Upload
glendalecdd
View
224
Download
0
Embed Size (px)
Citation preview
7/27/2019 Meeting #5 Presentation Slides
1/37
7/27/2019 Meeting #5 Presentation Slides
2/37
Tonights Agenda
Miscellaneous Items
Hillside Conditional Use Permits
Final Wrap-up
7/27/2019 Meeting #5 Presentation Slides
3/37
Miscellaneous Items
Eliminate Environmental and Planning
Board (EPB)
New Condos staff review for 6 units or
less
7/27/2019 Meeting #5 Presentation Slides
4/37
Miscellaneous Item No. 1
Parking Reduction/Parking Exception
Only in DSP/San Fernando
Redevelopment area
Now Director can approve in DSP whenthere is design review; otherwise PHO
Switch to administrative review, no hearing- with public notice for PUPs
7/27/2019 Meeting #5 Presentation Slides
5/37
Miscellaneous Item No. 2
Non-conforming buildings and structures
Non-conforming aspect can be rebuilt only
for safety/maintenance
Allow minor changes to location and size(not increase in floor area)
Typical example in staircase, patiostructures or garages
7/27/2019 Meeting #5 Presentation Slides
6/37
Miscellaneous Item No. 3
20% Administrative Exception
38 Standards Variances 2011-2013Six cases eligible for 20% AE
Three cases partially reviewed under 20%
AE
7/27/2019 Meeting #5 Presentation Slides
7/37
Hillside Conditional Use Permits
7/27/2019 Meeting #5 Presentation Slides
8/37
Hillside CUPs
Current Process
CUP for
New
Construction
Less than 80 lot width
Slope exceeds 50%
Move more than 1,500 c.y. of earth
7/27/2019 Meeting #5 Presentation Slides
9/37
Issues with Current Process
First Design Review by PHO, not DRB
Appeals to PC/CC before DRB
DRB feels decision has been made
Public believes done deal before DRB hearing
Instituted when Design Review was just starting
7/27/2019 Meeting #5 Presentation Slides
10/37
Hearing and Notice
DRB vs. CUP
DRB CUP
Radius 500 500
Mail-out 10 days 10 days
Site posting 3 X 4 sign 3 X 4 sign
Public hearing 5 p.m. 9:30 a.m.
7/27/2019 Meeting #5 Presentation Slides
11/37
Comprehensive Design
Guidelines
Site Planning Mass and Scale
Design and Detailing
7/27/2019 Meeting #5 Presentation Slides
12/37
Site Planning
Building Location
Solar Design
Yards and Usable Open Space Retaining Walls
Garage Location and Driveways Landscape Design
Walls and Fences
7/27/2019 Meeting #5 Presentation Slides
13/37
902 STEWARTON
WAY
PCUP 2010-007
Width
No. of Speakers: 181-PDR-2010-053-A
7/27/2019 Meeting #5 Presentation Slides
14/37
902 STEWARTON WAY
CUP
SUBMITTAL
DRB
SUBMITTAL
7/27/2019 Meeting #5 Presentation Slides
15/37
902 STEWARTON WAY
CUP
SUBMITTAL
DRB
SUBMITTAL
DRB
7/27/2019 Meeting #5 Presentation Slides
16/37
902 STEWARTON WAYDRB
SUBMITTAL
DRB
7/27/2019 Meeting #5 Presentation Slides
17/37
902 STEWARTON WAYDRB
SUBMITTAL
7/27/2019 Meeting #5 Presentation Slides
18/37
1912 SUSSEX
COURT
PCUP 2008-045
Width and Slope
No. of Speakers: 3
PDR-2011-011-A-1
7/27/2019 Meeting #5 Presentation Slides
19/37
1912 SUSSEX COURT
CUP
DRB
7/27/2019 Meeting #5 Presentation Slides
20/37
1912 SUSSEX COURT
CUP
DRB
1912 SUSSEX COURT
7/27/2019 Meeting #5 Presentation Slides
21/37
1912 SUSSEX COURT
DRB
CUP
DRB
7/27/2019 Meeting #5 Presentation Slides
22/37
1912 SUSSEX COURTDRB
SUBMITTAL
7/27/2019 Meeting #5 Presentation Slides
23/37
PCUP 2010-002
Width
No. of Speakers: 91-PDR-2010-012-A
1410 COLINA
DRIVE
7/27/2019 Meeting #5 Presentation Slides
24/37
1410 COLINA DRIVE
CUP
DRB
7/27/2019 Meeting #5 Presentation Slides
25/37
1410 COLINA DRIVE
CUP
DRB
CUP
7/27/2019 Meeting #5 Presentation Slides
26/37
1410 COLINA DRIVECUP
SUBMITTAL
1410 COLINA DRIVEDRB
7/27/2019 Meeting #5 Presentation Slides
27/37
1410 COLINA DRIVEDRB
SUBMITTAL
7/27/2019 Meeting #5 Presentation Slides
28/37
PCUP 2010-020
Slope and Grading
No. of Speakers: 7
PDR-2009-011-P1-1
3431 LINDA
VISTA DRIVE
7/27/2019 Meeting #5 Presentation Slides
29/37
3431 LINDA VISTA DRIVE
7/27/2019 Meeting #5 Presentation Slides
30/37
3431 LINDA VISTA DRIVE
7/27/2019 Meeting #5 Presentation Slides
31/37
Proposed New Process
Design Review Board of all new s.f.
homes
Emphasis on site planning
Comprehensive Design Guidelines
Expand DRB review authority
7/27/2019 Meeting #5 Presentation Slides
32/37
Summary
Some uses with CUP now AUP
ZUC to BRL with annual renewal
Design Review
7/27/2019 Meeting #5 Presentation Slides
33/37
CommercialReview and Noticing Thresholds
>10,000 s.f.
DRB review 10 day notice of hearing
(500 radius + all HOAs)
on-site posting
7/27/2019 Meeting #5 Presentation Slides
34/37
Multi-FamilyReview and Noticing Thresholds
7 or more
units
DRB review 10 day notice of hearing
(500 radius + all HOAs)
on-site posting
6 or fewer
units
administrative review (staff)
10 day notice of future decision
(500 raduis + all HOAs)
7/27/2019 Meeting #5 Presentation Slides
35/37
Single Family
Review and Noticing Thresholds
NewConstruction
DRB review
10 day notice of hearing(500 radius + all HOAs)
on-site posting
Additions
and
Remodels
administrative review (staff) 10 day notice of future decision
(500 radius + all HOAs)
on-site posting
stor oles still re uired
7/27/2019 Meeting #5 Presentation Slides
36/37
Next Steps
Planning Commission review
City Council review and adoption
Reassessment in 12 months
7/27/2019 Meeting #5 Presentation Slides
37/37