17
Bi-annual Environmental Monitoring Report Project Number: 46348-KGZ ADB Loan/Grant Number: L3212/G0419-KGZ Reporting period: January - June 2018 Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase 2 Project Prepared by: the Open Joint Stock Company Electric Power Plants (Bishkek, Kyrgyz Republic) with the assistance of the Project Implementation Consultant (Tractebel Engineering-Coyne Et Bellier (France) in association with Endustriel Elektrik Maden LLC (Kyrgyz Republic) This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

Bi-annual Environmental Monitoring Report

Project Number: 46348-KGZ ADB Loan/Grant Number: L3212/G0419-KGZ Reporting period: January - June 2018

Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase 2 Project

Prepared by: the Open Joint Stock Company Electric Power Plants (Bishkek, Kyrgyz Republic) with the assistance of the Project Implementation Consultant (Tractebel Engineering-Coyne Et Bellier (France) in association with Endustriel Elektrik Maden LLC (Kyrgyz Republic)

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

2

TABLE OF CONTENTS

1. INTRODUCTION ..................................................................................................... 4

1.1. General description of the Toktogul HPP and context ....................................... 4

1.2. Objective of the rehabilitation works ................................................................. 5

1.2.1. Original scope of work for Phase 2 .......................................................... 5

1.2.2. Modified scope of work for Phase 2 ......................................................... 5

1.3. Documents relevant for Environmental Safeguard ............................................ 5

1.4. Implementation progress .................................................................................. 6

1.4.1. Progress of the rehabilitation phases (pre-construction) .......................... 6

2. ENVIRONMENTAL MANAGEMENT ........................................................................ 6

2.1. Institutional Arrangement of the Project ............................................................ 6

3. ENVIRONMENTAL MONITORING .......................................................................... 8

3.1. Environmental Monitoring Program ................................................................... 8

3.2. Non-compliance Notices ................................................................................... 9

3.3. Corrective Action Plans .................................................................................... 9

3.4. Site inspections and audits ............................................................................... 9

LIST OF PICTURES

Picture 1. Toktogul hydropower plant dam .............................................................................................4

LIST OF SCHEMES

Scheme 1.Environmental management of the Rehabilitation of Toktogul HPP Phase 2 Project

as on June 2018 .........................................................................................................................................8

LIST OF ANNEXES

Annex 1. The Initial list of main documents on Environmental Safeguard Power Sector

Rehabilitation Phase 2 Project as on June 2018 .................................................................................10

Annex 2. Approval of the SAEPF on IEE developed for the Project Phase 2. ................................12

Page 3: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

3

ABBREVIATIONS:

ADB Asian Development Bank

CC Construction Contractor

EADB Eurasian Development Bank

EMP Environmental Management Plan within IEE

EPP/OJSC EPP Open Joint Stock Company «Electric Power Plant»

ES Environmental Specialist

GE General Electric

HPP Hydropower Plant

IEE Initial Environmental Examination

IPID Investment Projects Implementation Department within EPP

PAM Project Administration Manual

PIC Project Implementation Consultant

PIU Project Implementation Unit within EPP for ‘Power Sector

Rehabilitation Project’

SAEPF State Agency on Environmental Protection and Forestry

SSEMP Site Specific Environmental Management Plan

Page 4: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

4

1. INTRODUCTION

1.1. General description of the Toktogul HPP and context

1. The Toktogul Dam is a concrete gravity dam, with a height of 215 m, and is equipped

with a large hydropower plant of 1200 MW capacity. The Toktogul hydropower plant

(HPP) provides 40% of the average Kyrgyz Republic electricity output. The dam’s

construction began in 1960 and the hydropower plant was put into services in 1975

(Picture 1).

2. The Toktogul HPP plays a major role on Kyrgyz Republic electrical grid and on the

Central Asian power system, providing energy and frequency regulator services. It is

equipped with 4 vertical Francis units of 300 MW each, and has never been significantly

rehabilitated since its commissioning.

3. The Kyrgyz Republic has received a funding from the Asian Development Bank and the

Eurasian Development Bank for the Phase 2 of Toktogul HPP Rehabilitation Project.

The executing agency of this project is the Open Joint-Stock Company Electric Power

Plants (EPP).

4. Rehabilitation studies and rehabilitation works are divided into 3 phases. During the

reporting period, no construction activities have been started yet. This report is the fourth

Bi-annual EMR for Rehabilitation of Toktogul HPP Phase 2 Project.

