    Henderson Water Utility 4/27/04

    Potable Water Manual

    Technical Manual

    Requirements and Specifications

    For

    Potable Water Facilities

    Henderson Water Utility

    Henderson, Kentucky

    April 27, 2004

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    2/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    3/52

    Henderson Water Utility 4/27/04

    Potable Water Manual

    TABLE OF CONTENTS

    SECTION PAGE

    1.1 INTRODUCTION .....................................................................................................1

    1.2 PURPOSE..................................................................................................................2

    1.3 GENERAL CRITERIA .............................................................................................2

    1.4 GENERAL SPECIFICATIONS ................................................................................7

    1.4.1 GENERAL

    1.4.1.1 SCOPE ........................................................................................................ 10

    1.4.1.2 DESIGNATION OF PARTIES .................................................................. 10

    1.4.1.3 SAFETY ..................................................................................................... 10

    1.4.1.4 PRODUCT DELIVERY, STORAGE & HANDELING............................ 101.4.1.5 COOPERATION ........................................................................................ 11

    1.4.1.6 NOTIFICATION ........................................................................................ 11

    1.5 MATERIAL SPECIFICATIONS ............................................................................ 11

    1.5.1 PIPE

    1.5.1.1 PVC PIPE.................................................................................................... 11

    1.5.1.2 DUCTILE IRON PIPE ............................................................................... 12

    1.5.2 FITTINGS............................................................................................................ 13

    1.5.3 VALVES.............................................................................................................. 13

    1.5.4 FIRE HYDRANTS AND FLUSH HYDRANTS ................................................ 161.5.5 CASING PIPE FOR BORE OR DITCH CROSSING......................................... 17

    1.6 EXECUTION........................................................................................................... 17

    1.6.1 TRENCH EXCAVATION .................................................................................. 17

    1.6.2 LAYING OF PIPE............................................................................................... 20

    1.6.3 LOCATOR WIRE & TAPE ................................................................................ 27

    1.6.4 FIELD QUALITY CONTROL............................................................................ 27

    1.7 WATER SERVICE LINE & METER SETTER SPECIFICATIONS..................... 30

    1.7.1 PRODUCTS......................................................................................................... 30

    1.7.2 EXECUTION....................................................................................................... 31

    1.7.3 FIELD QUALITY CONTROL............................................................................ 31

    1.8 STANDARD DRAWINGS

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    4/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    5/52

    Henderson Water Utility - 1 - 4/27/04

    Potable Water Manual

    1.1 INTRODUCTION

    This document is a technical guide for the construction of new potable water facilities to

    serve existing and new development. The information contained herein outlines the policies,

    procedures, and technical requirements as approved by the Henderson Water and Sewer

    Commission. The intent is to establish uniform policies and procedures for the constructionand acceptance of potable water facilities that will provide efficient, reliable service and are

    compatible with the existing potable water system.

    HWU and the Henderson Water and Sewer Commission reserve the right to add to these

    procedures as may be necessary in order to achieve the required service to its customers.

    The HWU Chief Engineer is responsible for working with developers and others subject to

    the procedures and specifications contained herein and may be contacted by telephone at

    (270) 826-2824. The System Operations office is located at 230 N. Alvasia Street,

    Henderson, KY 42420.

    Provision of Potable Water Facilities

    HWU reserves the right to design and construct all improvements to the potable water system

    for existing and new developments. HWU realizes that in certain instances it may be in the

    best interest of all concerned for HWU to allow others to design and construct potable water

    facilities that are to become part of HWUs System. Before others are allowed to provide the

    construction of these facilities, the agreements specified herein must be properly executed,

    and all required licenses, permits, easements and rights of way obtained and copies provided

    to HWU, including recorded copies of all easements and rights of way.

    Water System Extensions

    The procedures in this manual will apply to extensions to furnish general water service to a

    prospective customer or group of prospective customers including new developments. The

    customer(s) being served are expected to pay the cost of the extension unless prior agreement

    has been made with HWU to share the cost.

    Any additions to the public potable water system made as a result of an agreement with

    HWU, shall become the property of HWU who reserves the right to further extend the lines

    or provide other facilities it deems necessary and the customer(s) would not qualify for any

    refund of the cost of the newly extended section.

    If a line extension is to be built on general road frontage or farmland, the extension will

    generally stop at a point just past the last point of service. However, in order that the right of

    way be available for future use, HWU will generally require that the customer grant a right-

    of-way over the entire frontage.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    6/52

    Henderson Water Utility - 2 - 4/27/04

    Potable Water Manual

    HWU may require developers or others requesting line extensions to pay the full cost of off-

    site improvements necessary to serve a development when the development benefits from the

    improvement or constructing the improvement is necessary to serve the development.

    1.2 PURPOSE

    The regulated potable water in Henderson lies on both public and private property. Portions

    of the potable water infrastructure are constructed through the HWU capital improvements

    projects and portions are constructed through private residential, commercial, and industrial

    development. In many cases, the HWU may ultimately become the owner of the potable

    water infrastructure constructed by private development. To responsibly regulate the potable

    water infrastructure, a consistent quality of construction is necessary regardless of the entity

    financing and managing the construction.

    The purpose of this manual is to provide standards to assure quality in the design and

    construction of potable water infrastructure that becomes a part of that owned or regulated by

    the HWU by providing standard design criteria to the engineers who design theinfrastructure. The manual establishes uniformity in design assumptions and general

    methods of design. The manual also sets policy regarding design standards and

    specifications and provides for uniform interpretation of the specifications. Finally, the

    manual outlines the required calculations and design applicable to all potable water

    infrastructure.

    This manual draws heavily on technical information and design criteria used in numerous

    city and state manuals and is thus similar in may instances to those manuals. However, this

    manual has been tailored to fit Henderson County and contains important provisions that are

    unique to this area.

    1.3 GENERAL CRITERIA

    The following is a list of procedures to be followed by a developer or others who wish to

    design, finance, and construct potable water system facilities line that will become a part of

    the HWU system. These procedures must be followed in order for the proposed potable

    water system facilities to be considered for acceptance and connection to the HWU system.

    Design Criteria

    All designs shall comply with HWUs Technical Manual for Potable Water Facilities.

    The following is a list of minimum design criteria required of any water facility to beapproved to connect to the HWU system.

    1. Pipe size and material shall be as determined by HWU consistent with state of the artengineering practices. PVC pipe C-900 and C-905; or cement lined ductile iron pipe,

    Pressure Class 350, shall be a minimum and shall be manufactured and installed in

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    7/52

    Henderson Water Utility - 3 - 4/27/04

    Potable Water Manual

    accordance with the specifications contained herein. Higher-class pipe may be

    required as deemed necessary by HWU. Any 8-inch or smaller distribution piping

    located in areas served directly by the HWU North Water Treatment Plant without

    passing through a storage tank and any pipe larger than 8 inches shall be ductile iron

    pipe. All pipelines shall be a minimum of 8-inch diameter, unless otherwise approved

    in writing by HWU. Where a water main dead ends at the end of a cul-de-sac and isdeemed by HWU to not likely be extended in the future, the water main may be

    reduced to a 2-inch HDPE pipe around the head of the cul-de-sac. Poly-wrap is

    required for all ductile iron pipe installations.

    2. The pipeline shall be installed on a level bottom with holes for the bells cut at eachjoint and bedded with select material. Mechanical restraint retainer glands shall be

    used on all fittings in accordance with the specifications contained herein.

    3. Fire hydrants shall be installed not more than 600 feet apart. Where in HWUsjudgment the line may be extended in the future, fire hydrants shall be installed on all

    dead-in lines in accordance with the specifications contained herein. In othersituations, HWU may allow the installation of flush hydrants (minimum 2 inch

    outlet with 3-inch D.I. barrel).

    4. Gate valves for lines smaller than 16 or butterfly valves for lines 16 and larger shallbe spaced at a maximum of 600 feet. Gate or butterfly valves shall also be provided

    at all branch lines and at the tie-in to the existing line. At line tee connections, 3

    valves shall be installed. A valve shall be installed at the end of every line followed

    by a full section of pipe and end cap unless otherwise approved in writing by HWU.

    Hydrant valves shall be installed with a 6 tee installation and no other taps or

    services. The hydrant valve shall isolate the hydrant only. Valves to be located

    outside roadway unless approved by HWU.

    5. Dead-end lines will not be allowed if HWU determines that connections can be madeto loop the system.

    6. The maximum working pressure shall not be more than two thirds of the pressurerating of the pipe.

    7. Air release valves shall be located at significant high points in the constructedfacilities. Significant high point is considered to occur at a change in elevation of one

    pipe diameter or greater.

