Structural Steel
Prequalification Document (R2)
Page 1 of 82
KIRBYStructural Steel
Prequalification Document
7/29/2019 Kirby_Prequalifications_-_Rev_1311
2/82
Structural Steel
Prequalification Document (R2)
Page 2 of 82
I N D E X
Introduction 4
Market Sectors & Products 6
Vision & Mission Statement 7
Legal Status 8
Iso Certificate 16
Design and Engineering 17
Piece Monitoring System 19
The Project Structure 22
General Description of Work Flow Procedures 23
EngineeringDesign OutputDesign ReviewDesign ValidationDesign Changes
SoftwareR F I sPre-Production Planning
Example 27
Material PreparationIdentificationHandling, Storage and StackingConsumable StorageFabrication DrawingsBeam Processing
Beam Preparation EquipmentPlate ProcessingPlate Processing EquipmentAssemblyWeldingCurving and StraighteningNon-Destructive TestingSurface Preparation and PaintingDelivery of Finished Product
7/29/2019 Kirby_Prequalifications_-_Rev_1311
3/82
Structural Steel
Prequalification Document (R2)
Page 3 of 82
I N D E X (continued)
Attachments 32
Process Flow ChartChange Procedure Flow Chart sChange Procedure DocumentationProject Quality Plan (Sample)Inspection and Test Plan (Sample)PMS Sample Schedules and QC ReportsWelding Procedure Specifications
Organisation Chart 75
Customer Base 76
Typical Projects 78
7/29/2019 Kirby_Prequalifications_-_Rev_1311
4/82
Structural Steel
Prequalification Document (R2)
Page 4 of 82
Introduction
Kirby Steel Engineering emerged as a natural extension to the ever expanding Kirby steel
fabrication network, as well as in response to the continuous requests from the market and
satisfied customers.
Kirby Steel Engineering complements Kirby Building Systems by providing services and
customized Hot Rolled steel structures to industrial market sectors such as Oil & Gas,
Petrochemical Industry, Heavy Industries, Cement Plants, Aluminium smelters etc
The company also offers its services, expertise and products in other sectors such as
Commercial sectors where it contributes, alongside its sister company Kirby Building
Systems, in providing a complementary and wider range of products to clients whose projects
may include a combination of heavier structural steel requirements, as well as Pre-engineeredbuildings.
Kirby Steel Engineering is managed by a team of professionals with an average experience of
twenty to thirty years experience in the structural steel industry and known to have executed a
number of prestigious and high-profile projects in the GCC and Middle East.
The engineering department uses the latest versions of internationally renowned industry
standard 3D and 2D software for designing as well as drafting.
Kirby Steel Engineering is affiliated to Kirby Building Systems, which in turn is part of Al
Ghanim Industries having the Head Office in Kuwait.
Kirby Building Systems - Kuwait is the premier producer of steel buildings and structures in
the Middle East. In operation since 1976, Kirby maintains a strong reputation for providing
cost effective solutions for buildings manufactured to the highest standards. Kirbys network
includes 24 offices in the GCC countries (Kuwait, Saudi Arabia, Qatar, Oman, Bahrain and
the UAE), the Middle East, Africa, and the Far East to service customers locally. Kirby
manufacturing facilities produce hundreds of custom made steel buildings each year.
Kirby upholds its position at the cutting edge of the industry due to its commitment to quality
and customer satisfaction. Skilled structural engineers using the very latest in computerized
engineering design and drafting systems permit the selection of the most economical,
accurate and efficient framing and cladding systems.
Kirbys customer base covers thousands of satisfied clients including General Motors,
AT&T, PepsiCo and Coca Cola , Ministries of Defense, Oil companies and Petrochemical
projects and other key international organizations over the world.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
5/82
Structural Steel
Prequalification Document (R2)
Page 5 of 82
Alghanim Industries has consistently maintained its position as a leading private sector
trading and industrial group both in Kuwait and the GCC during the past 60 years. It is a
privately owned, professionally managed holding company. The executive management iscomposed of professionals with international education and experience in varying areas of
expertise. Overall, with the companys wholly owned subsidiaries, joint ventures and
associations, Alghanim Industries employs over 12000 men and women from over
40 different countries around the world.
The groups major areas of activity are trading and distribution of consumer electronics, food
and consumables, automotive vehicles and products, industrial manufacturing, engineering,
technology, travel, shipping and transportation services, advertising, insurance and
contracting.
Furthermore each of Alghanims separate businesses employs operating autonomy with its
own general manager, marketing managers and finance managers. Corporate policy mattersremain centrally controlled and direction is provided through strategic business planning
processes, quarterly operating review meetings and long term forecasting.
Multinational in both outlook and operation, Alghanim Industries has offices in countries that
span four continents. The diverse nationalities of the employees contribute to the companys
strength and widen its perspective. Alghanim Industries has successfully fused progressive
business procedures, local market place requirements and international resources.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
6/82
Structural Steel
Prequalification Document (R2)
Page 6 of 82
Market Sectors & Products
The following is an indication, but is not limited to, of the market sectors serviced and thetypes of structures undertaken by Kirby Steel Engineering.
The flexibility, expertise and equipment allows the company to customize and provide the
right products or mix of products as required by the clients projects.
