Kakatiya 1x600 MW Generator Stator Lifting on 11.06.2014. Kakatiya Thermal Power Project 1x600 MW . Shri Shiva Kumar Chief Engineer / KTPP TGGENCO breaking coconut on the occasion of Stator Lifting. . Kakatiya Thermal Power Project 1x600 MW . - PowerPoint PPT Presentation

Citation preview

Page 1: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya 1x600 MW Generator

Stator Lifting on 11.06.2014

Page 2: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

Shri Shiva Kumar Chief Engineer / KTPP TGGENCO breaking coconut on the occasion of Stator Lifting.

Page 3: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

Shri M V Keshavraj AGM BHEL Site breaking coconut on the occasion of Stator Lifting.

Page 4: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

Lifting of Generator Stator commenced at 0940 Hrs.

Page 5: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

Stator Lifting under progress.

Page 6: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

Stator entering TG floor.

Page 7: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

Stator Placed on Pedestals at 1100 Hrs

Page 8: Kakatiya 1x600 MW Generator Stator Lifting                       on 11.06.2014

Kakatiya Thermal Power Project 1x600 MW

TGGENCO officials along with BHEL staff after Stator Lifting