    8. Casing pipes shall be sized to accommodate the next higher diameter carrier pipe.The casing pipe shall be placed a minimum of five (5) feet past the ditch or toe-of-

    slope or as required by the owner of the right-of-way being crossed.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    8/52

    Henderson Water Utility - 4 - 4/27/04

    Potable Water Manual

    9. Water mains shall be laid at least 10 feet horizontally from any existing or proposedsewer. A sewer is defined as any conduit conveying fluids other than potable water.

    The distance shall be measured from the outside of each pipe wall. Water lines

    crossing sewer mains shall have a vertical distance of 18 inches between the outside

    of the water main and the outside of the sewer. If a water line is to be laid beneath a

    sewer main, the sewer main shall be constructed of ductile iron pipe with one fulllength of pipe centered on the water main. At all crossings, one full length of the

    water main pipe shall be located so both joints will be as far from the sewer as

    possible. Special structural support for the water and sewer pipes may be required.

    10.Ductile iron lines within a 200-foot radius of oil or gasoline lines, undergroundstorage tanks, petroleum storage tanks, or pumping stations shall be constructed using

    pipe joint materials which are resistant to permeation of the petroleum products.

    11.Any over-dig required for boring operations or any other reason shall be backfilledwith #9 stone up to and including bedding for pipe.

    12.The results of water sample analyses from disinfection shall be distributed toKentucky Division of Water and HWU.

    13.The construction drawings shall include a profile of the water line.14.Where the facilities are being constructed to serve residential, commercial, or

    industrial lots; the developer shall install the water service line and appurtenances in

    accordance with the information contained herein. For residential lots a double meter

    box and hanger setting, placed on the property line between the two lots, shall be

    installed where possible. One-inch soft copper service line shall be installed for

    double meter settings and soft copper service line shall be installed for singlemeter settings.

    15.For ditch or waterway crossings 15 feet or greater in width, the following shallgenerally be provided; however, because of the variability in the different crossings

    each will be evaluated on a case by case basis:

    a. The pipe shall be of special construction, having flexible watertight joints;b. Valves shall be provided at both ends of water crossings so that the section

    can be isolated for testing or repair; the valves shall be easily accessible, and

    not subject to flooding; and the valve closest to the supply source shall be

    supplied with a test point.

    16.For ditch or waterway crossings less than 15 feet in width, restrained joint gasketsshall be used on the ductile iron pipe.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    9/52

    Henderson Water Utility - 5 - 4/27/04

    Potable Water Manual

    17.Water mains shall be designed and built so that they generally run adjacent to, butoutside of the road rights-of-way in dedicated utility easements. Easements for water

    lines shall be a minimum of 12 feet in width. Easements for water and sewer lines

    running parallel shall be of sufficient width to maintain a minimum of 10 feet of

    separation between the adjacent edges of the water and sewer lines. Easements for

    water lines running parallel shall be of sufficient width to maintain a separationbetween the adjacent edges of the parallel sewer lines based on the formula (invert

    depth in feet/2) or 5 feet minimum. The outer edge of the easement for single and

    parallel lines shall be a distance from the outside edge of the pipe(s) based on the

    formula (invert depth in feet/2) or 5 feet minimum.

    18.Easements wider than those described herein may be required at HWUs discretion.19.Water storage tanks, chlorine boosters, and booster pump stations will be designed in

    accordance with all applicable standards under separate contracts with the HWU.

    HWU will only accept fluted column or concrete composite elevated storage tanks

    unless it can be demonstrated that the life cycle costs of other types of tanks are lessthan fluted column or composite. Specific requirements for these improvements will

    be as directed by HWU based on the specific applications and in accordance with the

    HWU Standard Specifications for Elevated Water Storage Tank.

    20.Water lines shall be designed so that an individual meter can be installed to serveeach building, except for out buildings on residential lots.

    21.Water lines installed on a slope greater than 20 degrees shall be approved on a caseby case basis by HWU.

    Other

    1. In no case shall any existing valve be operated by other than HWU personnel.2. Any new section of water line must be ready for use before disinfection isaccomplished.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    10/52

    Henderson Water Utility - 6 - 4/27/04

    Potable Water Manual

    MATERIALS CHECKLIST

    PIPE DI (DUCTILE IRON)

    Pressure Class 350; AWWA/ANSI C151/A21.51

    Cement Mortar Lined with Bituminous Seal Coat

    Clow, Griffen, US Pipe or approved equal

    PVC PIPE AWWA C900-81 and C905-81Pipe 4 thru 12 diameter 150psi Pressure Class; Dimension ratio DR 18

    Pipe larger than 12 diameter 165psi Pressure Class; Dimension ratio DR 25

    J-M Manufacturing Co. or approved equal

    FITTING DI (DUCTILE IRON)

    Class 350; Mechanical Joint

    AWWA/ANSI C153/A21.53

    Cement Mortar Lined with Bituminous Seal Coat

    Tyler, Clow, Griffen or approved equal

    GATE VALVE Resilient Seat

    Rated Working Pressure 200 psi

    Mechanical Joint; AWWA C509

    Kennedy, Mueller or approved equal

    AIRRELEASE VALVE

    ANSI/AWWA C512Made from Non-Corrodible Materials

    Bronze Saddle, Corp Stop, and Globe Valve Required

    APCO Model 200 or 200A or approved equal

    TAPPING VALVE Resilient Seat

    AWWA C509

    Rate Working Pressure 200 psi

    Flanged x Mechanical Joint

    AWWA C550 Fusion Bonded Epoxy Coating

    Kennedy, Mueller or approved equal

    TAPPING SLEEVE Stainless Steel

    Flanged

    Rated Working Pressure 200 psi

    ASTM A126Kennedy, Ford or approved equal

    CASING Steel

    AWWA C-200

    Minimum 0.250 Wall Thickness

    Neither Coated nor Wrapped

    VALVE BOXES Adjustable Cast Iron

    Covers Marked Water

    4 Inside Diameter

    Screw Type

    Tyler/Union or approved equal

    FIRE HYDRANTS AWWA C502-80

    Kennedy Model K81A

    RETAINER GLANDS Ductile Iron PVCMeg-a-lug (Ebaa Iron), Uniflange Wedge Action Retainer (Ford) or

    approved equal

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    11/52

    Henderson Water Utility - 7 - 4/27/04

    Potable Water Manual

    1.4 GENERAL SPECIFICATIONS

    General Notes, Legend, And Map Index

    1.Name of development; name, address, and telephone number of developer in lowerright-hand corner of plans.

    2. Names of existing utilities and telephone numbers3. Vicinity map (highlighting proposed extension).4. Sheet index.5. Legend as follows:

    LEGEND

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    12/52

    Henderson Water Utility - 8 - 4/27/04

    Potable Water Manual

    6. General notes as follows:a. The contractor is prohibited from excavating by KRS Chapter 367 until existing

    underground utilities have been located by properly notified utility companies.

    Utility locations are approximate and based on information provided by others.

    Phone numbers for known utilities in the area are shown on this sheet, however other

    utility companies may also have facilities in the project area. Contractor shallidentify and contact all utilities per legal requirements.

    b. Existing water line locations shown hereon are approximate and based on as built

    drawings provided by owner.

    c. All ductile iron pipe shall be in accordance with Part 2 Products of the technical

    specifications.

    d. Main line tie-ins and meter reconnections shall be coordinated and scheduled such

    that water service shall not be disrupted for more than two hours in a single twenty-

    four hour period. Disrupted service periods shall be limited to mid-morning and mid-

    afternoon.

    e. Contractor shall perform reconnection work, if required, on the customers side of the

    meter under supervision of a licensed plumber. Compliance with all state and federalregulations, including obtaining required permits, shall be the responsibility of the

    general contractor. Said work shall be coordinated with the property owner on whose

    land the meter is located.

    f. Contractor shall be responsible for maintenance of traffic in accordance with KYDOT

    requirements. Contact Kentucky Transportation Cabinet District Office for traffic

    control manuals.

    g. All new temporary construction easements are 30 wide centered on pipeline as

    shown. All new permanent water line easements are 12 wide except as specified

    herein and noted.

    h. All blacktop (BT) driveways shall be bored without casing.

    i. All meters over 85 psi shall have an individual pressure-reducing valve installed withtandem setter at meter.

    j. Prior to construction, contractor shall have on hand all appropriate repair sleeves, etc,

    to quickly correct damage to all sizes and material of existing waterlines. Soundings

    and hand excavation shall be necessary to avoid damaging existing lines.

    k. Contractor shall comply with all local, state, and federal regulations pertaining to

    existing asbestos cement pipe.

    l. Water lines shall be disinfected in accordance with the specifications.

