Operational Planning Workshop Report

Renewable Energy and Energy Efficiency Programme

2015-2016

Imprint

As a federal enterprise, GIZ supports the German Government in achieving its objectives in the field of international coopera-

tion for sustainable development.

Published by the

Deutsche Gesellschaft für

Internationale Zusammenarbeit (GIZ) GmbH

Registered offices

Bonn and Eschborn, Germany

Deutsche Gesellschaft für

Internationale Zusammenarbeit (GIZ) GmbH

Renewable Energy and Energy Efficiency Project

House 11-B, Street 50,

F-8/4, 44000 Islamabad – Pakistan

Tel: +92 51 285 1175 Fax: +92 51 285 4576 Email: [email protected] Internet: www.giz.de/pakistan

Responsible

Mr. Frank Fecher Renewable Energy and Energy Efficiency Project, Pakistan

Author/Editor etc.

Moderator: Florian Schindler

Tel: 0049-(0) 30 45 04 -2100 Email: [email protected]

Place and date of publication

Islamabad, March 10, 2015

Contents List of Abbreviations ......................................................................................................... i

Background ..................................................................................................................... 1

Objective ......................................................................................................................... 1

A. Workshop Proceedings- Day 1 ................................................................................. 2

Welcome and Introduction ....................................................................................... 2 A.1.

A.1.1. Welcome remarks by Dr. Frank Fecher, Principal Advisor - GIZ REEE ........... 2

A.1.2. Introduction to ‘The German Development Cooperation in Pakistan’ by

Ms. Almut Knop - BMZ Representative .......................................................................... 2

A.1.3. Opening remarks by Mr. Asjad Imtiaz Ali , CEO - AEDB .................................. 2

Presentation on Steering Committee Meeting by Sumaira Akram - GIZ REEE ........ 3 A.2.

Planning of Activities in Groups................................................................................ 3 A.3.

Presentation on project objective and indicators by Dr.Frank Fecher– GIZ REEE ... 4 A.4.

Participants Introduction and Group Photograph ...................................................... 4 A.5.

Group Work ............................................................................................................. 4 A.6.

Outcome of the day .................................................................................................. 5 A.7.

B. Workshop Proceeding – Day 2 ................................................................................. 5

Summary of day 1 by Dr. Frank Fecher – GIZ REEE ............................................... 5 B.1.

Networking tea and open space ............................................................................... 5 B.2.

Group Work Results and Presentations ................................................................... 5 B.3.

B.3.1. Policy and Economic Instruments .................................................................... 6

B.3.2. Renewable Energy .......................................................................................... 6

B.3.3. Energy Efficiency ............................................................................................. 6

C. Closing and Way forward ...................................................................................... 6

Closing Remarks by Mr. Joudat Ayaz , DG - AEDB ................................................. 6 C.1.

Closing Remarks by Mr. Sheikh Akbar, Chairman - APTMA Punjab ........................ 7 C.2.

Vote of thanks by Dr.Frank Fecher .......................................................................... 7 C.3.

Annexes .......................................................................................................................... 8

Annex-A: Workshop Agenda .............................................................................................. 8

Annex-B: Operational Plan P&EI ........................................................................................ 9

Annex-C: Operational Plan RE ......................................................................................... 11

Annex-D:Operational Plan EE .......................................................................................... 13

Annex-E : List of Participants ............................................................................................ 15

i

List of Abbreviations

AEDB Alternative Energy Development Board

BMZ Bundesministerium für wirtschaftliche Zusammenarbeit und Entwicklung

EE Energy Efficiency

GIZ Gesellshaft für Internationale Zusammenarbeit (Gesellshaft for International Cooperation)

KPK Khyber Pakhtunkhwa

KW Kilowatt

MW Megawatt

P&EI Policy and Economic Instruments

PPAF Pakistan Poverty Alleviation Fund

RE Renewable Energy

REEE Renewable Energy and Energy Efficiency

REAP Renewable and Alternative Energy Association of Pakistan

1

Background

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH is implementing Re-

newable Energy and Energy Efficiency (REEE) programme in Pakistan on behalf of the

German Federal Ministry of Economic Cooperation and Development (BMZ) since 2005.

