATOR (SKIDMORE)How The Tension Calibrator Works:

Tightening a fastener inserted into the calibrator creates pressure, which is transmitted through hydraulic fluid to a gauge. The gauge gives a direct reading equivalent to fastener tension in pounds.

Bolt Tension Calibrator Allows You To Verify:That your fasteners meet minimum bolt tension specifications.

That your impact wrenches are properly calibrated.

That your bolting crew understands how to achieve proper tension in all types of fasteners.

That you have the right installation tools and equipment.

Page 32: Pipe Rack Erection modified and Presentation

HIGH STRENGTH BOLTS TIGHTENING, INSPECTION & TESTING CALIBRATED

WRENCH PRETENSIONING METHOD

DURING PRETENSIONING OF BOLT ASSEMBLY:

THE TORQUE WRENCH IS CALIBRATED IN IN A DAILY BASIS.

AN ASTM F436 WASHER SHALL BE USED UNDER THE TURNED ELEMENT.

THE TORQUE DETERMINED IN THE PRE-INSTALLATION VERIFICATION IS APPLIED TO ALL BOLTS IN THE JOINT, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID PART OF THE JOINT IN A MANNER THAT WILL MINIMIZE RELAXATION OF PREVIOUSLY PRETENSIONED BOLTS.

Page 33: Pipe Rack Erection modified and Presentation

CALIBRATED WRENCH PRETENSIONING METHOD

Page 34: Pipe Rack Erection modified and Presentation

End of Part IIEnd of Part II