B A R A G A R H B O L A N G I R KALAHANDI SAMBALPUR MALKANGIRI KORAPUT RAYAGADA GAJAPATI KANDHAMAL B O U D H A N G U L DEOGARH MAYURBHANJ P U R I NH-5 NH-5 NH-6 280.060 KM NH-5 205.614 KM NH-6 215.320 KM NH-6 NH-23 NH-6 NH-6 N H -2 0 1 NH-201 NH-217 NH-217 NH-200 NH-200 NH-42 NH-2 3 NH-215 NH-215 NH-200 NH-5 NH- 200 NH-5 233.0 KM NH-217 150.0KM NH-43 NH-43 NH-6 NH-42 NH-203 61.521KM NH-5A NH-5A 77.400KM NH-60 NH-200 156.436KM 52.372KM NH-60 161.0KM 189.900KM 269.0KM NH-215 352.0KM NH-6 KEONJHAR 121.0KM NH-215 279.0KM NH-23 211.50KM NH-23 337.300KM NH-23 478.410KM NH-6 421.0KM NH-6 83.400KM NH-23 NH-201 0.000 KM NH-43 365.40KM NH-43 473.267KM NH-43 316.745KM 67.00KM NH-200 00.00KM NH-6 88.00KM NH-6 47.00KM NH-200 NH-6 566.00KM NH-42 268.386KM NH-201 319.60KM NH-42 130.00KM 288.77KM 301.893KM 8.80KM NH-200 NH-23 0.00KM NH-23 15.75KM NH-23 94.00KM NH-42 NH-200 105.50KM NH-42 0/0KM NH-215 199.200KM OF NH-5 JAJPUR 193.00KM NH-217 438.430KM 165.0KM 240.0KM 138.00KM 116.0KM 24.0KM NH-217 0.0KM NH-200 428.02KM E XP . WA Y VIZIANAGARAM BASTAR RAIPUR RAIPUR RAIG ARH GUM L A KOLKATA KOLKATA SUNDARGARH JHARSUGUDA KENDRAPARA BHADRAK 250.00KM NH-200 156.436KM 0.00KM 47 48 51 4 4 4 34 34 17 17 17 39 39 44 44 44 44 44 6A 6A 3 42 42 6 6 6 41 41 15 15 45 45 46 46 5 5 5 41 7 7 7 29 29 29 33 GANJAM 30 30 31 31 33 35 49 49 49 49 50 50 32 32 23 23 9 9 11 11 11 11 53 53 53 53 19 19 19 63 28 10A 55 3 3 52 7A NH-217 26 50 NH-203 Ext. NH-203A NH-22 4 NH-75 Extn. 1 1 1 9A 9A Boula B A R A G A R H NUAPADA NAWARANGAPUR KALAHANDI DHENKANAL SAMBALPUR MALKANGIRI KORAPUT GAJAPATI KANDHAMAL CUTTACK KHURDA SUBARNAPUR B O U D H NAYAGARH DEOGARH MAYURBHANJ P U R I JAGATSINGHPUR JAJPUR SUNDARGARH JHARSUGUDA KENDRAPARA BHADRAK BALASORE 47 48 51 4 4 4 34 34 17 17 17 39 39 44 44 44 44 44 6A 6A 3 3 6 6 6 41 41 15 15 45 45 46 46 5 5 5 41 7 7 7 29 29 29 33 GANJAM 30 30 30 31 31 33 35 49 49 49 49 50 50 32 32 23 23 9 9 11 11 11 11 53 53 53 53 19 19 19 63 65 65 28 55 3 3 52 7A 26 50 1 1 1 9A 9A 9A Boula 18 M 24 22 25 25 25 30 16 37 36 20 62 40 56 GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT FEASIBILITY STUDY AND DETAILED PROJECT PREPARATION FOR PHASE-I: YEAR I ROADS Draft Final Environmental Assessment Report January 2007 MAIN REPORT CONSULTING ENGINEERS GROUP LTD. E-12, Moji Colony, Malviya Nagar, Jaipur-17 Tel: +91-141-2520899, 2521899, 2520556 Fax: 2521348, E-mail: [email protected]

GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

B A R A G A R H

B O L A N G I R

KALAHANDI

SAMBALPUR

MALKANGIRI

KORAPUT

RAYAGADA GAJAPATI

KANDHAMAL

B O U D H

A N G U L

DEOGARH

MAYURBHANJ

P U R I

NH-5

NH-5

NH-6280.060 KM

NH-5

205.614 KM NH-6

215.320 KM

NH-6

NH-23

NH-6

NH-6

NH

-201

NH-201

NH-217

NH-217

NH-200

NH-200NH-42

NH-

23

NH-215

NH-215

NH-200

NH-5

NH

-200

NH-5233.0 KM

NH-217150.0KM

NH-43

NH-43

NH-6

NH-42

NH-20361.521KM

NH-5A

NH-5A77.400KM

NH-60

NH-200156.436KM

52.372KM NH-60

161.0KM

189.900KM

269.0KMNH-215

352.0KMNH-6

KEONJHAR

121.0KMNH-215

279.0KMNH-23

211.50KMNH-23

337.300KMNH-23

478.410KM NH-6

421.0KMNH-6

83.400KM NH-23

NH-2010.000 KM

NH-43365.40KM

NH-43473.267KM

NH-43316.745KM

67.00KM

NH-20000.00KM

NH-688.00KM

NH-647.00KM

NH-200

NH-6

566.00KM

NH-42268.386KM

NH-201319.60KM

NH-42130.00KM

288.77KM301.893KM

8.80KM

NH-200

NH-230.00KMNH-23

15.75KMNH-23

94.00KMNH-42

NH-200

105.50KMNH-42

0/0KMNH-215

199.200KMOF NH-5

JAJPUR

193.00KM

NH-217438.430KM

165.0KM

240.0KM

138.00KM116.0KM

24.0KMNH-2170.0KM

NH-200428.02KM

EXP.WAY

VIZIANAGARAM

BASTAR

RAIPUR

RAIPUR

RAIGARH

GU

MLA

KOLKATA

KOLK

ATA

SUNDARGARH

JHARSUGUDA

KENDRAPARA

BHADRAK

250.00KM

NH-200156.436KM0.00KM

47

48

51

4

4

4

34

34

17

17

17

39

39

44

44

44

44

44

6A

6A

3

42

42

66

6

41

41

15

15

45

45

46

46

5

5

5

41

7

7

7

29

29

29

33

GANJAM

3030

31

31

33

35

49

49

49

49

50

50

32

32

23

23

9

9

11

11

11

11

53

53

53

53

19

19

19

63

28

10A

55

3

3

52

7A

NH-217

26

50

NH-203 Ext.

NH-203A

NH-224

NH-7

5 Ex

tn.

1

1

1

9A

9A

Boula

B A R A G A R H

NUAPADA

NAWARANGAPUR

KALAHANDI

DHENKANAL

SAMBALPUR

MALKANGIRI

KORAPUT

GAJAPATI

KANDHAMAL

CUTTACK

KHURDA

SUBARNAPUR

B O U D H

NAYAGARH

DEOGARH

MAYURBHANJ

P U R I

JAGATSINGHPUR

JAJPUR

SUNDARGARH

JHARSUGUDA

KENDRAPARA

BHADRAK

BALASORE

47

48

51

4

4

4

34

34

17

17

17

39

39

44

44

44

44

44

6A

6A

3

3

66

6

41

41

15

15

45

45

46

46

5

5

5

41

7

7

7

29

29

29

33

GANJAM

30

3030

31

31

33

35

49

49

49

49

50

50

32

32

23

23

9

9

11

11

11

11

43

43

53

53

53

53

19

19

19

63

65

65

28

55

3

3

52

7A

26

50

1

1

1

9A

9A

9A

Boula

18

60

M

57

M

13

13

24

22

25

25

25

30

1637

36

20

62

40

56

GOVERNMENT OF ORISSA WORKS DEPARTMENT

ORISSA STATE ROAD PROJECT

FEASIBILITY STUDY AND DETAILED PROJECT PREPARATION FOR PHASE-I: YEAR I ROADS

Draft Final Environmental Assessment Report

January 2007

MAIN REPORT

C O N S U L T I N G ENGINEERS GROUP LTD. E-12, Moji Colony, Malviya Nagar, Jaipur-17 Tel: +91-141-2520899, 2521899, 2520556 Fax: 2521348, E-mail: [email protected]

Page 2: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ABBREVIATIONS

ADB Asian Development Bank

ASI Archaeological Survey of India

ADVs Animal Drawn Vehicles

BP Bank Practices

CAMPA Compensatory Afforestation, Fund Management and Planning Authority

CD Cross Drainage

CGWB Central Ground Water Board

CoI Corridor of Impact

CPCB Central Pollution Control Board

CPR Common Property Resources

CT Census Town

DFO Divisional Forest Officer

DOE Department of Environment

DPR Detailed Project Report

EA Environment Assessment

EAC Expert Appraisal Committee

EIA Environment Impact Assessment

EMAP Environment Management Action Plan

EMP Environment Management Plan

FACOR Ferro Alloys Corporation of Orissa

FGD Focus Group Discussion

GoI Government of India

GoO Government of Orissa

GP Good Practices, Gram Panchayat

Page 3: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

HAL Hindustan Aeronautics Limited

HDVs Human Drawn Vehicles

IBs Inspection Bungalows

IER Independent Environmental Review

IMD Indian Meteorological Department

IMFA Indian Metals & Ferro Alloys Corporation

IRC Indian Road Congress

ISAP Institutional Strengthening Action Plan

KBK Koraput-Bolangir-Kalahandi

LCV Light Commercial Vehicles

MDR Major District Road

MoEF Ministry of Environment & Forests

MoST Ministry of Surface Transport

MOU Memorandum of Understanding

NAC Notified Area Council

NALCO National Aluminium Company

NGO Non Government Organization

NH National Highway

NOC No Objection Certificate

NTPC National Thermal Power Corporation

O&M Operation & Maintenance

OBCC Orissa Bridge Construction Corporation

ODR Other District Road

OFC Optical Fibre Cable

OP Operational Policies

OSPCB Orissa State Pollution Control Board

OSRP Orissa State Roads Project

Page 4: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

OUAT Orissa University of Agriculture & Technology

OWD Orissa Works Department

PA Protected Areas

PAPs Project Affected Persons

PIA Project Influence Area

PIU Project Implementation Unit

PRI Panchayati Raj Institutions

RCC Reinforced Concrete Cement

R&R Rehabilitation & Resettlement

RD Rural Development

ROB Road Over Bridge

RoW Right of Way

SC Schedule Caste

SEZ Special Economic Zone

SEIAA State Environment Impact Assessment Authority

SH State Highway

SHG Self Helf Group

ST Scheduled Tribe

ToR Terms of Reference

TW Tube Well

VECs Valued Environment Components

WB World Bank

Page 5: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

TABLE OF CONTENTS

CHAPTERS TITLE PAGE NOS.

EXECUTIVE SUMMARY I - X CHAPTER-I INTRODUCTION 1

1.1 Development of Road Network – A Prerequisite to Develop Orissa’s Economy 1

1.2 Project Background 2 1.3 Positive Impacts/Benefits from the Project 3 1.4 Negative Impacts of the Project: 4 1.5 Boundaries of OSRP 4 1.6 Need for Environment Assessment (EA) for OSRP 6 1.7 Scope of the EA Study 6 1.8 Objective of the Environmental Assessment 8 CHAPTER-II METHODOLOGY FOR ENVIRONMENT ASSESSMENT 9 2.1 Steps in Environment Assessment Exercise 9 2.2 Use of Findings of Environment Screening Exercise 9 2.3 Review of Project Information/Policy/Legal Documents 10 2.4 Collection of Secondary Information/Data 11 2.5 Collection and Generation of Baseline Data 12 2.6 Assessment of Environmental Impacts 14 2.7 Community Consultation/Public Participation 15 2.8 Preparation of EMAP 15 CHAPTER-III PROJECT DESCRIPTION 16 3.1 Overall Details of OSRP 16 3.2 Corridor wise Details of Phase - I: Year - I Roads 17 3.3 Proposed Civil Activities, Designs, and Specifications 22 CHAPTER-IV LEGAL FRAMEWORK & ADMINISTRATIVE POLICIES 24 4.1 Natural Environment 24 4.2 Social and Cultural Environment 26 4.3 Other Legislations Applicable to Road Projects 27 4.4 Salient Features of Important Laws/Regulations 28 4.5 World Bank Requirements 36 4.6 Summary of Clearance Requirements 37 4.7 Project Promoter Responsibilities Interfaces with other Agencies 37

Page 6: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

CHAPTERS TITLE PAGE NOS.

4.8 Capability of OWD for Interface Management 39 CHAPTER-V EXISTING CONDITIONS 40 5.1 Geographical Coverage 40 5.2 Physiography 41 5.3 Geology 43 5.4 Hydrology 45 5.5 Soil 46 5.6 Climate 47 5.7 Land Utilization & Agriculture 53 5.8 Livestock 60 5.9 Fisheries 61 5.10 Minerals 62 5.11 Industries 63 5.12 Archaeological Sites/Places of Tourist Interest 63 5.13 Forest & Vegetation of the Area 64 5.14 Wildlife 66 5.15 Water Bodies 67 5.16 Demography 70 5.17 Availability of Infrastructure & Service Facilities 72 5.18 Noise Level 74 5.19 Water Quality 75 5.20 Air Quality 78 5.21 Soil Quality 79 5.22 Traffic Volume 82 CHAPTER-VI FINDINGS OF COMMUNITY CONSULTATION EXERCISE 85 6.1 Objectives of Community Consultation 85 6.2 Consultation Process 86 6.3 Communication Strategies followed for Community Consultation 86 6.4 Findings of Community Consultation 87 CHAPTER-VII POTENTIAL ENVIRONMENTAL IMPACTS 93 7.1 Type of Impacts 93 7.2 Impacts of Location 94 7.3 Impacts of Project Design 94

Page 7: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

CHAPTERS TITLE PAGE NOS.

7.4 Impacts During Construction 94 7.5 Impact During Operation Phase 111

CHAPTER-VIII ANALYSIS OF ALTERNATIVES & MITIGATION MEASURES 114

8.1 Alternative Alignment/Bypass 114 8.2 Reducing ROW width in Habitation Areas 117 8.3 Design Considerations 118 8.4 Drainage Designs & Slope Protection Measures 124 8.5 Choice of Construction Materials 127 8.6 Mitigation Measures for Adverse Environmental Impacts 128 8.7 Improved Traffic Safety Measures 136 CHAPTER- IX ENVIRONMENT ENHANCEMENT MEASURES 141 9.1 Provision of Toilet Blocks 141 9.2 Provision of Rest Shelters/Waiting Rooms 141 9.3 Plantation Programmes 142

Page 8: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

LIST OF ANNEXURES

ANNEXURES TITLE ANNEXURE – I - A Tree Enumeration List of Corridor - Bhadrak - Chandbali ANNEXURE – I - B Tree Enumeration List of Corridor - Bhadrak - Anandpur ANNEXURE – I - C Tree Enumeration List of Corridor – Bhawanipatna - Khariar ANNEXURE – I - D Tree Enumeration List of Corridor - Berhampur - Bangi Jn. ANNEXURE – I - E Tree Enumeration List of Corridor - Bangi Jn - J.K.Pur ANNEXURE – II - A CPR list Corridor - Bhadrak - Chandbali ANNEXURE – II - B CPR list Corridor - Bhadrak - Anandpur ANNEXURE – II - C CPR list Corridor - Bhawanipatna - Khariar ANNEXURE – II - D CPR list Corridor - Berhampur - Bangi Jn ANNEXURE – II - E CPR list Corridor -Bangi to J.K Pur ANNEXURE – III - A Lead Chart of Corridor - Bhadrak - Chandbali ANNEXURE – III - B Lead Chart of Corridor - Bhadrak - Anandpur ANNEXURE – III - C Lead Chart of Corridor - Bhawanipatna - Khariar ANNEXURE – III - D Lead Chart of Corridor - Berhampur - Bangi Jn ANNEXURE – III - E Lead Chart of Corridor - Bangi Jn - J.K Pur ANNEXURE – IV - A List of Habitation/Built up areas where RoW width is reduced to 16

meters of Corridor - Bhadrak - Chandbali ANNEXURE – IV - B List of Habitation/Built up areas where RoW width is reduced to 16

meters of Corridor - Bhadrak - Anandpur ANNEXURE – IV - C List of Habitation/Built up areas where RoW width is reduced to 16

meters of Corridor - Bhawanipatna - Khariar ANNEXURE – IV - D List of Habitation/Built up areas where RoW width is reduced to 16

meters of Corridor - Berhampur - Bangi Jn

Page 9: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project I

EXECUTIVE SUMMARY

Orissa State Roads Project (OSRP) is a road upgrading and rehabilitation initiative by Government of Orissa and will be implemented by Orissa Works Department (OWD). The total estimated project cost is 315 million US$. Out of this 250 million US$ will be funded by International Bank for Reconstruction and Development and rest 65 million US$ by Government of Orissa. The Project will be implemented in phases. Under Phase I of the Project, 825 kms of State Highways has been selected for up gradation and rehabilitation on priority basis. Out of the 825 kms of road corridors under Phase I of OSRP, 364.781 kms are to be covered in 1st Year of the Phase I programme. The present Environment Assessment exercise relates only to these corridors (Phase I: Year I) under OSRP. The road corridors covered under this exercise are Bhadrak - Chandbali (SH 9) (49.060 km), Bhadrak - Anandpur (SH 53) (56.736 km), Khariar - Bhawanipatna (SH 16) (66.545 km), Berhampur - Bangi Jn. (SH 17) (150.400 km) and Bangi Jn. - J. K. Pur (SH 4) (42.040 km). The broad objective of the Project is rehabilitation of existing road network involving rising of formation levels, strengthening of pavements and where necessary widening and realignment of roads. The main significant change that is expected at the end of project implementation is “Businesses and households in project areas utilize cost-effective road infrastructure and observe significant reduction in their transportation costs”. The detailed design for these corridors was initiated in early 2006 and is in progress. The work involved pavement design, highway design, and design of structures and environmental and social impact evaluation of the project. The expected contract period for construction work is 24 months, which has been referred in the discussion of environmental assessment as the construction phase. The road is expected to be operational in the first quarter of 2008, after which it will enter in to operational period as referred to in this report. The design life (or operation period) of the project is 20 years from the start of operation. In OSRP, as like other development projects, the environment acts, policy guidelines of both State and Central Government will be applicable. These include Forest (Conservation) Act, 1980; National Forest Policy, 1952, 1988 (Rev.); Environmental (Protection) Act, 1986, and Rules, 1987-2006 (various); Environmental Impact Assessment Notification, 1994 and Notification Dt 14th September 2006; Wildlife (Protection) Act, 1972; National Forest Policy, 1952, 1988 (Rev.); Water (Prevention and Control of Pollution) Act, 1974; Air (Control of Pollution) Act, 1981; Hazardous Wastes (Management and Handling) Rules, 1989; 2006; Public Liability Insurance Act, 1991 and Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996; Motor Vehicular Act, 1988; Central Motor Vehicles Rules; State Motor Vehicles Rules; Guidelines for Rail, Road and Highways Projects, 1989; Noise Pollution Control Act, 1990; Mining Act and Minor Mineral Concession Rules, 2004; Land Acquisition Act, (Amended up to 1984); Orissa Resettlement & Rehabilitation Policy 2006; The Ancient Monuments and Archaeological Sites and Remains Act, 1958 and Labour Act, 1986. All these constitute the legislative framework in which OSRP will be addressed with respect to the environment including social issues. The new notification for EIA has been issued by Ministry of Environment and Forests on 14th September 2006 and this notification surpass all other earlier notification of MOEF in

Page 10: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project II

this regard. The Environment Clearance for OSRP will be governed by the procedures suggested in this notification. As per the above notification, the OSRP fall under category “A” Projects listed for Environment Clearance by MOEF. Since some sections of selected road corridors of OSRP are located within 10 kms from the boundary of protected areas notified under the Wild Life (Protection) Act, 1972, the project has been marked as category “A” project, otherwise a category “B” project. The Environment Clearance for this category “A” projects will be granted by Ministry of Environment and Forests in the Central Government. The World Bank requirements from environment point of view are based on a three part classification system such as Category A, Category B, and Category C as defined by the World Bank OP 4.01. A project designated as Category A requires a full environmental assessment followed by Independent Environmental Review (IER) by an indepenent consultant. The Orissa State Road Proejct has been decalared as a Category ‘A’ project. Hence as per World Bank requirements a full environemental assesment is initiated. Further being Category ‘A’ project it will require independent environmental review by an independent consultant. The project will also require environmental clearance from Ministry of Environmental and Forests, therfore detailed EIA study once completed will be submitted to the MoEF for the clearance. The project will also follow all other World Bank procedures and guidelines during the project preparation stage. The field level exercise taken-up by the study team for the present study includes collection of detailed data on existing environment in and around project area. The existing environment along road corridor was divided in to three categories i.e. natural environment, ecological environment and physical environment and studied separately for Environment Assessment purpose. Under Natural Environment, aspects studied were Topography, Geology, Hydrology, Soil Erosion, Drainage and Water Logging, Noise levels, Water bodies (River/Canal/Pond), Air Quality, Soil Quality, Water Quality, Climate (Season, Rainfall, Temperature, Wind speed/direction), Source of raw material etc. Similarly, aspects studied under Ecological Environment includes Wildlife in Project Influence Area (PIA), Reserved/Protected Forest along project road, Medicinal plant species, Rare and endangered species, Plantation inside and outside RoW, Green Tunnels and Giant Trees and National Park/Wildlife Sanctuaries in the road corridor. In OSRP, a separate study named as “Biodiversity Assessment and Management Plan” was conducted keeping in view the rich biodiversity of Orissa state. The aspects under ecological environment have been covered in detail in this study. Under Physical Environment, a detailed study was conducted on infrastructure & service facilities (School/Hospital/College/Rest shed), Common Property Resources like Religious Structures (Temple/Mosque/Mandap) and Water sources (well, hand pumps, tube wells), burial grounds, Protected archaeological monuments, Individually owned assets (Cultivated lands, Residential, Commercial and other structures and assets) and Demography. Similar to Biodiversity report, SIA and R & R issues has been studied in detail by the Social Team and presented in SIA and RAP report prepared for OSRP. The study also included collection of data from various primary and secondary sources for identification of the possible impacts on the biophysical environment of the area through various parameters for air, noise and water analyzed at different sites through appropriate

Page 11: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project III

methods. Assessment of existing flora and fauna present within RoI as well as within the RoW was made through field survey and also from different published and non-published sources. The Public Consultation/Hearing has not been conducted as per the requirement of notification. But to record the opinion of public regarding perceived positive and negative impacts of the Project and other environmental and social issues of the Project area, community consultation was organized by the study team at selected locations along the road corridor. The findings of such an exercise have provided lot of inputs for preparation of EIA and EMAP of the Project. Regarding existing environment in the road corridor, Bhadrak – Chandbali corridor comprises of 52 km from 0.00 km at outskirt of Bhadrak town to 52.402 km at end of Chandbali town. But, due to high congestion inside Chandbali town and linking of this road with Jagatpur – Chandbali corridor (SH – 9A), realignment inside Chandbali town is being considered. Hence, in the present survey only 49.060 km road length has been considered i.e. from Bhadrak town (0.00 km) to start of Chandbali town (49.060 km). The existing carriageway varies from single lane to intermediate lane, but mostly of single lane. The road starts from Bhadrak Municipality and passes though Bhadrak, Tihidi and Chandbali blocks of Bhadrak district. The entire stretch of the road passes through the flood planes of river Baitarani, Salandi and Matai, which are very fertile and productive. The portion from Motto Bazaar to Tihidi 42 to 28 Kms are prone to submergence during high floods, associated with tidal surge on this link. The above-mentioned rivers inundate vast stretches of fields on either side of the road connected by several culverts, drainage cuts, creeks and nallas. Several long stretches of wetland system have developed over the years along this stretch. The floodwater carries rich topsoil, humus and essential mineral, which settle down on the flat agricultural lands, ponds and wetland enriching the soil. The tide brings fishes, crustaceans, mollusks to lay eggs and breed in these biomass rich shallow wetlands. All most all the culverts, bridges, are to be reconstructed on account of raising of the road surface and widening for double laning meaning soil erosion, silting up the creeks and wetlands. The road level is required to be raised besides realignment of the existing road within Chandbali Township. This needs careful planning. Some portion of the project road corridor is within 10 km of impact zone of the Bhitarkanika sanctuary. There are no reserved or protected forests along the road. This route has acquired much importance due its direct access to 4 lane NH-5 at Bhadrak town. One ODR is also being developed to connect Dhamra port from this corridor. In future, this road will help in transportation of iron, chromite ores from Keonjhar and Anandpur areas to Dhamra port and also to Paradeep port via Kendrapara. The prospects of the up coming SEZ near Paradeep port, POSCO steel plant, Indian Oil Petroleum Refinery Complex, Industrial park and Dhamra port has the scope of enhancing its importance further. This will also boost the freight and passenger movement from West Bengal and Bhadrak to Paradeep and Dhamra. The corridor, once developed will help the people of Chandbali; Tihidi and Bhadrak blocks in approaching district headquarter to meet education, health, market and other needs. The access to local markets at Motto, Pallia, Chandbali and Tihidi will also be easier for the local community. This corridor also provide access to the main market of Jute, Rice and other agricultural products, Horticultural crops like Coconut and Banana besides tourism interest of connecting Bhadrakali temple, Bhitarkanika Wild life Sanctuary and

Page 12: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project IV

Crocodile breeding center, Olive riddle, Sea turtle, Rookery area and endangered Horse Shoe Crab breeding habitant are the major tourist destinations.

The Bhadrak – Anandpur corridor comprises of 56.736 km of SH-53 from 0 km (Bhadrak) to 56.736 km (Bhogpur – 11 kms ahead of Anandpur). The road starts at Bhadrak Municipality and passes through Bonth block of Bhadrak district and Hatadihi, Anandpur block and Anandpur NAC of Keonjhar district. This road crosses Chennai - Kolkata railway line after the NH-5 from where it originates. A railway over bridge is under construction. There are good and young avenue trees along this route and most of them have formed excellent green tunnels. Road improvement, parking bays at village junctions and market areas, diversion of road to reconstruct bridges and culverts will lead to air and water pollution, soil erosion and cutting down of green tunnels and young avenues as well as giant trees between railway over bridge up to 12th Km on the right side. There are very little wetland and ponds along this road and no reserve or protected forests along this road up to Anandpur bypass. The road serves as the main connecting route to famous Ghatagaon Tarini temple for tourists from Bhadrak and Balasore district. The whole part of this road passes through the flood plains of Salandi and left flank of Baitarani. There are several market places and irrigation canal crossings and railway crossing on this road. Bhadrak, Barpada, Rahandia (Ferro-Chrome factory of FACOR), Bonth, Basantia, Fakirpur, Anandpur and Bankhidi are the major places of congregation and commercial activity. Students of Barpada Engineering College, Anandpur College, Hatadihi College and Bonth College depend on this route for going to college. The Hadagarh wildlife sanctuary is within the impact zone of 10 kms but negligible wildlife movement on the road is noticed due to the openness of the agricultural fields without any cover for the wild animals. The Hadagarh wildlife sanctuary is within 3 to 8 kms of this road, which forms a part of Mayurbhanj elephant sanctuary. The road will be a major connecting link of the mining belt of Keonjhar with Paradeep and Dhamra ports and commercial centers in between Jajpur road to Mayurbhanj and Keonjhar. The major commodities, which will have better marketing facilities, include forest, agricultural, horticultural, tribal arts/culture/stone carving products, iron ore and chromites etc. The pavement condition of substantial portion of this link is fair. The Bhawanipatna – Khariar corridor is 67.545 km long connecting Bhawanipatna town at 0.00 km with Khariar town at 69.545 km. Since there is need for realignment of road inside Bhawanipatna town as a part of main corridor connecting Khariar with JK Pur, road from chainage 3.00 km has been studied in the present Environment Assessment exercise. This corridor passes through three districts, namely Kalahandi, Bolangir and Nuapara. It is a part of main corridor of Khariar with J.K. Pur via Bhawanipatna and Muniguda, which originates from NH - 217 (Khariar) and terminates at NH – 201 (Raygada). It provides a link between Visakhapatnam port in Andhra Pradesh and Raipur in Chhatisgarh. The corridor comprises of whole part of SH-16 with varying carriageway width, but mostly single lane passing through plain and rolling terrain of agricultural land and built up areas, such as Khariar, Bhawanipatna etc. Pavement condition from km 0 to 2.00 km and from 39.00 to 45.00 km is good. The corridor passes through Khariar NAC of Nuapara district, Bangomunda and Titlagarh blocks of Bolangir district and Kalahandi Block and Bhawanipatna Municipality of Kalahandi district. Nuapara district is a new district carved out from Kalahandi district in 1992. The infrastructure and service facilities like health, education and market are very poor in Nuapara district. Hence, Bhawanipatna is the nearest major town for people of Nuapara district and this road serves as a lifeline for the people of Khariar and nearby areas.

Page 13: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project V

The link will be a part of main corridor developing better connectivity of NH-201 with NH-217. The RoW requires realignment and reconstruction at places for parking bay, road intersection, approach to new bridges and culverts at about sixteen places. The major water source is river Tel, which is a tributary of river Mahanadi. The approach road and the bridge are to be re-commissioned for use. There are five granular sub-base and metal quarries and stone aggregates manufacturing units, which shall be required to meet the demand. There is a pumping station and pipe line supplying water to Khariar from Sunder river at 59th km is to be relocated, before ROW improvement is taken up to prevent stress on water supply to town. The road gets flooded at several places, due to lower elevation. Some culverts have been washed away, requiring replacement of about 100 culverts and 15 additional culverts. There are no reserved forests or protected areas along this corridor. There are old avenues along the road and most of them are likely to be sacrificed for improvement of the road. The road does not cover any hilly tract; rather runs through plain rolling terrain, agricultural land and built up areas Khariar and Bhawanipatna towns. The Berhampur – Bangi Jn. corridor comprises of 150.400 km long road network starting at 0.00 km (Berhampur) to 150.400 km (Bangi Jn). The corridor originates from NH-217 at first gate Berhampur near revenue village Sankarpur and connects Balipada, Digapahandi, Kansamari, Podamari, Taptapani, Mohana, Adava, Raipanka, Gumuda and end at Bangi Jn near SH-5. This is an important road connecting coastal parts of the state with south Orissa and more particularly KBK region of the State. The road was developed in the past to provide connectivity to Industries like JK Industries at Raygada, IMFA at Therubali, NALCO at Damanjodi, HAL unit at Sunabeda and major irrigation & hydropower projects namely Balimela, Kolab, Harabhangi and Badanala Projects. The earlier name of the road was 132 KV Line road as on the side of this road power line from Hydro Power units to Coastal Orissa was there. The road passes through three districts namely, Ganjam, Gajapati and Raygada. The rural and urban areas through which the road corridor passes are Berhampur Municipality, Digapahandi NAC, Digapahandi Block, Sankhemundi Block and Kukudakhandi Block of Ganjam district; Mohana Block of Gajapati district and Padmapur and Ramanaguda blocks of Rayagada district. The road corridor starts from NH-217 at the first gate point of Berhampur junction and runs on flat agricultural terrain up to Podamari after which it enters into forested and hilly area. There are reserve forests, proposed reserved forests, protected forests, jungle blocks, cashew plantations etc along the roadsides. There is a deer park at Taptapani at 48 km and hot water spring at 49 km. The road crosses Vansadhara River and again enters Makundpur ghat beyond Bangi on Bangi – J.K.Pur link where leopards and other wild animals cross the road till the ends of the ghat. Provisions for wildlife crossing points, road under pass, habitat development in podu ravaged barren and bald hill tops will have to be carried out most carefully without depriving the tribal of their freedom of movement, settlement and commercial activity. Berhampur is the main commercial town of south Orissa and traders from Koraput, Rayagada and other districts transport goods through this road. Also from health services point of view, medical college and hospital is at Berhampur and the emergency patients of the nearby area move on this road to reach hospital at Berhampur. The road also connects various other roads and provides connection to Aska, Chikiti, Parlakhemundi, Gunupur, Daringbari, Phulbani, Gudari, Bhawanipatna through ODRs, MDRs and RD roads.

