METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN PELAKSANAAN, DAN PENJADWALAN PEKERJAAN STRUKTUR BAWAH PADA PROYEK APARTEMEN SWARNABUMI RESIDENCE BANDUNG Work Methods, Calculation of Implementation Budget Plan, and Scheduling Sub- Structure works in Apartement Swarnabumi Residence Bandung Project TUGAS AKHIR Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan Diploma Tiga Program Studi Teknik Konstruksi Gedung di Jurusan Teknik Sipil Oleh: ARCY PRAMADHANY GUNAWAN RIVAN DWICAHYO SAPUTRO NIM: 151111004 NIM: 151111056 POLITEKNIK NEGERI BANDUNG 2018

METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

  • Upload
    others

  • View
    23

  • Download
    1

Embed Size (px)

Citation preview

Page 1: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

METODE PELAKSANAAN, PERHITUNGAN RENCANA

ANGGARAN PELAKSANAAN, DAN PENJADWALAN

PEKERJAAN STRUKTUR BAWAH PADA PROYEK APARTEMEN

SWARNABUMI RESIDENCE BANDUNG

Work Methods, Calculation of Implementation Budget Plan, and Scheduling Sub-

Structure works in Apartement Swarnabumi Residence Bandung Project

TUGAS AKHIR

Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan

Diploma Tiga Program Studi Teknik Konstruksi Gedung

di Jurusan Teknik Sipil

Oleh:

ARCY PRAMADHANY GUNAWAN RIVAN DWICAHYO SAPUTRO NIM: 151111004 NIM: 151111056

POLITEKNIK NEGERI BANDUNG

2018

Page 2: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

Page 3: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

Page 4: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

Page 5: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

Page 6: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

i

ABSTRAK

Proyek pembangunan apartemen Swarnabumi Residence memiliki dua

tower utama, yaitu tower 1 dan tower 2. Keduanya memiliki jumlah lantai

sebanyak 24 lantai utama dan 3 lantai basement dengan total luas

bangunannya 56.722,76 m2.

Pembangunan proyek ini termasuk proyek yang besar dengan waktu

penyelesaian yang cukup lama, yaitu 30 bulan berdasarkan dokumen kontrak.

Untuk mengefektifkan dari segi mutu, biaya, dan waktu, diperlukan

penyusunan metode pelaksanaan yang tepat agar menghasilkan hasil yang

optimal yang kemudian dibuat dalam Work Breakdown Structure (WBS),

selanjutnya dilakukan perhitungan rencana anggaran pelaksanaan. Untuk

mengetahui berapa biaya dan waktu pelaksanaan proyek maka perlu

dilakukan analisis volume dari masing-masing pekerjaan, analisa koefisien

produktivitas dari sumber daya proyek dan harga dari setiap item pekerjaan.

Untuk penjadwalan dibutuhkan data laporan harian dan work breakdown

structure yang kemudian dibuat durasi penjadwalan menggunakan software

Microsoft Project. Penentuan hubungan ketergantungan merupakan dasar

pembuatan jaringan kerja setelah penentuan durasi, sehingga dapat diketahui

urutan kegiatan dari awal mulainya suatu proyek sampai dengan selesainya

proyek secara keseluruhan. Pembuatan network planning digunakan untuk

menganalisa jalur kritis dan float (toleransi keterlambatan waktu suatu

pekerjaan).

Dalam tugas akhir ini, perhitungan rencana anggaran pelaksanaan

struktur bawah meliputi pekerjaan galian, capping beam, dewatering, ground

anchor, dan waller beam diperoleh biaya total Rp 3.901.889.136,83 (Include

PPN 10%, profit, dan overhead) dan durasi proyek 223 hari serta terdapat 3

daftar pekerjaan kritis.

Kata Kunci: metode pelaksanaan, WBS, rencana anggaran pelaksanaan,

penjadwalan, network planning.

Page 7: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

ii

ABSTRACT

The apartment development project of Swarnabumi Residence has two

main towers, namely tower 1 and tower 2. Both have 24 floors and 3 basement

floors with total building area of 56,722.76 m2.

