LAPORAN SEMENTARA ASESMEN KONDISI TUBE BOILER UNIT 2 PLTU PAITON PT PJB UP PAITON PT PLN (PERSERO) PUSLITBANG KETENAGALISTRIKAN BIDANG PENELITIAN SISTEM PEMBANGKITAN DAN ENERGI PRIMER JL. DUREN TIGA JAKARTA 12760. PO BOX 6701/JKSRB, Jakarta 1267 Telepon : 7973774, 7980190, 7982035 (Hunting), Fax. (021) 7991762, 7975414

Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

  • Upload
    rizal

  • View
    251

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LAPORAN SEMENTARA

ASESMEN KONDISI TUBE BOILER

UNIT 2 PLTU PAITON

PT PJB UP PAITON

PT PLN (PERSERO) PUSLITBANG KETENAGALISTRIKAN BIDANG PENELITIAN SISTEM PEMBANGKITAN DAN ENERGI PRIMER JL. DUREN TIGA JAKARTA 12760. PO BOX 6701/JKSRB, Jakarta 1267 Telepon : 7973774, 7980190, 7982035 (Hunting), Fax. (021) 7991762, 7975414

Page 2: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

2

Dengan hormat ,

Bersama ini kami sampaikan laporan sementara hasil assesment PLTU Paiton unit 2.

Berdasarkan surat penugasan dari Direktur Operasi Jawa Bali PT. PLN (Persero) Pusat No.

00070/121/DITOPJB/2011 tanggal 10 Januari 2011, dan notulen rapat tanggal 26

September 2012 di PT PJB UP Paiton, PLN Puslitbang Ketenagalistrikan telah melakukan

pekerjaan pengujian/pengukuran tube boiler PLTU Paiton Unit 2 dengan metode Uji Tak

Merusak/Non Destructive Test (NDT) dan uji Destructive Test (DT) di Laboratorium

Metalurgi Puslitbang Jakarta.

1. MAKSUD DAN TUJUAN

Maksud dan tujuan pekerjaan asesmen tube boiler PLTU Paiton Unit 2 adalah untuk

menilai kondisi (condition assessment) tube boiler saat ini dan memberikan rekomendasi

pada komponen-komponen yang perlu perbaikan/penggantian segera.

2. DATA TEKNIK

Boiler PLTU Paiton Unit 1 dengan spesifikasi sebagai berikut :

Type : Single Drum

Control Circulation

Radiant Reheat

Balance Draft

Steam Pressure : 185 kg/cm2 max = 2719,5 psig

179 kg/cm2 SH Outlet = 2631 psig

43,2 kg/cm2 RH Outlet = 636 psig

Steam Temperature : 1005 0F SH Out

1005 0F RH Out

Probolinggo, Nopember 2012

Kepada :

Yth. Direktur Operasi Jawa Bali

PLN (Persero) PUSAT

Jakarta

Dari : Tim PLN Puslitbang

Hal : Laporan Sementara

Asesmen Kondisi Tube Boiler

PLTU Paiton Unit 2

Page 3: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

3

SH Type : L.T. Horizontal & Pendent Panels & Platen Finishing

(3 set)

RH Type : Wall, Pendant & Platen Finishing

Furnance : Control Circulation Radiant Reheat

Econimizer :

Boiler MCR : 29320100 lb/m.at 2631 psig

: F.W inlet 497 0F

Furnance Height : El 162100

Furnance Depth : 13619.16

Furnance Widht : 15544,8

Grade El : 100000

Tahun operari : 1992

3. RUANG LINGKUP PEKERJAAN

Adapun ruang lingkup dalam pekerjaan pengukuran ketebalan/thickness tube Boiler PLTU

Paiton Unit 2 sesuai notulen meeting rapat koordinasi RLA Test SE #2, tanggal 26

September 2012 adalah sebagai berikut :

Pengukuran Ketebalan Tube ( Thickness ) :

Area sootblower Economizer E-7 (tube) : 363 titik pengukuran

Area sootblower Economizer E-7 (wall) : 456 titik pengukuran

Area sootblower Economizer E-8 (tube) : 726 titik pengukuran

Area sootblower Economizer E-8 (wall) : 912 titik pengukuran

F22 : 732 titik pengukuran

F23 : 664 titik pengukuran

S-3 Backpass at Furnace Front Roof Tubes : 342 titik pengukuran

S-4 Backpass at Furnace Rear Roof Tubes : 136 titik pengukuran

S-14 Backpass Roof Tubes : 121 titik pengukuran

S-8 Backpass Side Wall Tubes at Front : 184 titik pengukuran

S-13 Backpass Front Wall Screen Tubes : 484 titik pengukuran

S-15 Backpass Rear Wall Tubes : 121 titik pengukuran

S-19 Low Temp Shtr.Horizontal Lower : 363 titik pengukuran

Page 4: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

4

S-19 Low Temp Shtr.Vertcal tube : 242 titik pengukuran

S-19 Low Temp Shtr.Vertcal tube : 21 titik pengukuran

S-20 Low Temp Shtr.Vertcal tube : 121 titik pengukuran

S-20 : 121 titik pengukuran

S-20 : 242 titik pengukuran

S-20 : 121 titik pengukuran

S-21 : 363 titik pengukuran

S-33 : 200 titik pengukuran

R-10 : 200 titik pengukuran

R-11 : 200 titik pengukuran

S- 38 : 24 titik pengukuran

S- 41 : 2 titik pengukuran

S- 1 Elbow : 21 titik pengukuran

S-33 elevasi blower : 88 titik pengukuran

R – 9 : 3520 titik pengukuran

Boroscope test :

Desuperheater : 2 hole

Reheater : 2 hole

Header Economizer Inlet : 1 hole

Replica Technik Tube ( RT) :

S-33 : 42 titik

S-38 : 24 titik

S-41 : 2 titik

Hardness Test :

S-33 : 42 titik

S-38 : 24 titik

S-41 : 2 titik

Page 5: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

5

Pengujian Labortorium :

Analisa komposisi endapan/deposit (kerak)

Pada Economizer Inlet Header E-5

RLA / uji merusak / Destructive Test (DT).

2 (dua) sampel tube S -3.

1 (satu) sampel tube S-4.

1 (satu) sampel tube S-14.

4. PELAKSANAAN

Pelaksanaan dimulai tanggal 16 Oktober s/d 11 Nopember 2012

Pelaksana : Tim PT PLN (Persero) Puslitbang Ketenagalistrikan :

- Yusuf Rasyid, ST, MT

- Achmad

- Tumpal Hutagalung

- Saprudin

- Haryadi

- Dikky Dwi A, ST

- Budiyanto

- Hadi Nurcahyo

- Bagus Panji Asmoro

Dibantu oleh : PT PJB UP Paiton :

- Lalu Bramantias Gutama

- Andi

- Nanang Samsul W

5. METODOLOGI

Metode pengujian adalah Uji Tak Merusak / Non Destructive Test (NDT) pada surface benda

uji, pengujian dilakukan secara visual dan menggunakan peralatan.

Peralatan yang digunakan :

- Ultrasonic Thickness Meter

Page 6: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

6

- Boroscope

- Replika Technic

- Hardness

Referensi :

- ASM Metal Handbook

- ASTM Section V

- Damage Mechanisms and Life Assessment of High-Temperatur Components,

R.Viswanathan.

- Steam Generator, BW

- Manual Book PLTU Paiton, unit 1, 2.

6. HASIL PENGUJIAN

Data hasil pengujian dilapangan dapat dilihat pada lampiran :

- Data hasil pengujian Thickness Tube pada lampiran - 1

- Data hasil pengujian Boroscope pada lampiran - 2

- Data hasil pengujian Replica/insitu metallography dan Hardness pada lampiran – 3

Hasil Pengujian Laboratorium akan dilakukan setelah dilakukan pemotong sampel, dilakukan uji

pada laboratorium metalurgi di PLN Puslitbang Jakarta.

7. EVALUASI

Hasil Pengujian Thickness Tube

Kegagalan/failure operasi boiler salah satunya disebabkan oleh terjadinya kebocoran/pecahnya

tube ketika beroperasi, salah satu penyebabnya karena terjadi penipisan pada tube sehingga tube

tidak sanggup menahan tekanan/pressure hoop stress yang terjadi. Penipisan tube boiler

disebabkan oleh adanya korosi dan erosi yang disebabkan antara lain oleh fly ash corrosion,

sootblower corrosion, coal particle corrosion, dan lain-lain. Maka pada tube boiler dilakukan

pengukuran ketebalan/thickness tube, sehingga diketahui apakah ketebalan tube masih

memenuhi MWT (Minimum Wall Thickness), apabila ketebalan tube dibawah MWT atau sama

dengan MWT maka perlu dilakukan tindakan segera untuk penggantian tube.

Page 7: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

7

Berikut adalah rangkuman hasil pengukuran thickness tube boiler unit 2 PLTU Paiton :

Tabel 1. Hasil maksimum dan minimum pengukuran tebal/thickness tube

No. Lokasi Jumlah

Titik Tube Yang Diuji

MWT Hasil Pengukuran

Jumlah Titik Tube Penipisan di Bawah

MWT

Keterangan

Maksimum Minimum

1 E-7 (TUBE) 405 5,08 5,96 4,49 145 2 E-7 (WALL) 106 5,08 5,52 5,16 - 3 E-7 (WALL) 349 7,11 7,82 6,39 111 4 E-8 (TUBE) 810 5,08 5,98 4,43 247 5 E-8 (WALL) 106 5,08 5,56 5,56 - 6 E-8 (WALL) 480 7,11 7,81 6,43 2 7 F-22 726 5,58 7,89 5,81 - 8 F-23 244 5,58 6,98 5,67 - 9 S-3 272 7,62 9,79 7,91 - 10 S-4 214 7,11 7,96 7,24 - 11 S-14 119 7,11 7,78 7,18 - 12 S-8 61 7,11 7,82 7,16 - 13 S-13 183 7,11 7,99 7,04 3 14 S-15 121 7,11 7,73 7,14 - 15 S-19 363 7,11 6,34 2,05 314 68 tube < 4,00 mm 16 S-19 (VERTICAL) 425 5,08 6,46 5,17 2 17 S-19 (VERTICAL) 183 ref* 5,64 4,84 - 18 S-20 (VERTICAL) 243 5,44 8,62 7,01 - 19 S-20 242 5,44 6,90 5,60 4 20 S-20 121 5,59 6,73 5,04 100 3 tube < 4,00 mm 21 S-20 242 5,08 5,99 3,61 215 7 tube < 4,00 mm 22 S-21 363 5,423 6,99 5,08 3 23 S-33 220 6,35 7,93 6,04 1 24 S-33 44 10,67 11,93 10,46 18 25 R-9 3520 4,57 6,16 3,06 2512 26 R-10 96 4,57 5,70 3,29 17 27 R-10 150 3,78 4,52 3,18 70 1 tube < 4,00 mm 28 R-11 220 3,81 4,52 3,06 16 29 S-38 36 7,16 8,60 1,92 5 1 tube < 4,00 mm 30 S-41 4 8,13 8,77 8,31 - 31 S-1 42 15.08 18.09 16.7 -

Jumlah 10710 3785

Page 8: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

8

Tabel 2. Realisasi pengukuran tebal/thickness tube

No. Lokasi MWT Permintaan Realisasi Selisih

plus (+) / minus (-)

1 E-7 (TUBE) 5,08 363 405 42 2 E-7 (WALL) 5,08 456 106 -350 3 E-7 (WALL) 7,11 0 349 349 4 E-8 (TUBE) 5,08 726 810 84 5 E-8 (WALL) 5,08 912 106 -806 6 E-8 (WALL) 7,11 0 480 480 7 F-22 5,58 732 726 -6 8 F-23 5,58 664 244 -420 9 S-3 7,62 342 272 -70 10 S-4 7,11 136 214 78 11 S-14 7,11 121 119 -2 12 S-8 7,11 184 61 -123 13 S-13 7,11 484 183 -301 14 S-15 7,11 121 121 0 15 S-19 7,11 363 363 0 16 S-19 (VERTICAL TUBE) 5,08 242 425 183 17 S-19 (VERTICAL TUBE) ref* 0 183 183 18 S-20 (VERTICAL TUBE) 5,44 121 243 122 19 S-20 5,44 121 242 121 20 S-20 5,59 242 121 -121 21 S-20 5,08 121 242 121 22 S-21 5,423 363 363 0 23 S-33 6,35 200 220 20 24 S-33 10,67 0 44 44 25 R-9 4,57 3520 3520 0 26 R-10 4,57 200 96 -104 27 R-10 3,78 0 150 150 28 R-11 3,81 200 220 20 29 S-38 7,16 24 36 12 30 S-41 8,13 2 4 2 31 S-1 15,08 21 42 21

Jumlah : 10981 10710 -271

Page 9: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

9

Hasil pengujian Boroscope

Boroscope salah satu peralatan NDT yang berfungsi untuk mengetahui kondisi material bagian

dalam, berikut hasil pengujian boroscope :

Desuperheater

- Desuperheater I (bagian timur) daerah nozzle spray dengan boroscope secara umum bagian

dalam tidak terdapat indikasi crack, terlihat lubang spray tidak terdapat sumbatan, kondisi

relative masih baik.

- Desuperheater II (bagian barat) daerah nozzle spray dengan boroscope bagian lubang dalam,

tidak terdapat indikasi crack. terlihat lubang spray tidak terdapat sumbatan, tidak mengalami

deformasi kondisi relative masih baik.

Reheater line pipe

- Reheater pipe line I (timur), pada bagian dalam Reheater kondisi pada pipe line kondisi

diselimuti korosi dan tidak terdapat indikasi crack.

- Reheater pipe line I (barat), pada bagian dalam Reheater, kondisi pada pipe line kondisi

diselimuti korosi dan tidak terdapat indikasi crack.

Economizer Inlet Header

- Permukaan dalam header secara umum mengalami general korosi, lumpur kerak/deposit dan

adanya pitting korosi.

Hasil uji metallography dan hardness

Mikrostruktur

- Pada material boiler yang beroperasi pada tekanan/pressure dan temperature tinggi akan

mengalami stress. Dalam kurun waktu yang lama, lambat laun material akan mengalami

degradasi, sehingga terjadi penurunan kualitas material. Salah satu indikasinya ditandai

dengan perubahan mikrostruktur material seperti terjadinya creep void, percipitat carbide,

stress cracking, corrosion (SCC) dll. Creep void berpotensi terjadinya crack pada material

sehingga tube pecah / terjadi kegagalan operasi. Untuk melihat kondisi material tersebut

dilakukan pengujian dengan teknik replica/insitu metallography, sehingga dapat diketahui

fenomena mikrostrukturnya.

- Uji kekerasan material dilakukan untuk mengetahui nilai kekerasannya sehingga dapat

diprediksi sifat dan kualitas material tersebut (ductile atau brittle).

Page 10: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

10

Hasil pemeriksaan dengan menggunakan teknik replica/insitu metallography pada material tube

boiler adalah sebagai berikut :

Pada S – 38 sebanyak 24 spot

- Strukturmikro material Steam Cooled Spacer Riser Tube, pada titik ukur A dan B secara

umum terdiri ferritic dan pada titik C dan D austenit mengalami persipitat carbida, tidak

terdapat creep void, klasifikasi material C menuju D.

- Nilai kekerasan material untuk ferritic titik ukur A dan B adalah 150 HV s/d 179 HV (standar

160 HV s/d 200 HV) dan titik C, D, antara 171 HV s/d 267 HV untuk austenitic (standar 150

HV s/d 180 HV).

Pada S – 33 sebanyak 21 spot, yaitu panel 16 s/d 22.

- Strukturmikro material S 33, secara umum mikro austenite pada tube No.1 dan No.4, tidak

terdapat indikasi creep void, batas butir mengalami korosi, menurut standar ERA teknologi

masuk class C, sedangkan pada tube No.13 struktur mikro austenite, martensite terdapat

indikasi creep void, batas butir mengalami korosi klasifikasi C menuju D.

- Nilai kekerasan material/hardness 147 HV s/d 210 HV untuk austenitic.

Pada S – 41 sebanyak 2 spot

- Strukturmikro material Steam Cooled Spacer Riser Tube, secara umum struktur mikro berupa

ferite-pearlite, tidak terdapat indikasi creep void, batas butir mengalami korosi, menurut

standar ERA teknologi material masuk class C.

- Nilai kekerasan material 149 HV s/d 164 HV untuk ferritic (standar 160 HV s/d 200 HV)

8. KESIMPULAN

Dari hasil evaluasi dapat disimpulkan sebagai berikut :

- Ketebalan tube boiler pada bagian yang diukur beberapa telah masuk pada ukuran di bawah

MWT yaitu tube E-7 (wall dan tube), E-8 (wall dan tube) , F23, S-20, S-8, S-13, S-19, S-21,

S-33, R-10, R-11 dan S 38. Jumlah keseluruhan yang mengalami penipisan 3.785 titik ukur

tube, dari jumlah 10.710 titik ukur tube.

- Hasil Pemeriksaan Boroscope pada header Economizer inlet terdapat lumpur/deposit,

Desuperheater spray, dan Reheater pipe line secara umum tidak terlihat adanya indikasi crack,

hanya mengalami serangan korosi dan pitting korosi lokal dan tidak terdapat ligament crack

antara stube tube.

Page 11: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

11

- Hasil pemeriksaan strukturmikro, material S 38 pada titik ukur C dan D, klasifikasi material

C menuju D (Remaining Life atau kurang dari 60 %).

- Material S 33 pada tube No.13, klasifikasi material C menuju D (Remaining Life atau kurang

dari 60 %).

9. SARAN

Dari hasil kesimpulan dapat disarankan sebagai berikut :

- Pada tube yang mengalami penipisan sampai di bawah ukuran Minimum Wall Thickness

(MWT) agar dilakukan penggantian tube / retubing.

- Header Economizer inlet yang terdapat endapan lumpur/deposit hendaknya dibersihkan /

flushing.

- Dari hasil uji insitu metallography, material yang klasifikasi material C menuju D (35.000

jam operasi), dan agar dilakukan reinspeksi / inpeksi ulang pada 16.000 jam, untuk

mengetahui perkembangnnya.

- Dalam rangka menjaga keandalan unit pembangkit, disarankan agar kondisi air/uap selalu

terjaga kualitasnya sesuai persyaratan operasi.

Demikian laporan sementara ini kami sampaikan, adapun laporan teknik selengkapnya akan

dikirim setelah dilengkapi hasil uji destructive dan deposit/kerak dilaboratorium. di PLN

Puslitbang. Atas kerjasamanya diucapkan terima kasih.

Hormat kami, Tim PT PLN PUSLITBANG

1. Yusuf Rasyid ................ 2. Ahmad ................ 3. Tumpal Hutagalung ................ 4. Saprudin ................ 5. Haryadi ................ 6. Dikky Dwi. A ................ 7. Budiyanto ................ 8. Hadi Nurcahyo ................ 9. Bagus Panji A ................

Tembusan : - GM PT PJB UP Paiton

Page 12: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LAMPIRAN 1

HASIL PENGUJIAN THICKNESS

BOILER PLTU PAITON UNIT 2

Page 13: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

Page 14: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

E-7DATA PENGUJIAN THICKNESS

Page 15: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-7

POSISI : A - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.29 5.07 5.05 5.06 4.95 5.04 5.15 5.13 5.06 5.15 5.15 5.18 5.08 4.99 5.05 4.94 5.13 5.13 5.15 5.20 5.03 5.63 5.11 5.20 5.10 5.09 5.04 4.97 4.99 4.97 4.95 5.01 5.10 5.03 4.90 4.95 4.97 4.94 4.96 5.07

Tengah 5.27 5.08 5.13 5.13 4.99 4.99 5.06 5.06 5.14 5.08 5.23 5.16 5.18 5.13 5.06 4.98 5.09 5.16 5.18 5.17 5.03 4.94 5.07 5.06 4.97 5.01 5.06 4.96 4.92 5.08 5.01 4.98 5.03 5.22 4.99 4.91 4.97 4.96 4.94 4.97

Kiri 5.34 5.01 5.05 5.07 5.09 5.07 5.10 5.08 4.99 5.07 5.04 5.01 5.12 5.12 5.04 5.00 5.05 5.03 5.11 5.01 5.04 4.94 5.08 5.02 4.97 5.04 4.97 5.06 4.96 5.01 4.99 5.01 4.74 5.08 5.13 4.93 4.91 4.85 4.93 4.93

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.08 4.49 4.93 4.91 4.88 4.90 4.90 4.97 4.92 4.98 4.80 4.92 4.90 4.93 4.93 4.91 4.84 4.93 4.74 4.79 4.96 5.03 4.84 4.85 4.77 5.06 5.35 5.21 5.27 4.94 4.96 4.96 4.95 5.04 5.02 5.02 4.91 4.82 4.79 4.93

Tengah 5.05 5.01 5.26 4.75 4.92 4.91 4.89 4.88 5.09 5.02 4.84 4.89 4.92 4.87 4.98 4.86 5.01 4.89 4.89 4.84 4.81 4.93 5.08 4.78 4.83 4.84 5.34 5.41 5.12 5.22 4.91 4.95 4.90 4.96 4.76 4.91 4.96 4.98 5.01 4.95

Kiri 4.99 5.05 5.08 4.76 4.77 4.87 4.83 4.84 4.92 4.88 4.92 4.98 4.76 4.82 4.92 4.89 5.04 5.05 4.80 4.79 4.97 5.04 4.81 4.90 4.87 4.70 5.34 5.33 5.02 5.26 4.87 5.09 5.00 4.99 4.87 4.83 4.93 4.94 4.82 4.97

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.63

5.08 4.49

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 16: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-7

POSISI : A - ATAS

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.12 5.01 4.96 5.02 5.03 5.02 4.95 4.97 5.11 4.97 5.06 5.00 5.06 5.00 5.07 5.00 5.00 5.03 5.05 4.90 5.01 5.09 5.09 5.08 5.07 5.26 5.06 5.00 5.14 5.13 5.05 5.02 5.06 4.99 5.08 4.99 5.08 5.09 5.08 5.01

Tengah 4.95 4.97 4.91 5.04 5.02 5.03 5.02 4.78 4.94 5.01 5.02 5.04 5.01 4.98 5.00 4.98 4.99 5.01 5.01 5.03 4.94 5.09 5.00 5.12 5.12 5.10 5.18 5.08 5.06 5.05 5.15 5.03 5.04 5.10 5.06 4.98 5.06 5.01 5.04 4.99

Kiri 5.08 5.00 5.04 5.02 4.97 4.84 5.06 5.04 5.00 5.03 5.08 5.09 4.96 5.03 5.01 5.02 4.90 5.01 5.03 5.09 5.01 5.03 5.06 5.08 5.07 5.01 5.18 5.08 5.09 5.13 5.03 5.15 5.05 4.99 5.01 5.02 5.04 5.02 5.08 5.10

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.15 5.12 5.09 5.04 5.06 5.14 5.14 5.05 5.15 5.19 5.19 5.21 5.19 5.22 5.18

Tengah 5.02 5.08 5.04 4.98 5.13 5.03 5.08 5.08 5.09 5.18 5.18 5.16 5.05 5.18 5.25

Kiri 5.04 5.03 5.07 5.12 5.11 5.05 5.11 5.05 5.11 5.01 5.16 5.21 5.10 5.18 5.25

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.26

5.08 4.78

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 17: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-7

POSISI : B - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.30 5.30 5.02 5.28 5.22 5.16 5.27 5.22 5.20 5.27 5.28 5.22 5.25 5.22 5.20 5.32 5.31 5.27 5.24 5.21 5.21 5.30 5.14 5.18 5.23 5.27 5.23 5.30 5.25 5.26 5.29 5.11 5.18 5.11 5.26 5.16 5.16 5.22 5.24 5.18

Tengah 5.28 5.26 5.31 5.36 5.35 5.23 5.32 5.21 5.24 5.23 5.25 5.22 5.19 5.03 5.16 5.28 5.15 5.24 5.23 5.17 5.25 5.22 5.18 5.21 5.18 5.16 5.16 5.29 5.18 5.18 5.20 5.26 5.14 5.10 5.30 5.27 5.17 5.26 5.13 5.25

Kiri 5.26 5.29 5.28 5.22 5.28 5.27 5.29 5.29 5.20 5.20 5.26 5.25 5.24 5.13 5.13 5.16 5.05 5.14 5.28 5.10 5.10 5.26 5.22 5.05 5.14 5.24 5.24 5.21 5.24 5.24 5.40 5.09 5.17 5.17 5.19 5.16 5.13 5.25 5.18 5.26

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.12 5.08 5.24 5.21 5.25 5.03 5.27 5.12 5.25 5.23 5.14 5.08 5.12 5.10 5.25 5.09 5.07 5.10 5.12 5.22 5.20 5.17 5.19 5.07 5.13 5.16 5.29 5.19 5.23 5.11 5.06 5.17 5.14 5.18 5.18 5.22 5.26 5.12 5.23 5.04

Tengah 5.12 5.11 5.15 5.18 5.07 5.08 5.19 5.17 5.06 5.13 5.13 5.09 5.11 5.05 5.16 5.18 5.14 5.11 5.11 5.22 5.22 5.17 5.13 5.20 5.10 5.96 5.26 5.16 5.16 5.04 5.09 5.12 5.16 5.14 5.04 5.19 5.16 5.16 5.12 5.12

Kiri 5.21 5.11 5.27 5.23 5.29 5.21 5.24 5.20 5.28 5.26 5.24 5.21 5.22 5.23 5.02 5.11 5.27 5.26 5.18 5.28 5.22 5.02 5.23 5.20 5.28 5.12 5.25 5.13 5.29 5.24 5.16 5.18 5.18 5.23 5.20 5.30 5.26 5.22 5.15 5.27

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.96

5.08 5.02

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 18: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-7

POSISI : B - ATAS

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.21 5.19 5.21 5.20 5.12 5.14 5.17 5.19 5.24 5.16 5.16 5.21 5.13 5.12 5.18 5.16 5.16 5.28 5.26 5.31 5.21 5.15 5.25 5.24 5.31 5.37 5.23 5.34 5.36 5.29 5.33 5.25 5.19 5.24 5.22 5.29 5.23 5.31 5.27 5.30

Tengah 5.24 5.15 5.25 5.22 5.06 5.14 5.18 5.20 5.28 5.13 5.19 5.32 5.22 5.18 5.11 5.10 5.13 5.19 5.14 5.29 5.21 5.16 5.15 5.18 5.25 5.34 5.33 5.30 5.25 5.19 5.35 5.14 5.19 5.17 5.19 5.23 5.04 5.23 5.22 5.18

Kiri 5.33 5.34 5.23 5.32 5.24 5.32 5.32 5.24 5.29 5.31 5.25 5.25 5.64 5.30 5.34 5.28 5.17 5.26 5.19 5.27 5.15 5.30 5.24 5.08 5.18 5.34 5.21 5.31 5.15 5.25 5.18 5.19 5.18 5.16 5.19 5.21 5.11 5.32 5.26 5.16

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.22 5.25 5.33 5.36 5.36 5.35 5.21 5.34 5.28 5.57 5.13 5.37 5.31 5.23 5.33

Tengah 5.12 5.08 5.22 5.22 5.13 5.21 5.11 5.25 5.30 5.31 5.08 5.18 5.25 5.27 5.23

Kiri 5.29 5.29 5.18 5.23 5.29 5.16 5.14 5.16 5.28 5.33 5.22 5.37 5.37 5.30 5.18

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.64

5.08 5.04

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 19: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-7

POSISI : C - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.35 5.34 5.36 5.20 5.32 5.24 5.23 5.30 5.32 5.24 5.36 5.31 5.19 5.26 5.27 5.22 5.27 5.27 5.28 5.28 5.26 5.33 5.32 5.28 5.20 5.24 5.32 5.26 5.30 5.30 5.26 5.27 5.24 5.24 5.16 5.16 5.27 5.24 5.28 5.29

Tengah 5.24 5.28 5.32 5.29 5.28 5.28 5.26 5.21 5.22 5.21 5.18 5.24 5.27 5.29 5.15 5.16 5.23 5.36 5.23 5.17 5.26 5.30 5.26 5.22 5.26 5.22 5.28 5.20 5.24 5.21 5.20 5.23 5.25 5.28 5.18 5.26 5.27 5.23 5.28 5.20

Kiri 5.28 5.18 5.36 5.22 5.27 5.27 5.28 5.34 5.33 5.24 5.31 5.29 5.32 5.21 5.24 5.21 5.35 5.31 5.16 5.25 5.23 5.29 5.31 5.23 5.24 5.24 5.23 5.25 5.31 5.30 5.24 5.21 5.28 5.29 5.14 5.25 5.22 5.24 5.34 5.27

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.25 5.20 5.13 5.28 5.22 5.28 5.30 5.31 5.18 5.28 5.30 5.30 5.21 5.25 5.30 5.30 5.27 5.11 5.24 5.24 5.19 5.10 5.21 5.15 5.22 5.31 5.13 5.09 5.34 5.08 5.00 5.17 5.23 5.15 5.17 5.23 5.15 5.19 5.28 5.20

Tengah 5.21 5.17 5.12 5.20 5.26 5.20 5.15 5.27 5.27 5.18 5.31 5.22 5.20 5.23 5.22 5.27 5.17 5.21 5.27 5.17 5.22 5.16 5.13 5.21 5.22 5.12 5.07 5.14 5.26 5.01 5.00 5.17 5.23 5.15 5.17 5.23 5.15 5.19 5.20 5.10

Kiri 5.23 5.22 5.15 5.25 5.31 5.27 5.25 5.15 5.29 5.31 5.27 5.27 5.24 5.28 5.30 5.22 5.23 5.18 5.23 5.18 5.25 5.17 5.23 5.25 5.27 5.06 5.17 5.15 5.31 5.26 5.19 5.23 5.15 5.26 5.17 5.21 5.20 5.18 5.15 5.18

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.36

5.08 5.00

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 20: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-7

POSISI : C - ATAS

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.22 5.26 5.21 5.21 5.14 5.26 5.21 5.19 5.21 5.26 5.30 5.26 5.21 5.29 5.10 5.23 5.18 5.20 5.22 5.19 5.29 5.19 5.20 5.29 5.20 5.33 5.28 5.19 5.25 5.19 5.09 5.30 5.24 5.30 5.29 5.26 5.31 5.22 5.19 5.28

Tengah 5.29 5.25 5.21 5.10 5.28 5.32 5.18 5.22 5.22 5.17 5.18 5.21 5.28 5.18 5.22 5.21 5.22 5.13 5.29 5.22 5.26 5.16 5.19 5.19 5.30 5.27 5.30 5.21 5.22 5.21 5.10 5.27 5.22 5.18 5.27 5.15 5.23 5.08 5.24 5.32

Kiri 5.27 5.32 5.23 5.19 5.27 5.31 5.14 5.26 5.22 5.24 5.22 5.29 5.30 5.31 5.19 5.18 5.17 5.26 5.21 5.22 5.28 5.25 5.17 5.28 5.36 5.30 5.29 5.24 5.26 5.32 5.22 5.29 5.29 5.25 5.20 5.25 5.23 5.25 5.28 5.32

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.24 5.26 5.18 5.36 5.20 5.24 5.13 5.21 5.31 5.36 5.30 5.30 5.31 5.33 5.32

Tengah 5.24 5.32 5.29 5.37 5.26 5.16 5.33 5.25 5.31 5.21 5.28 5.33 5.34 5.22 5.27

Kiri 5.27 5.32 5.23 5.34 5.23 5.26 5.28 5.27 5.34 5.26 5.37 5.37 5.25 5.22 5.25

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.37

5.08 5.08

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 21: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSE-7 (WALL)

Page 22: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : TURBIN (FRONT) - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.46 7.44 7.57 7.41 7.62 7.52 7.63 7.55 7.51 7.22 7.43 7.50 7.61 7.62 7.42 7.60 7.50 7.43 7.40 7.49 7.60 7.57 7.55 7.36 7.55 7.46 7.64 7.48 7.66 7.57 7.55 7.60 7.50 7.56 7.53 7.62 7.51 7.59 7.35 7.45

Tengah 7.51 7.62 7.66 7.38 7.68 7.52 7.48 7.55 7.54 7.31 7.41 7.45 7.42 7.59 7.51 7.66 7.59 7.50 7.36 7.55 7.67 7.56 7.41 7.45 7.48 7.67 7.50 7.42 7.47 7.63 7.41 7.36 7.64 7.62 7.53 7.59 7.43 7.51 7.34 7.55

Kiri 7.52 7.49 7.46 7.47 7.48 7.49 7.58 7.61 7.62 7.49 7.49 7.74 7.39 7.47 7.50 7.45 7.58 7.45 7.46 7.55 7.49 7.50 7.48 7.33 7.54 7.51 7.52 7.53 7.42 7.55 7.31 7.47 7.59 7.44 7.53 7.49 7.49 7.48 7.26 7.63

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.60 7.38 7.61 7.43 7.55 7.41 7.48 7.53 7.52 7.58 7.65 7.58 7.71 7.56 7.54 7.52 7.31 7.46 7.46 7.45 7.56 7.63 7.40 7.65 7.56 7.35 7.61 7.43 7.48 7.61 7.62 7.53 7.66 7.53 7.69 7.46 7.51 7.65 7.48 7.52

Tengah 7.53 7.38 7.57 7.57 7.61 7.40 7.44 7.57 7.38 7.56 7.44 7.66 7.59 7.45 7.41 7.42 7.52 7.49 7.52 7.51 7.43 7.48 7.62 7.44 7.45 7.45 7.28 7.40 7.34 7.49 7.51 7.45 7.61 7.53 7.56 7.37 7.46 7.58 7.50 7.50

Kiri 7.42 7.53 7.60 7.46 7.56 7.55 7.38 7.42 7.44 7.48 7.38 7.58 7.62 7.55 7.47 7.46 7.45 7.66 7.53 7.43 7.53 7.54 7.70 7.42 7.44 7.41 7.57 7.32 7.41 7.44 7.59 7.42 7.47 7.59 7.47 7.45 7.59 7.60 7.44 7.53

DATA PENGUJIAN THICKNESS BOILER TUBE

No. Row

UNIT 2 PLTU PAITON

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 7.55 7.50 7.44 7.38 7.49 7.62 7.58 7.52 7.45 7.67 7.47 7.57 7.49 7.60 7.67 7.71 7.61 7.71 7.73 7.51 7.45 7.62 7.60 7.41 7.56 7.61 7.60 7.43 7.57 7.72 7.45 7.60 7.63 7.46 7.46 7.40 7.52 7.47 7.46 7.63

Tengah 7.49 7.45 7.40 7.68 7.60 7.64 7.63 7.59 7.46 7.48 7.38 7.31 7.63 7.53 7.58 7.55 7.59 7.62 7.50 7.48 7.40 7.51 7.55 7.50 7.49 7.55 7.45 7.49 7.53 7.57 7.56 7.42 7.57 7.62 7.40 7.45 7.41 7.35 7.50 7.45

Kiri 7.40 7.40 7.33 7.49 7.53 7.65 7.54 7.61 7.43 7.51 7.56 7.41 7.68 7.61 7.56 7.42 7.42 7.46 7.35 7.38 7.47 7.79 7.34 7.47 7.53 7.60 7.53 7.51 7.56 7.61 7.55 7.51 7.52 7.62 7.47 7.55 7.53 7.34 7.51 7.55

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 7.58 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 7.39 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 7.51 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

Teb

al (m

m) - 7.79

7.11 7.22

Teb

al (m

m)

No. Row

No. Row

Posisi Pengujian

E‐ 8

Page 23: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : TURBIN (FRONT) - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.60 7.52 7.55 7.43 7.45 7.56 7.57 7.51 7.59 7.61 7.59 7.45 7.45 7.51 7.56 7.50 7.56 7.55 7.47 7.57 7.57 7.57 7.44 7.51 7.38 7.44 7.61 7.67 7.60 7.61 7.35 7.49 7.65 7.47 7.46 7.48 7.50 7.54 7.32 7.59

Tengah 7.44 7.60 7.56 7.38 7.49 7.48 7.50 7.61 7.60 7.55 7.49 7.43 7.46 7.53 7.60 7.60 7.59 7.54 7.45 7.54 7.67 7.56 7.39 7.44 7.58 7.64 7.62 7.48 7.63 7.62 7.51 7.38 7.71 7.53 7.67 7.62 7.40 7.49 7.27 7.50

Kiri 7.47 7.54 7.57 7.42 7.65 7.41 7.53 7.50 7.60 7.53 7.62 7.45 7.60 7.55 7.54 7.58 7.47 7.47 7.43 7.49 7.60 7.55 7.55 7.41 7.64 7.54 7.41 7.46 7.65 7.62 7.54 7.58 7.70 7.48 7.51 7.53 7.61 7.50 7.35 7.47

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.50 7.49 7.64 7.50 7.59 7.50 7.35 7.43 7.48 7.42 7.38 7.55 7.53 7.59 7.48 7.46 7.45 7.56 7.46 7.41 7.54 7.52 7.61 7.45 7.38 7.43 7.55 7.35 7.42 7.46 7.58 7.55 7.48 7.65 7.46 7.56 7.58 7.61 7.46 7.61

Tengah 7.61 7.49 7.46 7.64 7.68 7.50 7.44 7.53 7.46 7.39 7.59 7.60 7.70 7.48 7.40 7.51 7.51 7.46 7.46 7.40 7.59 7.49 7.69 7.49 7.45 7.51 7.36 7.36 7.30 7.51 7.64 7.45 7.58 7.61 7.50 7.47 7.58 7.53 7.54 7.46

Kiri 7.63 7.50 7.51 7.50 7.49 7.43 7.46 7.44 7.52 7.61 7.65 7.57 7.67 7.46 7.51 7.50 7.50 7.56 7.39 7.43 7.64 7.55 7.60 7.60 7.54 7.42 7.58 7.47 7.48 7.56 7.57 7.52 7.60 7.58 7.54 7.53 7.51 7.58 7.57 7.47

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 7.40 7.59 7.35 7.48 7.59 7.48 7.55 7.64 7.39 7.61 7.46 7.42 7.67 7.62 7.54 7.46 7.34 7.46 7.53 7.42 7.50 7.51 7.55 7.50 7.57 7.52 7.57 7.58 7.55 7.54 7.57 7.43 7.55 7.61 7.69 7.58 7.51 7.32 7.63 7.60

Tengah 7.39 7.51 7.41 7.51 7.61 7.65 7.60 7.64 7.55 7.55 7.40 7.44 7.66 7.63 7.60 7.53 7.64 7.66 7.59 7.57 7.46 7.56 7.51 7.56 7.51 7.46 7.49 7.48 7.54 7.66 7.45 7.42 7.49 7.52 7.56 7.55 7.55 7.45 7.56 7.62

Kiri 7.55 7.64 7.37 7.43 7.52 7.55 7.60 7.45 7.58 7.60 7.52 7.52 7.58 7.52 7.61 7.62 7.62 7.69 7.65 7.41 7.53 7.58 7.62 7.40 7.56 7.66 7.64 7.39 7.55 7.65 7.55 7.53 7.66 7.65 7.57 7.38 7.49 7.54 7.50 7.50

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 7.57 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 7.55 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 7.66 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) - 7.71

7.11 7.27

Posisi Pengujian

E‐ 8

Page 24: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KIRI - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.60 7.49 7.57 7.35 7.45 7.59 7.63 7.46 7.39 7.56 7.63 7.30 7.57 7.67 7.29 7.62 7.43 7.39 7.62 7.43 7.57 7.23 7.39 6.43 7.54 7.35 7.70 7.37 7.46 7.69 7.55 7.54 7.56 7.70 7.44 7.60

Tengah 7.52 7.32 7.63 7.38 7.58 7.29 7.61 7.53 7.42 7.59 7.44 7.44 7.41 7.67 7.45 7.75 7.25 7.52 7.58 7.38 7.63 7.29 7.43 6.72 7.64 7.18 7.56 7.40 7.25 7.56 7.40 7.42 7.29 7.60 7.68 7.61

Kiri 7.70 7.27 7.59 7.50 7.47 7.28 7.65 7.68 7.50 7.63 7.41 7.41 7.50 7.55 7.48 7.63 7.30 7.58 7.52 7.19 7.51 7.57 7.39 7.16 7.46 7.42 7.45 7.31 7.44 7.66 7.31 7.36 7.35 7.50 7.68 7.58

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

Kanan 7.46 7.81 7.40 7.33 7.34 7.58 7.72 7.64 7.34 7.37 7.37 7.22 7.29 7.51 7.68 7.32 7.62 7.68 7.36 7.64 7.53 7.66 7.51 7.70 7.69

Tengah 7.53 7.59 7.27 7.42 7.64 7.52 7.31 7.71 6.85 7.18 7.39 7.27 7.39 7.70 7.49 7.40 7.52 7.65 7.40 7.50 7.64 7.49 7.62 7.52 7.57

Kiri 7.64 7.68 7.39 7.50 7.61 7.57 7.56 7.54 6.67 7.37 7.39 7.41 7.46 7.64 7.38 7.57 7.30 7.62 7.49 7.52 7.52 7.41 7.55 7.60 7.61

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Main Hole

No. Row

Teb

al (m

m)

Main Hole

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.81

7.11 6.43

Posisi Pengujian

E‐ 8

Page 25: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KIRI - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.58 7.49 7.31 7.28 7.53 7.26 7.69 7.54 7.29 7.63 7.65 7.33 7.53 7.43 7.58 7.61 7.44 7.52 7.52 7.61 7.48 7.44 7.71 7.63 7.32 7.58 7.47 7.47 7.23 7.38 7.45 7.51 7.58 7.53 7.46 7.53 7.55 7.56 7.70 7.45

Tengah 7.61 7.31 7.44 7.19 7.64 7.37 7.65 7.54 7.48 7.64 7.38 7.27 7.46 7.21 7.42 7.46 7.49 7.63 7.55 7.55 7.65 7.31 7.50 7.46 7.37 7.56 7.37 7.26 7.29 7.46 7.23 7.55 7.56 7.52 7.29 7.43 7.52 7.58 7.47 7.30

Kiri 7.50 7.28 7.54 7.43 7.43 7.52 7.65 7.52 7.50 7.75 7.48 7.30 7.61 7.35 7.44 7.53 7.46 7.63 7.53 7.54 7.68 7.39 7.69 7.37 7.46 7.60 7.46 7.51 7.41 7.45 7.46 7.41 7.53 7.62 7.60 7.34 7.59 7.66 7.58 7.44

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Kanan 7.62 7.60 7.48 7.59 7.48 7.46 7.49 7.52 7.31 7.64 7.40 7.59 7.68 7.61 7.49 7.69 7.43 7.45 7.65

Tengah 7.51 7.45 7.47 7.56 7.35 7.25 7.68 7.50 7.38 7.53 7.47 7.50 7.50 7.59 7.52 7.58 7.59 7.48 7.38

Kiri 7.50 7.41 7.50 7.59 7.34 7.36 7.58 7.37 7.45 7.59 7.50 7.56 7.47 7.49 7.53 7.53 7.46 7.61 7.48

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

7.11 7.19

- 7.75

Posisi Pengujian

E‐ 8

Page 26: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : STACK (REAR) - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.43 5.46 5.41 5.43 5.46 5.35 5.49 5.47 5.35 5.34 5.33 5.31 5.46 5.38 5.34 5.33 5.37 5.30 5.47 5.43 5.36 5.46 5.37 5.43 5.42 5.46 5.44 5.43 5.43 5.30 5.48 5.39 5.47 5.37 5.52 5.45 5.45 5.37 5.35 5.44

Tengah 5.40 5.42 5.51 5.44 5.43 5.33 5.51 5.44 5.40 5.41 5.38 5.32 5.39 5.32 5.34 5.38 5.29 5.33 5.41 5.34 5.32 5.39 5.37 5.33 5.42 5.43 5.33 5.42 5.32 5.28 5.46 5.26 5.43 5.25 5.45 5.38 5.46 5.41 5.36 5.48

Kiri 5.48 5.50 5.52 5.38 5.51 5.48 5.54 5.48 5.41 5.45 5.35 5.38 5.36 5.44 5.41 5.40 5.29 5.37 5.54 5.42 5.46 5.41 5.34 5.41 5.49 5.40 5.36 5.39 5.36 5.36 5.38 5.45 5.33 5.46 5.33 5.38 5.46 5.45 5.38 5.53

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.36 5.30 5.46 5.42 5.45 5.41 5.42 5.34 5.47 5.48 5.44 5.40 5.37 5.39 5.41 5.45 5.45 5.30 5.46 5.39 5.38 5.55 5.33 5.53 5.42 5.20 5.41 5.45 5.40 5.51 5.42 5.35 5.37 5.35 5.41 5.39 5.34 5.35 5.33 5.56

Tengah 5.36 5.35 5.41 5.46 5.35 5.42 5.45 5.35 5.47 5.34 5.37 5.32 5.34 5.35 5.45 5.35 5.39 5.31 5.42 5.30 5.38 5.50 5.35 5.53 5.46 5.31 5.46 5.35 5.30 5.38 5.30 5.36 5.34 5.40 5.43 5.36 5.34 5.27 5.31 5.51

Kiri 5.29 5.45 5.40 5.50 5.35 5.39 5.39 5.40 5.46 5.35 5.36 5.46 5.36 5.45 5.40 5.47 5.43 5.37 5.37 5.40 5.43 5.48 5.30 5.46 5.50 5.45 5.46 5.41 5.30 5.35 5.40 5.37 5.37 5.44 5.45 5.38 5.40 5.42 5.35 5.49

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106

Kanan 5.41 5.43 5.35 5.33 5.40 5.47 5.47 5.48 5.50 5.30 5.42 5.34 5.43 5.43 5.47 5.42 5.37 5.28 5.36 5.41 5.40 5.35 5.44 5.39 5.38 5.31

Tengah 5.38 5.39 5.33 5.31 5.33 5.44 5.42 5.42 5.41 5.35 5.31 5.36 5.32 5.34 5.45 5.38 5.34 5.34 5.40 5.37 5.34 5.25 5.32 5.42 5.36 5.35

Kiri 5.41 5.47 5.47 5.31 5.45 5.44 5.30 5.45 5.40 5.32 5.33 5.33 5.47 5.37 5.47 5.43 5.36 5.37 5.34 5.43 5.43 5.36 5.37 5.39 5.37 5.44

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

- 5.56

5.08 5.20

Posisi Pengujian

E‐ 8

Page 27: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KANAN - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.41 7.35 7.48 7.44 7.40 7.63 7.44 7.55 7.44 7.61 7.43 7.65 7.62 7.62 7.54 7.53 7.69 7.22 7.60 7.41 7.54 7.42 7.58 7.45 7.41 7.22 7.45 7.69 7.52 7.63 7.66 7.40 7.23 7.44 7.51 7.41

Tengah 7.32 7.50 7.50 7.33 7.51 7.69 7.23 7.52 7.51 7.62 7.47 7.60 7.60 7.60 7.51 7.39 7.60 7.14 7.43 7.59 7.47 7.40 7.61 7.41 7.48 7.47 7.57 7.66 7.45 7.48 7.62 7.35 7.44 7.55 7.48 7.41

Kiri 7.47 7.70 7.35 7.29 7.61 7.64 7.36 7.40 7.71 7.58 7.52 7.58 7.56 7.49 7.49 7.43 7.57 7.50 7.64 7.53 7.59 7.58 7.66 7.57 7.62 7.38 7.56 7.52 7.35 7.49 7.61 7.44 7.34 7.59 7.47 7.36

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

Kanan 7.47 7.59 7.63 7.39 7.60 7.45 7.66 7.67 7.63 7.70 7.45 7.58 7.44 7.67 7.41 7.41 7.62 7.52 7.44 7.43 7.59 7.43 7.37 7.38 7.35

Tengah 7.47 7.51 7.71 7.37 7.60 7.32 7.54 7.63 7.42 7.66 7.42 7.61 7.46 7.65 7.40 7.39 7.61 7.42 7.50 7.46 7.61 7.37 7.40 7.46 7.36

Kiri 7.37 7.51 7.68 7.48 7.64 7.44 7.53 7.51 7.50 7.52 7.47 7.52 7.38 7.53 7.49 7.46 7.66 7.30 7.58 7.36 7.60 7.40 7.50 7.51 7.51

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Main Hole

No. Row

Teb

al (m

m)

Main Hole

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.71

7.11 7.14

Posisi Pengujian

E‐ 8

Page 28: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KANAN - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.43 7.42 7.43 7.56 7.39 7.26 7.25 7.55 7.56 7.61 7.60 7.61 7.57 7.67 7.53 7.59 7.41 7.43 7.47 7.51 7.37 7.36 7.41 7.38 7.59 7.52 7.53 7.65 7.42 7.59 7.47 7.51 7.55 7.56 7.53 7.51 7.66 7.56 7.35 7.63

Tengah 7.42 7.29 7.39 7.46 7.49 7.43 7.31 7.61 7.66 7.59 7.58 7.53 7.70 7.62 7.41 7.61 7.39 7.46 7.44 7.45 7.41 7.44 7.47 7.35 7.54 7.46 7.54 7.63 7.32 7.53 7.50 7.63 7.57 7.59 7.52 7.61 7.55 7.55 7.40 7.55

Kiri 7.29 7.26 7.28 7.33 7.44 7.53 7.51 7.52 7.67 7.67 7.59 7.46 7.53 7.60 7.44 7.52 7.48 7.36 7.48 7.40 7.47 7.31 7.52 7.57 7.56 7.66 7.51 7.64 7.48 7.36 7.59 7.61 7.58 7.60 7.58 7.60 7.62 7.42 7.52 7.52

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Kanan 7.59 7.52 7.42 7.62 7.44 7.57 7.57 7.42 7.48 7.59 7.50 7.42 7.52 7.60 7.52 7.61 7.56 7.36 7.32

Tengah 7.53 7.49 7.35 7.41 7.42 7.53 7.44 7.42 7.53 7.50 7.42 7.48 7.45 7.53 7.58 7.64 7.59 7.34 7.47

Kiri 7.50 7.56 7.42 7.42 7.55 7.66 7.53 7.56 7.56 7.43 7.43 7.55 7.65 7.60 7.56 7.50 7.57 7.47 7.40

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.70

7.11 7.25

Posisi Pengujian

E‐ 8

Page 29: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSE-8

Page 30: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : A - BAWAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.03 4.94 4.70 4.70 4.82 5.02 5.13 4.43 4.95 4.88 4.96 4.90 4.59 4.87 4.92 4.99 4.65 4.83 5.02 4.75 4.77 4.90 5.00 4.71 4.81 4.73 4.99 4.70 4.61 5.00 4.82 4.86 4.72 4.87 4.65 4.68 5.02 5.00 5.03 4.80

Tengah 5.15 4.90 4.73 4.52 4.80 4.91 5.15 4.98 5.01 4.77 4.84 4.92 4.66 4.91 4.89 5.15 4.85 4.78 5.04 4.85 4.85 4.84 5.00 4.89 4.79 4.66 4.69 4.75 4.62 4.92 4.99 4.62 4.59 4.80 4.81 4.66 4.86 4.97 4.86 4.84

Kiri 5.35 4.92 4.93 4.92 4.77 4.94 4.96 4.87 5.17 4.94 4.98 4.79 4.85 4.80 4.75 5.00 4.91 4.99 4.93 4.76 4.94 4.87 4.91 4.89 5.04 4.79 4.82 4.74 4.82 4.78 4.73 4.89 4.55 4.79 4.79 4.76 4.80 4.95 4.86 4.87

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 4.73 4.98 4.72 4.71 5.00 4.80 4.82 5.05 4.88 4.74 4.71 4.77 4.88 5.03 4.77 4.80 4.88 4.84 4.88 4.97 4.98 4.88 5.00 5.08 4.62 4.84 5.25 5.19 5.21 5.13 4.86 4.98 4.90 5.11 4.98 4.83 4.96 4.88 5.19 4.89

Tengah 4.63 4.72 4.77 4.90 4.97 4.93 4.88 4.89 4.83 4.85 4.69 4.88 4.95 5.06 4.86 4.75 4.85 4.91 5.04 4.97 5.05 4.93 4.83 4.87 4.78 4.73 5.33 5.13 5.30 4.99 4.94 4.94 4.91 4.97 4.92 4.92 4.90 4.89 5.00 4.92

Kiri 4.72 4.70 4.65 4.88 4.92 4.88 5.09 4.86 4.89 4.96 4.66 4.77 4.74 4.98 5.05 4.65 4.83 4.83 5.07 4.72 4.95 4.92 4.90 4.82 4.77 4.65 5.32 5.08 5.25 4.89 4.95 4.89 4.98 4.86 4.94 4.91 4.87 4.73 5.04 4.95

DATA PENGUJIAN THICKNESS BOILER TUBE

Teb

al (m

m)

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Budiyanto ………...

