Laboratory for the ALICE O 2 project. Pierre Vande Vyvre. September 2013 CERN. ALICE O 2 project. Common DAQ, HLT, Offline project Online-offline computing after LS2 Part of the Upgrade LoI of September 2012 and endorsed by the LHCC Present laboratories: DAQ - PowerPoint PPT Presentation

Citation preview

Page 1: Laboratory for  the ALICE O 2  project

Laboratory for the ALICE O2 project

September 2013 CERN

Pierre Vande Vyvre

Page 2: Laboratory for  the ALICE O 2  project

P. Vande Vyvre 2 DAQ PoW 2013-14

• Common DAQ, HLT, Offline project • Online-offline computing after LS2 • Part of the Upgrade LoI of September 2012 and endorsed by

the LHCC • Present laboratories:

DAQo Labs after the transfer from 4-R and 53-R decided in April 2010 (and

delivered in December 2011)o 4-S-027: DAQ lab 45 m2

o 4-S-034: DDL lab 34 m2

HLT: none at CERN Offline:

o 13-R-018: staging room shared with PH-ESEo 13-R-020: 4 racks of servers: Grid central services, AliRoot build and test

systems; operation 24/7

ALICE O2 project

Page 3: Laboratory for  the ALICE O 2  project

P. Vande Vyvre 3 DAQ PoW 2013-14

• Present DAQ lab (4-S-027) Dimensioned for 8 racks

Presently with 10 racks (2 from HLT during the work at P2)• Future O2 lab

ALICE upgrade started after DAQ lab decision O2 system currently estimated to ~200 racks R&D and prototyping: ~10% → 20 racks => Power: triphase 400 V, 3x160 A. Cooling: 100 kW mininmum. If possible close to bld. 3, 4, 53, 58 3 rooms of 4-R (054, 056, 060) not very much used at preset regrouped

together would be adequate

Laboratory space

Page 4: Laboratory for  the ALICE O 2  project

P. Vande Vyvre 4 DAQ PoW 2013-14

• 4-R-054 (PH-ESE): used (2 month/year) by Markus Joos for the TDAQ school (standard infrastructure:needs only power and network, almost every room suits these needs)

• 4-R-056 (PH-ESE): kept in case a rack activity is restarted in ESE (high ceiling, mixed water available)-wasn’t it the purpose to group all ESE activitiesin Bldg 13?

• 4-R-060(Power and water pipes) . What used for?

• 2016: O2 lab in 4-R-054, 056, 060

Work to start Apr 2014 • 2019:

13-R-020: ALICE to PH-ESE after Run 2 Offline server infrastructure to be migrated to

present DAQ lab (4-S-027)

Proposal

Page 5: Laboratory for  the ALICE O 2  project

P. Vande Vyvre 5 DAQ PoW 2013-14

Schedule

Run 12010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

LS1 Run 2 LS2 Run 3

2022

2023

2024-26

LS3 Run 4

Availability of present DAQ Lab

Availability of present Offline Lab

Availability of new O2 Lab

ALICE LS2 Upgrade

Move of the Offline lab to present DAQ lab

Start the migration of the DAQ lab to the O2 lab

O2 Lab infrastructure (Racks, etc)