The focus of the REEE programme is to promote renewable energy for grid connected as

well as off-grid application and energy efficiency in selected industrial sectors and buildings.

Recently, (BMZ) has approved a new phase of the REEE programme with effect from No-

vember 2014 to December 2016. The main objective of the new programme phase is “Pro-

motion mechanism and strategies for investments in renewable energies and energy effi-

ciency are utilized by small and medium enterprises, the industry and end-users“.

As part of the planning process for the implementation of the new phase, GIZ REEE man-

agement in collaboration with main implementation partners and key stakeholders organized

a two day planning workshop in Islamabad Serena Hotel to elaborate activities through con-

sultation with partner organizations to successfully implement this programme phase in order

to achieve its intended objectives and indicators.

Objective

The purpose of this operational planning workshop is to discuss and agree on joint

measures to be implemented in 2015 and 2016 to reach the objectives as stated above.

In a consultative and participatory manner, the planning workshop achieved the following

objectives:

Elaboration of an operational plan for 2015; Brainstorming on activities for the year 2016.

2

A. Workshop Proceedings- Day 1

On the first day the arrival and registration of participants took place from 11:00-11:30 at the

Sheesh Mahal Hall-III of the Serena Hotel .

Welcome and Introduction A.1.

A.1.1. Welcome remarks by Dr. Frank Fecher, Principal Advisor - GIZ REEE

Dr. Frank Fecher Principal Advisor of the GIZ REEE programme welcomed the participants

giving them an overview about the invited organisations and announced beginning of the two

day planning workshop.

The official welcome was followed by the recitation of the Holy Quran.

A.1.2. Introduction to ‘The German Development Cooperation in Pakistan’ by

Ms. Almut Knop - BMZ Representative

After the recitation the representative of the German Ministry for Economic Cooperation and

Development (in German: Bundesministerium für wirtschaftliche Zusammenarbeit und

Entwicklung - BMZ) working at the German Embassy in Islamabad, Ms. Almut Knop gave a

short introduction about the German Development Cooperation in Pakistan.

A.1.3. Opening remarks by Mr. Asjad Imtiaz Ali , CEO - AEDB

The Chief Executive Officer of the Alternative Energy Development Board (AEDB), Mr. Asjid

Imtiaz, was invited as one of the key stakeholders to give the welcome address to the partic-

ipants of the operational planning workshop.

In his role as CEO of the Alternative Energy Development Board (AEDB) and steering com-

mittee chairperson honourable Mr. Asjid Imtiaz welcomed the participants from public, non-

governmental and private sector institutions and industrial associations. Mr. Asjid Imtiaz

highlighted in his welcome address the importance of energy projects for Pakistan and the

role which is taking the German International Cooperation Agency GIZ in this respect. He

mentioned the recent visit of the Pakistani Prime Minister H.E. Mr. Nawaz Sharif to Germany

and that there was an intent signed by the two governments in order to establish a renewa-

ble energy forum. Mr. Asjid Imtiaz underlined the commitment of the Government of Pakistan

to overcome the energy crisis and presented examples of large scale power projects in the

country.

Furthermore he shared his thoughts about the situation of rural electrification in different re-

gions and welcomed the support of donor- and development organisations such as the GIZ.

Finally Mr. Asjid Imtiaz motivated the participants to actively participate in the workshop in

order to contribute to the Government of Pakistan’s plan to achieve energy independence

and promote the implementation of sustainable renewable energy as well as energy efficien-

cy initiatives.

3

Last but not least Mr. Asjid Imtiaz wished the participants very constructive and fruitful dis-

cussions in the following days and the GIZ all possible success in their operational planning

workshop.

Presentation on Steering Committee Meeting by Sumaira Akram - GIZ A.2.

REEE

The welcome address was followed by Ms. Sumaira Akram (GIZ) presenting the results of

the first steering committee meeting held on February 11, 2015.

The members of the steering committee are, apart from the chairperson Mr. Asjid Imtiaz Ali

and other representatives from the AEDB, Mr. Abazzi – Director Infrastructure of the State

Bank of Pakistan (SBP) and Mr. Abbas Mehdi Manager (R&D) from the Ministry of Textile

Industry.