Yusuf Rasyid, ST, MT 2 Hadi Nur Cahyo ………...

- 5.35

5.08 4.43

E‐ 8

E‐ 7Posisi Pengujian

CA B

Page 31: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : A - BAWAH

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 4.80 4.78 4.78 4.89 4.77 4.85 4.93 4.95 4.79 4.78 4.95 4.90 4.76 4.85 4.91 4.90 4.92 4.97 4.92 4.82 4.79 4.72 4.75 5.15 4.74 4.76 4.82 4.85 4.85 4.61 4.84 4.71 4.77 5.01 5.11 4.65 4.88 4.72 4.96 4.87

Tengah 4.91 4.81 4.90 4.85 4.84 4.86 4.91 4.99 4.89 4.77 4.96 4.97 4.94 4.75 4.97 5.00 4.96 4.91 5.01 4.88 4.87 4.83 4.71 4.97 4.82 4.96 4.87 4.95 5.00 4.84 4.69 4.91 4.89 4.98 4.98 4.96 4.90 5.07 5.03 4.71

Kiri 4.88 4.92 4.96 4.87 4.88 4.78 4.87 4.92 4.91 4.87 4.93 4.97 5.01 4.89 4.89 5.01 4.85 4.81 4.95 4.80 4.88 4.79 4.72 4.92 4.98 4.98 4.93 4.81 5.07 4.80 4.72 5.03 4.93 4.73 4.86 4.86 4.73 4.96 5.06 4.70

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 4.72 4.96 4.67 4.90 4.92 4.83 4.81 4.63 4.91 4.82 4.75 4.76 4.83 4.87 4.84

Tengah 4.72 4.84 4.74 4.76 4.89 4.89 4.95 4.90 4.71 5.02 4.85 4.95 4.58 4.81 5.01

Kiri 4.74 4.80 4.82 4.51 4.64 4.72 5.05 4.84 4.63 4.99 4.90 5.01 4.77 4.74 4.92

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.15

5.08 4.51

E‐ 8

E‐ 7Posisi Pengujian

CA B

Page 32: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : B - BAWAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.16 5.08 5.07 5.20 5.20 5.23 5.16 5.02 5.08 5.05 5.14 5.13 5.04 5.16 5.23 5.28 5.08 5.34 5.38 5.02 5.10 5.10 5.08 5.24 5.19 5.18 5.09 5.13 5.23 5.14 5.21 5.09 5.21 5.11 5.13 5.01 5.25 5.18 5.15 5.14

Tengah 5.22 5.07 5.21 5.13 5.18 5.18 5.27 5.07 5.07 5.05 5.16 5.02 5.27 5.30 5.09 5.18 5.11 5.16 5.11 5.08 5.00 5.19 5.23 5.06 5.33 5.15 5.23 5.26 5.41 5.12 5.05 5.10 5.22 5.20 5.16 5.21 5.21 5.17 5.05 5.13

Kiri 5.28 5.05 5.18 5.18 5.11 5.13 5.27 5.21 5.06 5.08 5.04 5.02 5.08 5.09 5.22 5.14 5.30 5.16 5.10 5.15 5.14 5.11 5.17 5.04 5.22 5.19 5.16 5.12 5.06 5.09 5.09 5.09 5.13 5.23 5.09 5.28 5.19 5.13 5.23 5.15

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.12 5.06 5.16 5.06 5.11 5.04 5.35 5.21 5.11 5.22 5.19 5.07 5.23 5.17 5.30 5.11 5.07 4.99 5.16 5.11 5.16 5.11 5.07 5.15 5.12 5.01 5.02 5.24 5.24 5.18 5.08 5.21 5.05 5.16 5.15 5.13 5.21 5.03 5.19 5.27

Tengah 5.18 5.18 5.21 5.11 5.04 5.02 5.31 5.24 5.05 5.17 5.33 5.22 5.25 5.30 5.39 5.02 5.06 5.03 5.15 5.06 5.12 5.13 5.12 5.17 5.17 5.12 4.91 5.22 5.21 5.26 5.07 5.26 5.13 5.10 5.46 5.03 5.24 5.02 5.31 5.19

Kiri 5.07 5.12 5.18 5.17 5.06 5.04 5.35 5.26 5.08 5.33 5.10 5.24 5.18 5.25 5.35 5.11 5.23 5.03 5.18 5.17 5.22 5.03 5.13 5.14 5.07 5.04 5.13 5.44 5.17 5.31 5.25 5.09 5.16 5.20 5.33 5.02 5.16 5.08 5.24 5.09

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Budiyanto ………...

Yusuf Rasyid, ST, MT 2 Hadi Nur Cahyo ………...

- 5.46

5.08 4.91

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 33: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : B - BAWAH

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.21 5.02 5.10 5.35 5.25 5.21 5.05 5.11 5.25 5.06 5.25 5.03 5.20 5.40 5.22 5.10 5.02 5.11 5.33 5.41 5.16 5.30 5.18 5.03 5.15 5.15 5.16 5.14 5.26 5.04 5.13 5.14 5.11 5.12 5.48 5.04 5.12 5.02 5,-6 5.14

Tengah 5.34 5.00 5.09 5.11 5.17 5.27 5.27 5.19 5.18 5.04 5.06 5.04 5.37 5.30 5.24 5.15 5.14 5.15 5.10 5.13 5.41 5.34 5.22 5.19 5.27 5.21 5.15 5.19 5.23 5.14 5.14 5.30 5.30 5.17 5.23 5.01 5.12 5.06 5.08 5.42

Kiri 5.47 5.06 5.07 5.18 5.42 5.18 5.27 5.27 5.04 5.03 5.06 5.11 5.24 5.22 5.09 5.06 5.10 5.20 5.21 5.10 5.13 5.21 5.21 5.29 5.25 5.35 5.07 5.12 5.20 5.38 5.14 5.21 5.16 5.08 5.13 5.05 5.02 5.01 5.12 5.45

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.23 5.33 5.08 5.21 5.04 5.24 5.22 5.25 5.06 5.21 5.18 5.11 5.13 5.13 5.26

Tengah 5.09 5.22 5.02 5.18 5.16 5.21 5.26 5.05 5.08 5.03 5.05 5.04 5.06 5.06 5.29

Kiri 5.17 5.32 5.07 5.11 5.16 5.20 5.11 5.13 5.11 5.13 5.07 5.05 5.18 5.12 5.28

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Budiyanto ………...

Yusuf Rasyid, ST, MT 2 Hadi Nur Cahyo ………...

- 5.48

5.08 5.00

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 34: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : C - BAWAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.12 5.07 5.17 5.19 5.20 5.07 5.12 5.14 5.06 5.11 5.21 5.02 5.17 5.14 5.21 5.45 5.06 5.28 5.19 5.06 5.10 5.11 5.19 5.30 5.20 5.26 5.04 5.11 5.24 5.23 5.15 5.23 5.32 5.31 5.21 5.10 5.09 5.28 5.12 5.23

Tengah 5.03 5.12 5.35 5.23 5.26 5.16 5.19 5.09 5.13 5.07 5.22 5.03 5.19 5.40 5.32 5.14 5.22 5.09 5.14 5.15 5.02 5.22 5.22 5.22 5.46 5.14 5.26 5.46 5.29 5.10 5.16 5.06 5.32 5.23 5.11 5.24 5.13 5.05 5.07 5.35

Kiri 5.08 5.03 5.33 5.24 5.21 5.13 5.11 5.10 5.04 5.09 5.15 5.03 5.23 5.11 5.21 5.11 5.16 5.19 5.27 5.30 5.09 5.18 5.31 5.19 5.23 5.16 5.29 5.18 5.14 5.05 5.13 5.04 5.19 5.21 5.14 5.19 5.14 5.06 5.26 5.31

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.13 5.09 5.20 5.12 5.02 5.04 5.25 5.49 5.05 5.12 5.21 5.31 5.27 5.27 5.32 5.14 5.11 5.05 5.21 5.13 5.14 5.15 5.13 5.31 5.18 5.17 5.23 5.28 5.19 5.45 5.01 5.05 5.18 5.15 5.17 5.07 5.21 5.11 5.24 5.06

Tengah 5.17 5.10 5.18 5.08 5.07 5.25 5.18 5.20 5.12 5.16 5.36 5.31 5.30 5.39 5.30 5.13 5.06 5.03 5.20 5.15 5.16 5.16 5.14 5.11 5.13 5.06 5.19 5.22 5.28 5.25 5.05 5.21 5.16 5.00 5.26 5.09 5.38 5.04 5.06 5.37

Kiri 5.27 5.14 5.21 5.24 5.09 5.01 5.25 5.19 5.02 5.31 5.22 5.17 5.09 5.07 5.14 5.03 5.17 5.10 5.17 5.36 5.25 5.20 5.16 5.12 5.20 5.14 5.26 5.40 5.11 5.23 5.11 5.14 5.13 5.08 5.23 5.05 5.16 5.03 5.05 5.05

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Achmad ………...

Yusuf Rasyid, ST 2 Bagus Panji A. ………...

- 5.49

5.08 5.00

E‐ 8

E‐ 7

Posisi Pengujian

CA B

Page 35: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : C - BAWAH

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.19 5.02 5.13 5.20 5.10 5.18 5.15 5.06 5.22 5.15 5.15 5.02 5.30 5.26 5.31 5.32 5.23 5.19 5.19 5.20 5.09 5.25 5.34 5.12 5.09 5.12 5.19 5.01 5.43 5.13 5.21 5.13 5.12 5.23 5.44 5.06 5.22 5.08 5.02 5.31

Tengah 5.23 5.02 5.06 5.24 5.18 5.32 5.04 5.12 5.20 5.08 5.09 5.05 5.14 5.48 5.09 5.13 5.04 5.25 5.34 5.34 5.37 5.14 5.32 5.04 5.17 5.02 5.04 5.06 5.22 5.16 5.17 5.13 5.22 5.15 5.11 5.00 5.15 5.05 5.15 5.29

Kiri 5.35 5.01 5.07 5.28 5.18 5.34 5.36 5.23 5.09 5.04 5.07 5.04 5.28 5.07 5.13 5.21 5.02 5.20 5.12 5.11 5.06 5.04 5.16 5.12 5.17 5.37 5.04 5.15 5.04 5.24 5.29 5.10 5.25 5.10 5.16 5.14 5.13 5.11 5.06 5.14

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.31 5.13 5.05 5.18 5.10 5.28 5.21 5.09 5.15 5.32 5.03 5.15 5.18 5.18 5.12

Tengah 5.10 5.21 5.13 5.13 5.07 5.32 5.28 5.19 5.10 5.08 4.96 5.08 5.01 5.03 5.18

Kiri 5.11 5.22 5.00 5.02 5.18 5.26 5.13 5.20 5.09 5.21 5.05 5.12 5.16 5.19 5.24

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :

UNIT 2 PLTU PAITON

5 48

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Achmad ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.48

5.08 4.96

E‐ 8

E‐ 7Posisi Pengujian

CA B

Page 36: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : A - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.46 5.25 5.42 5.56 5.42 5.21 5.29 5.32 5.35 5.26 5.39 5.38 5.33 5.23 5.26 5.35 5.20 5.31 5.75 5.24 5.37 5.26 5.22 5.27 5.27 5.30 5.29 5.24 5.42 5.31 5.58 5.40 5.40 5.51 5.62 5.31 5.33 5.34 5.32 5.20

Tengah 5.59 5.98 5.33 5.34 5.42 5.38 5.23 5.33 5.31 5.23 5.48 5.32 5.24 5.15 5.31 5.20 5.22 5.30 5.28 5.18 5.44 5.23 5.17 5.20 5.22 5.21 5.29 5.21 5.26 5.18 5.18 5.39 5.52 5.44 5.30 5.65 5.61 5.36 5.32 5.22

Kiri 5.28 5.28 5.32 5.42 5.38 5.38 5.32 5.38 5.27 5.21 5.30 5.38 5.25 5.26 5.28 5.31 5.29 5.26 5.27 5.21 5.36 5.35 5.19 5.23 5.24 5.26 5.27 5.26 5.25 5.27 5.28 5.36 5.30 5.44 5.38 5.47 5.39 5.38 5.28 5.30

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.24 5.37 5.35 5.38 5.32 5.35 5.31 5.32 5.45 5.28 5.34 5.26 5.39 5.30 5.24 5.36 5.49 5.32 5.37 5.30 5.37 5.38 5.28 5.28 5.28 5.22 5.30 5.30 5.57 5.33 5.54 5.36 5.37 5.23 5.19 5.34 5.33 5.33 5.34 5.48

Tengah 5.31 5.33 5.29 5.27 5.23 5.30 5.27 5.31 5.33 5.26 5.23 5.19 5.26 5.27 5.32 5.34 5.32 5.31 5.35 5.28 5.32 5.28 5.24 5.28 5.26 5.33 5.33 5.39 5.31 5.25 5.32 5.30 5.32 5.31 5.22 5.26 5.25 5.30 5.28 5.23

Kiri 5.35 5.32 5.22 5.28 5.25 5.28 5.31 5.30 5.28 5.25 5.26 5.35 5.23 5.24 5.18 5.28 5.33 5.29 5.37 5.29 5.39 5.36 5.25 5.33 5.27 5.21 5.12 5.31 5.37 5.42 5.38 5.33 5.20 5.27 5.23 5.36 5.25 5.24 5.26 5.30

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

- 5.98

5.08 5.12

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 37: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : A - ATAS

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.40 5.31 5.34 5.40 5.34 5.43 5.32 5.26 5.90 5.24 5.28 5.36 5.26 5.29 5.38 5.31 5.34 5.31 5.25 5.28 5.38 5.36 5.25 5.32 5.27 5.34 5.23 5.37 5.41 5.23 5.30 5.27 5.22 5.34 5.15 5.23 5.39 5.28 5.25 5.30

Tengah 5.46 5.18 5.24 5.30 5.28 5.35 5.26 5.24 5.81 5.16 5.30 5.25 5.28 5.30 5.30 5.23 5.33 5.27 5.25 5.28 5.31 5.31 5.12 5.24 5.20 5.27 5.26 5.28 5.27 5.22 5.31 5.22 5.12 5.21 5.16 5.20 5.42 5.26 5.29 5.16

Kiri 5.33 5.24 5.32 5.27 5.15 5.31 5.32 5.24 5.96 5.22 5.27 5.22 5.28 5.32 5.22 5.26 5.34 5.30 5.25 5.27 5.34 5.28 5.23 5.23 5.23 5.26 5.14 5.25 5.25 5.22 5.22 5.24 5.15 5.21 5.26 5.26 5.33 5.24 5.25 5.16

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.28 5.37 5.36 5.34 5.40 5.47 5.36 5.33 5.22 5.37 5.15 5.32 5.21 5.33 5.27

Tengah 5.31 5.35 5.27 5.22 5.35 5.29 5.38 5.26 5.22 5.28 5.22 5.18 5.28 5.25 5.24

Kiri 5.30 5.26 5.26 5.23 5.32 5.40 5.24 5.35 5.22 5.31 5.21 5.19 5.26 5.34 5.26

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

- 5.96

5.08 5.12

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 38: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : B - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.51 5.37 5.37 5.45 5.47 5.52 5.28 5.41 5.32 5.33 5.35 5.27 5.41 5.37 5.32 5.39 5.35 5.41 5.42 5.32 5.23 5.30 5.18 5.30 5.30 5.21 5.32 5.12 5.32 5.25 5.21 5.35 5.40 5.64 5.35 5.45 5.31 5.35 5.23 5.29

Tengah 5.63 5.44 5.43 5.40 5.63 5.42 5.37 5.31 5.35 5.31 5.35 5.31 5.40 5.51 5.31 5.42 5.27 5.22 5.30 5.30 5.32 5.37 5.19 5.29 5.20 5.23 5.25 5.22 5.,11 5.27 5.31 5.48 5.20 5.42 5.25 5.30 5.29 5.23 5.34 5.28

Kiri 5.36 5.59 5.51 5.48 5.50 5.60 5.40 5.28 5.29 5.23 5.41 5.38 5.48 5.35 5.35 5.37 5.37 5.36 5.26 5.45 5.37 5.34 5.19 5.24 5.33 5.28 5.34 5.28 5.18 5.36 5.44 5.35 5.23 5.42 5.28 5.21 5.25 5.25 5.35 5.34

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan ,365,3 5.32 5.27 5.40 5.20 5.29 5.35 5.32 5.35 5.28 5.45 5.31 5.22 5.43 5.38 5.14 5.28 5.29 5.37 5.20 5.37 5.36 5.24 5.29 5.37 5.33 5.24 5.24 5.36 5.23 5.33 5.23 5.32 5.29 5.19 5.36 5.31 5.32 5.30 5.44

Tengah 5.20 5.34 5.24 5.38 5.19 5.31 5.46 5.29 5.34 5.21 5.35 5.25 5.16 5.35 5.34 5.19 5.21 5.21 5.23 5.12 5.16 5.25 5.23 5.29 5.13 5.32 5.30 5.39 5.28 5.25 5.19 5.18 5.17 5.22 5.12 5.15 5.19 5.21 5.26 5.29

Kiri 5.21 5.40 5.33 5.23 5.29 5.31 5.33 5.41 5.36 5.35 5.34 5.33 5.30 5.29 5.33 5.30 5.24 5.24 5.29 5.23 5.33 5.22 5.25 5.33 5.17 5.26 5.14 5.28 5.37 5.40 5.15 5.18 5.19 5.26 5.23 5.18 5.23 5.23 5.25 5.29

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.64

5.08 5.12

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 39: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : B - ATAS

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.37 5.26 5.39 5.36 5.33 5.34 5.35 5.30 5.25 5.32 5.30 5.31 5.29 5.36 5.33 5.21 5.38 5.45 5.30 5.26 5,,30 5.19 5.37 5.36 5.38 5.35 5.31 5.28 5.49 5.36 5.32 5.35 5.20 5.18 5.14 5.35 5.38 5.27 5.25 5.31

Tengah 5.28 5.10 5.23 5.33 5.25 5.20 5.41 5.20 5.20 5.24 5.22 5.22 5.28 5.19 5.13 5.25 5.26 5.27 5.17 5.27 5.25 5.23 5.32 5.29 5.18 5.14 5.27 5.23 5.23 5.25 5.22 5.21 5.09 5.31 5.20 5.20 5.32 5.28 5.23 5.26

Kiri 5.29 5.22 5.38 5.29 5.48 5.16 5.26 5.20 5.23 5.31 5.13 5.27 5.35 5.26 5.13 5.24 5.25 5.26 5.07 5.14 5.25 5.25 5.44 5.65 5.17 5.37 5.28 5.35 5.28 5.35 5.33 5.33 5.18 5.29 5.20 5.35 5.39 5.31 5.20 5.32

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.23 5.34 5.27 5.45 5.33 5.36 5.39 5.35 5.40 5.42 5.32 5.31 5.35 5.22 5.35

Tengah 5.26 5.28 5.20 5.23 5.25 5.30 5.30 5.15 5.16 5.39 5.50 5.31 5.27 5.24 5.24

Kiri 5.39 5.23 5.19 5.33 5.34 5.22 5.22 5.27 5.38 5.29 5.29 5.30 5.14 5.31 5.27

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.65

5.08 5.07

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 40: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : C - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.27 5.26 5.36 5.32 5.18 5.35 5.17 5.27 5.28 5.25 5.27 5.44 5.31 5.37 5.34 5.30 5.34 5.38 5.25 5.25 5.28 5.27 5.15 5.31 5.15 5.27 5.44 5.30 5.26 5.36 5.36 5.21 5.26 5.23 5.34 5.37 5.31 5.23 5.38 5.33

Tengah 5.26 5.22 5.31 5.31 5.14 5.20 5.18 5.19 5.27 5.11 5.19 5.28 5.23 5.30 5.30 5.28 5.16 5.29 5.30 5.30 5.26 5.23 5.12 5.28 5.17 5.24 5.30 5.27 5.27 5.22 5.37 5.22 5.25 5.21 5.33 5.28 5.27 5.24 5.32 5.32

Kiri 5.22 5.23 5.29 5.28 5.04 5.22 5.19 5.18 5.31 5.25 5.15 5.31 5.24 5.22 5.29 5.29 5.20 5.22 5.10 5.19 5.29 5.25 5.13 5.18 5.23 5.25 5.23 5.20 5.22 5.28 5.23 5.19 5.17 5.23 5.27 5.22 5.26 5.29 5.28 5.32

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.38 5.12 5.34 5.50 5.26 5.23 5.20 5.20 5.19 5.43 5.38 5.15 5.37 5.25 5.25 5.32 5.24 5.32 5.08 5.29 5.50 5.30 5.39 5.30 5.21 5.27 5.52 5.32 5.30 5.15 5.26 5.30 5.28 5.35 5.34 5.34 5.25 5.25 5.32 5.28

Tengah 5.24 5.16 5.18 5.25 5.16 5.26 5.16 5.24 5.22 5.27 5.22 5.14 5.24 5.30 5.22 5.26 5.28 5.28 5.13 5.13 5.28 5.13 5.24 5.15 5.11 5.23 5.45 5.36 5.22 5.11 5.25 5.11 5.34 5.36 5.33 5.32 5.23 5.13 5.20 5.19

Kiri 5.30 5.13 5.21 5.27 5.18 5.33 5.13 5.30 5.27 5.26 5.22 5.22 5.14 5.22 5.31 5.17 5.25 5.27 5.10 5.33 5.13 5.10 5.18 5.29 5.11 5.36 5.35 5.38 5.25 5.14 5.25 5.27 5.35 5.35 5.38 5.33 5.20 5.14 5.29 5.33

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

- 5.52

5.08 5.04

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 41: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8

POSISI : C - ATAS

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.41 5.48 5.25 5.34 5.29 5.16 5.27 5.37 5.20 5.18 5.27 5.19 5.32 5.20 5.27 5.32 5.32 5.19 5.25 5.20 5.26 5.34 5.32 5.28 5.33 5.16 5.19 5.23 5.29 5.34 5.23 5.19 5.34 5.40 5.29 5.18 5.24 5.43 5.40 5.12

Tengah 5.33 5.30 5.16 5.25 5.17 5.17 5.32 5.23 5.25 5.16 5.25 5.18 5.24 5.13 5.19 5.35 5.20 5.12 5.20 5.28 5.25 5.23 5.26 5.26 5.28 5.18 5.15 5.19 5.23 5.26 5.32 5.10 5.31 5.30 5.15 5.08 5.11 5.36 5.28 5.13

Kiri 5.35 5.35 5.15 5.11 5.18 5.16 5.26 5.34 5.26 5.25 5.24 5.16 5.23 5.38 5.25 5.36 5.21 5.22 5.22 5.27 5.45 5.24 5.26 5.33 5.21 5.10 5.14 5.12 5.18 5.31 5.30 5.17 5.20 5.18 5.17 5.26 5.34 5.18 5.27 5.19

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Kanan 5.36 5.34 5.49 5.51 5.51 5.35 5.35 5.34 5.19 5.24 5.22 5.31 5.23 5.36 5.33

Tengah 5.34 5.29 5.43 5.32 5.29 5.20 5.25 5.26 5.29 5.19 5.21 5.20 5.14 5.11 5.30

Kiri 5.30 5.23 5.44 5.35 5.32 5.24 5.24 5.30 5.19 5.42 5.22 5.26 5.09 5.19 5.38

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

- 5.51

5.08 5.08

E‐ 8

E‐ 7

Posisi PengujianCA B

Page 42: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSE-8 (WALL)

Page 43: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : TURBIN (FRONT) - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.46 7.44 7.57 7.41 7.62 7.52 7.63 7.55 7.51 7.22 7.43 7.50 7.61 7.62 7.42 7.60 7.50 7.43 7.40 7.49 7.60 7.57 7.55 7.36 7.55 7.46 7.64 7.48 7.66 7.57 7.55 7.60 7.50 7.56 7.53 7.62 7.51 7.59 7.35 7.45

Tengah 7.51 7.62 7.66 7.38 7.68 7.52 7.48 7.55 7.54 7.31 7.41 7.45 7.42 7.59 7.51 7.66 7.59 7.50 7.36 7.55 7.67 7.56 7.41 7.45 7.48 7.67 7.50 7.42 7.47 7.63 7.41 7.36 7.64 7.62 7.53 7.59 7.43 7.51 7.34 7.55

Kiri 7.52 7.49 7.46 7.47 7.48 7.49 7.58 7.61 7.62 7.49 7.49 7.74 7.39 7.47 7.50 7.45 7.58 7.45 7.46 7.55 7.49 7.50 7.48 7.33 7.54 7.51 7.52 7.53 7.42 7.55 7.31 7.47 7.59 7.44 7.53 7.49 7.49 7.48 7.26 7.63

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.60 7.38 7.61 7.43 7.55 7.41 7.48 7.53 7.52 7.58 7.65 7.58 7.71 7.56 7.54 7.52 7.31 7.46 7.46 7.45 7.56 7.63 7.40 7.65 7.56 7.35 7.61 7.43 7.48 7.61 7.62 7.53 7.66 7.53 7.69 7.46 7.51 7.65 7.48 7.52

Tengah 7.53 7.38 7.57 7.57 7.61 7.40 7.44 7.57 7.38 7.56 7.44 7.66 7.59 7.45 7.41 7.42 7.52 7.49 7.52 7.51 7.43 7.48 7.62 7.44 7.45 7.45 7.28 7.40 7.34 7.49 7.51 7.45 7.61 7.53 7.56 7.37 7.46 7.58 7.50 7.50

Kiri 7.42 7.53 7.60 7.46 7.56 7.55 7.38 7.42 7.44 7.48 7.38 7.58 7.62 7.55 7.47 7.46 7.45 7.66 7.53 7.43 7.53 7.54 7.70 7.42 7.44 7.41 7.57 7.32 7.41 7.44 7.59 7.42 7.47 7.59 7.47 7.45 7.59 7.60 7.44 7.53

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 7.55 7.50 7.44 7.38 7.49 7.62 7.58 7.52 7.45 7.67 7.47 7.57 7.49 7.60 7.67 7.71 7.61 7.71 7.73 7.51 7.45 7.62 7.60 7.41 7.56 7.61 7.60 7.43 7.57 7.72 7.45 7.60 7.63 7.46 7.46 7.40 7.52 7.47 7.46 7.63

Tengah 7.49 7.45 7.40 7.68 7.60 7.64 7.63 7.59 7.46 7.48 7.38 7.31 7.63 7.53 7.58 7.55 7.59 7.62 7.50 7.48 7.40 7.51 7.55 7.50 7.49 7.55 7.45 7.49 7.53 7.57 7.56 7.42 7.57 7.62 7.40 7.45 7.41 7.35 7.50 7.45

Kiri 7.40 7.40 7.33 7.49 7.53 7.65 7.54 7.61 7.43 7.51 7.56 7.41 7.68 7.61 7.56 7.42 7.42 7.46 7.35 7.38 7.47 7.79 7.34 7.47 7.53 7.60 7.53 7.51 7.56 7.61 7.55 7.51 7.52 7.62 7.47 7.55 7.53 7.34 7.51 7.55

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 7.58 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 7.39 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 7.51 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

7.79

7.11 7.22

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) -

Posisi Pengujian

E‐ 8

Page 44: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : TURBIN (FRONT) - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.60 7.52 7.55 7.43 7.45 7.56 7.57 7.51 7.59 7.61 7.59 7.45 7.45 7.51 7.56 7.50 7.56 7.55 7.47 7.57 7.57 7.57 7.44 7.51 7.38 7.44 7.61 7.67 7.60 7.61 7.35 7.49 7.65 7.47 7.46 7.48 7.50 7.54 7.32 7.59

Tengah 7.44 7.60 7.56 7.38 7.49 7.48 7.50 7.61 7.60 7.55 7.49 7.43 7.46 7.53 7.60 7.60 7.59 7.54 7.45 7.54 7.67 7.56 7.39 7.44 7.58 7.64 7.62 7.48 7.63 7.62 7.51 7.38 7.71 7.53 7.67 7.62 7.40 7.49 7.27 7.50

Kiri 7.47 7.54 7.57 7.42 7.65 7.41 7.53 7.50 7.60 7.53 7.62 7.45 7.60 7.55 7.54 7.58 7.47 7.47 7.43 7.49 7.60 7.55 7.55 7.41 7.64 7.54 7.41 7.46 7.65 7.62 7.54 7.58 7.70 7.48 7.51 7.53 7.61 7.50 7.35 7.47

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.50 7.49 7.64 7.50 7.59 7.50 7.35 7.43 7.48 7.42 7.38 7.55 7.53 7.59 7.48 7.46 7.45 7.56 7.46 7.41 7.54 7.52 7.61 7.45 7.38 7.43 7.55 7.35 7.42 7.46 7.58 7.55 7.48 7.65 7.46 7.56 7.58 7.61 7.46 7.61

Tengah 7.61 7.49 7.46 7.64 7.68 7.50 7.44 7.53 7.46 7.39 7.59 7.60 7.70 7.48 7.40 7.51 7.51 7.46 7.46 7.40 7.59 7.49 7.69 7.49 7.45 7.51 7.36 7.36 7.30 7.51 7.64 7.45 7.58 7.61 7.50 7.47 7.58 7.53 7.54 7.46

Kiri 7.63 7.50 7.51 7.50 7.49 7.43 7.46 7.44 7.52 7.61 7.65 7.57 7.67 7.46 7.51 7.50 7.50 7.56 7.39 7.43 7.64 7.55 7.60 7.60 7.54 7.42 7.58 7.47 7.48 7.56 7.57 7.52 7.60 7.58 7.54 7.53 7.51 7.58 7.57 7.47

No. Row

Teb

al (m

m)

No. Row

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 7.40 7.59 7.35 7.48 7.59 7.48 7.55 7.64 7.39 7.61 7.46 7.42 7.67 7.62 7.54 7.46 7.34 7.46 7.53 7.42 7.50 7.51 7.55 7.50 7.57 7.52 7.57 7.58 7.55 7.54 7.57 7.43 7.55 7.61 7.69 7.58 7.51 7.32 7.63 7.60

Tengah 7.39 7.51 7.41 7.51 7.61 7.65 7.60 7.64 7.55 7.55 7.40 7.44 7.66 7.63 7.60 7.53 7.64 7.66 7.59 7.57 7.46 7.56 7.51 7.56 7.51 7.46 7.49 7.48 7.54 7.66 7.45 7.42 7.49 7.52 7.56 7.55 7.55 7.45 7.56 7.62

Kiri 7.55 7.64 7.37 7.43 7.52 7.55 7.60 7.45 7.58 7.60 7.52 7.52 7.58 7.52 7.61 7.62 7.62 7.69 7.65 7.41 7.53 7.58 7.62 7.40 7.56 7.66 7.64 7.39 7.55 7.65 7.55 7.53 7.66 7.65 7.57 7.38 7.49 7.54 7.50 7.50

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 7.57 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 7.55 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 7.66 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) - 7.71

7.11 7.27

Posisi Pengujian

E‐ 8

Page 45: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KIRI - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.60 7.49 7.57 7.35 7.45 7.59 7.63 7.46 7.39 7.56 7.63 7.30 7.57 7.67 7.29 7.62 7.43 7.39 7.62 7.43 7.57 7.23 7.39 6.43 7.54 7.35 7.70 7.37 7.46 7.69 7.55 7.54 7.56 7.70 7.44 7.60

Tengah 7.52 7.32 7.63 7.38 7.58 7.29 7.61 7.53 7.42 7.59 7.44 7.44 7.41 7.67 7.45 7.75 7.25 7.52 7.58 7.38 7.63 7.29 7.43 6.72 7.64 7.18 7.56 7.40 7.25 7.56 7.40 7.42 7.29 7.60 7.68 7.61

Kiri 7.70 7.27 7.59 7.50 7.47 7.28 7.65 7.68 7.50 7.63 7.41 7.41 7.50 7.55 7.48 7.63 7.30 7.58 7.52 7.19 7.51 7.57 7.39 7.16 7.46 7.42 7.45 7.31 7.44 7.66 7.31 7.36 7.35 7.50 7.68 7.58

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

Kanan 7.46 7.81 7.40 7.33 7.34 7.58 7.72 7.64 7.34 7.37 7.37 7.22 7.29 7.51 7.68 7.32 7.62 7.68 7.36 7.64 7.53 7.66 7.51 7.70 7.69

Tengah 7.53 7.59 7.27 7.42 7.64 7.52 7.31 7.71 6.85 7.18 7.39 7.27 7.39 7.70 7.49 7.40 7.52 7.65 7.40 7.50 7.64 7.49 7.62 7.52 7.57

Kiri 7.64 7.68 7.39 7.50 7.61 7.57 7.56 7.54 6.67 7.37 7.39 7.41 7.46 7.64 7.38 7.57 7.30 7.62 7.49 7.52 7.52 7.41 7.55 7.60 7.61

No. Row

Teb

al (m

m)

Main Hole

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Main Hole

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.81

7.11 6.43

Posisi Pengujian

E‐ 8

Page 46: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KIRI - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.58 7.49 7.31 7.28 7.53 7.26 7.69 7.54 7.29 7.63 7.65 7.33 7.53 7.43 7.58 7.61 7.44 7.52 7.52 7.61 7.48 7.44 7.71 7.63 7.32 7.58 7.47 7.47 7.23 7.38 7.45 7.51 7.58 7.53 7.46 7.53 7.55 7.56 7.70 7.45

Tengah 7.61 7.31 7.44 7.19 7.64 7.37 7.65 7.54 7.48 7.64 7.38 7.27 7.46 7.21 7.42 7.46 7.49 7.63 7.55 7.55 7.65 7.31 7.50 7.46 7.37 7.56 7.37 7.26 7.29 7.46 7.23 7.55 7.56 7.52 7.29 7.43 7.52 7.58 7.47 7.30

Kiri 7.50 7.28 7.54 7.43 7.43 7.52 7.65 7.52 7.50 7.75 7.48 7.30 7.61 7.35 7.44 7.53 7.46 7.63 7.53 7.54 7.68 7.39 7.69 7.37 7.46 7.60 7.46 7.51 7.41 7.45 7.46 7.41 7.53 7.62 7.60 7.34 7.59 7.66 7.58 7.44

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Kanan 7.62 7.60 7.48 7.59 7.48 7.46 7.49 7.52 7.31 7.64 7.40 7.59 7.68 7.61 7.49 7.69 7.43 7.45 7.65

Tengah 7.51 7.45 7.47 7.56 7.35 7.25 7.68 7.50 7.38 7.53 7.47 7.50 7.50 7.59 7.52 7.58 7.59 7.48 7.38

Kiri 7.50 7.41 7.50 7.59 7.34 7.36 7.58 7.37 7.45 7.59 7.50 7.56 7.47 7.49 7.53 7.53 7.46 7.61 7.48

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

7.11 7.19

- 7.75

Posisi Pengujian

E‐ 8

Page 47: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : STACK (REAR) - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.43 5.46 5.41 5.43 5.46 5.35 5.49 5.47 5.35 5.34 5.33 5.31 5.46 5.38 5.34 5.33 5.37 5.30 5.47 5.43 5.36 5.46 5.37 5.43 5.42 5.46 5.44 5.43 5.43 5.30 5.48 5.39 5.47 5.37 5.52 5.45 5.45 5.37 5.35 5.44

Tengah 5.40 5.42 5.51 5.44 5.43 5.33 5.51 5.44 5.40 5.41 5.38 5.32 5.39 5.32 5.34 5.38 5.29 5.33 5.41 5.34 5.32 5.39 5.37 5.33 5.42 5.43 5.33 5.42 5.32 5.28 5.46 5.26 5.43 5.25 5.45 5.38 5.46 5.41 5.36 5.48

Kiri 5.48 5.50 5.52 5.38 5.51 5.48 5.54 5.48 5.41 5.45 5.35 5.38 5.36 5.44 5.41 5.40 5.29 5.37 5.54 5.42 5.46 5.41 5.34 5.41 5.49 5.40 5.36 5.39 5.36 5.36 5.38 5.45 5.33 5.46 5.33 5.38 5.46 5.45 5.38 5.53

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.36 5.30 5.46 5.42 5.45 5.41 5.42 5.34 5.47 5.48 5.44 5.40 5.37 5.39 5.41 5.45 5.45 5.30 5.46 5.39 5.38 5.55 5.33 5.53 5.42 5.20 5.41 5.45 5.40 5.51 5.42 5.35 5.37 5.35 5.41 5.39 5.34 5.35 5.33 5.56

Tengah 5.36 5.35 5.41 5.46 5.35 5.42 5.45 5.35 5.47 5.34 5.37 5.32 5.34 5.35 5.45 5.35 5.39 5.31 5.42 5.30 5.38 5.50 5.35 5.53 5.46 5.31 5.46 5.35 5.30 5.38 5.30 5.36 5.34 5.40 5.43 5.36 5.34 5.27 5.31 5.51

Kiri 5.29 5.45 5.40 5.50 5.35 5.39 5.39 5.40 5.46 5.35 5.36 5.46 5.36 5.45 5.40 5.47 5.43 5.37 5.37 5.40 5.43 5.48 5.30 5.46 5.50 5.45 5.46 5.41 5.30 5.35 5.40 5.37 5.37 5.44 5.45 5.38 5.40 5.42 5.35 5.49

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106

Kanan 5.41 5.43 5.35 5.33 5.40 5.47 5.47 5.48 5.50 5.30 5.42 5.34 5.43 5.43 5.47 5.42 5.37 5.28 5.36 5.41 5.40 5.35 5.44 5.39 5.38 5.31

Tengah 5.38 5.39 5.33 5.31 5.33 5.44 5.42 5.42 5.41 5.35 5.31 5.36 5.32 5.34 5.45 5.38 5.34 5.34 5.40 5.37 5.34 5.25 5.32 5.42 5.36 5.35

Kiri 5.41 5.47 5.47 5.31 5.45 5.44 5.30 5.45 5.40 5.32 5.33 5.33 5.47 5.37 5.47 5.43 5.36 5.37 5.34 5.43 5.43 5.36 5.37 5.39 5.37 5.44

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

- 5.56

5.08 5.20

Posisi Pengujian

E‐ 8

Page 48: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KANAN - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.41 7.35 7.48 7.44 7.40 7.63 7.44 7.55 7.44 7.61 7.43 7.65 7.62 7.62 7.54 7.53 7.69 7.22 7.60 7.41 7.54 7.42 7.58 7.45 7.41 7.22 7.45 7.69 7.52 7.63 7.66 7.40 7.23 7.44 7.51 7.41

Tengah 7.32 7.50 7.50 7.33 7.51 7.69 7.23 7.52 7.51 7.62 7.47 7.60 7.60 7.60 7.51 7.39 7.60 7.14 7.43 7.59 7.47 7.40 7.61 7.41 7.48 7.47 7.57 7.66 7.45 7.48 7.62 7.35 7.44 7.55 7.48 7.41

Kiri 7.47 7.70 7.35 7.29 7.61 7.64 7.36 7.40 7.71 7.58 7.52 7.58 7.56 7.49 7.49 7.43 7.57 7.50 7.64 7.53 7.59 7.58 7.66 7.57 7.62 7.38 7.56 7.52 7.35 7.49 7.61 7.44 7.34 7.59 7.47 7.36

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

Kanan 7.47 7.59 7.63 7.39 7.60 7.45 7.66 7.67 7.63 7.70 7.45 7.58 7.44 7.67 7.41 7.41 7.62 7.52 7.44 7.43 7.59 7.43 7.37 7.38 7.35

Tengah 7.47 7.51 7.71 7.37 7.60 7.32 7.54 7.63 7.42 7.66 7.42 7.61 7.46 7.65 7.40 7.39 7.61 7.42 7.50 7.46 7.61 7.37 7.40 7.46 7.36

Kiri 7.37 7.51 7.68 7.48 7.64 7.44 7.53 7.51 7.50 7.52 7.47 7.52 7.38 7.53 7.49 7.46 7.66 7.30 7.58 7.36 7.60 7.40 7.50 7.51 7.51

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Main Hole

No. Row

Teb

al (m

m)

Main Hole

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.71

7.11 7.14

Posisi Pengujian

E‐ 8

Page 49: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : E-8 (WALL)

POSISI : KANAN - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.43 7.42 7.43 7.56 7.39 7.26 7.25 7.55 7.56 7.61 7.60 7.61 7.57 7.67 7.53 7.59 7.41 7.43 7.47 7.51 7.37 7.36 7.41 7.38 7.59 7.52 7.53 7.65 7.42 7.59 7.47 7.51 7.55 7.56 7.53 7.51 7.66 7.56 7.35 7.63

Tengah 7.42 7.29 7.39 7.46 7.49 7.43 7.31 7.61 7.66 7.59 7.58 7.53 7.70 7.62 7.41 7.61 7.39 7.46 7.44 7.45 7.41 7.44 7.47 7.35 7.54 7.46 7.54 7.63 7.32 7.53 7.50 7.63 7.57 7.59 7.52 7.61 7.55 7.55 7.40 7.55

Kiri 7.29 7.26 7.28 7.33 7.44 7.53 7.51 7.52 7.67 7.67 7.59 7.46 7.53 7.60 7.44 7.52 7.48 7.36 7.48 7.40 7.47 7.31 7.52 7.57 7.56 7.66 7.51 7.64 7.48 7.36 7.59 7.61 7.58 7.60 7.58 7.60 7.62 7.42 7.52 7.52

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Kanan 7.59 7.52 7.42 7.62 7.44 7.57 7.57 7.42 7.48 7.59 7.50 7.42 7.52 7.60 7.52 7.61 7.56 7.36 7.32

Tengah 7.53 7.49 7.35 7.41 7.42 7.53 7.44 7.42 7.53 7.50 7.42 7.48 7.45 7.53 7.58 7.64 7.59 7.34 7.47

Kiri 7.50 7.56 7.42 7.42 7.55 7.66 7.53 7.56 7.56 7.43 7.43 7.55 7.65 7.60 7.56 7.50 7.57 7.47 7.40

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari turbin ke stack

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.70

7.11 7.25

Posisi Pengujian

E‐ 8

Page 50: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSDATA PENGUJIAN THICKNESSF-22

Page 51: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-22

POSISI : LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.30 6.94 6.20 6.25 6.41 6.37 6.27 6.24 6.29 6.20 6.28 6.20 6.30 6.31 6.23 6.22 6.29 6.23 6.17 6.24 6.29 6.31 6.21 6.24 6.25 6.23 6.28 6.21 6.25 6.28 6.25 6.23 6.30 6.22 6.22 6.30 6.28 6.15 6.16 6.06

Tengah 7.31 6.11 6.26 6.31 6.36 6.38 6.33 6.30 6.38 6.25 6.24 6.18 6.17 6.28 6.24 6.14 6.26 6.21 6.23 6.25 6.46 6.24 6.25 6.21 6.17 6.28 6.24 6.21 6.24 6.35 6.30 6.31 6.24 6.25 6.20 6.28 6.28 6.24 6.23 6.17

Kiri 7.17 6.10 6.31 6.33 6.37 6.28 6.47 6.41 6.31 6.18 6.28 6.30 6.27 6.31 6.35 6.24 6.29 6.28 6.19 6.23 6.45 6.32 6.28 6.21 6.26 6.26 6.26 6.26 6.37 6.24 6.29 6.20 6.33 6.22 6.16 6.30 6.16 6.20 6.24 6.15

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 6.10 6.19 6.28 6.21 6.20 6.18 6.06 6.13 6.09 6.85 6.21 6.19 6.19 6.19 6.17 6.14 6.20 6.21 6.22 6.15 6.23 6.18 6.25 6.05 6.18 6.21 6.01 6.18 6.19 6.18 6.22 6.23 6.13 6.03 6.20 6.08 6.16 6.13 6.22 6.18

Tengah 6.18 6.11 6.21 6.22 6.22 6.32 6.14 6.11 6.10 6.20 6.14 6.21 6.28 6.21 6.18 6.13 6.40 6.18 6.27 6.27 6.22 6.14 6.21 6.13 6.10 6.22 6.20 6.09 6.19 6.20 6.19 6.17 6.12 6.12 6.09 6.06 6.21 6.14 6.22 6.23

Kiri 6.12 6.24 6.23 6.27 6.21 6.20 6.25 6.20 6.23 6.27 6.17 6.23 6.23 6.27 6.31 6.24 6.25 6.26 6.28 6.16 6.20 6.21 6.23 6.28 6.21 6.16 6.02 6.10 6.18 6.23 6.19 6.26 6.11 6.21 6.21 6.38 6.29 6.17 6.11 6.14

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 6.05 6.19 6.02 6.13 6.13 6.10 6.14 6.23 6.07 6.18 6.30 6.24 6.14 6.18 6.19 6.12 6.16 6.21 6.41 6.15 6.36 6.16 6.30 6.15 6.18 6.08 6.10 6.18 6.18 6.15 6.16 6.05 6.00 6.32 6.18 6.06 6.04 6.09 6.06 6.16

Tengah 6.11 6.16 6.34 6.12 6.11 6.17 6.23 6.20 6.21 6.19 6.21 6.25 6.19 6.25 6.19 6.07 6.22 6.23 6.15 6.17 6.16 6.24 6.20 6.16 6.29 6.19 6.17 6.23 6.41 6.06 6.13 6.21 6.12 6.23 6.17 6.03 6.05 6.18 6.18 6.17

Kiri 6.12 6.14 6.27 6.14 6.21 6.13 6.26 6.29 6.26 6.20 6.24 6.24 6.37 6.24 6.22 6.23 6.17 6.17 6.23 6.21 6.23 6.22 6.24 6.12 6.23 6.05 6.11 6.26 6.12 6.40 6.21 6.10 6.07 6.26 6.14 6.03 6.03 6.10 6.18 6.15

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

- 7.31

5.58 6.00

LEVEL 3

LEVEL 2

LEVEL 1

Page 52: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-22

POSISI : LEVEL 1

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160

Kanan 6.26 6.27 6.25 6.15 6.20 6.08 6.15 6.26 6.17 6.06 6.22 6.16 6.15 6.14 6.27 6.23 6.20 6.06 6.13 6.14 6.15 6.08 6.17 6.22 6.15 6.18 6.26 6.16 6.14 6.06 6.16 6.26 6.06 6.21 6.26 6.15 6.26 6.18 6.27 6.28

Tengah 6.27 6.29 6.27 6.13 6.12 6.09 6.14 6.21 6.21 6.02 6.23 6.26 6.22 6.19 6.24 6.16 6.24 6.15 6.18 6.15 6.18 6.22 6.31 6.21 6.21 6.17 6.23 6.14 6.13 6.18 6.18 6.16 6.35 6.18 6.29 6.15 6.24 6.20 6.26 6.22

Kiri 6.27 6.36 6.21 6.20 6.22 6.19 6.27 6.26 6.20 6.06 6.21 6.27 6.23 6.23 6.24 6.25 6.29 6.25 6.20 6.17 6.28 6.28 6.22 6.18 6.19 6.20 6.25 6.21 6.16 6.30 6.25 6.13 6.28 6.25 6.26 6.20 6.25 6.12 6.27 6.26

161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200

Kanan 6.27 6.19 6.25 6.22 6.17 6.16 6.24 6.21 6.10 6.15 6.14 6.13 6.24 6.24 6.12 6.11 6.13 6.11 6.16 6.09 6.28 6.19 6.14 6.10 6.21 6.16 6.22 6.23 6.22 6.52 6.20 6.26 6.21 6.25 6.20 6.26 6.16 6.16 6.16 6.13

Tengah 6.19 6.10 6.21 6.18 6.18 6.09 6.15 6.23 6.19 6.09 6.21 6.15 6.31 6.15 6.19 6.14 6.15 6.17 6.30 6.18 6.20 6.26 6.16 6.06 6.20 6.24 6.21 6.25 6.15 6.22 6.19 6.24 6.16 6.23 6.29 6.22 6.00 6.27 6.12 6.18

Kiri 6.21 6.12 6.24 6.16 6.16 6.18 6.25 6.17 6.23 6.13 6.22 6.17 6.24 6.22 6.16 6.21 6.12 6.13 6.14 6.22 6.21 6.26 6.25 6.18 6.29 6.20 6.29 6.29 6.18 6.30 6.22 6.27 6.51 6.24 6.27 6.37 6.15 6.23 6.15 6.14

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240

Kanan 6.34 6.38 6.25 6.25 6.26 6.25 6.38 6.23 6.30 6.22 6.23 6.35 6.24 6.19 6.21 6.28 6.22 6.23 6.25 6.15 6.22 6.25 6.24 6.25 6.21 6.21 6.26 6.17 6.25 6.31 6.33 6.27 6.23 6.13 6.20 6.34 6.27 6.31 6.31 6.34

