SITE IDENTIFICATION AND EVALUATION 1
TECHNICAL SITE SURVEY (TSS) AND LOS 2
GA DRAWINGS AND TECHNICAL REPORTS 3
BAN, BAK AND LEASE PACKAGES 4
LEGAL SUPPORTING DOCUMENTS 5
BUILDING PERMIT APPLICATIONS 6
BUILDING PERMITS 7
DETAILED SITE DESIGN DOCUMENTS 8
CME DOCUMENTATION 9
CME SITE ACCEPTANCE 10
I&C DOCUMENTATION 11
NE ACCEPTANCE DOCUMENTATION 12
FINAL ACCEPTANCE TEST 13
7/29/2019 MSFI Non Deliverable
2/26
Hammer Test Report(sample only)
7/29/2019 MSFI Non Deliverable
3/26
NPWP Certificate(sample only)
7/29/2019 MSFI Non Deliverable
4/26
Engineer's Certificate(sample only)
7/29/2019 MSFI Non Deliverable
5/26
Payment Receipt(sample only)
7/29/2019 MSFI Non Deliverable
6/26
Receipt ofIMB Application
(sample only)
7/29/2019 MSFI Non Deliverable
7/26
Structure
Calculation(DSD, still in approval process
by HCPT)
7/29/2019 MSFI Non Deliverable
8/26
IMB Certificate(sample only)
7/29/2019 MSFI Non Deliverable
9/26
IMB Principle Permit/
Statement fromLocal Government
(sample only)
7/29/2019 MSFI Non Deliverable
10/26
As-Built RiskAssesment Docs
(sample only)
7/29/2019 MSFI Non Deliverable
11/26
Original of Electrical
Installation Certificate(sample only)
7/29/2019 MSFI Non Deliverable
12/26
Safety Certificate(sample only)
7/29/2019 MSFI Non Deliverable
13/26
Shelter's Manufacturer
Installation Certificate(sample only)
7/29/2019 MSFI Non Deliverable
14/26
Equipment Supplier's
Papers of:
- ACPDB & KWH Panel
- Lighting Arrestors
- Air Conditioners
- M/E Inside Shelter, Exhaust Fan
- Alarm Panel
- Aviation Light
- Fire Alarm
- Air Conditioning
(no sample)
7/29/2019 MSFI Non Deliverable
15/26
Permanent Power
Voltage Test Result(sample only)
7/29/2019 MSFI Non Deliverable
16/26
RFIChecklist
(sample only)
7/29/2019 MSFI Non Deliverable
17/26
- PLN Application for
Supporting Docs
- Contract Agreement for
Commercial Power And/Or
Application Supporting Docs
(no sample)
7/29/2019 MSFI Non Deliverable
18/26
BPUJL(Connection Fee/Deposit Fee)
Receipt
(sample only)
7/29/2019 MSFI Non Deliverable
19/26
Key Transmittal(sample only)
7/29/2019 MSFI Non Deliverable
20/26
As PlannedDrawings
(Layout and Construction)
7/29/2019 MSFI Non Deliverable
21/26
GOVERNMENT PAPERS:
- DISHUB (Air Transport
Authority Permit)
- RKT (Tower Height
Recommendation from
Military/Air Force)
- Environment Permit
- Original HO/Disturbances
- Other Applicable Permits
(no sample)
7/29/2019 MSFI Non Deliverable
22/26
CSA PunchlistRooftop & Greenfield
(no sample)
7/29/2019 MSFI Non Deliverable
23/26
- MW Installation Checklist
- BSS Comm Test Result
- MW Comm Test Result
- OHSE Documentation
(no sample)
7/29/2019 MSFI Non Deliverable
24/26
Project Name : Full Turnkey Phase 1 (Macro-Micro Site) Site Id :
DCC Ref. No. : Site Name :
SEQ
NUM
1 RNP
COPY ORIGINAL NACOPY ORIGINAL NA
COPY ORIGINAL NA
2 SAC
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
3 CME
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
4 I & C
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NACOPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
COPY ORIGINAL NA
Old
Prepared by Siemens DCC Checked by Siemens A&D Manager Approved by
## Rahim Rajab
Name Name Name
Date Date Date
Master Site File Index
#N/A
SITE DOCUMENTATION PACKAGE
#N/A
CATEGORY
7/29/2019 MSFI Non Deliverable
25/26
Site Id Region Site Name Date DCC Ref. No.
Botabek /MSFI/001
7/29/2019 MSFI Non Deliverable
26/26
Prepared by
Sitti Aisyah