Market Sectors Structures
Heavy Industries Oil & Gas Pipe Racks
Petrochemical Rectangular Platforms
Aluminum Smelters Circular Platforms
Fertilizer Plants Pipe Supports
Cement Plants Main Workshop Structures
Raw Material Storage
Buildings
Floor Gratings
Staircases
Handrails
Ladders
Temporary Structures
Infrastructure Bridges Steel Bridges
Power & Desalination
Heavy Duty Building
Structures
Airports & Seaports Platforms
Railways Equipment Support Structures
Passenger Terminals
Cargo Terminals
Aircraft Hangars
Buildings Segment Residential / Commercial Hi-rise Towers
Shopping Malls Tower CrownsLeisure Centres Atrium Structures
Multi-storey Car Parks
Roof Structures
Sports Centres
7/29/2019 Kirby_Prequalifications_-_Rev_1311
7/82
Structural Steel
Prequalification Document (R2)
Page 7 of 82
Vision & Mission Statement
7/29/2019 Kirby_Prequalifications_-_Rev_1311
8/82
Structural Steel
Prequalification Document (R2)
Page 8 of 82
Trade License - Kuwait
7/29/2019 Kirby_Prequalifications_-_Rev_1311
9/82
Structural Steel
Prequalification Document (R2)
Page 9 of 82
Commercial License - Kuwait
7/29/2019 Kirby_Prequalifications_-_Rev_1311
10/82
Structural Steel
Prequalification Document (R2)
Page 10 of 82
Chamber of Commerce Kuwait
7/29/2019 Kirby_Prequalifications_-_Rev_1311
11/82
Structural Steel
Prequalification Document (R2)
Page 11 of 82
Commercial Register Kuwait
7/29/2019 Kirby_Prequalifications_-_Rev_1311
12/82
Structural Steel
Prequalification Document (R2)
Page 12 of 82
Import License Kuwait
7/29/2019 Kirby_Prequalifications_-_Rev_1311
13/82
Structural Steel
Prequalification Document (R2)
Page 13 of 82
Trade License Ras Al Khaimah - UAE
7/29/2019 Kirby_Prequalifications_-_Rev_1311
14/82
Structural Steel
Prequalification Document (R2)
Page 14 of 82
Chamber of Commerce Ras Al Khaimah - UAE
7/29/2019 Kirby_Prequalifications_-_Rev_1311
15/82
Structural Steel
Prequalification Document (R2)
Page 15 of 82
Commercial Register Ras Al Khaimah UAE
7/29/2019 Kirby_Prequalifications_-_Rev_1311
16/82
Structural Steel
Prequalification Document (R2)
Page 16 of 82
ISO Certificate
7/29/2019 Kirby_Prequalifications_-_Rev_1311
17/82
Structural Steel
Prequalification Document (R2)
Page 17 of 82
Design and Engineering
Kirby Steel Engineering uses the latest computer software in both Engineering and Design
allowing both activities to be as fully integrated as possible.
All work undertaken in the Engineering / Design Department is closely monitored by the
Engineering Manager who is responsible for ensuring that the design conforms to the clients
requirements and is in accordance with the relevant Design Codes and Regulatory Authority
requirements
The Design / Engineering Department is fully computerized, utilising the latest software
packages to enable them to produce the most economical structures in the shortest time
possible. The software packages most frequently utilised are :
7/29/2019 Kirby_Prequalifications_-_Rev_1311
18/82
Structural Steel
Prequalification Document (R2)
Page 18 of 82
Design and Engineering Cont
The Drafting office is also fully computerised and utilises the following main software
packages :
Package Description Specifications / Code
AutoCad Preparation of GA Drawings &Fabrication Drawings Miscellaneous Works
N/A
BoCad 3D Modelling Detailing ofConnections AutomaticGeneration of Fabrication Drawings,Production & Material Listings
N/A
Strucad 3D Modelling Detailing ofConnections Automatic
Generation of Fabrication Drawings,Production & Material Listings
N/A
7/29/2019 Kirby_Prequalifications_-_Rev_1311
19/82
Structural Steel
Prequalification Document (R2)
Page 19 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
20/82
Structural Steel
Prequalification Document (R2)
Page 20 of 82
Piece Monitoring System What does it do ?
Maintains a full bill of quantities for each main and sub-assembly
Establish Production Priorities for each component
Automatically program each item of steel through the workshop to suit clientrequirements and production capacities
Issue production requirements for each stage of fabrication
Automatically maintain the independent KIRBY Steel Engineering quality assuranceprogramme
Real Time monitoring of production status
Piece Monitoring SystemThe Advantages
Each individual piece of steel is dynamically monitored at the stages of production toassure the client receives all the items on time
Monitors the effects of design changes etc to enable the client to incorporate intheir production schedules
A full set of reports is available under password control in the Web Server. Reportscan be downloaded by the user into spreadsheets, databases etc for later use
7/29/2019 Kirby_Prequalifications_-_Rev_1311
21/82
Structural Steel
Prequalification Document (R2)
Page 21 of 82
Piece Monitoring SystemHow does it work ?
The project is broken down into units of build-ability or client requirements
Project programmes are developed using Primavera Project Manager
Specialised CAD systems used to produce working drawings, also produce their ownbill of materials which is automatically fed into the Piece Monitoring System.
Drawings produced from other sources are taken off and entered manually.
The PMS automatically reviews the programme, type of fabrication and production
capacities to produce an individual fabrication programme for each item of steel. Full
manual modification control is maintained to allow further requirements to be incorporated
Production lists are produced for each stage of fabrication and production data re-entered into the system
Quality assurance inspection requests are generated automatically by the system andrecords maintained
Full status reports are produced, cross-checked between each function
The Web Server is automatically updated
7/29/2019 Kirby_Prequalifications_-_Rev_1311
22/82
Structural Steel
Prequalification Document (R2)
Page 22 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
23/82
Structural Steel
Prequalification Document (R2)
Page 23 of 82
Index to the General Description of Work Flow Procedures
The purpose of the following section is to describe in general each
activity executed during a project.