Tengah 6.44 6.25 6.27 6.14 6.11 6.25 6.29 6.26 6.36 6.33 6.20 6.32 6.17 6.21 6.20 6.27 6.24 6.26 6.23 6.31 6.15 6.24 6.10 6.23 6.03 6.22 6.11 6.17 6.21 6.19 6.32 6.17 6.16 6.20 6.20 6.39 6.32 6.28 6.26 6.21

Kiri 6.31 6.27 6.28 6.16 6.25 6.13 6.34 6.29 6.29 6.22 6.27 6.24 6.14 6.31 6.16 6.24 6.14 6.56 6.26 6.26 6.23 6.18 6.09 6.20 6.24 6.12 6.37 6.15 6.11 6.32 6.28 6.22 6.23 6.58 6.18 6.36 6.33 6.20 6.26 6.32

241 242 241 242 Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 6.20 6.26 6.27 6.22 Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 6.21 6.25 6.22 6.24 Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 6.29 6.28 6.16 6.18 Ketebalan Pipa Tipe : DMS 2 (Minimum Wall Thickness)

Desain = mm Ketelitian : 0.01 mm

Minimum = mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m) 6.58

6.00

-

5.58

No. Row

Teb

al (m

m)

LEVEL 3

LEVEL 2

LEVEL 1

Page 53: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-22

POSISI : LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 6.33 6.25 6.28 6.28 6.31 6.27 6.27 6.27 6.26 6.22 6.41 6.31 6.14 6.24 6.24 6.26 6.28 6.25 6.24 6.17 6.23 6.26 6.25 6.27 6.24 6.36 6.28 6.31 6.31 6.21 6.23 6.22 6.34 6.29 6.16 6.37 6.26 6.36 6.17 6.23

Tengah 6.30 6.22 6.24 6.23 6.37 6.20 6.24 6.22 6.31 6.20 6.27 6.19 6.17 6.30 6.20 6.31 6.25 6.21 6.11 6.19 6.21 6.25 6.22 6.30 6.23 6.27 6.16 6.26 6.23 6.20 6.24 6.57 6.26 6.23 6.66 6.15 6.23 6.31 6.07 6.22

Kiri 6.28 6.52 6.24 6.23 6.31 6.36 6.50 6.28 6.18 6.37 6.15 6.24 6.15 6.26 6.20 6.32 6.28 6.22 6.18 6.20 6.24 6.27 6.31 6.32 6.26 6.29 6.15 6.16 6.26 6.94 6.31 6.36 6.28 6.31 6.24 6.27 6.24 6.30 6.27 6.21

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 6.21 6.53 6.70 6.70 6.89 6.87 6.84 6.74 6.29 6.97 6.80 6.92 6.62 6.74 6.66 6.58 6.62 6.56 6.78 6.64 6.78 6.71 6.96 6.75 6.66 6.74 6.50 6.98 6.61 6.64 6.62 6.93 6.55 6.70 6.77 6.67 6.67 6.35 6.55 6.67

Tengah 6.38 6.45 6.67 6.64 6.57 6.38 6.60 6.78 6.55 6.55 6.73 6.71 6.88 6.40 6.78 6.32 6.89 6.77 6.22 6.72 6.67 6.61 6.68 6.65 6.57 6.70 6.66 6.47 6.78 6.44 6.66 6.80 6.74 6.64 6.78 6.64 6.62 6.25 6.85 6.49

Kiri 6.23 6.53 6.76 6.61 6.96 6.72 7.89 6.78 6.65 6.55 6.50 6.91 6.88 6.52 6.85 6.72 6.67 6.66 6.66 6.57 6.45 6.77 6.57 6.72 6.66 6.77 6.14 6.53 6.66 6.68 6.58 6.78 6.56 6.69 6.80 6.84 6.61 6.53 6.66 6.57

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 6.71 6.66 6.66 6.70 6.01 6.84 6.51 6.86 6.47 6.46 6.26 6.55 6.56 6.99 6.55 6.47 6.80 6.78 6.55 6.72 6.67 6.50 6.25 6.55 6.62 6.44 6.68 6.75 6.64 6.73 6.62 6.72 6.59 6.70 6.32 6.88 6.72 6.64 6.34 6.78

Tengah 6.65 6.67 6.77 6.66 6.78 6.82 6.48 6.66 6.76 6.72 6.84 6.80 6.83 6.80 6.37 6.64 6.71 6.70 6.51 6.56 6.74 6.60 6.40 6.99 6.52 6.07 6.71 6.60 6.60 6.63 6.58 6.53 6.86 6.69 6.64 6.51 6.87 6.57 6.64 6.56

Kiri 6.68 6.59 6.60 6.72 6.34 6.93 6.63 6.77 6.95 6.59 6.41 6.95 6.66 6.98 6.66 6.60 6.84 6.85 6.82 6.58 6.72 6.80 6.83 6.42 6.58 6.62 6.78 6.89 6.71 6.64 6.70 6.55 6.93 6.53 6.48 6.56 6.49 6.68 6.74 6.63

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

- 7.89

5.58 6.01

LEVEL 3

LEVEL 2

LEVEL 1

Page 54: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-22

POSISI : LEVEL 2

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160

Kanan 6.14 6.72 6.47 6,,67 6.62 6.72 6.78 6.55 6.67 6.35 6.57 6.55 6.78 6.92 6.76 6.72 6.62 6.72 6.91 6.58 6.78 6.57 6.56 6.97 6.80 6.72 6.61 6.74 6.62 6.59 6.22 6.59 6.70 6.99 6.92 6.62 6.58 6.70 6.66 6.76

Tengah 6.74 6.70 6.80 6.56 6.33 6.66 6.64 6.55 6.75 6.70 6.57 6.74 6.68 6.35 6.71 6.89 6.78 6.96 6.77 6.80 6.66 6.51 6.66 6.02 6.78 6.64 6.71 6.93 6.55 6.93 6.58 6.83 6.55 6.61 6.70 6.72 6.64 6.60 6.64 6.70

Kiri 6.76 6.75 6.72 6.22 6.64 6.80 6.80 6.78 6.78 6.64 6.74 6.76 6.87 6.57 6.77 6.43 6.91 6.74 6.68 6.68 6.68 6.74 6.70 6.82 6.74 6.49 6.82 6.59 6.93 6.56 6.52 6.72 6.72 6.78 6.32 6.70 6.61 6.62 6.74 6.43

161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200

Kanan 6.44 6.42 6.44 6.44 6.44 6.55 6.50 6.51 6.53 6.16 6.19 6.36 6.20 6.30 6.23 6.17 6.24 6.37 6.25 6.27 6.28 6.33 6.23 6.28 6.30 6.25 6.24 6.27 6.14 6.26 6.22 6.23 6.22 6.16 6.27 6.23 6.27 6.23 6.25 6.36

Tengah 6.41 6.60 6.57 6.60 6.74 6.56 6.57 6.53 6.49 6.24 6.25 6.28 6.22 6.15 6.19 6.18 6.22 6.14 6.28 6.24 6.20 6.38 6.15 6.20 6.32 6.27 6.20 6.27 6.17 6.20 6.23 6.20 6.20 6.23 6.18 6.28 6.28 6.21 6.16 6.30

Kiri 6.78 6.73 6.76 6.52 6.40 6.57 6.69 6.27 6.27 6.27 6.23 6.35 6.28 6.30 6.17 6.26 6.28 6.27 6.22 6.25 6.26 6.32 6.25 6.19 6.30 6.28 6.28 6.16 6.13 6.32 6.22 6.27 6.18 6.22 6.27 6.31 6.25 6.20 6.20 6.23

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240

Kanan 6.23 6.28 6.25 6.27 6.21 6.25 6.28 6.24 6.29 6.31 6.28 6.24 6.25 6.25 6.26 6.05 6.47 6.21 6.31 6.18 6.22 6.24 6.32 6.21 6.30 6.34 6.26 6.21 6.22 6.25 6.39 6.19 6.17 6.12 6.19 6.24 6.27 6.23 6.24 6.25

Tengah 6.31 6.21 6.22 6.24 6.27 6.24 6.25 6.27 6.28 6.26 6.29 6.23 6.39 6.23 6.20 6.23 6.22 6.23 6.31 6.32 6.11 6.26 6.37 6.36 6.21 6.59 6.33 6.22 6.27 6.27 6.24 6.33 6.21 6.27 6.24 6.34 6.25 6.24 6.23 6.31

Kiri 6.33 6.28 6.22 6.21 6.21 6.24 6.29 6.25 6.26 6.28 6.33 6.33 6.20 6.31 6.19 6.24 6.30 6.28 6.29 6.28 6.16 6.30 6.31 6.44 6.36 6.21 6.53 6.32 6.19 6.17 6.20 6.32 6.24 6.23 6.12 6.37 6.29 6.21 6.24 6.32

241 242 241 242 Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 6.32 6.24 6.41 6.31 Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 6.33 6.21 6.24 6.28 Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 6.36 6.40 6.24 6.27 Ketebalan Pipa Tipe : DMS 2 (Minimum Wall Thickness)

Desain = mm Ketelitian : 0.01 mmMinimum = mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

Teb

al (m

m)

No. Row

Teb

al (m

m) 6.99

6.02

-

5.58

No. Row

LEVEL 3

LEVEL 2

LEVEL 1

Page 55: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-22

POSISI : LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 6.75 5.84 6.03 6.01 5.85 6.05 7.03 6.03 6.12 6.17 5.87 6.07 6.01 5.98 6.03 6.01 6.01 6.02 6.03 6.10 6.00 6.07 6.03 6.02 6.01 6.05 6.02 6.05 6.02 6.03 6.07 6.05 6.08 6.04 6.03 6.08 6.13 6.06 6.03 5.99

Tengah 5.98 6.81 5.89 5.93 6.01 6.15 6.00 6.01 5.97 5.92 7.03 6.11 5.98 6.00 6.05 6.03 6.03 6.15 5.87 6.06 6.01 6.06 6.01 6.03 6.00 6.04 6.05 6.01 6.60 5.98 6.07 6.05 6.02 6.12 6.04 6.02 6.05 6.10 6.00 5.95

Kiri 6.05 5.99 6.27 6.02 6.05 7.04 6.04 7.01 6.00 6.03 6.96 6.01 5.99 6.10 6.09 6.08 6.09 6.09 6.01 6.08 6.08 6.10 6.02 6.09 6.02 6.04 6.11 6.07 6.03 6.04 6.10 5.98 6.16 6.09 6.07 6.07 6.07 6.14 6.15 6.04

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 6.01 6.02 6.03 6.01 5.99 6.00 6.04 6.04 5.92 5.94 6.05 6.05 6.07 6.05 6.09 6.08 6.04 6.06 6.06 6.06 6.01 6.02 6.14 6.02 6.03 6.06 6.01 6.06 6.09 6.02 6.08 6.09 6.03 6.01 6.04 6.06 6.07 6.06 6.10 6.06

Tengah 6.04 6.00 5.86 5.99 6.02 5.95 5.93 6.03 5.92 5.90 6.00 6.01 6.01 6.06 6.07 6.05 6.00 6.08 6.03 6.03 6.01 6.01 6.04 6.02 6.00 6.02 6.00 6.06 6.08 5.98 5.89 6.05 6.04 6.00 6.06 6.02 6.05 6.09 6.07 6.05

Kiri 6.09 5.99 6.05 6.06 6.03 6.03 6.06 6.02 6.04 7.07 6.06 6.04 6.09 6.08 6.06 6.09 6.13 6.10 6.12 6.04 6.14 6.02 6.11 6.07 6.06 6.02 6.03 6.03 6.13 6.11 6.04 6.07 6.00 5.98 6.04 6.08 6.07 6.09 6.06 6.10

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 6.88 6.05 6.03 6.17 6.11 6.03 6.04 6.03 6.03 6.04 6.09 6.65 6.07 6.02 6.04 6.05 6.03 6.11 6.05 6.06 6.08 6.14 6.07 6.10 6.09 6.10 6.01 6.08 6.06 6.03 6.01 6.03 6.04 6.04 6.06 6.02 6.03 6.07 6.06 6.00

Tengah 6.86 6.08 6.02 6.05 6.03 6.00 6.04 6.02 6.03 6.06 6.08 6.05 6.01 6.01 6.06 6.09 6.05 6.10 6.02 6.07 6.10 6.07 6.06 6.05 6.06 6.05 6.00 6.06 6.03 6.03 6.03 6.07 6.04 6.05 6.06 6.06 5.82 6.00 6.10 6.00

Kiri 6.89 6.11 6.06 6.19 6.04 6.10 6.07 6.06 6.01 6.08 6.14 6.00 6.13 6.07 6.10 6.02 6.06 6.11 6.15 6.03 6.06 6.03 6.09 6.08 6.07 6.06 6.11 6.10 6.06 6.04 6.00 6.11 6.01 6.11 6.07 6.07 6.03 6.14 6.08 6.01

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.07

5.58 5.82

No. Row

Teb

al (m

m)

LEVEL 3

LEVEL 2

LEVEL 1

Page 56: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-22

POSISI : LEVEL 3

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160

Kanan 6.00 6.10 6.07 6.04 6.07 6.01 6.04 6.03 6.04 6.06 6.05 6.04 6.00 6.07 6.07 6.03 6.01 6.05 6.02 6.05 6.04 6.05 6.10 6.08 6.11 6.04 6.03 6.06 6.04 5.99 6.05 6.05 6.07 6.03 6.02 6.11 6.06 6.04 6.04 6.03

Tengah 6.09 6.07 6.07 6.05 6.06 6.02 6.06 6.00 6.04 6.00 6.05 6.02 6.00 6.08 6.07 6.02 5.93 6.10 5.85 6.02 6.01 6.03 6.07 6.02 6.06 6.04 6.07 6.05 5.98 5.92 6.03 6.08 6.01 6.04 6.02 6.03 6.08 6.12 6.13 5.96

Kiri 6.06 6.14 6.12 6.10 6.10 6.04 6.00 6.13 6.03 6.06 6.04 6.04 6.10 6.08 6.14 6.10 5.97 6.04 5.93 6.07 6.08 6.07 6.07 6.09 6.13 6.08 6.10 6.07 6.01 6.01 6.08 6.04 6.04 6.09 6.01 5.99 6.08 6.06 6.00 6.07

161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200

Kanan 6.02 6.05 6.05 6.02 6.05 6.02 6.05 6.01 6.17 6.02 6.00 6.11 6.08 5.98 6.06 6.03 6.02 6.02 6.09 6.06 6.02 6.10 6.01 6.08 6.04 6.00 6.06 6.10 6.03 6.02 6.01 6.07 5.94 5.99 6.13 6.05 6.00 6.08 5.98 5.98

Tengah 6.01 5.99 5.97 6.02 5.95 6.01 6.04 6.07 6.04 6.00 6.04 6.04 6.03 5.99 6.01 6.00 6.02 6.08 6.03 5.90 5.94 6.20 5.81 6.03 6.04 5.98 5.81 5.92 6.07 6.02 6.02 6.04 6.06 6.00 5.85 6.04 6.05 5.95 5.97 5.94

Kiri 5.99 5.98 6.08 6.04 6.05 6.03 6.08 6.05 6.03 6.07 6.05 6.08 6.07 6.00 6.03 6.06 5.94 5.99 5.90 6.07 6.02 6.00 6.03 6.01 5.97 6.00 6.03 6.00 6.06 6.04 5.95 5.99 6.02 6.05 5.98 5.99 6.02 6.00 5.98 5.95

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240

Kanan 6.08 6.00 6.01 6.02 6.04 6.00 6.03 6.01 6.05 6.07 6.18 6.07 6.05 6.03 5.96 6.00 5.98 6.03 6.03 6.03 6.00 6.03 6.11 6.60 6.14 6.03 6.04 6.01 6.08 5.93 6.06 6.09 6.08 6.10 6.08 6.06 5.96 6.05 5.94 6.08

Tengah 6.04 6.02 5.97 5.96 6.02 6.06 6.03 5.92 6.01 6.13 6.07 6.03 6.07 5.97 5.94 5.95 6.04 5.88 6.00 6.00 5.98 5.98 6.09 5.97 6.15 6.03 6.13 5.97 6.10 6.00 6.08 5.98 5.98 5.95 5.96 6.03 6.06 5.94 5.90 6.06

Kiri 6.06 5.99 6.00 6.01 6.01 5.99 6.17 6.03 6.02 6.08 6.07 5.99 6.09 5.96 6.03 6.06 6.00 5.90 5.93 6.07 5.97 5.93 6.07 5.99 6.02 5.94 6.04 5.98 5.99 5.93 6.12 5.98 5.97 5.90 5.98 5.95 6.02 5.98 5.92 6.17

241 242 241 242 Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 6.09 6.11 6.06 6.05 Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.93 6.00 5.98 5.97 Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 6.01 6.02 6.05 6.03 Ketebalan Pipa Tipe : DMS 2 (Minimum Wall Thickness)

Desain = mm Ketelitian : 0.01 mmMinimum = mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) 6.60

5.81

-

5.58

LEVEL 3

LEVEL 2

LEVEL 1

Page 57: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSDATA PENGUJIAN THICKNESSF-23

Page 58: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-23

POSISI : LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.91 5.79 5.74 5.89 5.98 6.01 6.00 5.95 5.84 5.91 5.87 5.91 5.93 5.92 5.86 5.80 6.00 6.04 6.04 5.91 6.03 5.82 5.92 5.82 5.90 6.07 6.01 5.85 6.01 5.99 5.92 6.04 5.89 5.82 5.95 5.93 6.05 6.00 5.92 6.00

Tengah 5.84 5.92 6.61 5.99 5.99 6.03 5.93 5.90 5.73 5.91 5.87 5.89 5.98 5.90 5.80 5.93 5.97 6.03 6.00 6.09 6.02 6.03 5.90 5.91 5.87 5.97 6.01 5.89 5.97 6.06 5.94 6.09 5.82 5.90 6.01 5.84 6.00 5.93 5.97 5.93

Kiri 5.78 5.93 5.94 6.05 6.01 6.06 5.86 5.82 5.98 5.94 5.92 5.89 6.05 5.89 5.87 5.87 5.87 5.95 5.70 6.04 5.95 6.07 5.82 5.94 5.92 5.86 5.82 5.87 5.99 6.01 5.84 6.12 5.93 5.92 6.01 5.85 5.95 5.90 5.80 5.82

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 5.90 5.88 5.90 5.91 5.71 5.92 5.91 5.89 5.82 5.91 5.89 5.97 5.97 5.97 5.81 5.89 5.97 5.82 5.92 6.01 5.92

Tengah 5.99 5.95 5.88 6.01 5.86 5.99 6.03 6.04 5.99 5.83 5.98 5.79 5.92 5.79 5.87 5.77 5.98 5.99 5.91 5.98 5.95

Kiri 5.98 5.96 5.80 5.91 5.87 6.01 6.07 5.98 6.00 5.81 6.06 5.88 5.85 5.87 5.98 6.01 5.85 6.00 5.88 5.73 6.05

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 6.61

5.58 5.70

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

Page 59: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-23

POSISI : LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.80 5.81 5.86 5.93 5.97 5.81 5.90 5.96 5.81 5.86 5.81 5.91 5.89 5.97 5.88 5.81 6.00 6.07 6.00 5.93 5.99 5.86 5.92 5.81 5.93 6.07 5.99 5.88 5.97 5.93 5.95 6.05 5.85 5.83 5.97 5.93 6.06 5.99 5.96 5.99

Tengah 5.90 5.82 5.92 5.87 5.91 6.00 5.85 5.97 5.84 5.80 5.82 5.88 6.02 5.92 5.70 5.95 5.94 6.02 6.00 5.99 5.99 6.00 5.87 5.86 5.89 5.97 6.04 5.86 5.94 6.07 5.95 6.03 5.81 5.90 6.02 5.84 5.97 5.94 5.93 5.91

Kiri 5.88 5.90 5.92 5.97 6.02 6.04 5.80 5.67 5.90 5.88 5.84 5.87 6.09 5.86 5.85 5.84 5.91 6.04 5.88 5.99 5.97 6.01 5.81 6.03 5.88 6.03 5.91 5.93 5.97 6.04 5.92 6.04 5.91 5.87 6.09 5.84 5.96 5.89 5.86 5.87

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 5.88 5.86 5.85 5.95 5.83 5.95 5.90 5.83 5.93 5.85 5.97 6.03 5.96 6.01 5.79 5.97 5.94 5.75 5.90 5.95 5.92

Tengah 5.96 5.97 5.83 6.00 5.84 6.05 6.00 5.84 5.93 5.87 5.97 5.91 5.97 6.02 5.89 5.99 6.04 5.93 5.89 5.97 6.00

Kiri 5.97 5.82 5.73 5.98 5.86 6.00 6.03 6.00 5.96 5.92 5.93 5.83 5.81 5.84 5.98 6.03 6.00 6.01 5.83 5.93 6.01

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 6.09

5.58 5.67

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

Page 60: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-23

POSISI : LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.87 5.84 5.89 5.88 5.81 5.83 5.88 5.88 5.77 5.99 5.74 6.00 5.85 5.91 5.91 5.86 6.01 6.03 5.94 5.96 5.83 5.93 5.84 5.97 5.91 6.11 5.87 5.97 5.94 5.94 5.94 6.01 5.92 5.90 5.88 5.95 5.96 6.04 5.90 6.00

Tengah 5.85 5.67 5.96 5.89 5.85 5.95 5.90 5.90 5.91 5.90 5.83 5.88 5.97 5.86 5.69 5.97 5.97 5.95 5.97 5.95 5.86 5.88 5.95 5.93 5.94 6.00 6.06 5.81 5.99 5.97 5.92 6.00 5.88 5.85 5.99 5.82 5.97 5.92 5.94 5.93

Kiri 5.82 5.91 5.80 5.95 5.85 6.01 5.84 5.74 5.86 5.87 5.84 5.92 6.00 5.80 5.78 6.05 5.78 5.95 5.72 5.96 5.89 5.95 5.84 5.93 5.91 5.90 5.82 5.82 5.92 6.07 5.80 5.99 5.72 5.88 6.09 5.85 5.95 5.88 5.78 5.88

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 5.90 5.90 5.86 5.93 5.70 5.83 5.96 5.90 5.92 5.80 5.84 6.00 5.94 6.04 5.78 5.88 6.02 5.80 5.90 5.96 5.93

Tengah 5.99 5.88 5.89 6.00 5.85 5.95 6.04 6.00 6.00 5.88 6.00 6.00 5.95 5.86 5.78 5.94 5.96 5.88 5.73 6.01 5.97

Kiri 5.98 6.01 5.80 6.01 5.83 5.87 6.04 6.00 6.98 5.93 5.90 5.89 5.92 5.80 6.01 5.97 5.91 6.01 5.91 5.93 5.98

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 6.98

5.58 5.67

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

Page 61: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : F-23

POSISI : LEVEL 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.87 5.87 89.5.95.98 5.95 5.93 6.00 5.82 5.89 5.88 5.88 5.85 5.85 5.98 5.87 5.94 6.01 5.90 5.93 6.00 6.06 5.94 5.95 5.92 6.00 6.01 6.00 6.01 6.00 5.96 5.97 6.01 5.80 5.92 5.91 5.83 6.00 5.99 5.90 5.99

Tengah 5.80 5.91 5.97 5.91 5.98 6.04 5.87 5.95 5.90 5.93 5.86 5.87 5.96 5.89 5.81 5.98 5.99 6.02 6.03 6.02 6.03 5.98 5.93 5.88 5.96 5.99 6.00 5.83 6.02 6.08 5.92 5.96 5.70 5.86 5.99 5.84 6.02 5.80 5.90 5.96

Kiri 5.81 5.89 5,92 5,39 6,03 6,05 5,80 5,88 5,94 5,94 5,93 5,86 5,96 5,90 5,87 5,98 5,87 6,00 5,91 6,00 5,96 6,03 5,91 5,97 5,97 6,00 5,95 5,90 5,98 5,97 5,89 5,94 5,84 5,81 6.05 5.77 5.87 5.84 5.84 5.73

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 5.92 5.86 5.86 5.91 5.80 5.93 5.98 5.87 5.87 5.96 5.83 6.01 6.00 5.93 5.79 5.89 5.90 5.85 5.89 5.94 5.96

Tengah 5.99 5.97 5.85 5.88 5.83 6.03 6.04 5.96 5.99 5.84 6.01 5.91 5.99 5.87 5.91 5.98 5.94 5.86 5.79 5.90 5.94

Kiri 5.97 5.98 5.76 5.94 5.94 5.84 6.01 5.93 5.98 5.88 5.71 5.80 5.94 5.90 5.91 5.96 5.89 5.91 5.90 5.85 6.00

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 6.08

5.58 5.71

LEVEL 1

LEVEL 2

LEVEL 3LEVEL 4

Page 62: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSDATA PENGUJIAN THICKNESSS-3

Page 63: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-3

POSISI : A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 8.32 8.73 8.43 8.81 8.48 8.50 8.58 8.54 8.51 9.00 8.41 8.35 8.57 8.52 8.76 8.92 8.81 8.46 8.33 8.52 8.53 8.65 8.59 8.70 8.43 9.05 8.61 8.50 8.37 8.80 9.02 8.64 8.77 8.02 8.41 8.52 8.01 8.64 8.52 8.65

Tengah 8.44 8.75 8.57 8.78 8.46 8.51 8.42 8.68 8.36 8.91 8.34 8.43 8.86 8.56 8.62 8.88 8.46 8.51 8.21 8.45 8.49 8.70 8.64 8.60 8.74 8.91 8.55 8.47 8.41 8.60 8.93 8.50 8.71 8.51 8.56 8.61 8.11 8.52 8.47 8.42

Kiri 8.52 8.66 8.56 8.74 8.55 8.60 8.41 8.55 8.45 8.66 8.52 8.38 8.57 8.64 8.56 8.82 8.61 8.45 8.38 8.44 8.38 8.65 8.61 8.55 8.75 9.03 8.30 8.70 8.51 8.73 8.94 8.47 8.65 8.55 8.56 8.35 8.07 8.65 8.48 8.72

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 8.43 8.40 8.49 8.48 8.39 8.75 8.59 8.35 8.65 8.40 8.45 9.79 8.62 8.56 8.50 8.53 8.33 8.58 8.56 9.10 8.58 8.44 8.55 8.34 8.44 8.26 8.87 8.59 8.23 8.75 8.38 8.34 8.33 8.47 8.49 8.65 8.79 8.56 8.44 8.78

Tengah 8.46 8.50 8.50 8.50 8.59 8.87 8.60 8.51 8.71 8.73 8.49 8.84 8.57 8.60 8.49 8.55 8.49 8.48 8.48 8.99 8.42 8.44 8.55 8.39 8.54 8.50 8.78 8.57 8.41 8.64 8.40 8.70 8.32 8.19 8.44 8.57 8.85 8.50 8.63 8.74

Kiri 8.39 8.46 8.51 8.57 8.60 8.90 8.62 8.57 8.70 8.62 8.54 8.77 8.43 8.51 8.51 8.51 8.58 8.58 8.37 8.95 8.49 8.54 8.65 8.32 8.55 8.49 8.74 8.61 8.40 8.59 8.39 8.25 8.41 8.29 8.37 8.45 8.87 8.69 8.69 8.71

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 9.79

7.62 8.01

A B

Page 64: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-3

POSISI : A

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 8.72 8.33 8.81 8.84 8.46 8.40 8.59 8.01 8.62 9.06 8.51 8.39 8.35 8.66 8.04 8.53 8.58 8.91 8.64 8.71 8.46 8.54 8.67 8.63 8.52 8.63 8.57 8.64 8.57 8.35 8.50 8.37 8.10 8.85 8.56 8.22 8.46 8.74 8.43 8.47

Tengah 8.48 8.51 8.73 8.73 8.51 8.48 8.46 8.20 8.52 9.03 8.35 8.22 8.46 8.78 7.91 8.58 8.67 8.82 8.43 8.71 8.54 8.52 8.62 8.36 8.49 8.64 8.53 8.58 8.57 8.42 8.57 8.45 8.02 8.78 8.63 8.71 8.50 8.45 8.01 8.70

Kiri 8.61 8.58 8.65 8.96 8.58 8.46 8.53 8.21 8.50 8.98 8.58 8.30 8.64 8.69 8.02 8.51 8.64 8.74 8.58 8.47 8.54 8.89 8.78 8.40 8.42 8.53 8.44 8.65 8.51 8.25 7.91 8.45 8.07 8.78 8.45 8.34 8.42 8.49 8.66 8.73

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136

Kanan 8.46 8.62 8.30 8.64 8.02 8.92 8.50 8.56 8.59 8.51 8.05 8.49 8.30 8.47 8.42 8.17

Tengah 8.53 8.58 8.58 8.52 8.00 8.08 8.81 8.72 8.60 8.52 8.10 8.57 8.56 8.58 8.48 8.45

Kiri 8.85 8.49 8.54 8.67 8.00 8.87 8.69 8.54 8.51 8.52 8.16 8.15 8.73 8.45 8.65 8.41

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 9.06

7.62 7.91

A B

Page 65: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-3

POSISI : B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 8.64 8.44 8.44 8.74 8.49 8.39 8.48 8.43 8.50 8.76 8.38 8.42 8.42 8.61 8.57 8.42 8.66 8.61 8.78 8.26 8.56 8.46 8.79 8.55 8.45 8.51 8.56 8.45 8.40 8.48 8.58 8.67 8.52 8.57 8.63 8.53 8,,02 8.56 8.53 8.44

Tengah 8.41 8.31 8.55 8.57 8.41 8.56 8.56 8.68 8.42 8.35 8.31 8.39 8.63 8.49 8.69 8.27 8.73 8.44 8.22 8.49 8.42 8.45 8.88 8.47 8.53 8.53 8.52 8.55 8.54 8.40 8.57 8.57 8.51 8.60 8.40 8.62 8.40 8.55 8.41 8.72

Kiri 8.25 8.56 8.78 8.44 8.49 8.57 8.46 8.54 8.49 8.38 8.43 8.41 8.69 8.50 8.46 8.40 8.60 8.52 8.34 8.70 8.52 8.54 8.55 8.40 8.69 8.56 8.25 8.54 8.44 8.33 8.55 8.67 8.45 8.46 8.45 8.34 8.13 8.54 8.50 8.64

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 8.50 8.45 8.57 8.56 8.54 8.33 8.60 8.04 8.42 8.50 8.38 8.38 8.52 8.67 8.58 8.56 8.54 8.56 8.52 8.61 8.42 8.56 8.58 8.61 8.44 8.50 8.41 8.43 8.25 8.85 8.41 8.57 8.51 8.45 8.53 8.37 8.48 8.57 8.58 8.64

Tengah 8.60 8.37 8.76 8.53 8.55 8.44 8.50 8.58 8.56 8.74 8.49 8.51 8.39 8.72 8.54 8.50 8.71 8.49 8.47 8.50 8.43 8.42 8.45 8.53 8.49 8.75 8.52 8.51 8.33 8.14 8.36 8.49 8.76 8.37 8.42 8.46 8.58 8.77 8.58 8.72

Kiri 8.53 8.39 8.51 8.54 8.75 8.54 8.65 8.43 8.43 8.43 8.55 8.40 8.50 8.50 8.52 8.58 8.76 8.57 8.43 8.51 8.42 8.49 8.54 8.69 8.51 8.62 8.49 8.56 8.60 8.32 8.47 8.41 8.68 8.37 8.56 8.51 8.56 8.55 8.72 8.65

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

8.04

- 8.88

7.62

A B

Page 66: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-3

POSISI : B

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 8.45 8.35 8.33 8.35 8.57 8.45 8.46 8.28 8.67 8.49 8.44 8.43 8.35 8.41 8.78 8.52 8.42 8.55 8.60 8.54 8.50 8.61 8.55 8.42 8.45 8.44 8.48 8.50 8.53 8.37 8.56 8.50 8.08 8.41 8.63 8.64 8.79 8.58 8.57 8.20

Tengah 8.51 8.46 8.25 8.37 8.53 8.55 8.47 8.50 8.74 8.54 8.57 8.41 8.31 8.48 8.13 8.55 8.56 8.30 8.62 8.71 8.53 8.45 8.63 8.43 8.54 8.47 8.40 8.56 8.37 8.45 8.69 8.39 8.00 8.46 8.75 8.52 8.47 8.37 8.65 8.38

Kiri 8.63 8.49 8.25 8.48 8.66 8.39 8.42 8.45 8.54 8.43 8.60 8.50 8.51 8.40 8.18 8.49 8.60 8.49 8.72 8.46 8.38 8.38 8.75 8.51 8.29 8.49 8.49 8.54 8.35 8.59 8.76 8.39 8.07 8.43 8.75 8.47 8.52 8.44 8.75 8.52

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136

Kanan 8.44 8.72 8.30 8.34 8.11 8.11 8.53 8.49 8.42 8.50 8.20 8.50 8.57 8.60 8.42 8.54

Tengah 8.54 8.61 8.51 8.32 8.12 8.56 8.52 8.68 8.62 8.41 8.08 8.58 8.39 8.48 8.38 8.51

Kiri 8.46 8.54 8.54 8.54 8.10 8.54 8.54 8.58 8.63 8.25 8.00 8.45 8.47 8.38 8.32 8.51

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B dihitung dari turbin ke stack

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 8.79

7.62 8.00

A B

Page 67: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSDATA PENGUJIAN THICKNESSS-4

Page 68: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-4

POSISI :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.63 7.44 7.59 7.65 7.59 7.52 7.69 7.61 7.48 7.65 7.52 7.61 7.29 7.40 7.52 7.56 7.43 7.30 7.61 7.56 7.58 7.50 7.39 7.46 7.55 7.40 7.42 7.35 7.44 7.56 7.40 7.61 7.66 7.44 7.67 7.61 7.43 7.60 7.40 7.50

Tengah 7.67 7.49 7.54 7.56 7.68 7.44 7.53 7.71 7.56 7.64 7.48 7.60 7.46 7.58 7.39 7.52 7.35 7.38 7.63 7.62 7.62 7.55 7.48 7.52 7.45 7.64 7.46 7.34 7.32 7.42 7.53 7.70 7.63 7.47 7.49 7.51 7.42 7.66 7.42 7.59

Kiri 7.68 7.58 7.51 7.53 7.64 7.45 7.49 7.36 7.65 7.68 7.44 7.52 7.47 7.54 7.45 7.40 7.43 7.45 7.65 7.63 7.68 7.59 7.51 7.54 7.56 7.56 7.47 7.38 7.35 7.41 7.54 7.54 7.55 7.52 7.43 7.44 7.47 7.55 7.39 7.61

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.52 7.39 7.50 7.41 7.61 7.58 7.57 7.57 7.55 7.65 7.45 7.60 7.52 7.64 7.45 7.54 7.62 7.50 7.53 7.65 7.59 7.64 7.55 7.50 7.48 7.51 7.69 7.64 7.66 7.41 7.39 7.24 7.58 7.62 7.52 7.54 7.60 7.55 7.67 7.56

Tengah 7.51 7.44 7.52 7.50 7.58 7.48 7.54 7.52 7.51 7.70 7.54 7.63 7.51 7.64 7.54 7.40 7.69 7.58 7.60 7.50 7.61 7.65 7.51 7.51 7.48 7.53 7.62 7.61 7.53 7.45 7.52 7.60 7.58 7.50 7.49 7.54 7.55 7.51 7.63 7.68

Kiri 7.54 7.47 7.59 7.61 7.54 7.66 7.60 7.70 7.61 7.64 7.60 7.46 7.49 7.72 7.51 7.43 7.69 7.48 7.66 7.47 7.55 7.58 7.53 7.61 7.46 7.57 7.56 7.55 7.40 7.52 7.60 7.66 7.51 7.53 7.64 7.66 7.56 7.52 7.63 7.53

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

- 7.72

7.11 7.24

Page 69: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-4

POSISI :

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 7.48 7.48 7.46 7.34 7.47 7.67 7.34 7.53 7.41 7.61 7.57 7.52 7.47 7.64 7.45 7.63 7.51 7.51 7.60 7.62 7.54 7.47 7.53 7.46 7.58 7.59 7.72 7.48 7.57 7.44 7.60 7.43 7.58 7.41 7.61 7.60 7.47 7.52 7.96 7.52

Tengah 7.63 7.62 7.41 7.31 7.57 7.73 7.44 7.57 7.55 7.74 7.58 7.51 7.53 7.54 7.53 7.65 7.58 7.53 7.67 7.71 7.52 7.47 7.64 7.43 7.69 7.66 7.72 7.47 7.49 7.42 7.51 7.38 7.72 7.35 7.58 7.60 7.55 7.57 7.58 7.58

Kiri 7.64 7.60 7.34 7.48 7.55 7.62 7.55 7.58 7.66 7.67 7.69 7.62 7.61 7.47 7.56 7.65 7.66 7.64 7.59 7.73 7.68 7.49 7.54 7.43 7.69 7.55 7.64 7.38 7.46 7.49 7.42 7.46 7.74 7.44 7.55 7.66 7.69 7.44 7.59 7.67

121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136

Kanan 7.38 7.48 7.65 7.79 7.61 7.55 7.47 7.38 7.52 7.52 7.51 7.62 7.66 7.46 7.44 7.61

Tengah 7.32 7.57 7.55 7.59 7.73 7.50 7.44 7.51 7.47 7.46 7.49 7.68 7.45 7.48 7.44 7.56

Kiri 7.35 7.59 7.50 7.58 7.71 7.42 7.54 7.49 7.54 7.43 7.37 7.62 7.48 7.41 7.49 7.51

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

- 7.96

7.11 7.31

Page 70: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSDATA PENGUJIAN THICKNESSS-14

Page 71: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI : S-14

POSISI :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.46 7.58 7.46 7.46 7.50 7.62 7.60 7.65 7.60 7.18 7.67 7.47 7.46 7.60 7.61 7.32 7.73 7.68 7.56 7.44 7.55 7.52 7.78 7.68 7.52 7.58 7.45 7.63 7.66 7.62 7.62 7.76 7.63 7.53 7.57 7.47 7.43 7.58 7.75 7.74

Tengah 7.40 7.70 7.48 7.59 7.58 7.52 7.44 7.72 7.49 7.47 7.65 7.57 7.42 7.45 7.48 7.54 7.54 7.73 7.44 7.50 7.68 7.55 7.64 7.41 7.65 7.46 7.67 7.54 7.51 7.53 7.77 7.52 7.43 7.68 7.59 7.39 7.46 7.52 7.60 7.72

Kiri 7.51 7.59 7.58 7.54 7.53 7.42 7.50 7.73 7.47 7.59 7.59 7.57 7.54 7.44 7.53 7.63 7.49 7.63 7.46 7.50 7.70 7.63 7.51 7.47 7.62 7.67 7.61 7.51 7.48 7.46 7.72 7.54 7.48 7.60 7.47 7.51 7.53 7.58 7.67 7.58

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.55 7.61 7.78 7.66 7.58 7.43 7.65 7.75 7.62 7.57 7.54 7.64 7.68 7.50 7.70 7.41 7.51 7.48 7.60 7.57 7.66 7.62 7.54 7.47 7.56 7.75 7.67 7.64 7.63 7.50 7.65 7.59 7.50 7.70 7.61 7.56 7.49 7.41 7.67 7.61

Tengah 7.31 7.41 7.62 7.59 7.45 7.42 7.50 7.58 7.74 7.37 7.52 7.58 7.69 7.46 7.54 7.40 7.47 7.46 7.40 7.50 7.62 7.48 7.50 7.42 7.64 7.70 7.50 7.60 7.67 7.51 7.63 7.71 7.41 7.68 7.70 7.59 7.45 7.41 7.59 7.46

Kiri 7.47 7.53 7.54 7.64 7.48 7.48 7.49 7.63 7.61 7.46 7.59 7.46 7.65 7.51 7.41 7.49 7.44 7.62 7.63 7.40 7.66 7.44 7.47 7.54 7.59 7.54 7.50 7.66 7.69 7.66 7.67 7.67 7.46 7.57 7.59 7.61 7.56 7.49 7.48 7.41

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119

Kanan 7.58 7.67 7.75 7.74 7.63 7.39 7.59 7.82 7.56 7.44 7.58 7.70 7.65 7.60 7.64 7.76 7.65 7.46 7.38 7.48 7.48 7.66 7.53 7.55 7.66 7.54 7.66 7.46 7.43 7.56 7.62 7.46 7.68 7.40 7.60 7.60 7.52 7.51 7.59

Tengah 7.63 7.65 7.59 7.68 7.57 7.47 7.70 7.51 7.54 7.56 7.45 7.59 7.55 7.73 7.67 7.67 7.60 7.70 7.37 7.23 7.53 7.58 7.72 7.70 7.34 7.58 7.55 7.33 7.47 7.59 7.52 7.63 7.58 7.60 7.71 7.45 7.64 7.52 7.62

Kiri 7.57 7.55 7.53 7.57 7.44 7.55 7.59 7.41 7.49 7.68 7.50 7.61 7.66 7.63 7.56 7.71 7.64 7.73 7.47 7.35 7.68 7.52 7.54 7.71 7.60 7.55 7.44 7.53 7.45 7.61 7.44 7.54 7.60 7.56 7.53 7.47 7.64 7.59 7.70

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

- 7.78

7.11 7.18

Page 72: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-8

Page 73: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-8

POSISI :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.41 7.49 7.51 7.33 7.33 7.38 7.41 7.56 7.45 7.48 7.56 7.52 7.38 7.24 7.26 7.60 7.20 7.57 7.38 7.59 7.60 7.53 7.35 7.43 7.49 7.41 7.59 7.57 7.53 7.44 7.33 7.48 7.36 7.40 7.46 7.51 7.51 7.35 7.43 7.50

Tengah 7.29 7.32 7.47 7.31 7.32 7.23 7.28 7.38 7.34 7.49 7.51 7.44 7.59 7.40 7.67 7.50 7.34 7.45 7.25 7.42 7.57 7.53 7.45 7.49 7.34 7.45 7.42 7.46 7.67 7.37 7.25 7.60 7.38 7.38 7.42 7.36 7.49 7.52 7.47 7.42

Kiri 7.34 7.42 7.49 7.45 7.37 7.29 7.25 7.58 7.46 7.37 7.41 7.48 7.58 7.41 7.37 7.51 7.35 7.46 7.42 7.45 7.54 7.44 7.56 7.58 7.53 7.50 7.59 7.48 7.62 7.33 7.16 7.65 7.52 7.25 7.46 7.69 7.65 7.43 7.22 7.32

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.63 7.44 7.41 7.28 7.44 7.54 7.32 7.60 7.39 7.47 7.41 7.50 7.56 7.82 7.39 7.51 7.34 7.42 7.50 7.52 7.34

Tengah 7.45 7.57 7.49 7.30 7.65 7.43 7.42 7.40 7.54 7.34 7.55 7.48 7.39 7.46 7.42 7.23 7.28 7.35 7.31 7.52 7.28

Kiri 7.48 7.46 7.36 7.35 7.69 7.45 7.46 7.48 7.48 7.28 7.64 7.29 7.28 7.45 7.41 7.43 7.35 7.40 7.44 7.50 7.38

No. Row

Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Saprudin ………...

7.82

7.11 7.16

-

Posisi Pengujian

Page 74: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-13

Page 75: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-13

POSISI : LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.44 7.52 7.50 7.50 7.52 7.66 7.74 7.64 7.62 7.58 7.50 7.63 7.42 7.53 7.45 7.70 7.50 7.40 7.48 7.53 7.57 7.44 7.47 7.36 7.58 7.57 7.48 7.52 7.66 7.51 7.43 7.66 7.54 7.64 7.51 7.66 7.51 7.56 7.55 7.52

Tengah 7.42 7.04 7.06 7.33 7.37 7.39 7.38 7.35 7.48 7.43 7.39 7.34 7.31 7.26 7.07 7.30 7.36 7.35 7.42 7.40 7.46 7.38 7.53 7.17 7.40 7.33 7.44 7.44 7.43 7.43 7.44 7.48 7.47 7.50 7.32 7.40 7.47 7.55 7.31 7.30

Kiri 7.45 7.15 7.38 7.34 7.41 7.38 7.57 7.65 7.48 7.50 7.49 7.60 7.53 7.55 7.45 7.42 7.53 7.46 7.48 7.55 7.60 7.57 7.47 7.26 7.43 7.45 7.41 7.51 7.51 7.53 7.65 7.51 7.55 7.55 7.47 7.65 7.49 7.54 7.47 7.45

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.57 7.57 7.61 7.65 7.52 7.62 7.55 7.61 7.70 7.58 7.55 7.71 7.55 7.51 7.63 7.61 7.61 7.39 7.70 7.49 7.42

Tengah 7.43 7.45 7.47 7.39 7.40 7.38 7.57 7.28 7.33 7.40 7.47 7.45 7.39 7.44 7.33 7.28 7.42 7.20 7.24 7.29 7.25

Kiri 7.57 7.53 7.66 7.53 7.50 7.43 7.57 7.44 7.52 7.52 7.58 7.61 7.43 7.56 7.49 7.51 7.53 7.42 7.52 7.36 7.31Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE mengikuti susunan tube di bawah level 1

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

7.74

7.047.11

-

LEVEL 3

LEVEL 2

LEVEL 1

Page 76: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-13

POSISI : LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.46 7.53 7.66 7.50 7.53 7.65 7.71 7.57 7.58 7.49 7.52 7.60 7.51 7.56 7.62 7.60 7.47 7.45 7.50 7.52 7.62 7.39 7.32 7.35 7.53 7.56 7.46 7.47 7.58 7.47 7.51 7.60 7.55 7.50 7.41 7.46 7.49 7.56 7.46 7.36

Tengah 7.44 7.51 7.58 7.45 7.49 7.49 7.39 7.57 7.61 7.50 7.52 7.58 7.46 7.43 7.51 7.47 7.54 7.46 7.57 7.59 7.56 7.36 7.28 7.36 7.54 7.46 7.50 7.46 7.44 7.41 7.59 7.55 7.47 7.59 7.34 7.50 7.44 7.55 7.37 7.40

Kiri 7.51 7.52 7.63 7.39 7.48 7.56 7.59 7.61 7.46 7.61 7.52 7.53 7.60 7.60 7.53 7.46 7.64 7.43 7.53 7.67 7.59 7.50 7.38 7.26 7.44 7.48 7.49 7.34 7.35 7.53 7.48 7.50 7.60 7.59 7.37 7.65 7.50 7.56 7.43 7.48

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.65 7.51 7.51 7.71 7.65 7.60 7.58 7.57 7.63 7.54 7.62 7.54 7.56 7.56 7.60 7.65 7.57 7.44 7.53 7.47 7.43

Tengah 7.62 7.50 7.53 7.56 7.55 7.46 7.51 7.44 7.58 7.49 7.58 7.48 7.49 7.55 7.42 7.46 7.63 7.42 7.55 7.49 7.34

Kiri 7.50 7.43 7.51 7.48 7.49 7.49 7.69 7.44 7.44 7.39 7.63 7.62 7.50 7.71 7.53 7.55 7.58 7.45 7.54 7.50 7.43Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE mengikuti susunan tube di bawah level 1

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

7.71

7.11 7.26

-

LEVEL 3

LEVEL 2

LEVEL 1

Page 77: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-13

POSISI : LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.52 7.52 7.67 7.59 7.46 7.59 7.50 7.60 7.62 7.56 7.56 7.59 7.57 7.51 7.54 7.53 7.60 7.46 7.45 7.53 7.53 7.53 7.48 7.38 7.45 7.51 7.40 7.49 7.53 7.47 7.50 7.71 7.60 7.64 7.44 7.49 7.49 7.52 7.54 7.48

Tengah 7.59 7.56 7.55 7.41 7.48 7.52 7.56 7.59 7.55 7.58 7.49 7.46 7.49 7.56 7.52 7.54 7.63 7.52 7.45 7.59 7.63 7.54 7.35 7.25 7.45 7.52 7.53 7.43 7.53 7.72 7.62 7.55 7.59 7.67 7.99 7.49 7.50 7.54 7.40 7.48

Kiri 7.50 7.57 7.61 7.33 7.49 7.47 7.57 7.64 7.56 7.58 7.42 7.61 7.51 7.59 7.48 7.49 7.60 7.43 7.55 7.59 7.67 7.71 7.49 7.23 7.38 7.45 7.63 7.54 7.50 7.57 7.62 7.52 7.55 7.62 7.46 7.65 7.52 7.55 7.94 7.52

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.62 7.52 7.41 7.69 7.50 7.55 7.61 7.49 7.57 7.55 7.39 7.67 7.58 7.54 7.61 7.58 7.62 7.50 7.49 7.42 7.43

Tengah 7.64 7.53 7.67 7.60 7.55 7.42 7.46 7.46 7.60 7.50 7.62 7.52 7.50 7.75 7.64 7.42 7.54 7.47 7.62 7.20 7.33

Kiri 7.55 7.40 7.57 7.53 7.52 7.51 7.53 7.44 7.56 7.41 7.50 7.62 7.40 7.67 7.29 7.61 7.23 7.48 7.63 7.53 7.47Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE mengikuti susunan tube di bawah level 1

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

7.99

7.11 7.20

-

LEVEL 3

LEVEL 2

LEVEL 1

Page 78: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-15

Page 79: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-15

POSISI :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.58 7.71 7.67 7.44 7.49 7.47 7.53 7.46 7.33 7.69 7.62 7.70 7.59 7.70 7.55 7.63 7.57 7.64 7.51 7.41 7.56 7.65 7.39 7.55 7.70 7.56 7.56 7.66 7.58 7.49 7.66 7.60 7.51 7.56 7.62 7.55 7.51 7.57 7.63 7.50

Tengah 7.56 7.59 7.62 7.52 7.36 7.39 7.55 7.65 7.43 7.46 7.63 7.62 7.61 7.66 7.62 7.57 7.64 7.55 7.51 7.43 7.27 7.64 7.28 7.45 7.52 7.41 7.48 7.65 7.63 7.25 7.42 7.63 7.30 7.57 7.47 7.51 7.43 7.54 7.51 7.44

Kiri 7.65 7.59 7.63 7.56 7.36 7.46 7.63 7.70 7.50 7.53 7.60 7.61 7.55 7.46 7.61 7.69 7.60 7.63 7.50 7.60 7.31 7.58 7.49 7.30 7.55 7.67 7.38 7.51 7.62 7.33 7.46 7.61 7.40 7.61 7.62 7.58 7.73 7.65 7.58 7.59

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 7.50 7.14 7.32 7.61 7.68 7.50 7.54 7.51 7.49 7.63 7.63 7.64 7.48 7.39 7.48 7.57 7.63 7.65 7.45 7.47 7.61 7.63 7.55 7.67 7.68 7.53 7.55 7.64 7.44 7.63 7.63 7.50 7.70 7.55 7.64 7.43 7.32 7.53 7.63 7.64