Picture 1. Toktogul hydropower plant dam

Page 5: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

5

1.2. Objective of the rehabilitation works

5. The general objective of the rehabilitation works is to improve the technical and

operational performances of Toktogul HPP. Considering the strategic importance of

Toktogul HPP for the stability of the national and regional grid, there are two main

objectives that can be identified:

• To recover a proper reliability and availability of the plant,

• To increase the capacity of the power plant.

1.2.1. Original scope of work for Phase 2

6. As originally planned, the Phase 2 required completely rehabilitating/replacing the Units

n°2 and n°4 with their auxiliary systems and was divided into the two following lots:

• Package 1 of Phase 2 concerns the Rehabilitation of Gates & Hydraulic

Steel Structures (International competitive bidding, single stage, one

envelope):

• Package 2 of Phase 2 concerns the rehabilitation of the two units 2 and 4

(International competitive bidding, two stages with pre-qualification, and two

envelopes) and their auxiliary systems.

1.2.2. Modified scope of work for Phase 2

7. Decision was taken to group in a single phase the rehabilitation of 4 units and to replace

the existing units by completely new units with the exception of the main embedded

parts.

8. Additionally, in order to speed up the bidding process, it was decided to cancel the pre-

qualification stage and to replace it by a road show that took place in September 2015.

9. The content of the different phases becomes as follow:

• In addition to the original forecast, the scope of the Phase 1 will also cover

the replacement of the main transformer for the 4 units.

• The Phase 2 will consist in completely replacing the 4 units with their

auxiliary systems and will be divided into the 2 following lots:

o Package 1 of Phase 2 will concern the Rehabilitation of Gates &

Hydraulic Steel Structures related to the 4 units as well as the

rehabilitation of spillway and bottom water outlet gates.

o Package 2 of Phase 2 will concern the replacement of the 4 units and

their auxiliary systems.

1.3. Documents relevant for Environmental Safeguard

10. The following documents were prepared for the Project and include environmental

safeguards:

• Initial Environmental Examination (IEE) for Rehabilitation of Toktogul HPP Phase 2 under the

Power Sector Rehabilitation Project. ADB - TA-8434 (KGZ), July 2014;

Page 6: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

6

• Project Administration Manual (PAM) to Power Sector Rehabilitation Project, October 2014;

• Financing Agreement between The Kyrgyz Republic and ADB of December 26, 2014;

• Contract between Tractebel Engineering-Coyne Et Bellier (France) in association with

Endustriel Elektrik Maden LLC (Kyrgyz Republic) and EPP dated 17 November 2015.

1.4. Implementation progress

1.4.1. Progress of the rehabilitation phases (pre-construction)

11. After signing the Contract Agreement for Package 1 between Keum Jeon Industrial Co.,

Ltd. and EPP on 29th December 2017, Keum Jeon failed to fulfil the requirement of the

Contract Agreement which has led to the annulment of the Contract.

12. In order to launch a new bidding procedure for Package 1, Bidding documents have

been updated.

13. The Contract for the Package 2 of Phase 2 has been awarded to the Consortium of the

legal entities of GE Hydro France and GE Renewable Switzerland GmbH (GE) and the

Contract Agreement has been signed by EPP and the Contractor on 9th February 2018.

14. A 3D scan activity has been performed by GE at site in all the rooms of Toktogul HPP

from the 22nd April to the 4th May 2018.

15. The Package 2 Kick-off meeting with the participation of the Contractor, EPP and the

Project Implementation Consultant (PIC) was held on 24th and 25th of May 2018.

2. ENVIRONMENTAL MANAGEMENT

2.1. Institutional Arrangement of the Project

16. Proposed Phase 2 project is jointly financed by Asian Development

Bank (ADB) and Eurasian Development Bank (EADB). The Executing Agency of the

Project is the OJSC Electric Power Plants, a state-owned enterprise. The objective of

the executing agency EPP is to improve the technical and operational performance of

the Toktogul HPP, and intends to contract the rehabilitation of the Toktogul HPP on an

Engineering Procurement and Construction scheme. The Project Implementation

Consultant will work with the Investment Project Implementation Department (IPID) of

EPP. The assignment will cover project due diligence for Phase 3 and project

implementation for Phase 2.