The construction of this project includes a large project with a fairly long

completion time, which is 30 months based on contract documents. To make

effective in terms of quality, cost, and time, it is necessary to prepare the right

method of implementation in order to produce optimal results which are then

made in Work Breakdown Structure (WBS), then calculate the

implementation budget plan. To find out how much cost and time of project

execution it is necessary to analyze the volume of each work, analysis of the

productivity coefficient of the project resources and the price of each work

item. For scheduling required daily report data and work breakdown structure

which then made the duration of scheduling using Microsoft Project software.

Determination of dependency relationship is the basis of networking after the

determination of duration, so it can know the sequence of activities from the

beginning of a project until the completion of the project as a whole. Making

network planning is used to analyze critical path and float (tolerance of delay

time of a job).

In this final project, the calculation of budget plan for the implementation

of the lower structure includes excavation work, capping beam, dewatering,

ground anchor, and waller beam. The total cost is Rp 3.901.889.136,83

(Include PPN 10%, profit, and overhead) and the duration of the project is

227 days and there are 9 critical jobs list.

Keywords: method of implementation, WBS, the implementation of the

budget plan, scheduling, network planning.

Page 8: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

iii

KATA PENGANTAR

Puji dan syukur penulis ucapkan kepada Allah SWT, karena berkah, rahmat,

dan karunia-Nyalah Laporan Tugas Akhir yang berjudul “Metode Pelaksanaan,

Perhitungan Rencana Anggaran Pelaksanaan, dan Penjadwalan Pekerjaan Struktur

Bawah pada Proyek Pembangunan Apartemen Swarnabumi Residence Bandung”

ini dapat diselesaikan. Laporan ini disusun sebagai salah satu syarat meyelesaikan

pendidikan Diploma III Jurusan Teknik Sipil Program Studi Konstruksi Gedung

Politeknik Negeri Bandung.

Tentunya selama pengerjaan Tugas Akhir ini tidak lepas dari bimbingan,

arahan, dan dukungan dari berbagai pihak. Oleh karena itu, penulis mengucapkan

terima kasih kepada semua pihak yang terkait dalam penulisan laporan Tugas Akhir

ini, yaitu kepada:

1. Politeknik Negeri Bandung sebagai almamater yang telah memberikan

kesempatan untuk belajar.

2. Bapak Hendry, Dipl.Ing.HTL, MT selaku Ketua Jurusan Teknik Sipil

Politeknik Negeri Bandung.

3. Bapak Heri Kasyanto, ST., MT. selaku Ketua Program Studi Teknik

Konstruksi Gedung

4. Bapak Antonius Siswanto, Drs, SST, MT. dan Bapak R. Andjar Prasetyo, ST,

MT. selaku Wali Kelas 3-KGA dan 3-KGB yang banyak memberikan kami

informasi dan arahan mengenai laporan ini.

5. Ibu Yullianty Noorlaelasari, ST, MT. selaku dosen pembimbing yang telah

memberikan arahan, bimbingan dan masukan kepada penulis pada saat

penulisan laporan Tugas Akhir.

6. Ibu Ery Radya Juarti, ST, MT. dan Pak Husnul Fikri, ST, MT. selaku dosen

penguji yang telah memberikan segala masukan kepada penulis pada saat

penulisan laporan Tugas Akhir.

7. Bapak Ujang dan Bapak Bayu serta seluruh staf Proyek Swarnabumi Residence

yang telah mengizinkan penulis untuk melakukan studi pengamatan di

lapangan dan memberikan data-data untuk keperluan pengerjaan tugas akhir.

Page 9: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

iv

8. Kedua orang tua, yang senantiasa memberikan kasih sayang, motivasi, doa,

serta dukungan moril, materil, maupun spiritual.

9. Seluruh staf administrasi Jurusan Teknik Sipil Politeknik Negeri Bandung yang

telah membantu kami dalam proses pelaksanaan Tugas Akhir ini.

10. Teman-teman seperjuangan Teknik Sipil Politeknik Negeri Bandung angkatan

2015 yang telah membantu dan memberi masukan yang membangun.