Page 14: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project VI

The entire SH-17 over 150 km is mostly single lane, except the recently improved carriageway from 0 to 58 km. The pavement condition of the roads at places from 0 to 58 km has been under improvement with intermittent patches remaining to be covered. The balance carriageway is in poor condition of maintenance. There are two large water bodies of reservoir and several big nalas and rivers on this route. The area is mostly running through reserve and protected forests, under the influence of naxalite movement in tribal areas. The road connects the famous R. Udaygiri, Adava, Gunupur and Gudari areas. The areas are under influence of naxal activity resulting in looting of the treasury, demolition of the R.Udaygiri jails, brutal killings of Govt. officials, Land owners, Police sympathizer, CRPF and jail personnel engaged in their duties. The hills are also subject to rampant podu/ shifting cultivation resulting in accelerated soil erosion, loss of vegetation and wildlife with silting up of reservoirs, raised nala and river beds. There has been flash flood on account of this washing away of many approaches to bridges and culverts and severe damage to road surface. Many places of this road are subject to flooding between Mohana to Adava, Adava to Raipanka and Milkapanga to Bangi Jn.. The recent flood between July to Sept’ 2006 has damaged the approaches of Bansadhara, Bangi nala, Ghodanadi and road surface between Kanteikoli to Padagaon, Padagaon to Adava, Guluba to Nalaghat, Badanala bridge to Antarjhuli and Antarjhuli to Bangi Jn. Around 150 culverts and bridges are going to be reconstructed on this route. The link passes near 5 km redial distance of Lakhari valley elephant sanctuary and two large water bodies of Harabhangi and Badanala, medium irrigation projects (reservoir water spread area), Taptapani hot water spring and deer park with panthanivas and tourist lodge facilities on the road sides. The quarry sites for procurement of road construction materials are located within 1 km to 25 km distance with haulage roads covering maximum 12 km to minimum 1 km on either side of the road. Three rivers i.e. Ghodahada (29 km), Bansadhara (141 km), Ghodanadi (147 km) and three small rivers i.e. Harabhangi, Badanala and Bangi are the chief source of supplying sand, river water for road formation and bridge construction etc. There are stiff ghat portion from 43rd km to 58th km at moderate slope at intermittent locations where geometric corrections at right or left centric realignment will be necessary to improve the road. The corridor named Bangi Jn. to JK Pur is 42.040 km staring from Bangi Jn at 160.980 km and ending at J.K. Pur at 118.940 km. The width of carriageway is mostly single line. The road passes through plains up to 154 km and enters reserved forest with ghat between 154 to 128 km. The balance part of the road passes through agricultural land and built up area like J.K. Pur having very poor pavement condition all throughout. There is a sharp curve and accident-prone spots at 140, 145 and 149 km chainage points. There are two major junctions, one at km 119.200 with SH-5 and at 148.900km (MDR 48B to Kereda), where the road is to be realigned for preventing accidents. The dense reserved forests are between km 154 to 128 with steep Ghats and sharp curves, for which some new alignment is proposed at some of the locations abandoning the old road. There are wildlife movements across this route but no permanent established wildlife crossing in this stretch. As a whole, the five road corridors pass through eight districts namely, Bhadrak, Keonjhar, Kalahandi, Bolangir, Nuapara, Ganjam, Gajapati and Rayagada districts. Out of these eight districts, Bhadrak is located in coastal Orissa, Keonjhar in northern Orissa, Kalahandi, Bolangir and Nuapara districts in western Orissa and Ganjam, Gajapati and Rayagada in south Orissa.

Page 15: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project VII

About 29% of the state’s total population resides in eight districts of project area. The density of population in Bhadrak and Ganjam district is 532 and 385, respectively, which is almost double the density of population in the State (236). About 29% of the state’s total population resides in eight districts of project area. Out of the eight districts of project area, six districts namely Rayagada, Gajapati, Keonjhar, Kalahandi, Bolangir and Nuapara are dominated by tribal. Major parts of these six districts are located in TSP areas of the State. Out of the five corridors under Phase I Year I, only two corridors i.e. Berhampur – Bangi Jn. and Bangi Jn to JK Pur passes through Reserve Forests and Protected Forests in Rayagada, Gajapati and Ganjam Districts. In addition to Reserve and Protected Forests under Forest Department, protected forests in the form of avenue plantations exists along roadsides and will also be acquired for construction purpose. Tree enumeration was done both for existing and proposed RoW and added up together to find out a total of 25989 trees to be cut. However, the number of trees to be cut may slightly vary due to change in alignment. This will be finalized during Joint Verification exercise by OWD officials and officials from Forest Department.

The project roads are some of the oldest roads of Orissa state. Hence, a good number of sound and healthy avenue trees and multiple rows of avenue trees have been raised over years. In Khariar – Bhawanipatna section, discussion with the local community revealed that majority of the giant trees on road side were planted several decades back by rulers of Princely States. These trees have formed excellent green tunnels on roadsides. Attempt has been made to save these old trees and green tunnels during finalization of design. The road double-laning can be easily carried out with minimum sacrifice of tree growth if carefully planned. However the old hollow and rotten trees may need removal for road safety. Major tree species under avenue plantation in the road corridor includes Anogeissus latifolia, Azadirachta indica (Neem), Buchanania lanjan (Chiranji), Butea monosperma (Palas), Careya arborea, Cassia fistula, Dalbergia Latifolia (Sishu), Diospyros melanoxylon (Kendu), Madhuca Indica (Mohua), Phyllanthus emblica (Amli), Scleichera oleosa (Kusum), Samecarpus anacardium (Bhalia), Semaruba glauca, Shorea robusta (Sal), Syzygium Cummini (Jamum), Tectona grandis, Terminalia arjuna (Arjun), Terminalia belerica (Bahera), Terminalia chebula, Wrightia arborea, Zizyphus Oenoplia. Similarly, important medicinal plants found in the project area are chandan (Santalum album), bija (Pterocarpus marsupium), rohini (Ssoyimida fabrifuga), fanfana, (Oroxylon indicem), kamalagudi (Malotus philipinansis), patuli (Pterospermum swave), chandeigodi (Vitex peduncularis), bidanga (Embelia ribes), modafal (Helioteres isora), bumpipali (Piper longum), karpura haldi (Curcuma aromatica), iswari (Aristolochea indica), bridha daruka (Aargeyreia durvula) etc. Detailed discussion about tree species, flora and green tunnels has been made in the Biodiversity Assessment and Management plan prepared separately by OSRP. Out of five corridors, the three corridors namely Berhampur – Bangi, Bangi-JK Pur and Bhadrak - Anandpur are passing within 10 km radius of Wildlife Sanctuaries.

Page 16: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project VIII

In Berhampur – Bangi Jn. Corridor wildlife crossings were observed, the detailed account of which is presented in Biodiversity Assessment and Management plan. Majority of the crossings are for Elephants and sloth bear. Water bodies in the project area mainly include rivers, ponds, canals, tanks etc. Major rivers flowing in and around project area are Baitarani, Rusikulya, Bahuda, Bansadhara, Nagavali, Salandi, Sunder and Tel. All of the project roads have man-made water ponds, tube wells, open wells, water bodies etc on sides of road. During the field survey attempt was made by the study team to identify and locate different water sources within 20m to 30m from the road edge on both the sides and find out how many of them will be fully and partially affected because of road improvement programme. It was observed that majority of the tube wells and open wells are fully affected. But in case of pond and water bodies, majority comes under category of either partially affected or not affected. One small Check Dam (Water Harvesting Structure) constructed for irrigation purpose will be fully affected in Berhampur – Bangi Jn. The baseline data generated on air, noise, water and soil quality at sample locations along the road corridor revealed that these are within permissible limits prescribed by CPCB. The community consultation exercise was carried out in the project stretch at 39 locations during the field surveys. Major perceived benefits as identified by the community during the consultation process were:

♦ Reduced travel time/avoid long distance alternate road ♦ Less operating and maintenance costs of vehicles/avoid frequent breakdown of

vehicles on road ♦ Less accidents due to less congestion ♦ Better access to community facilities ♦ Local business would be benefited due to increased road traffic/more tourist

flow to temples etc ♦ Increased regional developments in terms of industry, tourism agriculture ♦ Better access to transport and communication facilities ♦ Increased access to health and educational facilities

The major perceived losses that are going to be the outcome of the project as visualized by the people and identified during the focused group discussions are:

♦ Loss of agricultural, residential and business properties ♦ Loss of common property resources i.e. tube wells, dug wells, ponds, burial

ground, temples, rest sheds etc. ♦ Higher risk for pedestrians ♦ Increase in pollution level, use of alcohol, commercial sex etc.

The possible impact of the project on the bio-physical and chemical environment during the construction as well as operation of the road include: ♦ The dust pollution during construction period due to transport of construction

material, rock crushing operation and asphalt manufacturing units.

Page 17: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project IX

♦ Increase in noise level in the construction period due to the plying of heavy machineries and vehicles.

♦ Acquisition of water bodies present within the RoW at many places. ♦ Discharge of sewerage into the water bodies from the construction camps as well as

dumping of garbage. ♦ Loss of trees within the RoW during the construction period affecting existing

vegetable cover. ♦ Acquisition of CPRs like waiting rooms, toilets, drinking water sources, temples,

giant trees, mandaps, boundary wall of schools, colleges etc Several measures have been suggested in the Environment Management Plan to avoid or mitigate the adverse impacts. Initially, the Social-Screening exercise is conducted in the road section to identify potential social impacts, which are considered along with other issues such as environmental, financial and technical considerations. In the screening exercise, areas of concern-heavily congested market place on the sides of the road, extent of physical displacement, loss of land etc. was studied in detail. The findings have been used as inputs for engineering design to change the alignment within the technical requirements and cost effectiveness. As per the findings of screening exercise, it was observed that at Chandbali town in Bhadrak – Chandbali corridor and at Bhawanipatna town in Bhawanipatna-Khariar corridor there is need for construction of bypasses. The new two-lane alignment will be carrying heavy traffic and to reduce the traffic and avoid demolition of residential and commercial structures, alternative alignment/bypasses were studied in the above two corridors at two locations. Construction of these two bypasses will have significant beneficial impact in terms of minimizing displacement, reducing resistance to the project and minimize the impact on the existing trees/local environment. The existing ROW along the project road is not uniform and lesser then the IRC But, in all the five corridors, it was observed that at some locations, habitations are close to the edge of the road. Widening of the road by RoW as per recommendations will lead to displacement of lot of people from residential and commercial structures. Further as a part of habitation area phenomena, almost all the common property resources are concentrated in these locations. The common property resources include temples, giant trees with mandaps, tube wells, ponds, and clubs, rest sheds etc. Widening of the road by RoW as per IRC norms will lead to acquisition of these resources. This will have significant social and environmental impacts and lead to large scale resistance of people for the project. Under such a situation, the Project Consultant, World Bank Mission and the PIU officials agreed upon to vary the limits set out in the IRC guidelines. Accordingly different ROW limits were adopted for different project road sections. With reference to the “Preparation Mission Aide Memoir (July 4-13, 2006), Technical Aspects Para 23 – Design and Engineering Issues, the ROW (absolute minimum corridor of impact, COI) follows, “For Berhampur-Rayagada and Bhawanipatna-Khariar road corridor will have COI in built-up areas as 15m. If land needed to be acquired then such acquisition will be done up to 16m. In non built-up sections the minimum COI (Assuming an embankment height of 2m) will be about 22m.

Page 18: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project X

Similarly, for Chandbali – Bhadrak - Anandpur road corridor will have COI in built-up areas as 17m. If land needed to be acquired then such acquisition will be done up to 18m. In non built-up sections the minimum COI (assuming an embankment height of 2m) will be about 25m. The above strategy was followed for RoW during the finalization of design. Attempt was made to reduce the proposed RoW width in habitation/built up areas instead of recommended RoW as per IRC norms. At about 85 locations, habitations exist on roadsides of five corridors. In these locations, RoW has been reduced. The total lengths of these locations constitute about 16.61% of total road length of five corridors. This strategy followed in OSRP could save a good number of residential and commercial structures from possible demolition. Similarly, a lot of CPRs like temples, schools etc have been saved. Other mitigation measures suggested to overcome the adverse impact of the project include ♦ Replacement of affected CPRs by Project Authorities ♦ Adoption of Improved Traffic Safety Measures like, geometric corrections,

realignment of curve locations, improvement of junctions and intersections, provision for bus /truck lay bye, crash barriers, interception walls, road signage, delineators, guard rails etc

♦ To check air pollution, spraying of water at regular intervals during the construction period in order to minimize the dust in the construction area.

♦ Excavation of new ponds, dug wells and tube wells to compensate those affected by the widening of the project road.

♦ Maintenance of vehicles and machineries to check high noise emission during the construction period as well as during operation.

♦ Workers exposed to high noise level and dust will be provided with earplug and dust mask to prevent them from adverse health impact.

♦ Avenue plantation on the roadside will be encouraged in order to attenuate noise. A detailed account of all the mitigation measures along with budget, implementation strategy, schedule etc is provided in EMAP.

Page 19: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 1

CHAPTER I INTRODUCTION

1.1 DEVELOPMENT OF ROAD NETWORK– A PREREQUISITE TO DEVELOP ORISSA’s ECONOMY Good quality roads and an efficient transport and communication system play a significant role in socio-economic development of any area and consequently improvement in quality of life of human beings. Efficient and fastest transport system can only be achieved when there exists good quality roads connecting all corners of a state or the country as a whole. Development in the industry, agriculture, service, trade and other major sectors of a State’s economy depend to a large extent on the efficiency of the existing highway network. It is through a wide spread network of roads that the fragmented markets are integrated, consuming hinterlands are linked to production centers, administrative, commercial, cultural & religious centers are connected and made accessible for the general populace. Orissa, a state of modern India lies in the sub-tropical belt between 17o 52’ and 22o 45’ N latitude and 81o 45’ and 87o 50’ E longitude. It is the 10th largest state of India in terms of geographical area (15.54 million hectares). The state has 30 revenue districts, 42 agricultural districts, 314 blocks and 51639 villages. Orissa occupies 4.74% of India’s land mass and with 36.71 million people (2001 census) accounting for 3.57% of the total population of the country. Nearly 85% of its population live in rural areas and depend mostly on agriculture for their livelihood. The state is rich in mineral resources. About 27 different kinds of minerals are found in Orissa. The state rank 5th and 6th in the country in iron and coal reserve, respectively. It contributes about 90% of Chromites, 80% of Graphite, 46% Dolomite and about one third (40%) of India’s Manganese ore production. It tops Bauxite production and shares 47% of the total production. Due to large deposit of mineral resources, several mineral based industries are operating in the state. Exploitation of its natural resources began in the 1950’s and has gained momentum after the start of economic reforms and liberalization process in 1991. Formulation of new Industrial Policy in 2001 and higher emphasis on industrialization by elected Government, Orissa has witnessed a huge influx of corporate giants to set up Industries in the State. These mainly include Iron and Steel Industries and Thermal Power Plants. Recently, State Government has signed MOU with 43 Corporate Houses to set up Steel Plants in the State.

Similarly, due to abundance of natural resources, long coastline, beautiful inland waters, mangroves, biodiversity of the forests and rich cultural heritage, the State has become a privileged tourist destination for both domestic and foreign tourists. The influx of tourists is increasing every year and tourism is expected to contribute significantly to state’s economy in recent years. In other fronts like agriculture, education, export, trade, services etc. the state in struggling hard in recent years to secure its position among frontline states of eastern India. A major hindrance to development of industries, export of mineral ores, development of tourism, services, market network is non availability of good quality roads to all corners of the state. Though about 1682 kms of National Highways pass through the state, these do not connect remote pockets enriched with minerals or natural resources, culture and heritages. Regarding railway network, the state is lagging far behind other states of the country. Out of 30 districts, seven districts, namely, Boudh, Kondhamal, Deograh, Nayagarh, Kendrapara,

Page 20: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 2

Malkanagiri and Nawarangpur do not have a single inch of railway line passing through them. The density of railway route length per 1000 sq km of area in Orissa is only 15.03 km as against 42.66 km in West Bengal and 19.11 km at all India level. Two reasons are cited for such a poor railway network, one is less attention by Central Government and second is difficulty and huge cost involvement in lying railway line in major parts of the state. On the basis of physiography characteristics, the state has been divided into five major morphological regions i.e., the coastal plain in the east, the middle mountainous and highlands region, the central plateaus, the western rolling uplands and the major flood plains. Out of these five regions, the middle mountainous and highlands region covers maximum area of about three-fourth of the entire state. This region mostly comprises the hills and mountains of the Eastern Ghats that rise abruptly and steeply in the east and slope gently to a dissected plateau in the west running from northeast (Mayurbhanj) to northwest (Malkanagiri). The average height of this region is about 900 meters above the mean sea level. Similarly, the coastal plain in the east and the major flood plains are intercepted with a number of rivers and rivulets that makes laying of railway a costly option. Under such a situation, State Highways have long been playing a significant role in meeting transport and communication needs of the state. The dependence on State Highways was always high and has assumed higher proportions in recent years due to large-scale mining and industrial activities along with development in trade, services, tourism etc. But the condition of these State Highways is very poor and unable to bear the sudden loads due to rapid industrialization in the State. Due to rapidly increasing traffic, industrial growth, and increasing levels of mobility, the existing State Highways are experiencing different levels of stress. Further, the state has always been a victim of frequent and recurring natural calamities like floods, cyclones etc and the roads are exhibiting marked deterioration. In a scenario of worsening fiscal resources, the state has failed to maintain its existing road network in proper serviceable state. Realizing the fact that development of road network in a state like Orissa is a guiding factor for economic development, the Government of Orissa under Orissa Works Department (OWD) has started the Orissa State Roads Project (OSRP) with loan assistance from World Bank (WB). The project is expected to deliver good quality roads required for large scale industrial and mining activity, development of tourism, agriculture, trade, services, combat naxalite activity and ultimately bring prosperity to the state with improvement in quality of life. 1.2 PROJECT BACKGROUND Orissa State Roads Project (OSRP) is a road upgrading and rehabilitation initiative by Govt. of Orissa with financial assistance from the World Bank. The Project will be implemented in phases. Under Phase I of the Project, 825 kms of State Highways has been selected for upgradation and rehabilitation on priority basis. These 825 kms of State Highways has been short listed based on technical and economic evaluation studies conducted by Orissa Works Department (OWD) of Government of Orissa. Preparation of Detailed Project Report for these 825 kms of State Highways under Phase I have been initiated through on site data collection on traffic volumes, existing pavement condition in terms of roughness and design, assets and resources within and outside RoW etc. Also cost estimates, bid documents are being prepared along with measures to address social and environment issues in the light of World Bank guidelines, statutory requirements of Government of India and State Government. In addition, network analysis of remaining 3700 km State Highways is being

Page 21: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 3

done under Phase I of the Project, to arrive at a selection of 1600 km of State Highways for rehabilitation in subsequent Phases.

Out of the 825 kms of road corridors under Phase I of OSRP, 364.781 kms are to be covered in 1st Year of the Phase I programme (Table 1). The present Environment Assessment exercise relates only to these corridors (Phase I: Year I) under OSRP

Table No 1 Detail of Road Corridors under Phase I: Year I of OSRP

Sl. No. Corridor Identification 01 Chandbali - Bhadrakh SH 9 02 Bhadrakh - Anandpur SH 53 03 Khariar - Bhawanipatna SH 16 04 Berhampur - Bangi Jn. SH 17 05 Bangi Jn. - J. K. Pur SH 4

The Orissa State Roads Project (OSRP) is functioning under administrative control of Orissa Works Department (OWD) of Government of Orissa and is funded by loan assistance from World Bank. The broad objective of the Project is rehabilitation of existing road network involving rising of formation levels, strengthening of pavements and where necessary widening and realignment of roads. However, the specific objectives of the Project are

Provide scope for more efficient transportation of passengers and goods Reduce transport operating costs by improving the quality of the road Reduce journey time by minimizing congestion in urban centers Minimize road accidents by increasing road widths, improving intersections and road

geometry Provide better accessibility and reduce traffic distress on the arterial highways passing

through the state Improve accessibility to major ports, existing and proposed industrial estates, SEZs

and mega-industrial complexes for efficient transport of goods. Upgrade road to function in all weather by improving drainage and raising road

levels. Provide structurally sound roads capable of achieving their design life.

1.3 POSITIVE IMPACTS/Benefits from the Project: As mentioned above, the main objective of the project is to improve the performance of the State's road transport network thereby benefiting the community in terms of reduced travel time and saving in vehicle operating and maintenance costs. The project will also help in upgrading linkages to National Highways and opening up the areas adjacent to the project roads to increased economic activity. The project may also generate local employment opportunities through the construction activities. The Community Consultation Programme held during the field survey also reveals that majority of the Project Affected Persons (PAPs) feel that the project will be beneficial to them. Major perceived benefits as identified during the survey are:

♦ Reduction in road congestion ♦ Abatement of ambient air and noise pollution ♦ Improvement of roadside drainage conditions

Page 22: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 4

♦ Increase in safety levels for both pedestrians as well as motorists ♦ Reduced travel time ♦ Saving on vehicle operating and maintenance costs ♦ Better access to community facilities ♦ Significant economic opportunities due to increased access to markets. ♦ Local business would be benefited due to increased road traffic. ♦ Increased regional development in terms of industry, tourism, agriculture and

development of handloom industry. ♦ Better access to transport and communication facilities.

Details of the findings of the Community Consultation Programme are included in Chapter VI. 1.4 NEGATIVE IMPACTS OF THE PROJECT: Improvement work in the road corridors under OSRP will be confined in most of the sections to public land i.e. the existing Right of Way (RoW), which is under the control of Orissa Works Department (OWD). But, in some of the sections, improvement of the road requires widening of the existing RoW involving expropriation of land and other assets like water bodies, trees, common property resources, individually owned assets from the current owners/users. This will also cause disruption of existing environment and social set up and direct economic loss for asset losers and their families in the process. Besides the above-mentioned negative impacts during land acquisition and construction of project, the Project may impact the existing environmental and social conditions during its operation i.e. after its full stages of development. To identify such impacts, during the community consultation attempt have been made to record the perceptions of community about the negative impacts of the project. The major adverse impacts as identified during the group discussions include:

♦ Loss of agricultural, residential and business properties. ♦ Loss of trees, green tunnels and other natural resources ♦ Loss of common property resources i.e. tube wells, dug wells, drinking water

tap points, tanks etc. ♦ Loss of infrastructure facilities ♦ High risk for pedestrians ♦ Increase in pollution level, use of alcohol, commercial sex etc. because of

increased traffic. 1.5 Boundaries of ORSP The spatial and temporal boundaries of the project roads are defined as-

Spatial boundary a) Direct Area of Influence: The RoW is the primary boundary defining the area within which all construction and operation stage activities will be contained. The corridor of impact (CoI) is the direct area of influence. The CoI is defined on the basis of road design, speed and the distance needed (the clear zone) for a vehicle leaving the road to come to a safe stop or to swerve back on to the

Page 23: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 5

carriageway. For example, for a design-speed of 80-100km/h the clear zone should extend 4.5m beyond the standard 2.5m road shoulder, thus creating a 7m wide cleared area beyond the edge of the carriageway. For this design speed the CoI would be 21m (4.5m clear zone plus 2.5m shoulder on either side plus two 3.5m carriageways). However, in certain cases, the CoI is wider than the available RoW (such as where land beyond the RoW is required for geometric realignment of highway, etc.) and in these cases the direct area of influence has been taken as the “edge of permanent works”.

In urban areas, with design speed of 50-60km/h, the minimum CoI would be about 16m. However, because of the need for on-street parking, urban service lanes and similar facilities, the CoI has been set as 18m. These CoI boundaries, when drawn onto the strip maps, yield much lower and, hopefully, more realistic impacts, for example, reduced number of affected assets and persons. The CoI concept has not been applied as an absolute measure but, rather, as a guideline. The CoI is extended to include, the RoW boundary and beyond, for example, when schools or hospitals border the RoW. The design decisions also play a part where, the pavement is deliberately constricted or has been designed as narrow sections.

3.5m

Shoulder

ClearCarriage Way

Clear

3.5m

Corridor of Impact

7.0m 7.0m

2.5m 2.5m

Shoulder

Right of Way: Typically 26m

The Corridor of Impact

b) Indirect Area of Influence:

A distance of 10km on either side of the corridors was used to define the indirect area of influence. Within such area of indirect influence environmental features that are important in a regional scale and have perceivable linkages with the project roads, such as national parks, wildlife sanctuaries, protected forests, archaeological and cultural/religious sites were recorded.

Temporal boundary The project implementation period and start of operation are two important periods in terms of environmental impact and management. These boundaries are defined as follows:

a) Project Preparation Stage

Project preparation stage involves feasibility study, planning and design stage of the project. The investment prioritization study was further undertaken. The detailed design for the Phase- I corridors was initiated in early 2006 and is in progress. The work involved pavement

Page 24: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 6

design, highway design, and design of structures and environmental and social impact evaluation of the project.

b) Construction Period:

The expected contract period is 24 months for individual contract packages, all of which would start simultaneously. In the discussion of environmental assessment, this period will be referred to as the construction phase.

c) Operational Period: The discussion of Environmental Assessment refers to the general time periods when the road will be operational in the future, which is expected to be first quarter of 2008. The design life (or operation period) of the project is 20 years from the start of operation. 1.6 NEED FOR ENVIRONMENT ASSESSMENT (EA) FOR OSRP A sustainable approach to road development requires substantial strategies or measures to mitigate negative impacts of development activity on existing social and environmental set up of the Project area. Unless this is carried out, the project will not deliver the desired benefits to its target group of beneficiaries. Such a strategy involves three basic steps – firstly, the assessment of existing natural and social environment and identification of full range of impacts, second, quantification of these impacts and thirdly mitigation measures to counter or reduce the intensity of these impacts. Thus Environmental Assessment (EA) forms an integral part of any planning process of road project and this applies to OSRP too. EA has also been made a mandatory requirement for development projects by environment protection laws of the country. EA is an important tool for integrating the objectives of environmental management with the requirements of economic growth and social development. EA serves as a valuable tool for eliminating or mitigating the undesirable effects of contemplated actions on the environment by appropriate modification in the planning, designing construction and operational phases. EA present a clear and concise picture of the benefits and cost in terms of natural and cultural assets as well as social values associated with alternate courses of action. It is indeed the most valuable, interdisciplinary and objective decision making tool with respect to alternate routes for development, process technologies and project sites. 1.7 SCOPE OF THE EA STUDY:

In the present exercise the operational policy OP 4.01 of the World Bank and laws related to environmental management and pollution control in India were followed strictly without any deviation. The legal promulgations for carrying out this EA study, i.e. the January 27, 1994 notification and subsequent amendments dated, 4th May 1994, 10th April 1997 and 14 September 2006 under the Environmental Protection Act, 1986 were reviewed thoroughly and accordingly the study was conducted. The legal procedures on land acquisition; tree felling, compensatory afforestation and preparation of rehabilitation and resettlement plan were also followed while preparing this project document. In the present exercise Environment Assessment Study was undertaken for selected road corridors (Phase I: Year I) under OSRP. Initially environmental screening of the project roads

Page 25: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 7

was undertaken in detail to assess the environmental issues involved in implementation of project at each and every chainage points. The sections of road corridor exhibiting high degree of natural environment or social problems were identified for change in designs. The road sections indicating less damage to natural and social environments were considered as such without any change in designs. Based on requirements at field conditions and previous experience of other road projects, Scoping was done to prepare a list of environmental parameters (terms of reference) to be studied for preparation of this EIA report. On the basis of such an exercise detailed EIA study was conducted throughout the road corridor to identify and record impacts in detail along with mitigation measures. It is expected that the environmental parameters studied in the EIA exercise will meet the requirements of Expert Appraisal Committee (EAC) of MOEF as per the notification. However, if any aspect is left will be covered and added in the final EIA report. The Public Consultation/Hearing has not been conducted as per the requirement of notification. But to record the opinion of public regarding perceived positive and negative impacts of the Project and other environmental and social issues of the Project area, community consultation was organized by the study team at selected locations along the road corridor. The findings of such an exercise have provided lot of inputs for preparation of EIA and EMAP of the Project.

EIA notification of MOEF Dated 14th September 2006 & requirements for OSRP

The new notification for EIA has been issued by Ministry of Environment and Forests on 14th September 2006 and this notification surpass all other earlier notification of MOEF in this regard. The Environment Clearance for OSRP will be governed by the procedures suggested in this notification. As per the above notification, the OSRP fall under category “A” Projects listed for Environment Clearance by MOEF. Since some sections of selected road corridors of OSRP are located within 10 kms from the boundary of protected areas notified under the Wild Life (Protection) Act, 1972, the project has been marked as category “A” project, otherwise a category “B” project. The Environment Clearance for this category “A” projects will be granted by Ministry of Environment and Forests in the Central Government. The environment clearance process for any category “A” Project has to pass through four different stages i.e., Screening, Scoping, Public Consultation and Appraisal. In the Screening stage, project will be screened by Expert Appraisal Committee (EAC) of MOEF to assess the need for detailed EIA study for grant of Environment Clearance. Then under Scoping stage, detailed and comprehensive Terms of Reference (TOR) for EIA will be suggested by EAC to address all relevant environmental concerns in the preparation of an Environment Impact Assessment (EIA) Report for the project. Then “Public Consultation” will be carried out in project area by which the concerns of local affected persons and others who have plausible stake in the environmental impacts of the project or activity are ascertained with a view to taking into account all the material concerns in the project or activity design as appropriate. After completion of the public consultation, all the material environmental concerns expressed during this process will be included in the draft EIA and EMP. The final EIA report, so prepared, shall be submitted to the concerned regulatory authority i.e. MOEF for appraisal and subsequent grant of environment clearance

Page 26: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 8

1.8 Objective of the Environmental Assessment: The key objectives, which were covered during the present Environmental Assessment exercise, are

• Study in detail the existing environmental and social condition of the Project area • Assess potential environmental impacts associated with the project; • Assess need for integration of environmental considerations into the project’s

detailed engineering design; • Recognize the importance of multiple secondary uses of the project road; • Assess alternative project designs and provide input into project design; • Design adequate and practical mitigation and management measures to be

implemented during road construction and operation to avoid or minimize adverse impacts;

• Prepare an Environmental Management Action Plan (EMAP).

Page 27: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 9

CHAPTER II METHODOLOGY FOR ENVIRONMENT ASSESSMENT

2.1 STEPS IN ENVIRONMENT ASSESSMENT EXERCISE The Environmental Assessment exercise of OSRP was conducted phase wise as detailed below:

• Use of findings of Environment Screening exercise • Review of Background Information/policy guidelines/legal documents • Collection of Secondary Information/data • Generation of Baseline data - Environmental, Wildlife and Social • Assessment of Impacts; Environmental, Wildlife and Social, • Community Consultation – Public Participation and views, suggestions, • Preparation of Mitigation and Enhancement Measures and EMAP

2.2 USE OF FINDINGS OF ENVIRONMENT SCREENING EXERCISE During the Environment Screening Exercise, various Valued Environmental Components (VECs) were identified for OSRP. These VECs included social and biophysical component of the environment of the project influence area and are presented category wise in the below mentioned paragraph. These VECs were used in detail in the present exercise to assess existing environment and possibility of any impact due to the proposed Project activities.

a) Natural Environment

(i) Topography (ii) Geology

(iii) Hydrology (iv) Soil Erosion (v) Drainage and Water Logging

(vi) Noise levels (vii) Water bodies (River/Canal/Pond)

(viii) Air Quality (ix) Soil Quality (x) Water Quality

(xi) Climate (Season, Rainfall, Temperature, Wind speed/direction) (xii) Source of raw material

b) Ecological Environment

(i) Wildlife in Project Influence Area (PIA) (ii) Reserved/Protected Forest along project road

(iii) Medicinal plant species (iv) Rare and endangered species (v) Plantation inside and outside RoW

(vi) Green Tunnels and Giant Trees (vii) National Park/Wildlife Sanctuaries

Page 28: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 10

c) Physical Environment

(i) Infrastructure & Service facilities (School/Hospital/College/Rest shed) (ii) Common Property Resources - Religious Structures

(Temple/Mosque/Mandap) and Water sources (well, hand pumps, tube wells), burial grounds

(iii) Protected archaeological monuments (iv) Individually owned assets (Cultivated lands, Residential, Commercial and

other structures and assets) (v) Demography

The present EIA exercise was focused on these VECs. All the environment components described above were studied in detail during the field survey. 2.3 REVIEW OF PROJECT INFORMATION/POLICY/LEGAL DOCUMENTS Before taking up any field level surveys, the project documents were studied to have a detailed understanding of the project objectives, its main components, boundaries etc. The project documents were studied in detail and discussions were made with OWD Officials to clarify the doubts of the study team. In this regard, the contributions made by the Chief Engineer in charge of OSRP and the Nodal Officer is worth mentioning, who took lot of pain in explaining details of the Project to the study team mostly beyond office hours. Similarly, in the present exercise all the environment laws, policy guidelines of both State Government and Government of India were identified and studied in detail. The applicability of various administrative policies, laws to ORSP along with their salient features has been discussed in detail in Chapter – 3 of this report. To assess the status of various environmental parameters in pre and post project period, environmental standards fixed by Ministry of Environment and Forest (MoEF), Indian Road Congress, Bureau of Indian Standards, etc were also refereed by the study team. A list of documents studied for the present Environment Assessment exercise of the OSRP is presented below.

1. Environment Impact Assessment – A Manual, 2001 - Ministry of Environment and Forest (MoEF), Government of India

2. Environmental Guidelines for Rail/Road/Highway Project – 1989, Ministry of Environment and Forest (MoEF), Government of India

3. Guidelines for Environmental Impact Assessment, 1989, Indian Roads Congress (IRC 104-1988)

4. Roads and Environment – A Handbook, 1997 – World Bank 5. Environmental Considerations in ADB Operations, OM Section 20: Issued on 28

February 2003, Asian Development Bank 6. Handbook on Environmental Procedures and Guidelines, 1994 Ministry of

Environment and Forest (MoEF), Government of India 7. Operational Policies (OP) / Bank Practices (BP)/Good Practices (GP) 4.01 4.02,

4.04, Social Safeguard Policies (OP) 4.12 for Involuntary Resettlement, OD 4.20 for Indigenous People development plan and OPN 11.03 for Cultural property and BP 17.50 Disclosure of Operational Information

Page 29: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 11

2.4 COLLECTION OF SECONDARY INFORMATION/DATA Collection of data from secondary source forms an integral part of present exercise both for identifying and appraising parameters such as physico-chemical environment, land use pattern, ecological habitats, species and communities. In the present survey information on some of the Valued Environmental Components (VECs) were collected from primary sources and some from secondary data sources. The list of these sources is provided in Table 2 below.