17. The IPID, which is the one of EPP’s departments and specially assigned for implementing projects funded by international development organizations such as ADB and World Bank (WB).

18. Currently, IPID is implementing two different projects (including ADB project). Within IPID, EPP has established a dedicated project implementation unit (PIU) for implementing concerned components of the “Power Sector Rehabilitation Project” in February 2013.

The structure of IPID is as follows:

• IPID Head

Page 7: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

7

• Deputy IPID Head

1) Project Implementation Unit(PIU) “Toktogul HPP Rehabilitation” • Head; • Deputy head; • Senior Financial Specialist; • Senior Engineer ; • Interpreter ; • Procurement Specialist of PIU “Toktogul HPP Rehabilitation Phase 2 Project”

(individual consultant); • Financial Specialist/Accountant of PIU “Toktogul HPP Rehabilitation Phase 2

Project ” (individual consultant); • Environmental Safeguards Specialistof PIG “Toktogul HPP Rehabilitation Phase 2;

Project” (individual consultant);

2) PIU “At-Bashy HPP Reconstruction”; 3) PIU “Kambarata HPP second unit input”.

19. The IPID will administer all consulting and procurement contracts on behalf of EPP. It

will be responsible for bid evaluation, contract award, construction supervision, and

report to the Government, ADB, and EDB.

20. The IPID head will report directly to the General Director of EPP. The IPID will be the

main contact point for working communication between EPP and ADB, and EDB. The

IPID will coordinate the consultants and contractors.

21. The IPID, assisted by the PIC, will submit necessary project plans, tender evaluation

reports, progress reports, applications for withdrawal of funds, and any other required

reports to ADB, EBD and the Government.

22. Tractebel Engineering-Coyne Et Bellier (France) in association with Endustriel Elektrik

Maden LLC (Kyrgyz Republic)has been awarded a contract for supervision services to

implement successfully the rehabilitation works of Rehabilitation of Toktogul HPP Project

Phase 2 as PIC and to conduct the due diligence for Project Phase 3.In this sense, the

national and international team of consultants will assist EPP as project supervision

consultant on the rehabilitation of Toktogul HPP.

23. The major assignments are:

a) Phase 3: Conduct Due diligence for Phase 3 project.

b) Phase 2: Successful implementation of the two turnkey contacts through

provision of technical assistance to the PIU of EPP for the procurement of

contract on and implementation of works. In particular the firm will be

responsible for supporting PIU in Project administration, design and

engineering, services, contracting, management control, procurement and

expediting of equipment, materials control, inspection of equipment prior to

delivery, shipments, transportation, control of schedule and quality, pre-

commissioning and completion, performance guarantee testing during

construction and commissioning of the project and through the defects

liability period. The Construction Contractor for the Package 2 of Phase 2 is

the Consortium of the legal entities of GE Hydro France and GE Renewable

Switzerland GmbH. Construction Contractor for Package 1 of Phase 2 is

under the bidding procedure.

Page 8: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

8

PIC Tractebel Engineering-Coyne Et

Bellier (France) in association with Endustriel Elektrik Maden LLC

(Kyrgyz Republic)

EA OJSC Electric Power Plants, IPID,

ES: Ms.Jyldyz Moldosanova

Financing Organizations:

ADB, EADB

Construction Contractor

of Package 2 -GE; ES is under selection process

National ES: Ms.Nazgul

Asanalieva*

International ES:Mr.Jean-Luc

Pigeon

Environmental management of the Rehabilitation of Toktogul HPP Phase 2 Project is shown in Scheme 1 below.

Scheme 1.Environmental management of the Rehabilitation of Toktogul HPP

Phase 2 Project as on June 2018

*Ms Nazgul Asanalieva replaced Ms. Elena Kutmanova.

EPP PIU Environmental specialist has developed the initial list of main documents to be

included into Track Documentation system. This list is attached in Annex 1.

3. ENVIRONMENTAL MONITORING

3.1. Environmental Monitoring Program

24. Environmental monitoring actions are outlined in the IEE/EMP elaborated to this Project

along with mitigation measures for both construction and operation phases.

