! ( ! l ! ( ! ( ¾ À 305 S2-S08 S2-S09 75RT Tower 145 E-611258, N-5496792 S2-Aqua-200 S2-Aqua-109 S2-Aqua-110 P A R KE R D RA I N MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE 6 9 TWP007 RGE01 E1M TWP008 RGE01 E1M TWP007 RGE01 W1M TWP008 RGE01 W1M NW NW NE SW NE SE SE SW NE NW NE SE NW NW SW NE NW NE SW SE SE SW SE SW 1 19 24 25 30 31 36 6 Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: July 23, 2014 Version: Draft ± 1:10,000 0 250 500 125 Metres Map 315 Bipole III Transmission Project Construction Environmental Protection Plan Construction Section S2 Environmentally Sensitive Site Locations ESS Features Water ! ( Water Crossing Water Groundwater Points of Access* ! ( Proposed Access Point ! ( Major Stream Crossing Abandoned Rail Crossing Rail Crossing " ) Transmission Line Crossing Project Infrastructure Proposed Access Route Land Base 66 m Right of Way BPIII Final Preferred Route Angle Tower Locations # # *Labels correspond to BPIII Access Management Database Mining ! ! Transmission Line Highway Major Road Local Road Railway (Operational) Railway (Discontinued) First Nation Provincial Forest Draft: For Discussion Purposes Only Proposed Converter Station Ground Electrode Line Township/Range

MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

!

!

!

!

!

!

!

!

!(

!l

!l

!(

!(

!(

¾À305

S2-S

08

S2-S09 75RT

Tower 145E-611258, N-5496792

S2-Aqua-200

S2-A

qua-1

08

S2-Aqua-109

S2-Aqua-110

P A R K E R D R A I N

MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE

69

TWP007RGE01

E1M

TWP008RGE01

E1M

TWP007RGE01W1MTWP008

RGE01W1M

NWNW

NE

SW

NESE

SE

SW

NE

NW

NESE

NW

NW SW

NE

NW

NE

SW

SE

SE

SW

SE

SW

1

19

2425

3031

36

6

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 315

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 2: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S2-S09 S2-Aqua-109 Parker Drain 611290 5495282 14N N/A 4m Low Marginal

S2-S09 S2-Aqua-110

Unnamed Drain 611293 5495151 14N N/A N/A None None

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream

Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S2-S08 S2-Aqua-200 Saline artesian areas Site: 5 to 6 E-605565 N-5496688

E-611257 N-5496792 14N 5693m

S2-S09 S2-Aqua-200 Saline artesian areas Site: 9 to 10 E-611257 N-5496792

E-611391 N-5490218 14N 6574m

Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:

• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.

MAP NUMBER: 315

Page 3: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

!l

!l

!(

!(

¾À305

S2-S

10

S2-S0975RT

Tower 146E-611392, N-5490219

S2-Aqua-200

S2-Aqua-111

S2-Aqua-112

G A R B E R D R A I N

MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE

1011

TWP007RGE01

E1M

TWP007RGE01W1M

NW

SE

NW

NE

SWSW

NE

SE

NW

NE

SW

SE

NW

SESE SE

SW

NE

SW

NE

NW

NW

SW

NE

1213

18

19

24

7

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 316

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 4: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS

Name Easting Northing UTM Zone

Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S2-S10 S2-Aqua-111

Garber Drain 611387 5490553 14N N/A 7m Low Marginal

S2-S10 S2-Aqua-112

Garber Drain 611558 5490222 14N N/A 4m Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream

Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S2-S09 S2-Aqua-200 Saline artesian areas Site: 9 to 10 E-611257 N-5496792

E-611391 N-5490218 14N 6574m

S2-S10 S2-Aqua-200 Saline artesian areas Site: 11 to 12 E-611391 N-5490218

E-619944 N-5490397 14N 8554m

Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:

• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.

MAP NUMBER: 316

Page 5: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

")

! l

! l

!(

Y51L

S2-S10

S2-S1021

S2-Aqua-200

S2-Aqua-113

MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE

10

151617

18

3456

7

89

TWP007RGE01

E1M

NWNW

NW

SW

NW

SW

NE

NE

SWSE

SE

SWSW

NE

NW NE

SW SE

NW

SE

NE

SE

SE

NE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 317

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesWater

Groundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 6: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S2-S10 S2-Aqua-200 Saline artesian areas Site: 11 to 12 E-611391 N-5490218

E-619944 N-5490397 14N 8554m

Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:

• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.