Index
Engineering
Software
R F I s
Pre Production Planning
Example
Identification
Handling Storage and Stacking
Fabrication Drawing
Beam Processing
Plate Processing
Assembly
Welding
Curving and Straightening
Non Destructive Testing
Surface Preparation
Delivery of Finished Products
7/29/2019 Kirby_Prequalifications_-_Rev_1311
24/82
Structural Steel
Prequalification Document (R2)
Page 24 of 82
Engineering
All Technical information received from the client such as drawings, project specifications,
bills of quantity, agreed scope of work and any other pertinent information is forwarded to
the Design Department who review all relevant documentation to establish the designparameters. Any clarifications and requests for information are communicated to the
client in writing.
Should circumstance arise were the requested information is not available then the Design
Department clearly detail any and all assumptions they have made. This information is
forwarded to the client.
Design Output
The design output is expressed in the following formats :
Computer generated calculations prepared on propriety software Design sketches containing all the necessary information to allow drafting to generate
general arrangement drawings
The General Arrangement drawing package shall consist of but not be limited to:
Anchor Bolt Layout
Roof Framing Plan
Elevations
Connection Details (if requested)
Design Review
During the Design Sketch and calculation stage, the activities of the individual designer are
monitored by the Design Department Supervisor
On completion of the calculations the designer details in writing all parameters used in
the calculation, the Design Supervisor verifies that the design parameters are correct as
per contract documentation.
Should the contract require the formal submittal of the design calculations to the client then
the Design Supervisor forwards the package to the Engineering Manager for Approval.
All General Arrangement drawings developed from design sketches are reviewed by thedrafting department for drawing accuracy and signed as checked then the package is
forwarded to the Design Department for review by the Designer against his design sketches
to determine if they have been correctly interpreted. The design package is then forwarded
to the client for review and comment.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
25/82
Structural Steel
Prequalification Document (R2)
Page 25 of 82
Design Validation
All design packages, as detailed in the contractual requirements are forwarded to the client
for review comment and approval prior to the start of fabrication. Should any comments or
status codes be applied to the submitted design package other than approved, these commentsare addressed and another submittal is made to the client. This process is repeated until the
design is acceptable to the client.
Design Changes
When a change or modification to the design is required, the originator of the change
documents the required modification and forwards written instructions to the relevant
departments. Depending on the source of the change notice, the information is transmitted as
follows :
Internal Change notice Information to be forwarded to the Design Supervisor for
review and action
External (Client) notice Information to be forwarded to the Design Supervisor forreview and action
All change notices either in the form of commented drawings or written instructions are filed
in the Project File for future reference.
Software
KIRBY Steel Engineering has standardized the computer software used in order to ensure
compatibility with clients and other third parties involved in the project:
Microsoft Office General Office
Primavera / Microsoft Project Planning
Autocad 2D Drafting
Strucad 3D modeling and drafting
Bocad 3D modeling and drafting
Staad Pro 2D & 3D Design
Master Key Connections Design
ProKon Connections Design
PMS system Production Tracking & Monitorng
RFI s
If during the review, engineering design, or drafting cycles, additional information or
clarifications are required, a formal RFI is raised and issued to the client. The issue and
return of the RFI is recorded.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
26/82
Structural Steel
Prequalification Document (R2)
Page 26 of 82
Pre-Production Planning
On award of the contract the Planning Department review the overall structure to establish
the following :
Overall production requirements per week and month
Sequence of contract execution in order to support the clients program
Priority for each sub structure
Engineering and Drafting planning
Procurement planning
The 3D modeling & drafting systems utilized by KIRBY Steel Engineering produce a full
Bill of Quantities during the "3 D" modelling phase of the drafting cycle. This information is
transferred to the piece monitoring system where the pre-determined priority ratings for each
Sub-structure are automatically assigned to the individual item
This allows the Piece Monitoring System to automatically generate a detailed (item by item)
production program which is then grouped together to give the daily production requirements
for all fabrication activities.
Due to the modular format of the Piece Monitoring System the individual module and the
relevant information required to control a specific activity can be downloaded onto the
computer system of any associate company. This allows them to conduct their area of the
operation in parallel with the overall project requirements.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
27/82
Structural Steel
Prequalification Document (R2)
Page 27 of 82
Example
Material Preparation
The relevant material preparation modules of the Piece Monitoring System is forwarded tothe relevant departments and all the production scheduling information downloaded.
The engineering department also issues the plates and beam shafts drawings in the format
required to program the CNC equipment used in the material preparation.
As the material is processed in accordance with the production schedule, the Piece
Monitoring System is regularly updated by the computer system controlling the CNC
equipment or by manual entry periodically through the shift. This updated informationallows monitoring the progress of the contract piece by piece.
This example is applicable to each individual stage of the fabrication process.
Identification
All material received either from the mill or merchants stock is inspected on receipt for:
Completeness of order
Compliance with Purchase Order requirements
Transport Damage
Identifiable to valid mill certificate
As the material is processed through the preparation stage of the fabrication process the heatnumber of the individual piece is logged onto the cutting schedule against its unique position
/ item number. This information is then transferred to the Piece Monitoring System
providing material trace-ability for each individual piece back to the mill certification
Handling, Storage and Stacking
Steel plates and sections are either delivered to the preparation facility on a JIT basis or
stored and stacked in a KIRBY Steel Engineering designated area. All material is stored and
stacked in such a manner as to prevent distortion twisting or bending.