    Water Line Plan Sheet

    1. Minimum 24 x 36 sheet.2. Title block3. Name, address, and telephone number of developer

    4. Name, address and telephone number of engineer

    5. Professional engineer seal and signature

    6. Sheet number

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    13/52

    Henderson Water Utility - 9 - 4/27/04

    Potable Water Manual

    7. North arrow

    8. Scale (minimum 1 = 100)

    9. Date

    10.Right of way (designate city, county or state)11.Show waterline easements12.Property owners, deed book and page numbers of recorded plat13.Show all existing utilities in project area14.Show all new proposed utility lines15.Show detail of tie in to existing lines16.Show size of lines and class of pipe17.Show meter locations18.Show gate valves19.Show fire hydrants or flush hydrants at end of line20.Show match lines with station number reference21.Cross-reference the plan sheets at road intersections22.Show length and size of steel casing pipe for road bores or open cut23.Show distance to waterline from centerline of road or other visible permanent topography24.Provide detail information for all road, creek, and railroad crossingsSTANDARD DETAIL DRAWINGS

    Standard details must be included in the drawings if any of the items listed below are used:

    1. Fire Hydrant Assembly (profile view) HWU001.DWG2. Flush Hydrant Assembly (profile view) HWU002.DWG3. Test Connection Point HWU003.DWG4. Accordion Gate Valve and Box (in street) HWU004.DWG5. Valve placement at tees (plan view) HWU005.DWG6. Service tap HWU006.DWG7. 5/8 to 1 Single Meter Setting HWU007.DWG8. 1 Dual Meter Setting HWU008.DWG9. Meter and box placement HWU009.DWG10.Thrust blocking HWU0010.DWG11.Water main: open cut Installation HWU0011.DWG12.Water main: ditch or Stream crossing HWU0012.DWG13.Proposed water line under Proposed sewer line HWU0013.DWG14.Cased water line crossing Under roadway HWU0014.DWG15. Casing detail HWU0015.DWG

    16. Air Release Valve HWU0016.DWG

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    14/52

    Henderson Water Utility - 10 - 4/27/04

    Potable Water Manual

    1.4.1 GENERAL

    1.4.1.1 SCOPE

    1.4.1.1.1 The work to be accomplished under this section of the Specifications consists

    of the furnishing of all labor, materials, equipment, and services necessary forthe construction of potable water mains and appurtenances as shown on the

    Drawings and more fully described herein.

    1.4.1.2 DESIGNATION OF PARTIES

    1.4.1.2.1 The City of Henderson, Henderson Water Utility is the utility having

    jurisdiction and supplying water and/or sewer service and is referred to herein

    as Henderson Water Utility and abbreviated as HWU.

    1.4.1.2.2 Contractor shall refer to the party or parties who have been retained by either

    HWU or others to perform the construction work.

    1.4.1.2.3 Engineer refers collectively to the HWU General Manager, an Engineer in

    responsible charge working under contract to HWU or in the employ of

    HWU, or an Engineer in responsible charge working in the employ of a

    developer working under an Infrastructure Development Agreement.

    1.4.1.2.4 Owner refers collectively to HWU or to a developer working under an

    Infrastructure Development Agreement.

    1.4.1.3 SAFETY

    All work shall be carried out in strict accordance with all applicable rules and regulations of

    the Kentucky Labor Cabinet, Division of Occupational Safety and Health, and, for projects

    contracted directly with HWU, the document titled HWU Safety Policies.

    1.4.1.4 PRODUCT DELIVERY, STORAGE AND HANDLING

    1.4.1.4.1 Care shall be exercised in transporting and handling to avoid damage to pipe

    and fittings, and all appurtenances.

    1.4.1.4.2 Materials shall be stored in an enclosure or under protective coverings if

    required by the engineer to prevent damage.

    1.4.1.4.3 Materials shall not be stored directly on the ground.

    1.4.1.4.4 The inside of pipes and fittings shall be kept free of dirt and debris.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    15/52

    Henderson Water Utility - 11 - 4/27/04

    Potable Water Manual

    1.4.1.4.5 Contractor shall inspect materials furnished by HWU at delivery and shall

    replace at his own expense all materials found defective after delivery.

    Contractor shall report to HWU immediately upon finding defects in any

    material supplied by HWU. Contractor shall furnish all materials and labor

    required for replacement of installed materials found to be defective or

    damaged after delivery.

    1.4.1.4.6 HWU reserves the right to reject any materials that do not comply with these

    standards.

    1.4.1.5 COOPERATION

    Cooperation with the Owner concerning construction activities is required.

    1.4.1.6 NOTIFICATON

    The Contractor shall give the Owner or Owners representative a minimum of 48 hoursnotice before starting construction. Where a public roadway must be closed, notify all safety

    agencies and the general public in accordance with local, state and federal regulations.

    Where a private driveway must be closed, provide the resident a minimum 48 hours

    advanced notice. Non-residential private driveway crossings shall be done so that continual

    access is maintained.

    1.5 MATERIAL SPECIFICATIONS

    1.5.1 PIPE

    1.5.1.1 PVC PIPE

    1.5.1.1.1 PVC pipe 4 thru 12 diameter for potable water main shall conform to

    AWWA C900-81, 150 psi pressure class, dimension ratio DR 18. Pipe larger

    than 12 diameter shall conform with AWWA C905-81, 165 psi pressure

    class, dimension ration DR 25. Joints shall be of the push-on type as

    specified.

    1.5.1.1.2 PVC pipe with rubber gaskets shall conform to dimensions and tolerances:

    ASTM D-2241, ASTM D-2122, and National Sanitation Foundation F-14

    1.5.1.1.3 Materials: ASTM D-1784 and National Sanitation Foundation for potablewater use. Pipe and couplings shall be made of virgin PVC compounds with a

    cell classification of 12454-A or 12454-B. The hydrostatic design basis rating

    shall be 4,000 psi for water at 73.4 degrees F (23 degrees C).

    1.5.1.1.4 Joints and seals: ASTM D-3139 and ASTM F-477.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    16/52

    Henderson Water Utility - 12 - 4/27/04

    Potable Water Manual

    1.5.1.1.4 Lubricants: Compatible with PVC materials and approved for use in potable

    water line pipe.

    1.5.1.1.5 Each piece of pipe shall bear the manufacturers name or trademark, and the

    National Sanitation Foundation (NSF) mark of approval.

    1.5.1.2 DUCTILE IRON PIPE

    1.5.1.2.1 Ductile iron pipe shall be designed and manufactured in accordance with the

    latest revision of ANSI/AWWA C150/A21.50 for a minimum 150 psi (or

    project requirements, whichever is greater) rated working pressure plus a 100

    psi surge allowance (if anticipated surge pressures are other than 100 psi, the

    actual anticipated pressure should be used); and a 2 to 1 factor of safety on the

    sum of working pressure plus surge pressure.

    1.5.1.2.2 Ductile iron pipe shall be manufactured in the U.S.A. in accordance with thelatest revision of ANSI/AWWA C151/A21.51. Each pipe shall be subjected

    to a hydrostatic pressure test of at least 500 psi at the point of manufacture.

    1.5.1.2.3 Pipe shall have standard asphaltic coating on the exterior. Pipe shall also have

    a cement-mortar lining on the interior in accordance with ANSI/AWWA

    C104/A21.4, or latest revision.

    1.5.1.2.4 The class or nominal thickness, net weight without lining, and casting period

    shall be clearly marked on each length of pipe. Additionally, the

    manufacturers mark, country where cast, year in which the pipe was

    produced, and the letters DI or DUCTILE shall be cast or stamped on thepipe.

    1.5.1.2.5 All pipe shall be furnished with Push-on Type Joints, such as Tyton or

    Fastite. Joints shall be in accordance with ANSI/AWWA C111/A21.11, of

    latest revision, and be furnished complete with all necessary accessories.

    1.5.1.2.6 Fittings shall be manufactured in the U.S.A. and be ductile iron. Fittings shall

    conform to the latest revision of ANSI/AWWA C153/A21.53. Fittings shall

    have a standard asphaltic coating on the exterior. Fittings shall also have a

    cement-mortar lining on the interior in accordance with ANSI/AWWA

    C104/A21.4, or latest revision.

