    Tonights Agenda

    CUP/Administrative Use Permits

    Design Review for commercial buildings

    Design Review for multi-family buildings

  • 7/28/2019 Meeting 2 Presentation Slides

    3/42

    Administrative Use Permit Process

    Discretionary permit for uses that are more

    routine and attract few speakers

    Mailed notice 500 feet offuture decision

    Sign posted on-site

    Neighbors can request notice of decision

    for possible appeal Identical findings as for CUPs

  • 7/28/2019 Meeting 2 Presentation Slides

    4/42

    CUP/AUP

    Preserves public hearing for more

    controversial uses

    Director can kick up AUPs to a public

    hearing for Code violations or ambiguous

    permit history

    Banquet halls and nightclubs always

    require CUP, regardless of alcohol

    License required in certain DSP districts

  • 7/28/2019 Meeting 2 Presentation Slides

    5/42

    Design Review

  • 7/28/2019 Meeting 2 Presentation Slides

    6/42

    Code Structure of Design

    Review

    Applicability Authority

    Standards

    Actions of the Board

  • 7/28/2019 Meeting 2 Presentation Slides

    7/42

    Applicability

    Applicable to new construction and most

    building alterations

    Not applicable to creative signs; detached

    garages

    Design review = DRB, Council, or HPC

    Staff reviewed exemption Ability to kick-up from staff exemption to

    Board review

  • 7/28/2019 Meeting 2 Presentation Slides

    8/42

    Authority

    Most zones DRB or staff reviewed

    exemptions

    Historic resources and historic districts

    HPC

    DSP and former redevelopment areas

    City Council

    Staff administrative review already exists

    in DSP and redevelopment areas

  • 7/28/2019 Meeting 2 Presentation Slides

    9/42

    How DRB works

    Applications received and posted on-line

    Sign posted on-site

    Notice of hearing mailed to occupants andowners within 500, plus all HOAs

    Staff report covers site planning, mass and

    scale, and architectural design and details Consultant suggested streamlining report

    to pare down Code analysis and repetition

  • 7/28/2019 Meeting 2 Presentation Slides

    10/42

    How Admin Review would work

    Applications posted on-line

    Sign posted on-site

    Notice of future decision mailed to abuttingproperties, plus all HOAs

    Staff decision letter from Design Studio

    Review required submittal materials

  • 7/28/2019 Meeting 2 Presentation Slides

    11/42

    GRA Faade Grant Program

    staff-level design review

  • 7/28/2019 Meeting 2 Presentation Slides

    12/42

    462 W. Colorado

  • 7/28/2019 Meeting 2 Presentation Slides

    13/42

    6912 San Fernando

  • 7/28/2019 Meeting 2 Presentation Slides

    14/42

    6640-44 San Fernando

  • 7/28/2019 Meeting 2 Presentation Slides

    15/42

    6635 San Fernando

  • 7/28/2019 Meeting 2 Presentation Slides

    16/42

    700 Allen

  • 7/28/2019 Meeting 2 Presentation Slides

    17/42

    722 Thompson

  • 7/28/2019 Meeting 2 Presentation Slides

    18/42

    211 N. Brand

  • 7/28/2019 Meeting 2 Presentation Slides

    19/42

    318 N. Brand

  • 7/28/2019 Meeting 2 Presentation Slides

    20/42

    Redevelopment Areas

    staff-level design review

  • 7/28/2019 Meeting 2 Presentation Slides

    21/42

  • 7/28/2019 Meeting 2 Presentation Slides

    22/42

    431 W. Los Feliz

  • 7/28/2019 Meeting 2 Presentation Slides

    23/42

    200 S. Louise

  • 7/28/2019 Meeting 2 Presentation Slides

    24/42

    645 W. Broadway

  • 7/28/2019 Meeting 2 Presentation Slides

    25/42

    DRB Cases

    Commercial

  • 7/28/2019 Meeting 2 Presentation Slides

    26/42

    2448 Honolulu Ave.

    Type of Work: New Construction

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    27/42

    350 N Glendale Ave.

    Type of Work: New Construction

    No. of Speakers: 1

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    28/42

    1439 East Colorado Street

    Type of Work: Addition and Remodeling

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    29/42

    1008 North Pacific Avenue (Pacific Food Mart)

    Type of Work: Addition

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    30/42

    1133 S. Central Avenue

    Type of Work: Faade Remodeling

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    31/42

    1200 East Colorado Street

    Type of Work: Faade remodeling

    No. of Speakers: 2/1

    Board Decision: Stricter than staff

    Very difficult preliminary review

    Type of project staff kicks up to DRB

  • 7/28/2019 Meeting 2 Presentation Slides

    32/42

    DRB Cases

    Multi-Family Residential

  • 7/28/2019 Meeting 2 Presentation Slides

    33/42

    460 W California St.

    Type of Work: New Construction

    No. of Speakers:1

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    34/42

    1232 N Pacific Ave.

    Type of Work: New Construction

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    35/42

    624 Geneva Street

    Type of Work: New Construction

    No. of Speakers: 1

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    36/42

    1116 E Harvard St.

    Type of Work: Addition, Remodel

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    37/42

    214 E Garfield Ave.

    Type of Work: Addition

    No. of Speakers: 0

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    38/42

    500 East Lexington Drive

    Type of Work: Faade Remodeling

    No. of Speakers:3

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    39/42

    1241 Boynton St.

    Type of Work: Faade Remodeling

    No. of Speakers: 1

    Board Decision: Same as staff

  • 7/28/2019 Meeting 2 Presentation Slides

    40/42

    1181 Spazier Ave.

    Type of Work: Addition

    No. of Speakers: 1

    Board Decision: Stricter than staff

    Staff initially recommended

    approval of a simpler design; Board

    added conditions to make it more

    consistent with look of existing

    house

  • 7/28/2019 Meeting 2 Presentation Slides

    41/42

    906 E Harvard St.

    Type of Work: Addition

    No. ofSpeakers: 0

    Board Decision: Stricter than staff

    DRB decision similar to staffs, but

    board asked for additional refinement ofwindows and cladding materials

  • 7/28/2019 Meeting 2 Presentation Slides

    42/42

    1062 Allen Ave.

    Type of Work: New Construction

    No. of Speakers:0

    Board Decision: Stricter than staff

    DRB asked for changes to roof

    forms, window pattern, and entry