Consumable Storage
All welding rods painting and blasting material are stored in accordance with the
anufacturer's recommendations.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
28/82
Structural Steel
Prequalification Document (R2)
Page 28 of 82
Fabrication Drawings
Material preparation drawings are issued to the Preparation Facility in electronic format and
are identified by phase substructure and cutting schedule.
The assembly drawings are issued either in electronic format or paper copy again they are
identified by phase substructure and assembly schedule
Beam Processing
During the cutting operation each beam is marked with it's item / position number to allow
identification and trace-ability through the rest of the fabrication process.
After the beam has been marked and cut, and depending on the requirements, the beam is
either moved directly to the transit lay-down area or processed thorough the CNC drill
station.
Beam Preparation Equipment
Please refer to the list of equipment attached.
Plate Processing
Plates are processed using various methods depending on thickness contract requirements and
end usage
If the thickness of the plate is 12 mm or less, the plates can be sheared to the required size,
however the end usage and contract requirements are also considered before work is detailed
to these machines.
Once the plate has been cut to the correct size and shape the final operation is producing the
holes. This can be done either by drilling or punching. Again thickness, hole dia, and
contract requirements are considered before allocating the work to the various machines
During the cutting operation, each plate is marked with it's item / position number to allow
identification and trace-ability through the rest of the fabrication process.
All cut edges can be dressed to remove burrs, dross and irregularities. Holes are dressed
as required to provide a smooth contoured surface.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
29/82
Structural Steel
Prequalification Document (R2)
Page 29 of 82
Plate Processing Equipment
Please refer to the list of equipment attached.
Once the preparation of the material has been completed the material is then ready forassembly.
Assembly
When the material has passed it's inspection, it is released to the assembly / welding yard
were it is segregated in the lay down yard prior to release to assembly.
The material is assembled in accordance with the fitting schedule issued by Piece Monitoring
System.
The material is assembled in accordance with the fabrication drawings in such a manner thatthey are not bent, twisted or otherwise damaged, and any deformation is within the stated
tolerances.
All items, after assembly, are fully dimensionally checked, any deviations are corrected
immediately.
The results of the dimensional check are logged onto the Piece Monitoring System.
Welding
All welding operations are carried out in accordance with KIRBY Steel Engineeringsapproved welding procedures by independently qualified welders.
All procedures and welder qualifications are in accordance with AWS D 1.1
During the welding operation all welders are continually monitored to ensure that the welding
parameters, as detailed in the relevant procedure, are adhered to and that the level of
workmanship is maintained.
All items, after completion of welding are visually inspected against the requirements of
AWS D 1.1 for compliance. Any visual discontinuity is marked and repaired immediately.
Only when the item has been fully passed and accepted will it be released to blasting and
painting
All welding inspections are entered onto the piece monitoring system.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
30/82
Structural Steel
Prequalification Document (R2)
Page 30 of 82
Curving and Straightening
When it is necessary to curve or straighten components one of the following methods may be
used:
Mechanical - taking care not to cause indentations or changes in cross section
Local Application of Heat - ensuring that the temperature does not exceed 650C
Non-Destructive Testing
Non destructive testing is carried out in accordance with the contract requirements, all NDT
inspections are conducted by an independent 3rd party specialist company with AWS D1.1
acceptance standards used for determining the acceptability of the weld.
The results of all NDT examinations are entered on the Piece Monitoring System.
Surface Preparation and Painting
The surface preparation / blast cleaning produces the required anchor pattern and cleanliness
level as detailed by the paint manufacturer to ensure paint adhesion to the surface.
The Painting Inspector carries out profile checks at the start of each blasting run to ensure
that the required profile and cleanliness levels are met.
All material once blasted are primed within 4 hours to prevent rust bloom.
The painting operation is conducted ony if the following conditions are met:
(as specified by the paint manufacturer)
The surface temperature shall be at least 3 degrees centigrade above the dew point andthe Relative Humidity (RH%) 40% and 85%.
Visual checks on the surface shall be carried out to ensure none of the following pointexist oil, grease, dirt, loose paint, rust and other surface contamination.
There is protection from adverse weather conditions, such as wind that may blowsand, or other foreign bodies on the painted surface or it may disrupt the paint pattern
or cause dry spray.
Paint Strip shall be applied to all welds and corners if required.
Primers, intermediate coats and top coats shall be contrasting colours, if more thanone application is required to achieve the required film thickness, then the same
colour should be used. But reference to Client's specifications must be made before
implementation.
Finished coatings shall be free of runs, drips, dry spray etc. Areas that are cracked,damaged or below minimum thickness shall be repaired in prior to dispatch
7/29/2019 Kirby_Prequalifications_-_Rev_1311
31/82
Structural Steel
Prequalification Document (R2)
Page 31 of 82
All defective areas are to be cleaned with solvents, detergents or clean water as required
All repair areas blast cleaned to the metal surface, with the edges being feathered back at
least 50 mm beyond the clean metal surface. For areas less than 1000 mm2, brush coating
may be acceptable, but with reference to Client's specifications , areas greater than 1000 mm2the paint shall be applied as to the original specification.
Painted items shall be handled with proper care so that damage to the paint is minimised.
