Laboratory for the ALICE O2 project
September 2013 CERN
Pierre Vande Vyvre
P. Vande Vyvre 2 DAQ PoW 2013-14
• Common DAQ, HLT, Offline project • Online-offline computing after LS2 • Part of the Upgrade LoI of September 2012 and endorsed by
the LHCC • Present laboratories:
DAQo Labs after the transfer from 4-R and 53-R decided in April 2010 (and
delivered in December 2011)o 4-S-027: DAQ lab 45 m2
o 4-S-034: DDL lab 34 m2
HLT: none at CERN Offline:
o 13-R-018: staging room shared with PH-ESEo 13-R-020: 4 racks of servers: Grid central services, AliRoot build and test
systems; operation 24/7
ALICE O2 project
P. Vande Vyvre 3 DAQ PoW 2013-14
• Present DAQ lab (4-S-027) Dimensioned for 8 racks
Presently with 10 racks (2 from HLT during the work at P2)• Future O2 lab
ALICE upgrade started after DAQ lab decision O2 system currently estimated to ~200 racks R&D and prototyping: ~10% → 20 racks => Power: triphase 400 V, 3x160 A. Cooling: 100 kW mininmum. If possible close to bld. 3, 4, 53, 58 3 rooms of 4-R (054, 056, 060) not very much used at preset regrouped
together would be adequate
Laboratory space
P. Vande Vyvre 4 DAQ PoW 2013-14
• 4-R-054 (PH-ESE): used (2 month/year) by Markus Joos for the TDAQ school (standard infrastructure:needs only power and network, almost every room suits these needs)
• 4-R-056 (PH-ESE): kept in case a rack activity is restarted in ESE (high ceiling, mixed water available)-wasn’t it the purpose to group all ESE activitiesin Bldg 13?
• 4-R-060(Power and water pipes) . What used for?
• 2016: O2 lab in 4-R-054, 056, 060
Work to start Apr 2014 • 2019:
13-R-020: ALICE to PH-ESE after Run 2 Offline server infrastructure to be migrated to
present DAQ lab (4-S-027)
Proposal
P. Vande Vyvre 5 DAQ PoW 2013-14
Schedule
Run 12010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
LS1 Run 2 LS2 Run 3
2022
2023
2024-26
LS3 Run 4
Availability of present DAQ Lab
Availability of present Offline Lab
Availability of new O2 Lab
ALICE LS2 Upgrade
Move of the Offline lab to present DAQ lab
Start the migration of the DAQ lab to the O2 lab
O2 Lab infrastructure (Racks, etc)