Tengah 7.41 7.44 7.36 7.63 7.52 7.30 7.42 7.53 7.68 7.57 7.50 7.61 7.50 7.41 7.48 7.53 7.48 7.53 7.36 7.30 7.65 7.50 7.62 7.40 7.67 7.51 7.44 7.61 7.39 7.62 7.50 7.63 7.63 7.59 7.52 7.55 7.46 7.59 7.54 7.53

Kiri 7.15 7.42 7.23 7.64 7.57 7.40 7.33 7.57 7.63 7.31 7.58 7.34 7.59 7.52 7.55 7.62 7.38 7.47 7.23 7.44 7.66 7.31 7.33 7.44 7.59 7.59 7.45 7.52 7.30 7.46 7.57 7.58 7.46 7.63 7.35 7.52 7.50 7.61 7.54 7.53

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 7.52 7.66 7.62 7.57 7.62 7.60 7.59 7.54 7.64 7.62 7.45 7.65 7.62 7.57 7.64 7.47 7.61 7.48 7.68 7.49 7.48 7.64 7.68 7.59 7.69 7.55 7.60 7.57 7.57 7.69 7.53 7.58 7.68 7.60 7.69 7.54 7.68 7.60 7.58 7.56

Tengah 7.62 7.63 7.66 7.64 7.69 7.55 7.65 7.50 7.52 7.58 7.42 7.45 7.64 7.51 7.68 7.58 7.59 7.40 7.61 7.35 7.39 7.49 7.56 7.50 7.55 7.58 7.61 7.46 7.36 7.61 7.47 7.54 7.54 7.70 7.70 7.58 7.66 7.68 7.51 7.47

Kiri 7.68 7.61 7.62 7.65 7.58 7.50 7.60 7.62 7.53 7.34 7.38 7.52 7.59 7.61 7.45 7.57 7.40 7.41 7.48 7.36 7.50 7.50 7.44 7.52 7.51 7.57 7.58 7.39 7.41 7.60 7.33 7.44 7.58 7.61 7.64 7.66 7.64 7.51 7.49 7.56

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 7.47 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 7.55 Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 7.50 Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

7.73

7.11 7.14

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) -

Posisi Pengujian

Page 80: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-19

Page 81: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-19

POSISI : A - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.43 5.55 5.26 5.16 4.58 5.34 5.56 5.47 5.45 5.36 5.13 5.35 5.29 5.41 5.36 5.37 5.37 5.17 5.19 5.27 5.37 5.47 5.25 4.78 5.39 5.22 5.38 4.99 4.69 5.47 5.40 5.04 5.23 5.79 5.34 4.87 5.06 5.93 5.41 5.35

Tengah 5.45 5.15 4.46 4.37 4.35 4.57 4.70 4.93 4.84 4.55 4.31 4.47 4.79 4.35 5.10 5.18 4.66 4.25 4.45 4.59 4.57 4.39 4.41 4.51 4.49 4.24 4.60 4.38 4.41 3.89 4.42 4.32 4.40 5.84 4.14 4.20 4.16 5.59 4.15 4.31

Kiri 5.42 5.36 5.28 5.35 5.40 5.25 5.32 5.35 5.29 5.45 5.45 5.35 5.50 5.45 5.34 5.27 5.36 5.33 5.41 5.32 5.39 5.28 5.25 5.37 5.36 5.32 5.38 5.37 5.36 5.39 5.37 5.37 5.21 5.72 5.44 5.47 5.37 5.81 5.26 5.15

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.80 5.45 5.39 4.72 4.99 5.18 5.13 5.85 5.40 5.06 5.17 5.28 5.88 5.86 5.28 4.88 5.99 5.82 5.82 5.44 5.47 5.37 5.31 5.99 5.39 5.89 5.46 5.37 5.28 5.51 5.54 5.26 5.91 5.35 5.86 5.41 5.91 5.32 5.98 5.27

Tengah 5.78 4.42 4.01 3.71 4.18 3.81 4.05 5.63 4.45 4.74 4.16 3.87 5.58 5.93 4.43 4.06 5.84 5.75 5.61 5.35 5.42 5.37 4.03 5.78 4.67 5.74 4.47 4.44 3.81 5.68 4.22 3.72 5.76 4.32 4.77 4.06 5.65 4.39 5.73 3.99

Kiri 5.96 5.18 5.43 5.26 5.19 4.82 5.38 5.81 5.18 5.27 5.36 5.35 5.81 5.86 5.31 5.02 5.80 5.75 5.93 5.54 5.25 5.18 5.31 5.87 5.27 5.79 4.62 4.94 4.68 5.64 4.42 5.22 5.93 5.22 5.86 4.50 5.85 5.06 5.81 4.58

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.89 5.35 5.45 5.29 5.75 5.48 5.56 5.42 5.95 5.33 5.29 5.37 5.29 5.35 5.55 5.83 5.29 5.31 5.46 5.71 5.32 5.38 5.22 5.40 5.25 5.12 5.35 5.47 5.45 5.37 5.41 5.42 5.38 5.34 5.51 5.24 5.39 5.32 5.39 5.42

Tengah 5.82 4.19 3.61 4.62 5.75 4.32 5.69 4.61 5.85 4.41 3.90 4.84 4.24 3.82 4.67 5.78 4.49 3.74 4.55 5.71 4.82 4.08 4.46 3.86 4.25 4.82 4.69 3.97 4.83 3.96 5.01 3.87 4.67 4.61 4.59 3.91 4.64 3.99 4.92 4.87

Kiri 5.77 4.36 5.06 5.18 5.57 4.84 5.73 5.11 5.82 4.95 5.24 5.37 4.90 5.35 4.93 5.94 4.85 4.51 4.96 5.70 5.23 5.36 4.73 5.32 4.85 5.41 4.68 5.06 5.21 5.36 5.15 5.14 5.18 5.24 4.99 5.50 5.11 5.45 5.37 5.24

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.48 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.49 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.41 Tipe : DMS 2 ketebalan tube < 4,00 mm

Ketelitian : 0.01 mm ketebalan tube di bawah MWT

` (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

-

5.08

5.99

3.61

No. Row

Teb

al (m

m)

Posisi Pengujian

CA B

Page 82: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-19

POSISI : B - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.46 5.50 5.43 5.38 5.40 5.44 5.40 5.02 5.42 5.47 5.37 4.74 5.50 5.36 5.45 5.41 5.50 5.23 5.22 5.46 5.44 5.40 5.41 5.35 5.27 5.37 5.27 5.45 5.31 5.38 5.29 5.33 5.28 5.33 5.32 5.44 5.43 5.42 5.45 5.30

Tengah 5.46 5.26 4.58 4.98 5.16 4.54 5.22 4.87 5.20 4.43 5.11 4.50 5.13 4.45 4.94 4.76 5.14 4.33 5.19 4.47 4.82 4.33 5.21 4.50 4.93 4.18 5.10 4.35 4.52 4.26 4.40 4.26 4.25 4.38 4.34 4.20 4.12 4.30 3.92 4.55

Kiri 5.47 5.39 5.40 5.37 5.31 5.22 5.29 5.24 5.34 4.95 5.42 5.18 5.39 5.38 5.30 5.26 5.33 5.27 5.46 5.23 5.28 5.20 5.29 5.34 5.30 5.25 5.33 5.25 5.26 5.30 5.26 5.20 5.22 5.25 5.22 5.46 5.36 5.00 5.31 5.25

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.38 5.33 5.26 5.28 5.44 5.40 5.27 5.37 5.32 5.43 5.37 5.39 5.37 5.33 6.34 5.36 5.31 5.40 5.26 5.41 5.34 5.38 5.88 5.61 5.47 5.42 5.41 5.36 5.21 5.32 5.45 5.31 5.31 5.31 5.31 5.49 5.42 5.42 5.36 5.33

Tengah 3.84 4.38 4.10 4.24 4.29 4.70 4.20 4.12 3.99 4.25 3.70 4.31 4.14 4.81 4.02 3.91 3.79 3.73 3.06 5.37 5.43 5.50 5.79 4.56 3.30 3.81 3.98 3.86 4.18 3.82 3.78 4.39 3.32 3.96 3.52 3.88 3.63 4.25 3.65 4.18

Kiri 5.33 5.36 5.21 5.21 5.32 5.35 5.38 5.37 5.22 5.33 5.24 5.32 5.32 5.30 5.14 5.34 5.39 5.41 5.10 5.43 5.48 5.45 5.98 5.73 5.02 5.23 5.41 5.37 5.33 5.22 5.27 5.22 5.36 5.33 5.36 5.30 5.34 5.42 5.29 5.35Teb

al (m

m)

Teb

al (m

m)

No. Row

No. Row

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.39 5.36 5.35 5.50 5.27 5.46 5.40 5.36 5.43 5.43 5.45 5.38 5.39 5.47 5.37 5.55 5.53 5.45 5.45 5.44 5.38 5.42 5.41 5.45 5.39 5.34 5.39 5.39 5.44 5.43 5.44 5.26 5.44 5.53 5.43 5.33 5.37 5.39 5.36 5.43

Tengah 3.66 4.15 3.80 4.72 3.85 4.47 4.04 4.68 3.65 4.26 4.00 4.42 3.92 4.73 4.24 4.17 4.73 4.05 4.26 4.36 4.27 4.51 4.47 4.85 4.45 4.94 4.27 4.56 4.60 4.75 4.71 4.05 5.01 4.62 4.40 4.63 4.87 4.55 4.48 4.98

Kiri 5.25 5.31 5.39 5.24 5.24 5.32 5.30 5.32 5.28 5.36 5.25 5.33 5.26 5.26 5.35 5.28 5.26 5.30 5.23 5.28 5.35 5.25 5.30 5.29 5.31 5.28 5.29 5.29 5.41 5.24 5.28 5.27 5.36 5.47 5.36 5.36 5.39 5.27 5.40 5.39

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.40 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.39 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.38 Tipe : DMS 2 ketebalan tube < 4,00 mm

Ketelitian : 0.01 mm ketebalan tube di bawah MWT

` (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) -

5.08

6.34

3.06

Posisi Pengujian

CA B

Page 83: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-19

POSISI : C - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.36 5.37 5.14 5.28 5.28 5.42 5.20 5.45 5.30 5.41 5.53 5.30 5.20 5.39 5.32 5.15 5.14 5.38 5.35 5.18 5.14 5.32 5.28 5.16 5.35 5.11 5.22 4.91 5.32 5.16 5.31 5.35 5.24 4.85 5.21 5.26 5.36 5.18 5.19 5.25

Tengah 5.27 4.80 4.42 4.95 4.52 4.90 4.50 5.04 4.27 4.75 4.50 4.86 4.08 4.89 4.18 4.89 4.49 4.86 3.96 4.54 3.72 4.81 3.97 4.74 3.77 4.21 3.57 4.07 3.75 4.58 3.99 4.03 4.39 3.87 4.26 3.57 3.73 3.78 4.05 3.73

Kiri 5.28 5.34 5.31 5.26 5.01 5.16 5.29 5.44 4.76 5.30 5.25 5.16 4.70 4.96 5.30 5.07 5.18 5.27 5.14 5.19 4.80 5.42 4.74 5.12 5.24 4.84 4.54 4.76 5.29 5.09 4.97 5.01 5.31 4.88 5.30 4.86 4.54 5.03 4.84 5.08

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.23 4.72 5.22 5.28 4.52 5.27 4.74 4.26 5.24 5.21 5.36 5.48 4.79 4.78 4.45 4.78 4.39 4.06 4.79 5.41 5.32 5.40 5.34 5.49 5.33 5.42 5.49 5.35 5.50 5.56 5.48 5.31 5.33 5.38 5.39 5.38 5.48 5.15 5.25 5.46

Tengah 4.06 3.58 4.27 3.62 3.99 3.80 4.06 3.54 3.97 3.81 4.20 3.85 4.09 3.97 3.82 3.76 3.42 4.06 2.05 5.37 5.37 5.39 4.94 4.82 4.86 4.77 4.41 4.64 4.61 4.94 4.64 4.71 4.49 4.99 4.30 4.73 4.50 4.85 4.03 4.71

Kiri 4.76 4.43 4.99 4.62 4.66 4.81 4.93 4.39 4.47 4.85 4.91 4.52 4.29 4.38 4.87 4.73 4.86 4.45 3.70 5.42 5.26 5.36 4.64 5.14 4.94 5.35 5.33 5.32 4.83 5.23 5.07 5.33 5.01 5.23 4.92 5.15 4.84 5.03 4.46 4.93

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.40 5.40 5.49 5.40 5.36 5.43 5.36 5.37 5.44 5.23 5.37 5.36 5.36 5.21 5.33 5.37 5.26 5.51 5.42 5.13 5.47 5.38 5.32 5.32 5.43 5.42 5.36 5.50 5.40 5.48 5.37 5.39 5.21 5.31 5.49 5.48 5.31 5.39 5.37 5.41

Tengah 4.54 4.58 4.49 4.80 4.58 4.82 4.42 4.88 4.55 4.56 4.48 4.82 4.69 4.68 4.83 4.87 4.87 4.86 4.69 4.74 4.99 4.72 4.68 4.84 5.06 4.86 4.74 4.98 4.88 4.90 4.59 5.10 4.65 4.74 4.99 5.15 4.92 4.95 4.62 4.79

Kiri 5.09 5.04 5.07 5.15 4.81 5.11 4.73 5.36 5.07 4.95 4.96 5.01 4.99 4.96 5.07 5.17 5.06 4.95 5.14 4.80 5.01 4.76 4.95 4.96 5.37 5.07 5.02 5.18 5.10 5.11 4.98 5.16 5.00 4.89 5.16 5.29 5.06 4.16 5.23 5.08

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.02 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.41 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.40 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

-

5.08

5.56

2.05

Posisi Pengujian

CA B

Page 84: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-19 (VERTICAL)

Page 85: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-19

POSISI : VERTICAL - ELEVASI SOOT BLOWER 39 & 40

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.42 5.47 5.37 5.31 5.34 5.38 5.43 5.38 5.31 5.41 5.47 5.41 5.49 5.39 5.43 5.36 5.42 5.45 5.47 5.32 5.34 5.34 5.43 5.45 5.41 5.28 5.46 5.40 5.33 5.36 5.37 5.47 5.49 5.41 5.49 5.37 5.47 5.45 5.37 5.40

Tengah 5.54 5.44 5.42 5.43 5.46 5.45 5.40 5.39 5.41 5.43 5.47 5.45 5.50 5.47 5.47 5.47 5.47 5.30 5.47 5.33 5.43 5.51 5.49 5.50 5.35 5.42 5.50 5.46 5.17 5.24 5.25 5.37 5.43 5.42 5.50 5.34 5.57 5.31 5.35 5.28

Kiri 5.45 5.36 5.36 5.35 5.46 5.46 5.38 5.30 5.41 5.40 5.54 5.48 5.44 5.47 5.46 5.44 5.55 5.51 5.40 5.38 5.42 5.58 5.41 5.56 5.51 6.46 5.24 5.40 5.46 5.44 5.44 5.48 5.42 5.40 5.43 5.42 5.38 5.42 5.50 5.39

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.36 5.39 5.39 5.39 5.42 5.34 5.21 5.47 5.39 5.36 5.42 5.39 5.44 5.55 5.53 5.38 5.48 5.45 5.48 5.43 5.39 5.35 5.26 6.27 5.45 5.32 5.29 5.41 5.41 5.46 5.30 5.25 5.20 5.27 5.43 5.43 5.40 5.50 5.43 5.43

Tengah 5.33 5.45 5.41 5.49 5.42 5.41 5.33 5.40 5.56 5.38 5.35 5.43 5.38 5.54 5.39 5.46 5.32 5.42 5.40 5.35 5.36 5.39 5.28 5.39 5.50 5.47 5.39 5.40 5.45 5.47 5.35 5.28 5.25 5.45 5.41 5.47 5.41 5.56 5.35 5.44

Kiri 5.43 5.46 5.46 5.57 5.41 5.48 5.33 5.40 5.29 5.42 5.45 5.27 5.51 5.45 5.43 5.47 5.40 5.43 5.40 5.37 5.29 5.41 5.30 5.45 5.42 5.44 5.46 5.44 5.50 5.42 5.36 5.36 5.30 5.49 5.45 5.38 5.44 5.42 5.41 5.50

No. Row

Teb

al (m

m)

No. Row

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.36 5.44 5.47 5.34 5.44 5.28 5.41 5.38 5.38 5.32 5.30 5.43 5.44 5.46 5.46 5.44 5.35 5.32 5.42 5.39 5.35 5.47 5.38 5.32 5.41 5.49 5.38 5.42 5.30 5.35 5.40 5.46 5.45 5.41 5.45 5.44 5.51 5.47 5.44 5.32

Tengah 5.45 5.44 5.38 5.38 5.43 5.41 5.33 5.38 5.44 5.28 5.30 5.28 5.35 5.42 5.39 5.33 5.42 5.47 5.44 5.47 5.40 5.49 5.29 5.38 5.48 5.57 5.40 5.48 5.42 5.45 5.48 5.45 5.45 5.38 5.39 5.41 5.57 5.41 5.46 5.45

Kiri 5.49 5.47 5.40 5.42 5.47 5.45 5.34 5.40 5.41 5.34 5.46 5.45 5.38 5.37 5.33 5.37 5.44 5.48 5.34 5.49 5.43 5.36 5.37 5.34 5.48 5.42 5.36 5.48 5.48 5.48 5.47 5.48 5.34 5.45 5.39 5.44 5.48 5.45 5.49 5.51

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.38 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.45 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 5.42 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) - 6.46

5.08 5.17

Posisi Pengujian

CA B

Page 86: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-19

POSISI : VERTICAL - ELEVASI SOOT BLOWER 41 & 42

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.45 5.43 5.50 5.38 5.52 5.48 5.48 5.42 5.42 5.45 5.56 5.51 5.54 5.49 5.50 5.43 5.46 5.54 5.44 5.42 5.36 5.36 5.45 5.45 5.42 5.43 5.35 5.24 5.35 5.21 5.30 5.44 5.48 5.45 5.41 5.45 5.39 5.51 5.50 5.47

Tengah 5.45 5.48 5.35 5.52 5.35 5.49 5.40 5.47 5.38 5.43 5.50 5.44 5.47 5.44 5.54 5.50 5.47 5.48 5.47 5.45 5.46 5.46 5.37 5.48 5.40 5.41 5.40 4.95 5.14 4.84 5.13 5.30 5.38 5.36 5.44 5.48 5.45 5.45 5.46 5.54

Kiri 5.37 5.39 5.45 5.47 5.47 5.50 5.42 5.34 5.40 5.38 5.47 5.49 5.48 5.39 5.45 5.44 5.61 5.38 5.51 5.52 5.40 5.45 5.48 5.40 5.45 5.34 5.46 5.28 5.38 5.33 5.22 5.43 5.44 5.47 5.45 5.42 5.48 5.49 5.38 5.50

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.53 5.53 5.35 5.44 5.40 5.43 5.39 5.51 5.38 5.44 5.39 5.43 5.49 5.50 5.51 5.48 5.47 5.44 5.49 5.50 5.38 5.37 5.44 5.46 5.44 5.37 5.52 5.60 5.42 5.44 5.47 5.46 5.42 5.57 5.44 5.37 5.41 5.46 5.53 5.48

Tengah 5.46 5.48 5.47 5.45 5.45 5.43 5.50 5.43 5.50 5.41 5.47 5.49 5.46 5.41 5.45 5.49 5.49 5.52 5.39 5.35 5.52 5.43 5.52 5.45 5.45 5.46 5.52 5.45 5.50 5.49 5.44 5.44 5.47 5.51 5.41 5.53 5.48 5.45 5.47 5.47

Kiri 5.46 5.55 5.42 5.48 5.43 5.46 5.52 5.43 5.39 5.36 5.42 5.49 5.49 5.46 5.47 5.43 5.33 5.52 5.47 5.44 5.54 5.44 5.44 5.46 5.41 5.49 5.59 5.49 5.55 5.56 5.51 5.46 5.44 5.45 5.36 5.54 5.43 5.54 5.45 5.57

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.53 5.58 5.46 5.35 5.37 5.38 5.45 5.34 5.32 5.36 5.42 5.49 5.45 5.36 5.45 5.52 5.62 5.36 5.48 5.44 5.35 5.38 5.64 5.46 5.37 5.48 5.47 5.40 5.42 5.39 5.52 5.56 5.38 5.51 5.48 5.40 5.30 5.33 5.46 5.49

Tengah 5.48 5.38 5.46 5.48 5.41 5.46 5.47 5.45 5.36 5.31 5.34 5.42 5.47 5.45 5.54 5.49 5.51 5.55 5.47 5.52 5.43 5.45 5.44 5.47 5.42 5.40 5.43 5.49 5.43 5.48 5.48 5.54 5.41 5.51 5.47 5.37 5.46 5.53 5.39 5.41

Kiri 5.49 5.47 5.43 5.39 5.48 5.43 5.45 5.53 5.49 5.39 5.42 5.44 5.49 5.46 5.48 5.37 5.45 5.44 5.42 5.34 5.55 5.49 5.47 5.45 5.47 5.45 5.44 5.55 5.47 5.50 5.47 5.44 5.37 5.55 5.48 5.34 5.47 5.50 5.44 5.49

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.43 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.51 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 5.48 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) - 5.64

5.08 4.84

Posisi Pengujian

CA B

Page 87: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-19

POSISI : VERTICAL - ELEVASI SOOT BLOWER 37-38

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 8.01 8.06 7.95 7.75 7.79 7.57 7.71 7.67 7.78 8.05 7.65 7.61 7.76 7.60 7.78 7.46 7.71 7.99 7.86 8.05 7.73 7.01 7.82 7.80 8.04 8.01 7.81 7.66 7.71 7.92 8.54 7.46 7.76 8.62 7.79 7.76 7.76 7.83 8.02 7.92

Tengah 7.53 7.93 7.80 7.51 7.81 7.24 7.54 7.60 7.61 7.80 7.59 7.73 7.80 7.52 7.72 7.48 7.60 8.13 7.45 7.49 7.72 7.75 7.54 7.94 7.95 7.76 7.77 7.58 7.79 7.90 8.30 7.47 7.40 8.49 7.49 7.56 7.54 7.57 7.67 7.79

Kiri 7.45 7.60 7.50 7.72 7.95 7.28 7.88 7.75 7.78 8.21 7.62 7.63 7.52 7.66 8.06 7.33 8.09 7.99 7.71 8.03 7.70 8.00 7.94 8.00 8.13 8.00 7.74 7.42 7.98 7.94 8.45 7.34 7.67 8.53 7.79 7.79 7.76 7.65 7.73 8.00

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.13 7.76 7.52 7.65 7.63 7.60 7.76 7.52 7.86 7.79 7.90 7.57 7.86 7.89 7.74 7.70 7.58 7.62 7.70 7.51 7.86

Tengah 7.44 7.78 7.40 7.43 7.55 7.80 7.76 7.66 7.92 7.73 7.87 7.68 7.81 7.57 7.73 7.76 7.67 7.38 7.43 7.43 7.53

Kiri 7.31 7.92 7.35 7.37 7.57 7.97 7.88 7.89 7.69 8.03 7.95 7.99 7.60 8.01 7.62 7.99 7.81 7.85 7.86 7.86 7.64

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 8.62

REF* 7.01

Posisi Pengujian

BA

Page 88: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-19

POSISI : VERTICAL - ELEVASI SOOT BLOWER 39-40

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 8.04 8.30 8.01 7.50 7.94 7.59 7.62 8.04 7.50 7.88 7.85 8.22 7.88 8.12 8.00 8.14 7.85 8.48 8.25 7.41 8.31 7.69 7.91 7.59 7.81 8.19 7.57 8.05 7.96 8.41 7.73 8.52 8.15 7.78 7.58 7.94 7.68 8.50 8.33 7.71

Tengah 8.05 8.53 8.07 7.75 7.84 7.66 7.71 8.10 7.71 7.55 7.89 7.52 7.64 7.70 8.00 8.29 7.87 8.42 8.41 7.48 7.87 7.83 7.89 7.46 7.49 8.15 8.03 8.38 8.19 8.31 7.91 8.13 8.31 7.55 7.75 7.45 7.63 8.21 7.89 7.61

Kiri 7.99 8.55 8.06 7.73 7.73 7.68 7.59 8.10 7.51 8.08 7.91 7.40 7.52 8.04 8.15 8.40 8.05 8.12 8.49 7.57 7.70 7.91 7.75 7.62 7.44 8.14 7.85 8.35 8.13 8.03 8.07 8.39 8.31 7.62 7.98 7.56 7.45 8.07 8.08 7.62

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.67 7.87 7.62 7.61 7.63 8.06 8.01 8.60 7.73 7.41 8.01 7.76 7.71 7.71 7.67 7.86 7.64 7.72 7.69 7.68 8.04

Tengah 7.77 7.44 7.72 7.61 7.47 8.02 7.65 8.36 7.35 7.42 7.89 7.87 7.46 7.64 7.60 7.67 7.73 7.68 7.53 7.24 7.83

Kiri 7.45 7.49 7.78 7.88 7.50 8.20 7.54 8.47 7.46 7.64 7.87 7.69 7.49 7.83 7.38 7.48 7.97 7.61 7.69 7.32 7.88

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 8.60

REF* 7.24

Posisi Pengujian

CA

Page 89: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-19

POSISI : VERTICAL - ELEVASI SOOT BLOWER 41-42

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.99 7.65 7.74 7.61 8.59 7.68 8.31 7.84 8.03 7.68 8.23 7.67 8.22 8.57 8.85 8.85 8.07 8.70 8.25 8.19 8.53 7.84 7.95 7.61 7.69 7.54 7.64 8.01 7.83 7.49 8.08 8.11 7.89 8.60 8.14 8.05 7.89 8.57 8.41 7.99

Tengah 7.62 7.81 7.70 7.43 7.95 7.47 7.86 7.87 7.84 7.66 8.21 7.43 8.31 8.47 8.52 7.93 7.49 8.61 8.15 8.41 7.85 7.54 7.90 7.77 7.42 7.65 7.48 7.83 7.90 8.47 8.06 8.11 7.60 7.66 8.11 8.32 7.68 8.45 8.23 7.65

Kiri 7.42 7.85 7.57 7.62 7.95 7.83 7.90 7.92 7.61 7.58 7.50 7.55 8.60 8.04 8.35 7.94 7.68 8.28 8.30 8.55 8.01 8.20 7.98 7.98 7.74 8.15 7.71 7.59 7.82 8.60 8.35 7.90 8.15 7.95 7.69 8.53 7.99 8.35 8.29 7.58

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.81 7.94 8.74 8.03 7.64 7.72 8.03 8.00 7.76 7.81 7.69 7.75 7.63 7.95 7.96 7.67 7.82 7.60 7.78 8.03 7.76

Tengah 7.43 7.82 8.52 7.90 7.58 7.72 8.14 7.78 7.60 7.52 7.54 7.60 7.40 7.80 7.77 7.58 7.45 7.66 7.58 7.97 7.65

Kiri 7.76 7.68 8.46 7.82 7.66 7.57 8.03 7.92 7.61 7.48 7.81 7.58 7.62 7.62 7.90 7.70 7.58 7.85 7.61 7.92 7.91

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 8.85

REF* 7.40

Posisi Pengujian

CA

Page 90: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-20

Page 91: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-20

POSISI : A - BAWAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.81 5.79 5.53 5.79 5.84 5.36 5.91 5.41 5.06 5.75 5.78 5.84 5.72 5.76 5.67 5.63 5.78 5.87 5.93 5.91 5.76 5.96 5.77 5.84 5.86 5.98 5.71 5.86 5.85 5.83 5.71 5.58 5.87 5.85 5.86 5.51 5.88 5.86 5.99 5.37

Tengah 5.89 5.78 3.72 4.53 4.05 5.68 4.86 5.19 5.22 5.66 4.27 4.37 5.44 5.85 5.58 5.39 4.71 5.08 4.84 4.64 5.14 5.87 4.82 4.67 5.18 5.52 5.53 4.67 5.52 5.16 4.88 4.79 5.68 5.15 5.31 4.76 5.18 5.05 4.45 4.76

Kiri 5.82 5.82 5.57 4.97 5.91 5.65 5.70 5.28 5.70 5.67 5.79 5.90 5.67 5.83 5.95 5.80 5.65 5.90 5.63 5.93 5.78 5.98 5.88 5.95 5.85 5.81 5.83 5.84 5.89 5.79 5.86 5.91 5.85 5.93 5.87 5.99 5.96 5.77 5.81 5.92

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.78 5.70 5.73 5.32 5.76 5.83 5.29 5.89 5.85 5.89 5.95 5.91 5.95 5.07 5.99 5.87 5.79 5.83 5.85 5.94 5.91 5.96 5.56 5.84 5.71 5.84 5.99 5.91 5.85 5.95 5.73 5.97 5.85 5.94 5.84 5.86 4.92 5.90 5.85 5.84

Tengah 5.25 5.50 4.62 4.83 5.37 5.64 4.76 5.33 5.61 5.69 5.39 5.72 5.69 5.69 5.59 5.71 5.52 4.99 4.80 5.95 5.86 5.92 4.85 5.61 5.17 5.23 5.72 5.35 5.32 5.11 5.23 5.28 4.89 5.51 4.84 5.44 4.36 4.84 4.84 5.06

Kiri 5.95 5.78 5.76 5.29 5.80 5.86 5.74 5.99 5.97 5.82 5.84 5.87 5.83 5.77 5.96 5.98 5.98 5.87 5.79 5.87 5.86 5.93 5.64 5.88 5.90 5.98 5.94 5.75 5.95 5.80 5.83 5.84 5.92 5.91 5.88 5.98 5.08 5.74 5.99 5.90Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.44 5.95 5.85 5.82 5.50 5.63 5.54 4.85 4.93 5.84 5.76 5.77 5.79 5.80 5.81 5.84 5.79 5.88 5.74 5.47 5.83 4.96 5.43 5.83 5.66 5.83 5.93 5.89 5.58 5.18 5.93 5.79 5.83 5.85 5.82 5.16 5.89 5.21 5.87 5.78

Tengah 4.28 5.11 4.49 5.03 4.38 4.80 4.22 4.96 4.40 5.08 4.73 4.97 4.97 4.64 5.50 4.41 5.34 3.96 5.10 4.84 5.68 4.46 4.74 4.34 4.75 5.08 5.56 4.22 5.24 4.65 5.66 4.73 5.75 5.51 3.61 4.58 5.47 4.33 5.85 4.20

Kiri 5.83 5.89 4.65 5.89 5.34 5.97 5.53 5.56 5.68 5.83 5.74 5.93 5.74 5.80 5.85 5.69 5.76 5.72 5.61 5.66 5.90 4.94 5.56 5.78 5.67 5.95 5.65 5.75 5.70 5.38 5.91 5.60 5.95 5.79 5.73 5.61 5.96 5.55 5.64 5.87

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.72 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.71 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.87 Tipe : DMS 2 ketebalan tube < 4,00 mm

Ketelitian : 0.01 mm ketebalan tube di bawah MWT

` (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

-

5.59

5.99

3.61

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Posisi Pengujian CA B

Page 92: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-20

POSISI : B - BAWAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.37 5.29 5.24 5.30 5.19 5.15 5.19 5.33 5.20 5.21 5.16 5.27 5.05 5.46 5.26 4.87 4.75 4.77 4.91 4.52 5.16 5.33 5.27 4.94 5.37 4.97 5.22 4.70 5.11 4.69 4.60 4.75 4.49 4.64 4.54 4.69 5.08 5.13 4.71 5.30

Tengah 5.35 5.29 4.98 4.96 5.08 5.04 4.89 5.18 4.87 4.86 4.78 5.17 4.81 4.98 4.77 4.40 4.78 4.42 4.50 4.20 4.44 4.39 4.62 4.36 4.85 4.59 3.85 4.15 4.57 4.26 4.11 4.19 4.30 4.49 4.29 4.34 4.59 4.62 4.25 4.60

Kiri 5.36 5.22 5.23 5.55 5.39 5.13 5.35 5.22 5.23 5.25 4.93 4.98 4.94 5.12 4.75 4.25 4.77 4.53 4.63 4.53 4.88 4.96 4.63 4.34 4.89 4.75 5.23 4.47 4.88 4.99 4.49 4.47 4.58 5.20 4.74 4.55 5.03 5.06 5.29 5.00

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 4.99 5.30 5.35 5.46 5.09 5.30 5.27 5.31 5.18 5.15 4.90 5.38 5.15 5.33 5.18 5.29 5.20 5.22 5.20 5.39 5.29 5.37 5.28 5.23 5.47 4.99 5.36 5.20 5.17 5.33 5.27 5.43 5.20 5.13 5.23 5.32 5.20 5.06 4.88 5.13

Tengah 4.27 4.42 4.39 4.49 4.66 4.51 4.43 4.86 4.15 4.47 4.56 4.74 4.56 4.95 5.02 4.87 4.39 4.65 4.16 5.23 5.36 5.28 4.44 4.70 4.19 4.73 4.94 4.80 4.90 4.76 4.75 4.84 4.26 4.63 4.42 4.61 4.54 4.74 4.39 4.47

Kiri 4.92 5.08 4.82 4.98 4.76 4.83 4.52 5.22 4.46 5.04 4.99 5.23 5.16 5.02 5.08 5.32 5.14 4.80 4.54 5.47 5.38 5.35 4.84 4.98 5.16 5.05 4.95 4.99 4.91 4.98 5.09 5.13 4.59 4.81 4.55 4.60 4.24 5.00 4.81 4.79Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 4.91 5.25 4.56 5.20 5.24 5.22 5.20 5.25 4.77 5.26 5.25 4.73 4.94 4.82 4.74 4.75 4.94 5.24 5.18 5.22 4.75 5.28 5.27 5.15 4.68 5.18 5.15 5.22 4.27 5.31 5.24 5.22 5.26 5.27 5.21 5.34 4.82 5.12 5.34 5.17

Tengah 4.67 4.59 4.46 4.54 4.49 4.33 4.21 4.76 4.36 4.13 4.57 4.10 4.41 3.86 4.51 4.16 4.40 3.72 4.29 4.59 4.35 4.28 4.31 4.95 4.35 4.55 4.48 4.30 4.37 4.35 4.85 4.02 4.85 4.42 3.04 4.84 4.63 3.74 4.19 4.63

Kiri 5.02 5.19 4.45 5.02 4.72 4.31 4.20 4.30 4.19 4.29 4.39 4.27 4.17 4.46 4.51 4.28 4.57 3.85 4.52 4.92 4.43 4.57 4.86 4.82 4.46 4.77 4.85 4.93 4.65 4.58 5.25 4.36 5.30 5.28 4.81 5.03 4.85 4.14 4.70 4.60

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.23 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.36 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.31 Tipe : DMS 2 ketebalan tube < 4,00 mm

Ketelitian : 0.01 mm ketebalan tube di bawah MWT

` (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

Teb

al (m

m) -

5.08

5.55

3.04

Teb

al (m

m)

No. Row

No. Row

Posisi Pengujian

CA B

Page 93: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-20

POSISI : C - BAWAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.23 4.94 5.24 5.32 5.31 5.43 5.32 5.39 4.72 5.08 4.47 5.38 4.21 5.29 5.30 5.30 4.89 5.09 5.34 5.35 5.41 5.46 4.70 5.31 5.34 5.44 5.22 4.67 4.62 5.33 5.40 5.24 4.48 5.24 5.21 4.52 5.17 5.27 4.70 4.35

Tengah 5.29 4.84 4.45 4.83 4.51 5.84 4.95 4.80 3.98 4.61 4.30 4.75 5.22 4.70 4.22 4.79 4.21 4.83 4.37 4.80 4.31 4.55 4.23 4.69 4.11 4.58 4.12 4.63 3.87 4.43 4.12 4.85 4.34 4.34 4.61 4.16 4.71 4.50 4.36 4.24

Kiri 5.32 5.40 4.43 5.02 4.84 5.08 5.10 4.90 5.28 5.20 5.24 5.05 5.08 5.25 4.36 5.40 4.83 4.72 5.54 5.47 4.75 5.31 4.66 5.21 5.25 5.10 4.48 5.05 5.33 5.24 5.28 5.20 5.26 5.07 5.42 5.24 5.06 4.38 4.78 4.50

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.47 4.68 5.47 5.20 5.38 4.65 5.38 5.44 4.96 5.06 5.25 5.29 5.41 5.31 5.33 5.34 5.26 4.97 5.60 5.35 5.45 5.35 5.40 5.38 5.46 5.33 5.32 5.40 5.26 4.76 5.30 5.25 5.29 5.31 5.22 5.38 5.31 5.36 5.23 5.50

Tengah 4.52 4.18 4.40 4.49 4.71 4.31 4.76 4.60 4.43 4.39 4.85 5.19 4.90 4.93 4.90 5.18 4.60 4.54 4.30 5.32 5.48 5.55 5.36 5.02 5.12 5.35 5.27 5.20 5.31 5.03 5.05 5.08 5.10 4.98 4.95 4.89 4.99 5.01 4.91 4.89

Kiri 5.19 4.45 4.72 4.34 5.14 4.45 4.87 4.40 5.21 4.64 4.95 5.33 5.38 4.98 5.10 5.36 4.99 4.72 5.23 5.33 5.32 5.27 4.91 5.15 5.31 5.12 5.15 5.28 5.45 5.18 5.07 5.18 5.05 5.00 5.10 5.23 5.11 5.37 5.17 4.77

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 5.3 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.34 5.40 5.32 5.10 5.32 5.32 5.42 5.27 5.29 5.42 5.21 5.29 5.44 5.12 5.39 4.38 5.38 5.47 5.40 5.30 5.05 5.29 5.41 5.41 5.41 5.34 5.41 5.16 5.38 4.90 5.41 5.34 5.21 4.99 5.36 5.26 5.34 5.27 5.15 5.25

Tengah 5.02 4.86 4.99 4.80 5.24 4.86 4.92 4.79 4.74 4.99 4.98 4.74 4.69 4.72 4.99 4.88 5.03 4.87 4.97 4.55 4.99 5.11 5.17 4.74 4.93 4.83 5.29 4.66 4.97 4.59 4.76 4.80 5.27 4.83 5.11 4.74 4.90 5.03 5.72 5.37

Kiri 4.17 4.15 4.78 4.74 5.21 5.00 4.84 5.15 4.96 4.81 5.27 4.71 5.34 5.11 5.33 5.24 5.37 4.80 5.12 4.91 5.43 5.40 5.02 4.89 4.48 4.98 4.83 4.80 4.79 4.93 5.32 4.79 5.16 5.32 5.34 4.78 4.79 5.12 5.03 5.36

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.24 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.26 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.18 Tipe : DMS 2 ketebalan tube < 4,00 mm

Ketelitian : 0.01 mm ketebalan tube di bawah MWT

` (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m) - 5.84

5.08 3.87

No. Row

Teb

al (m

m)

Posisi Pengujian

A B C

Page 94: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-20

POSISI : A - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.87 5.72 5.71 5.70 5.64 5.70 5.75 5.62 5.73 5.78 5.58 5.68 5.85 5.62 5.69 5.81 5.68 5.63 5.63 5.63 5.81 5.83 5.60 5.71 5.59 5.63 6.65 6.65 5.60 5.66 5.67 5.71 5.65 5.65 5.72 5.67 5.63 5.62 5.64 5.76

Tengah 5.86 5.63 5.68 5.64 5.57 5.67 5.74 5.60 5.70 5.72 5.52 5.72 5.85 5.55 5.70 5.70 5.72 5.59 5.66 5.54 5.76 5.76 5.62 5.68 5.60 5.58 5.55 5.59 5.68 5.62 5.57 5.63 5.54 5.66 5.66 5.73 5.54 5.64 5.61 5.69

Kiri 5.92 5.70 5.61 5.59 5.62 5.64 5.81 5.63 5.75 5.71 5.60 5.66 5.92 5.60 5.73 5.66 5.65 5.65 5.76 5.61 5.73 5.75 5.69 5.79 5.62 5.78 5.58 5.66 5.64 5.72 5.67 5.52 5.65 5.58 5.66 5.69 5.63 5.54 5.59 5.77

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.73 5.77 5.70 5.46 5.61 5.57 5.71 5.60 5.61 5.82 5.67 5.65 5.62 5.63 5.76 5.71 5.62 5.64 5.59 5.70 5.63 5.72 5.65 5.72 5.66 5.73 5.67 5.60 5.70 5.76 5.56 5.60 5.80 5.64 5.61 5.70 5.60 5.61 5.57 5.71

Tengah 5.62 5.72 5.67 5.64 5.69 5.70 5.67 5.65 5.67 5.79 5.69 5.73 5.61 5.64 5.70 5.65 5.65 5.52 5.61 5.62 5.61 5.66 5.68 5.68 5.69 5.67 5.66 5.74 5.72 5.63 5.66 5.65 5.76 5.69 5.62 5.63 5.62 5.59 5.61 5.58

Kiri 5.75 5.73 5.64 5.55 5.55 5.68 5.64 5.76 5.65 5.73 5.70 5.63 5.61 5.70 5.72 5.67 5.67 5.63 5.51 5.69 5.60 5.65 5.56 5.67 5.68 5.72 5.74 5.75 5.60 5.78 5.66 5.64 5.73 5.69 5.54 5.65 5.71 5.61 5.59 5.69

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.57 5.66 5.64 5.60 5.67 5.79 5.70 5.69 5.70 5.64 5.66 5.65 5.64 5.52 5.55 5.52 5.64 5.71 5.69 5.60 5.87 5.74 5.60 5.71 5.61 5.67 5.83 5.69 5.85 5.62 5.79 5.71 5.67 5.70 5.67 5.75 5.64 5.70 5.56 5.58

Tengah 5.64 5.70 5.66 5.70 5.60 5.72 5.62 5.75 5.72 5.67 5.58 5.67 5.61 5.64 5.64 5.69 5.69 5.64 5.64 5.58 5.73 5.64 5.65 5.84 5.76 5.66 5.78 5.56 5.84 5.69 5.75 5.73 5.65 5.68 5.68 5.68 5.59 5.65 5.66 6.73

Kiri 5.65 5.70 5.72 5.72 5.64 5.73 5.70 5.73 5.71 5.71 5.55 5.63 5.68 5.65 5.66 5.65 5.72 5.61 5.72 5.59 5.83 5.72 5.60 5.91 5.74 5.66 5.79 5.70 5.76 5.68 5.04 5.65 5.63 5.73 5.58 5.64 5.65 5.79 5.75 5.74

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.75 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.73 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.90 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m) - 6.73

5.44 5.04

No. Row

Teb

al (m

m)

Posisi Pengujian A B

Page 95: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-20

POSISI : B - ATAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.64 5.68 5.67 5.65 5.69 5.61 5.59 5.74 5.66 5.74 5.64 5.70 5.72 5.66 5.74 5.69 5.71 5.57 5.75 5.68 5.72 5.75 5.60 5.75 5.59 5.79 5.69 5.67 5.62 5.78 5.62 5.61 5.63 5.54 5.65 5.62 5.62 5.65 5.65 5.74

Tengah 5.83 5.63 5.62 5.59 5.64 5.58 5.71 5.67 5.71 5.55 5.59 5.69 5.76 5.58 5.64 5.49 5.75 5.48 5.65 5.55 5.74 5.63 5.50 5.65 5.61 5.74 5.57 5.66 5.66 5.62 5.20 5.61 5.54 5.59 5.70 5.75 5.56 5.58 5.49 5.61

Kiri 5.79 5.56 5.66 5.67 5.55 5.56 5.71 5.50 5.64 5.57 5.53 5.68 5.80 5.47 5.57 5.60 5.62 5.63 5.65 5.63 5.63 5.82 5.48 5.57 5.53 5.55 5.54 5.50 5.51 5.65 5.60 5.66 5.60 5.51 5.73 5.66 5.62 5.58 5.47 5.57

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.62 5.78 5.71 5.64 5.58 5.58 5.75 5.68 5.63 5.78 5.67 5.72 5.65 5.50 5.73 5.72 5.63 5.76 5.65 5.66 5.68 5.54 5.66 5.78 5.77 5.69 5.72 5.76 5.69 5.59 5.56 5.61 5.74 5.63 5.63 5.72 5.67 5.65 5.70 5.68

Tengah 5.55 5.70 5.68 5.62 5.55 5.64 5.58 5.71 5.68 5.69 5.72 5.75 5.54 5.56 5.68 5.58 5.50 5.49 5.59 5.65 5.62 5.65 5.62 5.71 5.67 5.56 5.83 5.77 5.69 5.67 5.61 5.63 5.54 5.64 5.58 5.61 5.72 5.54 5.60 5.47

Kiri 5.65 5.67 5.67 5.61 5.64 5.60 5.56 5.64 5.54 5.67 5.56 5.70 5.53 5,,63 5.57 5.60 5.65 5.66 5.52 5.33 5.74 5.66 5.44 5.56 5.63 5.67 5.82 5.73 5.66 5.70 5.52 5.56 5.58 5.63 5.55 5.57 5.60 5.61 5.64 5.53

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.60 5.73 5.64 5.71 5.70 5.63 5.50 5.68 5.68 5.65 5.66 5.70 5.54 5.66 5.50 5.58 5.67 5.70 5.62 5.63 5.79 5.69 5.70 5.93 5.74 5.64 5.90 5.64 5.87 5.44 5.79 5.70 5.61 5.66 5.67 5.73 5.71 5.69 5.66 5.80

Tengah 5.53 5.66 5.59 5.80 5.59 5.68 5.58 5.70 5.73 5.58 5.68 5.69 5.63 5.71 5.60 5.49 5.67 5.64 5.57 5.62 5.76 5.55 5.65 5.78 5.69 5.60 5.73 5.52 5.85 5.52 5.82 5.55 5.56 5.55 5.62 5.68 5.59 5.60 5.64 5.73

Kiri 5.58 5.63 5.64 5.69 5.69 5.65 5.59 5.69 5.64 5.65 5.62 5.63 5.50 5.67 5.59 5.52 5.71 5.57 5.65 5.56 5.79 5.71 5.51 5.75 5.59 5.45 5.32 5.67 5.70 5.50 5.64 5.49 5.59 5.50 5.61 5.53 5.63 5.61 5.69 5.63

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.72 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.61 Minimum = mm Ketebalan Minimum = mm Merek : GE - Posisi A-B-C dihitung dari turbin ke stack

Kiri 5.77 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

No. Row

Teb

al (m

m) - 5.93

5.44 5.20

No. Row

Teb

al (m

m)

Posisi Pengujian BA

Page 96: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-20 (VERTICAL)

Page 97: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-20

POSISI : VERTICAL - ELEVASI SOOT BLOWER 33 & 34

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.75 6.06 5.90 6.16 6.09 5.84 5.95 5.92 5.92 5.95 6.00 5.89 5.74 5.94 6.13 5.90 5.70 6.00 6.13 5.96 6.02 5.77 5.86 5.93 5.95 5.90 5.88 6.14 5.76 5.89 5.60 5.92 5.70 5.91 6.05 6.06 5.86 6.03 6.00 6.15

Tengah 5.94 6.00 5.83 6.11 6.02 5.76 5.99 5.85 6.05 6.07 6.01 5.93 5.86 5.88 6.27 6.01 6.00 5.90 5.97 5.99 6.01 5.71 5.70 6.02 6.02 5.89 5.73 5.95 5.82 5.88 5.90 5.91 5.76 5.80 5.74 6.19 5.71 5.99 6.19 6.04

Kiri 5.64 6.05 5.81 6.05 5.87 5.89 6.12 5.82 5.97 5.91 5.92 5.93 5.78 6.04 5.99 5.95 6.03 6.04 5.95 5.97 5.96 5.80 5.79 5.92 6.13 5.79 5.80 5.89 5.68 5.91 5.94 6.17 5.66 5.72 5.71 6.24 5.89 ,,91 6.27 5.99

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 5.88 5.84 5.83 6.14 5.77 5.96 6.06 5.75 5.97 6.07 5.83 6.00 5.95 5.98 6.10 6.12 5.86 5.88 5.91 5.89 6.03 6.15 5.91 5.86 6.06 6.03 6.01 5.86 5.68 5.84 6.05 6.09 5.83 5.89 5.94 6.18 5.86 6.90 5.90 5.82

Tengah 5.84 5.86 5.95 6.11 5.83 5.99 5.94 5.98 5.98 5.91 5.91 5.91 5.90 5.83 5.95 6.05 5.72 6.02 6.14 6.00 6.16 6.08 6.06 5.89 5.91 6.20 6.01 5.97 5.82 5.88 6.04 5.99 6.01 5.79 5.73 5.97 5.72 5.94 5.78 5.88

Kiri 6.00 5.75 6.00 6.05 5.92 5.88 6.01 6.03 5.97 6.19 5.85 5.86 6.06 5.89 6.03 6.05 5.92 6.04 6.03 6.23 6.03 5.95 6.03 6.05 5.98 6.07 5.98 5.91 5.70 5.80 6.12 6.05 6.00 6.02 5.73 5.91 5.73 6.00 5.72 5.83

No. Row

Teb

al (m

m)

No. Row

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 5.93 6.08 5.70 6.03 6.51 6.22 6.04 5.72 5.86 5.93 5.88 5.95 6.06 6.08 6.34 6.02 6.45 6.24 6.01 6.26 5.96 5.99 5.95 5.99 5.86 5.98 6.07 5.86 5.89 6.30 5.79 5.80 6.06 6.00 6.13 5.96 6.13 6.04 6.18 5.95

Tengah 6.03 5.98 5.84 5.81 5.85 6.06 6.02 5.82 5.79 5.78 5.76 6.03 6.21 6.04 6.15 5.88 6.25 6.08 5.88 6.14 5.88 6.16 5.91 6.03 6.03 6.02 6.07 5.92 6.00 6.10 5.99 5.98 6.02 6.04 6.09 5.85 6.02 5.95 6.01 5.81

Kiri 6.18 6.04 6.00 5.85 5.80 6.18 5.99 5.80 5.83 5.83 5.90 6.07 6.06 5.98 6.18 5.91 6.25 6.19 6.02 6.00 6.02 6.17 6.06 6.04 6.00 5.85 6.12 5.90 5.92 6.01 6.04 5.93 6.17 6.18 5.85 5.84 6.15 5.94 5.87 5.82

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.99 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.83 Minimum = mm Ketebalan Minimum = mm Merek : GE

Kiri 5.91 Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

6.90

5.44 5.60

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) -

Posisi Pengujian

Page 98: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-20

POSISI : VERTICAL - ELEVASI SOOT BLOWER 33-34

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.37 7.26 7.35 7.30 7.90 7.18 7.44 7.48 7.15 7.38 7.40 7.48 7.55 7.38 7.41 7.30 7.46 7.52 7.58 7.26 7.29 7.44 7.53 7.35 7.54 7.48 7.26 7.27 7.40 7.35 6.79 7.38 7.38 7.28 7.26 7.20 7.21 7.22 7.42 7.40