Ms. Sumaira Akram explained that in the steering committee meeting held on 11th February

2015, a clear commitment was given by all three main stakeholder organisations with re-

spect to ownership of the envisaged objectives. The strategic outline of the RE-EE project

was also discussed in the meeting. It was agreed upon that the steering committee shall

take place on quarterly basis.. In each meeting the committee members will review the moni-

toring reports provided by GIZ-two weeks in advance to the steering committee members.

The discussion points, suggestions and/or adjustments agreed upon by the steering commit-

tee will be documented in form of a steering committee protocol.

Planning of Activities in Groups A.3.

In order to inform the participants about the afternoon workshop programme Ms. Sumaira

Akram guided the audience through the workshop agenda of the following days. After the

lunch break the participants were divided into three working groups in order to operationalize

the strategic planning outlined by the steering committee. The GIZ strategic planning ap-

proach followed within the workshop was outlined and introduced in detail by Dr. Frank

Fecher in his opening presentation.

With respect to the working groups Ms. Sumaira Akram organized the division of the partici-

pants into three different groups following a specific colour coding:

Group 1 – Renewable Energy – silver = silver colour code

Group 2 – Energy Efficiency - yellow = yellow colour code

Group 3 – Policy and Economic Instruments – red = red colour code

After the definition of the working groups for the afternoon Ms. Sumaira Akram announced

the introductory presentation by Dr. Frank Fecher.

4

Presentation on project objective and indicators by Dr.Frank Fecher– GIZ A.4.

REEE

In his presentation Dr. Frank Fecher introduced the GIZ Renewable Energy and Energy Effi-

ciency (RE-EE) projectpresenting the project´s objectives, the new indicators and milestones

focusing on support mechanisms and investments in the RE and EE sector, the desired out-

puts, the project´s cooperation structure with the main stakeholders and the strategic as well

as the operational planning approach followed by GIZ which will be adopted by the RE-EE

project.

In the planning process the project stakeholders translate the strategic objectives into corre-

sponding acitivities which are monitored by measurable indicators.

Participants Introduction and Group Photograph A.5.

The presentation of the GIZ REEE Principal Advisor was followed by an introduction round

of all participants suggested and initiated by Mr. Ali Yasir. List of participants is attached in

Annex F.

After this introductory session a group photograph was organized by Mr. Muhammad Saeed,

Mr. Ali Yasir and Mr. Irshad Khan.

Following the group photograph Ms. Sumaira Akram explained the structure of the metaplan

pin-boards and the tasks of the working groups. Each working group was provided with two

metaplan pin-boards.

Group Work A.6.

The metaplan pin-boards have been prepared by the GIZ project team with the correspond-

ing activity cards. The activities proposed on the pin-boards have been discussed and elabo-

rated together with the key stakeholders in order to provide a first draft of activities to the

participants of the workshop. The preparation of the proposal has been based on the experi-

ence of the last three phases of the RE-EE project and was meant for the support of the dif-

ferent working groups.

5

The workshop participants of the partner organisations were motivated to take ownership of

the proposed activities and to change, alter, comment, adapt, remove or add activities.

When the group work started, the component managers and technical advisor from GIZ pre-

sented their “Planning-Drafts” to the group members. After the presentation the groups

worked out the draft operational plan for their specific project component. The GIZ REEE

programme component managers facilitated the process of scrutinising and refining the ac-

tivities in the afternoon session of the workshop which resulted in the elaboration of a draft

operational planning matrix.

After the elaboration of the draft operational planning matrix it was announced that one or

more person(s) should be selected from each group in order to present the results of the

corresponding working group on Friday the 13th to the audience (members of all other work-

ing groups).

Outcome of the day A.7.

The outcomes of the first workshop day were three draft operational plans of the individual

working groups.

B. Workshop Proceeding – Day 2

The second day started with the recitation of the Holy Quran.

Summary of day 1 by Dr. Frank Fecher – GIZ REEE B.1.

After the recitation Dr. Frank Fecher briefly summarised the results of day 1.

Networking tea and open space B.2.

The summary of day one by Dr. Frank Fecher was followed by an open space networking

session in order to exchange and reflect the group work results with members of the other

groups (peer-review). Therefore, the meta-plan boards were placed in different corners of

the Sheesh Mahal hall.