Structural steel items shall not be handled until paint has thoroughly dried.
Care shall be taken to avoid abrasions and other damage.
Nylon / Canvas slings shall be used for handling the coated steelwork or when steel slings are
to be used, they shall not be choked with wood to avoid / limit contact with coated steelwork.
Delivery of Finished Product
Each piece of steelwork shall be distinctly marked with Item No and bar code before dispatch
in accordance with the fabrication drawing . Steelwork shall be stacked on timbers in order to
provide easy handling
All attachments and fittings shall be securely attached. Loose plates and smaller items shall
be either boxed or wired together and then wired to larger parts.
Floor plates shall be bundled for shipment
Bolts, Nuts and Washers shall be packed in strong bags with the Nuts and Washers assembledon the Bolts.
The client should be informed of the time of delivery and delivery notes shall accompany all
deliveries.
The sequence of shipment shall be such as to expedite erection and minimise field handling
of material
7/29/2019 Kirby_Prequalifications_-_Rev_1311
32/82
Structural Steel
Prequalification Document (R2)
Page 32 of 82
Attachments
i. KIRBY STEEL ENGINEERING Process Flow Chart & Description
ii. KIRBY STEEL ENGINEERING Change Control Procedure & Description
iii. KIRBY STEEL ENGINEERING Steel Sample Project Quality Plan
iv. KIRBY STEEL ENGINEERING Steel Sample Inspection & Test Plan
v. P M S Sample Schedules & Q C Reports
vi. KIRBY STEEL ENGINEERING Welding Procedures
7/29/2019 Kirby_Prequalifications_-_Rev_1311
33/82
Structural Steel
Prequalification Document (R2)
Page 33 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
34/82
Structural Steel
Prequalification Document (R2)
Page 34 of 82
KIRBY STEEL ENGINEERING Change Procedure
7/29/2019 Kirby_Prequalifications_-_Rev_1311
35/82
Structural Steel
Prequalification Document (R2)
Page 35 of 82
KIRBY STEEL ENGINEERING Change Procedure
The attached logic chart details the standard method adopted by KIRBY STEEL
ENGINEERING for processing changes. This procedure may be amended to reflect ndividual
contract requirements.
Note: P = Project Management Team
FW = Fabrication Workshop
SAMPLE DOCUMENTATION ONLY
PROJECT QUALITY PLAN
Document No CGP-PQP-204Revision 0
15-9-01 0 Douglas Bevan Henry Nasr Henry NasrDate Revision Author Review Approval
Page 39 of 96KIRBY STEEL ENGINEERING Prequalification
7/29/2019 Kirby_Prequalifications_-_Rev_1311
36/82
Structural Steel
Prequalification Document (R2)
Page 36 of 82
SAMPLE DOCUMENTATION ONLY
PROJECT QUALITY PLAN
Document No. CGP-PQP-204
Revision 0
7/29/2019 Kirby_Prequalifications_-_Rev_1311
37/82
Structural Steel
Prequalification Document (R2)
Page 37 of 82
SAMPLE DOCUMENTATION ONLY
INDEX
1.0 Purpose
2.0 Scope
3.0 References
4.0 Definitions
5.0 Responsibilities
6.0 Procedure
6.1 Contract / Tender Review
6.2 Document Control and Quality Records
6.3 Procurement Procedure
6.4 Material Control
6.5 Identification and Tractability
6.6 Process Control
6.7 Inspection and Testing
6.8 Control of Inspection Measuring and Testing Equipment
6.9 Non Conforming Product Control
6.10 Corrective and Preventative Action
6.11 Material Handling Storage and Delivery
6.12 Audit Procedure6.13 Training
7.0 Exhibits
7/29/2019 Kirby_Prequalifications_-_Rev_1311
38/82
Structural Steel
Prequalification Document (R2)
Page 38 of 82
SAMPLE DOCUMENTATION ONLY
1.0 Purpose
The purpose of this Standard Project Quality Plan is to outline the applicableprocedures to be used for the execution of a project in conformance with KIRBY
STEEL ENGINEERING Quality system.
2.0 Scope
This procedure is applicable to all contracts where the generation of a specific Project
Quality Plan is not called for by the client.
3.0 References
KIRBY STEEL ENGINEERING's Quality Management System.
4.0 Definitions
KIRBY STEEL ENGINEERING KIRBY STEEL ENGINEERING
ITP Inspection and Test Plan
5.0 Responsibilities
As Detailed in the procedure
6.0 Procedure
6.1 Contract / Tender Review
6.1.1 All Tender Enquiry's Shall Be:
Logged as received and assigned a Tender Number
Reviews shall be carried out by Senior Management
The contract shall be priced by engineering
7/29/2019 Kirby_Prequalifications_-_Rev_1311
39/82
Structural Steel
Prequalification Document (R2)
Page 39 of 82
SAMPLE DOCUMENTATION ONLY
6.2 Document Control and Quality Records
6.2.1 Project Filing System
On the award of a contract, a contract specific identification number shall be allocated
by the Engineering Manager, and a Project File shall be generated All the in-coming
and out-going documents related to their project will be logged in the Project File.
On completion of the project, the Project files shall be filed for a minimum of 1 year.