Tengah 7.39 7.13 7.39 7.10 7.26 7.12 7.25 7.36 7.12 7.49 7.40 7.21 7.42 7.37 7.38 7.38 7.37 7.51 7.35 7.33 7.30 7.53 7.45 7.27 7.35 7.40 7.24 7.31 7.22 7.39 7.06 7.33 7.28 7.21 7.30 7.21 7.23 6.97 7.22 7.43

Kiri 7.35 7.16 7.49 7.32 7.23 7.11 7.29 7.49 7.24 7.52 7.39 7.48 7.44 7.43 7.39 7.36 7.38 7.36 7.35 7.34 7.35 7.55 7.48 7.21 7.46 7.45 7.31 7.54 7.35 7.46 7.02 7.20 7.16 7.12 7.44 7.23 7.24 7.17 7.31 7.37

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.18 7.23 7.20 7.28 7.47 7.10 7.42 7.31 7.38 7.30 7.53 7.51 7.38 7.30 7.30 7.39 7.32 7.41 7.56 7.21 7.43

Tengah 7.11 7.14 7.11 7.30 7.31 7.84 7.43 7.40 7.37 7.00 7.30 7.41 7.34 7.36 7.32 7.31 7.36 7.20 7.55 7.23 7.35

Kiri 7.02 7.09 7.09 7.20 7.48 7.18 7.47 7.25 7.48 7.20 7.35 7.55 7.26 7.38 7.41 7.27 7.39 7.78 7.39 7.32 7.53

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.90

REF* 6.79

Posisi Pengujian

Page 99: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-20

POSISI : VERTICAL - ELEVASI SOOT BLOWER 35-36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 7.29 7.38 7.20 7.21 7.23 7.45 7.51 7.21 7.25 7.14 7.47 7.33 7.38 7.87 7.44 7.51 7.30 7.27 7.42 7.55 7.41 7.17 7.51 7.32 7.48 7.44 7.59 7.53 7.31 7.41 7.42 7.41 7.13 7.38 7.48 7.44 7.42 7.47 7.41 7.56

Tengah 7.22 7.20 7.20 7.23 7.30 7.47 7.43 7.28 7.12 7.24 7.43 7.15 7.38 7.31 7.43 7.45 7.15 7.38 7.29 7.42 7.46 7.22 7.40 7.35 7.40 7.23 7.45 7.49 7.22 7.39 7.23 7.88 7.05 7.40 7.36 7.37 7.23 7.37 7.44 7.40

Kiri 7.35 7.36 7.32 7.30 7.37 7.56 7.34 7.30 7.30 7.41 7.49 7.20 7.39 7.42 7.31 7.46 7.31 7.42 7.15 7.51 7.33 7.24 7.54 7.42 7.24 7.44 7.47 7.57 7.36 7.44 7.59 7.33 7.20 7.41 7.52 7.30 7.30 7.33 7.37 7.47

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Kanan 7.16 7.18 7.48 7.27 7.46 7.43 7.40 7.38 7.31 7.24 7.37 7.50 7.50 7.33 7.40 7.23 7.29 7.50 7.30 7.52 7.34

Tengah 7.19 7.20 7.40 7.37 7.30 7.35 7.35 7.42 7.28 7.23 7.28 7.41 7.38 7.28 7.36 7.52 7.36 7.45 7.45 7.30 7.42

Kiri 7.22 7.31 7.14 7.44 7.31 7.45 7.21 7.51 7.24 7.25 7.18 7.36 7.34 7.37 7.31 7.34 7.36 7.29 7.38 7.43 7.49

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 7.88

REF* 7.05

Posisi Pengujian

Page 100: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-21

Page 101: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-21

POSISI : LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.89 6.03 5.81 5.92 5.91 6.03 5.99 6.01 5.97 6.04 5.82 5.98 6.02 6.00 6.13 5.88 5.89 5.92 5.84 6.00 5.95 5.99 6.06 6.07 5.95 5.92 6.11 6.02 6.10 6.11 5.99 5.67 6.08 5.87 6.16 6.21 6.11 5.88 6.05 5.99

Tengah 6.04 6.04 6.09 5.85 5.90 5.88 5.94 5.92 5.75 6.03 5.95 5.81 5.98 6.04 6.00 6.06 5.91 6.13 5.97 6.02 5.95 5.79 5.86 6.01 5.91 5.91 6.00 5.92 6.01 5.92 5.81 5.87 6.08 5.85 6.05 5.98 6.09 5.94 5.91 6.06

Kiri 6.02 5.99 5.93 5.94 6.00 5.78 5.88 6.99 5.91 6.13 6.00 5.88 5.91 6.05 5.78 6.08 5.81 6.21 5.84 6.01 6.06 5.76 5.54 6.11 5.86 6.06 6.06 5.70 5.94 5.94 5.95 5.77 5.95 5.95 6.07 6.09 6.22 5.82 5.77 6.01

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 6.10 5.93 6.01 6.10 5.90 5.92 5.97 5.94 6.07 6.06 6.11 5.85 6.17 6.00 6.00 6.05 5.99 5.83 5.99 6.01 6.03 6.03 6.17 5.86 5.95 5.81 5.94 5.95 5.93 6.10 6.07 6.17 5.91 5.98 6.03 6.00 6.06 5.90 6.20 6.00

Tengah 5.59 5.98 6.00 6.01 5.87 5.83 6.03 5.94 6.00 5.91 5.99 5.84 5.99 5.95 5.88 5.90 5.88 5.80 5.89 5.79 6.02 6.04 6.10 5.85 6.00 6.07 5.88 6.02 5.81 6.03 5.97 6.11 5.90 6.12 5.99 6.15 5.95 5.94 6.08 5.78

Kiri 5.95 5.88 5.98 6.06 5.77 5.91 6.09 5.94 6.08 5.84 6.05 5.98 6.06 6.01 5.93 6.08 5.79 6.06 6.05 6.11 5.99 6.02 6.03 5.99 5.94 6.08 5.92 6.05 5.95 6.00 6.05 6.01 5.85 6.04 5.92 6.05 5.96 5.97 6.01 5.68

No. Row

No. Row

Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Teb

al (m

m)

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 6.04 6.21 6.01 5.91 5.97 5.98 5.94 5.93 6.11 5.89 6.07 5.93 5.97 5.93 6.15 5.87 5.95 6.12 5.88 6.04 5.92 6.05 5.95 6.24 5.95 6.04 5.99 6.02 6.16 6.60 5.88 5.91 5.97 5.84 5.87 6.04 6.15 5.96 5.95 5.92

Tengah 5.87 6.06 5.90 6.03 5.88 6.13 5.88 6.08 5.96 5.74 5.99 5.93 5.97 5.96 6.02 6.09 5.88 6.11 6.02 5.93 5.97 5.89 5.99 6.03 6.02 5.90 5.80 5.91 6.07 5.93 5.80 5.95 5.93 5.84 5.83 5.67 5.93 6.03 5.90 5.78

Kiri 6.00 5.69 5.87 6.02 6.02 6.05 5.93 5.98 5.91 5.83 6.08 5.97 5.96 5.98 6.00 6.01 5.83 5.93 5.99 6.82 5.90 5.97 5.78 6.13 6.10 5.70 5.82 5.81 6.04 6.02 5.80 5.96 5.90 5.70 5.93 6.00 5.99 5.89 5.93 5.76

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 6.06 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 6.04 Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 6.04 Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

5.44 5.54

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m) - 6.99

LEVEL 3

LEVEL 2

LEVEL 1

Page 102: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-21

POSISI : LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 6.81 6.01 5.88 6.17 5.18 5.82 5.92 6.05 5.92 5.92 5.85 6.02 6.05 6.19 6.00 5.86 6.00 6.06 5.92 6.95 6.00 6.14 5.91 6.61 5.96 5.95 6.13 6.00 6.07 6.09 5.93 5.82 5.86 5.97 6.00 5.99 6.20 6.07 6.16 6.22

Tengah 6.21 6.10 5.95 6.00 5.80 6.08 6.15 5.93 5.92 5.99 6.10 5.99 5.83 6.13 6.08 5.92 5.92 6.21 6.00 5.91 6.01 5.91 5.99 5.92 5.88 5.87 6.06 5.97 6.12 6.04 5.84 5.92 6.05 6.01 6.01 5.97 6.24 6.00 6.13 6.15

Kiri 6.01 5.94 6.10 5.93 5.93 5.96 6.07 5.92 5.95 5.90 5.98 5.94 5.87 6.22 5.90 5.89 5.80 6.13 5.86 6.03 6.06 5.75 5.91 5.83 5.94 5.96 6.16 5.95 6.18 6.03 5.89 5.81 6.00 5.85 6.00 5.98 6.21 5.87 6.11 6.17

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 6.05 5,,85 5.98 6.04 5.81 5.89 6.00 5.92 6.02 6.01 6.12 5.88 6.16 6.16 6.05 5.99 5.92 5.89 6.10 5.99 5.99 5.95 6.09 6.00 5.96 5.88 5.96 5.97 6.12 6.23 6.12 5.96 6.11 5.81 6.08 5.97 6.17 6.07 6.19 6.07

Tengah 6.10 5.84 6.16 6.03 5.86 5.95 6.02 5.93 5.89 5.87 6.02 5.83 6.01 6.14 6.05 5.98 6.06 5.79 5.92 5.92 5.88 6.06 6.00 5.99 5.95 6.02 5.87 6.02 5.97 6.20 5.98 6.01 5.96 5.99 6.12 6.06 5.97 5.92 6.16 6.98

Kiri 6.17 5.92 6.15 6.10 5.82 5.84 6.06 6.04 6.08 5.79 6.01 5.98 6.09 6.12 6.00 5.96 5.97 5.97 5.97 6.04 6.03 6.05 6.12 5.89 5.89 5.97 5.82 5.86 6.02 6.08 6.16 6.07 5.74 5.87 6.00 5.99 6.07 5.83 6.07 6.76

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 6.08 6.15 6.04 5.96 6.03 5.85 6.06 5.87 6.03 5.76 5.95 6.20 5.94 5.98 6.17 5.96 6.00 6.09 5.99 5.87 5.99 6.14 5.94 6.16 5.81 6.14 6.09 5.98 6.12 5.96 5.96 5.90 5.94 6.03 5.95 6.00 5.98 5.92 6.05 6.13

Tengah 6.02 6.09 5.82 5.96 5.90 5.87 6.00 5.92 6.01 5.83 6.09 6.12 6.10 6.01 5.08 5.92 6.05 6.17 6.06 5.95 6.10 5.91 5.82 5.96 5.90 6.05 5.93 5.96 6.11 5.93 6.00 5.99 6.00 6.04 6.00 5.88 6.05 6.04 6.07 6.00

Kiri 5.96 5.93 5.75 5.97 5.86 5.98 6.03 5.95 5.93 5.74 6.04 6.03 6.01 6.04 6.10 6.08 5.91 6.09 6.06 5.86 6.16 5.80 6.06 6.10 5.95 5.79 5.90 6.00 5.95 6.04 6.05 5.93 5.91 5.92 5.99 6.01 6.05 5.83 5.99 6.03

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.92 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 5.97 Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 6.06 Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

Teb

al (m

m) - 6.98

5.44 5.08

No. Row

Teb

al (m

m)

No. Row

LEVEL 3

LEVEL 2

LEVEL 1

Page 103: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-21

POSISI : LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 6.00 5.89 6.12 5.84 5.13 5.74 5.82 5.86 6.06 6.04 6.26 6.85 5.98 6.30 5.81 6.06 6.03 5.91 5.91 5.73 5.90 6.09 6.28 5.89 6.02 6.11 5.73 5.87 5.81 6.17 5.89 6.13 5.83 6.18 6.14 6.05 6.21 6.09 5.89 6.13

Tengah 6.04 6.03 6.08 5.91 5.23 5.88 5.91 6.09 6.00 5.84 6.11 6.37 6.72 6.12 5.92 6.06 5.97 5.96 5.81 5.70 5.88 6.20 6.04 5.90 6.00 6.19 5.77 5.80 6.01 5.97 6.03 6.11 5.81 6.32 5.91 6.05 5.98 6.21 5.91 6.11

Kiri 5.73 6.07 6.16 5.99 5.82 5.72 5.85 6.01 6.07 5.92 5.88 5.87 6.75 6.16 5.94 5.96 6.16 6.06 5.75 5.75 5.75 5.92 6.06 5.73 6.30 6.08 5.86 6.00 6.02 6.14 5.84 6.11 5.94 6.15 5.74 6.09 6.08 6.10 5.79 6.15

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Kanan 6.12 6.06 5.82 5.96 6.03 5.99 6.19 5.95 6.04 5.90 5.82 5.98 5.93 6.15 6.06 5.96 5.85 5.90 6.27 6.19 5.92 6.15 5.84 5.85 6.07 5.87 6.04 5.97 5.97 5.85 5.87 6.03 6.09 6.18 6.05 6.25 5.93 6.02 5.92 5.88

Tengah 6.11 6.06 5.76 5.96 5.99 5.94 5.94 5.96 6.01 5.78 5.74 6.16 6.04 5.88 6.04 5.85 5.72 5.95 6.12 6.15 6.00 6.08 5.96 5.75 6.11 5.97 6.12 6.07 6.19 5.81 5.94 6.00 5.96 6.15 6.00 6.21 6.02 6.01 5.96 5.72

Kiri 5.95 5.94 5.96 6.06 6.05 5.91 5.93 6.16 6.05 5.87 5.79 6.19 6.21 6.04 6.01 5.92 5.91 6.02 6.23 6.04 6.16 6.19 6.00 5.95 6.03 5.96 6.05 6.10 6.23 5.86 5.99 5.97 6.05 6.24 5.98 6.29 6.02 5.96 5.89 5.72

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Kanan 6.11 6.20 5.97 6.00 5.91 5.85 6.08 5.83 6.09 6.13 6.05 6.16 6.10 5.93 5.95 6.07 6.03 6.04 6.04 6.15 6.07 6.03 6.01 6.16 5.95 6.06 6.10 6.13 5.99 6.05 5.67 5.76 6.00 6.19 6.04 6.09 6.00 5.81 6.04 6.06

Tengah 6.09 5.92 6.05 6.00 6.23 5.74 6.28 5.93 6.11 6.10 6.00 6.02 6.08 6.01 5.94 6.08 5.90 6.18 6.07 6.15 6.13 6.07 6.18 6.20 5.92 6.14 5.99 6.10 6.03 6.01 5.76 5.76 5.99 6.07 5.91 6.00 6.09 5.94 6.02 5.90

Kiri 6.17 6.10 6.05 5.99 6.33 6.01 6.12 5.92 6.14 6.07 6.04 6.06 6.15 5.77 5.80 6.12 6.07 6.07 5.99 6.18 6.16 6.14 6.00 6.21 5.81 6.08 6.03 6.09 6.01 6.15 5.66 6.09 6.09 6.18 6.06 6.21 5.87 6.16 5.95 6.03

121 Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Kanan 5.99 Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timurTengah 6.04 Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Kiri 6.00 Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

Teb

al (m

m) - 6.85

5.44 5.13

No. Row

Teb

al (m

m)

No. Row

LEVEL 3

LEVEL 2

LEVEL 1

Page 104: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-33

Page 105: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-33

POSISI : A - ELBOW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kanan 11.23 10.87 10.66 11.55 11.58 10.46 10.71 10.58 10.58 10.50 10.82 10.64 10.63 10.62 10.85 11.00 10.69 10.75 11.63 10.70 10.74 11.12

Tengah 10.87 10.82 10.66 10.71 11.74 10.57 10.70 10.55 10.72 10.65 10.65 10.60 10.55 10.55 10.66 11.01 10.51 10.90 10.61 10.67 10.58 11.36

Kiri 10.93 10.58 11.10 11.10 11.26 11.39 11.05 10.71 11.21 10.88 10.89 10.89 10.98 10.97 10.85 11.23 10.85 11.35 10.94 11.01 10.63 10.87

LOKASI : S-33

POSISI : B - ELBOW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kanan 11.40 11.43 11.43 11.38 11.11 11.66 11.07 11.21 11.11 11.04 10.92 11.87 11.89 11.07 11.31 11.41 11.33 10.81 11.27 11.11 11.21 11.14

Tengah 10.83 10.91 10.67 10.68 10.73 10.72 10.71 10.69 10.72 10.64 10.82 11.64 11.65 10.64 11.74 10.78 10.88 10.59 10.67 10.84 10.67 10.85

Kiri 11.10 10.90 10.78 10.81 10.98 10.53 11.24 11.21 10.80 10.80 11.32 10.92 10.94 10.70 10.94 10.85 11.15 11.06 10.79 11.13 10.89 11.09Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

No. Row

Teb

al (m

m)

No. Row

DATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 11.89 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 10.67 mm Ketebalan Minimum = 10.46 mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Achmad ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 106: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-33

POSISI : A - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kanan 11.70 11.66 11.24 11.60 11.49 11.33 11.93 11.65 11.43 11.43 11.76 11.60 11.21 11.57 11.60 11.56 11.77 11.51 11.59 11.69 11.56 11.42

Tengah 11.56 11.68 11.41 11.61 11.43 11.38 11.60 11.55 11.52 11.60 11.73 11.49 11.22 11.60 11.35 11.82 11.48 11.55 11.55 11.65 11.55 11.45

Kiri 11.52 11.65 11.69 11.74 11.51 11.38 11.28 11.49 11.61 11.74 11.56 11.44 11.35 11.62 11.31 11.85 11.28 11.60 11.52 11.56 11.55 11.44

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 11.93 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 10.67 mm Ketebalan Minimum = 11.21 mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

No. Row

Teb

al (m

m)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Achmad ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 107: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-33

POSISI : B - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kanan 7.13 6.85 7.05 7.02 6.93 6.99 7.06 7.03 6.90 6.85 6.83 7.15 6.88 6.95 6.96 6.89 6.84 6.98 6.98 7.05 6.76 6.95

Tengah 7.00 6.95 6.95 6.99 6.98 7.01 7.06 6.92 6.98 6.85 6.90 7.00 6.82 6.91 6.82 7.01 6.84 6.94 6.97 6.97 6.79 6.92

Kiri 6.95 7.06 7.00 6.95 7.08 7.01 7.14 6.96 7.14 6.83 6.96 6.93 6.83 7.00 6.84 7.06 6.97 7.00 7.00 6.95 7.03 7.09

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 7.15 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 6.35 mm Ketebalan Minimum = 6.76 mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

No. Row

Teb

al (m

m)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 108: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-33

POSISI : A - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tube S-38Kanan 6.93 6.80 7.15 6.84 6.99 6.92 7.09 7.03 6.75 6.68 7.12 6.87 6.96 6.93 6.92 6.81 6.78 6.83 6.96 6.79 6.85 6.76

Tengah 6.89 6.82 7.03 6.71 6.74 6.86 6.93 6.94 6.69 6.77 7.03 6.82 6.94 6.91 6.86 6.84 6.76 6.86 7.01 6.86 6.84 6.75 Ketebalan PipaKiri 6.04 6.93 6.89 6.74 6.81 6.91 6.83 6.89 6.78 6.89 7.02 6.96 6.99 6.91 6.84 6.94 6.88 7.06 7.01 7.04 7.08 6.82 Desain = - mm

LOKASI : S-33 Minimum = 7.11 mmPOSISI : B - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Hasil PengukuranKanan 6.95 6.84 7.09 6.83 7.15 7.33 6.98 6.83 6.93 7.54 7.16 7.03 7.49 7.00 7.03 6.91 7.74 6.85 7.06 7.57 6.90 6.94 Ketebalan Mak. = 7.74 mmTengah 6.98 6.86 7.31 6.83 7.07 7.15 6.92 6.78 6.95 7.31 7.10 7.90 7.17 6.88 7.01 7.01 7.26 6.93 6.89 7.36 6.93 6.93 Ketebalan Min. = 7.09 mm

Kiri 7.06 7.01 7.51 6.89 7.09 7.46 6.86 6.99 7.01 7.48 7.08 6.93 7.22 6.91 7.08 7.17 7.55 7.03 6.89 7.62 7.03 7.19Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 7.90 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 6.35 mm Ketebalan Minimum = 6.04 mm Merek : GE - Row No. 3, 6, 10, 13, 17 dan 20 pada

Tipe : DMS 2 posisi B adalah Tube S-38

Ketelitian : 0.01 mm ketebalan tube di bawah MWT(Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 109: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-33

POSISI : A - LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tube S-38Kanan 6.91 6.99 7.05 6.87 6.91 6.90 7.11 7.01 7.93 7.12 7.12 6.85 6.97 7.05 6.91 6.95 7.01 7.03 6.96 6.84 7.06 6.90

Tengah 6.87 6.96 7.02 6.92 6.88 6.91 7.07 7.06 6.83 7.16 7.08 6.82 7.00 7.13 6.94 7.02 6.91 7.02 7.03 6.98 6.94 6.94 Ketebalan PipaKiri 6.92 6.98 6.94 7.02 6.91 6.90 7.04 7.06 6.94 7.09 7.00 6.93 7.05 7.03 6.99 7.06 6.93 7.02 7.02 7.13 6.97 6.85 Desain = - mm

LOKASI : S-33 Minimum = 7.11 mmPOSISI : B - LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Hasil PengukuranKanan 6.97 7.23 7.61 6.96 6.97 7.83 7.76 7.11 6.96 7.82 7.10 7.05 7.80 6.90 6.87 7.02 7.67 7.01 7.01 7.89 6.86 7.08 Ketebalan Mak. = 7.89 mmTengah 6.93 7.20 7.65 6.90 7.05 7.80 7.11 7.13 7,-8 7.79 7.02 6.94 7.75 6.99 6.89 7.20 7.70 6.92 7.02 7.74 7.06 7.08 Ketebalan Min. = 7.61 mm

Kiri 7.00 7.17 7.80 6.98 7.16 7.80 7.16 7.17 7.21 7.83 6.97 6.97 7.75 7.18 7.07 7.18 7.88 6.90 7.17 7.67 7.25 7.11Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 7.93 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 6.35 mm Ketebalan Minimum = 6.82 mm Merek : GE - Row No. 3, 6, 10, 13, 17 dan 20 pada

Tipe : DMS 2 posisi B adalah Tube S-38

Ketelitian : 0.01 mm ketebalan tube di bawah MWT(Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Tumpal H. ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 110: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-33

POSISI : A - LEVEL 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tube S-38Kanan 6.90 6.92 7.04 6.96 6.86 7.05 7.03 7.07 6.92 6.92 7.12 6.87 6.97 7.06 6.95 6.96 7.04 7.04 7.01 6.97 6.94 6.95

Tengah 7.00 6.99 7.00 6.91 6.80 7.02 6.98 6.94 6.92 6.92 6.99 6.86 6.91 7.04 6.89 7.01 6.87 7.12 7.06 7.03 6.94 6.95 Ketebalan PipaKiri 6.91 7.02 6.95 6.96 6.84 6.90 6.99 6.88 6.90 6.93 7.01 6.86 6.91 7.00 6.87 7.02 6.82 7.05 7.10 7.16 7.05 7.01 Desain = - mm

LOKASI : S-33 Minimum = 7.11 mmPOSISI : B - LEVEL 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Hasil PengukuranKanan 6.98 6.98 7.70 6.99 7.06 7.84 6.94 7.18 7.11 7.71 7.15 7.01 7.78 6.99 6.98 7.08 7.73 7.12 6.97 7.87 6.82 7.05 Ketebalan Mak. = 7.87 mmTengah 6.94 7.02 7.71 6.91 7.09 7.78 7.07 7.06 7.30 7.79 7.07 7.42 7.73 6.99 6.88 7.13 7.77 6.92 6.96 7.79 7.81 7.08 Ketebalan Min. = 7.70 mm

Kiri 7.08 7.07 7.71 6.93 7.16 7.85 7.18 6.98 7.10 7.85 7.05 6.96 7.79 7.00 6.88 7.19 7.85 6.97 7.03 7.72 7.98 7.65Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 7.98 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 6.35 mm Ketebalan Minimum = 6.80 mm Merek : GE - Row No. 3, 6, 10, 13, 17 dan 20 pada

Tipe : DMS 2 posisi B adalah Tube S-38

Ketelitian : 0.01 mm ketebalan tube di bawah MWT(Minimum Wall Thickness)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Tumpal H. ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 111: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : S-33

POSISI : A - LEVEL 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tube S-38Kanan 7.08 6.99 6.96 7.02 6.98 7.03 7.09 6.97 6.77 7.12 7.04 6.92 7.03 6.91 7.06 7.13 7.25 7.04 7.04 7.12 7.12 7.22

Tengah 7.01 6.95 7.06 7.04 7.03 6.94 6.98 7.03 6.70 7.06 7.01 6.86 7.07 6.93 7.15 7.11 7.32 7.03 7.01 7.10 7.08 7.21 Ketebalan PipaKiri 6.88 6.99 7.18 7.16 7.03 6.88 6.98 7.15 7.00 7.01 7.05 7.04 7.04 7.01 7.18 7.18 7.15 7.04 7.02 6.99 7.07 7.10 Desain = - mm

LOKASI : S-33 Minimum = 7.11 mmPOSISI : B - LEVEL 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Hasil PengukuranKanan 6.73 6.92 7.67 7.01 6.99 7.76 6.86 6.84 6.90 7.77 7.14 7.00 7.75 7.04 6.94 7.01 7.72 7.81 7.02 7.82 6.85 7.03 Ketebalan Mak. = 7.83 mmTengah 6.48 6.54 6.40 6.48 6.43 1.92 6.41 6.40 6.62 6.79 6.61 6.96 7.68 7.01 6.80 6.92 7.68 6.84 6.81 7.73 6.77 6.72 Ketebalan Min. = 1.92 mm

Kiri 6.63 6.84 7.62 6.75 6.67 7.75 6.83 6.68 6.89 7.83 6.83 6.98 7.60 7.02 6.89 7.02 7.72 6.88 6.84 7.74 6.91 6.70

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = - mm Ketebalan Maksimum = 7.81 mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = 6.35 mm Ketebalan Minimum = 6.40 mm Merek : GE - Row No. 3, 6, 10, 13, 17 dan 20 pada

Tipe : DMS 2 posisi B adalah Tube S-38

Ketelitian : 0.01 mm ketebalan tube di bawah MWT(Minimum Wall Thickness)

ketebalan tube < 4,00

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

B - LEVEL 5

B - LEVEL 4

B - LEVEL 3

B - LEVEL 2

B - LEVEL 1

B - ELBOWA - ELBOW

A - LEVEL 1

A - LEVEL 2

A - LEVEL 3

A - LEVEL 4

A - LEVEL 5

Page 112: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSR-9

Page 113: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL A POSISI : PANEL 2 LEVEL A POSISI : PANEL 3 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,47 4,49 4,81 4,48 5,28 4,55 4,49 4,86 4,61 5,15 Kanan 4,47 4,61 4,72 4,49 4,95 4,51 4,39 4,76 4,74 5,27 Kanan 4,47 4,49 4,84 4,57 4,90 4,98 4,66 4,86 4,53 4,61

Tengah 4,36 4,53 4,80 4,43 5,36 4,57 4,47 4,73 4,57 5,20 Tengah 4,34 4,53 4,62 4,51 4,88 4,47 4,39 4,76 4,51 5,27 Tengah 4,39 4,57 4,81 4,53 4,90 5,05 4,55 4,79 4,46 4,84

Kiri 4,41 4,47 4,85 4,43 5,40 4,59 4,49 3,54 4,66 5,17 Kiri 4,36 4,47 4,55 4,43 5,13 4,55 4,38 4,95 4,57 5,10 Kiri 4,47 4,53 4,85 4,49 4,92 4,92 4,53 4,82 4,53 4,86

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL A POSISI : PANEL 5 LEVEL A POSISI : PANEL 6 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,94 4,74 4,55 4,55 5,35 4,82 4,55 5,12 4,32 4,32 Kanan 3,49 4,55 4,59 4,43 4,76 4,15 4,62 3,84 4,43 4,59 Kanan 4,45 4,49 5,22 4,55 4,99 4,81 4,82 5,13 4,78 4,85

Tengah 4,90 4,80 4,55 4,59 5,39 5,59 4,53 5,02 4,38 4,74 Tengah 4,47 4,51 4,66 4,47 4,78 4,84 4,47 4,91 4,39 4,43 Tengah 4,49 4,51 5,28 4,47 5,13 4,87 4,69 4,79 4,79 4,90

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

No. Tube

Teb

al (m

m)

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

No. Tube

Teb

al (m

m)

Tengah 4,90 4,80 4,55 4,59 5,39 5,59 4,53 5,02 4,38 4,74 Tengah 4,47 4,51 4,66 4,47 4,78 4,84 4,47 4,91 4,39 4,43 Tengah 4,49 4,51 5,28 4,47 5,13 4,87 4,69 4,79 4,79 4,90

Kiri 4,98 4,83 4,68 4,79 5,30 4,68 4,51 4,99 4,39 4,70 Kiri 4,43 4,53 4,57 4,47 4,70 4,82 4,53 5,03 4,86 4,57 Kiri 4,45 4,39 5,31 4,59 4,94 4,84 4,66 5,14 4,78 4,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL A POSISI : PANEL 8 LEVEL A POSISI : PANEL 9 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,55 4,47 4,41 5,20 4,83 4,01 5,02 4,77 4,90 Kanan 4,71 5,02 4,80 4,68 4,82 4,68 4,86 5,40 4,75 4,79 Kanan 4,53 4,51 4,76 4,55 4,92 4,77 4,72 4,90 4,92 4,92

Tengah 4,80 4,53 4,47 4,59 5,15 4,90 4,62 4,77 4,75 4,92 Tengah 4,78 4,95 4,80 4,66 4,74 4,78 4,88 5,37 4,64 4,85 Tengah 4,55 4,51 4,78 4,53 4,98 4,79 4,88 4,97 4,95 4,83

Kiri 4,78 4,75 4,53 4,61 5,15 4,82 4,51 5,00 4,57 4,98 Kiri 4,70 4,93 4,79 4,68 4,75 4,84 4,95 5,10 4,72 4,89 Kiri 4,66 4,47 4,83 4,45 5,02 4,75 4,79 4,80 4,85 4,97

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,59

Teb

al (m

m)

Teb

al (m

m)

4,57-

Teb

al (m

m)

Teb

al (m

m)

3,49

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

R-9LEVEL A

Koordinator Lapangan1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL A

Page 114: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL A POSISI : PANEL 11 LEVEL A POSISI : PANEL 12 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,49 4,43 4,67 4,51 5,05 4,87 4,92 4,90 4,45 4,66 Kanan 4,51 4,53 4,68 4,45 4,48 4,58 4,59 4,68 4,89 4,74 Kanan 4,45 4,51 4,71 4,59 5,17 4,73 4,45 4,98 4,68 4,79

Tengah 4,47 4,51 4,55 4,57 4,99 4,90 4,86 4,89 4,41 4,68 Tengah 4,47 4,53 4,66 4,55 4,84 4,78 4,57 4,66 4,87 4,70 Tengah 4,45 4,49 4,60 4,61 5,22 4,81 4,45 4,98 4,73 4,81

Kiri 4,45 4,51 4,55 4,64 5,03 4,89 4,85 5,16 4,43 4,69 Kiri 4,53 4,53 4,76 4,53 4,85 4,74 4,82 4,72 4,75 4,76 Kiri 4,47 4,51 4,76 4,57 5,20 4,91 4,55 5,02 4,78 4,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL A POSISI : PANEL 14 LEVEL A POSISI : PANEL 15 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,61 4,55 4,62 4,43 4,66 4,70 4,84 5,02 4,87 4,79 Kanan 4,43 4,57 4,72 4,51 4,91 4,88 4,55 4,92 5,07 4,92 Kanan 5,00 4,82 4,80 4,73 4,71 4,96 4,51 5,23 4,76 4,90

Tengah 4,55 4,53 4,64 4,43 4,70 4,77 4,86 4,99 4,69 4,72 Tengah 4,41 4,55 4,70 4,49 4,88 4,81 4,45 5,27 4,99 4,79 Tengah 5,01 4,84 4,78 4,75 4,77 4,90 4,53 5,45 4,78 4,89

Teb

al (m

m)

Teb

al (m

m)

No. Tube

Teb

al (m

m)

No. Tube No. Tube

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 4,55 4,53 4,64 4,43 4,70 4,77 4,86 4,99 4,69 4,72 Tengah 4,41 4,55 4,70 4,49 4,88 4,81 4,45 5,27 4,99 4,79 Tengah 5,01 4,84 4,78 4,75 4,77 4,90 4,53 5,45 4,78 4,89

Kiri 4,47 4,49 4,66 4,39 4,72 4,73 4,72 5,03 4,72 4,68 Kiri 4,45 4,51 4,64 4,43 4,80 4,80 4,51 5,36 5,02 4,78 Kiri 4,99 4,82 4,81 4,76 4,71 4,89 4,62 5,45 4,78 4,92

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL A POSISI : PANEL 17 LEVEL A POSISI : PANEL 18 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,80 4,77 4,47 4,77 4,76 4,91 4,88 4,80 4,84 Kanan 4,41 4,55 5,21 4,47 4,60 4,49 4,87 4,95 4,80 4,73 Kanan 4,72 4,83 5,00 4,55 4,74 4,82 4,62 5,46 5,30 4,86

Tengah 4,77 4,77 4,64 4,47 4,75 4,81 4,92 4,91 4,78 4,86 Tengah 4,39 4,51 5,35 4,45 4,68 4,41 4,87 4,96 4,76 4,76 Tengah 4,72 4,83 4,70 4,49 4,73 4,72 4,68 3,46 4,69 4,65

Kiri 4,71 4,68 4,70 4,45 4,78 4,73 4,86 4,88 4,82 4,91 Kiri 4,38 4,71 5,35 4,45 4,74 4,49 4,88 4,95 4,80 4,72 Kiri 4,75 4,80 4,93 4,49 4,74 4,81 4,81 5,30 4,70 4,83

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,46

No. Tube No. TubeT

ebal

(mm

)

Teb

al (m

m)

Teb

al (m

m)

No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,46-

R-9LEVEL A

Koordinator Lapangan1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL A

Page 115: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL A POSISI : PANEL 20 LEVEL A POSISI : PANEL 21 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,55 4,47 4,47 5,03 4,91 4,86 5,00 4,70 4,80 Kanan 4,77 4,82 4,43 4,45 4,69 4,85 4,83 5,24 4,77 4,99 Kanan 4,51 4,45 4,59 4,47 4,61 4,68 4,61 4,66 4,36 4,55

Tengah 4,77 4,53 4,45 4,51 4,98 4,95 4,84 4,83 4,77 4,86 Tengah 4,73 4,55 4,53 4,43 4,73 4,85 4,84 5,14 4,79 4,97 Tengah 4,22 4,49 4,59 4,47 4,64 4,75 4,16 4,68 4,36 4,57

Kiri 4,76 4,52 4,43 4,53 4,97 4,88 4,85 4,86 4,71 4,83 Kiri 4,77 4,55 4,51 4,45 4,68 4,91 4,82 5,23 4,76 4,97 Kiri 4,45 4,51 4,59 4,41 4,64 4,74 4,68 4,66 4,39 4,47

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL A POSISI : PANEL 23 LEVEL A POSISI : PANEL 24 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,47 4,61 4,87 4,59 4,84 4,49 4,71 5,00 4,51 4,73 Kanan 4,41 4,51 4,53 4,47 5,20 4,66 4,70 4,84 4,57 4,85 Kanan 4,45 4,57 4,57 4,57 4,81 4,88 4,57 4,79 4,53 4,85

Tengah 4,45 4,66 4,85 4,63 4,85 4,61 4,88 4,97 4,31 4,53 Tengah 4,30 4,61 4,51 4,55 5,12 4,71 4,77 4,73 4,69 4,81 Tengah 4,49 4,47 4,57 4,49 4,80 4,89 4,57 4,94 4,59 4,82

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 4,45 4,66 4,85 4,63 4,85 4,61 4,88 4,97 4,31 4,53 Tengah 4,30 4,61 4,51 4,55 5,12 4,71 4,77 4,73 4,69 4,81 Tengah 4,49 4,47 4,57 4,49 4,80 4,89 4,57 4,94 4,59 4,82

Kiri 4,41 4,62 4,87 4,64 4,84 4,43 4,77 4,96 4,45 4,57 Kiri 4,38 4,49 4,55 4,59 5,22 4,73 4,78 4,57 4,47 4,82 Kiri 4,45 4,47 4,53 4,47 4,89 4,87 4,55 4,89 4,59 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL A POSISI : PANEL 26 LEVEL A POSISI : PANEL 27 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,84 4,45 4,43 4,49 4,77 4,45 4,99 5,51 4,78 4,71 Kanan 4,76 4,55 4,45 4,47 5,03 4,82 4,61 4,80 4,76 4,85 Kanan 4,91 4,80 4,53 4,51 4,92 4,59 4,75 4,93 4,75 4,88

Tengah 4,83 4,43 4,43 4,41 4,76 4,51 4,89 5,52 4,72 4,91 Tengah 4,77 4,57 4,34 4,43 5,62 4,82 4,59 4,71 4,78 4,96 Tengah 4,91 4,88 4,55 4,53 5,00 4,61 4,72 4,91 4,76 4,98

Kiri 4,83 4,41 4,41 4,47 4,85 4,57 4,81 5,42 4,77 4,85 Kiri 4,77 4,59 4,53 4,41 4,89 5,04 4,73 4,61 4,75 4,88 Kiri 4,89 4,74 4,47 4,57 4,88 4,57 4,80 5,00 4,62 5,04

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,62

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 4,16-

R-9LEVEL A

Koordinator Lapangan1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL A

Page 116: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL A POSISI : PANEL 29 LEVEL A POSISI : PANEL 30 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,45 5,02 5,51 5,53 5,78 4,99 4,53 4,78 4,61 4,91 Kanan 4,77 4,83 4,55 4,45 4,95 4,68 4,43 5,11 4,83 4,91 Kanan 4,84 4,51 4,55 4,43 4,74 4,90 4,61 5,27 4,62 4,55

Tengah 4,41 5,00 5,58 4,43 4,82 4,81 4,57 4,81 4,64 4,90 Tengah 4,79 4,86 4,69 4,66 4,98 4,70 4,39 5,07 4,66 4,74 Tengah 4,83 4,45 4,47 4,55 4,70 4,89 4,55 4,39 4,69 4,61

Kiri 4,45 4,96 5,70 4,47 5,83 4,49 4,93 5,03 4,68 4,79 Kiri 4,38 4,85 4,66 4,66 4,96 4,68 5,12 5,15 4,87 4,78 Kiri 4,80 4,88 4,42 4,45 4,79 4,95 4,88 5,39 4,68 4,55

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL A POSISI : PANEL 32 LEVEL A POSISI : PANEL 33 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,45 4,47 4,69 4,45 4,74 4,88 4,74 4,74 4,49 4,64 Kanan 4,53 4,53 4,83 4,49 4,85 4,96 4,59 4,88 4,59 4,91 Kanan 4,51 4,51 4,94 4,39 4,78 4,77 4,55 4,95 4,57 4,84

Tengah 4,41 4,51 4,47 4,39 4,79 5,02 4,78 4,61 4,43 4,61 Tengah 4,51 4,47 4,68 4,53 4,91 4,85 4,61 4,61 4,57 4,93 Tengah 4,43 4,51 4,73 4,47 4,80 4,74 4,57 5,06 4,53 4,86

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Row No. Row No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 4,41 4,51 4,47 4,39 4,79 5,02 4,78 4,61 4,43 4,61 Tengah 4,51 4,47 4,68 4,53 4,91 4,85 4,61 4,61 4,57 4,93 Tengah 4,43 4,51 4,73 4,47 4,80 4,74 4,57 5,06 4,53 4,86

Kiri 4,43 4,33 4,64 4,38 4,80 5,10 4,62 4,93 4,45 4,65 Kiri 4,43 4,47 4,80 4,51 4,89 4,78 4,66 4,59 4,68 4,83 Kiri 4,70 4,57 4,70 4,53 4,79 4,74 4,59 4,89 4,59 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL A POSISI : PANEL 35 LEVEL A POSISI : PANEL 36 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,59 4,53 4,83 4,47 5,24 4,82 4,38 4,99 4,55 4,59 Kanan 4,51 4,55 4,78 4,49 4,81 4,92 4,59 4,81 4,45 4,62 Kanan 4,49 4,74 4,78 4,49 5,20 4,91 5,01 4,96 4,53 4,79

Tengah 4,51 4,45 4,80 4,41 5,30 4,78 4,49 5,06 4,45 4,51 Tengah 4,49 4,59 4,80 4,49 4,61 4,93 4,51 4,83 4,47 4,53 Tengah 4,45 4,46 4,66 4,41 5,22 4,92 4,95 4,84 4,47 4,80

Kiri 4,43 4,55 4,81 4,53 5,24 4,83 4,55 4,84 4,47 4,66 Kiri 4,59 4,62 4,82 4,49 4,61 4,94 4,43 4,69 4,43 4,55 Kiri 4,36 4,45 4,49 4,53 5,23 4,87 4,98 4,96 4,45 4,70

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,83

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

-

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 4,33

R-9LEVEL A

Koordinator Lapangan1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL A

Page 117: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL A POSISI : PANEL38 LEVEL A POSISI : PANEL 39 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,59 4,68 4,28 5,22 4,68 4,66 4,72 4,45 4,66 Kanan 4,72 4,66 4,51 4,59 5,25 5,01 4,64 4,74 4,51 4,53 Kanan 4,51 4,72 5,60 4,55 6,15 4,94 4,80 4,64 4,41 4,66

Tengah 4,66 4,45 4,68 4,38 5,20 4,74 4,55 4,78 4,41 4,68 Tengah 4,80 4,51 4,41 4,49 5,26 5,08 4,61 4,29 4,49 4,50 Tengah 4,41 4,57 5,63 4,45 6,05 4,03 4,78 4,66 4,39 4,62

Kiri 4,66 4,41 4,70 4,45 5,16 4,64 4,49 4,68 4,45 4,75 Kiri 4,89 4,43 4,49 4,45 5,23 5,03 4,55 4,97 5,00 4,45 Kiri 4,47 4,49 5,62 4,43 6,16 4,86 4,69 4,75 4,39 4,57

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL A POSISI : PANEL 41 LEVEL A POSISI : PANEL 42 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,62 3,70 3,78 3,51 5,43 3,95 4,49 4,20 4,45 4,62 Kanan 4,82 4,70 4,82 4,59 4,76 5,31 4,61 4,85 4,41 4,64 Kanan 4,55 4,61 4,86 4,43 5,09 5,21 4,55 5,09 4,49 4,64

Tengah 3,55 3,51 3,78 3,51 5,28 3,94 4,60 4,22 4,36 4,55 Tengah 4,78 4,55 4,53 4,53 4,53 5,21 4,64 4,84 4,89 4,62 Tengah 4,51 4,47 4,91 4,41 5,24 5,22 4,53 4,81 4,38 4,61

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

Tengah 3,55 3,51 3,78 3,51 5,28 3,94 4,60 4,22 4,36 4,55 Tengah 4,78 4,55 4,53 4,53 4,53 5,21 4,64 4,84 4,89 4,62 Tengah 4,51 4,47 4,91 4,41 5,24 5,22 4,53 4,81 4,38 4,61

Kiri 3,45 3,45 3,80 3,61 5,12 3,93 4,52 4,30 4,45 4,51 Kiri 4,74 4,59 4,49 4,45 4,59 5,28 4,66 4,81 4,45 4,61 Kiri 4,61 4,55 4,86 4,57 5,07 5,21 4,64 4,71 4,38 4,61

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL A POSISI : PANEL 44 LEVEL A

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,53 4,62 4,86 4,58 5,11 5,24 4,64 5,21 4,43 4,61 Kanan 5,36 5,41 5,47 5,13 5,49 5,18 4,74 5,54 4,44 4,58

Tengah 4,39 4,51 4,82 4,53 5,22 5,34 4,66 5,14 4,93 4,53 Tengah 5,20 5,21 5,57 5,21 5,59 5,39 4,70 5,28 4,46 4,30

Kiri 4,43 4,53 4,78 4,45 5,27 5,31 4,73 5,02 4,51 4,45 Kiri 5,29 5,50 5,60 5,46 5,57 5,33 4,75 5,37 4,49 4,67

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

6,16-4,57 3,45

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9LEVEL A

Koordinator Lapangan1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL A

Page 118: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL B POSISI : PANEL 2 LEVEL B POSISI : PANEL 3 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,75 4,77 4,62 4,70 4,82 4,59 4,34 5,08 4,81 5,37 Kanan 4,86 4,80 4,76 4,74 4,59 4,41 4,43 4,45 4,62 5,12 Kanan 4,71 4,98 4,64 4,59 4,59 4,81 5,11 4,94 4,73 4,82

Tengah 4,78 4,82 4,51 4,51 4,55 4,59 4,47 5,07 4,39 4,79 Tengah 4,75 4,79 4,79 4,75 4,79 4,59 4,41 4,41 4,49 5,10 Tengah 4,75 4,75 4,47 4,72 4,55 4,76 5,14 5,07 4,78 4,87

Kiri 4,75 4,78 4,47 4,68 4,59 4,74 4,47 4,96 4,55 4,78 Kiri 4,73 4,80 4,89 4,75 4,82 4,51 4,41 4,55 4,95 5,24 Kiri 4,71 4,89 4,39 4,72 4,59 4,85 5,24 5,02 4,70 4,75

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL B POSISI : PANEL 5 LEVEL B POSISI : PANEL 6 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,96 4,90 4,57 4,78 4,81 4,82 5,15 4,89 4,78 5,09 Kanan 4,93 4,51 4,71 4,72 4,82 4,53 5,03 4,83 4,93 4,84 Kanan 4,75 4,87 5,44 4,76 4,61 4,72 5,22 5,31 4,88 4,79

Tengah 4,92 4,88 4,70 4,76 4,81 4,89 5,03 5,05 4,72 5,08 Tengah 4,95 4,55 4,78 4,61 4,84 4,59 5,09 4,94 4,95 4,93 Tengah 4,75 4,79 5,32 4,77 4,59 4,72 5,19 5,36 4,85 4,78

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube

Tengah 4,92 4,88 4,70 4,76 4,81 4,89 5,03 5,05 4,72 5,08 Tengah 4,95 4,55 4,78 4,61 4,84 4,59 5,09 4,94 4,95 4,93 Tengah 4,75 4,79 5,32 4,77 4,59 4,72 5,19 5,36 4,85 4,78

Kiri 4,94 4,83 4,76 4,78 4,75 4,91 5,09 4,79 4,73 5,07 Kiri 4,86 4,51 4,60 4,59 4,84 4,68 5,16 4,57 4,12 4,76 Kiri 4,66 4,84 5,29 4,78 4,51 4,70 5,24 4,89 4,86 4,78

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL B POSISI : PANEL 8 LEVEL B POSISI : PANEL 9 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,94 4,88 4,93 4,55 4,55 4,59 4,57 5,36 4,77 4,91 Kanan 4,76 4,90 4,79 4,60 4,62 4,73 4,87 5,29 4,76 4,78 Kanan 4,66 4,77 4,47 4,57 4,51 4,61 5,16 5,14 4,94 4,87

Tengah 4,75 4,90 5,03 4,69 4,62 4,53 4,59 5,01 4,77 4,94 Tengah 4,71 4,87 4,83 4,64 4,61 4,80 4,92 5,11 4,73 4,80 Tengah 4,81 4,68 4,51 4,55 4,53 4,51 5,22 5,22 4,93 4,94

Kiri 4,78 4,73 5,03 4,70 4,75 4,52 4,54 4,96 4,68 4,90 Kiri 4,76 4,81 4,81 4,69 4,79 4,83 4,90 5,07 4,68 4,87 Kiri 4,79 4,82 4,66 4,41 4,59 4,57 5,21 5,18 4,93 4,99

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,44-

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 4,12

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL B

Page 119: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL B POSISI : PANEL 11 LEVEL B POSISI : PANEL 12 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,76 4,82 4,02 4,75 4,51 4,66 5,02 5,13 5,00 4,90 Kanan 4,82 4,90 4,89 4,79 4,61 4,72 5,07 5,33 4,88 4,74 Kanan 4,80 4,93 4,70 4,77 4,61 4,62 5,11 5,19 4,75 4,86

Tengah 4,75 4,83 4,61 4,76 4,53 4,75 5,20 5,15 4,90 4,94 Tengah 4,78 4,90 4,90 4,80 4,61 4,66 5,27 4,79 4,89 4,73 Tengah 4,79 4,77 4,69 4,79 4,64 4,80 5,02 5,07 4,79 4,72

Kiri 4,75 4,81 4,53 4,71 4,53 4,73 5,30 4,81 4,92 4,94 Kiri 4,73 4,82 4,83 4,78 4,69 4,73 5,23 4,82 4,82 4,81 Kiri 4,78 4,99 4,73 4,80 4,69 4,85 5,03 5,30 4,64 4,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL B POSISI : PANEL 14 LEVEL B POSISI : PANEL 15 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,80 4,87 4,57 4,78 4,55 4,73 5,07 5,19 4,88 4,73 Kanan 4,77 4,84 4,82 4,64 4,68 4,76 5,04 5,08 4,90 5,08 Kanan 4,99 4,82 5,00 4,74 4,61 4,99 4,94 4,97 4,77 4,85

Tengah 4,75 4,86 4,61 4,75 4,51 4,68 5,20 4,99 4,80 4,82 Tengah 4,70 4,85 4,83 4,81 4,45 4,77 5,15 5,01 4,82 4,88 Tengah 5,01 4,77 4,87 4,78 4,53 5,15 4,91 4,97 4,68 4,82

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Tengah 4,75 4,86 4,61 4,75 4,51 4,68 5,20 4,99 4,80 4,82 Tengah 4,70 4,85 4,83 4,81 4,45 4,77 5,15 5,01 4,82 4,88 Tengah 5,01 4,77 4,87 4,78 4,53 5,15 4,91 4,97 4,68 4,82

Kiri 4,83 4,79 4,75 4,75 4,51 4,68 4,89 5,06 4,07 4,80 Kiri 4,81 4,86 4,80 4,70 4,47 4,81 5,35 5,02 5,01 4,85 Kiri 4,97 4,82 4,79 4,74 4,47 5,38 4,97 5,15 4,72 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL B POSISI : PANEL 17 LEVEL B POSISI : PANEL 18 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,79 4,80 5,05 4,57 4,66 4,90 4,97 5,19 4,78 4,88 Kanan 4,74 4,82 5,65 5,64 5,83 4,69 5,20 4,95 4,77 4,79 Kanan 4,84 4,93 4,74 4,68 4,76 4,80 4,91 4,87 4,76 4,79

