Jameel Arts Centre - Main Contract Works
Facts Project DescriptionThe Jameel Art Centre Dubai (JAC) Project comprises of the "build only" construction ofthe main building works and associated external works on the plot at Cultural Village,linked to the Dubai Creek.
The main scope includes an arts centre building with artist residence and creativeenterprise incubator consisting of galleries, artist studios, classrooms, incubator spacesand a restaurant.
Built up Area:Basement - 3,725 m²Ground Floor - 3,050 m²First Floor - 1,175 m²Second Floor - 650 m²Third Floor - 120 m²
Total : 8,720 m²
During the contract negotiation it was decided by the Client to convert main trades of thesubcontractor works into optional work packages, (will be awarded separately) likeelevators, external façade, doors, windows, floor & ceiling finishes, external works, lightfittings, etc.
Enabling works like shoring, piling etc. was awarded to Züblin Ground Engineering Dubaiin a separate contract.
City/Country
Dubai / United Arab Emirates
Client
Abdul Latif Jameel Landholdings Co. Ltd.,Dubai, U.A.E
Contract Value
€ 14,72 Mio.
Construction Period
10/2016 - 02/2018 (17 Months)
.