11. Pihak-pihak lain yang telah banyak membantu, yang tidak dapat penulis

sebutkan satu persatu, atas segala kebaikan dan bantuannya selama ini. Semoga

Allah SWT membalas segala kebaikan dengan pahala yang berlipat.

Akhir kata penulis berharap agar laporan ini dapat bermanfaat dan dapat

memberikan sumbangan ilmu pengetahuan bagi penulis khususnya dan bagi

pembaca pada umumnya. Penulis mengharapkan kritik dan saran demi perbaikan

dimasa yang akan datang. Atas segala perhatiannya, penulis mengucapkan terima

kasih.

Bandung, Agustus 2018

Penulis

Page 10: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

v

DAFTAR ISI ABSTRAK .......................................................................................................... i

KATA PENGANTAR ……………………………………………………..……………………..…iii

DAFTAR ISI ......................................................................................................... v

DAFTAR LAMPIRAN ...................................................................................... viii

DAFTAR GAMBAR ............................................................................................ ix

DAFTAR TABEL ............................................................................................... xii

DAFTAR ISTILAH ........................................................................................... xiii

BAB I PENDAHULUAN .......................................................................... 1

I.1 Latar Belakang ......................................................................................... 1

I.2 Tujuan ...................................................................................................... 3

I.3 Ruang Lingkup ........................................................................................ 3

I.4 Sistematika Penulisan .............................................................................. 4

BAB II TINJAUAN PUSTAKA ................................................................ 5

II.1 Metode Pelaksanaan Konstruksi .............................................................. 5

II.1.1 Pekerjaan Capping Beam ............................................................ 5

II.1.2 Pekerjaan Galian Basement ........................................................ 7

II.1.3 Pelaksanaan Dewatering ............................................................. 7

II.1.4 Pemasangan Ground Anchor ...................................................... 8

II.1.5 Pekerjaan Waller Beam ............................................................... 9

II.2 Rencana Anggaran Pelaksanaan ............................................................ 10

II.2.1 Work Breakdown Structure (WBS) .......................................... 10

II.2.2 Gambar Kerja ............................................................................ 11

II.2.3 Volume Pekerjaan ..................................................................... 11

II.2.4 Produktivitas ............................................................................. 12

II.2.5 Harga Satuan Upah Pekerja dan Material ................................. 18

Page 11: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

vi

II.2.6 Analisa Harga Satuan Pekerjaan (AHSP) ................................. 19

II.2.7 Lump Sump .............................................................................. 21

II.2.8 Rekapitulasi Rencana Anggaran Pelaksanaan .......................... 22

II.3 Penjadwalan Pelaksanaan Konstruksi ................................................... 22

II.3.1 Metode Penjadwalan Network Planning .................................. 23

II.3.2 Penggunaan Microsoft Project ................................................. 26

II.3.3 Hubungan Ketergantungan ....................................................... 30

II.3.4 Lag Time dan Lead Time .......................................................... 31

II.3.5 Jalur Kritis ................................................................................ 31

II.3.6 Slack atau Float ........................................................................ 32

BAB III METODOLOGI PELAKSANAAN ........................................... 33

III.1 Metodologi ............................................................................................ 33

III.1.1 Tahap Persiapan ........................................................................ 34

III.1.2 Tahap Pengumpulan Data ......................................................... 34

III.1.3 Diagram Analisis Masalah ........................................................ 35

III.2 Analisis Masalah ................................................................................... 38

III.3 Kesimpulan dan Saran ........................................................................... 39

BAB IV HASIL DAN PEMBAHASAN.................................................... 40

IV.1 Data Proyek ......................................................................................... 40

IV.1.1 Data Administrasi ..................................................................... 40

IV.1.2 Data Teknis Elevasi Galian Tanah ........................................... 41

IV.2 Lokasi .................................................................................................. 41

IV.3 Metode Pelaksanaan Struktur Bawah .................................................. 42

IV.3.1 Metode Pelaksanaan Capping Beam ........................................ 44

IV.3.2 Metode Pelaksanaan Galian Basement ..................................... 47

IV.3.3 Metode Pelaksanaan Dewatering ............................................. 52