MAP NUMBER: 317

Page 7: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

# !(!(

!(

!(

¾À330

S2-S10S2-S1016 76RT

S2-Aqua-200

S2-Aqua-114 S2-Aqua-115S2-Aqua-113

MA

NN

ESS

DR

AIN

R OB E R T S

D R A I N

12

TWP007RGE01

E1M

NW

SE

NW NE

SW

SE

SW

SW

NE

SE

NE

SE

NW

SW

SE

SE

SW

NE

SW

NE

NW

NW NWNE1

10

11

12

131415

23

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 318

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 8: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S2-S10 S2-Aqua-113

Unnamed Drain 616907 5490335 14N N/A 3m Low Marginal

S2-S10 S2-Aqua-114

Manness Drain 618051 5490359 14N N/A 7m Low Marginal

S2-S10 S2-Aqua-115

Roberts Drain 620518 5490417 14N N/A 7m Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream

Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S2-S10 S2-Aqua-200 Saline artesian areas Site: 11 to 12 E-611391 N-5490218

E-619944 N-5490397 14N 8554m

Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:

• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.

MAP NUMBER: 318

Page 9: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

! l

! l

!(

!(

!(S2-S10

S2-Aqua-115

S2-Aqua-116 S2-Aqua-117

R OB E R T S

D R A I N

DO

MA

IND

RA

I N

SW SE

NW

NW

SW

NE

SE

NE

SE

SE

NE

NE

SE

NW

SW

NE

SE

NW

SW

NE1

12

131718

56

78

TWP007RGE01

E1M

TWP007RGE02

E1M

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 319

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 10: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS

Name Easting Northing UTM Zone

Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S2-S11 S2-Aqua-116

Domain Drain 623839 5490470 14N N/A 2m Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 319

Page 11: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

! l

! l

! l

! l

! l

!(

!(

!(

!(

S2-S11 S2-S12S2-S13S2-S10

Tower 147E-626224, N-5490538

Tower 148E-626709, N-5490589

Tower 149E-627627, N-5490613

S2-Aqua-118

S2-Aqua-119S2-Aqua-117

S2-Hert-100

L AP

OI N

T EC

OU

L E E

TWP007RGE02

E1M

10

141516

45

8

9

RL

557

555

549

551

545

547

533

535

553

543

541

539

537

SE

NW

SW SE

SW

NE

NENW

SE

NE

NE

SW

SW

NE

SE

NW

SW

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 320

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 12: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

S2-S14 S2-Hert-100 Old creek bed east of current drain 628452 5490429 14N Potential Effects: Potential disturbance to heritage resources. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S2-S14 S2-Aqua-117

Unnamed Drain 624682 5490494 14N N/A N/A None None

S2-S14 S2-Aqua-118

Unnamed Drain 626330 5490549 14N N/A N/A Low Marginal

S2-S14 S2-Aqua-119

La Pointe Coulee 628394 5490443 14N N/A 4m Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream

Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction

MAP NUMBER: 320

Page 13: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

#

!(

!(

!(

! l

! l

! l

! l

! l

! l

!(

!(

!(

!(!(

!(!(

Pembin

a Trail

¾À246

¾À200

[\75

S2-S14

S2-S13

S2-S15

S2-S15

17

77RT

78RT

Tower 150E-629850, N-5490069

Tower 151E-630164, N-5489742

S2-Aqua-201

S2-Wild-100

S2-Aqua-119

S2-Hert-100

S2-Aqua-120

S2-Hert-102

S2-Hert-103

S2-Hert-101

S2-Hert-300

R E DR I V E R

L AP O

I NT E

CO

UL E E

13

L1

L2

535

537

553

539

557

555

547

549

551

541

545

543

548

555

550

549

551

545

547

552

533

534

546

542

535

540

538

544

553

543

536

541

556

539

558

554

537

560

RL

RL

RL

TWP007RGE02

E1M

TWP007RGE03

E1M

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 321

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section S2Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological!( Cultural or Historic

Water!( Water Crossing

WildlifeBirds and Habitat

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial ForestDraft: For Discussion Purposes Only

ProposedConverter Station

Ground Electrode Line

Township/Range

Page 14: MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE · • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads

Version: DRAFT

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

S2-S15 S2-Hert-101 Potential Archaeological Site - Red River west shore 630003 5489915 14N

S2-S15 S2-Hert-102 Registered Archaeological Site 630019 5489897 14N

S2-S15 S2-Hert-103 Potential Archaeological Site - Red River east shore 630119 5489790 14N Potential Effects: Potential disturbance to heritage resources. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Historic

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

S2-S15 S2-Hert-300 Heritage River (Red River) 630075 5489837 14N Potential Effects: Potential aesthetic concerns with presence to canoe route traffic; disruption from operational activities Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS

Name Easting Northing UTM Zone

Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

S2-S15 S2-Aqua-120

Red River 630071 5489841 14N 50m N/A High Important

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams;

Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from September 15 to June 30 ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S2-S15 S2-Wild-100 Red River crossing Site: L1 to L2 E-630036 N-5489875

E-630115 N-5489792 14N 113m

Potential Effects:

Higher risk of wire collision; risk of wire collision is localized to the right-of-way. Specific Mitigation:

• Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

S2-S15 S2-Aqua-201 Saline artesian areas Site: 13 to 14 E-632182 N-5489241

E-633123 N-5489008 14N 970m

Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:

• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.

MAP NUMBER: 321