Group Work Results and Presentations B.3.

The networking session was followed by the presentations of the three working groups. On

Thursday, each working group selected one or more persons in order to present their group

work results on Friday to the audience

6

B.3.1. Policy and Economic Instruments

Group 1 working on “Energy Policies and Economic Instruments” started the presentation

round on the second day. The working group was focussing on support mechanisms for RE

and EE technologies in Pakistan.

Dr. M. Saleem,Additional Director – State Bank of Pakistan, presented the results of the

group work “policy and economic instruments”. The result of the group work is attached in

form of a planning matrix which can be found in of this workshop report as Annex B.

His presentation was followed by a short discussion in which some suggestions were made

to the working group.

B.3.2. Renewable Energy

Working group 2 focussed on “Renewable Energy”. The working group presentation was

done by Mr. Waleed Elahi, Vice Chairman- Pakistan Solar Association .

The result of the group work is attached in form of a planning matrix which can be found in

the attachment of this workshop report as Annex C.

B.3.3. Energy Efficiency

Mr. Ashfaq Ahmed, Deputy General Manager( Industry Support Cell) – Small and Medium

Enterprises Development Authority presented the results of the working group 3 on “Energy

Efficiency”.The results of the group work are attached in form of a planning matrix which can

be found in the Annex D of this workshop report.

C. Closing and Way forward

All the presentations were followed by a round for questions, remarks and suggestions. Mr.

Ahmed Bilal – Buksh Foundation suggested that commercial banks should have been invited

for the workshop.

Furthermore it was suggested that two Ministers should have been invited in order to get

their input with respect to the goals and full support by the ministries, when it comes to the

implementation of the activities.

The presentation of the results achieved by the working groups 1-3 was followed by the con-

cluding remarks of different stakeholders:

Closing Remarks by Mr. Joudat Ayaz , DG - AEDB C.1.

Mr.Joudat Ayaz, Director General from the Alternative Energy Development Board (AEDB)

shared his views on the RE-EE programme with the audience in his concluding remarks.

Doing this he gave a short overview about the AEDB activities, the necessity of having the

right business models in place, the role of the banks and GIZ as important players in the

7

renewable and energy efficiency market. Furthermore he reflected on the role of academia

and recommended more “learning by doing” and “less reports and paper work from consult-

ants”. In his closing remarks he highlighted the enormous potentials for investments in RE-

technologies with respect to off grid population and small hydro plants in Pakistan.

Closing Remarks by Mr. Sheikh Akbar, Chairman - APTMA Punjab C.2.

After the concluding remarks by Mr. Joudath Ayaz on behalf of the AEDB, Mr.Akbar Chair-

man of APTMA Punjab gave his closing remarks to the participants of the3 workshop. The

APTMA chairman highlighted the fact that the support by GIZ is time bound and will not last

not forever which implies that all stakeholders should work hard in order to make the results

of the project as sustainable as possible.

Vote of thanks by Dr.Frank Fecher C.3.

At the end of the 2nd workshop day Dr. Frank Fecher summarised the results and presented

a network of different interlinked activities (visualised by wool threads inter-connecting the

different metaplan pin-boards). He highlighted the interconnectivity of the identified activities

and explained how individual activities which are interlinked benefit from the input of other

components.

Furthermore the Principal Advisor of GIZ REEE programme praised the fruitful group work

comparing it with the good performance of a successful German soccer or Pakistani cricket

team.

Finally Dr. Frank Fecher asked for feedback from the participants and for a little patience

regarding the workshop report due to the personal inconveniences faced by Prof. Dr. F.

Schindler who was supposed to be the moderator of this workshop.

Last but not least he sincerely thanked the stakeholder organisations and the working

groups in the closing session 13th of February 2015 and wished all participants a save jour-

ney home.

8

Annexes

Annex-A: Workshop Agenda

9

Annex-B: Operational Plan P&EI

P&EI Component Operational Plan 2015-16

Task Name

Support Person

GIZ

Responsi-ble Per-

son/Partner

Months - 2015 Months - 2016

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

Output A: Using Market based instruments

1

Support in the development of green-financing regulations for Pakistan

AY-FID SBP

2

Market study for green-financing in Pakistan (pre-cursor to development of pru-dential regulations/green portfo-lio for commercial banks)

AY-FID SBP

2.1

Assessment of lending options for banks regarding green-financing

AY-FID SBP

2.2

Mechanism for consumer conces-sional financing for distributed generation net metering etc.