Page 12: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

vii

IV.3.4 Metode Pelaksanaan Ground Anchor ....................................... 58

IV.3.5 Metode Pelaksanaan Waller Beam ........................................... 64

IV.4 Rencana Anggaran Pelaksanaan (RAP) .............................................. 69

IV.4.1 Perhitungan Volume Pekerjaan ................................................ 69

IV.4.2 WBS .......................................................................................... 86

IV.4.3 Harga Satuan ............................................................................. 90

IV.4.4 Lumpsum Pekerjaan ............................................................... 105

IV.4.5 Perhitungan Rencana Anggaran Pelaksanaan ......................... 109

IV.5 Penjadwalan ...................................................................................... 110

IV.5.1 Durasi Pekerjaan ..................................................................... 110

IV.5.2 Hubungan Antar Kegiatan ...................................................... 114

IV.5.3 Pembuatan Network Planning ................................................ 117

IV.5.4 Identifikasi Jalur Kritis, Total Float dan Free Float pada Durasi

Aktual Pekerjaan................................................................................. 120

BAB V KESIMPULAN DAN SARAN.................................................. 127

V.1 Kesimpulan .......................................................................................... 127

V.2 Saran .................................................................................................... 128

DAFTAR PUSTAKA ..............................................................................................

Page 13: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

ix

DAFTAR GAMBAR

Gambar I.1 Kondisi Pekerjaan yang Sedang Berlangsung ..................................... 2

Gambar II.1 Contoh Daftar Harga Satuan Pekerjaan ............................................ 19

Gambar II.2 Contoh AHSP ................................................................................... 20

Gambar II.3 Skema Harga Satuan Pekerjaan ........................................................ 21

Gambar II.4 Hasil Rekapitulasi RAP .................................................................... 22

Gambar II.5 Simbol CPM (Critical Path Method) ............................................... 24

Gambar II.6 PDM (Precedence Diagram Method) ............................................... 25

Gambar II.7 Konstrain Pada PDM ........................................................................ 26

Gambar II.8 Tampilan Lembar Kerja Ms. Project 2016 ....................................... 26

Gambar II.9 Tampilan Task Name Ms. Project .................................................... 27

Gambar II.10 Tampilan Duration Ms. Project ...................................................... 27

Gambar II.11 Tampilan Start Ms. Project ............................................................ 28

Gambar II.12 Tampilan Finish Ms. Project .......................................................... 28

Gambar II.13 Tampilan dan Contoh Penulisan pada Predesessor ........................ 28

Gambar II.14 Tampilan Gantt Chart .................................................................... 29

Gambar II.15 Tampilan PERT CHART................................................................ 29

Gambar II.16 Tampilan Start to Start ................................................................... 30

Gambar II.17 Tampilan Start to Finish ................................................................. 30

Gambar II.18 Tampilan Finish to Start ................................................................. 30

Gambar II.19 Tampilan Finish to Finish .............................................................. 30

Gambar II.20 Tampilan Jalur Kritis pada Ms. Project .......................................... 31

Gambar II.21 Tampilan Total Slack pada Ms. Project.......................................... 32

Gambar II.22 Tampilan Free Slack pada Ms. Project .......................................... 32

Gambar III.1 Diagram alir pengerjaan tugas akhir ............................................... 33

Gambar III.2 Diagram Alir Analisis Metode Pelaksanaan Struktur Bawah ......... 35

Gambar III.3 Diagram Alir Analisis Rencana Anggaran Pelaksanaan ................. 36

Gambar III.4 Diagram Alir Analisis Penjadwalan Pelaksanaan Menggunakan

Network Planning ................................................................................................. 37

Gambar IV.1 Lokasi Proyek ................................................................................. 42

Gambar IV.2 Diagram alir metode pelaksanaan capping beam ........................... 44

Page 14: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

x

Gambar IV.3 Diagram alir metode pelaksanaan galian ........................................ 47

Gambar IV.4 Layout penempatan alat berat 1 ...................................................... 48

Gambar IV.5 Layout penempatan alat berat 2 ...................................................... 48

Gambar IV.6 Layout penempatan alat berat 3 ...................................................... 49