25. The IEE containing the needed actions for monitoring and supervision of the EMP

implementation has been approved by ADB and was published on the ADB Website:

https://www.adb.org/sites/default/files/project-document/81731/46348-003-iee-01.pdf

26. On December 15, 2014, the National State Agency on Environmental Protection and

Forestry (SAEPF) issued the environmental approval (No. 04-01-28/428) to the Project,

Phase-2, based on this IEE/EMP report (see

Construction Contractor

of Package 1 is under

bidding process

Page 9: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

9

27. Annex 2).

28. The Construction Contractor will further update the monitoring program, when the Site

specific environmental management plans are developed prior the start of the

construction activities.

29. No any on-site monitoring has been applied since the construction activities have not

commenced yet.

3.2. Non-compliance Notices

Not applicable (N.A.) for the reporting period

3.3. Corrective Action Plans

N.A. for the reporting period

3.4. Site inspections and audits

N.A. for the reporting period

Page 10: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

10

ANNEXES

Annex 1. The Initial list of main documents on Environmental Safeguard Power Sector Rehabilitation Phase 2 Project as on June 2018

# Document title Prepared by Date of approval

Basic Documentations:

1. IEE / Initial Environmental Examination

KGZ: Toktogul HPP Rehabilitation Phase

2 Project

Project Implementation

Consultant/PIC Fichtner

July 2014

https://www.adb.org/sites

/default/files/project-

document/81731/46348-

003-iee-01.pdf

2. Conclusion of the State environmental expert review on IEE developed for the Project Phase 2.

State Agency of

Environmental Protection

and Forestry of the Kyrgyz

Republic

December 2014

Reports:

3. Bi-annual Environmental Monitoring

Report covering July-December 2016

developed for Toktogul HPP

Rehabilitation Project Phase 2

OJSC Electric Power

Plants with the assistance

of PIC Tractebel

January 2017

https://www.adb.org/sites

/default/files/project-

document/225671/46348

-003-emr-01.pdf

4. Bi-annual Environmental Monitoring

Report covering January – June 2017

developed for Toktogul HPP

Rehabilitation Project Phase 2

OJSC Electric Power

Plants with the assistance

of PIC Tractebel

July 2017

https://www.adb.org/sites

/default/files/project-

documents/46348/46348

-003-emr-en.pdf

5. Bi-annual Environmental Monitoring

Report covering July - December 2017

developed for Toktogul HPP

Rehabilitation Project Phase 2

OJSC Electric Power

Plants with the assistance

of PIC Tractebel

July 2017

https://www.adb.org/sites

/default/files/project-

documents/46348/46348

-003-emr-en_0.pdf

6. Bi-annual Environmental Monitoring

Report covering January – June 2018

developed for Toktogul HPP

Rehabilitation Project Phase 2

OJSC Electric Power

Plants with the assistance

of PIC Tractebel

Is under development

Page 11: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

11

Other documentations:

7. Sample results

(Asbestos Risk Assessment Survey.

Rehabilitation of Toktogul HPP Phase 2

Project)

Project Implementation

Consultant Tractebel

December 2016

8. Asbestos Management Plan

(Rehabilitation of Toktogul HPP Phase 2

Project)

Project Implementation

Consultant Tractebel

December 2016

Page 12: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

12

Annex 2. Approval of the SAEPF on IEE developed for the Project Phase 2.

Page 13: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

13

Page 14: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

14

Page 15: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

15

Informal Translation

Annex 2. Approval of the SAEPF on IEE developed for the Project Phase 2.

STATE AGENCY OF ENVIRONMENT PROTECTION AND FORESTRY UNDER THE GOVERNMENT OF THE KYRGYZ REPUBLIC

December 15, 2014, No.04-01-28/428

I approve

Deputy Director of the State Agency on

Environment Protection and Forestry under the

KR Government /seal affixed/ signed/ A.A. Rustamov

December 15, 2014

APPROVAL

OF THE STATE ENVIRONMENTAL EXPERT REVIEW

to the Report “Initial Environmental Examination (IEE), Rehabilitation of Toktogul HPP, Phase 2” of the Energetic Sector Rehabilitation Project ADB-ТА-8434 (KGZ)

The Report “Initial Environmental Examination (IEE), Rehabilitation of Toktogul HPP, Phase 2” of the Energetic Sector Rehabilitation Project AБР-ТА-8434 (KGZ) developed by Fichtner in 2014 on request of ADB and “Electric Power Plants” OJSC was submitted to the State Agency on Environment Protection and Forestry under the Government of the Kyrgyz Republic to carry out state environmental expert review.