AY-FID AEDB

2.3 Development of financing concept for Industrial EE

AY-FID IAs

3

Support for microfinance based solar PV activities

AY-FID PPAF - SBP Activities will take place intermittently

4

Support in the development/review of FIT, for RE-Technologies

AY-IK-FID AEDB As and when required

Output B: Development of promotional strategies

5

PR strategy for the specific mar-ket-based instruments

CO-AY-FF-IK

SBP - PPAF - AEDB - IAs As and when required

Output C: Strengthen institution and capacity building

6

Capacity need assessment for SBP and commercial banks re-garding green financing and awareness sessions on green- AY-SA SBP

10

financing for commercial banks

7

Financial training for ESCOs and Commercial Banks FID-SR SBP Trainings will take place at different times during this period

8

Study tour microfinancing in Bang-ladesh

FID-SA PPAF - SBP

11

Annex-C: Operational Plan RE

RE Component Draft Operational Plan 2015-16

Task Name

Support Per-

son(S) GIZ RE-

EE

Responsi-ble Per-son(s)

/Partner (s)

Months - 2015 Months - 2016

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

Output A: Using Market based instruments

1

Review and provide recommenda-tion for improved rules and regula-tion of DG/ net metering

MIK-MS Irfan Yousaf

AEDB

2

Technical study to assess the impact of RE technologies on the existing grid network (net meter-ing)

3

Development of IRRs and security documents (IA, EPA) for RE (small hydro, biomass)

MIK-AF Irfan Yousaf

AEDB

4

IA, EPA for standalone Biomass project (up front basis)

MIK-AF Muhammad Yasin AEDB

5

Support in the implementation of duty free import of solar PV equipment MIK-MS

Asad Saleem AEDB

Output B: Development of RE-promotional strategies

6

Support in the development of strategy for RE based rural electri-fication MIK-MS

Navid Bokhari AEDB

7

Organizing print and electronic media campaign events (national and international)

AEDB, PSA, REAP, DoEs

8

Organize and conduct B to B and G to B meetings AEDB, PSA, REAP

9

Development of promotional mate-rial MIK-MS-AF AEDB, PSA, REAP

10

Support AEDB to arrange RE exhibitions in Islamabad and all provincial capitals MIK - MS

Dr. Basharat AEDB, PSA, REAP

12

11

Development of a knowledge bank / resource center for RE business (Provide regular Info+ Data on the profitability of optional RE technol-ogy & management MIK - MS Faiz Bhutta PSA

Output C: Strengthen institution and capacity building

12

Participation in relevant interna-tional conferences (Inter Solar, RE week, Asia Clean Energy Forum etc). AEDB ???

12.1

InterSolar Exhibition and Confer-ence 09-12 June 2015 with expo-sure visit MIK-MS AEDB ???

12.2

PR activity for AEDB in connection with InterSolar MIK-MS

13

Capacity developments of FBR and custom authorities (for imple-mentation of duty free- regulations on Solar PV equipment import incl. quality standards.) MIK-MS

Joudat Ayaz AEDB

14

Tailor made trainings on standard software on solar etc.

MIK - MS Faiz Bhutta PSA

13

Annex-D:Operational Plan EE

EE Component Operational Plan 2015-16

Task Name

Support Person (s) GIZ RE-EE

Responsi-ble Per-

son/Partner

Months - 2015 Months - 2016

1 2 3 4 5 6 7 8 9 10 11

12 1 2 3 4 5 6 7 8 9 10 11

12

Output A: Using Market based instruments

1

Review policy of Ministry of Textile (MoT) w.r.t Energy Efficiency

FF-SR MoT: Mr. Owais SMEDA APTMA

2

Identify/Develop criteria to give EE Awards to industry

FF-SR

DoE Punjab: Mr. Iftikhar

Randhawa, *PEECC

3

Establishment of legal framework for EE implementation

FF-SR ENERCON: Mr.