Gambar IV.7 Layout penempatan alat berat 4 ...................................................... 49

Gambar IV.8 Proses penggalian tanah .................................................................. 50

Gambar IV.9 Denah Penggalian Tahap 1 ............................................................. 50

Gambar IV.10 Proses Penggalian Tahap 2 ........................................................... 51

Gambar IV.11 Diagram alir metode pelaksanaan Dewatering ............................. 52

Gambar IV.12 Diagram Alir Metode Pelaksanaan Ground Anchor ..................... 58

Gambar IV.13 Diagram alir metode pelaksanaan waller beam ............................ 64

Gambar IV.14 Detail konsol Profil Siku ............................................................... 66

Gambar IV.15 Konsol Profil Siku setelah pemasangan ........................................ 66

Gambar IV.16 Dudukan Kepala Ground Anchor ................................................. 67

Gambar IV.17 Pemasangan dudukan kepala ground anchor ................................ 68

Gambar IV.18 Detail capping beam ..................................................................... 70

Gambar IV.19 Tampak atas penulangan capping beam ....................................... 71

Gambar IV.20 Denah Bidang Galian .................................................................... 73

Gambar IV.21 Tampak depan waller beam .......................................................... 77

Gambar IV.22 Tampak 1 dudukan Ground Anchor.............................................. 77

Gambar IV.23 Tampak 2 Dudukan Ground Anchor ............................................. 78

Gambar IV.24 Tampak 3 Dudukan Ground Anchor ............................................. 79

Gambar IV.25 Tampak 4 Dudukan Ground Anchor ............................................. 79

Gambar IV.26 Tampak isometri dudukan kepala ground anchor ......................... 80

Gambar IV.27 Penampang Profil IWF 250.125.6.9.............................................. 80

Gambar IV.28 Denah Pemasangan Waller Beam ................................................. 81

Gambar IV.29 Penampang Profil Siku L100.100.8 .............................................. 81

Gambar IV.30 Penampang Profil Siku L50.50.5 .................................................. 82

Gambar IV.31 Sumur Deep Well .......................................................................... 83

Gambar IV.32 Sumur Recharging......................................................................... 84

Gambar IV.33 Sumur Piezometer ......................................................................... 85

Gambar IV.34 WBS Pekerjaan Struktur Bawah ................................................... 86

Page 15: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

xi

Gambar IV.35 WBS Pekerjaan Capping Beam dan Galian Basement ................. 87

Gambar IV.36 WBS Pekerjaan Dewatering.......................................................... 88

Gambar IV.37 WBS Pekerjaan Ground Anchor dan Waller Beam ...................... 89

Page 16: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

xii

DAFTAR TABEL

Tabel II.1 Perbedaan RAP dan RAB .................................................................... 10

Tabel II.2 Klasifikasi kondisi peralatan ................................................................ 15

Tabel II.3 Nilai Efisiensi Operator ........................................................................ 15

Tabel II.4 Efisiensi waktu berdasarkan kondisi kerja ........................................... 15

Tabel II.5 Nilai efisiensi Kerja .............................................................................. 16

Tabel II.6 Waktu dumping & persiapan Loading berdasarkan kondisi alat ......... 17

Tabel IV.1 Total Volume Galian Tanah ............................................................... 41

Tabel IV.2 Spesifikasi Material Ground Anchor pada proyek Swarnabumi

Residence Bandung ............................................................................................... 59

Tabel IV.3 Daftar Alat yang digunakan untuk Pemasangan Ground Anchor ...... 60

Tabel IV.4 Panjang setiap bentang Capping beam ............................................... 69

Tabel IV.5 Kebutuhan panjang Profil IWF 250.125.6.9 ....................................... 76

Tabel IV.6 Rekapitulasi Kebutuhan total baja waller beam ................................. 83

Tabel IV.7 Waktu siklus realisasi Excavator ........................................................ 91

Tabel IV.8 Daftar Harga Satuan............................................................................ 99

Tabel IV.9 Analisa Harga Satuan Pekerjaan untuk 1 m3 galian basement ......... 102

Tabel IV.10 Analisa Harga Satuan Pekerjaan Capping Beam ............................ 103