Table No 2 Data sources used for different Valued Environment

Components (VECs) Sl No VECs Source of Data Details

Natural Environment

1 Topography, Geology and hydrology Secondary sources District Gazetteers, Planning Atlas, Toposheets of Geological Survey of India etc

2

Soil erosion sites, drainage and water logging areas during normal monsoon rains as well during natural calamities

Primary data collection & secondary sources

Local enquiry of knowledgeable persons, PRI representatives and OWD field functionaries

3 Water bodies (River, Ponds, Canals, non potable water bodies) Primary data collection Detailed survey throughout road

corridors

4 Climate (Rainfall, temperature, wind speed/directions, seasons) Secondary sources

IMD, Govt. of India, Planning Atlas, District Statistical Hand Book & District Gazetteers

5 Ambient air quality, noise levels, water and soil quality Primary data collection Collection of data at sample

locations

6 Sources of raw materials – Quarry details

Primary data collection & secondary sources

Revenue Department, Field Engineers of OWD were contacted to identify legal quarries

Ecological Environment

1 Wildlife in Project Influence Area (PIA)

Primary data collection & secondary sources

Data collected from local DFO and other field level functionaries. These data were cross checked through local enquiries of users of road in night, pugmarks etc.

2 Reserved/Protected Forest along project road Secondary sources Forest Department data

3 Medicinal plant species along project road Primary data collection Detailed survey throughout road

corridors

4 Rare & endangered species Primary data collection Detailed survey throughout road corridors

5 Plantation inside and outside RoW Primary data collection Detailed survey throughout road corridors

6 Green Tunnels and Giant Trees Primary data collection Detailed survey throughout road

Page 30: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 12

Sl No VECs Source of Data Details

corridors

7 National Park/Wildlife Sanctuaries Secondary sources Data from Forest Department

Physical Environment

1 Individual owned assets Primary data collection Detailed survey throughout road corridors by Social Team

2 Common Property Resources (Religious structures, water sources, burial ground, grazing land)

Primary data collection Detailed survey throughout road corridors

3 Infrastructure & Service facilities (School/Hospital/College/Rest shed)

Primary data collection & Secondary sources

Detailed survey throughout road corridors & District Statistical Hand Books

4 Protected archaeological monuments Secondary sources

Data from Tourism & Culture Department

Archaeological Survey of India

Department of Archaeology, GoO

5 Demography Secondary sources District Statistical Hand Books

Census of India, 2001

2.5 COLLECTION AND GENERATION OF BASELINE DATA: The baseline environmental data on VECs listed out in section 2.1 was collected through primary data collection as well as from secondary informations. Information which are collected from field by study team through primary data collection is presented in table 2. Baseline data on ambient air quality, water quality, soil quality and noise levels are generated through environment monitoring at sample locations. Tree enumeration was done girth wise and species wise inside existing RoW and proposed widening area.

Page 31: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 13

Figure 1: Strip Map Format For Data Collection

Start of Project Road Chainage 0.000

Distance and Location of Water Bodies (Ponds)

Distance and Location of Health Facilities

Distance and Location of Educational Institutes

Extension and Location of Reserve Forests

Extension of Habitations Village/Urban/Semi Urban Areas

Crossings of Major Surface water Sources (River, Drains/Nallas)

Distance and Location of Religious Structures (Temples/Mazars,

Chabutara, etc.) Distance of Nearest Wild Life Sanctuaries/Parks

Chainage 1.000

Project Road

Page 32: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 14

Data on soil erosion sites, drainage and water logging areas during normal monsoon rains as well during natural calamities and water bodies (river, ponds, canals, non potable water bodies), common property resources (religious structures, water sources, burial ground, grazing land) and infrastructure & service facilities (school/hospital/college/rest shed) were collected from field by the study team using designed formats and are presented in the form of a strip map (figure 1). For information on individually owned assets (cultivated lands, residential, commercial and other structures and assets) data were collected from Social study team. The ambient air quality monitoring was carried out in urban, rural and eco-sensitive sites along each of the road corridor. Each station has been monitored twice a week for one month. The parameters monitored are SO2, NOx, TSPM and RPM. All these parameters were monitored for 24-hour sampling period. Water quality monitoring has been done for surface and ground water sources. The analysis of water samples has been done as per PAHA specified procedure for each of the parameters. Soil Quality Monitoring was done at three to four sample locations along each of the road. Similarly, noise levels at twenty-four hourly basis were measured at sample locations along each of the road corridor. Orissa is rich is biodiversity. It is dotted with wildlife parks, sanctuaries, reserve and protected forests. Some of the project routes under consideration for improvement under OSRP are located close to or running through the protected areas like wildlife habitats and reserve/protected forests and ecologically sensitive zones. Keeping this in view, a separate standalone Biodiversity and Assessment and Management Plan has been prepared by another study team of OSRP. The aspects covered in this report include all the Valued Environment Component (VECs) under ecological environment component i.e. Wildlife, Reserved/Protected Forests, Medicinal plant species, Rare & endangered species, Green Tunnels and Giant Trees, and National Park/Wildlife Sanctuaries. The detailed methodology followed for collection of these informations is presented in Biodiversity and Assessment and Management Plan report. 2.6 ASSESSMENT OF ENVIRONMENTAL IMPACTS The impact assessment due to widening of project roads is done on different components of environment. The impacts are assessed using both qualitative/quantitative data. The impact assessment is done for pre-construction, construction and operational phases of the project. Impact during pre-construction phase was assessed in terms of loss of trees, water bodies, common property resources, infrastructure and service facilities, green tunnels, giant trees, individual owned assets etc. Similarly, impact during construction phase was assessed in the field of blockage of natural drainage channels, movement of loaded trucks, construction equipments, running of DG sets, transportation of raw materials from quarries, operation of burrow sites, construction camps etc. Soil erosion is a major issue in the OSRP as some of the project routes are passing through hillocks and undulating terrains. The erosion potential during construction (cutting of hills) is assessed in detail. The consumption of raw materials in OSRP is in the form of earthwork, granular sub-base, sub base and base course and bituminous works. The requirement of these for each project route is obtained from design team. The sources of these are studied and impacts are assessed due to transport and procurement. The increase in traffic volume due to transportation/handling of construction materials and bitumen is noted. The increase in noise levels during construction phase is

Page 33: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 15

studied due to vehicle movements, operation of construction machineries, running of DG sets at site, etc. During operation phase, impact on ambient air quality is assessed due to increased traffic. Impacts on flora are limited during operation. But the impacts relating to losses due to accidents, intentional cutting are assessed for operation phase and covered in the Biodiversity Assessment and Management Plan. 2.7 Community Consultation/PUBLIC PARTICIPATION Four tier (local levels, district level, state level and institutional level) consultations are being be carried out for OSRP. First round of local level consultations along road corridor have been completed. The second round of local level consultations is being done under stakeholder’s disclosure policy. The district level consultations will be organized after the preparation of draft EIA report. District level consultation will include a detailed presentation on project objectives, components, perceived positive and negative impacts, requirement for change in designs and mitigation, enhancement measures suggested etc. In State level consultations, officials of OWD, other related Departments and Experts from World Bank will be invited to attend. The details of the Project as a whole in the State will be presented and views/suggestions will be recorded. The institutional level consultations will include officials from Forest and Environment Department, OSPCB, Regional Office of MoEF. 2.8 PREPARATION OF EMAP After collection of relevant data, assessment of existing environment was made and impacts of proposed project activities are identified. Based on assessment of impacts on different environment components, mitigation measures/enhancement measures were suggested. Uniquely, location specific mitigation measures/enhancements are prepared for water resources such as: ponds, tanks, reservoirs, rivers, canals, areas of soil erosion, water logging/over toping, sensitive noise receptors like schools, hospitals etc. Mitigation measures with specifications are provided with sketch, which will be converted in the engineering drawings. Similarly, quarry details with lead charts, features along haul roads, and environmental protection measures are also suggested. Area near bus stops and areas entrapped between existing alignment and new proposed alignments were considered for avenue plantation and the scheme of plantation is given in the EMAP. Provision of toilet blocks, rest shelters, plantations and cyclone shelters are made in the EMAP as a part of enhancement measures under community development. General engineering safety provisions, signage for traffic calming and curve improvement near schools are grouped separately as mitigation measures in EMAP. The cost estimate for these environment mitigation measures are provided in the EMAP.

Page 34: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 16

CHAPTER III PROJECT DESCRIPTION

3.1 OVERALL DETAILS OF OSRP:

Orissa State Roads Project (OSRP) is a road upgrading and rehabilitation initiative by Govt. of Orissa and will be implemented by Orissa Works Department (OWD). The total estimated project cost is 315 million US$. Out of this 250 million US$ will be funded by International Bank for Reconstruction and Development and rest 65 million US$ by Government of Orissa. The Project will be implemented in phases. Under Phase I of the Project, 825 kms of State Highways has been selected for upgradation and rehabilitation on priority basis. Out of the 825 kms of road corridors under Phase I of OSRP, 364.781 kms are to be covered in 1st Year of the Phase I programme (Table 3). The present Environment Assessment exercise relates only to these corridors (Phase I: Year I) under OSRP.

Table No 3 Details of Road Corridors under Phase I: Year I of OSRP

Sl. No Corridor Identification Chainage points

Total Length (km)

01 Chandbali - Bhadrakh SH 9 0 km (Bhadrakh) to 49.060 km (start of Chandbali town) 49.060

02 Bhadrakh - Anandpur SH 53 0 km (Bhadrakh) to 56.736 km (Bhogpur – 11 kms ahead of Anandpur)

56.736

03 Khariar - Bhawanipatna SH 16 3 km (Bhawanipatna) to 69.545 km (Khariar town) 66.545

04 Berhampur - Bangi Jn. SH 17 0 (Berhampur) to 150.400 km (Bangi Jn) 150.400

05 Bangi Jn. - J. K. Pur SH 4 160.980 (Bangi Jn) to 118.940 (J.K. Pur) 42.040

Total 364.781 The broad objective of the Project is rehabilitation of existing road network involving rising of formation levels, strengthening of pavements and where necessary widening and realignment of roads. The main significant change that is expected at the end of project implementation is “Businesses and households in project areas utilize cost-effective road infrastructure and observe significant reduction in their transportation costs”. The proposed project comprises the following components:

(a) Road Improvement Component (US$300 million). This component will support: (i) upgrading and rehabilitation of about 1,200 km of high-priority roads of the OWD-managed network; (ii) a long-term Performance Based Maintenance contract for about 200 km of OWD roads; (iii) associated consulting services for sub-project preparation and supervision, and cost for resettlement and rehabilitation, (iv) GOO “viability gap” funding commitment to enable implementation of selected PPP projects.

(b) Institutional Development & Policy Component (US$10 million). This component will provide support for: (i) implementation of an Institutional Strengthening Action Plan (ISAP); (ii) measures for rapidly increasing the capacity of OWD’s core functions to

Page 35: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 17

match the increased resource allocations in the sector; (iii) development of a Road Asset Management System; (iv) supporting reform programs in the Orissa Bridges & Construction Corporation (OBCC) as part of a strategy to enhance the construction industry capacity in the state; (v) development of state-level Road Fund, with effective stakeholder involvement in sector planning and resource allocation decisions; and (vi) development of a multi-modal Transport Infrastructure Development Policy and Strategy.

(c) Community Development Initiative (US$5 million). This component will provide assistance to tribal communities living along road corridors with assistance for demand-driven initiatives, such as marketing infrastructure, schools, health facilities and/or access roads. In addition, it will provide for community road safety awareness and HIV/AIDS prevention campaign initiatives. OWD will engage an NGO to help implement this component and assist tribal communities to identify viable local proposals. The details of this component, and the extent of its intervention (if any), will be determined once the social analysis and environmental impact assessment are completed.

3.2 CORRIDORWISE DETAILS OF PHASE - I: YEAR - I ROADS: It is already discussed in section 3.1 that the present Environment Assessment exercise relates to 364.781 kms (Table 3) of project road that are to be covered in 1st year of Phase I of OSRP. The detail about these road corridors is presented in the paragraphs mentioned below. CORRIDOR: CHANDBALI – BHADRAKh: SH - 9 This corridor comprises of 52 km from 0.00 km at outskirt of Bhadrakh town to 52.402 km at end of Chandbali town. But, due to high congestion inside Chandbali town and linking of this road with Jagatpur – Chandbali corridor (SH – 9A), realignment inside Chandbali town is being considered. Hence, in the present survey only 49.060 km road length has been considered i.e. from Bhadrakh town (0.00 km) to start of Chandbali town (49.060 km). The existing carriageway varies from single lane to intermediate lane, but mostly of single lane. The road starts from Bhadrakh Municipality and passes though Bhadrakh, Tihidi and Chandbali blocks of Bhadrakh district. The entire stretch of the road passes through the flood planes of river Baitarani, Salandi and Matai, which are very fertile and productive. The portion from Motto Bazaar to Tihidi 42 to 28 Kms are prone to submergence during high floods, associated with tidal surge on this link. The above-mentioned rivers inundate vast stretches of fields on either side of the road connected by several culverts, drainage cuts, creeks and nallas. Several long stretches of wetland system have developed over the years along this stretch. The floodwater carries rich topsoil, humus and essential mineral, which settle down on the flat agricultural lands, ponds and wetland enriching the soil. The tide brings fishes, crustaceans, mollusks to lay eggs and breed in these biomass rich shallow wetlands.

Page 36: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 18

Bhadrakh – Chandbali Road Corridor (Single lane)

All most all the culverts, bridges, are to be reconstructed on account of raising of the road surface and widening for double laning meaning soil erosion, silting up the creeks and wetlands. The road level is required to be raised besides realignment of the existing road within Chandbali Township. This needs careful planning. Some portion of the project road corridor is within 10 km of impact zone of the Bhitarkanika sanctuary. There are no reserved or protected forests along the road. This route has acquired much importance due its direct access to 4 lane NH-5 at Bhadrakh town. One ODR is also being developed to connect Dhamra port from this corridor. In future, this road will help in transportation of iron, chromite ores from Keonjhar and Anandpur areas to Dhamra port and also to Paradeep port via Kendrapara. The prospects of the up coming SEZ near Paradeep port, POSCO steel plant, Indian Oil Petroleum Refinery Complex, Industrial park and Dhamra port has the scope of enhancing its importance further. This will also boost the freight and passenger movement from West Bengal and Bhadrakh to Paradeep and Dhamra. The corridor, once developed will help the people of Chandbali; Tihidi and Bhadrakh blocks in approaching district headquarter to meet education, health, market and other needs. The access to local markets at Motto, Pallia, Chandbali and Tihidi will also be easier for the local community. This corridor also provide access to the main market of Jute, Rice and other agricultural products, Horticultural crops like Coconut and Banana besides tourism interest of connecting Bhadrakali temple, Bhitarkanika Wild life Sanctuary and Crocodile breeding center, Olive riddle, Sea turtle, Rookery area and endangered Horse Shoe Crab breeding habitant are the major tourist destinations.

Page 37: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 19

CORRIDOR: BHADRAK-ANANDPUR: SH - 53

This link comprises of 56.736 km of SH-53 from 0 km (Bhadrakh) to 56.736 km (Bhogpur – 11 kms ahead of Anandpur). The road starts at Bhadrakh Municipality and passes through Bonth block of Bhadrakh district and Hatadihi, Anandpur block and Anandpur NAC of Keonjhar district. This road crosses Chennai - Kolkata railway line after the NH-5 from where it originates. A railway over bridge is under construction. There are good and young avenue trees along this route and most of them have formed excellent green tunnels. Road improvement, parking bays at village junctions and market areas, diversion of road to reconstruct bridges and culverts will lead to air and water pollution, soil erosion and cutting down of green tunnels and young avenues as well as giant trees between railway over bridge up to 12th Km on the right side. There are very little wetland and ponds along this road and no reserve or protected forests along this road up to Anandpur bypass. The road serves as the main connecting route to famous Ghatagaon Tarini temple for tourists from Bhadrakh and Balasore district. The whole part of this road passes through the flood plains of Salandi and left flank of Baitarani. There are several market places and irrigation canal crossings and railway crossing on this road. Bhadrakh, Barpada, Rahandia (Ferro-Chrome factory of FACOR), Bonth, Basantia, Fakirpur, Anandpur and Bankhidi are the major places of congregation and commercial activity. Students of Barpada Engineering College, Anandpur College, Hatadihi College and Bonth College depend on this route for going to college. The Hadagarh wildlife sanctuary is within the impact zone of 10 kms but negligible wildlife movement on the road is noticed due to the openness of the agricultural fields without any cover for the wild animals. The Hadagarh wildlife sanctuary is within 3 to 8 kms of this road, which forms a part of Mayurbhanj elephant sanctuary. The road will be a major connecting link of the mining belt of Keonjhar with Paradeep and Dhamra ports and commercial centers in between Jajpur road to Mayurbhanj and Keonjhar. The major commodities, which will have better marketing facilities, include forest, agricultural, horticultural, tribal arts/culture/stone carving products, iron ore and chromites etc. The pavement condition of substantial portion of this link is fair. CORRIDOR: KHARIAR – BHAWANIPATNA: SH - 16 This corridor is 67.545 km long connecting Bhawanipatna town at 0.00 km with Khariar town at 69.545 km. Since there is need for realignment of road inside Bhawanipatna town as a part of main corridor connecting Khariar with JK Pur, road from chainage 3.00 km has been studied in the present Environment Assessment exercise. This corridor passes through three districts, namely Kalahandi, Bolangir and Nuapara. It is a part of main corridor of Khariar with J.K. Pur via Bhawanipatna and Muniguda, which originates from NH - 217 (Khariar) and terminates at NH – 201 (Raygada). It provides a link between Visakhapatnam port in Andhra Pradesh and Raipur in Chhatisgarh. The corridor comprises of whole part of SH-16 with varying carriageway width, but mostly single lane passing through plain and rolling terrain of agricultural land and built up areas,

Page 38: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 20

such as Khariar, Bhawanipatna etc. Pavement condition from km 0 to 2.00 km and from 39.00 to 45.00 km is good. The corridor passes through Khariar NAC of Nuapara district, Bangomunda and Titlagarh blocks of Bolangir district and Kalahandi Block and Bhawanipatna Municipality of Kalahandi district. Nuapara district is a new district carved out from Kalahandi district in 1992. The infrastructure and service facilities like health, education and market are very poor in Nuapara district. Hence, Bhawanipatna is the nearest major town for people of Nuapara district and this road serves as a lifeline for the people of Khariar and nearby areas. The link will be a part of main corridor developing better connectivity of NH-201 with NH-217. The RoW requires realignment and reconstruction at places for parking bay, road intersection, approach to new bridges and culverts at about sixteen places. The major water source is river Tel, which is a tributary of river Mahanadi. The approach road and the bridge are to be re-commissioned for use. There are five granular sub-base and metal quarries and stone aggregates manufacturing units, which shall be required to meet the demand. There is a pumping station and pipe line supplying water to Khariar from Sunder river at 59th km is to be relocated, before ROW improvement is taken up to prevent stress on water supply to town. The road gets flooded at several places, due to lower elevation. Some culverts have been washed away, requiring replacement of about 100 culverts and 15 additional culverts. There are no reserved forests or protected areas along this corridor. There are old avenues along the road and most of them are likely to be sacrificed for improvement of the road. The road does not cover any hilly tract; rather runs through plain rolling terrain, agricultural land and built up areas Khariar and Bhawanipatna towns. CORRIDOR: BERHAMPUR - BANGI JUNCTION: SH - 17 This corridor comprises of 150.400 km long road network starting at 0.00 km (Berhampur) to 150.400 km (Bangi Jn). The corridor originates from NH-217 at first gate Berhampur near revenue village Sankarpur and connects Balipada, Digapahandi, Kansamari, Podamari, Taptapani, Mohana, Adava, Raipanka, Gumuda and end at Bangi Jn near SH-5. This is an important road connecting coastal parts of the state with south Orissa and more particularly KBK region of the State. The road was developed in the past to provide connectivity to Industries like JK Industries at Raygada, IMFA at Therubali, NALCO at Damanjodi, HAL unit at Sunabeda and major irrigation & hydropower projects namely Balimela, Kolab, Harabhangi and Badanala Projects. The earlier name of the road was 132 KV Line road as on the side of this road power line from Hydro Power units to Coastal Orissa was there. The road passes through three districts namely, Ganjam, Gajapati and Raygada. The rural and urban areas through which the road corridor passes are Berhampur Municipality, Digapahandi NAC, Digapahandi Block, Sankhemundi Block and Kukudakhandi Block of Ganjam district; Mohana Block of Gajapati district and Padmapur and Ramanaguda blocks of Rayagada district. The road corridor starts from NH-217 at the first gate point of Berhampur junction and runs on flat agricultural terrain up to Podamari after which it enters into forested and hilly area. There are reserve forests, proposed reserved forests, protected forests, jungle blocks, cashew plantations etc along the roadsides. There is a deer park at Taptapani at 48 km and hot water spring at 49 km. The road crosses Vansadhara River and again enters Makundpur ghat beyond Bangi on Bangi – J.K.Pur link where leopards and other wild animals cross the road

Page 39: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 21

till the ends of the ghat. Provisions for wildlife crossing points, road under pass, habitat development in podu ravaged barren and bald hill tops will have to be carried out most carefully without depriving the tribal of their freedom of movement, settlement and commercial activity. Berhampur is the main commercial town of south Orissa and traders from Koraput, Rayagada and other districts transport goods through this road. Also from health services point of view, medical college and hospital is at Berhampur and the emergency patients of the nearby area move on this road to reach hospital at Berhampur. The road also connects various other roads and provides connection to Aska, Chikiti, Parlakhemundi, Gunupur, Daringbari, Phulbani, Gudari, Bhawanipatna through ODRs, MDRs and RD roads. The entire SH-17 over 150 km is mostly single lane, except the recently improved carriageway from 0 to 58 km. The pavement condition of the roads at places from 0 to 58 km has been under improvement with intermittent patches remaining to be covered. The balance carriageway is in poor condition of maintenance. There are two large water bodies of reservoir and several big nalas and rivers on this route. The area is mostly running through reserve and protected forests, under the influence of naxalite movement in tribal areas. The road connects the famous R. Udaygiri, Adava, Gunupur and Gudari areas. The areas are under influence of naxal activity resulting in looting of the treasury, demolition of the R.Udaygiri jails, brutal killings of Govt. officials, Land owners, Police sympathizer, CRPF and jail personnel engaged in their duties. The hills are also subject to rampant podu/ shifting cultivation resulting in accelerated soil erosion, loss of vegetation and wildlife with silting up of reservoirs, raised nala and river beds. There has been flash flood on account of this washing away of many approaches to bridges and culverts and severe damage to road surface. Many places of this road are subject to flooding between Mohana to Adava, Adava to Raipanka and Milkapanga to Bangi Jn.. The recent flood between July to Sept’ 2006 has damaged the approaches of Bansadhara, Bangi nala, Ghodanadi and road surface between Kanteikoli to Padagaon, Padagaon to Adava, Guluba to Nalaghat, Badanala bridge to Antarjhuli and Antarjhuli to Bangi Jn. Around 150 culverts and bridges are going to be reconstructed on this route. The link passes near 5 km redial distance of Lakhari valley elephant sanctuary and two large water bodies of Harabhangi and Badanala, medium irrigation projects (reservoir water spread area), Taptapani hot water spring and deer park with panthanivas and tourist lodge facilities on the road sides. The quarry sites for procurement of road construction materials are located within 1 km to 25 km distance with haulage roads covering maximum 12 km to minimum 1 km on either side of the road. Three rivers i.e. Ghodahada (29 km), Bansadhara (141 km), Ghodanadi (147 km) and three small rivers i.e. Harabhangi, Badanala and Bangi are the chief source of supplying sand, river water for road formation and bridge construction etc. There are stiff ghat portion from 43rd km to 58th km at moderate slope at intermittent locations where geometric corrections at right or left centric realignment will be necessary to improve the road.

Page 40: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 22

Reservoir of Harabhangi Irrigation Project on side of Berhampur – Bangi Jn Corridor

CORRIDOR: BANGI JUNCTION – J.K. Pur: SH - 4 This corridor is 42.040 km staring from Bangi Jn at 160.980 km and ending at J.K. Pur at 118.940 km. The width of carriageway is mostly single line. The road passes through plains up to 154 km and enters reserved forest with ghat between 154 to 128 km. The balance part of the road passes through agricultural land and built up area like J.K. Pur having very poor pavement condition all throughout. There is a sharp curve and accident-prone spots at 140, 145 and 149 km chainage points. There are two major junctions, one at km 119.200 with SH-5 and at 148.900km (MDR 48B to Kereda), where the road is to be realigned for preventing accidents. The dense reserved forests are between km 154 to 128 with steep Ghats and sharp curves, for which some new alignment is proposed at some of the locations abandoning the old road. There are wildlife movements across this route but no permanent established wildlife crossing in this stretch. 3.3 PROPOSED CIVIL ACTIVITIES, DESIGNS, AND SPECIFICATIONS Under OSRP, the following activities will be taken up on existing state highways to meet the present day demands of traffic and other considerations like improvement of road geometry, safety and longevity. The proposed project activities mainly consist of:

Raising the formation level. Widening to two-lane from existing single lane and intermediate lane width. Strengthening of the pavement. Up grading to 4 laning in urban areas with provision for drainage, side walks,

parking bay etc. To make the top carriage way width of 7 mtrs with provision of soft and hard

shoulders of 2.5 mtr on either side. To improve the road geometry on highways.

After analysis of various alternatives (discussed in Chapter-8), based on economic indicators, bypass considerations, availability of RoW, present and proposed traffic volume,

Page 41: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 23

environmental and social considerations, the improvement works will mainly consist of raising the formation level, widening to two-lane from the existing single and intermediate lane width, and pavement strengthening. Some of the project route portions crossing urban areas may require upgrading to a four lane divided cross section with provision for drainage, sidewalks and parking besides project specific social and environmental action plan. The top carriage way width will be 7 m with provisions of soft and hard shoulders, having width of 2.5 m on either side, totaling to a formation width of 12 m. For improvement of highway geometry, some stretches will have minor lateral shifting in case of realignment.

Page 42: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 24

CHAPTER IV LEGAL FRAMEWORK & ADMINISTRATIVE POLICIES

Roads are essential components for regional development of a country. Better roads lead to better communications through efficient transport systems. Hence improvement of existing roads by widening will improve the road networks. The road network development will have immense impact on the atmospheric quality, water quality of rivers, streams, ponds, soil quality, noise level etc. caused due to various sources arising out of the project activities. In 1976 the 42nd Constitutional Amendment created Article 48A and 51A, placing an obligation on every citizen of the country to attempt to conserve the environment. As a result, a number of laws related to environment were passed to strengthen the existing legislation. Environment (Protection) Act, 1986 is the landmark legislation as it provides for the protection of environment and aims at plugging the loopholes in the other related acts. The Ministry of Environment and Forest made it mandatory for introducing environment assessment into the planning process of road projects as well as environmental impact appraisal as per Environmental Protection Act, 1986. The MoEF have assigned all central and State authorities to develop policies towards protection of environment for any infrastructure development activities as per the act. The Ministry of Environment and Forest (MoEF) has overall authority for the administration and implementation of government policies, laws and regulations. At the state level, the Department of Environment and Forest implement the MoEF authority. In OSRP, as like other development projects, the environment acts, policy guidelines of both State and Central Government will be applicable. As these acts/regulations have varying procedures, requirements depending on type of Project, a detailed discussion is required in this report to study the extent of applicability, procedures and requirements to be met by OSRP implementing authorities. The following subsections summarized the legislative framework in which OSRP will be addressed with respect to the environment including social issues. 4.1 NATURAL ENVIRONMENT The laws, regulations, and guidelines that govern the issues of natural environment associated with planning, construction and operation of the project are summarized in Table 4.

Page 43: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 25

Table 4: The Legal Framework – Natural Environment

Law/Regulation/ Guidelines Relevance Responsible

Agency The Forest (Conservation) Act, 1980

Applies to natural forest areas - Authority to issue clearance: (i) if area of forest >10ha (10ha in hilly area) Central Government; (ii) >5ha–10ha Regional Office of Chief Conservator of Forests; (iii) <5ha State Government; (4) if tree density >40%, permission for any work must come from the Central Government, regardless of area of forest to be cleared. The GoI, MoEF Notification of 18 February 1998 provides that the clearance to fell roadside plantations may be given by concerned Regional Office of MoEF, provided that at least two trees must be planted for each tree felled. If, decision not made within 30 days of receipt of application, the proponent agency may proceed under intimation to State Forest Department and the MoEF.

Forest Department, GoO (for land conversion below 5 hectare & 40% density).

The Environmental (Protection) Act, 1986, and Rules, 1987-2006 (various)

The various aspects of the Environment (Protection) Act and Rules apply to the road construction projects. The standards for discharge of pollutants in the atmosphere and noise levels are fixed. These standards are directed primarily at the industrial pollution, but are also applicable to road construction activity.

MoEF. GoI; DoE, GoO; CPCB; OSPCB

The Environmental Impact Assessment Notification, 1994 and Notification Dt 14th September 2006

Identifies highways (Item 21 of schedule I in Notification, 1994 and Item 7f in Notification Dt 14th September 2006) as one of the projects requiring prior clearance from the GoI, MoEF. 10 April 1997 MoEF Notification, provides that environmental clearance need not be obtained from the MoEF for Highway projects relating to improvement work including widening and strengthening of roads with marginal land acquisition along the existing alignments provided the highways do not pass through ecologically sensitive areas such as National Park, Sanctuaries, Tiger Reserve, Reserve Forest, etc. State Pollution Control Board empowered to hold public hearing for all projects requiring environmental clearances from the MoEF.

MoEF. GoI; DoE, GoO; OSPCB; CPCB

The Wildlife (Protection) Act, 1972

Provides for the creation, conservation and protection of National Parks and Sanctuaries.

Wildlife Warden, Forest Dept., GoO.

National Forest Policy, 1952, 1988 (Rev.)

To maintain ecological stability through preservation and restoration of biological diversity.

Forest Department, GoI and GoO

The Water (Prevention and Control of Pollution) Act, 1974

Central and State Pollution Control Board to establish/enforce water quality and affluent standards, monitor water quality, prosecute offenders, and issue licenses for construction/operation of certain facilities.

OSPCB

The Air (Control of Pollution) Act, 1981

Empowers OPCB to set and monitor air quality standards and to prosecute offenders, excluding vehicular air and noise emission.

OSPCB & Transport Department.

Hazardous Wastes (Management and Handling) Rules, 1989; 2006. Public Liability Insurance Act, 1991 and Chemical Accidents

The rules prescribe the details of management of hazardous industrial solid wastes from its generation to final disposal (cradle to grave) and fixes responsibilities on the generator, the transporter and the disposal agent. Requirement of preparation of on-site and off-site Disaster Management Plans for accident-prone areas. Special responsibilities are fixed on the managers of hazardous

State Government and OSPCB

Page 44: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 26

Law/Regulation/ Guidelines Relevance Responsible

Agency (Emergency Planning, Preparedness and Response) Rules, 1996.

industries, Factory Inspectorates, Pollution Control Boards, local and district authorities, the State Government and the Central Government.

The Motor Vehicular Act, 1988 Central Motor Vehicles Rules, State Motor Vehicles Rules

Empowers State Transport Authority to enforce standards for vehicular pollution. In August 1997 the “Pollution Under Control Certificate” was launched to reduce vehicular emissions.

Transport Department, State Government.

Guidelines for Rail, Road and Highways Projects, 1989

Issued by the MoEF and the MoST, not binding. However, serves the purpose of a useful framework for environmental reporting.

MoEF & MoST

World Bank Guidelines

Operational Policies (OP)/Bank Practices (BP)/Good Practices (GP) 4.01 4.02, 4.04 and BP 17.50 Disclosure of Operational Information

World Bank

The Noise Pollution Control Act, 1990.

The MoEF for various categories of area has promulgated the standards for noise for day and night.

OSPCB

The Mining Act The mining act has been notified for safe and sound mining activity.

Orissa State Department of Mining

Minor Mineral Concession Rules, 2004

Leases for mining of construction materials and STP for borrow pits

Department of Mines and Geology Govt. of Orissa.

4.2 SOCIAL AND CULTURAL ENVIRONMENT The laws, regulations, and guidelines that govern the issues of social and cultural environment associated with planning, construction and operation of the project are summarized in Table 5.

Table 5: The Legal Framework – Social and Cultural Environment

Laws/Regulations Relevance Responsible Agency The Land Acquisition Act, (Amended up to 1984)

Governs acquisition of land under eminent domain for defined public purposes and compensation there for.

Revenue Department. GoO.

The Environmental Impact Assessment Notification, 1994 & Notification, Dt 14 September 2006.

Makes the preparation of a project-specific RAP mandatory. The RAP must address, among other things; protection against loss of livelihood; community support systems and infrastructure; loss of productive resources and minimization of displacement. The GoI, MoEF Notification of 10 April 1997 empowers the State Pollution Control Board to hold public hearing for all projects requiring environmental clearances from the MoEF.