    1.5.1.2.7 Fittings and accessories shall be furnished with Mechanical Type Joints in

    accordance with ANSI/AWWA C111/A21.11, or latest revision.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    17/52

    Henderson Water Utility - 13 - 4/27/04

    Potable Water Manual

    1.5.1.2.8 All pipe, fittings and accessories shall be installed and tested in accordance

    with the latest revision of ANSI/AWWA C600.

    1.5.1.2.9 Polyethylene protection wrapping will be required for all ductile iron

    installations. Polyethylene shall be either 4 mil. HDCL or 8 mil. LLD

    installed in accordance with AWWA C105.

    1.5.2 FITTINGS

    1.5.2.1 Fittings for water lines shall be ductile iron fittings in accordance with

    ANSI/AWWA C153/A21.53) and shall conform to the details and dimensions

    shown therein. Fittings shall have mechanical joints meeting the requirements

    of ANSI/AWWA C111/A21.11). Fittings shall have interior cement-mortar

    lining as specified for the pipe.

    1.5.2.2 Mechanical joints shall be bolted and of the stuffing box type and shall consist

    of a bell, with exterior flange and interior recess for the sealing gasket, a pipeor fitting plain end, a sealing gasket, a follower gland, tee-head bolts and

    hexagon nuts.

    1.5.2.3 All mechanical joint connections shall be made using restraining joint glands.

    1.5.2.3.1 Meg-A-Lug type fittings specific to the pipe material or other mechanical

    restraining system approved in writing by HWU shall be used.

    1.5.2.3.2 All restraining joint glands to be installed according to manufacturer

    specifications concerning torque.

    1.5.3 VALVES

    1.5.3.1 GATE VALVES

    1.5.3.1.1 All gate valves shall conform with the latest revision of AWWA C-509

    Standard for Gate Valves - 3 inch through 48 inch - For Water and Other

    Liquid. Valves shall be manufactured by Mueller, M&H, American Valve

    and Hydrant, U.S. Pipe, or Kennedy.

    1.5.3.1.2 All gate valves shall be of the resilient seat type, ductile iron body, non-rising

    stem, fully bronze mounted and suitable for water working pressures of 150psi., unless otherwise indicated in the drawings. Valves shall be of standard

    manufacturer and of the highest quality both as to materials and workmanship.

    1.5.3.1.3 All gate valves shall be furnished with mechanical joint end connections,

    unless otherwise shown on the Drawings or specified hereinafter.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    18/52

    Henderson Water Utility - 14 - 4/27/04

    Potable Water Manual

    1.5.3.1.4 All gate valves shall have the name or monogram of the manufacturer, the

    year the valve casting was made, the size of the valve, and the working water

    pressure cast on the body of the valve.

    1.5.3.1.5 Each gate valve installed in the ground shall be installed in a vertical positionwith a valve box. Gate valves set with valve boxes shall be provided with a 2-

    inch square operating nut and shall be opened by turning to the left

    (counterclockwise).

    1.5.3.1.6 Gate valves shall be sized and installed at locations shown on the drawings.

    1.5.3.2 BUTTERFLY VALVES

    1.5.3.2.1 All butterfly valves shall be of the tight closing, rubber seat type with rubber

    seats, which are recess mounted and securely fastened to the valve body or to

    the valve disc. Valves shall be rated for 150 psi pressure. Valve discs shallrotate 90 degrees from the full open position to the tight shut position. Valves

    shall meet the full structural requirements of the application classes of

    AWWA C504, latest revision.

    1.5.3.2.2 Valve bodies shall be constructed of ductile iron and shall have integrally cast

    mechanical joint ends. Two (2) trunnions for shaft bearings shall be integral

    with each valve body. Body thickness shall be strictly in accordance with

    AWWA C504. Valves shafts shall be constructed of stainless steel or of other

    approved construction.

    1.5.3.2.3 The disc shall be constructed of any material described in AWWA C504,Section 3.4. All disc seating edges shall be smooth and polished. Valve

    shafts shall be a one-piece unit extending full size through the valve disc and

    bearings. Valve seats shall be a natural rubber to a synthetic compound and

    shall be mounted in body or on the disc. Disc mounted seats shall be

    mechanically retained; body mounted seats shall be bonded to the valve body.

    Bonded-in seats must be simultaneously molded in, vulcanized and bonded to

    the body and the seat bond must withstand 75 pounds pull under test

    procedure ASTM D429, Method B. Valves shall be fitted with sleeve type

    bearings. Bearing load shall not exceed 2,500 psi. Valves shall be as

    manufactured by Henry Pratt Company, Aurora, Illinois; Dresser; or

    American-Darling.

    1.5.3.2.4 The operators shall be the traveling nut type, AWWA C504, Class 150B. All

    operators shall be fully gasketed and grease packed and designed to withstand

    submersion in water to 10 psi. The number of turns to move from fully open

    to fully closed shall closely resemble conventional distribution valve practice

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    19/52

    Henderson Water Utility - 15 - 4/27/04

    Potable Water Manual

    to minimize water hammer. The operator shall be equipped for buried

    service.

    1.5.3.2.5 All surfaces of the valve shall be clean, dry, and free from grease before

    painting. The valve interior surfaces except seating surfaces shall be evenly

    coated with black asphalt varnish in accordance with Federal SpecificationsTT-C-494 B and AWWA C504.

    1.5.3.2.6 Hydrostatic and leakage tests shall be conducted in strict accordance with

    AWWA C504, Section 5.

    1.5.3.2.7 Butterfly valves installed in the ground shall have the operator nut in a

    vertical position for use in the valve box.

    1.5.3.2.8 Butterfly valves shall be sized and installed at locations shown on the

    Drawings.

    1.5.3.3 AIR RELEASE VALVES AND BOXES

    1.5.3.3.1 Air release valves and boxes shall be installed at the high points in the lines as

    shown on the Drawings. Air valve stems shall be connected to the main by a

    corporation stop. Valves shall be suitable for average working water pressure

    of 300 psi, have a 2-inch large orifice and a 3/32-inch small orifice. Valves

    shall be equipped with cast iron body and cover, stainless steel float, Buna-N

    seat and bronze linkage. Air release valves shall be APCO Model 200 or

    200A or approved equal.

    1.5.3.3.2 Air release valves shall be connected to the main by a corporation stop withinside I.P.S. threaded outlet. The inlet pipe to the valve shall be 304 stainless

    steel pipe with I.P.S. male threaded ends.

    1.5.3.3.3 The air valve boxes shall be a straight section of 36 RCP with standard

    manhole frame and lid, and shall be set on a crushed stone or gravel base.

    1.5.3.4 TAPPING SLEEVES AND VALVES

    1.5.3.4.1 Tapping sleeves shall be suitable for working pressures of 150 psi.

    1.5.3.4.2 Tapping sleeves for connections to existing water lines shall be two-piecefabricated saddles of all stainless steel construction with stainless steel or

    ductile iron flanges. Saddle bolts are to be stainless steel.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    20/52

    Henderson Water Utility - 16 - 4/27/04

    Potable Water Manual

    1.5.3.4.3 Tapping valves shall be of the mechanical joint type suitable for working

    pressures of 150 psi and shall be Mueller No. H-667, American Valve and

    Hydrant No. 565, M&H No. 751, Kennedy Figure 4950 or approved equal.

    1.5.3.4.4 Line tapping materials shall be supplied and installation performed by HWU

    personnel.

    1.5.3.5 VALVE BOXES

    1.5.3.5.1 Valve boxes shall be of 5-1/4 inch, standard cast iron, two or three piece,

    screw type valve box with drop cover marked WATER. Valve boxes and

    covers shall be as manufactured by Tyler Corporation, Opelika Foundry,

    Bingham & Taylor, or approved equal.

    1.5.4 FIRE HYDRANTS AND FLUSH HYDRANTS

    1.5.41 FIRE HYDRANTS

    1.5.4.1.1 Fire hydrants shall conform in all respects to the requirements of AWWA

    C502, latest revision. The hydrant barrel shall have a safety breakage feature

    above the ground line. All hydrants shall have 6-inch mechanical joint shoe

    connection; two 2-1/2-inch hose discharge nozzles and one 4-1/2-inch pumper

    nozzle. The nozzle connection threads shall be National Standard Threads

    (N.S.T.). The main valve shall have 5-1/4-inch full opening and be of the

    compression type, opening against water pressure so that the main valve

    remains closed should the barrel be broken off. Each nozzle is to be protected

    by nozzle caps. The caps shall be furnished with a 1-1/2-inch pentagonal

    opening nut, gaskets and attachment chains.

    1.5.4.1.2 Hydrants shall be furnished for a minimum 3-6 bury depth. The Contractor

    is responsible to provide adequate hydrant barrel length for proper installation

    in accordance with the standard drawings and the manufacturers

    recommendations.