Tabel IV.11 Analisa Harga Satuan Pekerjaan Waller Beam ............................... 105

Tabel IV.12 Kebutuhan alat dan material sumur deep well ................................ 106

Tabel IV.13 Kebutuhan alat dan material sumur piezometer .............................. 106

Tabel IV.14 Kebutuhan alat dan material sumur recharging ............................. 106

Tabel IV.15 Lumpsum Paket Pekerjaan Dewatering .......................................... 107

Tabel IV.16 Lumpsum Paket Pekerjaan Ground Anchor ................................... 109

Tabel IV.17 Rekapitulasi Perhitungan RAP pekerjaan Struktur Bawah............. 110

Tabel IV.18 Hubungan Antar Kegiatan .............................................................. 114

Tabel IV.19 Daftar Pekerjaan Kritis dan Slack Time .......................................... 120

Tabel IV.20 Rekapitulasi Daftar Pekerjaan Kritis .............................................. 126

Page 17: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

xiii

DAFTAR ISTILAH

Duration : Lama waktu pekerjaan.

Dump Truck : Truk yang digunakan untuk membuang

tanah.

Earliest Finish : Waktu pekerjaan/kejadian paling awal

berhenti bekerja.

Earliest Start : Waktu pekerjaan/kejadian paling awal

memulia pekerjaan.

Excavator : Alat berat yang digunakan pada

pekerjaan galian.

Finish to finish : Selesainya pekerjaan secara bersamaan.

Finish to start : Selesainya suatu pekerjaan kemudian

baru dimulainya pekerjaan baru.

Float : Waktu yang tersedia dalam kegiatan

sehingga kegiatan tersebut

memungkinkan ditunda atau

diperlambat.

Flow Chart : Diagram alir suatu proses pekerjaan.

For Construction Drawing : Gambar suatu pekerjaan yang

dibuat oleh kontraktor.

For Tender Drawing : Gambar yang digunakan oleh peserta

tender untuk mengestimasi biaya

proyek.

Free Float : Waktu yang tersedia dalam kegiatan

sehingga kegiatan tersebut

memungkinkan ditunda atau

diperlambat tanpa mempengaruhi

dimulainya kegiatan yang langsung

mengikutinya.

Lag time : Waktu keterlambatan.

Lag time negative : Waktu keterlambatan negatif.

Page 18: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

xiv

Lag time positive : Waktu keterlambatan positif.

Latest Finish : Waktu pekerjaan/kejadian paling akhir

berhenti bekerja.

Latest Start : Waktu pekerjaan/kejadian paling akhir

memulia pekerjaan.

Kontraktor : Pihak yang diberi tugas untuk

melaksanakan pembangunan proyek.

Precedence diagram : Diagram yang menunjukkan hubungan

dan keterkaitan antar pekerjaan.

Predecessors : Kegiatan sebelum.

Ready mix : Campuran beton segar yang siap dipakai

dalam pengecoran.

Slack : Waktu ambang pekerjaan.

Software Microsoft Project : Perangkat lunak yang dibuat oleh

Microsoft Corp. dan digunakan untuk

membuat penjadwalan.

Start to finish : Suatu pekerjaan dimulai ketika

pekerjaan lain selesai.

Start to start : Pekerjaan dimulai dalam waktu yang

bersamaan.

Task name : Nama tugas.

Total Float : Waktu yang tersedia dalam kegiatan

sehingga kegiatan tersebut

memungkinkan ditunda atau

diperlambat tanpa mempengaruhi

pelaksanaan seluruh kegiatan pada

suatu proyek.

Work Breakdown Structure : Pemilihan dan pemecahan pekerjaan

dimulai dari yang paling besar hingga

pekerjaan tidak dapat dipecah lagi pada

suatu proyek sehingga dapat dievaluasi

dan di kontrol dengan mudah.

Page 19: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

DAFTAR PUSTAKA

David, Batubara., & Taufik Hidayat. (2013). Perencanaan Metode Pelaksanaan

dan Network Planning Pekerjaan Excavation Earth, Waller Beam, dan

Ground Anchor Pada Proyek Parahyangan Residence.