MoEF. GoI; DoE, GoO; OSPCB; CPCB

Orissa Resettlement & Rehabilitation Policy 2006

All R & R issues need to be addressed within the guidelines & provisions made in the policy

OSRP, Revenue Department, GoO

The Ancient Monuments and Archaeological Sites and Remains Act,

Area within 100m of protected property is protected and within 300m is a zone of controlled development; any development within such areas requires prior authorization of the ASI.

Archaeological Dept. GoI, Indian Heritage Society, Indian National Trust for Art

Page 45: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 27

Laws/Regulations Relevance Responsible Agency 1958. and Culture Heritage

(INTACH). World Bank Guidelines

Social Safeguard Policies (OP) 4.12 for Involuntary Resettlement, OD 4.20 for Indigenous People development plan, OPN 11.03 for Cultural property and BP 17.50 Disclosure of Operational Information

World Bank

Labour Act, 1986 Payment of minimum wages and incentives to laborers Department of Labour Government of Orissa

4.3 OTHER LEGISLATIONS APPLICABLE TO ROAD PROJECTS During road construction stage generally equity, safety and health issues of workers and public are involved. The Orissa State Road Project is to be implemented complying with laws of the land, which include inter allia, the following:

• Workmen’s Compensation Act, 1923 (the Act provides for compensation in case of injury by accident arising out of and during the course of employment);

• Payment of Gratuity Act, 1972 (gratuity is payable to an employee under the Act on satisfaction of certain conditions on separation if an employee has completed 5 years);

• Employees PF and Miscellaneous Provision Act, 1952 (the Act provides for monthly contributions by the employer plus workers);

• Maternity Benefit Act, 1951 (the Act provides for leave and some other benefits to women employees in case of confinement or miscarriage, etc.);

• Contract Labour (Regulation and Abolition) Act, 1970 (the Act provides for certain welfare measures to be provided by the contractor to contract labour);

• Minimum Wagers Act, 1948 (the employer is supposed to pay not less than the Minimum Wages fixed by appropriate Government as per provisions of the);

• Payment of Wages Act, 1936 (it lays down as to by what date the wages are to be paid, when it will be paid and what deductions can be made from the wages of the workers);

• Equal Remuneration Act, 1979 (the Act provides for payment of equal wages for work of equal nature to Male and Female workers and not for making discrimination against Female employees);

• Payment of Bonus Act, 1965 (the Act provides for payments of annual bonus subject to a minimum of 8.33% of wages and maximum of 20% of wages);

• Industrial Disputes Act, 1947 (the Act lays down the machinery and procedure for resolution of industrial disputes, in what situations a strike or lock-out becomes illegal and what are the requirements for laying off or retrenching the employees or closing down the establishment);

• Industrial Employment (Standing Orders) Act, 1946 (the Act provides for laying down rules governing the conditions of employment);

• Trade Unions Act, 1926 (the Act lays down the procedure for registration of trade unions of workers and employers. The trade unions registered under the Act have been given certain immunities from civil and criminal liabilities);

• Child Labour (Prohibition and Regulation) Act, 1986 (the Act prohibits employment of children below 14 years of age in certain occupations and processes and provides for regulation of employment of children in all other occupations and processes. Employment of child labour is prohibited in Building and Construction Industry);

Page 46: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 28

• Inter-State Migrant Workmen’s (Regulation of Employment and Conditions of Service) Act, 1979 (the inter-state migrant workers, in an establishment to which this Act becomes applicable, are required to be provided certain facilities such as housing, medical aid, traveling expenses from home to the establishment and back, etc);

• The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 and the Cess Act of 1996 (all the establishments who carry on any building or other construction work and employs 10 or more workers are covered under this Act; the employer of the establishment is required to provide safety measures at the building or construction work and other welfare measures, such as canteens, first-aid facilities, ambulance, housing accommodation for Workers near the workplace, etc.);

• The Factories Act, 1948 (the Act lays down the procedure for approval of plans before setting up a factory, health and safety provisions, welfare provisions, working hours and rendering information regarding accidents or dangerous occurrences to designated authorities);

4.4 SALIENT FEATURES OF IMPORTANT LAWS/REGULATIONS: Forest (Conservation) Act: This Act is of particular significance in case the project corridor requires acquisition of forestland. The Forest (Conservation) Act (1927) was amended in 1980 in an attempt to check the rapid deforestation occurring throughout India. At the state level, the government was empowered to declare reserve and protected forest and was also given the authority to acquire land for extension and preservation of the forests. An advisory Committee was formed to supervise compliance, within other government departments. In December 1996, a Supreme Court Judgment further defined the types of forests to be protected.

In the present case this act will be applicable for all the roads irrespective of the presence or absence of reserved or protected forest along the road corridors as per the prevailing legal positions. But some of the roads pass within 10 km impact zone of wildlife sanctuary, elephant reserve and Biosphere Reserve buffer and transition zone as well as across the elephant corridors/passages for which the Wildlife (Protection) Act, rules and executive orders becomes mandatory to the followed. The Forest (conservation) Act 1980 was promulgated by GOI to regulate indiscriminate diversion, acquisition and destruction of forested land for various projects, which are non-forest uses by agencies of state and central govt. well as private or corporate agencies. The Act has undergone several changes the latest being in the year 1988. The Forest (Conservation) Rules 1981 was amended in 2003 and 2004. Few amendments out of which 2004 has been challenged in the Apex court and its operation have been stayed.

The Act prohibits diversion of any forestland for any non-forestry purpose and certain activities in the forestry operations by even forest department. As per the Section – 2 of the Act, the definition of forestland include not only forest as understood in the dictionary sense, but any area recorded as forest in the Government record irrespective of its ownership. The provisions enacted in the forest conservation Act 1980 for

Page 47: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 29

the conservation of forests and the matters connected there which shall apply clearly to all forests so understood irrespective of the ownership or classification there of. The term “Forest land” mentioned in Section 2 of the Act refers to Govt. Reserved Forest, Protected forest or any area recorded as forest in the Govt. records. Lands, which are notified under section 4 of Indian Forest Act, would also come within the preview of the Act (Supreme courts Judgment in NTPC’s case). It would also include ‘forest’ as understood in the dictionary sense (Supreme Courts order dt 12.12.1996 in WP No.202/1995). All proposals for diversion of such areas for any non-forestry purpose, irrespective of its ownership would require prior approval of the Central Govt. (Boulders, bajri, stone etc. in the river beds located within forest areas would constitute a part of the forest land and their removal would require prior approval of Central Government) Submission of proposal as described in the Handbook: Diversion of Forestland within Reserved Forest: Any proposal for diversion of Reserve Forest should be very carefully examined and detailed justification after exhausting all alternatives for locating the project in this forest area should be given while forwarding the proposal. It is essential to have the opinion of the local people whenever the project is coming up in the area. Therefore any proposal for diversion of forestland should be accompanied by a resolution of the “Aam Sava” of the Gram Panchayat or local body of the area endorsing the proposal that the project is in the interest of the people. Map of the forest area required showing boundary of adjoining forests etc. is to be furnished along with the prescribed form No. ‘A’. This should normally be on 1:50000 scale original Survey of India topo sheets. Species wise, diameter class wise abstracts of trees to be felled should be furnished in the prescribed form. Total enumeration of such trees is necessary only up to 10 ha. For larger areas species wise and diameter class wise abstract of trees may be computed either from the Working plans or by standard sampling methods. Compensatory Afforestation: Compensatory afforestation is one of the most important conditions stipulated by the Central Govt. while approving proposal for diversion of forestland for non-forest use. It is essential that a comprehensive scheme for compensatory afforestation is formulated and submitted to the Central Govt. The scheme should include details of non-forestland or degraded forestland identified for compensatory afforestation, map of the areas to be taken up for compensatory afforestation, year wise phased forestry operations, details of species to be planted and suitability certificate from afforestation/management point of view along with cost structure of various operations to be furnished.

Page 48: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 30

The compensatory afforestation schemes must have technical and administrative approvals, from the competent authority and should be in conformity with cost norms based on species, type of forestland and site conditions. Where non forest land for compensatory afforestation is not available compensatory, afforestation may be carried out over twice the area of degraded forests subject to production of certificate of non availability of non forest land within the entire state for compensatory afforestation from the Chief Secretary of the state. Components of Scheme for Compensatory Afforestation:

a) Details of equivalent non-forest or degraded forestland identified for raising compensatory afforestation.

b) Delineation of Proposed area on a suitable map c) Agency responsible for afforestation. d) Details of work schedule proposed for compensatory afforestation. e) Cost structure of Plantations, provision of funds and mechanism to ensure that the

funds will be utilized for raising afforestation. f) Details of proper monitoring mechanism.

Non-forestlands identified for compensatory afforestation are to be transferred to the Forest department and declared as Reserved or Protected forests so that the plantation raised can be maintained permanently. The transfer and notification must take prior to the commencement of the project. This has been modified later by MoEF to ensure notification under Indian Forest Act under section 4 or 26 as Proposed Reserved Forest or Reserved Forest. The Nodal officer is to ensure final notification as RF within 6 months. The honorable Supreme Court of India in their orders on 30.10.2002 in 1A No.566 writ petition (Civil) No. 202 of 1995 have directed regarding the creation of a body for “Compensatory Afforestation Management and Planning Agency” to be constituted in each state. This body will look after the receipt of such compensatory afforestation fund from the user agency, the net present value of forest land (NPV) fund, the catchments area treatment fund, the wild life management plan fund etc. for the conditions stipulated by the Central Govt. Compensatory Afforestation fund Management and Planning Authority (CAMPA) has been notified in the official gazette on 23rd April-2004 by GOI.

Applicability of the provisions of this act to the linear plantations was modified by notifications from the GoI, MoEF, dated 18th February 1998. The spirit behind the Forest (Conservation) Act was conservation of natural forest, and not strip plantation. In case of the “notification to be protected” road side plantations, the clearance now may be given by the concerned Regional Offices of the MoEF, irrespective of the area of plantation lost. While issuing the approval, in place of normal provision for compensatory Afforestation, the Regional Offices will stipulate a condition that Afforestation to be compensated in planting two times for felling down of every tree. If the concerned Regional Offices do not accord the decision within 30 days of the receipt of fully completed application, the proponent agency may proceed with the widening/expansion under intimation to the State Forest Department and MoEF. The approval requires that all forested land to be used must be surveyed and the species, size, number of trees and their location to be recorded. These data, plus other specific data must be prepared in a lengthy application for clearance.

Page 49: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 31

Wild Life (Protection) Act: The Wildlife (Protection) Act, 1972 has allowed the Government to establish a number of National Parks and Sanctuaries to protect and conserve the flora and fauna of the state. The Wildlife Protection Act, (1972) is the first comprehensive act enacted to protect the wild animals and their habitats. It will improve protection measures of the existing National Parks and Sanctuaries and strengthen the Protected Areas (PA). The objectives of the act include to protect the rapidly declining wild animal and birds of the country, control trade in wildlife products, streamline and strengthen wildlife setup at Central and State level and establishment of Wildlife Advisory Board. In the extensive amendment in 1991, endangered wild plants have also been included within the protective umbrella of this Act. In the present case this act will be applicable, as there are some points of wild life crossings on Berhampur – Bangi Jn – J.K. Pur routes. Wildlife Park, Sanctuary exists within close vicinity (up to 10 Kms.). None of the project route passes through Wildlife Park, Sanctuary and Biosphere reserves. The applicability and clearance procedure of Forest (Conservation) Act and Wild Life (Protection) Act are discussed in more details in Biodiversity Assessment and Management Plan. The Water (Prevention and Control of Pollution) Act, 1974 resulted in the establishment of the Central and State level Pollution Control Boards whose responsibilities include managing water quality and effluent standards, as well as monitoring water quality, prosecuting offenders and issuing licenses for construction and operation of any facility. This will include generation of liquid effluent during construction of road from civil engineering activities or from domestic activities in workers’ camp. There are specific penalties for violation, which include imprisonment for responsible officials. This act will apply to all corridors under consideration. The Air (Prevention and Control of Pollution) Act, 1981 empowers Central and State Pollution Control Boards for managing air quality and emission standards, as well as monitoring air quality, prosecuting offenders and issuing licenses for construction and operation of any facility. Air quality includes noise level standards. There are specific penalties for violation, which include imprisonment for responsible officials. This act has notified National Ambient Air Quality Standard for different regions e.g. Industrial, Residential and Commercial areas. Air quality during construction and operation phases will be guided by this specific act. This act will apply to all corridors under consideration. The Noise Pollution Regulation and Control Act has been issued to promulgate noise level standards for various land uses. Under this act day and time noise levels and other regulations have been issued to regulate noise levels. This act will apply to all corridors under consideration. The Mining Act has been enacted for safe and sound mining activity. This act will apply for all corridors under consideration, as construction materials are to be procured at all corridors from mine in near vicinity. The Environment (Protection) Act, 1986: This act was passed as an overall comprehensive act “for protection and improvement of environment” Under this act rules have been specified for discharge/emission of effluents and different standards for environmental quality. These include Ambient Noise Standard, Emission from Motor Vehicles, Mass

Page 50: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 32

Emission standard for Petrol Driven Vehicles, General Effluent Standards etc. especially important for road project. This act will apply to all corridors under consideration. The Environment Impact Assessment Notification, 1994: This notification has been issued under the Environment (Protection) Act, 1986. Prior environmental clearance from the Ministry of Environment and Forests for 30 categories of project is required, which includes highway projects. According to this notification the project proponent has to make an application in a specified Performa (Schedule II) along with EIA report. Notification Dated 14 September, 2006: All projects or activities included as Category ‘A’ or ‘B’ in the Schedule, including expansion and modernization of existing projects or activities and change in product mix, requires prior environmental clearance from the Ministry of Environment and Forests (MoEF) Government of India or from Environment Impact Assessment Authority (SEIAA). The Orissa State Roads Project (OSRP) is a category “A” project and requires environment clearance from MOEF. Procedure for Environmental Clearance

An application seeking prior environmental clearance shall be made in the prescribed Form 1 before commencing any construction activity, or preparation of land, at the site by the applicant. The applicant shall furnish, along with the application, a copy of the pre-feasibility project report. As per the new notification, the environment clearance proposal for any category “A” Project has to pass through four different stages i.e., Screening, Scoping, Public Consultation and Appraisal. In the Screening stage, project will be screened by Expert Appraisal Committees (EACs) of MOEF to assess the need for detailed EIA study for grant of Environment Clearance. Then under Scoping stage, detailed and comprehensive Terms of Reference (TOR) for EIA will be suggested by EAC to address all relevant environmental concerns in the preparation of an Environment Impact Assessment (EIA) Report for the project. Then “Public Consultation” will be carried out in project area by which the concerns of local affected persons and others who have plausible stake in the environmental impacts of the project or activity are ascertained with a view to taking into account all the material concerns in the project or activity design as appropriate. After completion of the public consultation, all the material environmental concerns expressed during this process will be included in the draft EIA and EMP. The final EIA report, so prepared, shall be submitted to the concerned regulatory authority i.e. MOEF for appraisal and subsequent grant of environment clearance Public Consultation refers to the process by which the concerns of local affected persons and others who have plausible stake in the environmental impacts of the project or activity are ascertained with a view to taking into account all the material concerns in the project or activity design as appropriate.

The Public Consultation shall ordinarily have two components comprising of: -

(a) A public hearing at the site or in its close proximity, district wise, to be carried out in the prescribed manner for ascertaining concerns of local affected persons;

(b) Obtain responses in writing from other concerned persons having a plausible stake in the environmental aspects of the project or activity.

Page 51: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 33

PROCEDURE FOR CONDUCT OF PUBLIC HEARING

1. The Applicant shall make a request through a letter to the Member Secretary of the SPCB or Union Territory Pollution Control Committee, in whose jurisdiction the project is located, to arrange the public hearing within the prescribed statutory period.

2. The Applicant shall enclose with the letter of request, at least 10 hard copies and an equivalent number of soft (electronic) copies of the draft EIA Report including the Summary Environment Impact Assessment report in English and in the local language. Simultaneously the applicant shall forward copies, one hard and one soft, of the above draft EIA Report along with the Summary EIA report to the Ministry of Environment and Forests and to the following authorities or offices, within whose jurisdiction the project will be located:

District Magistrate Zilla Parishad or Municipal Corporation District Industries Office Concerned Regional Office of the Ministry of Environment and Forests

3. On receiving the draft Environmental Impact Assessment report, the above-mentioned authorities except the MoEF, shall arrange to widely publicize it within their respective jurisdictions requesting the interested persons to send their comments to the concerned regulatory authorities. They shall also make available the draft EIA Report for inspection electronically or otherwise to the public during normal office hours till the Public Hearing is over. The Ministry of Environment and Forests shall promptly display the Summary of the draft Environmental Impact Assessment report on its website, and also make the full draft EIA available for reference at a notified place during normal office hours in the Ministry at Delhi.

4. The OSPCB shall also make similar arrangements for giving publicity about the project within the State/Union Territory and make available the Summary of the draft Environmental Impact Assessment report for inspection in select offices or public libraries or Panchayats etc. They shall also additionally make available a copy of the draft Environmental Impact Assessment report to the above five authorities/offices viz, Ministry of Environment and Forests, District Magistrate etc.

5. The Member-Secretary of the OSPCB shall finalize the date, time and exact venue for the conduct of public hearing within 7(seven) days of the date of receipt of the draft Environmental Impact Assessment report from the project proponent, and advertise the same in one major National Daily and one Regional vernacular Daily. A minimum notice period of 30(thirty) days shall be provided to the public for furnishing their responses;

6. The advertisement shall also inform the public about the places or offices where the public could access the draft Environmental Impact Assessment report and the Summary Environmental Impact Assessment report before the public hearing.

7. No postponement of the date, time, venue of the public hearing shall be undertaken, unless some untoward emergency situation occurs and only on the recommendation of the concerned District Magistrate the postponement shall be notified to the public through the same National and Regional vernacular dailies and also prominently displayed at all the identified offices by the OSPCB. In the above exceptional circumstances fresh date, time and venue for the public consultation shall be decided

Page 52: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 34

by the Member Secretary of the OSPCB in consultation with the District Magistrate and notified afresh as per procedure specified above.

8. The District Magistrate or his or her representative not below the rank of an Additional District Magistrate assisted by a representative of OSPCB, shall supervise and preside over the entire public hearing process.

9. The OSPCB shall arrange to video film the entire proceedings. A copy of the videotape or a CD shall be enclosed with the public hearing proceedings while forwarding it to the Regulatory Authority concerned.

10. The attendance of all those who are present at the venue shall be noted and annexed with the final proceedings. There shall be no quorum required for attendance for starting the proceedings.

11. A representative of the applicant shall initiate the proceedings with a presentation on the project and the Summary EIA report. Every person present at the venue shall be granted the opportunity to seek information or clarifications on the project from the Applicant. The summary of the public hearing proceedings accurately reflecting all the views and concerns expressed shall be recorded by the representative of the OSPCB and read over to the audience at the end of the proceedings explaining the contents in the vernacular language and the agreed minutes shall be signed by the District Magistrate or his or her representative on the same day and forwarded to the OSPCB concerned.

12. A Statement of the issues raised by the public and the comments of the Applicant shall also be prepared in the local language and in English and annexed to the proceedings:

13. The proceedings of the public hearing shall be conspicuously displayed at the office of the Panchayats within whose jurisdiction the project is located, office of the concerned Zilla Parishad, District Magistrate, and the OSPCB. The OSPCB shall also display the proceedings on its website for general information. Comments, if any, on the proceedings, which may be sent directly to the concerned regulatory authorities and the Applicant concerned.

14. The public hearing shall be completed within a period of 45 (forty five) days from date of receipt of the request letter from the Applicant. Thereafter the OSPCB concerned shall sent the public hearing proceedings to the concerned regulatory authority within 8 (eight) days of the completion of the public hearing .The applicant may also directly forward a copy of the approved public hearing proceedings to the regulatory authority concerned along with the final Environmental Impact Assessment report or supplementary report to the draft EIA report prepared after the public hearing and public consultations.

15. If OSPCB fails to hold the public hearing within the stipulated 45 (forty five) days, the Central Government in Ministry of Environment and Forests for Category ‘A’ project shall engage any other agency or authority to complete the process, as per procedure laid down in this notification.

After completion of the public consultation, the applicant shall address all the material environmental concerns expressed during this process, and make appropriate changes in the draft EIA and EMP. The applicant shall submit the final EIA report to the concerned regulatory authority for appraisal. The applicant may alternatively submit a supplementary report to draft EIA and EMP addressing all the concerns expressed during the public consultation.

Page 53: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 35

The Expert Appraisal Committee shall scrutinize the application and other documents like the Final EIA report, outcome of the public consultations including public hearing proceedings, submitted by the applicant to the regulatory authority concerned for grant of environmental clearance. This appraisal shall be made by Expert Appraisal Committee in a transparent manner in a proceeding to which the applicant shall be invited for furnishing necessary clarifications in person or through an authorized representative. On conclusion of this proceeding, the Expert Appraisal Committee shall make categorical recommendations to the regulatory authority concerned either for grant of prior environmental clearance on stipulated terms and conditions, or rejection of the application for prior environmental clearance, together with reasons for the same. The appraisal of an application be shall be completed by the Expert Appraisal Committee within sixty days of the receipt of the final Environment Impact Assessment report and other documents or the receipt of Form 1.The regulatory authority shall consider the recommendations of the EAC concerned and convey its decision to the applicant within forty five days of the receipt of the recommendations of the Expert Appraisal Committee or in other words within one hundred and five days of the receipt of the final Environment Impact Assessment Report.

Clearance Requirement for OSRP as per new MoEF notification No. SO 1533 Dt. 14.09.2006

OSRP - Category A Project

Step1: Application: In Form1, with ToR & Pre feasibility Report 1 day

Step 2: Screening: By SEAC for examination of requirement of EIA.

Step 3: Scoping: For finalizing ToR for Environment Impact Assessment and communication to Applicant. 60 days

Step 4: Submission of draft EIA report by the applicant 15 days

Step 5: Public Consultation at District Level 45 days

Step 6: Submission of Final EIA & EMP 7days

Step 7: Appraisal: To be Completed by the EAC 60 days

Step 9: Grant of Prior Environmental Clearance 45 days

Total 233 days

Page 54: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 36

Table 6: Applicability of Acts and Rules to OSRP

Act/Rules ApplicabilityYes/No Remark

Environment (Protection) Act, 1986 Yes To protect environment during construction and operation of

project Environmental Impact Assessment Notification Dt.14th September 06.

Yes To protect environment during construction and operation of project

The Forest (Conservation) Act and Forest (Conversion) Rules

Yes The Forest (Conservation) Act and Rules will be applicable as Berhampur – Bangi Jn – J.K. Pur corridor passes through reserve/protected forest

Wild Life (Protection) Act, 1972 Yes This act is applicable to as there are some points of wild life

crossings on Berhampur – Bangi Jn – J.K. Pur corridor

National Forest Policy Yes The Forest (Conservation) Act and Rules will be applicable as Berhampur – Bangi Jn – J.K. Pur corridor passes through reserve/protected forest

Water (Prevention & Control of Pollution) Act Yes

This act will be applicable during construction for establishments of hot mix plant, construction camp, workers’ camp, etc.

The Air (Prevention & Control of Pollution) Act, 1981

Yes This act will also be applicable to the OSRP project during construction; for obtaining NOC for establishment of hot mix plant, workers’ camp, construction camp, etc.

Central Motor Vehicle Act and Central Motor Vehicle Rules

No These acts and rules are not applicable to OSRP. These will be applicable to road users.

Ancient Monuments & Archaeological Sites and Remains Act

No This act is not applicable to OSRP as none of the project route is close to ancient monument declared protected under the act.

The Land Acquisition Act Yes This act will be applicable to OSRP as there will be acquisition of land for geometric improvements, bypasses and realignments.

Noise Pollution (Regulation & Control Act) Yes

This act will be applicable to OSRP as vehicular noise on project routes required assessing for future years and necessary protection measure need to be considered in design.

The Mining Act Yes The construction of project roads under OSRP will require sand aggregates. These will be procured through mining from riverbeds and quarries.

The Mining Act Yes The construction of project roads under OSRP will require sand aggregates. These will be procured through mining from riverbeds and quarries.

Minor Mineral Concession Rules, 2004 Yes Leases for mining of construction materials and STP for

borrow pits

Orissa R & R Policy, 2006 Yes This act will be applicable to OSRP as there will be acquisition of land, displacement of people and need for subsequent R & R operations

4.5 WORLD BANK REQUIREMENTS The World Bank requirements from environment point of view are based on a three part classification system such as Category A, Category B, and Category C as defined by the World Bank OP 4.01. A project designated as Category A requires a full environmental assessment followed by Independent Environmental Review (IER) by an indepenent consultant, Category B projects require a lesser level of environmental investigations. Category C projects require no environmental analysis beyond that determination.

Page 55: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 37

The Orissa State Road Proejct has been decalared as a Category ‘A’ project. Hence as per World Bank requirements a full environemental assesment is initiated. Further being Category ‘A’ project it will require independent environmental review by an independent consultant. The project will also require environmental clearance from Ministry of Environmental and Forests, therfore detailed EIA study once completed will be submitted to the MoEF for the clearance. The project will also follow all other World Bank procedures and guidelines during the project preparation stage. 4.6 SUMMARY OF CLEARANCE REQUIREMENTS The summary table showing time required for for obtaining different clearances from concerned agencies for smooth implementation of project is given below:

Table 7: Summary of Clearance Requirements

Type of Clearance Project Stage Responsible Agency

for Obtaining Clearance

Time Required

Consent to establish from OSPCB Pre Construction Orissa Works Department 1 Month

Environmental Clearance from MoEF Pre Construction Orissa Works Department 7-8 Months

Forestry Clearance Pre Construction Orissa Works Department 4-6 Months

Consents under Air and Water Act stage (Prior to initiation of any work) for establishment of construction camps

Construction stage (Prior to initiation of any work)

Respective contractors of Project roads

1-2 Months

Explosive License for storing fuel oil, lubricants, diesel, etc. at construction camp from Chief Controller of Explosives, Nagpur

Constrcution stage (Prior to initiation of any work)

Respective contractors of project roads

1-2 Months

4.7 PROJECT PROMOTER RESPONSIBILITIES INTERFACES WITH OTHER AGENCIES The responsibility of initiating actions leading to issuance of environmental clearance of a proposed project vests with the project promoter. In the present project i.e. OSRP; the PIU of Orissa Works Department (OWD) would take all responsibilities to meet all obligations as per laws of the land. Interface with MoEF The basic responsibility of the PIU is to prepare, submit a comprehensive document, complete in all respect for environment clearance. It shall be obliged to provide clarification, with or without additional documentation, when intimated by the designated authority. It will carry the commitment that no deviation from designed project would be made during implementation without prior and explicit permission of the designated authority to do so. Interface with Department of Revenue of the GoO For land acquisition purpose, an effective interface with the District and Tahasil level Offices of the Land & Revenue Department is necessary. With the authentication of the information compiled by the PIU by these offices, the District Collector can expedite the process. Public

Page 56: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 38

grievance in such matters complicates the schedule of implementation of the project. Therefore, it is recommended that no construction work should start before completing land acquisition process ending with payment of compensation and/or rehabilitation. Interface with the District Magistrate Office, Municipal authorities, local administrative officials and Panchayatiraj Institutions: This kind of interface is essential at the time of demolishing of encroached structures from RoW. The Magistrate of the District would take all actions on clearance of these encroachments. Rehabilitation of the displaced persons would need the assistance of District Magistrate Office, Municipal authorities, local administrative officials and Panchayatiraj Institutions. These offices should be approached while formulating the Resettlement & Rehabilitation Plan. Observations on this issue would come in the R&R Plans, which would be presented, in a separate report. However, in the context of environmental management, no construction work should start before the displaced persons are resettled and rehabilitated. Interface with the Department of Forests of the GoO When road developments projects require acquisition of forestland and/or involve felling of trees, consent of the Forest Department of the State as well as that of the MOEF, Government of India is required. The following steps needs to be taken up by the PIU for getting forest clearance

• Prepare a strip-plan showing the locations of trees to be felled, • Classify and count these trees by species and girth at 1.5 m from the ground level

through a survey conducted jointly by the of the authorised representative of the State Forest Department and the PIU officials,

• Obtain certificate from the State Forest Department stating that no endangered species of tree is proposed to be felled and that the wildlife value of the tract would not be reduced in consequence,

• Determine the value of the trees to be felled jointly with the State Forest Department,

• Measure the area of any designated forest to be diverted to such non-forest use, • Arrange for acquisition with the help of the Collector of the District of new land

acceptable to the State Forest Department for its quality and manageability for raising twice the number of trees to be felled as means to preserve the biotic wealth of the tract,

• Determine the cost of land acquisition and of raising new trees jointly with the State Forest Department,

• Submit all these documents to the District Collector while requesting for permission to fell trees along with the money agreed upon for transfer of acquired land and to cover the cost of raising new forests.

On receipt of the permission to fell trees, the State Forest Department has to arrange concurrence of the Forest Wing of the MOEF of the GOI for the plan. Interface with the Department of Mines of the GoO It is generally expected that the PIU would obtain supplies of stone aggregates from the existing licensed quarries. The permission of the State Department of Mines would be

Page 57: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 39

needed; if for any reason new quarries required to be opened up. Such new quarries of sizes more than 5-hectares would require environmental clearance based on EA reports. 4.8 CAPABILITY OF OWD FOR INTERFACE MANAGEMENT: In past the Orissa Works Department had no special wing to deal with environment management, land acquisition, compensatory afforestation and carrying our resettlement & rehabilitation operations. The full-fledged functioning of the Project Implementation Unit (PIU) with the involvement of a multidisciplinary team is the requirement of the day and will hep smooth implementation of future projects.

Page 58: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 40

CHAPTER – V EXISTING CONDITIONS

This section contains a detailed description on existing environment of the proposed project area including physical and biological environment in the study districts and more particularly in the area of study.. 5.1 GEOGRAPHICAL COVERAGE: It has been discussed in Chapter I (Table 1) that a total of 5 corridors totaling a length of 364.781 km is covered under Phase I: Year I of OSRP. The present Environment Assessment Report and the existing environment deal with only those five corridors. Before taking up any discussion on existing environment of the project area it is essential to know the geographical coverage of the selected road corridors in Orissa state. Detailed data was collected on urban areas (NACs /Municipalities /CT) and rural areas (Blocks) through which the road corridors are passing. The information on such an aspect is presented in table 8. The data reveals that Bhadrakh Chandbali road passes though Bhadrakh Municipality & Chandbali Census Town (CT) and Bhadrakh, Tihidi and Chandbali blocks, all under the administrative jurisdiction of Bhadrakh district. The details of the rural and urban areas through which the other four corridors are passing are presented in table 8. Out of the five corridors, maximum geographical coverage is under Berhampur – Bangi Jn (3 districts, 2 urban areas and 6 blocks). As a whole, the five road corridors pass through eight districts namely, Bhadrakh, Keonjhar, Kalahandi, Bolangir, Nuapara, Ganjam, Gajapati and Rayagada districts. Out of these eight districts, Bhadrakh is located in coastal Orissa, Keonjhar in northern Orissa, Kalahandi, Bolangir and Nuapara districts in western Orissa and Ganjam, Gajapati and Rayagada in south Orissa.