    1.5.4.1.3 The hydrants shall be fully bronze mounted. The main valves shall have a

    threaded bronze seat ring assembly of such design that is easily removable by

    unscrewing from a threaded bronze drain ring. Drainage waterways shall be

    completely bronze to prevent rust and corrosion.

    1.5.4.1.4 The operating stem shall be equipped with anti-friction thrust bearing to

    reduce operating torque and assure easy opening. A stop shall be provided to

    limit stem travel. Stem threads shall be enclosed in a permanently sealed

    lubricant reservoir protected from weather and the waterway with O-ring

    seals.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    21/52

    Henderson Water Utility - 17 - 4/27/04

    Potable Water Manual

    1.5.4.1.5 Hydrants shall be Kennedy K81A.

    1.5.4.2 FLUSH HYDRANTS

    1.5.4.2.1 Flush Hydrants shall be Kupferle Eclipse 2 Post Hydrant (in pedestrian orvehicular traffic areas, M & H Flush Type Style 333 furnished with cast iron

    box and cover) or approved equal.

    1.5.4.2.2 Flush hydrants shall be installed at the locations shown on and in accordance

    with the plans. Flush hydrants shall be installed with a reducer, valve, and

    with the top flush with the ground or sidewalk. They shall not be installed on

    a tap off the water main. A thrust block is required for flush hydrants the same

    as for a fire hydrant. The flush hydrant shall be located on the easement with

    good access for use.

    1.5.5 CASING PIPE FOR BORE OR DITCH CROSSING

    1.5.5.1 Casing pipe for water lines installed by road boring or in ditch crossings

    where required on the drawings or bid documents shall be steel, plain end,

    uncoated and unwrapped, have a minimum yield point strength of 35,000psi

    and conform to ASTM A252 Grade 2 or ASTM A139 Grade B without

    hydrostatic tests. The steel pipe shall have welded joints and be in at least 18-

    foot lengths. Pipe shall be straight along the centerline axis within 1/50 of the

    outside diameter. Pipe shall also be free from dents or humps due to damage

    or variations in wall thickness.

    1.5.5.2 For highway and ditch crossings, the minimum wall thickness of the casingpipe shall be 0.250 inches for 16 inch and smaller casings; 0.312 inches for 18

    inch, 20 inch, and 22 inch casings, 0.344 for 24 inch and larger casings. For

    railroad crossings casings shall have a minimum wall thickness of 0.344

    inches.

    1.5.5.3 Field lock gaskets shall be installed at all carrier pipe joints within all

    encasement pipe and within one pipe length outside the casing on both ends.

    1.6 EXECUTION

    1.6.1 TRENCH EXCAVATION

    1.6.1.1 Trenching shall be accomplished as described hereinafter. All excavation on

    this project is unclassified and no additional payment will be made for rock

    excavation unless a separate bid item is provided for rock excavation. Rock is

    defined herein as hardpan or bedrock of such consistency as to not be

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    22/52

    Henderson Water Utility - 18 - 4/27/04

    Potable Water Manual

    breakable with standard excavating equipment, and specifically excludes any

    rubble or boulders.

    1.6.1.2 Unless otherwise directed by the Engineer, trenches in which pipes are to be

    laid shall be excavated in open cut to the depths shown on the plans, or as

    specified by the Engineer. Excavation in earth shall undercut the pipe to adepth below the required invert elevation that will permit laying the pipe in a

    bed of granular material to provide continuous support for the bottom

    quadrant of the pipe. The bedding shall be as set out in hereinafter.

    1.6.1.3 Trenches shall be of sufficient width to provide free working space on each

    side of the pipe and to permit backfilling around the pipe, but unless

    specifically authorized by the Engineer, trenches shall in no case be excavated

    or permitted to become wider than 2 feet 6 inches plus the nominal diameter

    of the pipe at the level of or below the top of the pipe. If the trench does

    become wider than 2 feet 6 inches at the level of or below the top of the pipe,

    special precautions may be necessary, such as providing compacted, granularfill up to top of the pipe or providing the pipe with additional crushing

    strength as determined by the Engineer after taking into account the actual

    trench loads that may result and the strength of the pipe being used. The

    Contractor shall bear the cost of such special precautions as are necessary.

    1.6.1.4 All excavated materials shall be placed a minimum of 2 feet back from the

    edge of the trench.

    1.6.1.5 Prior to excavating the trench, Contractor shall pothole far enough ahead to

    reveal obstructions that may necessitate changing the line or grade of the

    pipeline, in order to avoid delays or the addition of avoidable fittings.

    1.6.1.6 Unless specifically directed otherwise by the Engineer, not more than 100 feet

    of trench shall be opened ahead of pipe laying work of any one crew, and not

    more than 100 feet of open ditch shall be left behind the pipe laying work of

    any one crew. Watchman or barricades, lanterns and other such signs and

    signals as may be necessary to warn the public of the dangers in connection

    with open trenches, excavation and other obstructions, shall be provided by

    and at the expense of the Contractor. Conformance to all state highway

    requirements shall be the responsibility of the Contractor when encroachment

    on highway right-of-way is necessary.

    1.6.1.7 When so required or when directed by the Engineer, only one-half of street

    crossings and road crossing shall be excavated before placing temporary

    bridges over the side excavated for the convenience of the traveling public.

    All backfilled ditches shall be maintained in such a manner that they will offer

    no hazard to the passage of traffic. The convenience of the traveling public

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    23/52

    Henderson Water Utility - 19 - 4/27/04

    Potable Water Manual

    and property owners abutting shall be taken into consideration. All public or

    private drives shall be taken into consideration and shall be promptly

    backfilled or bridged at the direction of the Engineer. Disposal of excavated

    materials shall cause as little interference with the work as possible, and in

    every case the disposition of materials shall be satisfactory to the Engineer.

    Trenches in which pipes are to be laid shall be excavated in open cut to thedepths shown on the approved plans, cut sheets or as specified by the

    Engineer.

    1.6.1.8 Where conditions exist that may be conductive to slides or cave-ins, proper

    and adequate sheeting, shoring and bracing shall be installed to provide safe

    working conditions and to prevent damage to work. Trenches shall be kept

    free of water during the laying of the pipe and until the pipeline has been

    backfilled. All excavation shall be in accordance with OSHA and/or KOSHA

    regulations. Where a trench box is used, the excavation shall be made such

    that the box rests on undisturbed soil fully above the top of the installed pipe

    to a maximum of two (2) feet or the maximum allowed by other regulation,whichever is less; to avoid disturbing the pipe bedding when the box is pulled

    forward. Where sheeting or shoring is used, it shall be fully removed with the

    completion of backfilling unless otherwise approved in writing by HWU.

    1.6.1.9 Water line trenches shall be excavated to the depths shown on the plans or as

    directed by the Engineer. If depths are not shown on the plans, all water lines

    shall have 3-6 to 4-0 cover unless otherwise approved by the Engineer.

    1.6.1.10 Dewatering of trenches shall be considered a part of trenching, at no extra cost

    to HWU. Dewatering of trenches shall include ground water and storm or

    sanitary sewage. Suitable pumping and other dewatering equipment are to beprovided by the CONTRACTOR, to insure the installation of the pipeline

    structure in a dewatered trench and under the proper conditions. Dewatering

    shall include all practical means available for prevention of surface runoff into

    trenches and scouring against newly laid pipe.

    1.6.1.11 Wherever pipelines are in, or cross, driveways and streets, the Contractor shall

    be responsible for any trench settlement which occurs within these right-of-

    ways within one (1) year from the time of final acceptance of the work. If

    paving shall require replacement because of trench settlement within this

    time, it shall be removed and/or replaced by the Contractor at no extra cost to

    the Owner. Repair of settlement damage shall meet the approval of theEngineer, the City of Henderson, Kentucky, and/or the Kentucky Department

    of Highways.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    24/52

    Henderson Water Utility - 20 - 4/27/04

    Potable Water Manual

    1.6.2 LAYING OF PIPE

    1.6.2.1 Laying Requirements

    1.6.2.1.1 Pressure pipe shall be installed in accordance with AWWA C600, latest

    revision, and laid to lines, cover or grades shown on the drawings. Waterlines installed on a slope greater than 20 degrees shall be approved on a case

    by case basis by HWU.

    1.6.2.1.2 Each segment of pipe must be swabbed out before lowering into trench. All

    pipe shall be visually inspected for cleanliness and proper jointing.