Irvan, Lovian., & Fadli. (2014). Perencanaan Metode Pelaksanaan dan

Manajemen Waktu Dengan Network Planning Pada Proyek Noor Hotel

Bandung.

Hamzah., & Reza Fazri Nasrulloh. (2014). Metoda Pelaksanaan, Perhitungan

Rencana Anggaran Pelaksanaan dan Jadwal Pekerjaan Pembangunan

Basement Gedung Jakarta Box Tower.

Rochmanhadi, (1992) Alat – Alat Berat dan Penggunannya. Jakarta: YBPPU

Ervianto, Wulfram I (2005) Manajemen Proyek Konstruksi (Edisi Revisi).

Yogyakarta: Andi

Husen, Abram (2010) Manajemen Proyek. Yogyakarta: Andi

Soeharto, Iman (1999). Manajemen Proyek, Jilid 1, Edisi Kedua, Jakarta: Erlangga

Soeharto, Iman (2001). Manajemen Proyek, Jilid 2, Edisi Kedua, Jakarta: Erlangga

Page 20: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

RIWAYAT HIDUP PENULIS

Data Pribadi

Nama : Arcy Pramadhany Gunawan

Tempat, tanggal lahir : Bandung, 29 Desember 1996

Jenis Kelamin : Laki-Laki

Alamat : Jalan Babakan Baru no 20

RT05/RW11, Kec. Cibeunying Kidul, Kel. Sukapada, Kota Bandung, Jawa Barat, Indonesia, 40125

Agama : Islam

No. Handphone : 083822135477

Email : [email protected]

Latar Belakang Pendidikan

Pengalaman Organisasi

Pengalaman Kerja

✓ Praktik Kerja Lapangan sebagai Quality Assurance di PT. Promaco Cipta Bersama. Proyek Apartemen Emerald Bintaro, Tangerang Selatan

Institusi Tahun Keterangan

Politeknik Negeri Bandung 2015 – 2018 D-III Teknik Sipil (Program

Studi Teknik Konstruksi Gedung)

SMA Negeri 1 Bandung 2012 – 2015 Ilmu Pengetahuan Alam (IPA) SMP Negeri 27 Bandung 2009 – 2012 -

SD Negeri Cikutra 5 2003 – 2009 -

Tahun Organisasi Jabatan

2016 – 2017 Himpunan Mahasiswa Jurusan Teknik Sipil Politeknik Negeri

Bandung (HIMAS Polban) Anggota Departemen Agama

Page 21: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

Training dan Seminar

✓ Peserta Program Pengenalan Kehidupan Kampus di Politeknik Negeri Bandung (2015) ✓ Peserta Learning Re-Creation di Politeknik Negeri Bandung (2015) ✓ Pelatihan Emotional Spiritual Quotient (ESQ) Leadership di Politeknik Negeri Bandung

(2015) ✓ Pelatihan Bela Negara dan Kedisiplinan Mahasiswa Politeknik Negeri Bandung di Pusat

Pendidikan Perhubungan (PUSDIKHUB) Kodiklat TNI Angkatan Darat (2015) ✓ Pelatihan Jarak Jauh Bidang Konstruksi Setara 52 Jam Pelajaran (JPL) Pada Jabatan Kerja

Ahli Muda K-3 Konstruksi (2018) ✓ Pelatihan Jarak Jauh Bidang Konstruksi Setara 52 Jam Pelajaran (JPL) Pada Jabatan Kerja

Quantity Surveyor (2018) ✓ Pelatihan Jarak Jauh Bidang Konstruksi Setara 52 Jam Pelajaran (JPL) Pada Jabatan Kerja

Manajer Lapangan Pelaksanaan Konstruksi Bangunan Gedung (2018)

Keterampilan Komputerisasi dan Software

AutoCad = Baik Microsoft Word = Baik

SAP 2000 = Baik Microsoft Excel = Baik

Geoslope = Cukup Microsoft Power Point = Baik

Microsoft Project = Baik

Microsoft Visio = Baik

Tugas Akhir

“Metode pelaksanaan, Rencana Anggaran Pelaksanaan, dan Penjadwalan Pekerjaan Struktur Bawah pada Proyek Swarnabumi Residence Bandung”

Riwayat Hidup ini disusun dengan data yang valid dan digunakan untuk semua pihak yang membutuhkan.