Table 8 Rural and Urban Areas through which the road corridors passes

Number of Villages District Block/NAC/ Municipality

Geographical Area (sq. km) Inhabited Un Inhabited TOTAL

No of wards

Bhadrakh to Chandbali Bhadrakh (M) 31.08 - - - 30 Chandbali (CT) 6.11 - - - - Bhadrakh Block 314.02 147 2 149 - Tihidi Block 319.85 152 7 159 -

Bhadrakh

Chandbali Block 515.84 261 24 285 - Overall 1155.82 560 33 593 30

Bhadrakh to Anandpur Bhadrakh (M) 31.08 - - - 30 Bhadrakh Block 314.02 147 2 149 - Bhadrakh

Bonth Block 238.90 194 10 204 - Anandpur NAC 72.87 - - - 16 Anandpur Block 300.15 124 1 125 - Keonjhar Hatadihi Block 327.42 210 2 212 -

Overall 925.94 675 13 478 46

Page 59: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 41

Number of Villages District Block/NAC/ Municipality

Geographical Area (sq. km) Inhabited Un Inhabited TOTAL

No of wards

Khariar to Bhawanipatna Bhawanipatna (M) 15.40 - - - 15 Kalahandi Bhawanipatna Block 553.93 239 14 253 - Bangomunda Block 318.03 133 - 133 - Bolangir Titlagarh Block 355.23 130 1 131 - Khariar (NAC) 23.83 - - - 13 Nuapara Khariar Block 308.87 114 2 116 -

Overall 593.16 616 17 633 28

Berhampur to Bangi Jn Berhampur (M) 79.80 - - - 27 Digapahandi (NAC) 10.22 - - - 11 Digapahandi Block 422.18 205 26 231 - Sankhemundi Block 275.95 140 19 159 -

Ganjam

Kukudakhandi Block 250.56 87 11 98 - Gajapati Mohana Block 655.10 458 23 481 -

Padmapur Block 860.24 114 9 123 Raygada Ramanaguda Block 849.59 118 5 123

Overall 3403.64 1122 93 1215 38

Bangi Jn to J.K. Pur Raygada (M) 18.65 - - - 21 Kolnara Block 356.63 189 7 196 -

Raygada Raygada Block 531.25 275 19 294 - Overall 906.53 464 26 490 21

Source: Statistical Abstracts of Orissa, 2005 5.2 PHYSIOGRAPHY: Orissa state is located in the sub-tropical belt between 17o52’ and 22o45 N latitude and 81o45’ and 87o50’ E longitude. It is bounded by the Bay of Bengal on the east; Chhatisgarh on the west, Jharkhand and West Bengal in north and Andhra Pradesh on the south. It has a coastline of about 450 kms. It extends over an area of 155,707 square kms, covering about 4.87% of the total landmass of the country. On the basis of homogeneity, continuity and physiography characteristics, Orissa has been divided into five major morphological regions: the Orissa Coastal Plain in the east, the Middle Mountainous and Highlands Region, the Central plateaus, the rolling uplands and the major flood plains. The alluvial deposit of the rivers originating in the Eastern Ghats and flowing eastwards draining into the Bay of Bengal forms the “Coastal plain”. The coastal plain is confined to the eight districts, namely, Balasore, Bhadrak, Jajpur, Kendrapara, Jagatsinghpur, Cuttack, Puri and Ganjam. It presents a flat topography extending in the north-south direction along the coast and gently sloping towards east with insignificant elevation difference. These coastal plains are the depositional landforms of recent origin and geologically belong to the Post-Tertiary Period. The 75-metre contour line delimits their western boundary and differentiates them from the Middle Mountainous Region. This region stretches from the West Bengal border, i.e. from the River Subarnarekha in the north to the River Rusikulya in the south. This region is the combination of several deltas of varied sizes and shapes formed by the major

Page 60: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 42

rivers of Orissa, such as Subarnarekha, Budhabalanga, Baitarani, Brahmani, Mahanadi, and Rusikulya. Therefore, the coastal plain of Orissa is called the "Hex deltaic region" or the "Gift of Six Rivers". It stretches along the coast of the Bay of Bengal having the maximum width in the Middle Coastal Plain (the Mahanadi Delta), narrow in the Northern Coastal Plain (Balasore Plain) and narrowest in the Southern Coastal Plain (Ganjam Plain). The North Coastal Plain comprises the deltas of the Subarnarekha and the Budhabalanga rivers and bears evidences of marine transgressions. The Middle Coastal Plain comprises the compound deltas of the Baitarani, Brahmani and Mahanadi rivers and bears evidences of past 'back bays' and present lakes. The South Coastal Plain comprises the laccustrine Plain of Chilika Lake and the smaller delta of the Rusikulya River. The Middle Mountainous and Highlands Region covers about three-fourth of the entire State. The major part of the state particularly the Northwestern and Southern Orissa come under this region. Northern uplands covering Mayurbhanj, Keonjhar and Sundergarh districts and Pallahara sub-division of Dhenkanal district are undulating, frequently intersected by hill ranges with general slope from north to south. The elevation in the central part of the upland generally varies between 300 to 600m and forms watersheds of Baitarani and Brahmani river systems. Southern hilly region lies to the south and southwest of Mahanadi valley region stretching through parts of Phulbani (Kandhamal), Ganjam, Gajapati, Rayagada, Kalahandi, Nowrangpur, Koraput and Malkangiri districts. Major part of this region has an elevation over 600m. Geologically it is a part of the Indian Peninsula which as a part of the ancient landmass of the Gondwanaland. The major rivers of Orissa with their tributaries have originated in this region and have flowed towards coastal plains through deep cuts and narrow valleys. This region act as the watershed of the two sets of rivers, one set flowing directly to the Bay of Bengal, namely Rusikulya, Nagavalli and Vansadhara and others feeding the Godavari and Mahanadi river systems. This region mostly comprises the hills and mountains of the Eastern Ghats, which rise abruptly, and steeply in the east and slope gently to a dissected plateau in the west running from northeast (Mayurbhanj) to northwest (Malkanagiri). This region is well marked by a number of interfluves or watersheds. A number of broad and narrow river valleys and flood plains interrupt the Eastern Ghats. The average height of this region is about 900 meters above the mean seal level. The Central Plateaus are mostly eroded plateaus forming the western slopes of the Eastern Ghats. There are two broad plateaus in Orissa: (i) the Panposh - Keonjhar -Pallahara plateau comprises the Upper Baitarani catchment’s basin, and (ii) the Nawarangpur - Jeypore plateau comprises the Sabari basin. The plateaus also extend throughout the western parts of Kalahandi, Nuapara, Koraput, Malkanagiri, Rayagada and Nawarangpur districts with an average elevation varying from 300 to 600m above mean sea level. The Rolling Uplands are lower in elevation than the plateaus having heights varying from 153 meters to 305 meters. The rolling uplands include a number of erosion plains and river basins presenting an upland plain. The erosion plains of Mahanadi river basin lie between the northern uplands and southern hilly region of the Eastern Ghats. The tract covers major parts of districts of Sambalpur, Deograh, Jharsuguda, Bargarh, Bolangir, Sonepur, Dhenkanal, Angul, Boudh, Nayagarh, Khordha and northern parts of Phulbani (Kondhamal) and western

Page 61: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 43

part of Puri districts. The altitude of this tract ranges from 150 to 300m above mean sea level. The Flood Plains are the typical areas formed by rivers in both coastal deltaic region and also found within the extensive mountainous regions in the form of river valleys. Out of the eight study districts, Bhadrakh and Ganjam district is located in Coastal Plain region of the state. Similarly, Keonjhar, Kalahandi, Bolangir and Nuapara district is located in Central Plateau region; Gajapati and Rayagada district is located mainly in Middle Mountainous and Highlands Region. Field observations of the study team revealed that Bhadrakh – Chandbali corridor passes through flood plains of Baitarani river in the deltaic region between river Budhabalanga and Baitarani. Similarly, initial chainages of Bhadrakh – Anandpur corridor passes through plain land formed by valleys of river Salandi & Baitarani and later part in plateau land. Bhawanipatna Khariar road passes though plain land formed in the catchments of Sunder and Tel River, which are tributaries of Mahanadi River. In case of Berhampur – Bangi Jn. Corridor, a part of the road i.e. up to Digapahandi passes through plain terrain and after that in rolling and hilly land with intermittent plain land. Similarly, Bangi Jn to Rayagada passes mainly through hilly and upland terrain with intermittent plain terrains.

Table 9. Terrain/Land use of the Project corridors

Road Corridor Land Use Terrain

Bhadrakh - Chandbali Agricultural Flood Plain – Deltaic Region

Bhadrakh-Anandpur Agricultural Plain/Plateau land

Bhawanipatna-Khariar Agriculture Plain

Berhampur – Bangi Jn. Agriculture /Forest Plain/Rolling/Hilly

Bangi Jn. – J.K. Pur Agriculture /Forest Plain/Rolling/Hilly Source: Field survey, 2006 5.3 GEOLOGY Geological history of Orissa dates back to more than 3000 million years ago in Precambrian period. Three distinct geological provinces were identified in Orissa. The Singhbhum, - North Orissa creation occupies Mayurbhanj, Keonjhar, parts of Balasore, Dhenkanal, Deograh, Sambalpur and Sundargarh districts. The litho assemblage in this sector comprises Banded Iron Formation, Green stone, and Granite association. The southern portion of the state is covered with the rocks of Eastern Ghats mobile belt. It comprises mainly granitic suite, charnokite, khondalite etc. These rocks of Precambrian province cover the vast stretch of Cuttack, Khordha, Nayagarh, undivided Bolangir, Sambalpur, Phulbani, Ganjam, Kalahandi and Koraput districts. In the western sector lies the Bhandara creation, which comprises greenstone, granite, and granulite etc facie assemblages along with upper Proterozoic sedimentary rocks. The Preoterozoic sedimentary rocks cover parts of Nuapara, Bargarh, Koraput, Nawarangpur and Malkanagiri districts. Boundaries in between these three Precambrian provinces are marked by structural lineaments. Since the end of Precambrian till late Paleozoic there was a long hiatus in the geological history of Orissa, except some tectonic reactivation in the Eastern Ghats, Belt. During the

Page 62: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 44

Paleozoic time non-marine clastic rocks were deposited in the grabens developed along the present day river valleys. This resulted in the formation of Gondwana Super Group, which has some of the famous coal deposits of India. They are restricted to the faulted troughs along the Mahanadi-Brahmani valleys in parts of Dhenkanal, Angul, Jharsuguda, Bargarh, Bolangir, Cuttack, Khordha, Phulbani, Sambalpur, Deograh and Sundargarh districts. During early Tertiary the marine transgression from the southeastern margin of the Precambrian shield led to the formation of a marine fossiliferrous sequence of Miocene age in Mayurbhanj district, which is known as Baripada beds. This is overlain by an unfossliliferous estuarine sequence, which occur in the districts of Mayurbhanj undivided Balasore and Cuttack and also in Khurda and Puri. The onset of the Quaternary period is marked by the epirogenic movements, which led to the upliftment of the continental crust and sedimentation under arid and humid climatic conditions resulting in the formation of late rite older delta and newer delta. Late rites of both high and low level occur extensively in the state, generally as capping over the older formations. Recent to Sub-recent sediments were deposited by various river systems built up deltas at the river mouths, which coalesced to form the narrow coastal tract in the districts of Bhadrakh, Kendrapara, Jagatsinghpur, Puri and parts of Balasore, Cuttack, Khordha, Jajpur and Ganjam districts. The lithologic assemblage is characterized by the cyclic sedimentation of sand and gravel with subordinate clay. Alluvium of Recent age occurs in numerous but narrow disconnected pockets adjoining most of the river/stream courses throughout the state.

Table 10 Distribution of major geological units in the State

Geological

Age Rock formation Districts

CONSOLIDATED FORMATION Pre-Cambrian Archaean

complex Granite gneisses Charnockites, Khondalites, Schist, Phyllite, slates, Granulite, Banded Haematite-Quartzite etc.

Occur in all districts except Kendrapara Jagatsinghpur, Bhadrakh

Cuddapah Vindhyan

Shale, Sand Stone, Quartzite, Limestone etc.

Koraput, Nawarangpur, Bargarh, Nuapara

SEMI – CONSOLIDATED FORMATION Palaeozoic – Mesozoic

Gondwana Group

Boulder bed, Sandstone, Shale and coal seams

Angul, Sambalpur, Jharsuguda, Cuttack, Khordha, Bolangir, Phulbani, Sundargarh,

Tertiary Baripada beds

Loosely cemented calcareous sandstone

Mayurbhanj

UNCONSOLIDATED FORMATION Pleistocene to Recent Alluvium (clay, silt, gravel and

sand in varying proportion) Ganjam, Gajapati, Mayurbhanj, Khordha, Puri, Cuttack, Kendrapara, Jajpur, Bhadrakh, Balasore, Keonjhar, Rayagada, Koraput, Nawarangpur.

The geology along the project roads is mainly comprised of rock formations under belonging to the Archaean system. These rock formations are represented mainly by the Khondalite series, which are widespread throughout the State and have intrusions of Pegmatite and quartz veins. Khondalite, a rock with a brownish aspect with spotted appearance due to the presence of mineral garnet, occurs in high hill ranges and on the plains. Some specks of granite may also be present in these rocks, in addition to its normal constituents such as

Page 63: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 45

sillimanite, quartz and feldspar. The rock is highly weathered (oxidized) and very friable, with the garnet having been converted to limonite. Laterite stones are also found throughout the State and are quarried at many places for building material, particularly in replacement of bricks. Other rocks like Khondolite, the upper Gondwana quartzite, Charnockite and the granite gneisses are also found and are used for building materials. A great variety of ores and minerals occur in the State, including coal, iron ore, Graphite, Galena (lead ore), Manganese ore, Bauxite, Chromite, tin, nickel, vanadium, and a variety of precious and semi-precious stones. 5.4 HYDROLOGY: Three major hydrological units have been identified in the State based on the geological set up, occurrence and distribution of aquifers and their yield potentials, and they are: (i) Consolidated formation; (ii) Semi-consolidated formation and (iii) Un-consolidated formation. Consolidated formation includes mainly granites, gneisses, schists, amphibolites, khondalites, charnockites, Pre-cambrian sandstones, shales, quartzites, limestones and basic and acid intrusives. They occupy about 70% of the geographical area of the state. In the consolidate formations ground water occurs under phreatic conditions in the weathered residuum and circulates through deeper fractures and fissures. The depth to water level varies from 5 to more than 10m below ground level (bgl) in pre-monsoon period and 2 to 3 m in post-monsoon period. The weathered and fissured granites and granite gneisses are the dominant rock types and form potential aquifers in this terrain. The average yield of dug wells located in granitic rocks is generally 25 to 30m3/day with a maximum of 40m3/day. The yield of the bore wells, which tap fractures within 200 m depth varies widely. Maximum of 25 lps was recorded from granitic rocks, 20 lops from Purana shales and sandstones and 16 lps from volcanics. The yield from charnockites, anorthosites, gabbors etc. is limited. In the semi-consolidated Gondwana formations and Tertiary deposits the weathered, friable and loosely cemented sandstones form the aquifers. Ground water occurs under phreatic condition in the near surface shallow aquifers and under semi-confined to confined conditions in the deeper aquifers. The pre-monsoon and post-monsoon depth to water level is 5 to 10m and 2 to 5 m bgl respectively. The yield of dug wells is generally around 25 to 35m3/day with a maximum of 50m3/day. The tube/bore wells, which tap deeper aquifers within a depth of 200m, sustain yield from very low to even up to 30 lps. Un-consolidated formations include alluvial deposits in the coastal tract and river alluvium along with the major rivers and streams. The alluvium in the inland areas has an average thickness of 15m, but it occurs extensively with considerable thickness in the coastal tract. The sand and gravel layers in the alluvium form prolific aquifers. Groundwater occurs under phreatic as well as semi confined to confined conditions. The average pre-monsoon and post-monsoon depth to water levels is 2 to 4 and 0 to 2 m bgl respectively. The yield from the dug wells is often around 40 to 50m3/day. The average yield of tube wells in inland alluvium within 45 m depth is around 10 to 15 lps. The medium deep and deep tube wells in coastal alluvial formation recorded yield up to 65 lps or more. A considerable area (8575 sqkm approximately) in the coastal alluvial tract suffers from salinity hazard and all the coastal districts are affected by this salinity problem in different magnitudes.

Page 64: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 46

Water resources of the project area include rivers, ponds, tanks, canals, tube wells, open wells etc a detailed account of this has been presented separately in the report. The ground water potential of the state is very less utilized for agriculture and domestic and other purposes. Utilization is better in urban areas than rural areas of the state. The percentage utilization of ground water in the study districts and in Orissa state is presented in table 11 below.

Table 11 Groundwater resources in study districts of Project area

District

Ground Water

Resource Assessed

(HM)

Utilizable Resource for Domestic and Industrial use

(HM)

Utilizable Resource for Irrigational use (HM)

Annual draft for irrigation

use (HM)

Balance Resources

for Irrigation

(HM)

Gross annual

Draft for all uses (HM)

Stage of GW Development

(%)

Bhadrakh 51209 2928 48281 17480 30801 19854 38.77 Bolangir 71349 4051 67298 3421 63877 6231 8.73 Gajapati 27754 1202 26552 3085 23467 3966 14.29 Ganjam 113804 9098 104706 18828 85878 24431 21.47 Kalahandi 89520 6911 82609 7832 74777 11483 12.83 Keonjhar 132291 4954 127337 12713 114624 16042 12.13 Nuapara 36729 1528 35201 3139 32062 4318 11.76 Rayagada 62882 3389 59493 3807 55686 7038 11.19

ORISSA 2101128 112272 1988856 236044 1752812 310689 14.79 Source: CGWB, Bhubaneswar 5.5 SOIL: Based on soil types, rainfall, temperature etc. the state has been divided in to ten Agro climatic zones. The districts covered under each of the Agro Climatic zones and the soil type is presented in table 11 below. Out of the 8 study districts, Bhadrakh district comes under North Eastern Coastal Plain Agro Climatic Zone and the soil type are Red & laterite, Deltaic alluvium, Coastal alluvium including saline soils. A part of Keonjhar district (mainly through which Bhadrakh – Anandpur corridor passes) is under the same Agro Climatic zone as that of Bhadrakh district. In case of Ganjam district, the portion of road corridor from Berhampur to Digapahandi comes under East and South Eastern Coastal Plain Agro Climatic Zone and the soil types in this region are Coastal saline & sandy, Lateritic alluvial, black, red and lateritic. The road section from Digapahandi to Bangi Jn and up to J.K. Pur comes under North Eastern Ghats Zone with soil type of Brown forest, Lateritic, Alluvial, red, Black, Red and yellow. In case of Bhawanipatna – Khariar corridor, road sections in Kalahandi and Nuapara district comes under Western Undulating Agro Climatic Zone and the soil types are Red, Red and yellow, Yellow, Red and black, Black, Deltaic alluvium. In the same corridor, road sections inside Bolangir district comes under West Central Table Land Agro Climatic Zone with soil type of Alluvial, red and yellow, red and black, Black, Lateritic red and Forest soils.

Page 65: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 47

Table 11 Soil types in different Agro Climatic zones of Orissa state

Sl. No Agro-climatic zones Districts Soil Group

1 North Western Plateau Zone Sundargarh, Deograh Red, Brown forest, Red & yellow, Red and black

2 North Central Plateau Zone Keonjhar, Mayurbhanj Lateritic, Red & Yellow, Mixed red & black

3 North Eastern Coastal Plain Zone

Balasore, Bhadrakh, Keonjhar, Jajpur

Red & laterite, Deltaic alluvium, Coastal alluvium including saline

4 East and South Eastern Coastal Plain Zone

Cuttack, Jagatsinghpur Kendrapara, Khordha, Puri, Nayagarh, Ganjam

Coastal saline & sandy, Lateritic alluvial, black, red and lateritic

5 North Eastern Ghats Zone Phulbani, Rayagada, Gajapati, part of Ganjam

Brown forest, Lateritic, Alluvial, red, Black, Red and yellow

6 Eastern Ghats Highland Zone Koraput, Nawarangpur

Red, Mixed red and black, Mixed red and yellow, Alluvial

7 South Eastern Ghats Zone Malkanagiri, Jeypore Red, lateritic, Black

8 Western Undulating Zone Kalahandi, Nuapara, part of Nawarangpur

Red, Red and yellow, Yellow, Red and black, Black, Deltaic alluvium

9 West Central Table Land Zone

Sambalpur, Sonepur, Bargarh, Bolangir

Alluvial, red and yellow, red and black, Black, Lateritic red, Forest

10 Mid- Central Table Land Zone

Dhenkanal, Angul, part of Cuttack

Alluvial, Black, red and laterite, Lateritic red

Source: Directorate of Research office, OUAT, Bhubaneswar 5.6 CLIMATE: Orissa is situated well within the tropical belt and as such experiences a humid tropical climate. The state receives most of its rainfall from the southwest monsoon between mid Junes to early October. A few pre monsoon showers during April to mid-June and few during the winter months from the retreating northeast monsoon are not infrequent in the state. But most of the precipitation is confined to the four months from July to October. Cyclonic storms (due to depression in Bay of Bengal), sometimes of devastating magnitude followed by heavy rains occur in the months of September, October and November frequently. The state experiences an equable climate, neither too hot nor too cold. In some places, however, extremes of climate are experienced, namely, in the western districts like Bolangir, Sambalpur and Sundargarh. The average annual rainfall in the state is 1482.2 mm (Table 12). A detailed discussion is made in the following paragraphs about climatic condition in the eight districts through which the road corridor passes.

Bhadrakh Bhadrakh district is the located in northeastern parts of the state between 20043’ to 21013’ North latitude and 86016’ to 87000’ East longitude. It is bounded in the north by district Balasore, in south by the district of Jajpur and Kendrapara, in the west by Keonjhar district and on the east by Bay of Bengal. It extends over an area of 2505 sq. The district lie closer to the Bay of Bengal and near to northeastern corner of the Deccan plateau. Its climate is characterized by lesser extremes of temperature and high humidity all the year round. The period from June to September constitutes the southwest monsoon period followed by the

Page 66: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 48

post-monsoon season by the next two months. According to the seven rain gauge stations available in the district the average annual rainfall is 1568.4 mm (Table 12). Although the variation in the annual rainfall is not large in the district a decreased of rainfall is generally marked when one proceeds from coastal region towards the interior. The rainfall during the southwest monsoon season accounts for 70 percent of the annual rainfall. Regarding temperature, the period from March to May there is steady rise in temperature. May is usually the hottest part of the year when the mean daily maximum temperature is about 41.30c (Table 14) and the mean daily minimum is about 25.20c expect that in coastal strip temperatures are lower particularly due to strong sea breeze. The temperature gradually decreases from October onwards and by December, which is the coldest month the mean daily maximum temperature is about 28.90c and mean daily minimum temperature is about 10.30c. In the interior parts of the district the temperature may be slightly lower than costal. The district is directly on the track of most of the cyclonic storm and depressions, which form in Bay of Bengal in the monsoon and post monsoon season and cross the Orissa coast. These cause wide spread heavy rain and strong winds. Winds in the district are generally light to moderate in the post-monsoon and winter season. In summer end southwest monsoon season winds are stronger. Keonjhar The climate of Keonjhar is characterized by an oppressive hot summer, high humidity and well-distributed rainfall during the monsoon season. The year may be chiefly divided into four seasons, the hot season from March to May, the southwest monsoon season from June to September, post monsoon season in October and November and the cold season from December to February. The cold climate commences early in November and lasts till the end of February. In the month of February the daytime remain hot but the nights and early morning continue to be comparatively cool and fresh. The climate is delightful during this part of the year, the days are bright warm and invigorating and as soon as the sun sets, the temperature falls. Westerly winds begin to blow in the second half of March and temperature rises considerably. The hot season commencing in April is ushered in by hot winds. The heat is intense in May and unless broken by frequent rain, continuous to increase until the gathering of clouds heralds the approach of the rainy season. The rain starts around mid of June. The rains continue till the end of September or middle of October, when the saturated ground begins to dry. This is considered to be the most trying season of the year as the air is hot and moist, while sun’s rays are still powerful. The temperature then diminishes and by November the mornings become perceptibly cool when the winter season commences. As revealed from table 12, the district enjoys good rainfall with an annual average 1534.5. The rainfall in the monsoon season from June to September constitutes about 75 percent of the annual rainfall. Generally the rainiest months of the year are July and August in the districts. Winter rains are rare. In Keonjhar district the mean monthly maximum temperature is 41.9 degree Celsius in the month of May and minimum temperature is 8.93 degree Celsius in December. The temperature begins to rise rapidly from March and attains highest in the month of April and May, which are the hottest month of the year. The cold weather commences by about the middle of December, when temperature begins to drop rapidly. During the southwest monsoon season, skies are generally heavily clouded to overcast. In the summer and post monsoon months, there prevails moderate cloud, the afternoons being cloudier than the mornings. In other months, the skies chiefly remain clear or lightly clouded. The relative

Page 67: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 49

humidity in the district is generally high that is about 75 percent in the southwest monsoon and post-monsoon months. In the summer afternoons the relative humidity varies between 35 to 40 percent. Winds are generally light to moderate with some increase in force in the summer and monsoon seasons. The morning winds generally flows from south or southwest during summer and monsoon season and from north, north, northeast during other seasons. Kalahandi The district is located in southwestern parts of Orissa and is situated between 19025’ to 20025’ North latitudes and 82032’ to 83047’ East longitudes. It is bounded on the north by district of Nuapara, Bolangir and Raipur of Chhatisgarh state; on the south by Rayagada district and on west by Nawarangpur district. It extends over an area of 7920 sq km and is divided into two sub-divisions, seven Tahasils and twelve Police stations out of which the present corridor is passing through Bhawanipatna block under Bhawanipatna subdivision. Bhawanipatna town is headquarter of the district and is named after the presiding deity Bhawanisankar Mahadev. The climate of the district, which is in the northeastern corner of the Deccan plateau, is in much respect similar to that of the main Deccan plateau. The year in this district may be divided into four seasons, classified as the hot season from March to May followed by southwest monsoon season from June to September. October and November constitute the post-monsoon season and cold season is from December to February. The average annual rainfall in the district is 1378.2 mm and is far low than state average and other districts of state (Table 12). The area comes under frequent drought and is ill famed due to malnutrition, hunger, child selling and migration to other states in search of livelihood. The hot season commences by about the beginning of March when the temperature begins to rise. May is the hottest month of this district when the daily maximum temperature is about 41.20c and the mean daily minimum temperature is about 27.40c (Table 14). With the onset of the Southwest monsoon by about the second week of June temperature drop appreciably and throughout the Southwest monsoon season the weather is generally cool. After the finest week of October when the monsoon withdraws the day temperature increase slightly while the night temperature begin to decreases progressively. December is usually the coldest month with the mean daily maximum temperature at about 29.280c and the mean daily minimum at about 8.50c. The relative humidity are high in the Southwest monsoon and post monsoon months. The air becomes gradually drier there after.

Bolangir Bolangir district lies in the western part of Orissa between 82045’ to 83040’ East longitude and 20000’ to 21040’ North latitudes. On the north it is surrounded by Bargarh districts; on the south by Kalahandi; on the west by Nuapara district and on the east by Sonepur and Phulbani district. It covers an area of 6551.5 sq km out of which about 6479 sq km is rural area and 72.50 sq km are urban area. Khariar to Bhawanipatna road corridor passes through the Bangomunda and Titlagarh block under Titlagarh sub-division. The average annual rainfall of this district is 1443.5 mm (Table 12). The southern part of this district receives the lowest rainfall, which cause frequent failure of crops and chronic droughts. The maximum temperature in the district is experienced in the month of May.

Page 68: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 50

Nuapara Nuapara district is separated from Kalahandi during 1992. The district is situated between 20000’to 2105’ North latitude and 82020’ to 82053’ East longitudes and is bounded on the north by Bargarh district and Chhatisgarh state, on the south by Kalahandi, on the west by Bolangir district and on the east again by Chhatisgarh state. With a geographical area of 3852 sq km, the district consists of one sub-division, two Tahasils, six police station and five blocks. The project corridor passes through Khariar block only. Nuapara district may be broadly divided into two natural divisions the hill tracts and the plain country. The first one chiefly comprises of a range of hills that run from north to west intersected by valley of river Junk. This mountainous tract contains a broad plateau at altitude varying from 610 to 915 meters in height. This tract is cut off from the plains below by a range of precipitous hills. The plain area is less fertile and is poor in soil type. The average annual rainfall of this district is 1346.1 mm (Table 12). The maximum temperature in the district is experienced in the month of May. Ganjam The district lies in the southern part of Orissa, between north latitude 19001 to 20017’ and east longitude 84091’ to 85011’. The district is surrounded by Kondhamal and Nayagarh district on south, by Bay of Bengal on the west, by Gajapati district on the east, by Khordha and Puri district on the north. For administrative purpose the district is divided unto 3 subdivisions, 14 Tahasils, 28 police stations and 22 blocks. Berhampur – Bangi Jn road corridor passes through Digapahandi, Sankhemundi and Kukudakhandi blocks and Berhampur Municipality and Digapahandi NAC of Ganjam district. Ganjam is one of the most beautiful districts of Orissa; Physiographically divided into two parts i.e. the eastern coastal plains and the western tablelands with an altitude of about 1400 m. The extreme southeast is occupied by a portion of the Chilika Lake. The immediate vicinity of Chilika Lake is good for fishery and manufacture of salt and is not suitable for cultivation. Since the hills of the districts are closed to the sea, the rivers flowing from the hills are not very long. Hence, they are subjected to sudden floods. The main rivers of the district are Rusikulya and Bansadhara. The climate of the district is pleasant and characterized by an equable temperature all the year round particularly in the coastal regions with high humidity. The cold season starts from December to February, which is very pleasant, and is followed by hot season from March to May. The period from June to September is the southwest monsoon season. October and November constitute the post monsoon transition period. The average annual rainfall in the district is 1295.6 mm (Table 12). The rainfall generally increases from the coast towards the interior hilly areas of the district. About 66% of annual rainfall is received during the southwest monsoon season. It commences in second week of June and withdraws early in October. There is heavy rainfall in the July-August. The variation in the rainfall from year to year is not much. In the inland hilly tracts of the district temperature is higher in the hot months and lower in winter by a few degree. May is the hottest month with the mean daily maximum at 39.60c and the mean daily minimum temp at 23.30c. December is the coldest month with the mean daily minimum temperature at 12.30c and mean daily maximum at 29.50c (Table 14). Relative humidity are high throughout the year in the coastal region while in the interior of the district

Page 69: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 51

these are slightly lower, particularly in afternoons in the non-monsoon months. Winds are fairly strong particularly in the coastal region in the summer and monsoon months. In the rest of the year they are generally moderate. In the post monsoon and cold seasons wind blow from north or northwesterly direction in the mornings. In the afternoons winds are form northeast and southeast in the months of October, November and December. In the summer and southwest monsoon months winds mainly blow from southerly or southwesterly directions. Gajapati Gajapati district lies in southern part of Orissa, between North latitude 18046’ to 19039’ and East longitude 83048’ to 84027’. It is bounded on the north by Kondhamal district, on the south by Srikakulam district of Andhra Pradesh, on the west by Raygada district and on the east by Ganjam district. The district covers an area of 4325 sq km out of which 4311.04 sq km is rural area and 13.99 sq km is urban area. For administrative purposes the district is sub divided into one sub-division, three tahasils, seven blocks and ten police stations. Only Mohana block is covered under the Berhampur to Bangi Jn corridor. Like Ganjam district, Gajapati is also a beautiful district due to its pleasant weather all the year round. The cold season from December to February is followed by the hot season from March to May. The period from June to November constitute the rainy season during which June to September is the onset of Southwest monsoon followed by offset by Southwest monsoon in the month of October and November. Data on rainfall in the district available from eight rain gauge stations revealed an average annual rainfall of 1394.4 mm in the district. About 60 percent of the annual rainfall is received during the southwest monsoon seasons, which commence in the district by about the second week of June, and withdraws early in October. In the district the temperature increase during the period from march to May and May is the hottest month which mean daily minimum temperature at 22.30c and mean daily maximum temperature at 38.20c. Rayagada The district of Rayagada lies between 82054’ to 8402’ East longitude and 1900’ to 19085’ north latitude. On the north the district is bounded by Kalahandi district, on west by Koraput district, on south by Srikakulam district of Andhra Pradesh and in the east by Gajapati district. It covered an area of 7030 sq km out of which 7036.65 sq km are rural area and 37.35 sq km urban area. For administrative purposes, the district is sub divided into two sub-divisions, four Tahasils, eleven blocks and twelve police stations. Padmapur & Ramanaguda blocks under Gunupur sub-division and Kolnara & Raygada blocks under Rayagada subdivision are covered by the Berhampur to Bangi Jn & Bangi Jn to J.K Pur road corridors. The whole of the region consists of two fertile valleys of the river Nagavalli and Vansadhara between rugged mountain ranges. The valley of the Vansadhara slopes down from a height 1300 feet near Ambadola to 260 feet at Gunupur. While that of Nagavalli fall from about 1200 feet north of Kalyan Singh Pur to 500 feet in south of Tahasil of Raygada.

Page 70: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 52

The climate of the major portion of the district, which lies in the plateau region, is more like that of the Deccan plateau. Due to elevation and its situation in the northeastern corner of Deccan plateau the climate is milder than in the main Deccan plateau. The year may be divided into four seasons, the hot season from March to May, the monsoon season from June to September, the post-monsoon month October and November and the cold seasons from December to February. The average annual rainfall over the district is recorded 1521.8 mm (Table 12). The rainfall is largely influenced by the Eastern Ghats. About 79% of the annual rainfall in the district falls during the monsoon seasons. July & August are rainiest months in the year. The variation in the rainfall from year to year is not large. January is the coldest part of the year with mean daily minimum temperature at 8.20C, while the mean daily maximum temperature may reach over 27.40C. May is the hottest month in the year.