The Initial Environmental Examination (IEE) of the Rehabilitation of Toktogul HPP, Phase 2” of the Power Sector Rehabilitation Project ADB-ТА-8434 (KGZ) consists of the following major sections:

1. Summary 2. Political, Legal and Administrative Frameworks 3. Description of the Project 4. Description of Environment 5. Expected environmental impacts and mitigation measures 6. Analysis of alternatives 7. Disclosure of information and consultation 8. Grievance Redress Mechanism 9. Environment Management Plan 10. Conclusion and Recommendations 11. Annexes

Implementation schedule: The construction shall start in second half of 2016 and last until 2020/2021.

Description of the Project and possible impacts:

The following activities will be carried out in the course of works at Toktogul HPP:

- replacement/rehabilitation of two turbines: - replacement/rehabilitation and upgrading of two generators;

Page 16: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

16

- replacement of two main transformers associated with two turbines / generators; - replacement of unit control systems for two units; - replacement of unit protection systems, including relevant transformer, loop and fencing

for two units; - replacement of a unit of electrical and mechanical auxiliary systems (MV and LV

switchgears, cooling system, drainage and water-pumping systems, etc.) for two units (for units);

- rehabilitation of hydraulic steel structures and hydromechanical equipment at the outlet and downstream;

- rehabilitation of hydraulic steel structures and hydromechanical equipment (pressure conduits, bottom outlets, taps, etc.).

Toktogul HPP Rehabilitation Project is a unique project and a vital link for regulation of voltage frequency of 500 kV transmission systems, which connects the Central Asian countries. Capacity of HPP was well built, but many components should be currently replaced to maintain generating integrity. Consequently, there is no other realistic alternative but one that suggests consistent replacement of worn-out equipment and relevant maintenance of engineering structures and installed equipment.

According to Examination, the following possible impacts on the environment may be associated with rehabilitation activities listed above:

- possible power outage during construction; - disposal of old oil (about 180 tons that do not contain PCBs according to conducted

analysis); - issues of occupational health and safety compliance during construction; - increase in truck movements through settlements during construction period;

transportation of heavy equipment, building materials and debris; - disposal of iron / steel (almost 4000 tons) and other wastes; - construction debris generated because of construction work, and some domestic waste

generated because of daily living activities of workers.

As a part of IEE it is provided for to identify proposed Project impacts on the environment and to plan appropriate preventive actions and mitigation measures to prevent, minimize or eliminate expected adverse effects. Potential environmental impact of the Project will be of local and temporary nature. To mitigate the impact on the environment, there is developed Environmental Management Plan (EMP), which provides for collection, storage and sale of scrap metal and re-use the oil from equipment to be replaced etc..

Public consultations and public meetings were conducted in Karakul Town of Jalal-Abad oblast when the Report was being prepared. Participants of those consultations and meetings mainly considered waste related matters and methods of coping with them. Eventually everybody came to conclusion that rehabilitation measures provided by the ADB Project on rehabilitation of Toktogul HPP were necessary. Having considered submitted materials, the State Agency on Environment Protection and Forestry under the Government of the Kyrgyz Republic issues positive opinion on the State Environmental Expert Review to the Report “Initial Environmental Examination (IEE), Rehabilitation of Toktogul HPP, Phase 2” of the Energetic Sector Rehabilitation Project ADB-ТА-8434 (KGZ). At the same time it is required that:

- “Electric Power Plants” OJSC must ensure that reports on environment protection are timely submitted and statutory payments for environmental pollution are timely paid to the Jalal-Abad Territorial Department of SAEPF during implementation of the Project.

- Jalal-Abad Territorial Department of SAEPF must be notified before beginning of work.

If the conclusion of the State Environmental Expert Review is not complied with and if works are not executed according to design decisions, the conclusion shall automatically become void.

Page 17: Kyrgyz Republic: Toktogul Hydropower Plant Rehabilitation Phase … · 2018-12-12 · construction began in 1960 and the hydropower plant was put into services in 1975 (Picture 1)

17

Chairman of Experts Commission, Head of Department of the State Environmental Expert Review and Environmental Management (DSEEREM) /signed/ K.K. Jumabekov

Members of Experts Commission:

Head of the Division of DSEEREM /signed/ A.A. Ryspekov

Chief Specialist of DSEEREM /signed/ I.M. Sarybaev