Asad

Output B: Development of EE-promotional strategies

4

Dissemination strategy for industrial Energy Efficiency

FF-SR

NUST, SMEDA, APTMA, PEECC

5

Dissemination of EE activi-ties and events

5.1

Media coverage of EE related events through tv and newspaper

FF-SR

NUST, SMEDA, APTMA

5.2

Development of SPC-APTMA Website

FF-SR

APTMA

5.3

Create a Link regarding Energy related activities on the PFA web-site FF-SR

PFA

Output C: Strengthen institution and capacity building

14

6

Certification of ESCOs

6.1

Identification of academic institu-tions for ESCOs certification

FF-SR

SMEDA, ENER-CON, PEECC

6.2

Develop methodology, curriculum review and refinement, test system etc. for certification

FF-SR NUST, Other

academic insti-tutions, SMEDA

6.3

Identify suitable certification body for ESCOs certification FF-SR

6.4 Conduct ESCOs certification course/classes FF-SR

6.5 Award of certification to successful ESCOs FF-SR

6.6

Improve performance contracting (incorporate price escalation and legal factors) FF-SR IAS, SMEDA

7

Capacity development of ESCOs and development of Bankable proposals

7.1

Capacity development of ESCOs to prepare bankable proposals including project implementation (Training by ISTEs) FF-SR SMEDA, NUST

7.2

Development of criteria for selec-tion of industry for bankable pro-posals FF-SR SMEDA, IAS

7.3 Development of standardized bankable audit format FF-SR SMEDA

7.4 Monitor the activity of progress of bankable proposals by the industry FF-SR SMEDA, IAS

Total

*Punjab Energy Efficiency and Conservation Cell Note: the time line for EE awards will to in-dustry will also depend upon the establish-ment of the PEECC

15

Annex-E : List of Participants

S/NO Name Designation Organization Contact Details

1 Ms. Almut Knop BMZ Repre-sentative

German Embassy Islamabad

German Embassy Islama-bad Diplomatic Enclave G5, Islamabad

2 Mr. Asjad Imtiaz Ali

Chief Executive Officer

Alternative Energy Development Board (AEDB)

OPF Building, Shahrah-e-Jamhuriat G-5/2, Islamabad Phone # 051-9222360-63 Fax # 051-9222364

3 Mr.Joudat Ayaz Director General Alternative Energy Development Board (AEDB)

OPF Building, Shahrah-e-Jamhuriat G-5/2, Islamabad Phone # 051-9222360-63 Fax # 051-9222364

4 Mr.Musaddiq Ahmed Khan

Director General Alternative Energy Development Board (AEDB)

OPF Building, Shahrah-e-Jamhuriat G-5/2, Islamabad Phone # 051-9222360-63 Fax # 051-9222364

5 Dr. Basharat Hassan Bashir

Director General Alternative Energy Development Board (AEDB)

OPF Building, Shahrah-e-Jamhuriat G-5/2, Islamabad Phone # 051-9222360-63 Fax # 051-9222364

6 Mr. Imtiaz Ali Shah

Director Alternative Energy Development Board (AEDB)

OPF Building, Shahrah-e-Jamhuriat G-5/2, Islamabad Phone # 051-9222360-63 Fax # 051-9222364

7 Mr. Nafees Ah-med Khan

Consultant Alternative Energy Development Board (AEDB)

OPF Building, Shahrah-e-Jamhuriat G-5/2, Islamabad Phone # 051-9222360-63 Fax # 051-9222364

8 Mr. Abbas Mehdi Manager Ministry of Textile Industry Govt of Paki-stan

Ministry of Textile Industry, 1st Floor, Evacuee Trust Complex, Agha Khan Road,F-5/1, Islambad. 051-9203346 &49 Fax: 051-9203345

9 Mr. Owais H. Farooqi

Section Officer Ministry of Textile Industry Govt of Paki-stan

Ministry of Textile Industry, 1st Floor, Evacuee Trust Complex, Agha Khan Road,F-5/1, Islambad. 051-9203346 &49 Fax: 051-9203345

16

10 Dr. Muhammad Saleem

Additional Direc-tor

State Bank of Paki-stan

5th Floor, SBP Main Build-ing, State Bank of Pakistan, I.I. Chundrigar Road, Kara-chi Phone: 021-99221979 Fax: 021-99221139