    1.6.2.1.3 The points insisted upon in the laying of pipe will be: Proper alignment,

    evenness of width and depth of joints, perfection in jointing, and care of the

    pipe in handling. Joint deflections shall not exceed one-half of the

    manufacturers recommended maximum allowable.

    1.6.2.1.4 Precautions must be taken to prevent flotation of the pipe should water enter

    the trench prior to putting the pipeline into operation.

    1.6.2.1.5 In wet, yielding and mucky locations where pipe is in danger of sinking below

    grade or floating out of grade or alignment, or where the backfill materials are

    of such a fluid nature that such movements of the pipe might take place during

    the placing of the backfill, the pipe must be weighted or secured permanently

    in place by such means as will prove effective. If crushed rock fill beneath

    the pipe is necessary for stability, it will be paid for at the unit price bid per

    ton of such material in place except in cases where instability is caused by

    neglect of the CONTRACTOR.

    1.6.2.1.6 Whenever pipe laying is stopped, the end of the pipe shall be securely plugged

    with a watertight plug.

    1.6.2.1.7 Elbows, plugs, dead end valves, and tees shall be firmly blocked, as shown on

    the Drawings, to prevent internal pressure from springing the pipe from the

    intended alignment, with permanent materials solidly placed without covering

    pipe joints.

    1.6.2.1.8 No pipe shall be laid resting on solid rock, blocking or other unyielding

    objects. Jointing before placing in the trench and subsequent lowering ofmore than one section jointed together will not be allowed except as otherwise

    stated herein or pre-approved by HWU.

    1.6.2.1.9 When locating near sewer lines, the horizontal separation between water and

    sewer lines should be at least 10 feet measured to the pipe wall exterior.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    25/52

    Henderson Water Utility - 21 - 4/27/04

    Potable Water Manual

    Should location conditions prevent a horizontal separation of 10 feet, HWU

    may allow a deviation on a case by case basis, if supported by data from the

    engineer. Such deviation may be allowed if the sewer is laid in a separate

    trench or if it is laid in the same trench with the water main located at one side

    on a bench of undisturbed earth. In either case, the elevation of the crown of

    the sewer is at least 18 inches below the invert of the water main.

    1.6.2.1.10 Water mains crossing above sewer lines shall be waterworks grade ductile

    iron pipe. The crossing shall be at the midpoint of the section of sewer pipe.

    The ductile iron water pipe shall be laid with a 20-foot section of pipe

    centered at the sewer line to insure that joints are as far as possible from the

    crossing.

    1.6.2.1.11 Water mains crossing sewers shall be laid to provide a minimum vertical

    distance of 18 inches between the outside of the water main and the outside of

    the sewer. Should location conditions prevent the water main from being

    buried to meet the above requirements and maintain minimum cover, HWUmay allow a deviation on a case by case basis, if supported by data from the

    engineer. Such deviation may be allowed if the sanitary sewer line is

    constructed with ductile iron pipe with protective internal coating of

    Protecto-401 or equivalent epoxy coating (RCP or cement lined DIP for

    storm sewer) for a distance of 10 feet on each side of the water line and one

    full length of water main is centered over the sewer so that both joints will be

    as far from the sewer as possible. As an alternative for existing sewers, the

    sewer line may be encased in a steel casing pipe with end seals for 10 feet on

    each side of the water line.

    1.6.2.2 PIPE BEDDING

    1.6.2.2.1 All water main pipe shall be bedded with select material. Where suitable soil

    conditions are encountered, the trench bottom may be shaped to cradle the

    bottom 60 degrees of the pipe.

    1.6.2.2.2 All water main pipe shall be supported on a level trench bottom. Holes in the

    trench bottom or bedding for pipe bells must be provided at each joint and

    should be no larger than necessary for proper joint assembly and assurance

    that pipe barrel will lie flat on trench bottom. The trench must supply true and

    even support for pipe.

    1.6.2.2.3 In no case shall the pipe be supported directly on solid rock. When rock is

    encountered in the trench bottom, bedding shall consist of fine gravel or size

    #9 crushed stone only.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    26/52

    Henderson Water Utility - 22 - 4/27/04

    Potable Water Manual

    1.6.2.3 SPECIAL BACKFILL

    1.6.2.3.1 Crushed stone for Special Backfill where required as set out in these

    specifications, shall be Kentucky Bureau of Highways crushed stone, size #9.

    In locations that require SPECIAL BACKFILL the entire trench shall be

    filled with No. 9 crushed stone to a point 4 below the final subgrade. In mostcases this will occur under road crossings. The top 6 of the trench shall be

    filled with DGA followed by the appropriate layer of surface material

    (asphalt, concrete, gravel, etc.) to bring the trench to final grade.

    1.6.2.3.2 All bore pits and any over digging related to such will be stabilized with #3

    stone and backfilled with #9 stone to sub-grade.

    1.6.2.4 INSTALLATION AND JOINTING

    1.6.2.4.1 Jointing of push-on type Ductile Iron Pipe with rubber gasket couplings shall

    be accomplished in accordance with the manufacturers specifications.

    1.6.2.4.2 Pipe shall not be laid in water or upon frozen sub grade at any time or

    condition when, in the opinion of the HWU, conditions are unsuitable.

    1.6.2.5 BACKFILLING

    1.6.2.5.1 Backfilling of pipeline trenches shall be accomplished in accordance with the

    details set forth hereinafter.

    1.6.2.5.2 In all cases walking or working on the completed pipelines, except as may be

    necessary in tamping or backfilling, will not be permitted until the trench hasbeen backfilled to a point one foot (1) above the top of the pipe. The filling

    of the trench and the tamping of the backfill shall be carried on

    simultaneously on both sides of the pipe in such a manner that the completed

    pipeline will not be disturbed and injurious side pressures do not occur. The

    methods of backfilling shall be as follows:

    1.6.2.5.3 Method A - Backfilling in Open Terrain:

    1.6.2.5.3.1 The lower portion of the trench, from the pipe bedding to a point six (6)

    inches above the top outside surface of the pipe, shall be backfilled with

    previously excavated soil material which is free from rock and/or acceptableto the Engineer. This soil material shall be placed in a manner approved by

    the Engineer and shall be lightly compacted by walking in or hand tamping to

    avoid displacement of the pipe. Crushed stone or fine gravel may be used as

    backfill in lieu of the compacted soil materials. Tamping or compaction, or

    materials used in lieu of same, is not a separate pay item.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    27/52

    Henderson Water Utility - 23 - 4/27/04

    Potable Water Manual

    1.6.2.5.3.2 The upper portion of the trench above the compacted portion shall be

    backfilled with material which is free from large rock. Incorporation of rock

    with any individual piece having a volume exceeding eight (8) cubic inches is

    prohibited. Backfilling this portion of the trench may be accomplished by any

    means approved by the Engineer. The trench backfill shall be heaped over thetop of the trench or leveled as directed by the Engineer. Material for

    backfilling the upper portion of the trench is not a separate pay item.

    1.6.2.5.4 Method B - Backfilling Under Sidewalks and Unpaved Driveways:

    1.6.2.5.4.1 The trench from the bottom of the trench to grade shall be backfilled with No.

    9 crushed stone, or fine river gravel.

    1.6.2.5.5 Method C - Backfilling Under Streets, Roads and Paved Driveways:

    1.6.2.5.5.1 The lower portion of the trench to a point six inches (6) below the bottom ofthe pavement or concrete sub-slab shall be backfilled with No. 9 crushed

    stone or fine gravel. Backfill for the lower portion of the trench is not a

    separate pay item.

    1.6.2.5.5.2 The upper portion of the trench, from the top of the #9 stone to grade, shall be

    backfilled with a base course of dense graded aggregate. At such time that

    pavement replacement is accomplished, the excess base course shall be

    removed as required. Material for backfilling the upper portion of the trench

    is not a separate pay item.

    1.6.2.5.5.3 Before final acceptance, the Contractor will be required to level off alltrenches or to bring the trench up to grade. The Contractor shall, at his

    expense, also remove and legally dispose of all excess earth or other materials

    resulting from construction from roadways, right-of-ways and/or private

    property. Hazardous materials are to be handled and disposed of in

    accordance with all local, State and Federal requirements.

    1.6.2.5.5.4 In the event that pavement is not placed immediately following trench

    backfilling in streets and highways, the Contractor shall be responsible for

    maintaining the trench surface in a smooth and level condition at proper

    pavement grade at all times. The Contractor shall be liable for any damage to

    persons or property resulting from the Contractors failure to maintain thetrench surface.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    28/52

    Henderson Water Utility - 24 - 4/27/04

    Potable Water Manual

    1.6.2.6 CONCRETE CRADLE ANCHORS, THRUST BLOCKS OR

    ENCASEMENTS

    1.6.2.6.1 Concrete anchors and thrust blocking of water mains and fittings shall be

    placed where shown on the Drawings, required by the Specifications, or as

    directed by the Engineer. Concrete shall be 2,500 psi and shall be mixedsufficiently wet to permit it to flow under the pipe to form a continuous bed.