After which they may be disposed of, at the discretion of Senior Management
6.2.2 Drawing Receipt Approval and Issue
All drawings received by KIRBY STEEL ENGINEERING relating to a specific
project shall be acknowledged and a copy of the acknowledgement shall be filed inthe project file
All drawings as detailed in the contract shall be issued to the client for approval
After approval Fabrication drawings shall be generated and issued to the relevant
personnel
Their issue and return shall be recorded in the Issue register maintained by the Head
of Drafting or his designated nominee.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
40/82
Structural Steel
Prequalification Document (R2)
Page 40 of 82
SAMPLE DOCUMENTATION ONLY
6.2.3 Quality Records
The QC Engineer shall maintain the following records: -
Material Certification
Goods Inwards Inspection Reports
Plate / Beam Cutting Schedules
Consumable Certification (Electrodes, Paint, Bolts etc)
Fabrication Check Lists
NDE Reports if applicable
Welders Qualifications
Welders Records
Weld Procedure Specifications
Procedure Qualification Records Painting Release Forms
Painting Inspection Reports
Dimensional Check Reports
Final Inspection Reports
Copies of Delivery Notes
QC Fabrication Drawings
On completion of a Project the quality records relating to the project shall be
correlated by the QC Engineer into a Project Data Book. The quality records shall
consist of:
Material Certification Data Book
Plate / Beam Cutting Schedules Data Book
Fabrication Check Lists Data Book
NDE Reports if applicable Data Book
Painting Release Forms Data Book
Painting Inspection Reports Data Book
Final Inspection Reports Data Book
Copies of Delivery Notes Forwarded with each delivery
QC Fabrication Drawings Data Book
Bolt Certification Data Book
Paint Certification Data Book
On completion of the project the quality records will be archived for the minimum of
one year
7/29/2019 Kirby_Prequalifications_-_Rev_1311
41/82
Structural Steel
Prequalification Document (R2)
Page 41 of 82
SAMPLE DOCUMENTATION ONLY
6.2 Procurement Procedure
6.3.1 BOQ
The Engineering Manager through his designated nominee shall ensure that a BOQ is raised
for each project.
The Stores shall check the BOQ against the stock lists and raise the necessary requisition
orders for the balance material
The Commercial Director shall review the requisitions for cost quantity and technical
accuracy; if the requisition is acceptable he shall approve it and forward it to Procurement
who shall raise the order.
6.4 Material Control
6.4.1 Material Receipt
All material ordered by and delivered to KIRBY STEEL ENGINEERING shall be inspected
by the Goods Inwards Inspector in accordance with the relevant Work Instructions and
Procedures.
6.4.2 Traceability
Material trace-ability shall be maintained by heat number, which shall be logged on the
material cutting schedule against the relevant piece number.
6.4.3 Electrodes
All electrodes shall be inspected upon receipt, stored in accordance with KIRBY STEEL
ENGINEERING procedures and their issue, return and baking (if required) shall be recorded
by the Rod Storeman.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
42/82
Structural Steel
Prequalification Document (R2)
Page 42 of 82
SAMPLE DOCUMENTATION ONLY
6.4.4 Paint
Paint shall be inspected upon receipt in accordance with KIRBY STEELENGINEERING's procedures; the paint shall be stored in the designated area, used
within its shelf life and rotated through the stores on a first in first out basis.
6.5 Identification and Trace-ability
All material shall be marked with its Project Number and position / piece number at
the material preparation stage.
The material heat numbers shall be logged on the Cutting schedule.
6.6 Process Control
6.6.1 Trace-ability of steel
All steel material shall have a valid mill certificate and the material shall be identified
to the mill certificate
6.6.2 Fabrication / Shop Drawings
All in house drawings shall be checked for accuracy before issue
The drawings shall contain all the necessary details for production to fabricate the
item.
Certain contracts may require specific information to be included on the drawing, the
head of drafting shall be informed of these requirements
6.6.3 Marking
All items shall be marked with their Project Number and their position / piece number
as detailed on the cutting schedule, at the preparation stage.
The Heat Number shall be transferred to the cutting schedule and logged against the
items position piece number.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
43/82
Structural Steel
Prequalification Document (R2)
Page 43 of 82
SAMPLE DOCUMENTATION ONLY
6.6.4 Cutting Shaping Bending and Bolt Holes.
Beams plates and sections shall be cut in accordance with their cutting schedules
Cutting may be done by shearing, sawing, grinding and machine cutting. Hand flame
cutting may be allowed if all other methods are impractical.
Holes may be made by drilling or punching and slotted holes made by a combination
of drilling punching and cutting. All tolerances shall be in accordance with the
contract requirements as detailed on the ITP
6.6.5 Assembly
All components shall be assembled in a manner such that they are not bent, twisted or
otherwise damaged.
6.6.6 Curving and Straightening
When it is necessary to curve or straighten components, this may be done by
mechanical means or the local application of heat
6.6.7 Welding
All welding shall be in accordance with the requirements of AWS D1.1
When required by contract all applicable welding procedures shall be submitted to the
client for approval
Pre Qualified welding procedures shall be used unless specifically stated in the
contract documentation.
The preparation and fit up of all parent metal shall be in accordance with the
requirements of AWS D1.1 and the approved welding procedure.
6.6.8 Electrodes and Automatic Coils
Electrodes and automatic coils shall be procured, stored, issued and controlled in
accordance with KIRBY STEEL ENGINEERING's procedure
7/29/2019 Kirby_Prequalifications_-_Rev_1311
44/82
Structural Steel
Prequalification Document (R2)
Page 44 of 82
SAMPLE DOCUMENTATION ONLY
6.6.9 Preheat and Interpass Temperature
Minimum Preheat and Interpass Temperature shall be exercised as detailed in theapproved WPS.