11 Mr. Imran Ah-med

Additional Direc-tor

State Bank of Paki-stan

5th Floor, SBP Main Build-ing, State Bank of Pakistan, I.I. Chundrigar Road, Kara-chi Phone: 021-99221979 Fax: 021-99221139

12 Mr. Abdul Ghani

Joint Director State Bank of Paki-stan

5th Floor, SBP Main Build-ing, State Bank of Pakistan, I.I. Chundrigar Road, Kara-chi Phone: 021-99221979 Fax: 021-99221139

13 Mr. Sheikh Akbar Chairman All Pakistan Textile

Mills Association

(APTMA)

APTMA OFFICE 97-A Aziz Avenue, Canal Bank, Gulberg Road Lahore Ph.No. 042-5754345-8 Fax.No. 042-5871945

14 Mr.Anis Ul Haq Secretary All Pakistan Textile

Mills Association

(APTMA)

APTMA OFFICE 97-A Aziz Avenue, Canal Bank, Gulberg Road Lahore Ph.No. 042-5754345-8 Fax.No. 042-5871945

15 Mr. Sameeh Ullah Policy Advisor All Pakistan Textile

Mills Association

(APTMA)

APTMA OFFICE 97-A Aziz Avenue, Canal Bank, Gulberg Road Lahore Ph.No. 042-5754345-8 Fax.No. 042-5871945

16 Engr. Faiz Mu-hammad Bhutta

Chairman Pakistan Solar Asso-ciation (PSA)

PSA Secretariat

Suite #10, First Floor

Al-Hafeez Suites 69-B/II

Gulberg III, Lahore.

Ph. No. 042-35772097

17 Waleed Elahi Vice chairman Pakistan Solar Asso-ciation (PSA)

PSA Secretariat

Suite #10, First Floor

Al-Hafeez Suites 69-B/II

Gulberg III, Lahore.

Ph. No. 042-35772097

18 Mr. Iftikhar Ah-med Randhawa

Chief engineer power

Power Energy De-partment Govt of Pun-jab

Central Design Building, Irrigation Secretariat, Old Anarkali, Lahore Phone No: 042 99213974-5 Fax: 042-99213906

17

19 Mr. Saqib Sid-

diqui

Microfinance Manager

Pakistan Poverty Alle-

viation Fund (PPAF)

90, Margalla Road, F-8/2, Islamabad Tele: (+92-51)8439450-79 Fax: (+92-51) 8431041

20 Asad Mahmood Management Executive

Pakistan Poverty Alle-

viation Fund (PPAF)

90, Margalla Road, F-8/2, Islamabad Tele: (+92-51)8439450-79 Fax: (+92-51) 8431041

21 Mr. Abdul Rashid Secretary Pakistan Foundry Association (PFA)

PFA, Lahore

Ph. No: 042-35023525,

36851559

22 Mr. Rizwan Kausar

REAP EC Co-ordinator

Renewable Energy Association of Paki-stan (REAP)

Plot # 140, Street # 9, I-10/3, Industrial Area, Is-lamabad Phone No: 051-4100081-85 Fax # 051-4100083

23 Mr. Zamir Naeem Khan

REAP Member Renewable Energy Association of Paki-stan (REAP)

Plot # 140, Street # 9, I-10/3, Industrial Area, Is-lamabad Phone No: 051-4100081-85 Fax # 051-4100083

24 Mr. Ashfaq Ah-med

Deputy General

Manager (Indus-

try Support Cell)

Small And Medium Enterprises Develop-ment Authority

SMEDA 8th floor LDA plaza Egerton Road Lahore Ph.No.042-111-111-456 Fax.No. 042-6304926-7

25 Mr. Hidayat Ullah

Khattak

Management

Associate

Small And Medium Enterprises Develop-ment Authority

SMEDA 8th floor LDA plaza Egerton Road Lahore Ph.No.042-111-111-456 Fax.No. 042-6304926-7

26 Mr. Ahsan

Maqbool

Managing Direc-

tor

Gilgit Baltistan Power Development Board

Gilgit Baltistan Council Sec-retariat, Benevolent Fund Buidling, Blovk B, 2nd Floor, Zero Point ,Islamabad