    In tamping concrete, care shall be taken not to disturb the grade or line of the

    pipe or injure the joints.

    1.6.2.6.2 All valves shall be anchored in accordance with the details on the project

    drawings.

    1.6.2.6.3 No fitting shall be totally encased in concrete so as to prohibit future

    excavation or repairs.

    1.6.2.6.4 Concrete cradles and/or encasement shall not be allowed except with expresswritten permission by the HWU. If concrete trench stabilization is necessary,

    excavate the trench and place the concrete to allow a minimum of four (4)

    inches of granular material between the concrete and the installed pipeline or

    structure. If concrete protection is required over the top of the pipeline, place

    a minimum of four (4) inches of granular material between the pipeline and

    the concrete. If flowable fill concrete is used to backfill the trench, bed the

    pipeline as indicated on the drawings to a point at least 12 inches above the

    top of the pipe prior to placement of the flowable fill.

    1.6.2.7 DITCH OR WATERWAY CROSSINGS

    1.6.2.7.1 For ditch or waterway crossings 15 feet or greater in width, unless the design

    plans indicate otherwise, the pipe shall be of special construction, having

    flexible watertight joints, and valves shall be provided at both ends of the

    crossing so that the section can be isolated for testing or repair. The valves

    shall be easily accessible, and not subject to flooding. The valve closest to the

    supply source shall be supplied with a test point.

    1.6.2.7.2 For ditch or waterway crossings less than 15 feet in width, restrained joint

    gaskets shall be used on the ductile iron pipe.

    1.6.2.7.3 The Contractor shall include allowance in his bid to divert water during creekcrossing installation, dewatering and/or other steps necessary to accomplish

    the work. No extras will be allowed for this work unless clearly outside the

    scope of what normally should be expected and the Contractor immediately

    notifies the Owner if such a situation is encountered.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    29/52

    Henderson Water Utility - 25 - 4/27/04

    Potable Water Manual

    1.6.2.8 FIRE HYDRANT INSTALLATION

    1.6.2.8.1 Hydrants shall be located as shown on the plans or as directed by the

    Engineer. The location shall provide complete accessibility and minimize the

    possibility of damage from vehicles or injury to pedestrians. When placed

    behind the curb or sidewalk, the hydrant barrel shall be set so that no portionof the pumper or hose nozzle cap will be less than 4-0 from the gutter face

    of the curb, the edge of sidewalk, or a driveway. All hydrants shall stand

    plumb with the pumper nozzle facing the curb. Hydrants shall be set to the

    established grade, with nozzles at 18 inches above finished grade as shown on

    the drawings or as directed by the Engineer. Unless otherwise shown, each

    hydrant on the drawings shall be connected to the main with a 6-inch branch

    connection controlled by an independent 6-inch gate valve. Fine grade river

    gravel to be placed 6 from surface to 6 below waterline in a 2-0 radius

    around hydrant barrel, for dissipation of weep hole drainage. No drainage

    sump shall be connected to a sanitary sewer. No hydrant shall be set over any

    other utility.

    1.6.2.8.2 All hydrants shall be provided with a concrete backing. The concrete backing

    shall be concrete thrust block, minimum of 2-4 x 6 x 16 concrete block,

    set against undisturbed earth. The backing shall be placed between

    undisturbed ground and the fitting to be anchored. The backing shall be so

    placed that the pipe and fitting joints will be accessible for repair. If shown

    on the drawings or directed by the Engineer any movement shall be prevented

    by attaching suitable metal rods, clamps, or restrained fittings.

    1.6.2.9 FITTING INSTALLATION

    1.6.2.9.1 M.J. Fittings shall be installed with a restraining gland (Meg-a-Lug by Ebaa

    Iron, Uni-Flange Series 1400 by Ford Meter Box, or approved equal) or other

    mechanical restraining system approved in writing by HWU and torqued at

    the specified foot-pounds of the manufacturer. Additionally, joining restraint

    is required along the length of pipe indicated on the drawings for the various

    type and size of fitting.

    1.6.2.9.2 All rubber gaskets in M.J. fittings shall be soaped as per manufacturer

    recommendations.

    1.6.2.9.3 Mechanical joints shall be made in accordance with the recommendations ofthe manufacturer. Joint bolts shall be drawn up equally around the entire

    periphery maintaining equal spacing from the gland to the face of the flange at

    all points around the joint. All bolts shall be tightened to within the following

    torque range. Bolts may be snugged with an air wrench.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    30/52

    Henderson Water Utility - 26 - 4/27/04

    Potable Water Manual

    FINAL TIGHTENING SHALL BE BY HAND OPERATED TORQUE WRENCH

    WITH BOLTS TORQUED TO THE FOLLOWING SPECIFICATIONS:

    PIPE SIZE BOLT SIZE RANGE OF

    TORQUE

    (in.) (in.) (ft.-lb.)

    3 5/8 45-60

    4-24 3/4 75-90

    30-36 1 100-120

    42-48 1 1/4 120-150

    1.6.2.10 TERMINATION OF LINE

    1.6.2.10.1 Lines shall be terminated for future use as shown on the drawings. If not

    shown on the drawings, termination shall be with a flushing hydrant.

    1.6.2.11 LINE VALVES

    1.6.2.11.1 Line valves shall be installed not more than 600 apart and where a main tees

    off to another line. A line valve shall be installed at each outlet/inlet of the

    tee, for a total of 3 valves. Tees for hydrants shall include 2 line valves and

    one hydrant valve. A line valve shall be installed at the end of every line with

    full section of pipe and end cap. Line valve to be placed outside roadway

    unless approved by HWU.

    1.6.2.12 HYDRANT VALVES

    1.6.2.12.1 Hydrant valves shall be installed on a single 6 tee line with no other taps or

    services. Hydrant valve must isolate the hydrant only.

    1.6.2.12.2 Valve boxes for gate valves shall be two or three piece type. Valve boxes

    shall be accurately centered over valve operating nut, with backfill thoroughly

    tamped about them. Valve box bases shall not rest on the valves but shall be

    supported on crushed stone fill. They shall be set vertically and properly cut

    and/or adjusted so that the tops of boxes will be at grade in any paving, walk

    or road surface, and 2 to 3 inches above ground in grass plots, fields, woods,

    or other open terrain.

    1.6.2.13 CASING PIPE FOR BORE OR DITCH CROSSING

    1.6.2.13.1 Steel casing pipe for bore or ditch crossings shall be placed at the elevations

    shown on the Drawings. All joints between lengths shall be solidly welded

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    31/52

    Henderson Water Utility - 27 - 4/27/04

    Potable Water Manual

    with a smooth non-obstructing joint inside. The casing pipe shall be installed

    without bends. The pipelines shall be installed after the casing pipe is in

    place.

    1.6.2.13.2 Ductile Iron pipes in casings shall be supported with manufactured PVC or

    polyethylene liner skids in accordance with the manufacturersrecommendations. A minimum of two spacers shall be provided with each

    length of pipe. All skid materials shall be furnished and installed at the

    Contractors expense.

    1.6.2.13.3 At each end of the casing pipe, the pipeline shall be sealed with casing seals

    model AM by Advance Products and Systems, Inc., (www.advprod.com).

    1.6.3 LOCATOR WIRE AND TAPE

    1.6.3.1 Tracer wire and locator tape shall be furnished and installed with all water

    mains. The tracer wire shall be taped or suitably held over the top center ofthe pipe and shall be #12 single strand copper wire with THW insulation or

    approved equal. All splices shall be made with the aid of DBR Direct Bury

    Splice Connectors as manufactured by 3M Electrical Products Division to

    insure continuity and insulation of the copper wire from the soil. Tracer wire

    shall be securely connected at flange bolts to all valves, fittings and hydrants

    to provide a suitable electrical connection. The electrical continuity of tracer

    wire between valves and fire hydrants shall be verified and defects found shall

    be corrected prior to acceptance by the Engineer. A metallic locator tape shall

    be buried in the trench a minimum of 12 over the top of the pipe and a

    minimum of 12 below the finished grade. The words Caution Water Line

    Below shall be repetitively printed along the length of the tape.

