1
CASE STUDY Pipe Rack Container Project Storage/Inventory: Increased Efficiency and Cost Pipe Rack Case Study Field-based equipment managers needed a safer and more efficient method of handling, organizing, storing, securing, and transporng 21 Ft random flanged pipe secons and transion fings used in the chemical-based cleaning & periodic maintenance operaons of large power plant infrastructure. In addion, this equipment was being stored outdoors in a single level which allowed contaminants into the pipes & fings and there was a highneed for space which comes at a premium during plant shutdowns. GEM 360 accepted this challenge and their decision resulted in the design & build and delivery of 40HC shipping containers modified to address the client’s need. Extensive structural work created very large & accessible openings on each side which allowed easy forkliſt access to pipe secons organized by diameter in heavy duty, adjustable pipe racks. For the smaller pipe fings, a high-security, enclosed storage area was provided at the cargo door end, that when opened, allow quick access to heavy duty shelving space. GEM 360’s containerized product soluons provided much- needed safety, control, and security in these difficult work environments while prevenng safety incidents and saving hundreds of labor hours before, during, and aſter being deployed at the work sites. GEM 360 314.267.9955 7500 NW 82ND PL, Miami FL 33166 www.gem360.net

Pipe Rack Container Project - gemanufacturing.com€¦ · Pipe Rack Container Project Storage/Inventory: Increased Efficiency and Cost Pipe Rack Case Study Field-based equipment managers

  • Upload
    others

  • View
    60

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pipe Rack Container Project - gemanufacturing.com€¦ · Pipe Rack Container Project Storage/Inventory: Increased Efficiency and Cost Pipe Rack Case Study Field-based equipment managers

CASE STUDY

Pipe Rack Container ProjectStorage/Inventory: Increased Efficiency and Cost

Pipe Rack Case Study

Field-based equipment managers needed a safer and more efficient method of handling, organizing, storing, securing, and transporting 21 Ft random flanged pipe sections and transition fittings used in the chemical-based cleaning & periodic maintenance operations of large power plant infrastructure. In addition, this equipment was being stored outdoors in a single level which allowed contaminants into the pipes & fittings and there was a highneed for space which comes at a premium during plant shutdowns. GEM 360 accepted this challenge and their decision resulted in the design & build and delivery of 40HC shipping containers modified to address the client’s need. Extensive structural work created very large & accessible openings on each side which allowed easy forklift access to pipe sections organized by diameter in heavy duty, adjustable pipe racks. For thesmaller pipe fittings, a high-security, enclosed storage area was provided at the cargo door end, that when opened, allow quick access to heavy duty shelving space. GEM 360’s containerized product solutions provided much-needed safety, control, and security in these difficult work environments while preventing safety incidents and saving hundreds of labor hours before, during, and after being deployed at the work sites.

GEM 360 314.267.99557500 NW 82ND PL, Miami FL 33166 www.gem360.net