27 Mr. Ahmed

Hussain

Project Engi-

neer/Coordinato

r

Gilgit Baltistan Power Development Board

Gilgit Baltistan Council Sec-retariat, Benevolent Fund Buidling, Blovk B, 2nd Floor, Zero Point ,Islamabad

28 Engr.Asad

Mahmood

Manager Tech-

nical-ECF

The National Energy Conservation Centre

ENERCON Building, G-5/2, Islamabad. Ph.No. 051-9206001 Fax.No. 051-9202657

29 Mr. Aimal Pir Asst. Director Energy and Power Department Govern-ment of Khyber Pakh-tunkhwa KPK

H. No 46, Street No. 3 Old Shami Road Peshawar Tel: 091-9212670 & 9223018 Fax 091-9212657

18

30 Mr. Mohammad

Omer

Business De-

velopment

Manager

Buksh Foundation Buksh group plot no 3-R MM Alam road Gulberg II, Lahore,

31 Mr .Ahmed Bilal- Strategy Con-

sultant

Buksh Foundation Buksh group plot no 3-R MM Alam road Gulberg II, Lahore,

32 Mr. Ahmer Butt,

Project Manager

Punjab

Bfz GmBH PHMA House, 33 A, Block D, New Muslim Town, La-hore, Pakistan.

33 Dr. Pervaiz

Naeem

Senior Sector

Coordinator

KfW office Islamabad House Nr. 23, Street Nr. 55 Sector F-7/4 Islamabad Pakistan 051-26563779 Fax: 051-2656380

34 Mr. Helmut Wolf Programme Manager

Swiss Agency for De-velopment and Coop-eration (SDC), Islamabad

H # 3, Street 3, F6/3 PO Box 1073, Islamabad Phone 0512279280 Fax 051-2824872

35 Ms. Lucy Coley Project Devel-

opment Manag-

er

ACTED Pakistan House #5 Street # 29 Sec-tor F7/1 Islamabad Tel: 051-2653035-6 Fax: 051-2653037

36 Mr. Sarfraz Lal Din

Manager ACTED Pakistan House #5 Street # 29 Sec-tor F7/1 Islamabad Tel: 051-2653035-6 Fax: 051-2653037

37 Ms. Yuko Enami Project Formula-tion Advisor (Indus-try/Investment Promotion)

Japan International Cooperation Agency (JICA)

4th Floor, Serena Office Complex, Khayaban-e-Suhrawardy, G-5/1, Islamabad 051-9244500-07 fax: 051-9244508

38 Dr Haroon-ur-Rashid Rana

Senior Pro-gramme Officer

Japan International Cooperation Agency (JICA)

4th Floor, Serena Office Complex, Khayaban-e-Suhrawardy, G-5/1, Islamabad 051-9244500-07 fax: 051-9244508

39 Nauman Bhutta

Manager Agency for France

Development (AFD)

AFD ,Diplomatic Enclave,

G5, Islamabad,

Ph.No: 051 201 15 17 Fax: 051 201 15 14

19

40 Ms. Romina Ko-

chius

Principal Advi-

sor

Implementation of

Social Standards

Support Programme

to Textile & Garment

Industry Punjab

H 65 Street 2 Cavalry

Ground Lahore

41 Mr. Frank Fecher Principal Advi-sor

GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

42 Mr. Irshad Khan Component head

GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

43 Mr. Ali Yasir Component head

GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

44 Mr. Asif Farid Technical Advi-sor

GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

45 Mr. Shahid Ra-shid

Technical Advi-sor

GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

46 Mr. Mohammad Saeed

Technical Advi-sor

GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

47 Ms. Sumaira Akram

Gender Advisor GIZ-REEE House. No 11B, Street 50, F-8/4, Islamabad Ph.no. 051-2851175 Fax.no. 051-2854576

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Renewabale Energy and Energy Efficiency REEE Programme House 11-B, Street 50, F-8/4 44000 Islamabad – Pakistan Phone: +92 51 285 1175 Fax: +92 51 285 4576 Email: [email protected] Internet: www.giz.de/pakistan