Tonights Agenda
CUP/Administrative Use Permits
Design Review for commercial buildings
Design Review for multi-family buildings
7/28/2019 Meeting 2 Presentation Slides
3/42
Administrative Use Permit Process
Discretionary permit for uses that are more
routine and attract few speakers
Mailed notice 500 feet offuture decision
Sign posted on-site
Neighbors can request notice of decision
for possible appeal Identical findings as for CUPs
7/28/2019 Meeting 2 Presentation Slides
4/42
CUP/AUP
Preserves public hearing for more
controversial uses
Director can kick up AUPs to a public
hearing for Code violations or ambiguous
permit history
Banquet halls and nightclubs always
require CUP, regardless of alcohol
License required in certain DSP districts
7/28/2019 Meeting 2 Presentation Slides
5/42
Design Review
7/28/2019 Meeting 2 Presentation Slides
6/42
Code Structure of Design
Review
Applicability Authority
Standards
Actions of the Board
7/28/2019 Meeting 2 Presentation Slides
7/42
Applicability
Applicable to new construction and most
building alterations
Not applicable to creative signs; detached
garages
Design review = DRB, Council, or HPC
Staff reviewed exemption Ability to kick-up from staff exemption to
Board review
7/28/2019 Meeting 2 Presentation Slides
8/42
Authority
Most zones DRB or staff reviewed
exemptions
Historic resources and historic districts
HPC
DSP and former redevelopment areas
City Council
Staff administrative review already exists
in DSP and redevelopment areas
7/28/2019 Meeting 2 Presentation Slides
9/42
How DRB works
Applications received and posted on-line
Sign posted on-site
Notice of hearing mailed to occupants andowners within 500, plus all HOAs
Staff report covers site planning, mass and
scale, and architectural design and details Consultant suggested streamlining report
to pare down Code analysis and repetition
7/28/2019 Meeting 2 Presentation Slides
10/42
How Admin Review would work
Applications posted on-line
Sign posted on-site
Notice of future decision mailed to abuttingproperties, plus all HOAs
Staff decision letter from Design Studio
Review required submittal materials
7/28/2019 Meeting 2 Presentation Slides
11/42
GRA Faade Grant Program
staff-level design review
7/28/2019 Meeting 2 Presentation Slides
12/42
462 W. Colorado
7/28/2019 Meeting 2 Presentation Slides
13/42
6912 San Fernando
7/28/2019 Meeting 2 Presentation Slides
14/42
6640-44 San Fernando
7/28/2019 Meeting 2 Presentation Slides
15/42
6635 San Fernando
7/28/2019 Meeting 2 Presentation Slides
16/42
700 Allen
7/28/2019 Meeting 2 Presentation Slides
17/42
722 Thompson
7/28/2019 Meeting 2 Presentation Slides
18/42
211 N. Brand
7/28/2019 Meeting 2 Presentation Slides
19/42
318 N. Brand
7/28/2019 Meeting 2 Presentation Slides
20/42
Redevelopment Areas
staff-level design review
7/28/2019 Meeting 2 Presentation Slides
21/42
7/28/2019 Meeting 2 Presentation Slides
22/42
431 W. Los Feliz
7/28/2019 Meeting 2 Presentation Slides
23/42
200 S. Louise
7/28/2019 Meeting 2 Presentation Slides
24/42
645 W. Broadway
7/28/2019 Meeting 2 Presentation Slides
25/42
DRB Cases
Commercial
7/28/2019 Meeting 2 Presentation Slides
26/42
2448 Honolulu Ave.
Type of Work: New Construction
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
27/42
350 N Glendale Ave.
Type of Work: New Construction
No. of Speakers: 1
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
28/42
1439 East Colorado Street
Type of Work: Addition and Remodeling
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
29/42
1008 North Pacific Avenue (Pacific Food Mart)
Type of Work: Addition
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
30/42
1133 S. Central Avenue
Type of Work: Faade Remodeling
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
31/42
1200 East Colorado Street
Type of Work: Faade remodeling
No. of Speakers: 2/1
Board Decision: Stricter than staff
Very difficult preliminary review
Type of project staff kicks up to DRB
7/28/2019 Meeting 2 Presentation Slides
32/42
DRB Cases
Multi-Family Residential
7/28/2019 Meeting 2 Presentation Slides
33/42
460 W California St.
Type of Work: New Construction
No. of Speakers:1
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
34/42
1232 N Pacific Ave.
Type of Work: New Construction
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
35/42
624 Geneva Street
Type of Work: New Construction
No. of Speakers: 1
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
36/42
1116 E Harvard St.
Type of Work: Addition, Remodel
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
37/42
214 E Garfield Ave.
Type of Work: Addition
No. of Speakers: 0
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
38/42
500 East Lexington Drive
Type of Work: Faade Remodeling
No. of Speakers:3
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
39/42
1241 Boynton St.
Type of Work: Faade Remodeling
No. of Speakers: 1
Board Decision: Same as staff
7/28/2019 Meeting 2 Presentation Slides
40/42
1181 Spazier Ave.
Type of Work: Addition
No. of Speakers: 1
Board Decision: Stricter than staff
Staff initially recommended
approval of a simpler design; Board
added conditions to make it more
consistent with look of existing
house
7/28/2019 Meeting 2 Presentation Slides
41/42
906 E Harvard St.
Type of Work: Addition
No. ofSpeakers: 0
Board Decision: Stricter than staff
DRB decision similar to staffs, but
board asked for additional refinement ofwindows and cladding materials
7/28/2019 Meeting 2 Presentation Slides
42/42
1062 Allen Ave.
Type of Work: New Construction
No. of Speakers:0
Board Decision: Stricter than staff
DRB asked for changes to roof
forms, window pattern, and entry