Tengah 4,80 4,85 5,04 4,75 4,61 4,90 4,98 4,98 4,80 4,90 Tengah 4,74 4,70 5,67 5,78 5,77 4,73 5,31 5,11 4,70 4,79 Tengah 4,83 5,11 4,73 4,70 4,78 4,84 4,87 4,83 4,75 4,30

Kiri 4,78 4,86 4,99 4,77 4,65 4,88 4,97 5,01 4,82 4,94 Kiri 4,75 4,81 5,70 5,76 5,75 5,75 5,28 4,99 4,70 4,70 Kiri 4,83 4,90 4,71 4,69 4,76 4,90 4,85 5,68 4,78 4,88

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,83-

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 4,02

R-9

Koordinator Lapangan1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL B

Page 120: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL B POSISI : PANEL 20 LEVEL B POSISI : PANEL 21 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,82 4,81 4,88 4,85 4,90 4,53 4,77 5,17 4,79 4,80 Kanan 4,77 4,95 4,85 4,78 4,51 4,71 4,82 5,26 4,76 4,88 Kanan 4,78 4,84 4,79 4,80 4,79 4,61 4,92 4,91 5,05 4,77

Tengah 4,80 4,82 4,82 4,82 4,91 4,55 4,76 5,18 4,78 4,82 Tengah 4,78 4,87 4,84 4,78 4,55 4,72 4,83 5,07 4,78 4,91 Tengah 4,80 4,83 4,76 4,77 4,71 4,58 4,89 4,99 4,98 4,81

Kiri 4,79 4,84 4,85 4,82 4,91 4,43 4,86 5,13 4,78 4,82 Kiri 4,70 4,87 4,87 4,76 4,62 4,72 4,81 5,00 4,75 4,90 Kiri 4,81 4,86 4,77 4,80 4,70 4,48 5,27 5,00 5,00 4,75

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL B POSISI : PANEL 23 LEVEL B POSISI : PANEL 24 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,77 4,83 4,55 4,61 4,68 4,49 5,37 5,11 4,99 4,89 Kanan 4,81 4,84 4,49 4,86 4,75 4,70 4,81 4,92 4,41 4,85 Kanan 4,75 4,81 4,57 4,64 4,51 4,45 4,59 4,99 4,55 4,88

Tengah 4,76 4,87 4,51 4,61 4,74 5,09 5,31 4,89 5,00 4,79 Tengah 4,78 4,79 4,77 4,79 4,72 4,73 4,61 5,25 4,55 4,86 Tengah 4,79 4,83 4,71 4,73 4,47 4,79 4,53 5,01 4,55 4,83

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Teb

al (m

m)

Tengah 4,76 4,87 4,51 4,61 4,74 5,09 5,31 4,89 5,00 4,79 Tengah 4,78 4,79 4,77 4,79 4,72 4,73 4,61 5,25 4,55 4,86 Tengah 4,79 4,83 4,71 4,73 4,47 4,79 4,53 5,01 4,55 4,83

Kiri 4,75 4,85 4,53 4,64 4,78 4,47 5,32 5,17 4,98 4,80 Kiri 4,77 4,80 4,78 4,80 4,64 4,73 4,59 5,10 4,53 4,86 Kiri 4,80 4,84 4,75 4,76 4,55 4,69 4,51 5,16 4,64 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL B POSISI : PANEL 26 LEVEL B POSISI : PANEL 27 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,77 4,80 4,86 4,75 4,44 4,77 5,00 5,31 4,76 4,93 Kanan 4,73 4,80 4,81 4,74 4,55 4,81 4,83 5,20 4,80 4,99 Kanan 4,90 4,83 4,84 4,01 4,72 4,61 4,80 4,64 4,68 4,07

Tengah 4,79 4,86 4,04 4,80 4,45 4,86 5,02 5,32 4,75 4,87 Tengah 4,81 4,79 4,77 4,73 4,47 4,82 4,87 5,03 4,79 4,87 Tengah 4,92 4,77 4,74 4,78 4,77 4,47 4,79 4,77 4,75 4,86

Kiri 4,84 4,85 4,85 4,70 4,46 4,83 5,01 5,38 4,76 4,88 Kiri 4,79 4,80 4,98 4,70 4,71 4,79 4,85 5,34 4,77 4,84 Kiri 4,89 4,75 4,83 4,81 4,78 4,67 4,80 5,09 4,74 4,95

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,38-

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 4,01

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL B

Page 121: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL B POSISI : PANEL 29 LEVEL B POSISI : PANEL 30 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,79 4,96 5,34 4,43 5,52 4,47 4,61 5,23 4,61 4,82 Kanan 4,77 4,86 4,80 4,80 4,57 4,03 4,89 5,13 4,84 4,83 Kanan 4,84 4,86 4,85 4,95 4,86 4,51 4,81 5,11 4,79 4,80

Tengah 4,77 4,97 5,44 4,47 5,63 4,45 4,68 5,35 4,57 4,79 Tengah 4,79 4,87 4,79 4,81 4,55 4,75 4,82 5,15 4,81 4,77 Tengah 4,84 4,84 4,88 4,94 4,83 4,68 4,95 4,96 4,76 4,82

Kiri 4,71 4,86 5,48 4,43 5,59 4,43 4,68 5,15 4,61 4,72 Kiri 4,78 4,82 4,79 4,79 4,57 4,74 4,82 5,14 4,70 4,76 Kiri 4,83 4,85 4,88 4,95 4,84 4,57 5,05 5,00 4,80 4,90

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL B POSISI : PANEL 32 LEVEL B POSISI : PANEL 33 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,79 4,81 4,84 4,71 4,61 4,78 4,59 4,66 4,78 4,66 Kanan 4,80 4,97 4,47 4,80 4,85 4,57 4,55 4,53 4,55 4,86 Kanan 4,75 4,81 4,88 4,91 4,68 4,79 4,55 5,24 4,55 4,87

Tengah 4,72 4,82 4,80 4,74 4,61 4,80 4,57 4,55 4,75 4,61 Tengah 4,81 4,96 4,62 4,81 4,84 4,57 4,49 4,43 4,55 4,94 Tengah 4,77 4,76 4,64 4,78 4,47 5,06 4,51 4,84 4,53 4,83

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Row No. Row No. Tube

No. Tube No. Tube No. Tube

Teb

al (m

m)

Tengah 4,72 4,82 4,80 4,74 4,61 4,80 4,57 4,55 4,75 4,61 Tengah 4,81 4,96 4,62 4,81 4,84 4,57 4,49 4,43 4,55 4,94 Tengah 4,77 4,76 4,64 4,78 4,47 5,06 4,51 4,84 4,53 4,83

Kiri 4,76 4,72 4,78 4,71 4,48 4,80 4,53 4,51 5,01 4,59 Kiri 4,83 4,84 4,74 4,79 4,61 4,78 4,51 4,74 4,59 4,84 Kiri 4,73 4,82 4,55 4,75 4,45 5,12 4,49 4,83 4,64 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL B POSISI : PANEL 35 LEVEL B POSISI : PANEL 36 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,75 4,87 4,66 4,80 4,68 4,73 4,59 4,82 4,61 4,78 Kanan 4,80 5,01 4,49 5,19 4,87 4,55 4,69 4,80 4,59 4,87 Kanan 4,70 4,93 4,59 4,88 4,01 4,84 4,55 4,90 4,64 4,96

Tengah 4,78 4,85 4,55 4,82 4,59 4,77 4,59 4,83 4,64 4,64 Tengah 4,79 4,84 4,53 4,91 4,88 4,66 4,59 4,80 4,62 4,84 Tengah 4,70 4,84 4,72 4,84 4,68 4,85 4,55 4,97 4,70 4,89

Kiri 4,77 4,85 4,49 4,98 4,57 4,80 4,73 4,83 4,68 4,77 Kiri 4,78 5,01 4,51 4,84 4,96 4,90 4,59 4,99 4,68 4,81 Kiri 4,74 4,85 4,88 4,82 4,72 4,86 4,47 4,96 4,83 4,90

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,63-4,57

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube

4,01

No. Tube No. Tube

R-9

Koordinator Lapangan1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL B

Page 122: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL B POSISI : PANEL38 LEVEL B POSISI : PANEL 39 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,76 4,82 4,91 4,74 4,51 4,66 4,71 4,72 4,77 4,90 Kanan 4,82 4,72 4,70 4,66 4,61 5,01 5,22 5,21 5,01 4,78 Kanan 4,80 5,11 5,38 4,82 5,14 4,84 4,51 4,59 4,75 4,59

Tengah 4,74 4,82 4,91 4,74 4,61 4,64 4,80 4,80 4,76 4,78 Tengah 4,70 4,72 4,66 4,69 4,59 5,04 5,21 5,15 4,89 4,66 Tengah 4,70 5,11 5,58 4,84 5,11 4,85 4,53 4,45 4,74 4,51

Kiri 4,70 4,78 4,82 4,74 4,81 4,68 4,79 4,82 4,78 4,91 Kiri 4,74 4,62 4,53 4,59 4,62 5,12 5,16 5,13 4,71 4,77 Kiri 4,76 5,14 5,46 4,80 5,16 4,84 4,57 4,38 4,69 4,45

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL B POSISI : PANEL 41 LEVEL B POSISI : PANEL 42 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,76 5,12 4,80 5,07 4,80 4,87 4,64 4,87 4,76 4,64 Kanan 4,82 4,99 5,03 4,76 4,70 4,55 4,51 5,15 4,77 4,87 Kanan 4,80 4,53 4,53 4,55 4,61 4,47 4,69 4,92 4,68 4,90

Tengah 4,78 5,09 4,70 5,07 4,84 4,86 4,66 4,61 4,77 4,49 Tengah 4,80 5,20 5,37 4,84 4,66 4,57 4,55 5,12 4,74 4,86 Tengah 4,88 4,91 4,51 4,61 4,47 4,43 4,72 4,49 4,69 4,91

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Teb

al (m

m)

Tengah 4,78 5,09 4,70 5,07 4,84 4,86 4,66 4,61 4,77 4,49 Tengah 4,80 5,20 5,37 4,84 4,66 4,57 4,55 5,12 4,74 4,86 Tengah 4,88 4,91 4,51 4,61 4,47 4,43 4,72 4,49 4,69 4,91

Kiri 4,80 5,05 4,66 4,99 4,59 4,76 4,68 4,53 4,75 4,51 Kiri 4,72 5,31 5,28 4,99 4,93 4,57 4,64 5,14 4,75 4,85 Kiri 4,76 5,03 4,45 4,74 4,95 4,53 4,59 4,74 4,68 4,86

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL B POSISI : PANEL 44 LEVEL B

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,79 4,99 4,72 5,24 4,84 4,55 4,73 5,26 4,77 4,83 Kanan 5,51 5,54 5,28 5,86 5,02 4,69 4,79 4,96 4,75 4,74

Tengah 4,76 4,93 4,45 5,14 4,68 4,44 4,68 5,13 4,77 4,83 Tengah 5,25 5,58 5,03 5,76 5,63 4,55 4,86 5,03 4,80 4,89

Kiri 4,76 4,84 4,41 5,01 4,51 4,53 4,62 5,17 4,78 4,79 Kiri 5,29 5,58 5,29 5,72 4,97 4,57 4,87 4,87 4,77 4,78

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GEKeterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,86-

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57

No. Tube No. Tube

4,38

R-9

LEVEL B Koordinator Lapangan1 Bagus Panji A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL B

Page 123: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL C POSISI : PANEL 2 LEVEL C POSISI : PANEL 3 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,80 4,87 4,72 4,61 4,86 4,80 4,70 5,16 4,93 4,87 Kanan 4,73 4,80 4,86 4,72 4,83 4,62 4,51 4,89 4,51 4,81 Kanan 3,79 4,89 4,81 4,70 4,86 4,82 4,98 4,93 4,74 4,84

Tengah 4,74 4,84 4,74 4,77 4,76 4,79 4,71 5,19 4,92 4,99 Tengah 4,72 4,85 4,83 4,70 4,90 4,61 4,59 4,47 4,61 4,70 Tengah 4,73 4,88 4,81 4,80 4,82 4,75 4,82 5,17 4,73 4,89

Kiri 4,72 4,88 4,79 4,75 4,84 4,77 4,70 5,16 4,87 4,93 Kiri 4,74 4,83 4,85 4,78 4,96 4,55 4,70 4,57 4,71 4,76 Kiri 4,78 4,86 4,82 4,81 4,89 4,77 4,95 5,21 4,68 4,97

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL C POSISI : PANEL 5 LEVEL C POSISI : PANEL 6 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,95 4,92 4,91 4,70 4,83 4,91 4,89 4,94 4,74 5,01 Kanan 4,90 5,07 4,78 4,80 3,77 4,93 4,95 5,01 4,74 4,78 Kanan 4,75 4,89 5,65 4,80 4,74 4,88 4,90 5,15 4,81 4,80

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)Kanan 4,95 4,92 4,91 4,70 4,83 4,91 4,89 4,94 4,74 5,01 Kanan 4,90 5,07 4,78 4,80 3,77 4,93 4,95 5,01 4,74 4,78 Kanan 4,75 4,89 5,65 4,80 4,74 4,88 4,90 5,15 4,81 4,80

Tengah 4,99 4,90 4,83 4,51 4,84 4,94 4,81 4,83 4,75 5,06 Tengah 5,03 4,98 4,78 4,78 4,74 4,74 4,90 4,90 4,75 4,84 Tengah 4,79 4,88 5,60 4,77 4,82 4,91 4,94 4,83 4,75 4,80

Kiri 4,94 4,79 4,82 4,66 4,84 4,94 4,76 5,04 4,73 5,06 Kiri 4,92 4,93 4,77 4,82 3,90 4,87 4,94 4,50 4,79 4,70 Kiri 4,84 4,77 5,59 4,78 4,80 4,81 4,95 4,59 4,91 4,78

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL C POSISI : PANEL 8 LEVEL C POSISI : PANEL 9 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,86 4,80 4,72 4,97 4,90 4,83 5,03 4,76 4,93 Kanan 4,74 4,92 4,83 4,70 4,90 4,96 5,05 5,50 4,78 4,82 Kanan 4,80 4,86 4,83 4,81 4,85 4,83 4,94 5,28 4,78 4,94

Tengah 4,79 4,96 4,81 4,79 5,05 4,88 4,86 5,02 4,83 4,94 Tengah 4,77 5,00 4,88 4,71 4,96 4,85 5,03 5,28 4,74 4,97 Tengah 4,81 4,87 4,89 4,81 4,86 4,82 4,55 5,03 4,75 4,99

Kiri 4,81 4,85 4,73 5,62 4,04 4,89 4,85 4,94 4,75 4,97 Kiri 4,78 5,04 4,86 4,73 4,81 4,89 4,92 4,98 4,72 4,77 Kiri 4,79 4,89 4,88 4,87 4,91 4,90 4,84 5,09 4,79 4,98

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012

3,775,65

4,57-

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube

R-9Diperiksa : Penguji : Paraf

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL C

Page 124: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL C POSISI : PANEL 11 LEVEL C POSISI : PANEL 12 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,71 4,80 4,85 4,74 4,83 5,08 4,82 5,03 4,73 4,90 Kanan 4,80 4,80 4,59 4,74 4,89 4,87 4,77 4,78 4,84 4,77 Kanan 4,77 4,87 4,84 4,81 4,83 4,98 4,83 5,07 4,74 4,79

Tengah 4,79 4,84 4,79 4,78 4,85 4,81 4,85 5,23 4,74 4,96 Tengah 4,78 4,82 5,70 4,72 4,85 4,79 4,81 4,80 4,83 4,79 Tengah 4,77 4,87 4,95 4,81 4,92 4,94 4,53 5,03 4,76 4,79

Kiri 4,80 4,85 4,86 4,70 4,86 4,92 4,73 4,75 4,73 3,95 Kiri 4,66 4,87 4,78 4,78 4,88 4,74 4,96 5,03 4,77 4,72 Kiri 4,82 4,99 4,96 4,82 4,93 5,03 4,89 5,04 4,66 4,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL C POSISI : PANEL 14 LEVEL C POSISI : PANEL 15 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,81 4,87 4,83 4,81 4,83 4,80 4,79 5,01 4,69 4,81 Kanan 4,77 4,86 4,84 4,81 4,81 4,93 5,14 4,79 4,85 3,81 Kanan 4,97 4,81 4,94 4,69 4,78 5,00 4,85 5,00 4,77 4,91

Tengah 4,78 4,87 4,94 4,80 4,83 4,75 4,76 5,19 4,77 4,76 Tengah 4,80 4,87 4,84 4,80 4,82 4,83 5,10 4,83 4,85 3,70 Tengah 4,96 4,80 4,88 4,73 4,85 4,09 4,86 4,83 4,76 4,90

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 4,78 4,87 4,94 4,80 4,83 4,75 4,76 5,19 4,77 4,76 Tengah 4,80 4,87 4,84 4,80 4,82 4,83 5,10 4,83 4,85 3,70 Tengah 4,96 4,80 4,88 4,73 4,85 4,09 4,86 4,83 4,76 4,90

Kiri 4,82 4,90 4,93 4,81 4,84 4,70 4,80 5,01 4,83 4,81 Kiri 4,70 4,85 4,87 4,75 4,89 5,01 4,97 4,76 4,81 3,76 Kiri 4,98 4,89 4,98 4,74 4,81 5,16 4,85 4,15 4,76 4,95

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL C POSISI : PANEL 17 LEVEL C POSISI : PANEL 18 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,79 4,77 5,02 4,84 4,84 3,79 3,92 4,03 3,78 4,70 Kanan 4,73 4,78 5,66 4,79 4,90 4,81 4,86 5,11 4,82 4,71 Kanan 4,83 4,85 4,76 4,75 5,02 4,81 4,87 4,97 4,77 4,83

Tengah 4,84 4,78 4,99 4,80 4,85 4,92 3,89 4,09 3,80 4,53 Tengah 4,71 4,02 5,63 4,73 4,90 4,76 4,90 5,03 4,78 4,69 Tengah 4,80 4,85 4,92 4,76 4,98 4,82 4,86 4,99 4,76 4,82

Kiri 4,83 4,79 4,99 4,70 4,84 3,88 3,95 3,99 3,88 4,60 Kiri 4,74 4,84 5,55 4,77 4,90 4,80 4,87 5,22 4,78 4,66 Kiri 4,76 4,84 5,05 4,64 4,99 4,81 4,91 4,85 4,74 4,83

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GEKeterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,70-

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,70

R-9

Koordinator Lapangan1 Tumpal H ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

LEVEL C

Page 125: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONPOSISI : PANEL 19 LEVEL C POSISI : PANEL 20 LEVEL C POSISI : PANEL 21 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,81 4,85 4,89 4,85 4,88 4,89 4,92 5,11 4,74 4,83 Kanan 4,70 4,95 4,85 4,75 4,86 4,85 4,90 4,94 4,73 4,99 Kanan 4,81 4,72 4,82 4,78 4,66 4,85 4,84 5,16 4,74 4,79

Tengah 4,78 4,82 4,87 4,77 4,87 4,88 5,00 4,91 4,73 4,82 Tengah 4,76 4,99 4,85 4,77 4,87 4,83 4,79 4,69 4,75 4,89 Tengah 4,74 4,77 4,83 4,79 4,88 4,84 4,86 5,06 4,64 4,78

Kiri 4,79 4,86 4,83 4,75 4,84 4,82 4,91 4,94 4,75 4,90 Kiri 4,72 4,86 4,85 4,74 4,87 4,72 4,82 4,74 4,70 4,93 Kiri 4,77 4,80 4,84 4,83 4,89 4,83 4,85 5,16 4,80 4,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL C POSISI : PANEL 23 LEVEL C POSISI : PANEL 24 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,76 4,89 4,89 4,77 4,80 4,73 4,89 5,03 4,80 4,85 Kanan 4,80 4,87 4,83 4,75 4,83 4,91 5,09 5,06 4,74 4,82 Kanan 4,78 4,84 4,80 4,68 4,76 4,87 4,84 5,15 4,74 4,87

Tengah 4,78 4,90 4,87 4,78 4,85 4,88 4,94 5,23 4,85 4,85 Tengah 4,76 4,86 4,82 4,77 4,83 4,95 5,10 5,01 4,75 4,79 Tengah 4,82 4,82 4,81 4,70 4,83 4,87 4,88 5,24 4,76 4,79

Kiri 4,77 4,87 4,78 4,79 4,86 4,81 4,85 5,13 4,79 4,88 Kiri 4,79 4,86 4,82 4,80 4,89 4,94 5,05 4,92 4,76 4,81 Kiri 4,78 4,74 4,83 4,73 4,84 4,84 4,91 5,12 4,77 4,80

No. Tube No. Tube

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Kiri 4,77 4,87 4,78 4,79 4,86 4,81 4,85 5,13 4,79 4,88 Kiri 4,79 4,86 4,82 4,80 4,89 4,94 5,05 4,92 4,76 4,81 Kiri 4,78 4,74 4,83 4,73 4,84 4,84 4,91 5,12 4,77 4,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL C POSISI : PANEL 26 LEVEL C POSISI : PANEL 27 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,83 4,80 5,05 4,76 4,92 4,82 4,88 3,34 4,78 4,83 Kanan 4,78 4,82 4,95 4,73 4,88 3,68 3,89 4,07 3,75 3,70 Kanan 4,93 4,82 4,83 4,72 4,79 5,25 5,03 4,78 4,95 3,76

Tengah 4,88 4,78 4,84 4,82 4,86 4,81 4,87 5,21 4,77 4,92 Tengah 4,80 4,82 4,97 4,68 4,95 3,76 3,90 3,97 3,72 3,78 Tengah 4,92 4,81 4,79 4,76 4,89 4,89 4,68 4,76 4,87 3,79

Kiri 4,84 4,81 5,05 4,82 4,94 4,80 4,89 5,23 4,69 4,87 Kiri 4,77 4,73 4,97 4,70 4,86 3,74 3,87 4,14 3,73 3,85 Kiri 4,90 4,76 4,87 4,74 4,87 4,87 5,18 4,15 4,91 3,72

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Koordinator Lapangan

5,25-

No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,34

No. Tube No. Tube

R-9

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

LEVEL C

Page 126: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL C POSISI : PANEL 29 LEVEL C POSISI : PANEL 30 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,81 4,86 4,74 4,79 5,61 4,82 4,85 4,99 4,75 4,85 Kanan 4,80 4,84 4,91 4,76 4,78 4,86 4,83 5,12 4,88 4,82 Kanan 4,86 4,82 4,87 4,91 4,87 5,03 5,01 5,22 4,80 4,81

Tengah 4,76 4,86 4,75 4,70 5,61 4,86 4,90 4,88 4,74 4,86 Tengah 4,78 4,83 4,83 4,05 4,91 4,88 4,72 5,25 4,82 4,83 Tengah 4,85 4,83 4,88 4,96 4,80 5,08 5,15 5,08 4,83 4,80

Kiri 4,74 4,85 4,61 4,79 5,65 4,85 4,83 4,92 4,78 4,78 Kiri 4,78 4,78 4,79 4,73 4,94 4,89 4,82 4,85 4,83 4,79 Kiri 4,78 4,85 4,86 4,95 4,82 5,01 4,96 5,17 4,78 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL C POSISI : PANEL 32 LEVEL C POSISI : PANEL 33 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,84 4,86 4,75 4,77 4,84 4,88 4,88 5,00 4,75 Kanan 4,79 4,84 4,82 4,80 4,78 4,79 4,76 4,80 4,76 4,89 Kanan 4,76 4,81 4,84 4,79 4,80 4,88 4,84 5,02 4,74 4,82

Tengah 4,80 4,87 4,86 4,78 4,83 4,84 4,84 4,82 4,73 4,74 Tengah 4,82 4,85 4,81 4,70 4,86 4,77 4,79 4,95 4,71 4,83 Tengah 4,74 4,82 4,88 4,77 4,81 4,86 4,89 5,13 4,78 4,76

No. Row No. Row No. Tube

No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. TubeNo. Tube

Tengah 4,80 4,87 4,86 4,78 4,83 4,84 4,84 4,82 4,73 4,74 Tengah 4,82 4,85 4,81 4,70 4,86 4,77 4,79 4,95 4,71 4,83 Tengah 4,74 4,82 4,88 4,77 4,81 4,86 4,89 5,13 4,78 4,76

Kiri 4,80 4,86 4,83 4,71 4,70 4,97 4,80 4,83 4,98 4,72 Kiri 4,80 4,84 4,79 4,69 4,85 4,76 4,80 4,80 4,73 4,80 Kiri 4,73 4,87 4,77 4,74 4,80 4,88 4,87 5,31 4,72 4,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL C POSISI : PANEL 35 LEVEL C POSISI : PANEL 36 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,79 4,77 4,83 4,75 4,86 4,84 4,82 5,15 4,80 4,80 Kanan 4,85 4,90 4,78 4,73 4,19 4,81 4,84 4,92 4,78 4,89 Kanan 4,76 4,82 4,91 4,80 4,89 4,84 4,90 4,89 4,79 4,95

Tengah 4,78 4,86 4,84 4,78 4,83 4,85 4,91 4,93 4,81 4,80 Tengah 4,81 4,87 4,80 4,71 4,68 4,87 4,91 4,96 4,74 4,91 Tengah 4,74 4,95 4,79 4,78 4,88 4,79 4,91 4,90 4,78 4,94

Kiri 4,68 4,92 4,89 4,78 4,80 4,80 4,77 4,87 4,78 4,84 Kiri 4,79 4,92 4,78 4,81 5,04 4,88 4,85 5,04 4,78 4,83 Kiri 4,78 4,88 4,84 4,74 4,86 4,86 4,90 4,87 4,81 4,89

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,65-

No. Tube No. Tube No. Tube

4,05

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57

R-9

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

LEVEL C

Page 127: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL C POSISI : PANEL38 LEVEL C POSISI : PANEL 39 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,70 4,84 4,89 4,70 4,84 4,84 4,86 4,88 4,78 4,90 Kanan 4,82 4,86 4,93 4,76 4,95 5,12 5,00 4,89 4,78 4,84 Kanan 4,84 5,07 5,71 4,78 5,53 4,87 4,83 4,78 4,74 4,85

Tengah 4,76 4,76 4,81 4,72 4,93 4,86 4,84 4,90 4,66 4,95 Tengah 4,68 4,88 4,86 4,76 4,89 5,13 4,99 4,84 4,72 4,82 Tengah 4,82 4,97 5,72 4,80 5,53 4,86 4,02 4,78 4,75 4,75

Kiri 4,74 4,70 4,93 4,68 4,74 4,85 4,80 4,80 4,77 4,87 Kiri 4,78 4,86 4,89 4,78 4,91 5,13 5,05 4,88 4,75 4,79 Kiri 4,84 4,91 5,65 4,82 5,53 4,84 4,87 4,83 4,74 4,81

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL C POSISI : PANEL 41 LEVEL C POSISI : PANEL 42 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,78 4,86 4,89 4,86 4,93 4,83 4,96 5,12 4,78 4,85 Kanan 4,78 4,91 5,03 4,70 4,68 5,00 5,00 5,29 4,77 4,81 Kanan 4,80 4,82 4,84 4,80 4,82 4,76 4,80 5,04 4,72 4,86

Tengah 4,80 4,84 4,88 4,86 4,95 4,84 4,97 5,07 4,75 4,82 Tengah 4,78 4,91 5,09 4,74 4,84 4,92 5,01 5,34 4,72 4,80 Tengah 4,89 4,08 4,82 4,78 4,86 4,79 4,84 5,00 4,71 4,80

No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

Tengah 4,80 4,84 4,88 4,86 4,95 4,84 4,97 5,07 4,75 4,82 Tengah 4,78 4,91 5,09 4,74 4,84 4,92 5,01 5,34 4,72 4,80 Tengah 4,89 4,08 4,82 4,78 4,86 4,79 4,84 5,00 4,71 4,80

Kiri 4,78 4,86 4,74 4,80 4,91 4,86 5,01 4,98 4,77 4,81 Kiri 4,76 5,01 4,78 4,69 4,88 4,91 4,97 5,08 4,70 4,85 Kiri 4,84 4,84 4,80 4,82 4,89 4,80 4,80 5,29 4,72 4,71

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL C POSISI : PANEL 44 LEVEL C

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,74 4,86 4,70 4,70 4,99 4,75 4,90 5,08 4,72 4,76 Kanan 4,70 4,88 4,82 4,74 4,97 4,84 4,96 4,89 4,75 4,80

Tengah 4,76 4,80 4,86 4,82 4,82 4,70 4,94 5,09 4,79 4,83 Tengah 4,76 4,86 4,82 4,76 4,86 4,80 4,88 5,09 4,73 4,80

Kiri 4,74 4,78 4,82 4,86 4,89 4,78 4,75 5,19 4,80 4,88 Kiri 4,82 4,76 4,89 4,80 4,82 5,02 4,84 5,32 4,82 4,88

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,72-

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 4,02

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

R-9LEVEL C

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

LEVEL C

Page 128: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL D POSISI : PANEL 2 LEVEL D POSISI : PANEL 3 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,75 3,93 3,82 3,94 3,90 4,51 3,75 4,14 3,74 3,70 Kanan 3,77 3,88 3,78 3,72 3,88 4,93 5,02 5,05 4,73 4,76 Kanan 3,79 3,87 3,77 3,71 3,67 3,75 3,93 3,89 3,79 4,14

Tengah 3,85 3,89 3,71 3,77 3,77 4,61 3,97 4,28 3,87 3,77 Tengah 3,77 3,76 3,88 3,85 3,83 4,92 5,04 5,17 4,73 4,76 Tengah 3,81 3,73 3,81 3,84 3,81 3,73 3,71 3,89 3,72 4,03

Kiri 3,74 3,92 3,69 3,81 3,84 4,59 3,70 4,11 3,82 3,82 Kiri 3,84 3,73 3,86 3,72 3,88 4,97 5,01 5,21 4,82 4,77 Kiri 3,74 3,74 3,80 3,83 3,80 3,67 3,95 3,94 3,80 4,05

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL D POSISI : PANEL 5 LEVELD POSISI : PANEL 6 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,82 3,80 3,88 3,77 3,78 3,66 3,75 4,09 3,89 4,07 Kanan 3,74 3,84 3,94 3,74 3,69 3,57 3,85 3,95 3,87 3,73 Kanan 3,67 3,89 3,91 3,71 3,84 3,73 3,84 4,14 3,90 3,75

Tengah 3,85 3,78 3,87 3,81 3,88 3,72 3,77 4,02 3,88 3,99 Tengah 3,71 3,92 3,88 3,82 3,60 3,69 3,75 4,03 3,74 3,73 Tengah 3,77 3,88 4,03 3,73 3,69 3,80 3,78 4,07 3,88 3,83

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Tengah 3,85 3,78 3,87 3,81 3,88 3,72 3,77 4,02 3,88 3,99 Tengah 3,71 3,92 3,88 3,82 3,60 3,69 3,75 4,03 3,74 3,73 Tengah 3,77 3,88 4,03 3,73 3,69 3,80 3,78 4,07 3,88 3,83

Kiri 3,94 3,78 3,84 3,78 3,72 3,73 3,85 3,96 3,81 3,95 Kiri 3,72 3,79 3,78 3,65 3,63 3,66 3,75 4,07 3,88 3,77 Kiri 3,81 3,95 3,91 3,82 3,84 3,72 3,68 4,05 3,85 3,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL D POSISI : PANEL 8 LEVEL D POSISI : PANEL 9 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,70 3,74 3,74 3,84 3,71 3,82 3,93 3,85 3,75 3,89 Kanan 3,91 3,69 3,87 3,92 3,88 3,80 3,94 3,74 3,84 4,09 Kanan 3,84 3,17 3,94 3,85 3,65 3,85 3,88 3,93 3,81 4,01

Tengah 3,86 3,70 3,81 3,86 3,80 3,83 4,03 3,89 3,72 3,88 Tengah 3,83 3,70 3,88 3,81 3,79 5,05 3,90 3,77 3,73 3,73 Tengah 3,83 3,76 3,68 3,76 3,68 3,83 3,87 3,88 3,65 4,05

Kiri 3,78 3,85 3,88 3,88 3,70 3,76 3,94 3,81 3,73 3,90 Kiri 3,73 3,62 3,87 3,88 3,82 3,86 3,86 3,75 3,77 3,77 Kiri 3,82 3,73 3,89 3,64 3,66 3,79 4,01 3,80 3,80 4,12

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

5,21-4,57 3,17

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. TubeT

ebal

(mm

)

Teb

al (m

m)

Teb

al (m

m)

R-9

4,57-

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL D

Page 129: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL D POSISI : PANEL 11 LEVEL D POSISI : PANEL 12 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,66 3,76 3,78 3,83 3,75 3,89 3,93 3,88 3,87 4,41 Kanan 3,77 3,82 3,90 3,77 3,78 3,77 3,77 3,73 3,71 3,72 Kanan 3,85 3,83 3,77 3,76 3,88 3,90 3,85 4,07 3,87 3,76

Tengah 3,60 3,73 3,83 3,79 3,88 3,87 3,91 3,74 3,91 4,41 Tengah 3,77 3,81 4,05 3,75 3,77 3,70 3,73 3,89 3,66 3,75 Tengah 3,77 3,87 3,76 3,76 3,89 4,05 3,80 3,93 3,81 3,70

Kiri 3,63 3,77 3,83 3,71 3,71 3,87 3,92 3,65 3,84 4,34 Kiri 3,77 3,82 3,97 3,74 3,76 3,70 3,88 3,77 3,75 3,89 Kiri 3,76 3,78 3,76 3,72 3,86 3,83 3,86 3,73 3,82 3,82

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL D POSISI : PANEL 14 LEVEL D POSISI : PANEL 15 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,71 3,88 3,85 3,71 3,62 3,80 3,86 3,88 3,97 4,11 Kanan 3,83 3,73 3,73 3,73 3,97 3,77 3,98 3,92 4,18 3,79 Kanan 3,82 3,73 3,76 3,84 3,79 3,70 3,75 3,85 3,79 4,34

Tengah 3,66 3,86 3,88 3,68 3,55 3,70 3,73 3,76 3,87 3,97 Tengah 3,88 3,73 3,72 3,77 3,90 3,88 3,88 3,93 4,23 3,81 Tengah 3,78 3,87 3,76 3,88 3,88 3,77 3,87 3,94 3,79 4,20

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Tengah 3,66 3,86 3,88 3,68 3,55 3,70 3,73 3,76 3,87 3,97 Tengah 3,88 3,73 3,72 3,77 3,90 3,88 3,88 3,93 4,23 3,81 Tengah 3,78 3,87 3,76 3,88 3,88 3,77 3,87 3,94 3,79 4,20

Kiri 3,76 3,87 3,87 3,78 3,61 3,71 3,94 3,88 3,89 4,12 Kiri 3,85 3,80 3,85 3,75 3,89 3,76 4,03 3,94 4,24 3,89 Kiri 3,75 3,79 3,88 3,93 3,73 3,53 3,70 3,88 3,78 4,39

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL D POSISI : PANEL 17 LEVEL D POSISI : PANEL 18 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,78 3,76 3,82 3,82 3,88 3,72 3,87 3,62 3,85 3,73 Kanan 3,64 3,62 3,84 3,85 3,95 3,70 3,80 3,71 3,90 4,47 Kanan 3,75 3,79 3,89 3,84 3,76 3,81 3,75 3,89 3,88 4,18

Tengah 3,81 3,74 3,81 3,67 3,68 3,70 3,85 3,78 3,79 3,82 Tengah 3,63 3,82 3,95 3,89 3,81 3,93 3,80 3,69 3,85 4,49 Tengah 3,76 3,69 3,86 3,94 3,76 3,86 3,91 3,97 3,85 4,34

Kiri 3,82 3,70 3,86 3,87 3,97 3,69 3,71 3,80 3,87 3,91 Kiri 3,77 3,80 3,94 3,85 3,77 3,83 3,82 3,81 3,83 4,50 Kiri 3,77 3,76 3,87 3,96 3,75 3,79 3,85 3,94 3,66 4,16

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

3,534,50

4,57-

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL D

Page 130: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL D POSISI : PANEL 20 LEVEL D POSISI : PANEL 21 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,88 3,92 3,88 3,94 3,84 3,82 3,81 4,05 3,95 3,93 Kanan 3,76 3,84 3,96 3,96 3,80 3,75 3,92 4,05 3,85 3,85 Kanan 3,72 3,94 3,73 3,91 3,83 3,83 4,01 4,11 4,07 3,99

Tengah 3,80 3,88 3,91 3,84 3,85 3,84 3,89 3,55 3,88 3,96 Tengah 3,77 3,84 3,83 3,96 3,81 3,71 3,84 3,88 3,80 3,94 Tengah 3,71 3,77 3,84 3,80 3,88 3,88 3,90 4,69 3,87 4,03

Kiri 3,76 3,94 3,88 3,82 3,82 3,86 3,76 3,97 3,92 4,09 Kiri 3,88 3,96 3,76 3,94 3,81 3,70 3,84 4,07 3,78 3,92 Kiri 3,71 3,86 3,95 3,82 3,73 3,87 3,90 4,07 3,78 3,93

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL D POSISI : PANEL 23 LEVEL D POSISI : PANEL 24 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,77 4,09 4,09 3,88 3,88 3,92 3,93 4,05 4,01 4,12 Kanan 3,87 3,65 3,83 3,85 3,81 3,77 3,75 3,70 3,73 3,73 Kanan 3,99 3,81 3,90 4,03 3,77 4,16 3,73 4,26 3,92 4,18

Tengah 3,75 3,36 4,07 3,82 3,90 3,96 3,99 4,04 4,96 4,14 Tengah 3,87 3,63 3,82 3,80 3,76 3,71 3,76 3,65 3,78 3,75 Tengah 4,16 3,97 3,70 4,05 3,92 4,28 3,76 4,11 3,97 4,45

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Tengah 3,75 3,36 4,07 3,82 3,90 3,96 3,99 4,04 4,96 4,14 Tengah 3,87 3,63 3,82 3,80 3,76 3,71 3,76 3,65 3,78 3,75 Tengah 4,16 3,97 3,70 4,05 3,92 4,28 3,76 4,11 3,97 4,45

Kiri 3,78 4,01 4,03 3,86 3,88 3,92 4,01 4,06 3,88 4,20 Kiri 3,86 3,83 3,82 3,85 3,70 3,82 3,82 3,71 3,74 3,79 Kiri 4,24 3,78 3,82 3,98 3,76 4,30 3,72 4,26 4,00 4,47

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL D POSISI : PANEL 26 LEVEL D POSISI : PANEL 27 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,72 3,95 3,73 3,88 3,85 3,88 3,88 4,01 3,79 3,73 Kanan 3,90 3,88 3,74 3,80 3,71 3,66 3,88 3,86 3,80 3,72 Kanan 3,80 3,88 3,84 3,76 3,75 3,84 3,89 3,75 4,11 3,76

Tengah 3,76 4,11 3,88 3,88 3,82 3,87 3,79 3,93 3,82 3,60 Tengah 3,81 3,81 3,77 3,80 3,78 3,62 3,87 3,87 3,84 3,71 Tengah 3,78 3,89 3,88 3,76 3,69 3,75 3,81 3,79 4,24 3,68

Kiri 3,81 3,98 3,87 3,84 3,86 3,84 3,73 4,03 3,80 3,61 Kiri 3,89 3,87 3,74 3,79 3,87 3,81 3,78 3,82 3,76 3,78 Kiri 3,82 3,94 3,89 3,74 3,80 3,80 3,90 3,70 4,18 3,65

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

4,96-4,57 3,36

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL D

Page 131: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL D POSISI : PANEL 29 LEVEL D POSISI : PANEL 30 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,70 3,91 3,91 3,86 3,82 3,93 3,81 3,82 3,70 3,95 Kanan 3,91 3,91 3,81 3,85 3,94 3,81 3,83 4,05 3,77 4,01 Kanan 3,75 3,75 3,77 3,87 3,79 3,81 3,91 3,93 3,88 4,14

Tengah 3,63 3,94 3,83 3,86 3,84 3,90 3,75 3,82 3,68 4,01 Tengah 3,79 3,90 3,85 3,89 3,92 3,72 3,64 3,99 3,72 4,09 Tengah 3,89 3,74 3,81 3,87 3,89 3,75 3,90 3,94 3,83 4,14

Kiri 3,69 3,96 3,85 3,83 3,84 3,89 3,70 3,81 3,63 3,94 Kiri 3,78 3,89 3,83 3,94 4,01 3,84 3,71 4,01 3,74 4,16 Kiri 3,87 3,77 3,89 3,83 3,84 3,76 3,88 3,92 3,73 4,09

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL D POSISI : PANEL 32 LEVEL D POSISI : PANEL 33 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,65 3,75 3,85 3,88 3,89 3,80 3,86 3,84 3,92 3,94 Kanan 3,75 3,81 3,78 3,83 3,78 3,87 3,97 4,11 3,93 3,97 Kanan 3,69 3,73 3,82 3,79 3,71 3,81 3,88 3,74 3,81 3,69

Tengah 3,69 3,75 3,88 3,83 3,83 3,87 3,88 3,85 4,03 3,88 Tengah 3,73 3,85 3,80 3,95 3,85 3,65 3,80 4,03 3,93 4,09 Tengah 3,70 3,77 3,82 3,94 3,76 3,73 3,95 3,88 3,69 3,69

No. Row No. Row No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 3,69 3,75 3,88 3,83 3,83 3,87 3,88 3,85 4,03 3,88 Tengah 3,73 3,85 3,80 3,95 3,85 3,65 3,80 4,03 3,93 4,09 Tengah 3,70 3,77 3,82 3,94 3,76 3,73 3,95 3,88 3,69 3,69

Kiri 3,62 3,74 3,88 3,89 3,95 3,95 3,78 3,87 3,87 3,86 Kiri 3,74 3,83 3,71 3,89 3,87 3,80 3,81 4,07 3,90 4,03 Kiri 3,62 3,80 3,80 3,87 3,76 3,81 4,05 3,71 3,67 3,72

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL D POSISI : PANEL 35 LEVEL D POSISI : PANEL 36 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,77 3,89 3,74 3,87 3,75 3,99 3,75 3,71 3,87 3,87 Kanan 3,88 3,86 3,83 3,93 3,75 3,63 3,79 3,98 3,73 4,04 Kanan 3,81 3,84 3,85 3,50 3,70 3,90 3,88 3,90 3,68 3,86

Tengah 3,82 3,81 3,75 3,77 3,77 3,88 3,80 3,69 3,75 3,88 Tengah 3,88 3,87 3,87 3,80 3,83 3,70 3,75 4,03 3,80 3,98 Tengah 3,61 3,93 3,90 3,83 3,72 3,93 3,87 3,88 3,69 3,90

Kiri 3,70 3,80 3,78 3,82 3,77 4,01 3,87 3,79 3,76 3,97 Kiri 3,77 3,88 3,88 3,86 4,05 3,68 3,85 3,95 3,80 4,15 Kiri 3,80 3,92 3,79 3,85 3,70 3,89 3,79 3,82 3,70 3,90

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

4,16-4,57 3,50

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL D

Page 132: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL D POSISI : PANEL38 LEVEL D POSISI : PANEL 39 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,93 3,72 3,82 3,85 3,82 3,79 3,60 3,96 3,65 4,26 Kanan 3,75 3,69 3,71 3,84 3,82 3,93 3,70 4,09 4,80 3,89 Kanan 3,72 3,75 3,74 3,97 3,68 3,88 3,86 3,97 3,74 3,85

Tengah 3,97 3,77 3,79 3,75 3,84 3,72 3,62 3,97 3,62 4,26 Tengah 3,70 3,67 3,78 3,83 3,77 3,91 3,85 4,01 4,83 3,78 Tengah 3,83 3,76 3,75 3,74 3,68 3,85 3,87 4,05 3,73 3,87

Kiri 4,00 3,73 3,79 3,80 3,74 3,69 3,64 3,99 3,60 4,22 Kiri 3,62 3,67 3,86 3,85 3,78 3,91 3,96 4,07 4,88 3,77 Kiri 3,68 3,79 3,91 3,77 3,73 3,83 3,82 4,00 3,60 4,75

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL D POSISI : PANEL 41 LEVEL D POSISI : PANEL 42 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,62 3,81 3,77 3,76 3,87 3,85 4,05 3,95 3,87 3,97 Kanan 3,80 3,80 3,85 3,88 3,77 3,66 3,74 4,05 3,76 3,80 Kanan 3,95 3,75 3,81 3,98 3,80 3,71 3,94 3,94 3,82 4,43

Tengah 3,84 3,70 3,79 3,81 3,90 3,86 3,88 3,90 3,88 3,98 Tengah 3,91 3,85 3,80 3,73 3,81 3,75 3,75 4,03 3,77 3,87 Tengah 3,99 3,80 4,05 3,97 3,89 3,73 3,90 3,93 3,81 4,38

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 3,84 3,70 3,79 3,81 3,90 3,86 3,88 3,90 3,88 3,98 Tengah 3,91 3,85 3,80 3,73 3,81 3,75 3,75 4,03 3,77 3,87 Tengah 3,99 3,80 4,05 3,97 3,89 3,73 3,90 3,93 3,81 4,38

Kiri 3,83 3,84 3,77 3,77 3,72 3,94 3,87 3,93 3,76 3,96 Kiri 4,05 3,78 3,85 3,79 3,89 3,74 3,77 4,01 3,75 3,81 Kiri 3,99 3,77 3,96 3,89 3,85 3,72 3,85 3,99 3,85 4,45

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL D POSISI : PANEL 44 LEVEL D

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,82 4,06 3,78 3,86 3,94 3,69 3,87 3,84 3,83 3,77 Kanan 3,71 3,67 3,99 3,82 3,76 3,73 3,84 3,83 3,81 3,84

Tengah 4,72 3,90 3,79 3,81 3,71 3,78 3,88 3,74 3,77 3,64 Tengah 3,77 3,90 3,90 3,87 3,78 3,74 3,68 3,82 3,79 3,86

Kiri 4,74 3,87 3,90 3,78 3,69 3,67 3,88 3,86 3,75 3,57 Kiri 3,76 3,80 3,99 3,92 3,80 3,75 3,85 3,83 3,72 3,88

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

4,88-4,57 3,57

No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Husni Thamrin ………...

LEVEL D

Page 133: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL E POSISI : PANEL 2 LEVEL E POSISI : PANEL 3 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,59 3,76 3,47 3,63 3,63 3,85 3,74 3,85 3,73 3,76 Kanan 3,49 3,53 3,73 3,56 3,59 3,78 3,66 3,97 3,83 4,61 Kanan 3,54 3,52 3,53 3,56 3,45 4,23 3,84 3,73 3,79 3,82

Tengah 3,53 3,69 3,61 3,60 3,62 3,82 3,71 3,88 3,71 3,67 Tengah 3,52 3,59 3,69 3,96 3,57 3,89 3,71 3,99 3,92 4,57 Tengah 3,50 3,59 3,60 3,81 3,48 3,80 3,74 3,79 3,74 3,82

Kiri 3,58 3,64 3,81 3,80 3,67 3,92 3,73 3,86 3,74 3,59 Kiri 3,58 3,61 3,50 3,56 3,73 3,70 3,76 3,92 3,94 4,59 Kiri 3,62 3,62 3,57 3,58 3,60 3,80 3,86 3,72 3,73 3,83

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL E POSISI : PANEL 5 LEVEL E POSISI : PANEL 6 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,60 3,70 3,60 3,64 3,60 3,72 3,74 3,93 3,86 3,77 Kanan 3,70 3,67 3,59 3,54 3,78 3,77 3,83 3,73 3,85 3,80 Kanan 3,47 3,76 3,63 3,53 3,51 3,71 3,80 3,82 3,99 3,69

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Kanan 3,60 3,70 3,60 3,64 3,60 3,72 3,74 3,93 3,86 3,77 Kanan 3,70 3,67 3,59 3,54 3,78 3,77 3,83 3,73 3,85 3,80 Kanan 3,47 3,76 3,63 3,53 3,51 3,71 3,80 3,82 3,99 3,69

Tengah 3,53 3,36 3,60 3,69 3,60 3,67 3,89 3,80 3,76 3,76 Tengah 3,53 3,62 3,61 3,61 3,76 3,61 3,76 3,71 3,89 3,63 Tengah 3,48 3,61 3,71 3,59 3,56 3,61 3,79 3,81 3,98 3,84

Kiri 3,47 3,46 3,57 3,71 3,68 3,63 3,81 3,99 3,87 3,76 Kiri 3,42 3,78 3,71 3,62 3,75 3,75 3,70 3,78 4,05 3,73 Kiri 3,48 3,77 3,68 3,81 3,84 3,73 3,70 3,97 3,94 3,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL E POSISI : PANEL 8 LEVEL E POSISI : PANEL 9 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,62 3,68 3,67 3,61 3,56 3,82 3,97 3,79 3,80 3,86 Kanan 3,50 3,39 3,97 3,82 3,55 3,88 3,84 3,83 3,88 3,80 Kanan 3,49 3,60 3,62 3,62 3,55 3,84 3,88 3,72 3,81 3,79

Tengah 3,52 3,62 3,68 3,71 3,58 3,75 3,90 3,75 3,74 3,89 Tengah 3,84 3,54 3,68 3,76 3,64 3,87 3,80 3,79 3,77 3,78 Tengah 3,50 3,70 3,66 3,57 3,67 3,82 3,91 3,84 3,75 3,70

Kiri 3,59 3,54 3,90 3,80 3,64 3,73 3,93 3,59 3,79 3,69 Kiri 3,83 3,60 3,75 3,70 3,58 3,91 3,81 3,76 3,78 3,67 Kiri 3,57 3,59 3,68 3,69 3,64 3,64 3,88 3,78 3,67 3,61

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012

4,61-4,57 3,36

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9 Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Saprudin ………...