    1.6.4 FIELD QUALITY CONTROL

    1.6.4.1 TESTING PIPE

    1.6.4.2 The CONTRACTOR will be required to test all pipelines and appurtenances

    with water. The maximum test pressure, measured at the lowest elevation of

    the pipeline being tested, shall be the pressure class of the pipe unless a

    specific test pressure is shown on the Drawings. The minimum test pressure

    shall be 1.5 times the design static pressure or 150 psi, whichever is greater.

    1.6.4.1.3 When the line or section being tested is pumped up to the required pressure, it

    shall be valved off from the pump and a pressure gauge placed in the line.

    The pressure drop in the line, if any, shall be noted. If no pressure drop is

    noted in 4 hours, the HWU, at its discretion, may accept the line or section as

    being tested, or HWU may require the test run the full 24 hours.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    32/52

    Henderson Water Utility - 28 - 4/27/04

    Potable Water Manual

    1.6.4.1.4 At the end of the 24-hour test period, the pressure shall be recorded. If there

    is a drop in pressure, the CONTRACTOR shall be required to find and repair

    any leaks, and retest until there is no pressure drop over the test period.

    1.6.4.1.5 Regardless of the testing, all leaks that are evident, in the opinion of theENGINEER, due to water at the surface of the ground, or by listening, the

    leak can be heard underground with the geophone, or any other means of

    determining a leak, the CONTRACTOR shall be required to repair those

    leaks.

    1.6.4.1.6 The CONTRACTOR shall furnish the meter or suction tank, pipe test plugs,

    and bypass piping, and make all connections for conducting the above tests.

    The pumping equipment used shall be centrifugal pump, or other pumping

    equipment, which will not place shock pressures on the pipeline. Power

    plunger or positive displacement pumps will not be permitted for use on

    closed pipe system for any purpose.

    1.6.4.1.7 Inspection of pipe laying shall in no way relieve the CONTRACTOR of the

    responsibility for passing tests or correcting poor workmanship.

    1.6.4.1.8 All testing will be observed by HWU or HWUs representative.

    1.6.4.1.9 Test sections of water main shall not exceed 2500 feet in length. Inline valves

    are to be suitably located along the water main to accommodate this

    requirement.

    1.6.4.2 DISINFECTION

    1.6.4.2.1 The new section must be ready for use before disinfection is done and the new

    line placed into service.

    1.6.4.2.2 Before any new section is put into service and prior to final acceptance, the

    CONTRACTOR shall disinfect all constructed water lines carrying treated

    water in accordance with AWWA C651, latest revision, and local and state

    regulations.

    1.6.4.2.3 Prior to starting disinfection, all water mains must be thoroughly flushed to

    remove debris. Disinfection will then be accomplished by the adding of thechlorine solution while filling the main to obtain the initial 50 ppm of

    chlorine. The CONTRACTOR shall supply all equipment, labor, etc.

    necessary for flushing and disinfecting the mains. The CONTRACTOR shall

    submit, in writing, to the ENGINEER, the method he proposes to use for

    adding the chlorine.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    33/52

    Henderson Water Utility - 29 - 4/27/04

    Potable Water Manual

    1.6.4.2.4 Disinfection shall be accomplished by filling the new and/or repaired portions

    of the system with water having a chlorine content of at least 50 parts per

    million and at the end of a 24 hour contact time a residual of at least 25 parts

    per million shall remain. At the end of the 24-hour contact period, all the

    sterilized surfaces and areas shall be thoroughly flushed from the watersystem.

    1.6.4.2.5 For tie-ins to an existing system such as the use of tapping valves where

    keeping the main out of service would restrict service to existing customers,

    disinfection shall, at the ENGINEERS discretion, consist of thoroughly

    cleaning the new part with a solution containing not less than 200 mg/l (ppm)

    chlorine.

    1.6.4.2.6 After initial disinfection and flushing, the CONTRACTOR will use a certified

    lab to collect water samples for bacteriological testing. A core zone, which

    includes up to the first mile, shall be established. Two samples shall betaken from the core zone. Additionally, 1 sample taken from each mile of

    new distribution main shall be submitted to HWU. A new or routine

    replacement main shall not be placed in service until negative laboratory

    results are obtained on the bacteriological analyses. Sample bottles shall be

    clearly identified as special construction tests. If any of the samples are

    found to be positive or contain confluent growth, the CONTRACTOR shall

    repeat the disinfection procedure until the required numbers of negative

    samples are obtained.

    1.6.4.2.7 Certified results shall be presented to HWU in writing before the new section

    is put in service. HWU personnel will then place the new section in service ifusage connections are made and the section is ready for use. Under no

    circumstances are valves to be operated by anyone other than HWU

    personnel.

    1.6.4.2.8 Water used for flushing shall be metered and charged to the CONTRACTOR.

    1.6.4.3 DE-CHLORINATION

    1.6.4.3.1 Chlorinated water shall be disposed of in accordance with 401 KAR 5:031

    and 8:020 which state that the allowable in stream concentration of chlorine is

    10 ug/l, which is equal to 0.01 mg/l. The CONTRACTOR shall submit, inwriting to the ENGINEER, the method he proposes for dechlorinating.

    Recommended chemicals, as given in AWWA C651-86, are sulfur dioxide,

    sodium bisulfate, sodium sulfite, and sodium thiosulfate.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    34/52

    Henderson Water Utility - 30 - 4/27/04

    Potable Water Manual

    1.6.4.4 WATER FOR TESTING, FLUSHING, AND DISINFECTION

    1.6.4.4.1 Water for the initial pressure test, flushing, and disinfection will be supplied

    or paid for by the CONTRACTOR.

    1.7 WATER SERVICE LINE & METER SETTER SPECIFICATIONS

    1.7.1 PRODUCTS

    1.7.1.1 All service pipe shall be type K soft copper.

    1.7.1.2 METER SETTER KIT

    1.7.1.2.1 dual setter kit shall be CITCO #DH1434-2-COMP or WWSI Fab Meter

    Box or approved equal.

    1.7.1.2.2 1 dual setter kit shall be CITCO CMU 1.0 or 1 WWSI Fab Meter Box orapproved equal.

    1.7.1.2.3 1 dual setter kit shall be CITCO CMU 1.5 or 1 WWSI Fab Meter Box

    or equal.

    1.7.1.2.4 2 dual setter kit shall be CITCO CMU 2.0 or 2 WWSI Fab Meter Box or

    approved equal.

    1.7.1.3 METER BOX TOPS AND LIDS

    1.7.1.3.1 Dual meter box top and lid shall be Ford Model A53H-T or Vestal RMC-21Lwith small nut non-recessed CI meter box locking ring and cover 32-094 or

    approved equal.

    1.7.1.3.2 Single meter box top and lid shall be Ford Model A52H-TT or Vestal RMC-

    18L meter box cover, 32-023 or approved equal.

    1.7.1.3.3 Corporation stop shall be Ford Model F-600-3, F-600-4, FB400-6, FB400-7 or

    approved equal.

    1.7.1.3.4 All soft copper connections shall be flare type connections.

    1.7.1.3.5 Service saddles shall be Ford Model FS303 or approved equal.

    1.7.1.3.6 Service saddles are required for PVC mains.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    35/52

    Henderson Water Utility - 31 - 4/27/04

    Potable Water Manual

    1.7.2 EXECUTION

    1.7.2.1 All new service lines, corporation stops and meter kits necessary for service

    up to and including the meter box shall be installed before water main is

    tested or put in service.

    1.7.2.2 All new corporation stops are to be installed in the horizontal 3 oclock or 9

    oclock positions in accordance with standard drawing.

    1.7.2.3 All taps on the water main shall be made with an AWWA approved tapping

    machine (no manual taps will be allowed). Saddles are not required for taps

    of 1 or smaller on ductile iron pipe. All other taps require the use of a

    service saddle. Saddles are required on all PVC pipe.

    1.7.2.4 A standard setter kit shall be installed at locations as shown on the

    construction drawings and as per standard drawings.

    1.7.2.5 Backfill under sidewalk, curb and roadway shall be special backfill as per

    standard drawings.

    1.7.2.6 Final finish elevation on meter kit assembly shall match final finish grade of

    lot.

    1.7.2.7 Location of meter kit assembly shall be centered on property line.

    1.7.3 FIELD QUALITY CONTROL

    1.7.3.1 All new service lines and accessories shall be tested to same standards and atthe same time as the water main.

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    36/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    37/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    38/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    39/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    40/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    41/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    42/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    43/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    44/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    45/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    46/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    47/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    48/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    49/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    50/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    51/52

  • 7/27/2019 Hwu Technical Manual Potable Water 2004-04-27

    52/52