Table 12 Month wise Normal Rainfall (in mm) in the study districts of Project area

Month wise Normal Rainfall (in mm)

DISTRICT

Janu

ary

Febr

uary

Mar

ch

Apr

il

May

June

July

Aug

ust

Sept

embe

r

Oct

ober

Nov

embe

r

Dec

embe

r

Tot

al

Bhadrakh 17.1 30.6 34.3 53.1 105.1 218.2 332.6 313.8 243.1 171.0 42.3 7.2 1568.4

Keonjhar 22.2 38.0 23.0 43.3 88.9 209.5 391.8 335.3 233.0 112.7 31.7 5.1 1534.5

Kalahandi 11.5 15.4 13.6 23.7 33.7 228.3 343.5 384.6 220.9 81.9 17.9 3.2 1378.2

Bolangir 13.9 18.2 13.9 18.7 29.1 233.7 391.7 407.1 232.0 65.6 15.9 3.7 1443.5

Nuapara 12.5 15.6 14.3 23.7 32.7 238.3 334.5 354.6 218.9 82.9 15.9 2.2 1346.1

Ganjam 10.8 22.2 21.3 42.3 76.8 169.2 221.6 242.4 229.6 179.8 68.6 11.0 1295.6

Gajapati 11.4 22.8 20.9 43.4 77.5 171.4 296.5 241.6 237.7 186.5 74.1 10.6 1394.4

Raygada 6.7 11.3 16.2 53.4 75.0 205.8 351.1 380.3 262.1 116.5 35.8 7.6 1521.8

Orissa 14.0 25.9 21.4 35.3 70.8 213.2 351.6 335.6 236.5 131.6 39.9 6.4 1482.2

Source: District Statistical Handbooks, 2005

Page 71: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 53

Table 13 Month wise Normal Rainy days in the study districts of Project area

Month wise Normal Rainy days

DISTRICT Ja

nuar

y

Febr

uary

Mar

ch

Apr

il

May

June

July

Aug

ust

Sept

embe

r

Oct

ober

Nov

embe

r

Dec

embe

r

Tot

al

Bhadrakh 1.1 1.8 2.1 3.2 5.8 10.4 14.2 14.3 11.8 6.6 1.5 0.4 73.2 Keonjhar 1.4 2.3 1.8 3.1 5.8 10.8 17.2 16.1 12.6 5.9 1.4 0.4 78.8 Kalahandi 0.8 1.2 1.2 1.9 2.5 9.8 16.1 16.1 10.5 4.1 1.0 0.2 65.4 Bolangir 0.8 1.4 1.2 1.6 2.3 10.1 16.9 16.6 11.0 3.7 1.1 0.3 67.0 Nuapara 0.8 1.2 1.2 1.9 2.5 9.8 16.1 16.1 10.5 4.1 1.0 0.2 65.4 Ganjam 0.7 1.4 1.5 3.0 4.6 8.7 11.7 12.5 11.3 7.1 2.3 0.6 65.4 Gajapati 1.7 1.3 1.8 3.2 4.6 8.8 11.5 12.6 11.4 7.2 2.4 0.7 67.2 Raygada 0.6 1.0 1.3 8.9 5.2 10.9 17.9 18.5 13.7 6.1 2.1 0.5 86.7 Orissa 1.0 1.7 1.6 2.8 4.4 10.1 15.6 15.5 12.0 5.6 1.5 0.4 72.2

Source: Orissa Agricultural Statistics, 2004-2005

Table 14 Month wise mean maximum and minimum temperature in the study districts of Project area

Bhadrakh Keonjhar Kalahandi Bolangir Nuapara Ganjam Gajapati Rayagada Months

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

January 30.7 11.3 26.0 10.9 30.4 9.5 28.4 10.8 25.5 10.3 30.5 12.0 31.5 12.4 27.4 8.2

February 31.4 14.5 29.4 13.0 35.0 10.4 33.2 17.0 27.9 16.5 31.2 14.0 32.2 13.0 28.3 11.4

March 37.9 17.7 35.6 19.0 38.6 14.0 37.6 19.2 31.8 17.7 32.8 19.9 33.8 18.4 40.0 14.0

April 39.4 21.3 37.0 24.0 39.3 20.5 41.4 25.0 38.5 21.5 33.8 21.2 34.8 20.0 34.3 19.8

May 41.3 25.2 41.9 26.8 41.2 27.4 41.8 22.4 41.6 14.5 39.6 23.3 38.2 22.3 39.1 21.2

June 36.0 22.8 34.0 24.0 34.0 21.1 36.0 19.0 36.1 16.9 37.8 22.9 36.8 21.9 32.0 19.5

July 35.4 22.6 33.0 23.0 33.8 19.8 32.3 16.0 32.3 14.3 34.8 22.7 33.4 23.7 35.4 21.4

August 35.0 22.9 32.6 23.0 33.4 21.2 31.9 16.9 33.9 18.3 34.0 21.7 35.0 22.7 34.8 21.7

September 34.8 22.0 31.2 22.0 33.1 19.6 33.4 23.0 33.1 16.5 33.0 21.0 34.8 23.0 36.4 21.4

October 32.3 21.5 30.8 19.0 32.2 12.3 31.0 21.4 30.3 14.4 33.0 19.4 34.0 19.4 34.1 20.8

November 31.0 17.3 29.5 13.0 30.5 11.0 30.4 14.6 31.3 12.1 32.9 16.7 33.9 16.2 30.5 15.0

December 28.9 10.3 27.4 8.9 29.2 8.5 28.2 12.1 29.1 10.4 29.5 12.3 28.4 11.1 32.2 8.5 Source: District Statistical Handbooks, 2005 5.7 LAND UTILIZATION & AGRICULTURE: Agriculture is the principal source of livelihood of majority of work force in the 8 districts project area as well as that of Orissa as a whole. The secondary data on land use pattern in districts of project area reveals that out of the total geographical area, percentage of net cultivated area range from 19.48% in Gajapati district to 63.81% in Bhadrakh district and 36.86% in Orissa state (Table 15). In fact, out of 8 districts, Gajapati and Rayagada districts have very less area under cultivation of crops (Gajapati – 19.48% and Rayagada – 19.91%). This is mainly due to high percentage of geographical area in these two districts under forest coverage. In these two districts, a major part is covered under forests and barren land. The farmers in these forest areas are practicing subsistence agriculture and mainly depend on

Page 72: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 54

minor forest produce collection and wage work for their livelihood. It may be mentioned here that in Bhadrakh district about 63.81% of total geographical area is cultivated land and the forest coverage is only 3.73% of geographical area.

Table 15 Land utilization pattern in study districts of project area

Districts

Parameters

Bha

drak

h

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Area 10 310 314 154 125 315 247 281 5813 Forest

% 3.73 37.35 37.56 23.44 36.66 36.17 64.16 37.07 37.33Area 17 6 8 25 5 22 12 21 482 Misc. tree crops &

grooves % 6.34 0.72 0.96 3.81 1.47 2.53 3.12 2.77 3.10 Area 14 34 23 32 10 20 6 26 443 Permanent pasture

& other grazing land % 5.22 4.10 2.75 4.87 2.93 2.30 1.56 3.43 2.85

Area 11 38 23 22 4 11 3 22 392 Cultivable waste land % 4.10 4.58 2.75 3.35 1.17 1.26 0.78 2.90 2.52

Area 21 55 35 40 9 60 10 38 999 Land put to non-agricultural uses % 7.84 6.63 4.19 6.09 2.64 6.89 2.60 5.01 6.42

Area 4 75 42 34 8 37 24 143 843 Barren & uncultivable land % 1.49 9.04 5.02 5.18 2.35 4.25 6.23 18.87 5.41

Area 7 14 11 6 15 15 5 43 426 Current fallows

% 2.61 1.69 1.32 0.91 4.40 1.72 1.30 5.67 2.74 Area 13 10 20 12 2 11 3 33 434

Other fallows % 4.85 1.20 2.39 1.83 0.59 1.26 0.78 4.35 2.79 Area 171 288 360 332 163 380 75 151 5739

Net Area Sown % 63.81 34.70 43.06 50.53 47.80 43.63 19.48 19.92 36.86

Area 268 830 836 657 341 871 385 758 15571Total

% 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Source: Orissa Agricultural Statistics - 2004-05 Area: in 000 ha Majority of the farmers in the districts of project area are either marginal or small farmers with land holding size of 0-1 ha and 1-2 ha, respectively. The secondary data collected on farmer’s category and land holding sizes is presented in table 16. The analyzed data reveals that small and marginal farmers constitute on an average 70-80% of the total farmers in the project area. Similarly the average land holding size is 1.30 ha. This varies from 0.98 ha in Ganjam and Gajapati district to 1.77 ha in Nuapara district (Table 16). During the field survey, discussion with the farmers of the project area reveals that majority is owner – cultivators. But activities like sharecropping, tenancy, lease holding also exists in the area with minor to marginal variations. Sharecropping, tenancy, lease holding practice

Page 73: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 55

was observed more in area where farmers take up double crops due to availability of irrigation facilities than mono crop areas.

Table 16 Category of farmers in study districts of project area

Districts

Parameters B

hadr

akh

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Nos 85779 110960 72612 96925 27245 228760 36782 52155 2145245Marginal

(0-1 ha) % 58.51 56.78 43.02 49.98 37.40 69.06 65.18 51.95 54.08

Nos 34178 55870 50127 54365 25770 64546 13861 27413 1106337Small (1-2 ha)

% 23.31 28.59 29.70 28.03 35.38 19.49 24.56 27.30 27.89

Nos 20909 22395 31832 30565 14395 29686 4446 14692 543791 Semi Medium

(2-4 ha) % 14.26 11.46 18.86 15.76 19.76 8.96 7.88 14.63 13.71

Nos 5486 5770 12710 10830 4845 7617 1246 5423 155921 Medium

(4-10 ha) % 3.74 2.95 7.53 5.58 6.65 2.30 2.21 5.40 3.93

Nos 265 430 1519 1250 590 647 96 713 15195 Large

(>10 ha) % 0.18 0.22 0.90 0.64 0.81 0.20 0.17 0.71 0.38

Nos 146617 195425 168800 193935 72845 331256 56431 100396 3966489Total

% 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Average land holding size (ha) 1.20 1.18 1.74 1.43 1.77 0.98 0.98 1.50 1.30

Source: Orissa Agricultural Statistics - 2004-05

Page 74: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 56

Table 17 Irrigation facility in the study districts of project area

Districts

Type

Bha

drak

h

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Net Area Sown (000'ha) 171 288 360 332 163 380 75 151 5739 Kharif

Area (000' ha) 90.31 28.40 86.20 7.69 16.89 128.08 0.00 9.80 1238.16Major & Medium Flow Irrigation Projects % to Net Area

Sown 52.81 9.86 23.94 2.32 10.36 33.71 0.00 6.49 21.57

Area (000' ha) 1.27 28.52 23.75 19.66 10.15 102.30 21.16 21.96 497.50Minor Flow Irrigation Projects % to Net Area

Sown 0.74 9.90 6.60 5.92 6.23 26.92 28.21 14.54 8.67

Area (000' ha) 19.07 15.43 13.37 10.30 4.87 23.86 5.05 13.47 364.31Minor Lift Irrigation (TW, RLI & ODW) % to Net Area

Sown 11.15 5.36 3.71 3.10 2.99 6.28 6.73 8.92 6.35

Area (000' ha) 21.69 17.61 17.47 24.61 14.87 30.09 6.58 10.51 564.97Other Sources % to Net Area

Sown 12.68 6.11 4.85 7.41 9.12 7.92 8.77 6.96 9.84

Area (000' ha) 132.34 89.96 140.79 62.26 46.78 284.33 32.79 55.74 2664.94Sub total % to Net Area

Sown 77.39 31.24 39.11 18.75 28.70 74.82 43.72 36.91 46.44

Rabi Area (000' ha) 12.00 6.09 53.01 0.86 4.42 13.68 0.00 3.00 563.23

Major & Medium Flow Irrigation Projects % to Net Area

Sown 7.02 2.11 14.73 0.26 2.71 3.60 0.00 1.99 9.81

Area (000' ha) 0.06 5.18 4.50 3.02 1.56 6.80 2.35 5.34 71.35 Minor Flow Irrigation Projects % to Net Area

Sown 1.80 1.80 1.25 0.91 0.96 1.79 3.13 3.54 1.24

Area (000' ha) 11.44 9.26 8.02 6.19 2.92 14.32 3.03 8.08 218.59Minor Lift Irrigation (TW, RLI & ODW) % to Net Area

Sown 6.69 3.22 2.23 1.86 1.79 3.77 4.04 5.35 3.81

Area (000' ha) 18.68 20.06 19.35 15.08 6.21 22.66 4.19 7.25 413.05Other Sources % to Net Area

Sown 10.92 6.97 5.38 4.54 3.81 5.96 5.59 4.80 7.20

Area (000' ha) 42.18 40.59 84.88 25.15 15.11 57.46 9.57 23.67 1266.22Sub total % to Net Area

Sown 24.67 14.09 23.58 7.58 9.27 15.12 12.76 15.68 22.06

Total (Kharif & Rabi) Area (000' ha) 174.52 130.55 225.67 87.41 61.89 341.79 42.36 79.41 3931.16Source: Orissa Agricultural Statistics - 2004-05

Page 75: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 57

In the 8 districts of project area, irrigation facilities to cultivated land are available to some extent. On an average 43.83% of net area under cultivation is irrigated in Kharif season and 15.38% in Rabi season. Maximum percentage of cultivated land is irrigated in Bhadrakh district and lowest percentage in Bolangir district. Discussion with farmers of the area reveals that though secondary data indicate such a good percentage area under irrigation, but in reality this is not true. The cultivated lands have been demarcated as irrigated area and the farmers are paying rent for it, but irrigation water rarely reaches majority of the crop fields. As per secondary data presented in Table 17, in Kharif season maximum area is under irrigation. But the farmers want irrigation mainly during Rabi season to grow second crop. Kharif irrigation is required only to save the crop during dry spell.

Paddy Threshing on roadside in Bhadrakh – Chandbali Corridor

Provision of irrigation always requires use of high yielding varieties, fertilizers, pesticides, insecticides etc to ultimately result in more productivity of crops. Unless scientific inputs are used irrigation facility alone cannot raise production or productivity in any project area. The present study reveals that per ha consumption of fertilizer in the districts of project area is not adequate. Though in districts like Bhadrakh (98 kg/ha) and Ganjam (52 kg/ha) it is higher than Orissa state average of 43 kg/ha, but it is much less than figures of agriculturally developed states like Punjab (185 kg/ha), Tamilnadu (163 kg/ha) and Andhra Pradesh (156 kg/ha). This clearly reveals that commercial agriculture with use of fertilizers and other scientific agro inputs are rarely developed in major parts of the project area. Bhadrakh and Ganjam districts are more agriculturally developed than other 6 districts of Project area.

Page 76: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 58

Table 18 District wise consumption of fertilizer in 2004-05 (Fig in MT) Annual Consumption

District N P K Total

Total Cropped Area

(000ha)

Per hectare Consumption

(kg/ha)

Bhadrakh 12728 6034 3819 22581 230.21 98

Keonjhar 6949 3617 920 11486 415.96 28

Kalahandi 14365 5817 3763 23945 523.10 46

Bolangir 7056 2694 1241 10991 439.23 25

Nuapara 3228 1313 610 5151 241.02 21

Ganjam 23272 4323 4071 31666 606.96 52

Gajapati 3778 284 283 4345 122.63 35

Raygada 4521 1427 1416 7364 223.85 33

ORISSA 223543 77993 53770 355306 8344.31 43 Source: Orissa Agricultural Statistics - 2004-05 The project area is scattered throughout the state, starting from Bhadrakh in Coastal Orissa to Nuapara in far western parts of the State. The area covers different agro climatic zones with varied topography, soil, climate etc. Depending on these biological factors, different cropping systems are being practiced. In the present study data were collected on area cultivated under different crops in different districts located in the Project area. The analyzed data has been presented in table 19. In the Project area, farmers grow mainly paddy. This is the principal crop in all the eight districts of Project area. Other cereal crops are maize, wheat, jowar, Bajra etc. Similarly, among the pulse crops, green gram/black gram rank first. The farmers grow these two crops in Rabi season on residual moisture available in the crop field after harvest of paddy. In some parts oilseed crops, fiber crops, sugarcane etc are also grown. In Khariar Bhawanipatna corridor on roadside farmers are cultivating sunflower and cotton. These are two important crops of the region.

Table 19 Cropping pattern in study districts of Project area

Districts

Crops

Area in 000 ha; % - percentage to Gross Cropped Area B

hadr

akh

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Area 178.16 205.64 267.38 230.94 105.46 259.67 35.97 66.13 4491.92 Paddy % 77.39 49.44 51.11 52.58 43.75 42.78 29.33 29.54 53.83 Area 0.29 26.75 13.90 12.71 8.78 57.46 21.59 43.30 433.49 Other Cereals % 0.13 6.43 2.66 2.89 3.64 9.47 17.61 19.34 5.20 Area 20.41 67.13 151.64 109.14 67.66 180.83 24.42 40.99 1650.97 Pulse Crops % 8.86 16.14 28.99 24.85 28.07 29.79 19.91 18.31 19.79 Area 3.13 44.56 47.31 42.23 42.83 49.64 17.90 37.46 840.87 Oilseeds % 1.36 10.71 9.04 9.61 17.77 8.18 14.60 16.73 10.08 Area 23.37 57.52 21.30 21.58 10.86 46.26 18.01 16.46 651.83 Vegetables % 10.15 13.83 4.07 4.91 4.51 7.62 14.68 7.35 7.81 Area 3.65 9.53 4.12 3.91 4.18 5.12 3.01 2.63 145.78 Spices % 1.59 2.29 0.79 0.89 1.73 0.84 2.46 1.17 1.75 Area 0.69 4.67 15.86 17.35 1.15 5.51 0.95 15.59 90.80 Fiber Crops % 0.30 1.12 3.03 3.95 0.48 0.91 0.78 6.96 1.09

Page 77: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 59

Districts

Crops

Area in 000 ha; % - percentage to Gross Cropped Area B

hadr

akh

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Area 0.52 0.16 1.35 1.24 0.06 2.48 0.67 0.12 33.83 Sugarcane % 0.23 0.04 0.26 0.28 0.03 0.41 0.55 0.06 0.41 Area 0.00 0.00 0.25 0.14 0.04 0.00 0.11 1.17 4.76 Tobacco % 0.00 0.00 0.05 0.03 0.02 0.00 0.09 0.52 0.06 Area 230.21 415.96 523.10 439.23 241.02 606.96 122.63 223.85 8344.26 Gross

Cropped Area % 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Source: Orissa Agricultural Statistics - 2004-05

Sunflower cultivation on roadsides of Bhawanipatna – Khariar corridor

Similar to cultivated crops, fruit crops are also grown in the project area with varying levels of coverage. Major fruit crops grown are Mango, Guava, Citrus, Litchi, Sapota, Banana, Papaya, Pineapple, Ber, Coconut, and Cashewnut etc. Area covered under different fruit crops district wise are presented in Table 20. Out of the eight study districts, in Ganjam district maximum area is under fruit trees.

Page 78: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 60

Table 20 Area under fruit crops in study districts of project area (2004-05) (Area in 000 ha)

District M

ango

Gua

va

Citr

us

Litc

hi

Sapo

ta

Ban

ana

Papa

ya

Pine

appl

e

Ber

Coc

onut

Cas

hew

nu

t

Oth

ers

Tot

al

Bhadrakh 4.566 0.880 0.827 0.042 0.029 0.261 0.024 0.014 0.000 0.908 0.020 0.429 8.000

Keonjhar 5.206 1.454 1.442 0.011 0.070 0.786 0.036 0.056 0.000 1.231 2.990 0.612 13.894

Kalahandi 5.667 1.577 1.173 0.070 0.048 0.777 0.039 0.023 0.088 0.384 0.840 1.983 12.669

Bolangir 3.029 0.243 0.569 0.028 0.296 1.391 0.035 0.010 0.380 0.896 0.040 3.210 10.127

Nuapara 2.315 0.682 0.460 0.030 0.009 0.244 0.021 0.009 0.373 0.107 0.190 1.075 5.161

Ganjam 7.328 0.168 2.663 0.004 0.339 1.833 0.041 0.035 0.000 7.340 13.690 1.273 34.714

Gajapati 2.830 0.369 1.761 0.009 0.135 0.354 0.026 0.051 0.000 1.991 4.640 0.615 12.781

Raygada 6.97 0.911 1.041 0.179 0.093 0.886 0.028 0.081 0.104 0.418 2.54 1.519 14.770

Orissa 120.250 13.804 26.416 3.907 3.266 20.734 0.743 0.705 2.317 50.783 89.390 41.297 373.612Source: Orissa Agricultural Statistics - 2004-05 5.8 LIVESTOCK: Livestock rearing and production is always designated as an activity allied to agriculture. In an agricultural based economy livestock contribute a lot towards rural livelihood. It acts as a major source of cooking energy, manure, nutrition, food and also traction power. It also acts as a buffer to household earning during natural calamity including crop failures. In an agriculturally developed area, livestock is also developed because of the symbiotic association between the two.

Grazing by cattle on sides of Project road corridor

Page 79: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 61

The secondary data collected on livestock population in the 8 districts of project area, is presented in table 21. The analysis of the data reveals that there is good number of cows, buffaloes, goats and poultry in project areas. The average number of cattle in each household varies from 1.56 in Ganjam district to 2.60 in Bhadrakh district. Similarly, the average number of buffaloes reared in each household varies from 0.68 in Rayagada district to 0.06 in Bhadrakh district. Discussion with the villagers’ reveals that due to lack of communication facilities, they face lot of difficulty in marketing of produces otherwise they would earn handsomely from livestock rearing.

Table 21 Livestock population of study districts of project area

Districts

Category

Bha

drak

h

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

No of Rural HH 215142 283092 299942 272975 116329 538530 100306 165257 6618547 Cattle

Population 25115 34413 17629 30242 1779 25405 10894 3992 869615 Crossbreed

Average Nos./HH 0.12 0.12 0.06 0.11 0.02 0.05 0.11 0.02 0.13

Population 535128 678918 463427 478191 205978 816256 229101 357680 12898275Indigenous

Average Nos./HH 2.49 2.40 1.55 1.75 1.77 1.52 2.28 2.16 1.95

Population 0 48 0 0 1205 0 3 0 42549 Exotic

Average Nos./HH 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 Population 560243 713379 481056 508433 208962 841661 239998 361672 13810439

Total Cattle Average Nos./HH 2.60 2.52 1.60 1.86 1.80 1.56 2.39 2.19 2.09

Buffaloes Population 12134 36080 94598 99748 32166 126094 23898 111340 1356765

Indigenous Average Nos./HH 0.06 0.13 0.32 0.37 0.28 0.23 0.24 0.67 0.20

Population 4 369 936 240 91 5211 802 895 31259 Improved

Average Nos./HH 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 Population 12138 36449 95534 99988 32257 131305 24700 112235 1388024 Total

Buffaloes Average Nos./HH 0.06 0.13 0.32 0.37 0.28 0.24 0.25 0.68 0.21

Population 7319 144133 100928 119403 29798 145914 10492 48093 1779367 Sheep’s

Average Nos./HH 0.03 0.51 0.34 0.44 0.26 0.27 0.10 0.29 0.27

Population 177370 403218 221848 268112 87377 218370 122391 158225 5879723 Goats

Average Nos./HH 0.82 1.42 0.74 0.98 0.75 0.41 1.22 0.96 0.89

Population 4792 22710 7689 3391 1298 13571 17039 38976 601917 Pigs

Average Nos./HH 0.02 0.08 0.03 0.01 0.01 0.03 0.17 0.24 0.09

Population 416229 1122789 825130 848338 230844 1437489 359781 498787 18437782Poultry Birds

Average Nos./HH 1.93 3.97 2.75 3.11 1.98 2.67 3.59 3.02 2.79 Source: Livestock Census, 2001 5.9 FISHERIES: The project area has good number of water bodies namely tanks, ponds, rivers and lakes. From these water bodies there is production of fresh water fishes. But, fishery adopting scientific practices is limited only in case of large farmers. The principal diet in the rural household is rice and fish. To meet the fish requirement the villagers mainly depend on water

Page 80: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 62

bodies in and around the project area. Out of the eight districts of project area, two (Bhadrakh and Ganjam) are located adjacent to Bay of Bengal and there is report of marine and brackish water fishes in these districts. The secondary data collected on annual fish production in districts of project area is presented in table 22.

Table 22 Annual productions of fish in study districts of project area (In tons)

Districts Fresh Water Marine Brackish water Total

Bhadrakh 64461.4 1000 15988.6 81450

Keonjhar 56220.7 0 0 56220.7

Kalahandi 83629.1 0 0 83629.1

Bolangir 84324.6 0 0 84324.6

Nuapara 22091.5 0 0 22091.5

Ganjam 171740.7 91756.3 16487.7 279984.7

Gajapati 11879.3 0 0 11879.3

Raygada 6092.2 0 0 6092.2

Orissa 1655919.9 1168803.9 244773.8 3069497.6

Source: Statistical Abstract of Orissa – 2005 5.10 MINERALS: The state is rich in mineral resources. About 27 different kinds of minerals are found in Orissa. The mineral belt is spread over in an area more than 6000 sq. km. The state rank 5th and 6th in the country in iron and coal reserve, respectively. It contributes about 90% of Chromites, 80% of Graphite, 46% Dolomite and about one third (40%) of India’s Manganese ore production. It tops Bauxite production and shares 47% of the total production. In the districts of Project area following minerals deposits are there.

Table 23 Mineral Resources available in study districts of Project area

Study district Type of mineral ores available

Bhadrakh NIL

Bolangir Bauxite, Graphite, Limestone, Manganese, Gemstone.

Gajapati Graphite.

Ganjam Mineral sand

Kalahandi Bauxite, Graphite, Manganese, Gemstone.

Keonjhar Chromite, Chinaclay, Pyrophyllite, Manganese, Gold

Nuapara Bauxite, Limestone

Rayagada Bauxite, Graphite, Manganese.

Source: Orissa Mining Corporation office, 2006

Page 81: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 63

The Manganese deposits in the project area are found in Rayagada-Kalahandi-Bolangir belt. Bauxite is available in huge quantities in Niamagiri hills bordering Rayagada and Kalahandi districts. Graphite ore is also available in Sargipalli belt (Bolangir and Kalahandi Districts) and Titlagarh belt (Bolangir and Kalahandi Districts). Chromite deposits are located in Boula-Nuasahi area of Keonjhar District near to project corridor. Limestone is also found in the Nuapara and Bolangir Districts of Project area. Sand minerals or heavy minerals are found in the belt along Ganjam coast of the State. The belt is under lease by Indian Rare Earth Limited. The entire ore is exported to America, Japan, Norway etc. through a minor Gopalpur port. 5.11 INDUSTRIES: In 1950, Orissa did not have any industry worth the name except for a few sawmills and some ice factories near Cuttack. Exploitation of its natural resources began in the 1950’s with the construction of Hirakud Dam and Rourkela Steel Plant. The progress of development was slow during the first three Plan Periods. Beginning from the 1970s, more dams, mines and industries were setup and use of mineral and other natural resources started at a faster rate. Formulation of new Industrial Policy in 2001 and higher emphasis on industrialization by elected Government, Orissa has witnessed a huge influx of corporate giants to set up Industries in the State. These mainly include Iron and Steel Industries and Thermal Power Plants. Recently, State Government has signed MOU with 43 Corporate Houses to set up Steel Plants in the State. In the Project area of OSRP, a good number of Industries are located, a list of which are presented below.

Table 24 Industries in study districts of Project area

Study district Industries

Bhadrakh - Chandbali Food & Food processing small scale industries at Chandbali and Light Engineering small scale industries at Bhadrakh

Bhadrakh - Anandpur Ferro Chrome factory of FACOR at Rahandia

Khariar - Bhawanipatna Food & Food processing small scale industries at Khariar and Drugs and Pharmaceutical, Food & Food Processing, Textile small scale industries at Bhawanipatna

Berhampur – Bangi Jn. Agro based, Cement based, Edible oil and forest based industries at Mohana

Bangi Jn. – J.K.Pur Ferro Silicon plant of IMFA at Theruveli, J.K. Paper mill – Rayagada,

Source: Industries Department, Government of Orissa 5.12 ARCHAEOLOGICAL SITES/PLACES OF TOURIST INTEREST: No archaeological sites are located within project area of the road corridor. Only tourist places are located the details of which are presented in table 25.

Page 82: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 64

Table 25: Tourist places located within the districts of Project area

Name of District Tourist Spot Bhadrakali Temple Bhadrakh Aredi - Akhandalamani Temple

Bolangir Harishankar Temple Mahendragiri hills Gajapati Gandahati Waterfall Taptapani - Hot water spring Nirmaljhara water fall Tara Tarini Temple Chilika Lake

Gopalpur sea beach Manikeswar Temple Phurli Jharana (Water Fall) Kalahandi Rabandhar (Natural Stream) Bada Ghagara Water fall Sana Ghagara Water fall Bhim Kunda Water body

Keonjhar

Ghatagaon Tarini Temple Pathara Dam Patala Ganga (Hot Spring) Nuapada Budhi Komna Temple Hatipathar Water Fall Majhigori Temple Titijhola Picnic Spot

Rayagada

Minajhola Picnic Spot Source: District Statistical Handbooks, 2005 5.13 FOREST & VEGETATION OF THE AREA: Out of the five corridors under Phase I Year I, only two corridors i.e. Berhampur – Bangi Jn. and Bangi Jn to JK Pur passes through Reserve Forests and Protected Forests in Rayagada, Gajapati and Ganjam Districts.

Table 26 Forests in the vicinity of road corridor

Project Corridor Details

Khariar Bhawanipatna No Reserved forest or protected area

Chandbali Bhadrak No Reserved forest or protected area

Bhadrak Anandapur No Reserved forest or protected area

Bramhapur Bangi JN JK Pur Reserved forest, ghats, and wildlife crossing points.

In addition to Reserve and Protected Forests under Forest Department, protected forests in the form of avenue plantations exists along roadsides and will also be acquired for construction purpose. The detailed list of trees to be cut for widening of the road is presented in Table 27 (Chainagewise list in Annexure – I A to E). Tree enumeration was done both for existing and proposed RoW and added up together to find out total number of trees to be cut. However, the number of trees to be cut may slightly vary due to change in alignment. This will be

Page 83: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 65

finalized during Joint Verification exercise by OWD officials and officials from Forest Department.

Table 27 List of trees located within existing & proposed RoW and will be affected

Left Right

Girth at Ht. 1.37m from G.L. (in cm) Girth at Ht. 1.37m from G.L. (in cm)

Corridor <3

00 m

m

300

to 6

00

600

to 1

800

>180

0 m

m

Tot

al

<300

mm

300

to 6

00

600

to 1

800

>180

0 m

m

Tot

al Total

Bhadrakh - Chandbali 0 108 2324 545 2977 0 108 2013 395 2516 5493

Bhadrakh - Anandpur 0 213 1878 460 2551 1 229 1917 364 2511 5062

Khariar - Bhawanipatna 0 315 933 685 1933 0 402 825 609 1836 3769

Berhampur - Bangi Jn. 0 45 3524 639 4208 1 56 3546 572 4175 8383

Bangi Jn. - J.K.Pur 0 87 1160 209 1456 0 13 1613 200 1826 3282

Total 0 768 9819 2538 13125 2 808 9914 2140 12864 25989

SOURCE: PRIMARY SURVEY, 2006 The project roads are some of the oldest roads of Orissa state. hence, a good number of sound and healthy avenue trees and multiple rows of avenue trees have been raised over years. in Khariar – Bhawanipatna section, discussion with the local community revealed that majority of the giant trees on road side were planted several decades back by rulers of princely states. these trees have formed excellent green tunnels on roadsides. attempt has been made to save these old trees and green tunnels during finalization of design. the road double-laning can be easily carried out with minimum sacrifice of tree growth if carefully planned. however the old hollow and rotten trees may need removal for road safety.

HOLLOW TREE ON SIDE OF BHAWANIPATNA – KHARIAR CORRIDOR

Page 84: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 66

Major tree species under avenue plantation in the road corridor includes Anogeissus latifolia, Azadirachta indica (Neem), Buchanania lanjan (Chiranji), Butea monosperma (Palas), Careya arborea, Cassia fistula, Dalbergia Latifolia (Sishu), Diospyros melanoxylon (Kendu), Madhuca Indica (Mohua), Phyllanthus emblica (Amli), Scleichera oleosa (Kusum), Samecarpus anacardium (Bhalia), Semaruba glauca, Shorea robusta (Sal), Syzygium Cummini (Jamum), Tectona grandis, Terminalia arjuna (Arjun), Terminalia belerica (Bahera), Terminalia chebula, Wrightia arborea, Zizyphus Oenoplia.

Similarly, important medicinal plants found in the project area are chandan (santalum album), bija (pterocarpus marsupium), rohini (ssoyimida fabrifuga), fanfana, (oroxylon indicem), kamalagudi (malotus philipinansis), patuli (pterospermum swave), chandeigodi (vitex peduncularis), bidanga (embelia ribes), modafal (helioteres isora), bumpipali (piper longum), karpura haldi (curcuma aromatica), iswari (aristolochea indica), bridha daruka (aargeyreia durvula) etc. Detailed discussion about tree species, flora and green tunnels has been made in the Biodiversity Assessment and Management plan prepared separately by OSRP. 5.14 WILD LIFE: Decades before, the project area had rich diversity of mammals, birds, reptiles and fishes. Now these animals are sparsely seen due to poaching and loss of habitat. The advance of cultivation along with growth of population and communication network has driven the wild animals back to the reserve forests in and around the project area.

Table 28 Nearest Wildlife Sanctuary of Road Corridors

Wildlife Sanctuary Road Corridor Location

Lakhary valley Elephant sanctuary Berhampur – Bangi Jn 840-16’ to 840-25’(E) Longitude 190-15’ to 190-25’ North Latitude

Hadagarh WL Sanctuary Bhadrakh – Anandpur 860-11’ to 860-25’(E) Longitude 210-11’ to 210-25’ North Latitude

Bhitarkanika WL Sanctuary Chandbali - Bhadrakh 860-30’ to 870-06’(E) Longitude 200-30’ to 200-50’ North Latitude

Out of five corridors, the above-mentioned three corridors are passing within 10 km radius of Wildlife Sanctuaries. Among the wild animals in Orissa, elephants do move over long distances for foraging, as their food requirement is very high and with the depletion of forests, vegetation and fragmentation of their habitat they have to cover long distance to meet their food requirement. Hence they migrate crossing roads, rivers, hillocks and cultivated land. In Berhampur – Bangi Jn. Corridor wildlife crossings were observed, the detailed account of which is presented in Biodiversity Assessment and Management plan. Majority of the crossings are for Elephants and sloth bear.

Page 85: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 67

Table 29 Wildlife movements in Project road corridors

Project Corridor Chainage of wildlife movement in Km.

