  • 7/29/2019 MSFI Non Deliverable

    1/26

    SITE IDENTIFICATION AND EVALUATION 1

    TECHNICAL SITE SURVEY (TSS) AND LOS 2

    GA DRAWINGS AND TECHNICAL REPORTS 3

    BAN, BAK AND LEASE PACKAGES 4

    LEGAL SUPPORTING DOCUMENTS 5

    BUILDING PERMIT APPLICATIONS 6

    BUILDING PERMITS 7

    DETAILED SITE DESIGN DOCUMENTS 8

    CME DOCUMENTATION 9

    CME SITE ACCEPTANCE 10

    I&C DOCUMENTATION 11

    NE ACCEPTANCE DOCUMENTATION 12

    FINAL ACCEPTANCE TEST 13

  • 7/29/2019 MSFI Non Deliverable

    2/26

    Hammer Test Report(sample only)

  • 7/29/2019 MSFI Non Deliverable

    3/26

    NPWP Certificate(sample only)

  • 7/29/2019 MSFI Non Deliverable

    4/26

    Engineer's Certificate(sample only)

  • 7/29/2019 MSFI Non Deliverable

    5/26

    Payment Receipt(sample only)

  • 7/29/2019 MSFI Non Deliverable

    6/26

    Receipt ofIMB Application

    (sample only)

  • 7/29/2019 MSFI Non Deliverable

    7/26

    Structure

    Calculation(DSD, still in approval process

    by HCPT)

  • 7/29/2019 MSFI Non Deliverable

    8/26

    IMB Certificate(sample only)

  • 7/29/2019 MSFI Non Deliverable

    9/26

    IMB Principle Permit/

    Statement fromLocal Government

    (sample only)

  • 7/29/2019 MSFI Non Deliverable

    10/26

    As-Built RiskAssesment Docs

    (sample only)

  • 7/29/2019 MSFI Non Deliverable

    11/26

    Original of Electrical

    Installation Certificate(sample only)

  • 7/29/2019 MSFI Non Deliverable

    12/26

    Safety Certificate(sample only)

  • 7/29/2019 MSFI Non Deliverable

    13/26

    Shelter's Manufacturer

    Installation Certificate(sample only)

  • 7/29/2019 MSFI Non Deliverable

    14/26

    Equipment Supplier's

    Papers of:

    - ACPDB & KWH Panel

    - Lighting Arrestors

    - Air Conditioners

    - M/E Inside Shelter, Exhaust Fan

    - Alarm Panel

    - Aviation Light

    - Fire Alarm

    - Air Conditioning

    (no sample)

  • 7/29/2019 MSFI Non Deliverable

    15/26

    Permanent Power

    Voltage Test Result(sample only)

  • 7/29/2019 MSFI Non Deliverable

    16/26

    RFIChecklist

    (sample only)

  • 7/29/2019 MSFI Non Deliverable

    17/26

    - PLN Application for

    Supporting Docs

    - Contract Agreement for

    Commercial Power And/Or

    Application Supporting Docs

    (no sample)

  • 7/29/2019 MSFI Non Deliverable

    18/26

    BPUJL(Connection Fee/Deposit Fee)

    Receipt

    (sample only)

  • 7/29/2019 MSFI Non Deliverable

    19/26

    Key Transmittal(sample only)

  • 7/29/2019 MSFI Non Deliverable

    20/26

    As PlannedDrawings

    (Layout and Construction)

  • 7/29/2019 MSFI Non Deliverable

    21/26

    GOVERNMENT PAPERS:

    - DISHUB (Air Transport

    Authority Permit)

    - RKT (Tower Height

    Recommendation from

    Military/Air Force)

    - Environment Permit

    - Original HO/Disturbances

    - Other Applicable Permits

    (no sample)

  • 7/29/2019 MSFI Non Deliverable

    22/26

    CSA PunchlistRooftop & Greenfield

    (no sample)

  • 7/29/2019 MSFI Non Deliverable

    23/26

    - MW Installation Checklist

    - BSS Comm Test Result

    - MW Comm Test Result

    - OHSE Documentation

    (no sample)

  • 7/29/2019 MSFI Non Deliverable

    24/26

    Project Name : Full Turnkey Phase 1 (Macro-Micro Site) Site Id :

    DCC Ref. No. : Site Name :

    SEQ

    NUM

    1 RNP

    COPY ORIGINAL NACOPY ORIGINAL NA

    COPY ORIGINAL NA

    2 SAC

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    3 CME

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    4 I & C

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NACOPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    COPY ORIGINAL NA

    Old

    Prepared by Siemens DCC Checked by Siemens A&D Manager Approved by

    ## Rahim Rajab

    Name Name Name

    Date Date Date

    Master Site File Index

    #N/A

    SITE DOCUMENTATION PACKAGE

    #N/A

    CATEGORY

  • 7/29/2019 MSFI Non Deliverable

    25/26

    Site Id Region Site Name Date DCC Ref. No.

    Botabek /MSFI/001

  • 7/29/2019 MSFI Non Deliverable

    26/26

    Prepared by

    Sitti Aisyah