Hormat Saya,

Arcy Pramadhany Gunawan

Page 22: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

RIWAYAT HIDUP PENULIS

Data Pribadi

Nama : Rivan Dwicahyo Saputro

Tempat, tanggal lahir : Cimahi, 11 Juni 1997

Jenis Kelamin : Laki-Laki

Alamat : Perum. Cilame Permai Jl. Protokol No. 9

RT01/RW19, Kec. Ngamprah

Kab. Bandung Barat, Jawa Barat, Indonesia

Agama : Islam

No. Handphone : +62819 1000 1279

Email : [email protected]

Latar Belakang Pendidikan

Pengalaman Organisasi

Pengalaman Kerja

✓ Praktik Kerja Lapangan sebagai Quality Control di PT. Adhi Karya (Persero) Tbk. Departemen Gedung pada Proyek pembangunan Ruko, Mall, dan Apartemen Eastern Green Lot. 1 Bekasi Timur.

Institusi Tahun Keterangan

Politeknik Negeri Bandung 2015 – 2018 D-III Teknik Sipil (Program

Studi Teknik Konstruksi Gedung)

SMA Negeri 3 Cimahi 2012 – 2015 Ilmu Pengetahuan Alam (IPA) SMP Negeri 1 Padalarang 2009 – 2012 -

SD Negeri Margajaya 2003 – 2009 -

Tahun Organisasi Jabatan

2016 – 2017 Himpunan Mahasiswa Jurusan Teknik Sipil Politeknik Negeri

Bandung (HIMAS Polban)

Anggota Departemen INFOKOM (Informasi,

Komunikasi, dan Dokumentasi)

Page 23: METODE PELAKSANAAN, PERHITUNGAN RENCANA ANGGARAN

 

 

 

 

 

 

 

 

 

 

 

 

Training dan Seminar

✓ Peserta Program Pengenalan Kehidupan Kampus di Politeknik Negeri Bandung (2015) ✓ Peserta Learning Re-Creation di Politeknik Negeri Bandung (2015) ✓ Pelatihan Emotional Spiritual Quotient (ESQ) Leadership di Politeknik Negeri Bandung

(2015) ✓ Pelatihan Bela Negara dan Kedisiplinan Mahasiswa Politeknik Negeri Bandung di Pusat

Pendidikan Perhubungan (PUSDIKHUB) Kodiklat TNI Angkatan Darat (2015) ✓ Seminar Penerapan Teknologi Konstruksi “Penerapan Teknologi Konstruksi Ramah

Lingkungan (2018) ✓ Pelatihan Jarak Jauh Bidang Konstruksi Setara 52 Jam Pelajaran (JPL) Pada Jabatan Kerja

Ahli Muda K-3 Konstruksi (2018) ✓ Pelatihan Jarak Jauh Bidang Konstruksi Setara 52 Jam Pelajaran (JPL) Pada Jabatan Kerja

Quantity Surveyor (2018) ✓ Pelatihan Jarak Jauh Bidang Konstruksi Setara 52 Jam Pelajaran (JPL) Pada Jabatan Kerja

Manajer Lapangan Pelaksanaan Konstruksi Bangunan Gedung (2018)

Keterampilan Komputerisasi dan Software

AutoCad = Baik Microsoft Word = Baik

SAP 2000 = Baik Microsoft Excel = Baik

Corel Draw = Baik Microsoft Power Point = Baik

Adobe Photoshop = Baik Microsoft Project = Baik

Geoslope = Cukup Microsoft Visio = Baik

Tugas Akhir

“Metode pelaksanaan, Rencana Anggaran Pelaksanaan, dan Penjadwalan Pekerjaan Struktur Bawah pada Proyek Swarnabumi Residence Bandung”

Riwayat Hidup ini disusun dengan data yang valid dan digunakan untuk semua pihak yang membutuhkan.

Hormat Saya,

Rivan Dwicahyo Saputro