Species crossing the road Important stretches which species mainly cross

Chandbali - Bhadrakh

26.1km, 28.8 km, 30.05 km, 31.6 km, 36.005 km

These are the wetlands and creeks, drainage channels etc. which serve as a food source for aviary, amphibian and reptilian fauna as well as the vital breeding ground of sweet and brackish water fish, shrimp, mollusks, amphibians, reptiles, rodents and millions of micro organism, common crabs, Crustacean and dragon fly etc.

There are canals and rivulets that serve as the conduit in the biodiversity chain to generate, disperse and regroup the different species for reproduction in intertidal areas and flood plains of river Baitarani.

Bhadrakh – Anandpur

12.2 km, 13.8 km, 17.2 km, 21.75 km, 23.5 km, 34.0 km, 41.1 km

Hyena, Rabbit, Frog, Lizard, Snakes, Jackal move across the road Check gate Check gate

Bhawanipatna - Khariar

4.1 km, 18.85 km, 22.15 km, 23.35 km, 54.35 km, 65.1 km, 67.85 km

Hayenas, wolves fox, python, snakes rats, mongoose, civets, amphibians, monitor lizards and gekos.

There is no important stretch

Bramhapur – Mohana – Bangi Jn – J.K.Pur - Rayagada

26.1 km 118 km 121 to 123 km 41.0 km 53.0 km 56.0 to 56.5 km 66.5 to 67.0 km, 73.0 km 78.0 to 79.0 km 91.0 km, 93.0 km, 96.0 km, 102km 107 km, 174 km, 176 km

Sloth bear – 26.1 Elephant pass Elephant pass

The prominent movement is Bear corridor at 26.1 (Moulabhanja), 118.0 & 121.0 Goibandha elephant corridor that is regular crossing. For other wild life out of the total length spots located under column 6 the frequented spots are at chainage 53, 56, 66.5, 91, 96, 107, 118, 171 and176 kms.

Source: Primary survey, 2006 5.15 WATER BODIES Water bodies in the project area mainly include rivers, ponds, canals, tanks etc. No. of water resources inside the RoW of each of the project corridor is presented below. Major rivers flowing in and around project area are Baitarani, Rusikulya, Bahuda, Bansadhara, Nagavali, Salandi, Sunder and Tel.

Page 86: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 68

Baitarani River originates from the Gonasika hills of the Keonjhar districts. It is 365 kms long and its catchments area spread over 12,790 sq. kms . It enters into the Bay of Bengal after joining of the Brahmani at Dharma mouth near Chandabali Subarnrekha. The Rusikulya originates from the Rushyamala hills of the Eastern Ghats in Phulbani district. It is 165 kms long with 8900 sq. kms of catchments areas. It's tributaries are the Baghua the Dhanei Badanadi etc. It has no delta at its mouth. The Bahuda originates from the Ramgiri hills of the eastern ghats in Gajapati districts and joins the bay of Bengal in Andhra Pradesh . Its length 73 kms having a catchment area of 1250 sq. kms . The Bansadhara originates from the flanks of the Durgakangar hills (Lingaraj hills) of the Eastern Ghats in Kalahandi districts. It is 230 kms long out of which only 150 kms in Orissa. It enters in to the Bay of Bengal at Kalingapatnam in Andhra Pradesh. It has a catchment area of 11500 sq. kms . The Nagabali originates from the Bijipur Hills of the eastern ghats near Lanji garah . It is 210 kms long out of which 100 kms is in Orissa. It has a total catchment area of about 9410 sq. kms. The Salandi originates from the Meghasani Hills of the Similipal massif in Keonjhar district. It is 144 kms long with a catchment areas of 1793 sq. kms.

Tank /Ponds on sides of Project Road corridor

All of the project roads have man-made water ponds, tube wells, open wells, water bodies etc on sides of road. During the field survey attempt was made by the study team to identify and locate different water sources within 20m to 30m from the road edge on both the sides and find out how many of them will be fully and partially affected because of road improvement programme. The details of these figures corridor wise are presented in table 30. It was

Page 87: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 69

observed that majority of the tube wells and open wells are fully affected. But in case of pond and water bodies, majority comes under category of either partially affected or not affected. One small Check Dam (Water Harvesting Structure) constructed for irrigation purpose will be fully affected in Berhampur – Bangi Jn.

Table 30 Potentially affected water sources in road corridor

Corridor: Bhadrakh - Chandbali Type of CPRs Not Affected Partially Affected Fully Affected Total

Open Well 0 0 3 3

Drinking water tap 1 0 12 13

Tube well 10 0 29 39

Pond 13 14 5 32

Water bodies 3 14 0 17 Total 27 28 49 104

Corridor: Bhadrakh - Anandpur Type of CPRs Not Affected Partially Affected Fully Affected Total

Open Well 3 0 3 6

Drinking water tap 2 0 24 26

Tube well 18 0 34 52

Pond 14 13 3 30

Water bodies 0 1 0 1 Total 37 14 64 115

Corridor: Bhawanipatna – Khariar Type of CPRs Not Affected Partially Affected Fully Affected Total

Open Well 24 0 4 28

Drinking water tap 5 0 12 17

Tube well 17 0 54 71

Pond 26 7 1 34

Water bodies 0 3 0 3 Total 72 10 71 153

Corridor: Berhampur – Bangi Jn. Type of CPRs Not Affected Partially Affected Fully Affected Total

Open Well 58 0 32 90

Drinking water tap 11 0 42 53

Tube well 45 0 131 176

Pond 20 26 2 48

Water bodies 8 8 3 19

Check Dams (WHS) 0 0 1 1 Total 142 34 211 387

Page 88: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 70

Corridor: Bangi Jn. – JK Pur Type of CPRs Not Affected Partially Affected Fully Affected Total

Open Well 1 0 4 5

Drinking water tap 0 0 12 12

Tube well 1 0 16 17

Pond 0 1 0 1

Water bodies 0 2 0 2

Total 2 3 32 37 Source: Primary survey, 2006

5.16 DEMOGRAPHY The demographic profiles of the 8 districts of Orissa state, which constitute the project area, are presented in table 31 to 34. It was revealed from the data that the about 29% of the state’s total population reside in eight districts of project area. The density of population in Bhadrakh and Ganjam district is 532 and 385, respectively, which is almost double the density of population in the State (236). Out of the eight districts of project area, six districts namely Rayagada, Gajapati, Keonjhar, Kalahandi, Bolangir and Nuapara are dominated by tribal. Major parts of these six districts are located in TSP areas of the State. The percentage of ST in Bhadrakh district is only 1.88, whereas that of SC is 21.50. Similar is the case with Ganjam district, which is dominated by Scheduled Castes than Scheduled Tribes. Further, as per Census 2001 figures, Rayagada and Gajapati districts recorded very low literacy rate i.e. 36.15 and 41.26%, respectively. This is because of the fact that majority of the population in these two districts are Scheduled Tribes and the rate of literacy in this community is very low.

Table 31 Demography of study districts of project area Districts Total Population % to state's total population Density of Population

(Nos/sq km) Bhadrakh 1333749 3.62 532

Keonjhar 1561990 4.24 188

Kalahandi 1335494 3.63 169

Bolangir 1337194 3.63 203

Nuapara 530690 1.44 138

Ganjam 3160635 8.59 385

Gajapati 518837 1.41 120

Raygada 831109 2.26 118

Orissa 36804660 100.00 236 Source: Statistical Abstract of Orissa – 2005

Page 89: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 71

Table 32 Percentage of SC and ST in study districts of project area

% to total population Districts

ST SC

Bhadrakh 1.88 21.50

Keonjhar 44.50 11.62

Kalahandi 28.65 17.67

Bolangir 20.63 16.92

Nuapara 34.71 13.62

Ganjam 2.88 18.57

Gajapati 50.78 7.50

Raygada 55.76 13.92

Orissa 22.13 16.53 Source: Statistical Abstract of Orissa – 2005

Table 33 Literacy rate in study districts of project area

Literacy rate (%) Districts

Male Female Total

Bhadrakh 84.65 62.85 73.86

Keonjhar 71.99 46.22 59.24

Kalahandi 62.66 29.28 45.94

Bolangir 71.67 39.51 55.70

Nuapara 58.46 25.79 42.00

Ganjam 75.22 46.44 60.77

Gajapati 54.71 28.42 41.26

Raygada 48.18 24.56 36.15

Orissa 75.35 50.51 63.08 Source: Statistical Abstract of Orissa – 2005

As regards the strength of work force in the population of of project area, the census data of 2001 in 8 districts are presented in table 34. The analysis of data reveals that % of main workers in the total population varies from 34.70% in Gajapati district to 22.61% in Bhadrakh district. The occupational pattern of workers indicates that majority are either cultivators or agricultural labourers.

Page 90: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 72

Table 34 Workforce participation rate and occupational pattern in study districts of

project area % to total population % to total workers

DISTRICTS Main workers

Marginal workers

Non workers Cultivators Agricultural

Labourers Workers in

HH industry Other

workers

Bhadrakh 22.61 6.26 71.13 39.11 28.50 2.43 29.96

Keonjhar 25.30 14.47 60.23 32.98 36.35 4.49 26.18

Kalahandi 28.61 17.89 53.50 29.63 50.33 2.87 17.17

Bolangir 26.30 15.56 58.14 31.03 40.06 4.30 24.61

Nuapara 24.79 21.26 53.95 34.10 46.28 2.94 16.68

Ganjam 25.94 15.38 58.68 24.69 38.59 3.80 32.92

Gajapati 34.70 18.41 46.89 32.71 45.15 2.13 20.01

Raygada 30.07 17.96 51.97 29.10 46.06 1.90 22.94

Orissa 26.05 12.74 61.21 29.75 35.02 4.91 30.32 Source: Statistical Abstract of Orissa – 2005 5.17 AVAILABILITY OF INFRASTRUCTURE & SERVICE FACILITIES Information on access to infrastructure and service facilities indicates the quality of life pursued by the community residing in any area. The health, education, sanitation and other socio economic status of people are mainly influenced by availability of infrastructure and service facilities in the area. In the present study data were collected by the study team on availability of these facilities in the 8 districts of the project area and a detailed discussion is made facility wise in the below mentioned paragraphs (Table 35). Education: Number of Primary Schools, Middle Schools, High Schools, Colleges and professional/technical institutions in each of the districts are presented in table 35. Population served per school/college in thousand numbers was also calculated district wise and presented in the table. The analysis reveals that in trend is almost similar in 8 districts of Orissa state. In all the study districts, the number of institutions for professional/technical education is very less and there is need for opening of additional institutions to meet the requirement of population. Health: Availability of health facilities is inadequate in the project area. Average population served per hospital/health institution varies from 9760 in Keonjhar district to 15420 in Ganjam district. Post Offices: Availability of post offices is adequate in the project area. Average population served per post office varies from 4740 in Nuapara district to 3520 in Keonjhar district. Banking and Credit facilities: Regarding banking and credit facilities, situation is worse in 8 districts of Orissa. Availability of commercial bank branches is better in Bhadrakh district and poor in Bolangir district. But in Bolangir district situation is better with regard to availability of Agricultural Credit Cooperative Societies. In fact availability of more numbers

Page 91: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 73

of Banking and Credit facilities is a good sign and will be of lot of help to the farmers in post project period to take up other income generating schemes. This will also help the poor farmers from exploitation of local moneylenders. Electricity: Electric energy for lighting, entertainment purpose is a important requirement for maintaining healthy quality of life. It was revealed from the secondary data that on average 73% villages in the 8 districts are electrified. Percentage of electrified villages varied from 39.50% in Rayagada district to 94.10 in Bolangir district (Table 36). There is an urgent need to electrify the unelectrified villages for improvement in quality of life of rural people.

Table 35 Availability of Service facilities in study districts of Project area

Districts

Service facilities

Bha

drak

h

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Nos 328 444 306 285 112 680 146 201 8175Post Offices

Dependency rate 4.07 3.52 4.36 4.69 4.74 4.65 3.55 4.13 4.50

Nos 37 25 28 38 15 70 2 26 1325Factories

Dependency rate 36.05 62.48 47.70 35.19 35.38 45.15 259.42 31.97 27.78

Nos 161 87 80 68 28 191 27 47 2240Commercial Bank Branches Dependency rate 8.28 17.95 16.69 19.66 18.95 16.55 19.22 17.68 16.43

Nos 108 39 77 158 26 400 50 14 2728Agricultural Credit Cooperative Societies Dependency rate 12.35 40.05 17.34 8.46 20.41 7.90 10.38 59.36 13.49

Nos 32 10 20 4 0 41 3 3 702 Non-Agricultural Credit Cooperative Societies Dependency rate 41.68 156.20 66.77 334.30 0.00 77.09 172.95 277.04 52.43

Nos 13 22 21 21 8 37 11 16 540 Veterinary Hospitals/Dispensaries Dependency rate 102.60 71.00 63.59 63.68 66.34 85.42 47.17 51.94 68.16

Nos 98 114 69 100 28 175 38 67 2688Artificial Insemination Centers Dependency rate 13.61 13.70 19.35 13.37 18.95 18.06 13.65 12.40 13.69

Nos 1239 1807 1705 1933 731 2936 937 1482 42104Primary Schools

Dependency rate 1.08 0.86 0.78 0.69 0.73 1.08 0.55 0.56 0.87

Nos 527 632 356 414 204 642 104 188 11510Middle Schools

Dependency rate 2.53 2.47 3.75 3.23 2.60 4.92 4.99 4.42 3.20

Nos 325 411 245 254 113 489 63 60 6820High Schools

Dependency rate 4.10 3.80 5.45 5.26 4.70 6.46 8.24 13.85 5.40

Nos 24 35 62 59 23 121 30 49 1701Colleges (Higher Secondary and above) Dependency rate 55.57 44.63 21.54 22.66 23.07 26.12 17.29 16.96 21.64

Nos 2 2 0 1 0 6 1 4 63 Professional & Technical Colleges Dependency rate 666.87 781.00 0.00 1337.19 0.00 526.77 518.84 207.78 584.20

Page 92: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 74

Districts

Service facilities

Bha

drak

h

Keo

njha

r

Kal

ahan

di

Bol

angi

r

Nua

para

Gan

jam

Gaj

apat

i

Ray

gada

Ori

ssa

Stat

e

Nos 7 13 13 14 5 24 7 11 328 Family Welfare Centers

Dependency rate 190.54 120.15 102.73 95.51 106.14 131.69 74.12 75.56 112.21Nos 102 160 93 104 37 205 35 74 2698Medical Institutions

(Hospitals, Dispensaries etc.) Dependency rate 13.08 9.76 14.36 12.86 14.34 15.42 14.82 11.23 13.64

NB: Dependency rate: Population (in 000 nos.) dependent per unit of service facilities Source: Statistical Abstract of Orissa – 2005

Table 36 Electrification of villages in study districts of Project area

Districts % of Villages Electrified Bhadrakh 83.80

Keonjhar 85.80

Kalahandi 63.60

Bolangir 94.10

Nuapara 80.90

Ganjam 86.80

Gajapati 50.40

Raygada 39.50

Orissa 77.00 Source: Statistical Abstract of Orissa - 2005 5.18 NOISE LEVEL Noise has become a major concern to all classes of people because of its growing menace, at each nook and corner of the country. Industries, transportation, many human activities contribute a lot to the sound level of a particular area. In order to assess the noise level in and around the proposed project, field monitoring was carried out at 13 locations along the existing alignment. Noise monitoring was carried out at each location for 24 hours during the study period. Interestingly, it was observed that noise level is high during daytime than nighttime. This is due to the fact that during daytime movement of local people, vehicles cause lot of noise along the road corridor. It was observed that noise level at Berhampur town, Bhawanipatna town and Bhadrakh town is marginally higher (Table 373 A, B & C) than prescribed limits.

Page 93: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 75

Table 37 Noise level (dB) along the project stretch

A. Corridor: Berhampur – Bangi Jn – JK Pur

Noise Level in Leq dB (A) Monitoring Locations

Day time Night time Berhampur Town (Start of Project Road) (Commercial) 66 58 Taptapani Chainage 50.00 of SH - 17/ Dear Park Chainage 49.00 for Reserve Forest (Commercial) 55 46

Adava Chainage 81.500 of SH – 17 (Commercial) 64 55 Kenduguda Chainage 123.500 of SH – 17 (Residential) 54 44 Raygada Town (Commercial) Near Chainage 18.00 of SH - 4 62 55 Ghats portion Chainage 39.00 SH – 4 (Residential) 54 45 Standards (dB (A) Leq) Commercial area 65 55 Standards (dB (A) Leq) Residential area 55 45

B. Corridor: Chandbali – Bhadrakh – Anandpur

Noise Level in Leq dB (A) Monitoring Locations

Day time Night time Chandbali Chainage 48.00 of SH – 9 (Commercial) 64 55 Bhadrakh Chainage 0.00 of SH – 9 (Commercial) 68 58 Anandpur Chainage 46.0 of SH – 53 (Residential) 59 48 Standards (dB (A) Leq) Commercial area 65 55 Standards (dB (A) Leq) Residential area 55 45

C. Corridor: Khariar – Bhawanipatna

Noise Level in Leq dB (A) Monitoring Locations

Day time Night time Khariar Town Chainage 70.000 of SH-16 (Commercial) 65 58 Village Gandharala Chainage 50.000 of SH-16 (Residential) 62 55 Karalapada Village Chainage 22.800 of SH-16 (Residential) 60 54 Bhawanipatna Town Near Chainage 3.000 of SH-16 (Commercial) 68 56 Standards (dB (A) Leq) Commercial area 65 55 Standards (dB (A) Leq) Residential area 55 45

Source: Primary survey, 2006 5.19 WATER QUALITY The rivers, streams, bore wells, dug wells; pond and water logging areas constitute the water resources of the entire project stretch. Most of the streams are seasonal and carry water and wastewater during rainy seasons. The ground water table is found at a depth of 5-8 meters below ground level.

Page 94: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 76

Erosion in the riverbanks and both sides of the streams is a common sight. In most of the pond water quality is perceived and opined to be in deteriorated conditions. The reason being uncontrolled use of the pond water i.e. people use the water for taking bath, washing clothes, utensils and mostly for cattle bathing. People opine that during rainy season the pond water quality becomes worse. It has been reported that epidemics spread through these water sources because of unscrupulous use of such resources. To assess the ground & surface water quality of the project area, samples were collected from 19 locations (Surface water – 11 locations & Ground water – 8 locations) and the detailed analysis is presented in Table 38.

Table 38 Surface and Ground Water quality along the road corridor

A. Corridor: Berhampur – Bangi Jn – JK Pur Parameters W1 W2 W3 W4 W5 W6 W7 W8

Physico-chemical parameters: pH 7.01 6.90 8.02 7.65 8.25 8.16 7.85 6.55Electrical Conductivity (mS/cm) 245 256 264 354 510 775 870 752 Hardness (CaCO3) (mg/L) 212 210 208 220 254 450 435 354 Calcium as Ca (mg/L) 36 31 45 58 54 68 70 82 Magnesium as Mg (mg/L) 19 21 22 28 14 25 37 42 Sodium as Na (mg/L) 19 14 28 18 20 47 52 60 Potassium as K (mg/L) 1.25 1.00 1.39 1.48 0.98 3.90 2.05 2.87Total Alkalinity (mg/L) 132 141 135 184 171 356 372 281 Chloride as Cl (mg/L) 70 79 45 85 68 111 148 150 Fluoride as F (mg/L) 1.15 0.55 0.68 1.10 1.38 1.30 1.27 0.95Sulphate as SO4 (mg/L) 7.0 3.0 2.0 2.5 3.6 8.0 11.0 9.1 Phosphate as PO4 (mg/L) 3.50 6.50 4.10 3.75 4.09 3.80 3.45 2.64Nitrate as NO3 (mg/L) 5 5 4 6 8 13 14 9 Iron as Fe (mg/L) 0.20 0.19 0.15 0.16 0.14 0.25 0.15 0.14Total Dissolved Solids (mg/L) 300 200 400 300 300 240 450 430 Total Suspended Solids (mg/L) 39 41 15 18 22 19 21 17

Biological Parameters

E - Coli Present Present Present Present Present - - - Dissolved Oxygen (mg/L) 6.00 5.20 3.90 8.00 6.50 4.20 3.55 4.15Bio-chemical oxygen demand (mg/L) 1.0 1.0 2.0 1.0 2.0 1.5 2.0 2.8

Total Coliforms/(MPN/100ml) 65 74 68 89 90 45 54 55 COD (mg/L) 34 52 38 44 42 62 61 38

Sample No Location

W1 Kudhar River at Chainage 29.500 of SH - 17

W2 Surface Water Body at Chainage 81.500 of SH – 17 (Right Hand Side)

W3 Surface Water Body at Chainage 123.500 of SH – 17

Page 95: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 77

W4 Bansadhara River at Chainage 141.500 of SH – 17

W5 Pond at Chainage 22.500 (Left) of SH – 17

W6 Ground Water Digapahandi Chainage 24.500 of SH – 17

W7 Ground Water at Mohana (Chainage 66.200) of SH – 17

W8 Ground Water at Habitation (Chainage 101.500) of SH – 17

B. Corridor: Chandbali – Bhadrakh – Anandpur Parameters W1 W2 W3 W4 W5 W6

Physico-chemical parameters: pH 8.40 8.36 8.25 7.26 7.80 8.21 Electrical Conductivity (�S/cm) 350 258 1006 880 1085 290 Hardness (CaCO3) (mg/L) 198 155 560 570 580 302 Calcium as Ca (mg/L) 26 34 60 76 85 42 Magnesium as Mg (mg/L) 16 18 29 25 28 34 Sodium as Na (mg/L) 26 18 44 42 48 20 Potassium as K (mg/L) 1.09 1.11 1.75 1.10 1.76 1.14 Total Alkalinity (mg/L) 145 214 198 144 105 139 Chloride as Cl (mg/L) 78 84 57 55 68 61 Fluoride as F (mg/L) 0.36 0.88 0.68 0.71 0.99 0.95 Sulphate as SO4 (mg/L) 6 3.00 4 11 16 2.00 Phosphate as PO4 (mg/L) 2.95 3.24 8.00 4.45 5.56 2.91 Nitrate as NO3 (mg/L) 3 7 8 11 19 6 Iron as Fe (mg/L) 0.22 0.18 0.14 0.11 0.13 0.16 Total Dissolved Solids (mg/L) 200 300 214 209 118 200 Total Suspended Solids (mg/L) 40 25 28 29 32 18

Biological Parameters

E - Coli Present Present - - - Present Dissolved Oxygen (mg/L) 7.10 6.40 4.40 3.12 5.02 7.50 Bio-chemical oxygen demand (mg/L) 1.0 2.0 1.9 2.4 3.2 1.0 Total Coliforms/(MPN/100ml) 45 67 - - - 72 COD (mg/L) 55 54 48 52 61 42

Sample No Location W1 Water Sample of Brahmani River at Chainage 73.000 of SH – 9A W2 Water Sample of Baitarani River at Chainage 87.500 of SH – 9A W3 Ground Water Sample at Chandbali near Chainage 3.00 of SH – 9 W4 Ground Water Sample at Bhadrakh Chainage 2.000 of SH – 53 W5 Ground Water Sample at Anandpur Chainage 44.00 of SH – 53 W6 Pond Water Sample at Chainage 56.900 at Satkosia of SH – 53

Page 96: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 78

C. Corridor: Khariar – Bhawanipatna

Parameters W1 W2 W3 W4 W5

Physico-chemical parameters: pH 7.85 8.10 7.15 7.65 7.10Electrical Conductivity (mS/cm) 378 588 888 456 980Hardness (CaCO3) (mg/L) 228 360 440 215 542Calcium as Ca (mg/L) 32 28 58 40 82 Magnesium as Mg (mg/L) 18 12 28 24 42 Sodium as Na (mg/L) 25 28 45 22 51 Potassium as K (mg/L) 1.40 1.15 2.15 1.08 2.45Total Alkalinity (mg/L) 189 205 265 164 420Chloride as Cl (mg/L) 86 125 165 71 144Fluoride as F (mg/L) 0.69 0.81 0.92 0.41 0.65Sulphate as SO4 (mg/L) 4 3.00 28 8 11 Phosphate as PO4 (mg/L) 6.80 1.80 19.25 5.81 14.40Nitrate as NO3 (mg/L) 6 5 12 4 8 Iron as Fe (mg/L) 0.15 0.25 0.12 0.27 0.20Total Dissolved Solids (mg/L) 400 300 500 400 360Total Suspended Solids (mg/L) 28 42 29 36 29

Biological Parameters

E - Coli Present Present - Present - Dissolved Oxygen (mg/L) 6.80 6.50 7.90 5.70 7.10Bio-chemical oxygen demand (mg/L) 1.0 2.0 3.0 2.0 2.4 Total Coliforms (MPN/100ml) 68 55 - 95 47 COD (mg/L) 49 35 58 61 63

Sample No Location

W1 Tel River Water Sample from Chainage 29.100 of SH-16 W2 Sunder River Water Sample from Chainage 59.00 of SH-16 W3 Ground Water Sample from Khariar Town (Chainage 70.000) of SH-16 W4 Surface Water Sample from Pond (on Right Side) Near Chainage 41.000 of SH-16 W5 Ground Water Sample from Karalapada Village (Chainage 22.800 of SH-16)

Source: Primary survey, 2006

5.20 AIR QUALITY Monitoring of air quality at 13 sample locations revealed that air quality along the project stretch is well within standards fixed by CPCB (Table 39). However, as per the version of the local community, the air quality along the project road is deteriorating rapidly in comparison to past. The reasons for this deterioration can be attributed to heavy traffic, narrow townships, poor road condition and presence of permanent structures in townships that do not allow the emitted pollutants to get dispersed.

Page 97: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 79

Table 39 Ambient Air Quality along the project stretch

A. Corridor: Berhampur – Bangi Jn – JK Pur Parameters Sl

No Monitoring Locations TSPM (µg/m3)

RPM (µg/m3)

Sox (µg/m3)

Nox (µg/m3)

CO (ppm)

1 Berhampur Town (Start of Project Road) 199 83 44 23 1.25

2 Taptapani Chainage 50.00 of SH - 17/ Deer Park Chainage 49.00 for Reserve Forest 128 56 24 13 0.75

3 Adava Chainage 81.500 of SH - 17 198 76 30 16 0.84

4 Kenduguda Chainage 123.500 of SH - 17 165 61 28 15 0.79

5 Raygada Town Near Chainage 18.00 of SH - 4 188 68 46 25 1.31

6 Ghat portion Chainage 39.00 SH - 4 132 55 17 15 0.66

Standards (NAAQS – 11.04.1994 Notification of CPCB) 200 100 80 80 4

B. Corridor: Chandbali – Bhadrakh – Anandpur

Parameters Sl No Monitoring Locations TSPM

(µg/m3) RPM

(µg/m3) Sox

(µg/m3) Nox

(µg/m3) CO

(ppm)

1 Chandbali Chainage 48.00 of SH – 9 208 92 48 26 1.46

2 Bhadrakh Chainage 1.00 of SH – 9 214 98 48 25 1.61

3 Anandpur Chainage 46.0 of SH – 53 199 79 37 15 0.99

Standards (NAAQS – 11.04.1994 Notification of CPCB) 200 100 80 80 4

C. Corridor: Khariar – Bhawanipatna

Parameters Sl No Monitoring Locations TSPM

(µg/m3) RPM

(µg/m3) Sox

(µg/m3) Nox

(µg/m3) CO

(ppm)

1 Khariar Town Chainage 70.000 of SH-16 172 75 35 26 1.21

2 Village Gandharala Chainage 50.000 of SH-16 142 59 26 15 0.75

3 Karalpada Village Chainage 22.800 of SH-16 159 55 14 17 0.64

4 Bhawanipatna Town 188 83 44 29 1.38 Standards (NAAQS – 11.04.1994 Notification of CPCB) 200 100 80 80 4

Source: Primary survey, 2006 5.21 SOIL QUALITY: To assess the soil quality along the Project stretch, attempt was made to collect data on soil quality at 13 sample locations. The analysed data is presented in table 40. As can be seen from the results, the soil along the study area is characterised by a pH value of 6 to 9. Data on

Page 98: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 80

pH value, organic carbon, water holding capacity, porosity and major and minor element content reveals that soils of the project stretch are conducible for growth of different species, which are commonly found in nature.

Table 40 Soil Quality along the project stretch A. Corridor: Berhampur – Bangi Jn – JK Pur Parameters S1 S2 S3 S4 pH 8.14 8.25 7.86 8.11 Electrical Conductivity (mS/cm) 256 189 220 275 Exchangeable Calcium (mg/kg) 1088 1122 1130 1205 Exchangeable Magnesium (mg/kg) 880 1086 1075 975 Exchangeable Sodium (mg/kg) 308 105 285 305 Exchangeable Potassium (mg/kg) 38 44 65 45 Chloride as Cl (mg/kg) 15 19 14 18 Exchangeable Sodium % of soils (%) 0.0265 0.0275 0.0256 0.0425 CEC (meq/100gm) 15 8 12 19 Organic Matter (%) 0.32 0.11 0.36 0.84 Water Holding Capacity (%) 28.70 29.40 31.00 32.50 Total Porosity (%) 0.50 0.51 0.42 0.51 Sulphate as SO4 (mg/kg) 25 11 32 26 Phosphate as P (mg/kg) 2 1 5 4 Manganese as Mn (mg/kg) 0.12 0.10 0.09 0.15 Copper as Cu (mg/kg) 0.55 0.45 0.65 0.85 Zinc as Zn (mg/kg) 0.12 0.10 0.13 0.08 Lead as Pb (ppm) 0.35 0.41 0.51 0.39

S1 Agriculture Field Near Chainage 20.500 of SH - 17 S2 Agriculture Field Near Mohana Town S3 Agriculture Field Near Chainage 85.800 of SH - 17 S4 Agriculture Field Near Chainage 24.00 of SH - 4

B. Corridor: Chandbali – Bhadrakh – Anandpur Parameters S1 S2 S3 S4 S5 pH 6.80 6.90 6.90 8.10 7.90 Electrical Conductivity (mS/cm) 248 192 218 263 285 Exchangeable Calcium (mg/kg) 1090 1114 1121 1245 1045 Exchangeable Magnesium (mg/kg) 878 1045 1061 964 899 Exchangeable Sodium (mg/kg) 310 110 294 306 291 Exchangeable Potassium (mg/kg) 42 41 56 41 44 Chloride as Cl (mg/kg) 14 18 22 11 10 Exchangeable Sodium % of soils (%) 0.0212 0.0.215 0.0198 0.0321 0.0185 CEC (meq/100gm) 15 8 12 19 17 Organic Matter (%) 0.28 0.45 0.18 0.22 0.33

Page 99: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 81

Parameters S1 S2 S3 S4 S5 Water Holding Capacity (%) 31.50 29.80 32.00 30.50 32.00 Total Porosity (%) 0.53 0.57 0.49 0.43 0.56 Sulphate as SO4 (mg/kg) 19 14 24 21 27 Phosphate as P (mg/kg) 3 2 4 5 1 Manganese as Mn (mg/kg) 0.14 0.09 0.11 0.13 0.17 Copper as Cu (mg/kg) 0.49 0.41 0.61 0.74 0.77

Zinc as Zn (mg/kg) 0.13 0.09 0.14 0.07 0.06 Lead as Pb (ppm) 0.39 0.44 0.51 0.38 0.44

S1 Agriculture Field near Chainage 8.00 of SH – 9A S2 Agriculture Field near Chainage 59.00 of SH – 9A S3 Agriculture Field near Chainage 9.00 of SH – 9 S4 Agriculture Field near Chainage 16.00 of SH – 53 S5 Agriculture Field near Chainage 22.00 of SH – 53

C. Corridor: Bhawanipatna – Khariar

Parameters S1 S2 S3 S4

pH 7.06 6.95 7.10 7.55

Electrical Conductivity (mS/cm) 254 201 205 198

Exchangeable Calcium (mg/kg) 1256 1204 1185 1043

Exchangeable Magnesium (mg/kg) 915 845 1024 845

Exchangeable Sodium (mg/kg) 299 105 311 285

Exchangeable Potassium (mg/kg) 38 36 49 32

Chloride as Cl (mg/kg) 13 16 19 17

Exchangeable Sodium % of soils (%) 0.0198 0.0211 0.0185 0.2984

CEC (meq/100gm) 14 12 15 17

Organic Matter (%) 0.32 0.37 0.24 0.18

Water Holding Capacity (%) 30.10 28.50 30.00 29.50

Total Porosity (%) 0.52 0.41 0.41 0.31

Sulphate as SO4 (mg/kg) 16 13 20 19

Phosphate as P (mg/kg) 4 3 5 2

Manganese as Mn (mg/kg) 0.16 0.08 0.09 0.11

Copper as Cu (mg/kg) 0.44 0.37 0.55 0.61

Zinc as Zn (mg/kg) 0.12 0.11 0.13 0.08

Lead as Pb (ppm) 0.41 0.30 0.36 0.40

Page 100: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 82

S1 Agriculture Field Near Chainage 12.000 of SH-16 S2 Agriculture Field Near Chainage 29.00 of SH-16 S3 Agriculture Field Near Chainage 16.000 of SH-6 S4 Agriculture Field Near Chainage 65.000 of SH-16

Source: Primary survey, 2006

5.22 TRAFFIC VOLUME: The growth of motor vehicles in Orissa during 1996-97 to 2004 is given in Table 41. It can be seen that two-wheelers, four wheelers and commercial vehicles has almost doubled in a span of eight years.