6.6.10 Inspection
These activities shall be controlled in accordance with procedure KIRBY STEEL
ENGINEERING Inspection and Testing procedures. And governed by the Test and
Inspection Plan
6.6.11 Surface Preparation, and Painting
All surface preparation, priming and top coating, will be in accordance with the
KIRBY STEEL ENGINEERING' procedure of Paint Control
6.7 Inspection and Testing
6.7.1 Inspection and Test Plan
KIRBY STEEL ENGINEERING standard Inspection and Test Plan shall be adhered
to unless a project specific Inspection and Test Plan is required by the contract in
which case the QA Manager shall draft, submit for approval and issue the relevant
Project Specific Inspection and Test Plan.
6.7.2 Receipt Inspection
All incoming material shall be checked by the Goods Inwards Inspector for
conformance to KIRBY STEEL ENGINEERING's requirements.
6.7.3 In-process Inspection and Testing
All stage inspections shall be carried out by the designated inspection personnel and
the findings reported to the QC Engineer.
6.7.4 Non-destructive Examination
The QC Engineer shall call up such NDT as required (10% MPI + Radiography of
Splice Welds. KIRBY STEEL ENGINEERING normal in-house requirement) to
ensure the quality of KIRBY STEEL ENGINEERING's fabrication.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
45/82
Structural Steel
Prequalification Document (R2)
Page 45 of 82
SAMPLE DOCUMENTATION ONLY
6.7.5 Records
Records of all inspections shall be filed with the QC Engineer as objective evidenceof the inspection.
6.8 Control of Inspection Measuring and Testing Equipment
All inspection Measuring and testing equipment utilised by KIRBY STEEL
ENGINEERING shall maintain a current calibration status that is traceable back to
the national standards at all times
6.9 Non Conforming Product Control
6.9.1 Non-conformance of Procured material
If purchased material is found not to conform to KIRBY STEEL ENGINEERING's
requirements, then the material shall be returned to the supplier. The materials
controller shall inform the supplier for the reason for rejection and the supplier may
re-supply material that conforms to KIRBY STEEL ENGINEERING's requirements
or the Materials Controller shall inform procurement who shall place the order with
an alternate supplier.
6.9.2 Non-conformance during Production
When a Non-conformance is noted during production the Inspector shall quarantine
the material and an NCR shall be raised.
The QC engineer shall evaluate the Non-conformance and decide on the relevant
course of action to correct the non-conformance.
Should corrective action be outside the specification requirements then a concession
request shall be forwarded to the client for their recommendation and approval.
Rejected material shall be removed from the production area and either down graded
or scraped
7/29/2019 Kirby_Prequalifications_-_Rev_1311
46/82
Structural Steel
Prequalification Document (R2)
Page 46 of 82
SAMPLE DOCUMENTATION ONLY
6.10 Corrective and Preventative Action
6.10.1 Customer Complaints
The QA manager shall record investigate and respond to any formal complaint from
the client.
6.10.2 Quality System Deficiencies
When a deficiency is identified in the Quality System, then the deficiency shall be
reviewed against the relevant procedure. Should it be found necessary to amend the
procedure this shall be done in accordance with Procedure Preparation Style and
Format procedure and the eview and issue procedure as detailed in the Quality
Manual.
6.11 Material Handling Storage and Delivery
6.11.1 Before and After Fabrication
All material shall be stacked in such a manner as to minimise damage and distortion.
The material during fabrication shall be laid out clear of the ground and in such a
manner as to acilitate inspection
6.11.2 After Painting
All painted material shall be stacked in bundles, with wooden strips in between
adjacent members these bundles shall then be metal strapped before loading. Alllifting operations of painted steel shall be done with nylon / canvas slings so as to
minimise damage. Paint touch-up is acceptable before dispatch.
6.11.3 Delivery of Finished Product
All items shall be marked with their item number as detailed on the erection drawings
All loose items shall be securely fastened, bundled or bagged before dispatch.
7/29/2019 Kirby_Prequalifications_-_Rev_1311
47/82
Structural Steel
Prequalification Document (R2)
Page 47 of 82
SAMPLE DOCUMENTATION ONLY
6.12 Audit Procedure
The QA Manager or his designated nominee shall carry out periodic audits of thequality system to access its effectiveness and the level of compliance to the Quality
Management Procedure.
