Kakatiya 1x600 MW Generator Stator Lifting on 11.06.2014. Kakatiya Thermal Power Project 1x600 MW . Shri Shiva Kumar Chief Engineer / KTPP TGGENCO breaking coconut on the occasion of Stator Lifting. . Kakatiya Thermal Power Project 1x600 MW . - PowerPoint PPT Presentation
Citation preview
Kakatiya 1x600 MW Generator
Stator Lifting on 11.06.2014
Kakatiya Thermal Power Project 1x600 MW
Shri Shiva Kumar Chief Engineer / KTPP TGGENCO breaking coconut on the occasion of Stator Lifting.
Kakatiya Thermal Power Project 1x600 MW
Shri M V Keshavraj AGM BHEL Site breaking coconut on the occasion of Stator Lifting.
Kakatiya Thermal Power Project 1x600 MW
Lifting of Generator Stator commenced at 0940 Hrs.
Kakatiya Thermal Power Project 1x600 MW
Stator Lifting under progress.
Kakatiya Thermal Power Project 1x600 MW
Stator entering TG floor.
Kakatiya Thermal Power Project 1x600 MW
Stator Placed on Pedestals at 1100 Hrs
Kakatiya Thermal Power Project 1x600 MW
TGGENCO officials along with BHEL staff after Stator Lifting