Standing Committee on Concrete Technology Annual Concrete Seminar 2007

High Workability Concrete for Bored Pile Construction

CC Wai, Alan Wan Gammon Construction Limited

Page 2: High Workability Concrete for Bored Pile Construction

iRl lA . det

mi

iL n oictur

stnoC n o

mma

G 6 002©

2

ghts

Res

erve

d.

Page 3: High Workability Concrete for Bored Pile Construction

Week 2

Week 3

Week 1

Sequence of Work in Bored Pile Construction

Sun Mon Tue Wed Thu Fri Sat

Excavation

Excavation Rock Drilling

Rock Drilling Airlifting Concrete Cage

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

3

Page 4: High Workability Concrete for Bored Pile Construction

. dver

seeR s thgi

R l lA . detimiL n oi

cturstno

Cn o

mma

G 6 002©

4

Page 5: High Workability Concrete for Bored Pile Construction

Presentation Scope

• Method of Concreting Bored Pile

• Problems and Defects

• Deficiencies in Current Practice

• Proactive Approach

• The Way Forward

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

5

Page 6: High Workability Concrete for Bored Pile Construction

Concreting of Bored Pile

. dver

seeR

s thgiRl lA

. detimiL

n oictur

stnoC

n om

maG

6 002©

6

Page 7: High Workability Concrete for Bored Pile Construction

General Setup ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

Ramp

Skip

Tremie Pipe

Concreting Platform

Concrete Truck

Concrete

7

Page 8: High Workability Concrete for Bored Pile Construction

m

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

Stages in Bored Pile Concreting

(1) (2) (3) (4)

Extract Tremie Pipe Extract Temporary Casing

Concrete Overbreak

Drop in Concrete

Head

Tremie Pipe

Temporary Casing

©20

06 G

am

8

Page 9: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

9

Cement Grout

Concrete

Page 10: High Workability Concrete for Bored Pile Construction

QA / QC

• Slump tests / Flow table

• Check temperature ( 32o)

• Cube samples to determine concrete strength

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

10

Page 11: High Workability Concrete for Bored Pile Construction

©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

11

Concreting Takes Many Hours

12:00 14:00

18:00 21:00

Page 12: High Workability Concrete for Bored Pile Construction

30

25

ours

)

20

(h 15

10

Tim

e

5

0 0 20 40 60 80 100

Pile Length (m)

Concreting Time Varies With Pile Length ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

12

Page 13: High Workability Concrete for Bored Pile Construction

©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

13

Slump Varies With Time

Time

Slu

mp

Page 14: High Workability Concrete for Bored Pile Construction

Common Problems Encountered

• Temporary casing cannot be withdrawn

• Tremie pipe cannot be withdrawn

• Blocked tremie pipe

• Reinforcement cage rides up with temporary casing

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

14

Page 15: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

15

Defects

Page 16: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

16

Honeycomb

• Reduced workability affects self compaction

Page 17: High Workability Concrete for Bored Pile Construction

©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

17

Air Voids

Page 18: High Workability Concrete for Bored Pile Construction

Entrapped Air Inside Concrete During Pouring ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

Air Voids

(1) (2) (3) 18

Page 19: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

19

Segregated Concrete

• Additive quantity needs fine-tuning

Page 20: High Workability Concrete for Bored Pile Construction

Remedial Actions

• Grouting

• High pressure water jet to remove “weak” concrete, followed by pressure grouting

• Stitched pile

• Additional pile

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

20

Page 21: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

21

Deficiencies in Current Practice

Page 22: High Workability Concrete for Bored Pile Construction

First In …. Last Out ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

16

17

1 *

2

3

18

First few truckloads need to remain workable throughout concreting

* Indicate order of truckload

22

Page 23: High Workability Concrete for Bored Pile Construction

Deficiencies in Current Practice ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

• Large piles / deep piles mean large concrete volume

• Specification / Contract Document – Single slump value specified on drawing – Workability vs time not considered – Lack of flexibility in interpretation

• Quality control – Need to control consistency in material

properties

23

Page 24: High Workability Concrete for Bored Pile Construction

The Proactive Approach ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

• Need to Consider …..

– Specification

– Concrete volume (related to pile size

and depth)

– Site constraints (physical or

environmental restrictions)

– Site location (travel time to site from

batching plant)

24

Page 25: High Workability Concrete for Bored Pile Construction

Pile Acceptance

Time

Concrete Performance

Material Consistency

Concrete Site Construction Volume Constraints Procedure

Route to Pile Acceptance ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

25

Page 26: High Workability Concrete for Bored Pile Construction

Delivery ~ 3 hours

Grade 45/20 •Designed slump 200mm

•Workability 5 hours

SUCCESS STORY ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

Hong Kong – Shenzhen Western Corridor

26

Page 27: High Workability Concrete for Bored Pile Construction

SUCCESS STORY Hong Kong – Shenzhen Western Corridor

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

• Supplier formulated a special concrete mix with enhanced workability

• Engineer relaxed concreting time to 5 hours

• Contractor checked workability prior to pouring

• Side-effect : minor segregation, need to pour additional concrete to avoid undercasting

27

Page 28: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

28

Way Forward

Page 29: High Workability Concrete for Bored Pile Construction

Concrete Triangle ©

2006

Gam

mon

Con

stru

ctio

n Li

mite

d. A

ll R

ight

s R

eser

ved.

Designer

Contractor Concrete Supplier

Concrete Quality / Performance

Constructability

Slump Retention Consistency

29

Page 30: High Workability Concrete for Bored Pile Construction

©20

06 G

amm

on C

onst

ruct

ion

Lim

ited.

All

Rig

hts

Res

erve

d.

30