6.13 Training
While it is not generally KIRBY STEEL ENGINEERING's policy to employ then
train personnel but to employ already trained personnel. Should the need for training
of personnel be identified then this training shall be accomplished in one of the
following manners
Verbal Instruction
Tool Box Talks Work Instructions
In House Training
Training Agency (outside the Company)
7.0 Exhibits
Inspection and Test Plan
7/29/2019 Kirby_Prequalifications_-_Rev_1311
48/82
Structural Steel
Prequalification Document (R2)
Page 48 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
49/82
Structural Steel
Prequalification Document (R2)
Page 49 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
50/82
Structural Steel
Prequalification Document (R2)
Page 50 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
51/82
Structural Steel
Prequalification Document (R2)
Page 51 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
52/82
Structural Steel
Prequalification Document (R2)
Page 52 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
53/82
Structural Steel
Prequalification Document (R2)
Page 53 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
54/82
Structural Steel
Prequalification Document (R2)
Page 54 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
55/82
Structural Steel
Prequalification Document (R2)
Page 55 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
56/82
Structural Steel
Prequalification Document (R2)
Page 56 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
57/82
Structural Steel
Prequalification Document (R2)
Page 57 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
58/82
Structural Steel
Prequalification Document (R2)
Page 58 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
59/82
Structural Steel
Prequalification Document (R2)
Page 59 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
60/82
Structural Steel
Prequalification Document (R2)
Page 60 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
61/82
Structural Steel
Prequalification Document (R2)
Page 61 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
62/82
Structural Steel
Prequalification Document (R2)
Page 62 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
63/82
Structural Steel
Prequalification Document (R2)
Page 63 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
64/82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
65/82
Structural Steel
Prequalification Document (R2)
Page 65 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
66/82
Structural Steel
Prequalification Document (R2)
Page 66 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
67/82
Structural Steel
Prequalification Document (R2)
Page 67 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
68/82
Structural Steel
Prequalification Document (R2)
Page 68 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
69/82
Structural Steel
Prequalification Document (R2)
Page 69 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
70/82
Structural Steel
Prequalification Document (R2)
Page 70 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
71/82
Structural Steel
Prequalification Document (R2)
Page 71 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
72/82
Structural Steel
Prequalification Document (R2)
Page 72 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
73/82
Structural Steel
Prequalification Document (R2)
Page 73 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
74/82
Structural Steel
Prequalification Document (R2)
Page 74 of 82
7/29/2019 Kirby_Prequalifications_-_Rev_1311
75/82
Structural Steel
Prequalification Document (R2)
Page 75 of 82
Organisation Chart
7/29/2019 Kirby_Prequalifications_-_Rev_1311
76/82
Structural Steel
Prequalification Document (R2)
Page 76 of 82
Customer Base
Kuwait United Arab Emirates
Snamprogetti/Equate National Food Co.
Al Hamra / MOD System Construct
Jahra Mega Warehouse Choithram & Sons
PIC/Kuwait Fertilizer Plant System Construct
Public Warehousing Sharjah Airport
RECAFCO System Construct
Kuwait Co.for Processing Plant C Fawaz Al Khateeb
Ministry of Defence Orion Engineering
TOYO Sheikh Saleh Bin Ham.
Kuwait Airways Corporation (KAC) Abu Dhabi Municipality
Ahmadi Governorate Gulf Erection / EMC
Kuwait Free Trade Zone System Construct
Coca Cola Boskin Factory
Kuwait Oil Co. Dubai Municipality
National Guard
Bahrain
Qatar Jawid Textile Mill
Al Jaber Engg. Manama Textiles
J.G.C. Daewoo Desalination Project
Qapco/Snamprogetti Rolls Royce / Chrysler
Qatar Clay Bricks Co. Bahrain Airport Service
Naseer Enterprise
NBKS Saudi Arabia
Qatar Steel Co. (QASCO) Ministry of Defence, S.A.
Al Madar Cont. Trdg. Al Owaidah / Ministry of Awkahf
NADA
Oman Al Othman Agri Products
Khimji Textile Mill Al-Othaim Central Warehouse Pro.
Oman Ceramics Ministry of Education
Qurum Contractors Sahara Building Cont.
Steel Service Centre Hussain Bakri Gazzaz & Partners
Raysyt Cement Co. Nesma & Al Fadel Cont. Co.
Al Turki Trdg. Cont. Co.
Yemen Saudi BinLaden Group
Canada Dry TADCO
Yemen Co. For Ind. Invest. Ltd. Saudi National Guard
H.S.A. - (YCFM)
7/29/2019 Kirby_Prequalifications_-_Rev_1311
77/82
Structural Steel
Prequalification Document (R2)
Page 77 of 82
Customer Base Ctd.
Syria Jordan
Rubi Eco. Group Jordan Royal Airforce
Deiri Group International Arabian Dev. Co.
Arab Agri. Mfg. Co.
Granada Ceramic Ind. Egypt
Arab Brothers
Lebanon Inglen
Sukom Misr Al Amria
Liban Lait Sal Al Safadi Group
Misr Al Amria
Sudan
Sudan Railway Corporation Tanzania
Coldair P.B. Power / Rolls Royce
Ethiopia Libya
H'rena Pvt. Ltd. F.L. Smidth
Summit Partners Alimaz
Burayu Spring
Sri Lanka
Vietnam Industrial & Commercial dev. Co.
Indochina Ceramics Factory Complex/Star Packaging
American Standard Cotton Line
Triumph International
Nestle Korea
Toforby Corporation
Bangladesh
Spinning Mill/Silver Line Composite Romania
Al Muhaidib & Sons
Pakistan
Adam Motor Co./Car Plan Cambodia
Manitel / Pochentong Airport
Guam
S.H. Behbehani
7/29/2019 Kirby_Prequalifications_-_Rev_1311
78/82
Structural Steel
Prequalification Document (R2)
Page 78 of 82
Typical Structural Steel Projects
7/29/2019 Kirby_Prequalifications_-_Rev_1311
79/82
Structural Steel
Prequalification Document (R2)
Page 79 of 82
Typical Structural Steel Projects
7/29/2019 Kirby_Prequalifications_-_Rev_1311
80/82
Structural Steel
Prequalification Document (R2)
Page 80 of 82
Typical Structural Steel Projects
7/29/2019 Kirby_Prequalifications_-_Rev_1311
81/82
Structural Steel
Prequalification Document (R2)
Page 81 of 82
Typical Structural Steel Projects
7/29/2019 Kirby_Prequalifications_-_Rev_1311
82/82
Structural Steel
Prequalification Document (R2)
Typical Structural Steel Projects