R-9

LEVEL E

Page 134: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL E POSISI : PANEL 11 LEVEL E POSISI : PANEL 12 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,57 3,35 3,62 3,58 3,61 3,81 3,94 3,60 3,85 3,77 Kanan 3,56 3,64 3,65 3,64 3,57 3,97 3,81 3,81 3,68 3,78 Kanan 3,51 3,63 3,60 3,62 3,55 3,85 3,78 3,73 3,82 3,78

Tengah 3,42 3,47 3,57 3,55 3,59 3,90 3,87 3,52 3,81 3,69 Tengah 3,60 3,60 3,67 3,64 3,54 3,84 3,80 3,84 3,72 3,82 Tengah 3,41 3,58 3,59 3,58 3,56 3,88 3,71 3,77 3,76 3,77

Kiri 3,40 3,64 3,81 3,56 3,60 3,89 3,85 3,68 3,82 3,73 Kiri 3,70 3,65 3,77 3,63 3,65 3,86 3,79 3,82 3,71 3,62 Kiri 3,46 3,59 3,58 3,61 3,56 3,74 3,88 3,78 3,81 3,70

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL E POSISI : PANEL 14 LEVEL E POSISI : PANEL 15 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,63 3,59 3,53 3,46 3,61 3,84 3,83 3,76 3,88 3,76 Kanan 3,61 3,40 3,40 3,42 3,50 3,73 3,80 3,91 3,81 3,81 Kanan 3,53 3,52 3,82 3,80 3,73 3,71 3,81 3,88 3,78 3,78

Tengah 3,61 3,60 3,65 3,42 3,41 3,85 3,72 3,73 3,97 3,79 Tengah 3,62 3,50 3,66 3,48 3,75 3,76 3,67 3,85 3,82 3,70 Tengah 3,49 3,73 3,88 3,79 3,53 3,76 3,82 3,77 3,79 3,70

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Tengah 3,61 3,60 3,65 3,42 3,41 3,85 3,72 3,73 3,97 3,79 Tengah 3,62 3,50 3,66 3,48 3,75 3,76 3,67 3,85 3,82 3,70 Tengah 3,49 3,73 3,88 3,79 3,53 3,76 3,82 3,77 3,79 3,70

Kiri 3,56 3,63 3,70 3,54 3,72 3,84 3,87 3,86 3,87 3,68 Kiri 3,69 3,55 3,65 3,59 3,68 3,78 3,84 3,79 3,87 3,66 Kiri 3,65 3,69 3,87 3,72 3,49 3,75 3,76 3,87 3,78 3,69

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL E POSISI : PANEL 17 LEVEL E POSISI : PANEL 18 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,45 3,55 3,60 3,58 3,65 3,82 3,93 3,76 3,85 4,01 Kanan 3,44 3,63 3,60 3,73 3,53 3,90 3,90 3,69 3,83 3,84 Kanan 3,60 3,54 3,64 3,69 3,64 3,78 3,80 3,92 3,90 3,81

Tengah 3,46 3,44 3,62 3,61 3,88 3,91 3,82 3,65 3,85 3,90 Tengah 3,54 3,66 3,72 3,70 3,72 3,88 3,88 3,70 3,85 3,77 Tengah 3,53 3,57 3,63 3,67 3,64 3,74 3,92 3,91 3,78 3,78

Kiri 3,57 3,51 3,61 3,53 3,87 3,85 3,75 3,75 3,86 3,88 Kiri 3,60 3,60 3,61 3,63 3,65 3,87 3,79 3,69 3,84 3,85 Kiri 3,65 3,53 3,81 3,66 3,62 3,73 3,86 3,96 3,68 3,88

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

-4,57 3,35

4,01

No. Tube No. Tube No. Tube

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

R-9Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Saprudin ………...

R-9

LEVEL E

Page 135: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL E POSISI : PANEL 20 LEVEL E POSISI : PANEL 21 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,56 3,50 3,66 3,55 3,54 3,77 3,91 3,88 3,89 3,84 Kanan 3,60 3,60 3,74 3,67 3,60 3,73 3,82 3,82 3,88 3,95 Kanan 3,54 3,81 3,52 3,68 3,55 3,74 3,92 3,99 3,76 3,94

Tengah 3,71 3,67 3,63 3,72 3,54 3,97 3,77 3,79 3,93 3,79 Tengah 3,61 3,52 3,70 3,76 3,57 3,72 3,86 3,88 3,87 3,90 Tengah 3,54 3,94 3,61 3,58 3,65 3,83 3,91 3,79 3,79 3,89

Kiri 3,72 3,71 3,68 3,66 3,58 3,79 3,94 3,79 3,87 3,78 Kiri 3,54 3,67 3,65 3,80 3,62 3,74 3,84 3,81 3,85 3,88 Kiri 3,55 3,79 3,57 3,57 3,62 3,85 4,05 3,85 3,85 3,83

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL E POSISI : PANEL 23 LEVEL E POSISI : PANEL 24 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,68 3,95 3,80 3,84 3,68 3,88 3,94 3,93 3,85 4,05 Kanan 3,70 3,45 3,66 3,71 3,68 3,67 3,80 3,71 3,72 3,77 Kanan 3,53 3,53 3,63 3,60 3,62 4,14 4,39 4,24 3,80 4,16

Tengah 3,53 3,90 3,81 3,69 3,71 3,93 3,91 3,88 4,09 4,07 Tengah 3,58 3,40 3,65 3,65 3,54 3,69 3,82 3,66 3,78 3,92 Tengah 3,75 3,63 3,62 3,67 3,65 4,18 3,89 4,30 3,84 4,24

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,53 3,90 3,81 3,69 3,71 3,93 3,91 3,88 4,09 4,07 Tengah 3,58 3,40 3,65 3,65 3,54 3,69 3,82 3,66 3,78 3,92 Tengah 3,75 3,63 3,62 3,67 3,65 4,18 3,89 4,30 3,84 4,24

Kiri 3,51 3,79 3,84 3,74 3,74 3,93 3,94 3,73 3,93 4,18 Kiri 3,71 3,46 3,82 3,62 3,51 3,74 3,65 3,75 3,75 3,84 Kiri 3,72 3,62 3,71 3,82 3,70 4,20 3,86 4,29 3,86 4,22

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL E POSISI : PANEL 26 LEVEL E POSISI : PANEL 27 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,54 3,83 3,65 3,59 3,57 3,79 3,78 3,73 3,80 3,68 Kanan 3,57 3,56 3,48 3,56 3,55 3,79 3,80 3,91 3,85 3,75 Kanan 3,57 3,73 3,74 3,71 3,52 3,77 3,76 4,01 3,88 3,88

Tengah 3,54 3,81 3,60 3,89 3,53 3,72 3,86 3,73 3,65 3,64 Tengah 3,69 3,57 3,41 3,57 3,50 3,78 3,68 3,94 3,77 3,68 Tengah 3,62 3,67 3,58 3,58 3,49 3,78 3,87 3,99 3,75 3,75

Kiri 3,65 3,88 3,66 3,80 3,70 3,82 3,88 3,63 3,70 3,69 Kiri 3,66 3,56 3,60 3,55 3,53 3,75 3,81 3,91 3,80 3,83 Kiri 3,67 3,79 3,58 3,63 3,47 3,77 3,78 3,96 3,76 3,79

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,40- 4,39

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Saprudin ………...

LEVEL E

Page 136: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL E POSISI : PANEL 29 LEVEL E POSISI : PANEL 30 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,52 3,87 3,55 3,62 3,66 3,82 3,75 3,83 3,72 3,88 Kanan 3,70 3,70 3,60 3,62 3,71 3,71 3,76 3,79 3,82 3,75 Kanan 3,56 3,51 3,51 3,47 3,59 3,76 3,92 3,78 3,79 3,84

Tengah 3,49 3,68 3,56 3,62 3,62 3,87 3,61 3,79 3,73 4,03 Tengah 3,48 3,64 3,50 3,68 3,70 3,74 3,78 3,72 3,83 3,70 Tengah 3,57 3,71 3,44 3,58 3,60 3,69 3,88 3,72 3,64 3,91

Kiri 3,45 3,66 3,65 3,69 3,65 3,92 3,69 3,76 3,82 3,89 Kiri 3,43 3,73 3,61 3,80 3,73 3,72 3,77 3,71 3,81 3,74 Kiri 3,59 3,49 3,43 3,60 3,76 3,78 3,80 3,74 3,80 4,01

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL E POSISI : PANEL 32 LEVEL E POSISI : PANEL 33 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,54 3,61 3,76 3,71 3,79 4,14 3,95 3,87 3,88 3,88 Kanan 3,56 3,43 3,53 3,56 3,56 3,88 3,88 3,79 3,89 3,70 Kanan 3,61 3,54 3,55 3,65 3,45 3,81 3,90 3,93 3,65 3,66

Tengah 3,47 3,54 3,72 3,65 3,58 3,99 3,81 3,88 3,97 3,86 Tengah 3,74 3,41 3,45 3,55 3,85 3,97 3,81 3,85 3,98 3,83 Tengah 3,52 3,52 3,59 3,66 3,44 3,79 3,94 3,71 3,65 3,63

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Row No. Row No. Tube

No. Tube No. Tube No. Tube

Tengah 3,47 3,54 3,72 3,65 3,58 3,99 3,81 3,88 3,97 3,86 Tengah 3,74 3,41 3,45 3,55 3,85 3,97 3,81 3,85 3,98 3,83 Tengah 3,52 3,52 3,59 3,66 3,44 3,79 3,94 3,71 3,65 3,63

Kiri 3,47 3,55 3,74 3,75 3,60 3,98 3,85 3,96 3,95 3,75 Kiri 3,71 3,57 3,68 3,72 3,56 3,64 3,77 3,84 3,83 3,74 Kiri 3,56 3,62 3,69 3,64 3,70 3,82 3,93 3,81 3,77 3,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL E POSISI : PANEL 35 LEVEL E POSISI : PANEL 36 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,60 3,69 3,59 3,74 3,54 3,88 3,78 3,69 3,90 3,68 Kanan 3,64 3,68 3,82 3,94 3,72 3,72 3,73 3,72 3,64 3,84 Kanan 3,49 3,60 3,68 3,55 3,50 3,93 3,89 3,74 3,77 3,83

Tengah 3,66 3,75 3,62 3,60 3,60 3,90 3,91 3,77 3,84 3,73 Tengah 3,63 3,60 3,74 3,63 3,98 3,68 3,79 3,74 3,74 3,75 Tengah 3,44 3,85 3,76 3,76 3,68 3,95 3,90 3,68 3,68 3,79

Kiri 3,46 3,80 3,64 3,65 3,83 3,81 3,69 3,76 3,92 3,78 Kiri 3,63 3,61 3,66 3,68 3,70 3,72 3,88 3,82 3,81 3,85 Kiri 3,26 3,99 4,05 3,78 3,62 3,97 3,97 3,75 3,80 3,76

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,26- 4,14

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Saprudin ………...

LEVEL E

Page 137: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL E POSISI : PANEL38 LEVEL E POSISI : PANEL 39 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,60 3,68 3,66 3,62 3,57 3,87 3,67 3,82 3,68 3,80 Kanan 3,55 3,50 3,62 3,63 3,57 3,92 3,88 3,84 3,77 3,84 Kanan 3,59 3,73 3,60 3,69 3,48 3,88 3,66 3,73 3,75 3,83

Tengah 3,70 3,57 3,64 3,62 3,75 3,88 3,69 3,80 3,65 3,78 Tengah 3,48 3,49 3,67 3,59 3,57 3,88 3,87 3,79 3,77 3,85 Tengah 3,59 3,73 3,76 3,64 3,64 3,85 3,77 3,81 3,75 4,84

Kiri 3,75 3,79 3,84 3,75 3,89 3,89 3,68 3,79 3,70 3,73 Kiri 3,53 3,71 3,93 3,74 3,67 3,90 3,79 3,87 3,79 3,76 Kiri 3,50 3,92 3,73 3,80 3,98 3,86 3,80 3,75 3,74 3,76

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL E POSISI : PANEL 41 LEVEL E POSISI : PANEL 42 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,52 4,09 3,57 3,57 3,74 3,79 3,91 3,72 3,85 4,01 Kanan 3,58 3,66 3,55 3,55 3,55 3,61 3,81 3,71 3,85 3,75 Kanan 3,81 3,88 3,86 3,96 3,79 3,69 3,78 3,87 3,74 3,73

Tengah 3,63 3,79 3,72 3,68 3,77 3,81 3,90 3,73 3,84 3,95 Tengah 3,50 3,79 3,62 3,65 3,79 3,66 3,76 3,70 3,84 3,74 Tengah 3,87 3,70 3,39 3,88 3,65 3,80 3,90 3,77 3,78 3,74

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,63 3,79 3,72 3,68 3,77 3,81 3,90 3,73 3,84 3,95 Tengah 3,50 3,79 3,62 3,65 3,79 3,66 3,76 3,70 3,84 3,74 Tengah 3,87 3,70 3,39 3,88 3,65 3,80 3,90 3,77 3,78 3,74

Kiri 3,50 3,66 3,95 3,79 3,89 3,82 3,88 3,75 3,91 3,91 Kiri 3,76 3,92 4,00 3,75 3,91 3,65 3,77 3,69 3,76 3,75 Kiri 3,86 3,54 3,72 3,89 3,63 3,70 3,91 3,78 3,78 3,88

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL E POSISI : PANEL 44 LEVEL E

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,55 3,89 3,94 3,91 4,00 3,66 3,98 3,74 3,84 3,71 Kanan 3,57 3,47 3,68 3,54 3,52 3,65 3,88 3,77 3,75 3,74

Tengah 3,54 3,81 3,74 3,58 3,59 3,65 3,93 3,76 3,77 3,70 Tengah 3,54 3,54 3,74 3,64 3,59 3,74 3,78 3,90 3,77 3,83

Kiri 3,57 3,63 3,65 3,54 3,19 3,74 3,95 3,80 3,77 3,69 Kiri 3,60 3,65 3,87 3,76 3,61 3,73 4,03 3,80 3,75 3,90

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

4,57 3,19- 4,84

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

R-9

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Saprudin ………...

LEVEL E

Page 138: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL F POSISI : PANEL 2 LEVEL F POSISI : PANEL 3 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,68 3,85 3,73 3,84 3,88 3,89 3,78 3,76 3,74 3,77 Kanan 3,82 3,65 3,92 3,76 3,89 3,84 3,74 3,74 3,92 3,82 Kanan 3,72 3,82 3,64 3,80 3,82 3,62 3,74 3,74 3,67 3,84

Tengah 3,76 3,98 3,73 3,83 3,73 3,82 3,90 3,72 3,72 3,88 Tengah 3,76 3,72 3,84 3,74 3,91 3,86 3,71 3,69 3,92 3,88 Tengah 3,79 3,76 3,72 3,88 3,69 3,79 3,78 3,73 3,72 3,76

Kiri 3,83 4,07 3,77 3,68 3,69 3,91 3,97 3,84 3,84 3,79 Kiri 3,71 3,79 3,82 3,78 3,85 3,83 3,81 3,70 3,86 3,91 Kiri 3,78 3,76 3,92 3,91 3,72 3,72 3,75 3,75 3,76 3,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL F POSISI : PANEL 5 LEVEL F POSISI : PANEL 6 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,68 3,74 3,91 3,81 3,86 3,64 3,82 3,85 3,80 3,80 Kanan 3,81 3,94 3,84 3,65 4,16 3,67 3,74 3,79 3,95 3,66 Kanan 3,77 3,96 3,97 3,79 3,73 3,72 3,81 3,70 4,01 3,79

Tengah 3,76 3,81 3,79 3,79 3,88 3,69 3,84 3,75 3,85 3,74 Tengah 3,84 3,80 3,97 3,76 3,95 3,74 3,83 3,77 3,81 3,74 Tengah 3,24 3,96 3,92 3,69 3,75 3,82 3,70 3,76 3,99 3,86

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,76 3,81 3,79 3,79 3,88 3,69 3,84 3,75 3,85 3,74 Tengah 3,84 3,80 3,97 3,76 3,95 3,74 3,83 3,77 3,81 3,74 Tengah 3,24 3,96 3,92 3,69 3,75 3,82 3,70 3,76 3,99 3,86

Kiri 3,79 3,93 3,88 3,85 3,86 3,73 3,86 3,72 3,81 3,75 Kiri 3,77 3,80 3,81 3,42 3,88 3,67 3,70 3,82 3,81 3,62 Kiri 3,73 3,91 3,78 3,89 3,69 3,96 3,75 3,79 3,90 3,87

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL F POSISI : PANEL 8 LEVEL F POSISI : PANEL 9 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,70 3,87 3,80 3,81 3,73 3,85 3,94 3,68 3,71 3,84 Kanan 3,81 3,65 3,95 4,03 3,72 3,94 3,74 3,79 3,75 3,79 Kanan 3,74 3,84 3,92 3,78 3,71 3,85 3,93 3,81 3,70 3,61

Tengah 3,64 3,76 3,81 3,79 3,73 3,67 3,94 3,72 3,78 3,83 Tengah 3,86 3,68 3,91 3,78 3,71 3,97 3,93 3,75 3,73 3,84 Tengah 3,80 3,80 3,79 3,78 3,74 3,70 4,01 3,75 3,74 3,78

Kiri 3,69 3,73 3,80 3,78 3,66 3,76 3,84 3,66 3,70 3,85 Kiri 3,84 3,67 3,95 3,87 3,62 3,97 3,81 3,70 3,76 3,77 Kiri 3,84 3,82 3,79 3,68 3,78 3,74 3,83 3,74 3,73 3,78

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,24- 4,16

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL F

Page 139: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL F POSISI : PANEL 11 LEVEL F POSISI : PANEL 12 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,67 3,80 3,75 3,79 3,81 3,87 3,84 3,67 3,88 3,73 Kanan 3,80 3,80 3,74 3,77 3,81 3,74 3,80 3,74 3,79 3,62 Kanan 3,73 3,89 3,82 3,88 3,81 3,82 3,78 3,79 3,83 3,78

Tengah 3,66 3,78 3,75 3,73 3,83 3,77 3,83 3,69 3,87 3,82 Tengah 3,67 3,82 3,83 3,78 3,72 3,62 3,84 3,75 3,76 3,72 Tengah 3,72 3,85 3,81 3,97 3,86 3,72 3,63 3,97 3,86 3,83

Kiri 3,66 3,82 3,70 3,66 3,73 3,78 3,90 3,61 3,86 3,85 Kiri 3,84 3,81 3,94 3,73 3,71 3,72 3,78 3,74 3,81 3,68 Kiri 3,74 3,83 3,82 3,82 3,78 3,86 3,73 3,96 3,87 3,78

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL F POSISI : PANEL 14 LEVEL F POSISI : PANEL 15 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,74 3,83 3,85 3,75 3,85 3,75 3,83 3,78 3,87 3,76 Kanan 3,89 3,75 3,73 3,65 3,88 3,67 3,73 3,84 3,93 3,84 Kanan 3,80 3,91 3,89 3,77 3,84 3,75 3,66 3,82 3,76 3,70

Tengah 3,72 3,85 3,81 3,78 3,84 3,73 3,79 3,78 3,88 3,74 Tengah 3,99 3,93 3,76 3,72 4,01 3,75 3,63 3,92 3,96 3,79 Tengah 3,79 3,80 3,99 3,88 3,71 3,69 3,76 3,78 3,74 3,79

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,72 3,85 3,81 3,78 3,84 3,73 3,79 3,78 3,88 3,74 Tengah 3,99 3,93 3,76 3,72 4,01 3,75 3,63 3,92 3,96 3,79 Tengah 3,79 3,80 3,99 3,88 3,71 3,69 3,76 3,78 3,74 3,79

Kiri 3,89 3,82 3,83 3,50 3,75 3,75 3,90 3,81 3,87 3,74 Kiri 3,83 3,76 3,75 3,75 3,97 3,75 3,84 3,86 3,85 3,83 Kiri 3,85 3,87 3,90 3,80 3,51 3,73 3,80 3,84 3,76 3,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL F POSISI : PANEL 17 LEVEL F POSISI : PANEL 18 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,78 3,73 3,71 3,79 3,79 3,79 3,87 3,70 3,90 3,84 Kanan 3,72 3,75 3,87 3,88 3,99 3,85 3,84 3,76 3,99 3,79 Kanan 3,70 3,77 3,88 3,41 3,84 3,76 3,76 3,92 3,86 3,84

Tengah 3,76 3,76 3,77 3,79 3,76 3,82 3,86 3,87 3,76 3,91 Tengah 3,70 3,76 3,85 3,86 3,83 3,71 3,90 3,72 3,87 3,88 Tengah 3,71 3,78 3,78 3,86 3,77 3,77 3,96 3,92 3,78 3,82

Kiri 3,69 3,74 3,81 3,70 3,86 3,90 3,89 3,78 3,90 3,86 Kiri 3,74 3,77 3,81 3,89 3,83 3,86 3,71 3,65 3,79 3,87 Kiri 3,78 3,83 3,74 3,85 3,84 3,77 3,98 3,92 3,80 3,82

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,41- 4,01

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL F

Page 140: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL F POSISI : PANEL 20 LEVEL F POSISI : PANEL 21 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,78 3,88 3,89 3,89 3,73 3,77 3,84 3,87 3,86 3,78 Kanan 3,71 3,84 3,98 3,88 3,80 3,79 3,84 3,85 3,83 3,87 Kanan 3,64 3,95 3,75 3,77 3,47 3,77 3,87 3,80 3,79 3,87

Tengah 3,88 3,91 3,86 3,81 3,88 3,76 3,78 3,88 3,84 3,95 Tengah 3,70 3,84 3,92 3,92 3,79 3,73 3,86 3,80 3,78 3,81 Tengah 3,75 3,93 3,76 3,66 3,72 3,66 3,91 3,88 3,68 3,88

Kiri 3,87 3,84 3,86 3,91 3,65 3,87 3,88 3,82 3,82 3,81 Kiri 3,72 3,84 3,96 3,90 3,80 3,72 3,79 3,83 3,75 3,88 Kiri 3,77 3,94 3,75 3,75 3,72 3,75 3,86 3,78 3,71 3,85

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL F POSISI : PANEL 23 LEVEL F POSISI : PANEL 24 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,89 4,03 4,03 3,87 3,87 3,92 3,93 3,89 3,93 4,07 Kanan 3,73 3,67 3,83 3,92 3,71 3,71 3,92 3,71 3,77 3,74 Kanan 3,81 3,88 3,82 3,92 3,87 4,20 3,81 4,18 3,90 4,45

Tengah 3,82 4,11 3,91 4,01 3,90 3,93 3,96 3,71 3,89 4,32 Tengah 3,76 3,69 3,76 3,90 3,74 3,93 3,74 3,74 3,69 3,68 Tengah 3,86 3,85 3,86 3,92 3,82 4,24 3,84 4,38 3,80 4,50

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,82 4,11 3,91 4,01 3,90 3,93 3,96 3,71 3,89 4,32 Tengah 3,76 3,69 3,76 3,90 3,74 3,93 3,74 3,74 3,69 3,68 Tengah 3,86 3,85 3,86 3,92 3,82 4,24 3,84 4,38 3,80 4,50

Kiri 3,89 3,99 3,75 3,98 3,91 3,95 3,99 3,83 4,03 4,26 Kiri 3,87 3,69 3,63 3,85 3,71 3,72 3,77 3,76 3,72 3,86 Kiri 3,81 3,74 4,01 4,11 3,79 4,34 3,78 4,28 4,01 4,32

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL F POSISI : PANEL 26 LEVEL F POSISI : PANEL 27 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,74 4,03 3,67 3,82 3,73 3,88 3,85 3,74 3,83 3,67 Kanan 3,74 3,87 3,74 3,75 3,75 3,70 3,93 3,86 3,81 3,71 Kanan 3,86 3,92 3,82 3,88 3,80 3,73 3,83 3,85 3,75 3,84

Tengah 3,64 3,95 3,76 3,85 3,74 3,78 3,81 3,70 3,70 3,73 Tengah 3,85 3,85 3,80 3,74 3,72 3,74 3,82 3,88 3,87 3,79 Tengah 3,87 3,88 3,82 3,81 3,77 3,71 3,71 3,86 3,78 3,83

Kiri 3,69 3,88 3,79 3,84 3,70 3,89 3,85 3,79 3,74 3,76 Kiri 3,88 3,80 3,77 3,66 3,77 3,63 3,80 3,85 3,81 3,79 Kiri 3,89 3,82 3,90 3,80 3,82 3,76 3,76 4,05 3,83 3,73

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,47- 4,50

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL F

Page 141: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL F POSISI : PANEL 29 LEVEL F POSISI : PANEL 30 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,65 3,81 3,87 3,84 3,78 3,86 3,68 3,82 3,68 3,91 Kanan 3,72 4,03 3,91 3,79 3,93 3,66 3,80 3,82 3,73 3,65 Kanan 3,78 3,80 3,64 3,76 3,73 3,76 3,65 3,77 3,80 3,86

Tengah 3,59 3,81 3,79 3,72 3,78 3,81 3,81 3,78 3,69 3,85 Tengah 3,70 4,01 3,85 3,86 3,92 3,78 3,84 3,81 3,74 3,75 Tengah 3,75 3,74 3,67 3,88 3,85 3,74 3,78 3,87 3,83 3,88

Kiri 3,63 3,71 3,75 3,81 3,71 3,76 3,82 3,85 3,80 3,78 Kiri 3,68 3,98 3,82 3,78 3,90 3,77 3,60 3,83 3,79 3,68 Kiri 3,70 3,95 3,63 3,87 3,82 3,63 3,86 3,74 3,79 3,87

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL F POSISI : PANEL 32 LEVEL F POSISI : PANEL 33 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,75 3,79 3,89 3,82 3,95 4,01 3,82 3,86 3,86 4,03 Kanan 3,79 3,90 3,73 3,86 3,76 3,73 3,84 3,81 3,88 3,78 Kanan 3,70 3,85 3,76 3,78 3,67 3,75 3,88 3,81 3,67 3,72

Tengah 3,54 3,79 3,88 3,88 3,91 3,92 3,78 3,93 3,93 4,01 Tengah 3,76 3,73 3,61 3,92 3,72 3,67 3,75 3,72 3,88 3,78 Tengah 3,69 3,77 3,77 3,82 3,65 3,70 3,89 3,72 3,83 3,70

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Row No. Row No. Tube

No. Tube No. Tube No. Tube

Tengah 3,54 3,79 3,88 3,88 3,91 3,92 3,78 3,93 3,93 4,01 Tengah 3,76 3,73 3,61 3,92 3,72 3,67 3,75 3,72 3,88 3,78 Tengah 3,69 3,77 3,77 3,82 3,65 3,70 3,89 3,72 3,83 3,70

Kiri 3,81 3,71 3,94 3,81 3,93 3,87 3,80 4,03 3,44 3,77 Kiri 3,81 3,71 3,75 3,83 3,71 3,64 3,77 3,70 3,97 3,75 Kiri 3,69 3,70 3,70 3,81 3,80 3,70 3,88 3,78 3,81 3,73

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL F POSISI : PANEL 35 LEVEL F POSISI : PANEL 36 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,77 3,74 3,84 3,90 3,66 3,91 3,78 3,74 3,85 3,67 Kanan 3,84 3,74 3,79 3,74 3,60 3,64 3,85 3,71 3,70 3,81 Kanan 3,89 3,79 3,81 3,90 3,79 3,88 3,88 3,73 3,66 3,97

Tengah 3,81 3,84 3,75 3,87 3,70 3,98 3,88 3,75 3,82 3,80 Tengah 3,85 3,88 3,86 3,76 3,90 3,72 3,72 3,79 3,58 3,77 Tengah 3,72 3,99 3,77 3,92 3,67 3,78 3,88 3,80 3,72 3,81

Kiri 3,80 3,85 3,74 3,80 3,70 3,85 3,87 3,73 3,93 3,72 Kiri 3,81 3,84 3,86 3,76 3,95 3,73 3,86 3,85 3,74 3,87 Kiri 3,84 3,85 3,86 3,79 3,76 3,83 3,90 3,75 3,68 3,75

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,44- 4,03

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9

Koordinator Lapangan1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

LEVEL F

Page 142: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL F POSISI : PANEL38 LEVEL F POSISI : PANEL 39 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,90 3,81 3,88 3,80 3,72 3,84 3,59 3,82 3,69 3,67 Kanan 3,75 3,58 3,72 3,80 3,80 3,80 3,69 3,93 3,66 3,87 Kanan 3,70 3,83 3,80 3,92 3,70 3,84 3,77 3,82 3,74 3,71

Tengah 3,89 3,74 3,81 3,77 3,78 3,85 3,60 3,83 3,73 3,70 Tengah 3,70 5,64 3,75 3,82 3,74 3,81 3,71 3,84 3,76 3,68 Tengah 3,76 3,76 3,73 3,76 3,72 3,83 3,75 3,75 3,75 3,76

Kiri 3,75 3,74 3,90 3,71 3,75 3,87 3,67 3,82 3,67 3,71 Kiri 3,65 3,75 3,80 3,80 3,79 3,82 3,69 3,87 3,74 3,75 Kiri 3,70 3,71 3,81 3,85 3,64 3,84 3,76 3,78 3,70 3,70

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL F POSISI : PANEL 41 LEVEL F POSISI : PANEL 42 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,78 3,73 3,75 3,81 3,78 3,70 3,91 3,78 3,80 3,88 Kanan 3,85 3,85 3,76 3,74 3,64 3,62 3,77 3,71 3,68 3,73 Kanan 3,83 3,77 3,93 3,85 3,81 3,69 3,93 3,79 3,79 3,71

Tengah 3,89 3,71 3,80 3,82 3,83 3,72 3,90 3,70 3,82 3,99 Tengah 3,89 3,88 3,82 3,82 3,91 3,63 3,70 3,70 3,71 3,72 Tengah 3,92 3,65 3,76 3,95 3,92 3,68 3,87 3,80 3,82 3,72

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,89 3,71 3,80 3,82 3,83 3,72 3,90 3,70 3,82 3,99 Tengah 3,89 3,88 3,82 3,82 3,91 3,63 3,70 3,70 3,71 3,72 Tengah 3,92 3,65 3,76 3,95 3,92 3,68 3,87 3,80 3,82 3,72

Kiri 3,62 3,88 3,88 3,82 3,84 3,67 3,95 3,76 3,90 3,93 Kiri 3,78 3,78 3,83 3,70 3,88 3,69 3,71 3,84 3,78 3,69 Kiri 3,96 3,70 3,72 3,85 3,77 3,70 3,88 3,82 3,77 3,73

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL F POSISI : PANEL 44 LEVEL F

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,85 3,81 3,90 3,75 3,75 3,66 3,76 3,70 3,74 3,61 Kanan 3,78 3,77 4,00 3,88 3,90 3,74 3,88 3,75 3,81 3,80

Tengah 3,60 3,90 3,74 3,84 3,63 3,60 3,95 3,74 3,72 3,73 Tengah 3,73 3,76 4,02 3,93 3,77 3,80 3,76 3,87 3,84 3,81

Kiri 3,82 3,85 3,83 3,75 3,63 3,61 3,95 3,79 3,73 3,66 Kiri 3,88 3,77 3,87 3,89 3,83 3,69 3,91 3,84 3,77 3,91

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

4,57 3,58- 5,64

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

R-9Koordinator Lapangan

1 Tumpal H. ………...

Yusuf Rasyid, ST, MT 2 Haryadi ………...

R-9

LEVEL F

Page 143: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL G POSISI : PANEL 2 LEVEL G POSISI : PANEL 3 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,95 4,24 3,97 4,24 4,05 3,92 3,88 3,69 3,72 3,64 Kanan 3,97 4,09 4,16 4,09 4,01 3,86 3,74 3,68 3,80 3,86 Kanan 4,11 4,28 4,11 4,09 3,94 3,77 3,85 3,84 3,76 3,78

Tengah 3,80 3,46 3,89 3,95 4,61 3,91 3,91 3,73 3,76 3,75 Tengah 4,18 4,07 4,22 4,11 4,14 3,82 3,75 3,65 3,80 3,94 Tengah 3,96 4,03 4,01 4,03 3,87 3,67 3,78 3,80 3,74 3,81

Kiri 3,84 3,90 3,76 3,77 3,82 3,90 3,84 3,76 3,74 3,68 Kiri 4,26 3,93 3,97 3,80 4,14 3,73 3,69 3,64 3,97 3,83 Kiri 3,86 3,81 3,77 4,05 3,57 3,68 3,79 3,71 3,78 3,83

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL G POSISI : PANEL 5 LEVEL G POSISI : PANEL 6 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,91 4,07 4,20 4,03 4,05 3,67 3,78 3,77 3,76 3,73 Kanan 4,14 3,83 4,14 3,97 4,01 3,63 3,73 3,85 3,81 3,71 Kanan 3,69 4,22 4,18 4,03 4,12 3,61 3,75 3,78 4,05 3,79

Tengah 4,11 4,09 4,22 4,05 4,77 3,66 3,88 3,70 3,81 3,75 Tengah 4,05 4,04 4,01 3,98 3,79 3,51 3,83 3,80 3,76 3,70 Tengah 3,92 4,20 4,22 4,11 3,93 3,70 3,74 3,82 3,44 3,77

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 4,11 4,09 4,22 4,05 4,77 3,66 3,88 3,70 3,81 3,75 Tengah 4,05 4,04 4,01 3,98 3,79 3,51 3,83 3,80 3,76 3,70 Tengah 3,92 4,20 4,22 4,11 3,93 3,70 3,74 3,82 3,44 3,77

Kiri 4,20 3,87 3,94 4,09 4,05 3,60 3,94 3,92 3,79 3,81 Kiri 3,86 4,24 3,77 4,01 3,79 3,61 3,70 3,68 3,94 3,68 Kiri 3,73 4,14 4,09 4,03 3,86 3,62 3,62 3,77 3,93 3,75

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL G POSISI : PANEL 8 LEVEL G POSISI : PANEL 9 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,01 4,11 3,96 4,05 4,01 3,70 3,92 3,69 3,72 3,76 Kanan 4,18 3,89 4,01 3,97 3,88 3,82 3,76 3,71 3,70 3,79 Kanan 4,00 4,11 4,18 4,04 3,97 3,92 3,87 3,78 3,74 3,74

Tengah 3,88 4,16 3,99 3,87 3,87 3,82 3,41 3,39 3,76 3,76 Tengah 4,14 3,87 3,99 3,98 3,86 3,76 3,72 3,79 3,75 3,72 Tengah 4,03 4,01 4,13 3,93 3,91 3,74 3,90 3,82 3,86 3,77

Kiri 3,78 4,01 3,87 3,65 3,74 3,85 3,90 3,72 3,80 3,72 Kiri 3,94 3,88 3,88 3,90 3,82 3,74 3,72 3,70 3,86 3,70 Kiri 3,95 3,92 3,91 3,95 3,85 3,93 3,89 3,71 3,80 3,84

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,39- 4,77

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Dikki Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL G

Page 144: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL G POSISI : PANEL 11 LEVEL G POSISI : PANEL 12 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,76 4,09 4,11 4,16 4,03 3,89 3,94 3,59 3,81 3,76 Kanan 4,03 4,05 4,12 4,16 3,99 3,67 3,66 3,73 3,78 3,78 Kanan 3,85 3,97 3,98 4,11 3,93 3,93 3,80 3,81 3,82 3,83

Tengah 3,92 4,12 3,99 3,98 4,02 3,70 3,96 3,60 3,88 3,79 Tengah 3,92 3,59 4,07 3,96 3,98 3,73 3,82 3,78 3,84 3,67 Tengah 4,14 4,07 3,95 4,12 4,05 3,89 3,66 3,73 3,79 3,80

Kiri 3,95 4,24 3,95 3,81 3,85 3,72 3,98 3,54 3,76 3,75 Kiri 3,88 3,55 3,96 3,88 3,93 3,66 3,78 3,79 3,96 3,77 Kiri 4,07 4,14 3,99 4,11 4,09 3,82 3,88 3,83 3,89 3,95

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL G POSISI : PANEL 14 LEVEL G POSISI : PANEL 15 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,95 4,16 4,01 3,99 4,12 3,80 3,62 3,82 4,01 3,70 Kanan 4,22 4,05 3,73 3,65 3,88 3,67 3,75 3,84 3,93 3,84 Kanan 3,85 4,07 4,22 4,11 3,95 3,65 3,68 3,76 3,91 3,72

Tengah 3,88 4,14 3,94 3,90 3,93 3,80 3,86 3,81 3,95 3,76 Tengah 4,14 3,95 3,76 3,72 4,01 3,75 3,63 3,92 3,96 3,79 Tengah 4,07 3,91 4,24 4,07 4,05 3,66 3,88 3,76 3,80 3,75

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,88 4,14 3,94 3,90 3,93 3,80 3,86 3,81 3,95 3,76 Tengah 4,14 3,95 3,76 3,72 4,01 3,75 3,63 3,92 3,96 3,79 Tengah 4,07 3,91 4,24 4,07 4,05 3,66 3,88 3,76 3,80 3,75

Kiri 3,90 3,92 3,99 4,01 3,99 3,84 3,75 3,98 3,80 3,74 Kiri 3,99 3,93 3,75 3,75 3,97 3,75 3,84 3,86 3,85 3,83 Kiri 4,03 4,11 4,05 4,03 3,98 3,64 3,89 3,78 3,93 3,72

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL G POSISI : PANEL 17 LEVEL G POSISI : PANEL 18 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,88 3,81 3,76 3,74 3,78 3,78 3,89 3,81 3,79 3,97 Kanan 3,88 4,16 4,14 4,16 4,14 3,70 3,80 3,79 3,87 3,91 Kanan 3,97 4,04 4,11 4,09 3,99 3,79 3,83 3,89 3,69 3,79

Tengah 3,78 3,74 3,80 3,75 3,77 3,85 3,82 3,73 3,87 3,84 Tengah 3,76 4,05 4,16 4,16 4,07 3,67 3,81 3,80 3,88 3,94 Tengah 3,81 3,97 3,90 3,95 3,87 3,77 3,93 3,92 3,67 3,81

Kiri 3,88 3,78 3,86 3,75 3,74 3,87 3,83 3,72 3,89 3,73 Kiri 3,82 4,09 4,12 3,99 3,99 3,68 3,75 3,68 3,85 3,90 Kiri 3,80 3,93 3,87 3,94 3,84 3,84 3,87 3,91 3,77 3,73

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,54- 4,24

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL G

Page 145: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL G POSISI : PANEL 20 LEVEL G POSISI : PANEL 21 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,87 4,22 4,09 4,28 3,99 3,75 3,76 3,78 3,90 3,92 Kanan 4,16 4,14 4,18 4,34 4,05 3,74 3,84 3,93 3,81 3,93 Kanan 3,88 4,11 4,01 4,12 4,22 3,89 3,83 3,75 3,80 3,91

Tengah 3,79 4,26 4,14 4,11 3,99 3,88 3,77 3,85 3,81 3,79 Tengah 3,82 3,95 4,11 4,36 4,11 3,74 3,90 3,88 3,78 3,95 Tengah 3,87 4,18 4,05 4,11 4,26 3,79 3,82 3,78 3,85 3,80

Kiri 3,87 4,01 4,43 4,14 3,97 3,90 3,88 3,85 3,76 3,75 Kiri 3,87 3,82 3,97 4,18 3,98 3,73 3,88 3,82 3,80 3,90 Kiri 3,85 4,14 3,95 3,97 4,11 3,78 3,92 3,77 3,86 3,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL G POSISI : PANEL 23 LEVEL G POSISI : PANEL 24 LEVELG

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,96 4,28 4,22 4,12 4,14 3,80 3,89 3,72 3,98 4,22 Kanan 4,12 3,95 4,16 4,14 3,97 3,70 3,95 3,72 3,88 3,84 Kanan 4,16 3,85 4,14 4,24 4,32 4,11 3,91 4,12 3,88 4,36

Tengah 3,95 4,07 3,86 4,20 4,12 4,09 3,87 3,81 3,88 4,09 Tengah 4,09 3,95 4,11 4,05 3,97 3,72 3,91 3,67 3,85 3,88 Tengah 4,16 3,77 4,22 4,16 4,28 4,24 3,83 4,09 4,07 4,24

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,95 4,07 3,86 4,20 4,12 4,09 3,87 3,81 3,88 4,09 Tengah 4,09 3,95 4,11 4,05 3,97 3,72 3,91 3,67 3,85 3,88 Tengah 4,16 3,77 4,22 4,16 4,28 4,24 3,83 4,09 4,07 4,24

Kiri 3,88 4,07 3,76 4,05 4,05 3,85 3,90 4,09 3,83 4,09 Kiri 4,18 4,03 4,07 4,14 3,97 3,84 3,84 3,78 3,81 3,89 Kiri 4,09 3,76 4,26 4,16 3,98 4,26 3,95 4,03 4,05 4,26

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL G POSISI : PANEL 26 LEVEL G POSISI : PANEL 27 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,14 4,22 4,11 4,07 4,01 3,61 3,77 3,75 3,72 3,75 Kanan 4,12 4,05 4,03 3,95 3,97 3,71 3,83 3,87 3,81 3,71 Kanan 4,01 4,34 4,05 4,20 4,09 3,76 3,86 3,95 3,80 3,81

Tengah 4,22 4,22 4,14 4,16 3,94 3,88 3,81 3,77 3,71 3,70 Tengah 3,96 3,99 3,99 3,85 3,99 3,75 3,78 3,86 3,80 3,75 Tengah 4,07 4,20 4,14 4,11 4,02 3,86 3,87 3,89 3,88 3,79

Kiri 4,03 4,20 4,16 4,20 3,89 3,87 3,80 3,65 3,82 3,63 Kiri 4,09 3,98 3,85 3,76 4,09 3,84 3,80 3,78 3,84 3,84 Kiri 4,09 4,11 4,09 3,88 4,07 3,85 3,58 3,90 3,77 3,77

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,58- 4,43

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL G

Page 146: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL G POSISI : PANEL 29 LEVEL G POSISI : PANEL 30 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,92 4,14 4,11 4,14 4,20 3,81 3,68 3,79 3,75 3,67 Kanan 3,88 4,20 4,16 4,12 4,20 3,74 3,75 3,77 3,89 3,70 Kanan 4,05 4,18 3,98 4,01 4,01 3,71 3,72 3,76 3,86 3,82

Tengah 3,85 4,11 4,16 4,13 4,01 3,87 3,82 3,65 3,79 3,83 Tengah 3,82 4,14 4,16 3,84 4,18 3,74 3,78 3,82 3,70 3,75 Tengah 3,96 4,05 3,91 4,01 3,93 3,66 3,84 3,79 3,82 3,88

Kiri 3,82 3,91 4,05 4,88 4,07 3,77 3,70 3,73 3,75 3,79 Kiri 3,84 4,20 4,14 4,07 4,07 3,72 3,77 3,81 3,83 3,70 Kiri 3,78 4,11 3,95 3,93 3,99 3,64 3,86 3,75 3,80 3,88

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL G POSISI : PANEL 32 LEVEL G POSISI : PANEL 33 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,83 3,37 4,22 4,18 4,12 3,92 3,84 3,89 3,83 3,74 Kanan 3,94 4,22 4,41 4,28 4,14 3,76 3,93 3,84 3,86 3,74 Kanan 3,99 4,20 4,07 4,05 3,94 3,91 3,90 3,79 3,81 3,69

Tengah 3,92 3,96 4,16 4,90 4,14 3,50 3,91 3,95 3,85 3,96 Tengah 4,04 4,22 4,11 4,26 4,09 3,77 3,80 3,88 3,88 3,86 Tengah 3,72 4,20 4,12 4,11 3,94 3,76 3,95 3,76 3,71 3,70

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Row No. Row No. Tube

No. Tube No. Tube No. Tube

Tengah 3,92 3,96 4,16 4,90 4,14 3,50 3,91 3,95 3,85 3,96 Tengah 4,04 4,22 4,11 4,26 4,09 3,77 3,80 3,88 3,88 3,86 Tengah 3,72 4,20 4,12 4,11 3,94 3,76 3,95 3,76 3,71 3,70

Kiri 3,86 3,95 4,07 4,86 4,95 3,70 3,76 4,01 3,83 3,82 Kiri 4,07 4,24 4,04 4,28 4,18 3,76 3,86 3,84 3,86 3,77 Kiri 3,87 4,18 4,11 4,03 4,01 3,88 3,86 3,83 3,77 3,69

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL G POSISI : PANEL 35 LEVEL G POSISI : PANEL 36 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,20 4,16 4,11 4,30 4,20 3,82 3,88 3,79 3,88 3,75 Kanan 3,88 3,78 3,72 3,92 3,55 3,64 3,72 3,75 3,71 3,77 Kanan 4,18 4,10 4,06 4,11 3,91 3,79 3,88 3,75 3,72 3,61

Tengah 4,05 4,11 4,03 4,32 4,03 3,85 3,97 3,78 3,79 3,66 Tengah 4,26 3,88 4,09 3,84 3,71 3,63 3,78 3,77 3,75 3,90 Tengah 3,89 4,04 3,98 4,06 3,83 3,80 3,87 3,73 3,69 3,71

Kiri 3,87 4,11 4,12 3,97 3,92 3,76 3,85 3,92 3,80 3,80 Kiri 3,96 4,05 4,09 4,07 3,97 3,71 3,88 3,81 3,77 3,73 Kiri 3,82 3,83 4,72 3,83 3,67 3,61 3,78 3,76 3,65 3,73

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,37- 4,95

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL G

Page 147: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL G POSISI : PANEL38 LEVEL G POSISI : PANEL 39 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,81 4,08 4,16 4,11 3,78 3,85 3,64 3,89 3,80 3,79 Kanan 4,25 3,82 3,95 4,00 4,00 3,83 3,62 3,83 3,74 3,83 Kanan 3,06 3,97 3,99 4,28 3,91 3,70 3,94 3,69 3,71 3,82

Tengah 4,08 3,90 4,11 3,89 3,72 3,84 3,63 3,70 3,79 3,88 Tengah 3,88 3,74 3,81 3,90 3,80 3,82 3,70 3,71 3,81 3,85 Tengah 3,86 3,90 3,78 3,90 3,66 3,76 3,84 3,87 3,72 3,80

Kiri 4,19 3,76 3,93 3,83 3,56 3,76 3,61 3,75 3,80 3,78 Kiri 3,77 3,60 3,83 3,88 3,79 3,79 3,77 3,81 3,82 3,85 Kiri 3,77 3,68 3,61 3,86 3,81 3,75 3,85 3,86 3,71 3,79

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL G POSISI : PANEL 41 LEVEL G POSISI : PANEL 42 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,01 3,93 3,95 4,04 3,94 4,31 3,81 3,95 3,94 3,83 Kanan 4,21 4,25 3,94 3,91 3,88 3,57 3,74 3,67 3,81 3,76 Kanan 4,22 3,94 4,02 4,03 4,01 3,68 3,79 3,82 3,78 3,69

Tengah 4,08 4,00 3,89 3,77 3,85 3,88 3,71 3,62 3,93 3,86 Tengah 4,24 3,90 3,90 3,81 3,87 3,60 3,73 3,68 3,82 3,78 Tengah 3,99 3,77 3,86 3,85 3,88 3,70 3,80 3,91 3,87 3,75

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 4,08 4,00 3,89 3,77 3,85 3,88 3,71 3,62 3,93 3,86 Tengah 4,24 3,90 3,90 3,81 3,87 3,60 3,73 3,68 3,82 3,78 Tengah 3,99 3,77 3,86 3,85 3,88 3,70 3,80 3,91 3,87 3,75

Kiri 3,74 3,75 3,64 3,66 3,80 3,89 3,76 3,83 3,92 3,95 Kiri 4,02 3,53 3,67 3,75 3,75 3,59 3,72 3,72 3,78 3,68 Kiri 3,83 3,69 3,69 3,83 3,67 3,72 3,91 3,86 3,70 3,73

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL G POSISI : PANEL 44 LEVEL G

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,63 4,00 3,83 3,78 3,82 4,06 3,88 3,87 3,70 3,64 Kanan 3,98 4,05 4,02 4,11 4,08 3,79 3,80 3,71 3,73 3,79

Tengah 3,74 3,82 3,84 3,73 3,68 3,67 3,83 3,68 3,69 3,67 Tengah 4,09 4,08 4,20 4,19 4,03 3,78 3,80 3,77 3,78 3,74

Kiri 3,73 3,79 3,75 3,81 3,78 3,71 3,88 3,67 3,86 3,70 Kiri 3,91 4,05 4,12 4,04 3,92 3,82 3,99 3,80 3,84 3,75

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

4,57 3,06- 4,31

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

R-9Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL G

Page 148: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 1 LEVEL H POSISI : PANEL 2 LEVEL H POSISI : PANEL 3 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,78 3,88 3,70 3,85 3,91 3,94 3,77 3,78 3,81 3,79 Kanan 3,70 3,72 3,85 3,65 3,88 3,91 3,86 3,67 3,82 3,27 Kanan 3,75 3,82 3,77 3,81 3,78 3,68 3,85 3,72 3,75 3,78

Tengah 3,71 3,85 3,76 3,76 3,78 3,88 3,47 3,73 3,87 3,79 Tengah 3,71 3,78 3,92 3,64 3,80 3,84 3,76 3,68 3,97 3,92 Tengah 3,86 3,77 3,80 3,90 3,53 3,80 3,84 3,69 3,76 3,77

Kiri 3,72 3,86 3,83 3,67 3,81 3,96 3,91 3,75 3,78 3,80 Kiri 3,72 3,81 3,85 3,70 3,90 3,91 3,78 3,73 3,83 3,97 Kiri 3,35 3,77 3,82 3,88 3,55 3,68 3,74 3,70 3,78 3,76

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 4 LEVEL H POSISI : PANEL 5 LEVEL H POSISI : PANEL 6 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 4,73 3,79 3,91 3,77 3,77 3,73 3,93 3,80 3,77 3,95 Kanan 3,78 3,75 3,88 3,72 3,77 3,58 3,73 3,74 4,01 3,71 Kanan 3,87 3,75 3,90 3,85 3,64 3,74 3,80 3,76 3,87 3,88

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Kanan 4,73 3,79 3,91 3,77 3,77 3,73 3,93 3,80 3,77 3,95 Kanan 3,78 3,75 3,88 3,72 3,77 3,58 3,73 3,74 4,01 3,71 Kanan 3,87 3,75 3,90 3,85 3,64 3,74 3,80 3,76 3,87 3,88

Tengah 3,83 3,77 3,88 3,81 3,78 3,67 3,86 3,84 3,76 3,89 Tengah 3,82 3,78 3,92 3,70 3,74 3,63 3,74 3,78 3,88 3,71 Tengah 3,64 3,87 3,96 3,94 3,84 3,68 3,69 3,84 3,88 3,81

Kiri 3,90 3,73 3,80 3,78 3,83 3,76 4,01 3,83 3,80 3,79 Kiri 3,87 3,83 3,92 3,61 3,74 3,63 3,68 3,72 3,90 3,62 Kiri 3,70 3,94 3,90 3,85 3,64 3,74 3,65 3,75 3,93 3,80

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 7 LEVEL H POSISI : PANEL 8 LEVEL H POSISI : PANEL 9 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,77 3,87 3,77 3,68 3,66 3,89 3,92 3,72 3,79 3,86 Kanan 3,88 3,60 3,86 3,88 3,74 3,88 3,70 3,65 3,76 3,77 Kanan 3,67 4,01 3,86 3,76 3,76 3,74 3,88 3,85 3,80 3,82

Tengah 3,69 3,79 3,84 3,82 3,75 3,72 3,88 3,75 3,88 3,76 Tengah 3,86 3,66 3,90 3,90 3,64 3,82 3,75 3,68 3,85 3,79 Tengah 3,88 3,99 3,84 3,82 3,77 3,73 3,89 3,82 3,85 3,74

Kiri 3,73 3,78 3,87 3,80 3,70 3,85 4,05 3,79 3,83 3,76 Kiri 3,77 3,75 3,96 3,88 3,73 3,77 3,76 3,62 3,76 3,73 Kiri 3,85 3,88 3,83 3,85 3,71 3,85 3,82 3,74 3,75 3,77

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,27- 4,73

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Koordinator Lapangan1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL H

Page 149: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 10 LEVEL H POSISI : PANEL 11 LEVEL H POSISI : PANEL 12 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,71 3,77 3,80 3,74 3,86 3,79 3,93 3,64 3,75 3,71 Kanan 3,58 3,83 3,81 3,78 3,80 3,60 3,82 3,77 3,74 3,77 Kanan 3,72 3,79 3,81 3,93 3,83 3,80 3,72 3,78 3,81 3,83

Tengah 3,69 3,79 3,77 3,73 3,84 3,73 3,99 3,58 3,87 3,71 Tengah 3,58 3,82 3,97 3,79 3,67 3,62 3,81 3,74 3,93 3,78 Tengah 3,72 3,77 3,80 3,90 3,82 3,77 3,80 3,72 3,88 3,81

Kiri 3,76 3,80 3,73 3,76 3,82 3,76 3,98 3,68 3,82 3,78 Kiri 3,87 3,83 3,84 3,78 3,75 3,68 3,86 3,76 3,75 3,75 Kiri 3,77 3,85 3,75 3,83 3,68 3,85 3,77 3,85 3,72 3,77

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 13 LEVEL H POSISI : PANEL 14 LEVEL H POSISI : PANEL 15 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,64 3,86 3,78 3,71 3,72 3,76 3,81 3,80 3,90 3,69 Kanan 3,78 3,71 3,84 3,97 3,72 3,68 3,85 3,85 3,78 3,83 Kanan 3,77 3,92 3,90 3,83 3,75 3,88 3,62 3,78 3,88 3,73

Tengah 3,68 3,87 3,76 3,84 3,73 3,81 3,83 3,90 3,46 3,83 Tengah 3,99 3,72 3,85 3,89 3,65 3,62 3,78 3,90 3,78 3,83 Tengah 3,78 3,85 3,93 3,84 3,70 3,76 3,88 3,75 3,92 3,72

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,68 3,87 3,76 3,84 3,73 3,81 3,83 3,90 3,46 3,83 Tengah 3,99 3,72 3,85 3,89 3,65 3,62 3,78 3,90 3,78 3,83 Tengah 3,78 3,85 3,93 3,84 3,70 3,76 3,88 3,75 3,92 3,72

Kiri 3,88 3,86 3,78 3,72 3,72 3,72 3,84 3,83 3,93 3,70 Kiri 3,88 3,88 3,85 3,85 3,72 3,90 3,84 3,84 3,84 3,70 Kiri 3,80 3,84 3,94 3,82 3,73 3,68 3,88 3,88 3,84 3,71

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 16 LEVEL H POSISI : PANEL 17 LEVEL H POSISI : PANEL 18 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,77 3,76 3,79 3,77 3,76 3,74 3,82 3,81 3,92 3,69 Kanan 3,79 3,84 3,89 3,90 3,84 3,78 3,81 3,74 4,05 3,92 Kanan 3,78 3,81 3,85 3,79 3,73 3,74 4,01 3,96 3,81 3,88

Tengah 3,76 3,84 3,78 3,76 3,77 3,19 3,86 3,75 3,95 3,72 Tengah 3,70 3,85 3,93 3,96 3,90 3,71 3,88 3,79 3,94 3,79 Tengah 3,79 3,76 3,73 3,82 3,77 3,69 3,85 3,87 3,80 3,84

Kiri 3,83 3,69 3,76 3,75 3,79 3,79 3,85 3,83 3,93 3,83 Kiri 3,77 3,87 3,75 3,92 3,79 3,85 3,84 3,69 3,79 3,75 Kiri 3,71 3,78 3,90 3,83 3,76 3,72 3,96 3,92 3,75 3,85

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,19- 4,05

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL H

Page 150: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 19 LEVEL H POSISI : PANEL 20 LEVEL H POSISI : PANEL 21 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,82 3,94 3,82 3,95 3,77 3,77 3,81 3,88 3,93 3,82 Kanan 3,88 3,77 4,01 4,01 3,81 3,68 3,84 3,75 3,77 4,01 Kanan 4,75 4,03 3,77 3,89 3,80 3,80 3,88 3,78 3,77 3,92

Tengah 3,72 3,90 3,89 3,91 3,75 3,88 3,85 3,73 3,79 3,75 Tengah 3,76 3,89 3,88 3,93 3,73 3,68 3,84 3,89 3,74 3,99 Tengah 4,77 4,05 3,78 3,70 3,82 3,83 3,91 3,75 3,76 3,92

Kiri 3,90 3,84 3,81 3,89 3,89 3,85 3,92 3,84 3,80 3,74 Kiri 3,72 3,82 3,98 3,88 3,79 3,72 3,78 3,81 3,75 3,98 Kiri 4,60 3,95 3,88 3,74 3,87 3,78 3,90 3,79 3,78 3,88

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 22 LEVEL H POSISI : PANEL 23 LEVEL H POSISI : PANEL 24 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,93 4,20 3,94 3,88 3,95 3,76 3,85 3,77 3,94 4,05 Kanan 3,93 3,65 3,81 3,63 3,67 3,70 3,87 3,58 3,78 3,92 Kanan 3,86 3,88 4,01 3,91 4,05 3,91 3,88 3,97 3,79 4,03

Tengah 3,94 4,01 3,96 4,01 3,87 3,72 3,88 3,63 3,84 4,07 Tengah 3,90 3,68 3,82 3,85 3,73 3,67 3,41 3,78 3,74 3,84 Tengah 3,79 3,93 4,01 3,93 3,79 4,11 3,73 3,88 3,75 4,24

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,94 4,01 3,96 4,01 3,87 3,72 3,88 3,63 3,84 4,07 Tengah 3,90 3,68 3,82 3,85 3,73 3,67 3,41 3,78 3,74 3,84 Tengah 3,79 3,93 4,01 3,93 3,79 4,11 3,73 3,88 3,75 4,24

Kiri 3,86 4,93 3,67 3,78 3,88 3,69 3,99 3,61 3,80 4,02 Kiri 3,88 3,70 3,95 3,83 3,71 3,66 3,89 3,68 3,79 3,95 Kiri 3,86 3,83 3,89 3,81 3,90 4,03 3,87 4,07 3,99 4,07

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 25 LEVEL H POSISI : PANEL 26 LEVEL H POSISI : PANEL 27 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,74 3,97 3,67 3,84 3,75 3,74 3,84 3,75 3,78 3,65 Kanan 4,03 3,81 3,83 3,72 3,75 3,74 3,79 3,85 3,76 3,79 Kanan 3,78 3,87 3,85 3,81 3,83 3,87 3,87 3,93 3,75 3,81

Tengah 3,70 4,05 3,96 3,87 3,72 3,78 3,70 3,76 3,70 3,65 Tengah 3,83 3,80 3,81 3,63 3,88 3,65 3,78 3,91 3,71 3,72 Tengah 3,75 3,88 3,88 3,74 3,82 3,81 3,85 4,07 3,74 3,71

Kiri 3,72 4,01 3,77 3,78 3,78 3,84 3,69 3,68 3,80 3,65 Kiri 3,85 3,80 3,85 3,72 3,86 3,75 3,75 3,81 3,83 3,71 Kiri 3,78 3,87 3,79 3,71 3,72 3,89 3,78 3,84 3,74 3,74

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,41- 4,93

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL H

Page 151: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 28 LEVEL H POSISI : PANEL 29 LEVEL H POSISI : PANEL 30 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,62 4,16 3,83 3,87 3,81 3,74 3,68 3,72 3,78 3,80 Kanan 3,64 3,97 3,88 3,86 3,93 3,71 3,77 3,77 3,75 3,69 Kanan 3,73 3,80 3,63 3,74 3,72 3,80 3,86 3,77 3,77 3,88

Tengah 3,62 4,26 3,94 3,75 3,80 3,96 3,67 3,83 3,77 3,78 Tengah 3,77 3,96 3,89 3,87 3,95 3,72 3,70 3,82 3,70 3,77 Tengah 3,81 3,84 3,64 3,82 3,74 3,70 3,91 3,72 3,84 3,84

Kiri 3,63 4,18 3,83 3,56 3,82 3,91 3,69 3,79 3,65 3,92 Kiri 3,62 3,85 3,81 3,81 4,01 3,65 3,71 3,81 3,80 3,69 Kiri 3,86 3,80 3,65 3,89 3,77 3,77 3,67 3,80 3,82 3,88

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 31 LEVEL H POSISI : PANEL 32 LEVEL H POSISI : PANEL 33 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,65 3,74 3,91 3,80 3,75 3,89 3,93 3,86 3,86 3,89 Kanan 3,73 3,89 3,98 3,82 3,79 3,77 3,89 3,77 3,85 3,70 Kanan 3,71 3,89 3,72 3,87 3,73 3,90 3,92 3,78 3,77 3,78

Tengah 3,68 3,69 3,88 3,86 3,88 3,99 3,76 3,92 3,91 4,03 Tengah 3,77 3,83 3,89 3,96 3,78 3,70 3,82 3,81 3,97 3,79 Tengah 3,73 3,76 3,79 3,76 3,71 3,71 3,85 3,80 3,73 3,79

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Row No. Row No. Tube

No. Tube No. Tube No. Tube

Tengah 3,68 3,69 3,88 3,86 3,88 3,99 3,76 3,92 3,91 4,03 Tengah 3,77 3,83 3,89 3,96 3,78 3,70 3,82 3,81 3,97 3,79 Tengah 3,73 3,76 3,79 3,76 3,71 3,71 3,85 3,80 3,73 3,79

Kiri 3,76 3,74 3,87 3,79 3,88 3,78 3,75 4,03 3,89 3,82 Kiri 3,72 3,86 3,86 4,01 3,83 3,76 3,80 3,68 3,85 3,75 Kiri 3,72 3,77 3,78 3,64 3,71 3,84 3,95 3,84 3,71 3,75

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 34 LEVEL H POSISI : PANEL 35 LEVEL H POSISI : PANEL 36 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,76 3,95 3,80 3,87 3,73 3,88 3,84 3,75 3,85 3,72 Kanan 3,70 3,72 3,78 3,80 3,91 3,70 3,80 3,66 3,65 3,77 Kanan 3,60 3,97 3,89 3,93 3,80 3,88 3,59 3,83 3,85 3,88

Tengah 3,77 3,80 3,88 3,86 3,67 3,81 3,84 3,73 3,88 3,69 Tengah 3,79 3,75 3,78 3,84 3,71 3,72 3,77 3,75 3,75 3,82 Tengah 3,74 3,85 3,77 3,91 3,73 3,89 3,80 3,85 3,78 3,77

Kiri 3,85 3,90 3,75 3,96 3,70 3,86 3,84 3,73 3,99 3,69 Kiri 3,88 3,83 3,90 3,74 3,58 3,65 3,94 3,76 3,78 3,87 Kiri 3,62 3,84 3,73 3,84 3,66 3,87 3,76 3,87 3,79 3,76

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

4,57 3,56- 4,26

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

R-9Koordinator Lapangan

1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL H

Page 152: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITONLOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 37 LEVEL H POSISI : PANEL38 LEVEL H POSISI : PANEL 39 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,78 3,83 3,79 3,84 3,73 3,83 3,79 3,72 3,85 3,68 Kanan 3,72 3,66 3,76 3,80 3,80 3,80 3,72 3,87 3,84 3,83 Kanan 3,77 3,94 3,75 3,79 3,68 3,70 3,77 3,77 3,71 3,70

Tengah 3,93 3,74 3,64 3,78 3,73 3,84 3,80 3,80 3,75 3,68 Tengah 3,76 3,58 3,76 3,81 3,76 3,83 3,78 3,84 3,75 3,76 Tengah 3,82 3,75 3,93 3,79 3,70 3,77 3,78 3,78 3,72 3,80

Kiri 3,91 3,78 3,78 3,81 3,80 3,85 3,70 3,85 3,75 3,67 Kiri 3,65 3,62 3,86 3,80 3,70 3,84 3,79 3,75 3,90 3,79 Kiri 3,75 3,78 3,76 3,79 3,64 3,78 3,85 3,83 3,80 3,72

LOKASI : R-9 LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 40 LEVEL H POSISI : PANEL 41 LEVEL H POSISI : PANEL 42 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,86 3,80 3,76 3,86 3,87 3,81 4,09 3,75 3,83 3,92 Kanan 3,91 3,82 3,68 3,65 3,76 3,75 3,69 3,64 3,74 3,75 Kanan 3,92 3,80 3,96 3,81 3,82 3,75 3,88 3,92 3,75 3,88

Tengah 3,81 3,73 3,90 3,80 3,80 3,80 3,88 3,74 3,87 3,90 Tengah 3,88 3,86 3,78 3,71 3,83 3,53 3,86 3,86 3,75 3,81 Tengah 3,89 3,76 3,96 3,97 3,81 3,74 3,85 3,81 3,77 3,91

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube No. Tube

No. Tube No. Tube No. Tube

Tengah 3,81 3,73 3,90 3,80 3,80 3,80 3,88 3,74 3,87 3,90 Tengah 3,88 3,86 3,78 3,71 3,83 3,53 3,86 3,86 3,75 3,81 Tengah 3,89 3,76 3,96 3,97 3,81 3,74 3,85 3,81 3,77 3,91

Kiri 3,80 3,70 3,78 3,73 3,82 3,79 3,94 3,79 3,93 3,88 Kiri 3,75 3,73 3,80 3,73 3,84 3,54 3,88 3,84 3,84 3,71 Kiri 3,77 3,83 3,76 3,86 3,75 3,72 3,97 3,82 3,84 3,70

LOKASI : R-9 LOKASI : R-9

POSISI : PANEL 43 LEVEL H POSISI : PANEL 44 LEVEL H

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Kanan 3,66 3,72 3,75 3,75 3,91 3,85 4,05 3,73 3,86 3,63 Kanan 3,60 3,72 3,87 3,86 3,79 3,72 3,91 3,76 3,75 3,72

Tengah 3,78 3,76 3,79 3,89 3,71 3,94 3,96 3,85 3,77 3,60 Tengah 3,68 3,78 3,96 3,88 3,69 3,69 3,97 3,76 3,76 3,83

Kiri 4,09 3,99 3,90 3,86 3,80 3,88 3,86 3,74 3,71 3,69 Kiri 3,76 3,81 3,92 3,84 3,79 3,66 3,87 3,83 3,70 3,80

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meterMinimum = mm Ketebalan Minimum = mm Merek : GE

Keterangan : Tipe : DMS 2- No. Tube dihitung dari sisi turbin ke sisi stack ketebalan tube di bawah MWT Ketelitian : 0.01 mm- No. Panel dihitung dari sisi barat ke timur (Minimum Wall Thickness)

Paiton, Nopember 2012Diperiksa : Penguji : Paraf

4,09-

Teb

al (m

m)

Teb

al (m

m)

4,57 3,53

Teb

al (m

m)

Teb

al (m

m)

Teb

al (m

m)

No. Tube No. Tube

R-9Koordinator Lapangan

1 Saprudin ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

R-9

LEVEL H

Page 153: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSR-10

Page 154: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : R-10

POSISI : A - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Kanan 4.70 4.64 4.50 4.53 4.53 4.72 4.74 4.65 4.64 4.83 4.70 4.55 4.65 4.60 4.74 4.72 4.72 4.85 4.79 4.64 4.77 4.70 4.07 4.73 4.73 4.64 4.62 4.65 4.51 4.51 4.78

Tengah 4.51 4.60 4.27 4.54 4.47 4.50 4.57 4.60 4.54 4.59 4.62 4.61 4.60 4.50 4.65 4.66 4.53 4.67 4.79 4.62 4.65 4.54 4.69 4.70 4.68 4.49 4.50 4.60 4.50 4.44 3.29

Kiri 4.10 4.62 4.69 4.68 4.77 4.55 4.60 4.70 4.73 4.70 4.70 4.64 4.67 4.63 4.78 4.71 4.65 4.82 4.74 4.77 4.57 4.74 4.73 4.80 4.74 4.68 4.62 4.68 4.62 4.72 4.67

LOKASI : R-10

POSISI : A - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Kanan 4.94 5.04 5.04 4.99 4.94 4.98 4.90 4.93 4.96 4.94 4.89 4.87 4.92 4.87 4.96 4.97 5.00 4.98 5.15 5.01 4.45 4.99 5.01 4.90 4.94 4.98 4.97 4.97 4.98 4.94 5.05

Tengah 5.00 4.97 5.03 5.00 4.96 4.93 4.93 4.90 4.87 4.94 4.93 4.92 4.96 4.89 5.02 4.99 4.92 5.70 4.96 5.04 5.50 5.02 4.98 4.90 4.92 5.07 4.99 4.95 5.02 5.01 5.27

Kiri 5.00 4.91 5.00 5.03 4.99 4.93 4.88 4.95 4.94 4.88 4.94 4.92 4.90 4.92 4.96 4.96 4.93 4.96 4.90 5.05 5.03 5.01 4.93 5.02 4.91 5.03 4.98 4.98 5.07 5.03 5.03

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE ketebalan tube di bawah MWT

Tipe : DMS 2 (Minimum Wall Thickness)

Ketelitian : 0.01 mm ketebalan tube < 4,00 mm

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.70

4.57 3.29

A - LEVEL 1

A - LEVEL 2

Page 155: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-10

POSISI : A - LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Kanan 5.01 4.94 5.01 4.97 4.93 4.91 5.00 4.96 5.05 4.92 5.00 5.00 4.92 5.02 5.03 4.97 4.93 5.00 5.07 4.94 4.96 4.91 5.06 5.52 5.01 5.01 4.89 4.95 5.00 5.00 4.92 4.97 4.90 5.00 5.00 4.95

Tengah 4.90 5.01 5.10 5.00 4.93 4.92 4.94 5.19 4.99 4.99 5.03 4.93 4.98 5.08 5.05 5.04 5.00 5.03 4.90 4.94 4.99 4.99 5.05 5.51 5.00 5.00 4.86 4.94 5.07 5.00 4.93 5.00 4.99 5.05 5.00 4.86

Kiri 4.98 4.99 4.88 4.95 4.91 4.96 4.83 5.02 4.94 5.01 5.00 5.05 4.97 4.93 4.86 4.93 4.74 5.10 5.04 5.01 4.93 4.74 5.10 5.04 5.01 5.01 4.93 4.94 5.02 4.95 4.88 5.01 5.01 4.94 4.98 4.89

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

4.57 4.74

No. Row

Teb

al (m

m)

- 5.52

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

A - LEVEL 3

Page 156: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-10

POSISI : B - LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Kanan 4.18 4.16 4.20 4.09 4.06 4.18 4.14 4.13 4.08 4.18 4.08 4.06 4.13 4.03 4.33 4.06 4.11 4.16 4.26 4.16 4.11 4.12 4.16 4.06 4.19 4.06 4.11 4.03 4.06 4.07 4.13

Tengah 4.19 4.08 4.15 4.05 4.03 4.12 4.15 4.15 4.08 4.21 4.05 4.07 4.07 3.94 4.30 4.10 4.09 4.11 4.42 4.22 4.26 4.06 4.18 4.08 4.20 4.05 4.15 4.13 4.05 4.03 4.12

Kiri 4.15 4.05 4.08 4.05 4.05 4.06 4.11 4.12 4.12 4.18 4.03 4.13 4.05 3.91 4.15 4.52 4.19 4.06 4.47 4.22 4.21 4.06 4.27 4.10 4.17 4.08 4.19 4.20 4.05 3.95 4.13

LOKASI : R-10

POSISI : B - LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Kanan 3.83 3.83 3.66 3.81 3.82 3.77 3.80 3.80 3.72 3.88 3.79 3.77 3.86 3.79 3.79 3.81 3.82 4.17 4.05 4.01 3.69 3.99 3.73 4.05 3.80 3.83 3.88 3.95 3.77 3.88 3.79

Tengah 3.85 3.78 3.59 3.86 3.79 3.68 3.97 3.80 3.87 3.88 3.71 3.78 3.88 3.78 3.67 3.96 3.83 4.07 4.07 4.01 3.73 3.81 3.79 3.81 3.66 3.98 3.89 3.79 3.67 4.01 3.73

Kiri 3.85 3.83 3.68 3.67 3.86 3.76 3.82 3.87 3.84 4.01 3.72 3.71 3.81 3.80 3.76 4.01 3.89 4.05 3.93 4.05 3.89 3.92 3.72 3.94 3.70 3.89 3.62 3.76 3.76 3.76 3.97

Teb

al (m

m)

No. Row

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 4.52

3.78 3.59

B - LEVEL 1

B - LEVEL 2

Page 157: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-10

POSISI : B - LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 3.77 3.80 3.72 3.64 3.70 3.18 3.86 3.86 3.80 3.82 3.61 3.88 3.78 3.93 3.70 3.86 3.74 3.84 3.72 3.87 3.79 3.99 3.62 3.83 3.69 3.85 3.94 3.84 3.76 3.88 3.78 3.70 3.63 3.67 3.78 3.84 3.98 3.84 3.89 3.97

Tengah 3.82 3.84 3.61 3.69 3.84 3.62 3.94 3.68 3.73 3.86 3.59 3.71 3.79 3.86 3.77 3.94 3.87 3.91 3.82 3.87 3.79 3.92 3.66 3.83 3.62 4.03 3.84 3.69 3.61 3.92 3.76 3.73 3.80 3.87 3.81 3.80 3.32 3.76 3.81 3.89

Kiri 3.85 3.78 3.67 3.71 3.88 3.62 3.86 3.78 3.78 4.01 3.77 3.77 3.72 3.87 3.73 3.92 3.97 3.96 3.78 3.83 3.76 4.07 3.67 4.14 3.70 3.88 3.70 3.70 3.65 3.96 3.86 3.73 3.71 3.46 3.92 3.89 3.88 3.79 3.84 3.91

41 42 43 44

Kanan 3.74 3.87 3.28 3.79

Tengah 3.69 3.77 3.79 3.87

Kiri 3.76 3.82 3.65 3.87

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :4 14

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 4.14

3.78 3.18

B - LEVEL 3

Page 158: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-10

POSISI : B - LEVEL 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 3.97 3.73 3.74 3.82 3.82 3.77 3.76 3.77 3.74 3.87 3.65 3.80 3.74 4.01 3.72 3.85 3.78 3.84 3.70 3.89 3.79 3.90 3.70 3.84 3.65 3.88 3.74 3.79 3.82 3.88 3.87 3.72 3.71 3.63 3.89 3.84 3.79 3.74 3.79 3.98

Tengah 3.88 3.71 3.62 3.76 3.82 3.68 3.85 3.67 3.77 3.74 3.63 3.80 3.71 3.83 3.71 3.90 3.79 3.82 3.72 3.91 3.68 3.86 3.86 3.82 3.62 3.93 3.76 3.78 3.67 3.87 3.83 3.77 3.82 3.73 3.89 3.73 3.74 3.73 3.79 3.90

Kiri 3.88 3.85 3.59 3.82 3.78 3.66 3.79 3.74 3.82 3.68 3.79 3.78 3.72 3.82 3.68 3.89 3.88 3.88 3.90 3.94 3.90 4.09 3.74 3.97 3.67 3.78 3.69 3.79 3.67 3.99 3.80 3.82 3.70 3.77 3.77 3.76 3.80 3.74 3.86 3.85

41 42 43 44

Kanan 3.76 3.68 3.65 3.89

Tengah 3.74 3.84 3.63 3.85

Kiri 3.67 3.94 3.70 3.84

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :4 09

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 4.09

3.78 3.59

B - LEVEL 4

Page 159: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSR-11

Page 160: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : R-11

POSISI : LEVEL 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 5.13 4.99 5.10 4.81 4.81 5.03 5.32 5.04 5.06 5.15 5.15 5.15 4.16 4.01 5.01 4.44 4.16 4.22 5.20 5.37 3.95 4.16 4.94 5.00 4.03 4.11 4.17 3.77 4.17 4.23 4.05 4.11 4.12 4.25 5.13 4.05 4.18 3.89 4.03 4.19

Tengah 5.86 4.84 4.74 4.90 4.43 4.93 4.07 4.75 4.74 4.96 4.85 5.00 3.88 4.01 4.98 3.89 3.87 3.93 4.80 4.79 3.93 3.95 4.65 4.87 3.73 4.19 3.97 3.74 3.99 4.14 3.98 3.93 3.95 4.13 4.76 3.81 4.07 3.62 3.90 3.96

Kiri 4.97 5.04 4.99 5.07 4.82 4.95 4.05 4.90 4.90 5.04 4.91 5.06 3.99 4.04 4.99 4.16 4.03 4.03 4.81 4.89 4.12 4.08 4.88 5.04 3.89 4.27 4.11 3.68 4.17 4.19 4.11 4.07 4.10 4.17 4.78 4.05 4.08 3.49 4.03 4.11

41 42 43 44

Kanan 3.98 3.87 3.95 4.05

Tengah 3.73 3.95 3.79 3.86

Kiri 3.74 4.05 3.78 3.81Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.86

3.81 3.49

LEVEL 5

LEVEL 4

LEVEL 3

LEVEL 2

LEVEL 1

Page 161: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-11

POSISI : LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 4.15 4.36 4.14 4.10 4.31 4.32 4.31 4.14 3.88 4.30 4.39 4.19 4.15 4.12 4.07 4.40 4.21 4.22 4.30 4.20 4.26 4.27 4.30 4.05 4.93 4.90 4.14 4.95 3.95 4.93 4.89 4.17 4.91 4.12 4.86 5.04 4.70 3.94 3.84 3.91

Tengah 4.05 4.18 4.01 4.03 4.39 3.98 4.15 4.15 3.79 4.19 4.34 4.07 3.96 4.15 3.98 4.34 4.01 4.01 4.01 4.11 4.14 4.24 4.13 4.06 4.80 4.75 4.13 4.86 3.95 4.79 4.90 4.20 4.95 4.05 4.47 4.90 4.65 3.81 3.80 3.78

Kiri 4.15 4.10 4.15 4.15 4.42 3.97 4.08 4.23 3.90 4.16 4.27 4.14 4.07 4.27 4.05 4.20 4.01 4.07 4.34 3.88 4.22 4.27 4.10 4.26 4.85 5.04 4.25 4.90 4.06 4.92 4.99 4.34 4.93 4.17 4.96 4.88 5.00 3.87 3.88 3.90

41 42 43 44

Kanan 3.47 3.94 4.10 3.98

Tengah 3.43 3.72 3.96 3.76

Kiri 3.52 3.80 3.90 3.70

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.04

3.81 3.43

LEVEL 5

LEVEL 4

LEVEL 3

LEVEL 2

LEVEL 1

Page 162: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-11

POSISI : LEVEL 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 4.30 4.57 4.20 4.23 4.29 4.26 4.30 4.43 4.06 4.47 4.38 4.31 4.43 4.30 5.27 5.25 4.51 4.43 4.38 3.90 4.33 4.19 5.46 4.31 4.20 4.21 5.32 5.25 4.24 4.30 4.13 5.34 4.57 4.37 4.31 5.74 4.03 4.13 4.15 4.05

Tengah 4.33 4.39 4.15 4.34 4.43 4.12 5.38 4.93 3.06 4.38 4.42 4.30 4.35 4.36 5.30 5.12 4.45 4.37 4.22 4.03 4.35 4.17 5.45 4.34 4.12 4.23 5.33 5.21 4.31 4.17 4.13 5.30 4.43 4.45 4.21 5.18 4.10 4.10 4.19 4.05

Kiri 4.41 4.31 4.18 4.47 4.61 4.11 5.44 4.39 3.98 4.28 4.45 4.37 4.29 4.47 5.37 5.13 4.36 4.38 4.20 4.26 4.44 4.21 5.43 4.41 4.21 4.29 5.25 5.17 4.40 4.14 4.19 5.21 4.28 4.45 4.23 5.15 4.18 4.15 4.20 4.09

41 42 43 44

Kanan 3.53 4.21 4.10 3.71

Tengah 3.56 4.18 4.11 3.66

Kiri 3.60 4.14 4.18 3.66

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.74

3.81 3.06

LEVEL 5

LEVEL 4

LEVEL 3

LEVEL 2

LEVEL 1

Page 163: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-11

POSISI : LEVEL 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 4.28 4.30 4.16 4.39 4.49 4.29 4.30 4.11 4.15 4.33 4.40 4.30 4.33 4.22 4.20 4.14 5.29 4.34 4.41 4.20 4.22 4.45 4.36 4.20 4.25 4.18 4.31 4.28 4.15 4.28 4.22 4.14 4.61 4.41 4.32 4.35 4.06 4.39 4.31 4.27

Tengah 4.35 4.20 4.14 4.39 4.40 4.31 4.23 4.03 4.31 4.42 4.38 4.25 4.29 4.31 4.14 4.14 5.23 4.32 4.30 4.18 4.09 4.30 4.23 4.27 4.17 4.24 4.12 4.38 4.20 4.18 4.20 4.18 4.50 4.39 4.26 4.28 4.03 4.10 4.17 4.13

Kiri 4.39 4.19 4.15 4.38 4.30 4.34 4.25 4.07 4.57 4.49 4.41 4.23 4.30 4.43 4.23 4.18 5.15 4.33 4.25 4.26 4.15 4.23 4.17 4.29 4.19 4.32 4.14 4.42 4.25 4.17 4.25 4.32 4.39 4.43 4.27 4.29 4.03 4.14 4.16 4.12

41 42 43 44

Kanan 4.01 4.34 4.29 4.51

Tengah 3.97 4.31 4.19 4.33

Kiri 4.11 4.34 4.20 4.19

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 5.29

3.81 3.97

LEVEL 5

LEVEL 4

LEVEL 3

LEVEL 2

LEVEL 1

Page 164: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

LOKASI : R-11

POSISI : LEVEL 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Kanan 4.05 4.31 4.15 4.39 4.46 3.99 4.24 4.14 4.01 4.29 4.24 4.17 4.24 4.06 4.11 4.18 4.27 4.18 4.34 4.21 4.08 4.55 4.43 4.15 4.30 4.21 4.40 4.14 4.20 4.30 4.13 4.32 4.53 4.32 4.19 4.31 4.26 4.24 4.20 4.14

Tengah 3.53 4.01 4.01 4.09 4.32 3.95 3.99 3.88 4.01 4.19 4.16 4.09 4.10 4.13 4.12 3.98 4.16 4.05 4.22 4.10 3.74 4.52 4.34 4.18 4.17 4.22 4.25 4.31 4.19 4.26 4.16 4.13 4.36 4.31 4.15 4.24 4.14 4.03 4.07 4.03

Kiri 4.05 4.01 4.05 4.16 4.31 4.15 4.01 4.06 4.25 4.40 4.29 4.06 4.19 4.28 4.21 4.15 4.17 4.21 4.25 4.10 4.85 4.33 4.28 4.21 4.17 4.30 4.20 4.47 4.28 4.16 4.32 4.16 4.26 4.36 4.16 4.26 4.11 3.94 4.08 4.05

41 42 43 44

Kanan 3.99 4.32 4.38 4.51

Tengah 3.87 4.27 4.13 4.01

Kiri 3.88 4.28 4.13 4.27

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter - No. Row dihitung dari barat ke timur

Minimum = mm Ketebalan Minimum = mm Merek : GE

Tipe : DMS 2 ketebalan tube di bawah MWT

Ketelitian : 0.01 mm (Minimum Wall Thickness)

Paiton, Oktober 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 4.85

3.81 3.53

LEVEL 5

LEVEL 4

LEVEL 3

LEVEL 2

LEVEL 1

Page 165: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-38

Page 166: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-38 LOKASI : S-38

POSISI : A POSISI : D

3 6 10 13 17 20 3 6 10 13 17 20 Ketebalan PipaKanan 7.66 7.93 7.85 7.80 7.80 7.83 Kanan 7.61 7.83 7.82 7.80 7.67 7.89 Desain = mmTengah 7.65 7.88 7.83 7.79 7.85 7.73 Tengah 7.65 7.80 7.79 7.75 7.70 7.74 Minimum = mm

Kiri 7.71 7.75 7.82 7.72 7.85 7.75 Kiri 7.80 7.80 7.83 7.75 7.88 7.67

LOKASI : S-38 LOKASI : S-38 Hasil PengukuranPOSISI : B POSISI : E Ketebalan Maksimum = mm

3 6 10 13 17 20 3 6 10 13 17 20 Ketebalan Minimum = mmKanan 8.34 8.26 8.38 7.66 8.18 7.94 Kanan 7.70 7.84 7.71 7.78 7.73 7.87

Tengah 8.25 8.60 8.55 7.81 8.19 8.12 Tengah 7.71 7.78 7.79 7.73 7.77 7.79 Alat yang dipakai : Keterangan :Kiri 8.24 8.21 8.49 7.95 8.34 8.03 Kiri 7.71 7.85 7.85 7.79 7.85 7.72 Nama : Thickness meter - No. Row dihitung dari barat ke timur

No. Row

Teb

al (m

m)

Teb

al (m

m)

8.60

1.92

7.16

-

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

LOKASI : S-38 LOKASI : S-38 Merek : GE mengikuti panel S-33POSISI : C POSISI : F Tipe : DMS 2 ketebalan tube di bawah MWT

3 6 10 13 17 20 3 6 10 13 17 20 Ketelitian : 0.01 mm (Minimum Wall Thickness)

Kanan 7.09 7.33 7.54 7.49 7.74 7.57 Kanan 7.67 7.76 7.77 7.75 7.72 7.82 ketebalan tube < 4,00 mmTengah 7.31 7.15 7.31 7.17 7.26 7.36 Tengah 6.40 1.92 6.79 7.68 7.68 7.73

Kiri 7.51 7.46 7.48 7.22 7.55 7.62 Kiri 7.62 7.75 7.83 7.60 7.72 7.74

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

Teb

al (m

m)

No. Row

Teb

al (m

m)

No. Row

F

E

D

CB

A

Page 167: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-41

Page 168: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-41

POSISI :

A B C D

Kanan 8.67 8.44 8.47 8.77

Tengah 8.31 8.48 8.42 8.34

Kiri 8.69 8.67 8.60 8.66

Ketebalan Pipa Hasil Pengukuran Alat yang dipakai : Keterangan :Desain = mm Ketebalan Maksimum = mm Nama : Thickness meter ketebalan tube di bawah MWT

Minimum = mm Ketebalan Minimum = mm Merek : GE (Minimum Wall Thickness)

Tipe : DMS 2

Ketelitian : 0.01 mm

- 8.77

8.12 8.31

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

Titik

Teb

al (m

m)

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Achmad ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

B

CD

A

Page 169: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi Primer

DATA PENGUJIAN THICKNESSS-1

Page 170: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

LOKASI : S-1

POSISI : A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Alat yang dipakai :Kanan 17.59 17.16 17.58 17.43 17.07 16.90 16.96 16.89 17.62 17.59 17.28 17.51 17.66 17.40 17.05 17.22 17.71 17.34 17.48 17.23 17.19 Nama : Thickness meterTengah 17.23 17.44 17.15 17.13 17.47 17.48 18.09 17.77 17.17 17.25 17.29 17.57 17.57 17.60 17.62 17.00 16.95 17.01 17.81 17.75 17.30 Merek : GE

Kiri 17.25 16.88 17.71 17.80 17.38 17.77 17.39 17.02 16.98 16.96 16.96 17.10 17.36 17.64 17.65 17.88 17.45 17.10 17.15 17.71 17.20 Tipe : DMS 2LOKASI : S-1 Ketelitian : 0.01 mmPOSISI : B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Keterangan :Kanan 17.49 17.48 17.15 17.47 17.92 17.54 17.22 17.17 16.95 17.56 17.02 17.48 16.73 17.42 16.72 17.39 17.46 17.55 17.59 17.29 17.81 - No. Row dihitung dari barat ke timurTengah 17.13 17.15 17.95 17.46 17.46 17.55 17.36 17.77 16.70 17.42 17.15 17.30 17.33 17.65 17.66 17.01 17.00 17.20 17.62 17.45 17.33

Kiri 17.33 17.17 17.62 17.79 17.85 17.38 17.43 17.27 17.24 17.19 16.98 17.43 17.81 17.12 17.64 17.38 17.71 17.75 16.87 17.13 17.68 ketebalan tube di bawah MWT(Mi i W ll Thi k )

Teb

al (m

m)

PLN PUSLITBANG - Bidang Penelitian Sistem Pembangkitan dan Energi PrimerDATA PENGUJIAN THICKNESS BOILER TUBE

UNIT 2 PLTU PAITON

No. Row

Teb

al (m

m)

No. Row

(Minimum Wall Thickness)

Ketebalan Pipa Hasil PengukuranDesain = mm Ketebalan Maksimum = mm

Minimum = mm Ketebalan Minimum = mm

Paiton, Nopember 2012

Diperiksa : Penguji : Paraf

Koordinator Lapangan

1 Dikky Dwi A. ………...

Yusuf Rasyid, ST, MT 2 Bagus Panji A. ………...

- 18.09

15.08 16.70

A

B

Page 171: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LAMPIRAN 2

HASIL PENGUJIAN BOROSCOPE

BOILER PLTU PAITON UNIT 2

Page 172: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LOKASI BOROSCOPE / DESUPERHEATER

LOKASI BOROSCOPE / REHEATER

GAMBAR BOILER PLTU UNIT 2 PAITON DAN POSISI PENGUJIAN BOROSCOPE

LOKASI BOROSCOPE ECONOMIZER HEADER

Page 173: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

PENGUJIAN BOROSCOPE PADA DESUPERHEATER

SISI TIMUR

Foto No.1 Lokasi Pengujian boroscope pada Desuperheater I (timur).

Foto No.2 Pengujian boroscope pada bagian dalam header desuperheater, terlihat lubang spray tidak terjadi sumbatan, kondisi relative masih baik.

Page 174: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

PENGUJIAN BOROSCOPE PADA DESUPERHEATER

SISI BARAT

Foto No.3 Lokasi Pengujian boroscope pada Desuperheater posisi II (barat).

Foto No.4 Pengujian boroscope pada bagian dalam header desuperheater, terlihat lubang spray tidak terjadi sumbatan, tidak mengalami deformasi kondisi relative masih baik.

Page 175: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

A. HASIL UJI BOROSCOPE PADA DESUPERHEATER SISI TIMUR

No.

Lokasi

Hasil Pemeriksaan

Keterangan

1.

Desuperheater I (timur)

Pada bagian dalam header desuperheater, terlihat lubang spray kondisi relative masih baik.

2.

Desuperheater II ( barat)

Pada bagian dalam header desuperheater, terlihat lubang spray kondisi tidak, mengalami deformasi relative masih baik.

Page 176: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

PENGUJIAN BOROSCOPE PADA REHEATER PIPE LINE

BOILER UNIT 2

Foto No.5 Pengujian boroscope pada bagian dalam Reheater A pipe line.

Foto No.6 Pengujian boroscope pada bagian dalam spray reheater A kondisi diselimuti korosi dan tidak terdapat indikasi crack.

Page 177: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

Foto No.7 Pengujian boroscope pada bagian dalam pipe line reheater kondisi diselimuti general korosi dan tidak terdapat indikasi crack.

Foto No.8 Pengujian boroscope pada Reheater B pipe line.

Page 178: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

Foto No.9 Pengujian boroscope pada bagian dalam reheater kondisi pipe line diselimuti korosi, nozzle kondisi baik dan tidak terdapat indikasi crack.

Foto No.10 Pengujian boroscope pada bagian dalam pipe line reheater kondisi diselimuti korosi dan tidak terdapat indikasi crack.

Page 179: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

B. HASIL UJI BOROSCOPE PADA REHEATER PIPE LINE/SISI TIMUR

No.

Lokasi

Hasil Pemeriksaan

Keterangan

1.

Reheater pipe line A (barat)

Pada bagian dalam Reheater, kondisi pada pipe line mengalami korosi, tidak terdapat indikasi crack.

2.

Reheater pipe line B (timur)

Pada bagian dalam Reheater, kondisi pada pipe line mengalami korosi, tidak terdapat indikasi crack.

Page 180: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

C. UJI BOROSCOPE PADA ECONOMIZER INLET HEADER

Foto No.1 Pengujian boroscope pada header Economizer inlet.

Foto No.2 Pengujian boroscope pada bagian dalam header Economizer inlet, terlihat adanya serangan korosi.dan pitting korosi.

Page 181: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

No.

Lokasi

Hasil Pemeriksaan

Keterangan

1. Economizer Inlet Header

- Permukaan dalam header secara umum

diselimuti korosi, kerak /endapan lumpur.

Kondisi masih rentan terhadap serangan korosi lokal.

Foto No.3 Pengujian boroscope pada bagian dalam header Economizer inlet, terlihat adanya endapan deposit semacam lumpur.

Terdapat lapisan lumpur.

Page 182: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

Page 183: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LAMPIRAN 3

HASIL PENGUJIAN REPLIKA / INSITU METALLOGRAPHY

DAN HARDNESS TUBE BOILER UNIT 2 PLTU PAITON

Page 184: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

GAMBAR BOILER DAN LOKASI PENGAMBILAN

REPLIKA TEST/INSITU METALLOGRAPHY

LOKASI PENGAMBILAN REPLIKA TEST (S 33)

LOKASI PENGAMBILAN REPLIKA TEST (S 41)

LOKASI PENGAMBILAN REPLIKA TEST (S 38)

Page 185: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

A. Pada S - 38 (Steam Cooled SpacerRiser Tube), sebanyak 24 spot.

NO.

LOKASI

HASIL UJI

KETERANGAN

KLASIFIKASI ERA

TECHNOLOGI

MIKROSTRUKTUR

HARDNESS (HV)

1.

S-38 1A Struktur mikro ferrit- bainit, persipitat carbida, tidak terdapat indikasi creep void.

Maks. 162 Min. 150 Standar Maks. 200 HV Min. 160 HV

Class C RL : 60 %

2.

S-38 1B Struktur mikro ferrit – pearlite, persipitat carbida, tidak terdapat indikasi creep void.

Maks. 170 Min. 152 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

3.

S-38 1C

Struktur mikro austenite, martensite tidak terdapat indikasi creep void, dibeberapa batas butir mengalami korosi,

Maks. 213 Min. 197 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Page 186: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

4.

S-38 1D

Struktur mikro austenite, martensite tidak terdapat indikasi creep void, dibeberapa batas butir mengalami korosi,

Maks. 216 Min. 198 Standar Maks. 180 HV Min. 150 HV

Class C

RL : 60 %

5.

S-38 2A

Struktur mikro ferritic- pearlite, tidak terdapat indikasi creep void,

Maks. 162 Min. 151 Standar Maks. 200 HV Min. 160 HV

Class C RL : 60 %

6.

S-38 2B

Struktur mikro ferrit - bainite, tidak terdapat indikasi creep void

Maks. 156 Min. 150 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

7.

S-38 2C

Struktur mikro austenite, martensite tidak terdapat indikasi creep void.

Maks. 220 Min. 202 Stdr Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Page 187: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

8.

S-38 2D

Struktur mikro austenite tidak terdapat indikasi creep void batas butir sedikit mengalami korosi.

Maks. 206 Min. 197 Stdr Maks. 180 HV Min. 150 HV

Class C RL : 60 %

9.

S-38 3A

Struktur mikro ferritic – bainite, tidak terdapat indikasi creep void.

Maks. 170 Min. 155 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

10.

S-38 3B

Struktur mikro ferrit – pearlite, bainite tidak terdapat indikasi creep void.

Maks. 169 Min. 152 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

11.

S-38 3C

Struktur mikro austenite, martensite tidak terdapat indikasi creep void, dibeberapa batas butir mengalami korosi,

Maks. 206 Min. 197 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Page 188: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

12.

S-38 3D

Struktur mikro austenite, tidak terdapat indikasi creep void, dibeberapa batas butir mengalami korosi,.

Maks. 210 Min. 197 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

13.

S-38 4A

Struktur mikro ferrit – bainite, tidak terdapat indikasi creep void, batas mengalami korosi,

Maks. 168 Min. 150 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

14.

S-38 4B

Struktur mikro ferritic, tidak terdapat indikasi creep void, batas mengalami korosi,

Maks. 165 Min. 150 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

15.

S-38 4C

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 252 Min. 205 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

Page 189: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

16.

S-38 4D

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 225 Min. 210 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

17.

S-38 5A

Struktur mikro ferrit – bainit , tidak terdapat indikasi creep void.

Maks. 165 Min. 152 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

18.

S-38 5B

Struktur mikro ferritic – bainite, tidak terdapat indikasi creep void, batas butir mengalami korosi.

Maks. 162 Min. 151 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

19.

S-38 5C

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 218 Min. 171 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

Page 190: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

20.

S-38 5D

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi.

Maks. 219 Min. 194 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : 60 %

21.

S-38 6A

Struktur mikro ferritic – bainite tidak terdapat indikasi creep void.

Maks. 169 Min. 159 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

22.

S-38 6B

Struktur mikro ferritic - bainite, terdapat persipitat carbida, tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 179 Min. 168 Standar Maks. 200 HV Min. 160 HV

. Class C RL : 60 %

23.

S-38 6C

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 264 Min. 243 Standar Maks. 180 HV Min. 150 H

Class C ke D RL : < 60 %

Page 191: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

24.

S-38 6D

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 267 Min. 241 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Pada S - 33 (Shtr. Vertical Platen Assemblies), sebanyak 21 spot, panel 16 s/d 22

NO.

LOKASI

HASIL UJI

KETERANGAN

KLASIFIKASI ERA

TECHNOLOGI

MIKROSTRUKTUR

HARDNESS Vickers Hardness

(HV) 1.

S-33 Panel 16 No.1

Struktur mikro austenite tidak terdapat indikasi creep void. batas butir mengalami korosi,

Maks. 166 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

2..

S-33 Panel 16 No.4

Struktur mikro austenitic tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 182 Min. 157 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Page 192: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

3.

S-33 Panel 16 No.13

Struktur mikro austenite, martensite terdapat indikasi cacat creep cavities pada batas butir.

Maks. 160 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

4

S-33 Panel 17 No.1

Struktur mikro austenite tidak terdapat indikasi creep cavities, batas butir mengalami korosi,

Maks. 181 Min. 167 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

5.

S-33 Panel 17 No.4

Struktur mikro austenitic tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 166 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

6..

S-33 Panel 17 No.13

Struktur mikro austenite, martensite terdapat indikasi creep cavities dan, batas butir mengalami korosi,

Maks. 182 Min. 157 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

Page 193: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

7.

S-33 Panel 18 No.1

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 160 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

8

S-33 Panel 18 No.4

Struktur mikro austenitic tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 181 Min. 167 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

9.

S-33 Panel 18 No, 13

Struktur mikro austenite, martensite terdapat indikasi creep cavities, batas butir mengalami korosi, .

Maks. 166 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

10..

S-33 Panel 19 No.1

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 182 Min. 157 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Page 194: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

11.

S-33 Panel 19 No.4

Struktur mikro austenitic tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 160 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

12

S-33 Panel 19 No.13

Struktur mikro austenite martensite terdapat indikasi creep cavities, dan mengalami korosi,

Maks. 181 Min. 167 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

13.

S-33 Panel 20 No.1

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 166 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

14..

S-33 Panel 20 No.4

Struktur mikro austenitic tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 182 Min. 157 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

15.

S-33 Panel 20 No.13

Struktur mikro austenite terdapat indikasi creep cavities, pada batas butir .

Maks. 160 Min. 147 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

Page 195: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

16

S-33 Panel 21 No.1 Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 210 Min. 178 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

17.

S-33 Panel 21 No.4

Struktur mikro austenitic tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 200 Min. 181 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

18..

S-33 Panel 21 No.13

Struktur mikro austenite tidak terdapat indikasi creep void pada batas butir dan mengalami korosi,

Maks. 170 Min. 152 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

19.

S-33 Panel 22 No.1

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 202 Min. 191 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

Page 196: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

20

S-33 Panel 22 No.4

Struktur mikro austenite tidak terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 201 Min. 194 Standar Maks. 180 HV Min. 150 HV

Class C RL : 60 %

21.

S-33 Panel 22 No.13

Struktur mikro austenite, martensite terdapat indikasi creep void, batas butir mengalami korosi,

Maks. 173 Min. 148 Standar Maks. 180 HV Min. 150 HV

Class C ke D RL : < 60 %

Foto material tube S38 yang mengalami penipisan (thickness = 1.92 mm) tube No.6, Panel 3

Page 197: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

C. Pada S – 41 (Steam Cooled Spacer Riser Tube), sebanyak 2 spot.

NO.

LOKASI

HASIL UJI

KETERANGAN KLASIFIKASI

ERA TECHNOLOGI

MIKROSTRUKTUR

HARDNESS Vickers Hardness

(HV)

1.

S-41 A

Struktur mikro ferite- pearlite, terjadi persipitat carbida, tidak terdapat indikasi creep void.

Maks. 156 Min. 150 Standar Maks. 200 HV Min. 160 HV

Class C RL : 60 %

2.

S-41 B

Struktur mikro ferite- pearlite, terjadi persipitat carbida, tidak terdapat indikasi creep void, dan mengalami korosi.

Maks. 164 Min. 149 Standar Maks. 200 HV Min. 160 HV.

Class C RL : 60 %

Page 198: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

Page 199: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer .

LAMPIRAN 4

ERA TECHNOLOGI

Page 200: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer .

Page 201: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer .

Page 202: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer .

Page 203: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

LAMPIRAN 5

AKTIVITAS PENGUJIAN ASESMEN

TUBE BOILER UNIT 2 PLTU PAITON

Page 204: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer

FOTO KEGIATAN PENGUJIAN

UNIT-2 PLTU PAITON

Foto 1. Pengukuran thickness di S-19

Foto 2. Pengukuran thickness di S-21

Foto 3. Pengukuran hardness test pada tube S-38

Foto 4. Pengukuran thickness di R-9

Foto 5. Pengujian Boroscope pada Desuperheater spray

Foto 6. Pengujian Replika Technic pada tube S-38

Page 205: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer .

LAMPIRAN 6

FOTO COPY SURAT PENUGASAN DARI DIREKTUR OPERASI JAWA BALI

PT PLN (PERSERO) PUSAT DAN HASIL NOTULEN RAPAT DI PT PJB UP

PAITON

Page 206: Laporan Sementara Assesment Boiler Paiton#2 -Nov2012-Litbang

PLN PUSLITBANG – Bidang Penelitian Sistem Pembangkitan dan Energi Primer .