Table 41 Growths of Motor Vehicles in Orissa (In Numbers)

Year Two Wheelers Three

Wheelers Cars Buses Commercial

vehicles Others Total 1996-97 562212 6559 59623 10843 78894 8405 726536 1997-98 618419 7736 64570 11523 87000 10286 799534 1998-99 680150 9362 70063 11986 92855 11393 875809 1999-00 764624 11501 77623 12398 99471 12591 978208 2000-01 853084 13876 84274 12731 109367 13558 1086890 2001-02 950401 16539 92256 13126 118843 14565 1205730 2002-03 1070677 19460 101005 13533 130223 15912 1350810 2003-04 1206671 23032 110664 14254 145102 17483 1517206 Source: Statistical Abstract of Orissa-2005 The present traffic volumes in all the five corridors were counted at various places. The details locations are provided in Table 42 and the traffic volume is given in 43 & 44.

Table 42 Locations of Classified Volume Count

Volume Count Station Period Re-counts Name of Road SH/ MDR CS no. Location km 7 days 3 days

Chandbali - Bhadrakh SH-9 VC-3 Barik Chak 5/500 20.12.05 to

27.12.05 22.7.06 to

24.7.06 Bhadrakh - Anandpur SH-53 VC-4 FACOR Factory 4/600 21.12.05 to

28.12.05

SH-17 VC-7 Near Berhampur 0/600 22.12.05 to 29.12.05

SH - 17 VC-8 Digapahandi 22/500 22.12.05 to 29.12.05

SH - 17 VC-9 Near Adva 80/800 22.12.05 to 29.12.05

15.7.06 to 17.7.06

Berhampur - Bangi Jn.

SH-17/4 VC-10 Near Gumuda

(near IB) 141/100 22.12.05 to 29.12.05

Bangi Jn- Rayagada SH - 4 VC-11 Near J. K Pur SQ

on SH4 115/500 22.12.05 to 29.12.05

SH-16 VC-17 Pastipada 18/700 23.12.05 to 30.12.05 Bhawanipatna -

Khariar SH-16 VC-18 Khariar 68/000 23.12.05 to 30.12.05

Page 101: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 83

Table 43 Summary of Annual Average Daily Traffic of fast moving vehicle FAST MOVING VEHICLES

Bus Truck Agri. Tractor

Count Station Details

2 W

3 W

Car

/Jee

p/T

axi

Min

i

Full

LCV

2-A

xle

Mul

ti-A

xle

Art

icul

ated

With

Tra

iler

No

Tra

iler

Total

AADT 2141 143 795 128 71 102 146 2 3 2 10 3543

PCU 1071 143 795 192 213 153 439 7 15 11 15 3054 VC-03

% 60.43 4.04 22.44 3.61 2.00 2.88 4.12 0.06 0.08 0.06 0.28 100

AADT 2219 108 742 80 100 133 621 109 8 18 4 4142

PCU 1110 108 742 121 300 200 1864 328 35 81 6 4895 VC-04

% 53.57 2.61 17.91 1.93 2.41 3.21 14.99 2.63 0.19 0.43 0.10 100

AADT 2685 223 416 132 222 107 179 30 25 113 17 4149

PCU 1343 223 416 199 665 160 538 91 115 509 26 4285 VC-07

% 64.71 5.37 10.03 3.18 5.35 2.58 4.31 0.72 0.60 2.72 0.41 100

AADT 1433 174 289 70 201 54 121 13 2 32 9 2398

PCU 717 174 289 105 603 81 362 40 9 145 15 2540 VC-08

% 59.76 7.26 12.05 2.92 8.38 2.25 5.05 0.54 0.08 1.33 0.38 100

AADT 314 5 193 2 37 23 160 13 0 5 2 754

PCU 157 5 193 3 111 35 479 39 0 25 3 1050 VC-09

% 41.64 0.66 25.60 0.27 4.91 3.05 21.22 1.72 0.00 0.66 0.27 100

AADT 812 26 218 11 81 45 116 18 6 78 14 1425

PCU 406 26 218 17 243 69 348 54 25 353 22 1781 VC-10

% 56.98 1.82 15.30 0.77 5.68 3.16 8.14 1.26 0.42 5.47 0.98 100

AADT 2087 65 934 182 183 352 730 139 15 47 18 4752

PCU 1044 65 934 273 549 528 2190 416 69 212 27 6307 VC-11

% 43.92 1.37 19.65 3.83 3.85 7.41 15.36 2.93 0.32 0.99 0.38 100

AADT 536 3 361 2 22 124 233 73 28 108 43 1533

PCU 268 3 361 4 65 187 699 218 127 485 65 2482 VC-17

% 34.96 0.20 23.55 0.13 1.44 8.09 15.20 4.76 1.83 7.05 2.80 100

AADT 734 5 270 15 24 72 104 19 18 145 26 1432

PCU 367 5 270 23 71 108 311 57 81 654 40 1987 VC-18

% 51.26 0.35 18.85 1.05 1.68 5.03 7.26 1.33 1.26 10.13 1.82 100

AADT 1440 84 469 69 105 112 268 46 12 61 16 2681

PCU 720 84 469 104 313 169 803 139 53 275 24 3153 Overall

% 53.72 3.12 17.48 2.58 3.90 4.19 9.99 1.72 0.44 2.27 0.59 100 Source: Primary survey, 2006

Page 102: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 84

Table 44 Summary of Annual Average Daily Traffic of slow moving vehicles and total summary

Slow moving vehicles Total Summary Human drawn Animal drawn

Cou

nt S

tatio

n

Des

crip

tion

Cyc

le

Ric

k-sh

aw

Bul

lock

C

art

Hor

se

Dra

wn

Tot

al

Mot

oriz

ed

Veh

icle

Tot

al C

omm

. V

ehic

le

Tot

al N

on

Mot

oriz

ed

Veh

icle

Tot

al V

ehic

le

AADT 1952 104 0 0 3543 454 2056 5599 PCU 976 208 0 0 3054 1030 1184 4238 VC-03 % 94.9% 5.1% 0.0% 0.0% AADT 1894 41 4 0 4142 1069 1939 6081 PCU 947 83 30 0 4895 2929 1060 5955 VC-04 % 97.7% 2.1% 0.2% 0.0% AADT 3802 192 9 0 4149 808 4003 8152 PCU 1902 385 75 0 4285 2277 2362 6647 VC-07 % 95.0% 4.8% 0.2% 0.0% AADT 1172 8 10 0 2398 493 1190 3588 PCU 587 17 83 0 2540 1345 687 3227 VC-08 % 98.5% 0.7% 0.8% 0.0% AADT 872 3 0 0 754 240 875 1629 PCU 437 7 0 0 1050 692 444 1494 VC-09 % 99.7% 0.3% 0.0% 0.0% AADT 1039 3 16 0 1425 355 1058 2483 PCU 520 6 128 0 1781 1109 654 2435 VC-10 % 98.2% 0.3% 1.5% 0.0% AADT 988 2 4 0 4752 1648 994 5746 PCU 494 4 30 0 6307 4237 528 6835 VC-11 % 99.4% 0.2% 0.4% 0.0% AADT 715 5 70 0 1533 590 790 2323 PCU 357 9 558 0 2482 1785 924 3406 VC-17 % 90.5% 0.6% 8.9% 0.0% AADT 1129 29 8 0 1432 397 1166 2598 PCU 565 58 68 0 1987 1305 691 2678 VC-18 % 96.8% 2.5% 0.7% 0.0%

Source: Primary survey, 2006

Page 103: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 85

CHAPTER -VI FINDINGS OF COMMUNITY CONSULTATION EXERCISE

The community consultation exercise was carried out in the project stretch during the field surveys conducted for preparation of feasibility report. In this section of the report the findings of the consultation programme will be discussed in detail. 6.1 OBJECTIVES OF COMMUNITY CONSULTATION The basic objectives of community consultations are

♦ To make community aware of the proposed programme of upgrading the State Highways.

♦ To record the opinion of people regarding environment impact of the proposed project and suggested mitigation measures

♦ To ascertain the views and preference of the people adversely affected or benefited by the proposed project.

♦ To incorporate the findings of community consultation in project design Community consultation is a continuous process throughout the project period i.e. during project preparation, implementation, and monitoring stage. Initially, at project planning stage it was carried out when surveys were conducted for preparation of feasibility report in order to ensure that the affected population and other stakeholders are informed, consulted, and allowed to participate actively in the survey process and views of the community have been incorporated in project preparation. While conducting survey for preparation of feasibility report, consultation at individual level, in groups and focused group discussions were conducted at congested locations, intersections in major town, and villages along the project roads. Preferences were given while conducting FGDs towards habitations of vulnerable sections of community like tribal settlements, junctions with major highway. The household data collection was not restricted to a mere question-answer session. All the queries and apprehensions of the people, settled along the project road, who were likely to be impacted, were answered. All possible benefits of the project and the need for expansion were highlighted to the people, which helped in gaining the confidence of the people and facilitating the data collection process. The entire survey process was done in close consultation with the PAPs, Panchayat Representatives, Revenue officials, NGOs and other stakeholders. For this purpose qualitative research techniques were employed which included focus group discussions and in-depth interviews. Different tools such as village profiles, FGD guidelines were used for successful employment of qualitative research techniques Outcome of these consultations like options of alternative alignments, suggestions for the location of underpasses, road safety measures, requirement of community property resources etc. have been incorporated in the design, in order to minimize the resettlement & involve local people in decision making processes.

Page 104: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 86

6.2 Consultation PROCESS

• In the first stage, community consultation was conducted in all the project corridors at sample locations during February-June 2006. Villages that had the maximum number of potential PAPs were chosen for conducting FGDs. A Village Meeting Information Disclosure Guide and a Focus Group Discussion Guide were prepared and followed during the conduct of focus group discussions. The proceedings of the meeting were recorded with an electronic tape recorder and a facilitator took notes of the entire proceedings. Detailed notes were prepared on issues and concerns raised at the meeting.

• In the second stage, preliminary design of the project corridor was shown to the potentially affected community and implications of the project and proposed land acquisition was discussed with an objective of generating responses and opinion, as well as design solutions. This was conducted during July –August 2006.

• The next stage involved contacting local Non Governmental Organizations (NGO). This was undertaken during September 2006.

• The last stage will take place once the designs are finalized. This would demonstrate that the interests of the community and the individual aspirations were accommodated in the final design of the project as far as possible. This last phase also will attempt to create a consensus among the (fully or partially affected) community for the project.

• In District and State level consultations overview of entire OSRP will be presented. The impact of project in broad sense and enhancements measures will be discussed and suggestions will be invited.

• The institutional level consultations will include State Forest Department, OSPCB, Regional Office of MoEF, State Department of Environment, etc.

As mentioned above, four-tier consultation exercise will be carried out for OSRP. These consultations include local levels, district level, state level and institutional level. The local level consultations have been completed and findings have been summarized in paragraphs presented below. The district level consultations will be carried out along with social team. Necessary location specific presentations will be made in these consultations. 6.3 Communication Strategies FOLLOWED FOR COMMUNITY CONSULTATION For this purpose an insitu institutional arrangement was made. Thirty-five local enumerators (having Knowledge of Oriya) were selected to carryout community consultation at field level. Five of them were nominated as community facilitators in which two are female. They interact regularly with local people about the project. They also appraise project related information to the people. Other strategy followed/to be followed for continued communication with the PAPs and their involvement in project related decisions are.

• Local newspaper reporters in the project area are being contacted to inform about the project related information to OWD (PIU) and to PAPs about the project related decisions.

• OWD has their Inspection Bungalows (IBs) at strategic as well as important locations. These IBs acted as an information center for PAPs during the stay of field survey teams.

Page 105: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 87

• Through public meetings/FGDs, attempt was made to ensure that vulnerable groups such as tribal people understand the project and express their needs freely without any fear or shyness.

• OWD is in the process of opening an website to disseminate information about the project and receive suggestions through e mail from different stakeholders including Environment Specialists working in the country and also abroad.

6.4 Findings of community consultation From the community consultation process, it was revealed that many people were very positive about the project. Major perceived benefits as identified by the community during the consultation process were:

♦ Reduced travel time/avoid long distance alternate road

♦ Less operating and maintenance costs of vehicles/avoid frequent breakdown of vehicles on road

♦ Less accidents due to less congestion

♦ Better access to community facilities

♦ Local business would be benefited due to increased road traffic/more tourist flow to temples etc

♦ Increased regional developments in terms of industry, tourism agriculture

♦ Better access to transport and communication facilities

♦ Increased access to health and educational facilities As revealed from group discussions, almost all the participants in the discussions were of the opinion that due to the proposed project the community will be benefited in terms of increased safety due to less accidents, reduced travel time and saving in vehicle operating and maintenance costs. Majorities of the participants were of the opinion that the present road has been encroached at many places and there is no parking place at market and business localities. This causes accidents in most part of the year leading to loss of lives and damage to vehicles mostly from local people. They perceive that after the upgrading and widening of the road these sorts of problems will be minimized to a great extent. Similarly, as revealed from the group discussions majority of the participants indicated that due to widening and upgrading of the roads better transport and communication facilities would be developed. In addition, short distance conveyances will also develop due to the proposed upgrading and rehabilitation programme. It was also revealed during group discussion that, there is every possibility of increase in wage rate due to the construction work of the project. As reported, by majority of the participants that at present they are receiving wages in the range of Rs. 50-60 for eight hours of non-agricultural labour. They hope that after the construction of road starts; the wage rate may increase up to Rs. 120.00 per day, which will help in increasing their daily earning and solving un-employment problem to some extent. The economic opportunities in the study area will also increase due to the proposed project. Better communication facilities will lead to increased regional development in terms of industry, tourism and agriculture. Demand for

Page 106: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 88

agricultural farm produces will increase leading to development of commercial farming in the region. The major perceived losses that are going to be the outcome of the project as visualized by the people and identified during the focused group discussions are:

♦ Loss of agricultural, residential and business properties

♦ Loss of common property resources i.e. tube wells, dug wells, ponds, burial ground, temples, rest sheds etc.

♦ Higher risk for pedestrians

♦ Increase in pollution level, use of alcohol, commercial sex etc. As revealed from the community consultation programme, one of the major losses to the community due to the proposed project is loss of individual owned assets. The primary occupation of majority of rural population is cultivation and agricultural labour. Similarly, most of the settlers in urban areas derive their livelihood from business sector. As opined by majority of the participants their income source will be affected due to acquisition of assets in the proposed project. Further, the loss of common property resources will affect their living condition to some extent. In the study area, the villagers use vacant Govt. lands and gochar lands for grazing purpose of their livestock population. As these lands are going to be affected due to the proposed project, they apprehend problem in feeding their livestock population. Similarly acquisition of ponds/water bodies which serves the purpose of bathing, washing and source of irrigation during dry spells will also affect living status, as revealed by villagers during the survey process. One of the important sources of safe drinking water in rural settlements of the study area is tube wells, which is going to be affected due to the proposed project. The villagers during the discussion process revealed that the acquisition of tube wells would affect their access to safe drinking water. Further the acquisition of temples and religious sites is one of the important losses to the community as perceived by majority of the participants during the survey process. It was also revealed from the group discussion that due to the proposed project, there is every chance of increase in use of alcohol and commercial sex in the region. A rising trend in prostitution is often associated with development of the region. Due to up gradation of the road, vehicular traffic will increase and roadside dhabas and motels will be developed along the road stretch. Further the payment of compensation will made ready money easily available. This will make it difficult for the women in the area to control their spendthrift husbands. The men will spend a large amount of the compensation money and their wages on drinking alcohol. Whenever the women will try to control them, their husbands may assault them. Due to increased expenditure on alcohol, the women may face difficulty in managing the family and feeding the children. Also, in case of displacement of the family, there will be disruption in earning source of women. All these factors will help women in despair, to resort to prostitution to earn their living. Major issues rose at group discussions and in depth interviews: The following are the major issues raised during the Focused Group Discussions and in depth individual interviews.

Page 107: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 89

a) Relocation: As revealed from the survey process, almost all the PAPs with residential structures are willing to relocate voluntarily provided compensation offered is fair and their resettlement and rehabilitation options are taken care of. Majority of the residents prefers to relocate in their existing neighbourhood or within the vicinity of the village they live. All most all the PAPs with residence affected indicate assistance in the form of house construction allowance for their resettlement.

Similarly, data collected from PAPs who are owners of affected commercial structures revealed that they require shop construction allowances for shifting their commercial units.

In the project stretch, majority of the agricultural land to be acquired by the project are either encroached ones (extension of large holdings) or are small in measurement. The quantum of agricultural land to be lost by majority of the PAPs is small in acreage. The data collected on rehabilitation preferences of PAPs with agricultural land affected indicated majority opting for cash compensation.

b) Compensation: During the group discussions the participants desired that the compensation offered should be at the replacement cost and it should be paid in one installment. The compensation usually being paid by the Revenue Department is lower than the market value and in some cases half the market value.

c) Parking places: As revealed from group discussions, the residents of roadside settlements and commercial establishments desire enough room for parking of vehicles along the roadside. They fear that the places, which are being used at present for parking of vehicles, will be converted to black topped road and there will be no space for parking purpose. This will often create a dangerous environment for local commuters and pedestrians.

d) Bus stops and rest sheds: Rest sheds in most of the locations are going to be affected due to the proposed project. Majority of the people in-group discussions in these localities demanded replacement of their rest sheds by the project authorities. Also in other locations, the villagers asked if it would be possible to provide more bus stops, bus lanes and pedestrian islands.

e) Widening of the road and pedestrian safety: Majority of the participants in the group discussions apprehend that the speed of motorized traffic traveling through their village may impact the safety of the children and people living near and those crossing the highways. They desired provision of speed breakers, signal points and other safety precautions in their communities.

f) Relocation of religious structures: Majority of the participants in group discussions conducted in villages where temples are to be affected indicate their willingness to shift the deity to their preferred places with the assistance of project authorities. The community members should be consulted in open meetings by project authorities prior to any such relocation. Further, they demanded development of communication, drinking water, electricity and sanitation facilities in these relocation sites by project authorities.

g) Replacement of trees: The villagers in the group discussions indicate that the trees to be affected due to the project should be replaced prior to their cutting down. They insisted that new plantation sites should be identified along with finalization of design and plantation should start immediately.

Page 108: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 90

h) Diversion of irrigation sources and drainage channels: The villagers in the group discussions also indicate that the existing streams and drainage channels should not be disturbed during construction work. It disturbed, care should be made for construction of siphons to avoid possible drought or water logging of the agricultural land.

Corridor specific findings of Community Consultation: Corridor: Bhadrakh – Chandbali

Road level need to be sufficiently raised as the road is cut off in rainy season every year due to flood

Schools and Colleges are located adjacent to the road corridor, hence adequate measures should be taken for safety of children during construction and operation period

A good number of Ponds are located on road sides, which should be acquired as little as possible

Ponds and water bodies are used for bathing purpose, hence need renovation with provision of bunds, bathing ghats

One important Muslim shrine (Sarkar Nagar) is located close to the road. In this Shrine huge gathering of devotees takes place during festivals. For safety of the devotees alternate route to the shrine need to be developed by Project Authorities. Alternate road is there, only need is widening, black topping etc.

Big Temples decorated with neatly carved sculptures and designs need to be protected by any means

Ready to accept Government rules, policies and development programmes and give land for road construction purpose, but the affected persons should be adequately compensated for loss of assets

Hand pumps, temples and rest houses, if demolished, should be re-constructed Corridor: Bhadrakh – Anandpur

Income will be enhanced through construction of roads in the area Construction should start only after business units are properly rehabilitated and

affected are compensated adequately. Maintenance allowance should be given to the people losing income sources All the affected households should be provided with adequate compensation Demolition of Temples should be avoided as far as possible. In case of demolition,

Project Authorities should take up relocation, development of road, sanitation etc in place of relocation in consultation with the community

Jagannth Temple at Badadanda near Anandpur Bus stand should be affected partially (only gate, wall etc)

A good number of Hanuman idols are there on roadsides, in the entrance to the villages. As a religious belief, the Hanuman God saves the villagers from entry of evil spirits, demons, thieves etc. In case of acquisition, replacement of these idols need to be done by Project Authorities

Road side drains, pedestrian bays, parking places, safety measures need to be included in design

Tube wells and drinking water sources need to be replaced and if required more in numbers than the number affected

Once side trees should be cut and necessary plantation done to reduce noise

Page 109: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 91

Pond near Bonth Girls High School need to be acquired as little as possible and renovated by Project authorities (The pond is used for religious purpose)

Land acquisition should be as little as possible to avoid displacement Majority of the Schools and temples on roadside are without boundary walls.

Boundary wall should be constructed by Project Authorities as safety measure The main traffic in the corridor will be Trucks; hence adequate safety measures need

to be taken. Awareness programme on HIV/AIDS should be conducted in the area. Corridor: Khariar – Bhawanipatna

Business and other income generating opportunities will increase in post project period

Distance to Bhawanipatna and Rayagada will be reduced Local traffic will increase. Presently, because of poor road condition, traffic is

avoiding the route Construction should start only after affected are compensated adequately. People losing business units should be provided with maintenance allowance Demolition of Temples should be avoided to the extent possible Old and matured trees of Kings tenure will be cut down in many locations. Needs to

be replaced with locally grown species, instead of foreign species Ponds on road sides need to be developed with bunds and bathing ghats Kabarstan and Crematorium of Khariar NAC need to be developed as a part of social

responsibility of Project Authorities Pedestrian bays, parking places, safety measures need to be included in design Tube wells and drinking water sources need to be replaced Schools and temples on roadside are without boundary walls. Boundary wall should

be constructed by Project Authorities as safety measure Road level of approach road to Tel river to be raised to avoid flooding during rainy

season Corridor: Berhampur – Bangi Jn.

Land for land rehabilitation package should be followed Road side drains and toilets need to be constructed The present road is up – down even in plain areas, this need to be rectified with

uniform level of the road Malaria is a major problem of the area; hence water logging on roadside either during

construction or operation period should be avoided Open defecation on roadside is a common practice in this corridor (within 0-50 km).

Chances of accident are there due to such a bad practice of the local community. To avoid this community toilets needs to be constructed and awareness campaign to be conducted for use of the toilet instead of road side defecation

All affected waiting rooms at bus stops need to be replaced CPRs like temples, ponds not affected during construction need to be provided with

approach roads Compensation should be calculated on the basis of present market value, instead of

the present practice of averaging three years land sale value in Sub – Registrar office Over bridge should be constructed to enable children to cross roads Need for over bridges/tunnels to carry bullock & plough to fields on opposite side of

the road

Page 110: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 92

Corridor: Bangi Jn. – JK Pur

Labour opportunities to local youths in construction work of the road Adequate compensation and rehabilitation measures for land and asset losers of road Improvement of Meenajhola Market yard Provisions should be made for tube wells (for water supply) in village Provisions should be made for public toilets in the village Environmental hazards, due to the construction of roads, will increase manifold

Table 45. List of villages/habitations where community consultation was conducted

Bhadrakh-Chandbali

Bhadrakh-Anandpur

Bhawanipatna-Khariar

Berhampur-Bangi Jn.

Bangi Jn.-JK Pur

Chandbali Chhayalsingh Karlaguda Kanteikoli Ramanaguda Kuansar Gurijang Garianala Birikote Mukundpur Panchapada Chordharia Pastipada Gokarnapur Kolnara Matto Fakirpur Rishigaon Adava Tihidi Mareigaon Tukula Kenduguda Arjunbindha Basantia Chandtara Gumuda Dolasahi Bontha Kamthana Narayanapur

Tillo Khariar Podamari Barpada Lanjiya

1st gate Berhampur Digapahandi

Total 7 locations

Total 9 locations Total 8 locations

Total 12 locations

Total 3 locations

Page 111: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 93

CHAPTER VII POTENTIAL ENVIRONMENTAL IMPACTS

7.1 TYPE OF IMPACTS Roads are the lifelines of economy of any area through which it passes. Better road connectivity develops socio-economic conditions and improves quality of life of the people living in the area. Good communication and transport network opens up the economy for better utilization of its potential resources, facilitates and induces growth of all sectors - agriculture and allied activities, industry, mining, tourism etc. The road corridors selected under Phase I: Year I of OSRP traverse through 8 districts. Each road corridor has its influence area, either a single or a group of districts. The upgrading of roads has a direct bearing on the socio-economic profile of the districts and the immediate neighborhood. The spread effect also extends to other close by districts and over to the districts of the neighboring states. The influence of the project roads thus widens. Because of symbiotic relationship between the environment and development, in any road development project both positive and negative and reversible and irreversible impacts are observed. Based on the scooping of the areas and the activities/work being proposed under the project the following key issues need to be considered while analyzing the impacts of any road development project

• Preservation of aesthetic and landscape of the project impacted area • Noise and air quality • Tree removal and tree plantation • Sanitation and waste disposal • Road safety • Protection of flora and fauna

It is already discussed in the preceding chapters that the present study is limited to five corridors which will be developed under Year I: Phase I of OSRP. The details of the existing biophysical, socio cultural environment of the area surrounding the five corridors are discussed in chapter V of this report. This section of the report provides an assessment of the potential environmental impacts that are likely to occur due to the expansion of the road. The majority of the impacts that are assessed will be mitigated through appropriate mitigation measures. In the below mentioned paragraph, a detailed discussion has been made on impact due to proposed widening of roads on different components of environment. The impacts are assessed using combination of both qualitative/quantitative techniques. As the project is yet to be operational, the identified impacts may be better termed as potential impacts. The proposed Road development project can have impacts in four specific situations as follows:

• Impacts of location • Impacts of project design • Impacts during construction, and • Impacts when the road become operational

Page 112: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 94

7.2 IMPACTS OF LOCATION The five studied road corridors exists since generations and are serving the people of the area for more than half of a century period. Under the proposed project, the existing road corridor will be improved with little land acquisition for widening of RoW width and geometric corrections. No significant change will be there with regard to location of the road. Hence, no specific impacts from the location aspect of the project. 7.3 IMPACTS OF PROJECT DESIGN There is no impact on environment of the Project area due to design of the Project. During the conduct of field surveys and other activities no harm to the local environment was caused. Soil sample and water samples were collected only from sample locations adopting scientific procedures. The High Volume Respirable Dust Sampler was installed only at sample locations to collect data on air quality. Similarly noise meter was used to record data on noise quality. Hence, there is absolutely no impact of project design activities on environment surrounding the road corridors. 7.4 Impacts during Construction During construction of road, several types of impacts may be caused on existing environment of the Project area. Majority of such impact is primarily due to negligent practices of project implementing authorities or agencies and can be easily avoided or mitigated if adequate mitigation/avoidance measures are taken. During construction of road corridor under OSRP, it is expected that the following environment components will be affected.

A. Impact on land use pattern due to land acquisition B. Impact due to quarrying of construction materials C. Impact on Common Property Resources D. Impact on water resources E. Noise Level F. Air Quality G. Biological Environment H. Sanitation, Waste disposal and other impacts I. Impact on Human Use Values J. Impact due to water logging, submergence and soil erosion

A. Impact on land use pattern due to land acquisition Widening of the road corridor will require additional land beyond the land already possessed by OWD. This will result in diversion of land from current use. Since the project is for rehabilitation and upgradation of existing roads only, requirement of additional land is approx. 181 hectares. Land requirement for different purposes, is given in Table 46. Out of these 112 hectares is required for alignment and bypasses confined to non-habitat areas.

Page 113: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 95

Table 46: Land Requirement for different purposes (In Ha) for widening of Phase I: Year I roads

Details Area of LA (ha)

Total Length (km) 365.781 km

Land required for Bypass/Alignment/widening 111.00

Curve Junction Improvements 47.70

Way side amenities 22.30

Total 181.00

NB: Actual requirement may slightly vary depending upon finalization of alignments.

Overall land requirement is very less compared to value and size of OSRP and is not expected to have any significant environmental impacts. About 181 ha of land are required for upgrading/widening of 364.781 kms of road corridor. The average figure is only 4.96 sq meter per kilometer of project road. Out of the total land requirement, 72% constitute agricultural land. About 16 ha of forestland are to be acquired. This will change the land use pattern along the sides of road corridor to some extent. But unlike National Highway Projects and other road projects, impact of land acquisition in OSRP will have very marginal impact on land use pattern of project area. B. Impact due to quarrying of construction materials Material source is important as widening and strengthening will require huge quantity of stone aggregates, sand, moorum, granular sub grade materials from existing or new quarries. Similarly sand from the riverbed and earth from barren non-agricultural and non-forestland will be procured close to project road. All these sourcing will adversely impact the environment. The detail list of quarry sites along with lead charts are given in Annexure – III A - E. Location of quarries with reference to the chainage on each corridor is provided in the lead charts annexed. Transportation and loading and unloading of these materials will have significant impact on local environment. The impacts due to transportation and handling of bitumen are also there. But these impacts due to natural material consumptions are limited to construction phase only. The suggested specifications for the different formations of the roads under upgrading appear reasonable. Nevertheless, the thickness of the different components of the road-formation would under go modifications in tune with the bearing strengths of the available materials. Since the nature of available materials would vary between regions, the total thickness of the formations is likely to vary between the locations of the project roads. Total requirement of various materials, for construction of the project roads is estimated and presented in table 47.

Page 114: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 96

Table 47 Requirement of construction material for Phase I: Year I roads

Type of construction material Unit Quantity

Earth Work M3 6240797

Sand/Crusher dust tons 914655

Coarse aggregate tons 3449544

Emulsion tons 2147

Water Kiloliter 373491

Filler Material tons 12834

Cement tons 58310

Bitumen tons 31387

Soil with gravel (moorum) occurs extensively over nearly all parts of project routes within reasonable lead. Borrow pits/quarries are generally located along the road corridors. But after lifting of materials, if Borrow and Quarry area management plan is not implemented then water will accumulate in these pits during the rainy season, which in turn can act as disease vectors. Considering the pressure on the haul roads and burrow areas, mitigation measures need to be suggested.

Table 48 Numbers of Quarries along Project Routes

Name of Corridor Number of Quarries Identified

Range of Haul Road

(km)

Chandbali - Bhadrakh 04 0.20-1.5

Bhadrakh – Anandpur 09 1.0-8.0

Khariar - Bhawanipatna 23 0.020-8.0

Berhampur –Bangi Jn. – JK Pur 50 0.10-9.0

Total 86 - C. Impact on Common Property Resources & Public Utilities: Due to widening of the Project road, various public utilities and common property resources located on sides of the road will be acquired. A list of public utilities to be acquired for construction of road is presented below.

Page 115: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 97

Regional Utilities Local Utilities

• Optical Fiber Cable Posts

• Telephone Box

• Telephone Poles

• Power Lines

• Power Transformers

• Electric Poles

• Lamp Posts

• Water pipe Lines

• Water Taps

• Open Wells

• Tube Wells

• Pump Houses

These utilities are to be shifted at alternative locations before start of construction to avoid disruption of regional services. These will need new relocations/reconstruction at new places, or else will significantly affect the users of the assets. The requirement of land for wayside amenities and utility shifting is 22.3 hectares. OWD is responsible, to make the land available for construction, free of all encumbrances.

In addition to public utilities, other Common Property Resources and community assets like, schools, colleges, temples etc located within the ROW. The detailed corridor wise lists of common property resources are provided in Annexure II A - E. A consolidated list of CPRs located on sides of Project road within 20-30 meter distance is presented in Table 49. Attempt has been made during finalization of design to acquire minimum numbers of CPRs, mostly located within a distance 12 meters from either side of the center line of the existing black topped road. Majority of such potentially affected CPRs include drinking water sources like tube wells, open wells, taps, small temples, mandaps, giant trees with mandaps and waiting rooms at bus stops. In all the corridors, in case of school, hostel, ashram, church, hospital, ANM center, Anganwadi, colleges’ only boundary walls and gates will be acquired. Only in Bhawanipatna – Khariar corridor, Chheliapada UP School at chainage 69.540 km, the school building will be partially affected. The building of this school is located very close to the road corridor. In Khariar – Bhawanipatna corridor, it was observed that small bathrooms have been constructed by World Vision adjacent to the tube wells on roadsides. In fact women members of the locality took bath on roadsides near to tube wells. To avoid obscenity, these bathrooms were constructed. Due to the Project, three of such structures will be acquired.

Page 116: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 98

Community bathrooms constructed by World Vision near roadside tube wells

(Bhawanipatna – Khariar Corridor)

Temple at 47.880 km in Bhadrakh-Chandbali corridor

In Bhadrakh – Chandbali corridor, big temples decorated with neatly carved sculptures and designs are there on both the sides of road. These temples need to be saved through change in designs. One important Muslim shrine (Sarkar Nagar) is located close to the Bhadrakh – Chandbali road. In this Shrine huge gathering of devotees takes place during festivals. There will be

Page 117: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 99

significant impact on safety of devotees due to plying of construction equipment, loaded trucks etc. For safety of the devotees alternate route to the shrine need to be developed by Project Authorities. Alternate road is there, only need is widening, black topping etc. Similarly, 144 schools and colleges are located adjacent to the road in all the five corridors. Adequate measures should be taken for safety of children during construction and operation period

In Bangi Jn – JK Pur corridor, one market place located at Meenajhola will be partly acquired for the project. Though sufficient space will be there for market after acquisition, the place needs to be developed for convenience of market goers and traders.

In Bhadrakh – Anandpur and Bhadrakh – Chandbali corridor, a good number of Hanuman idols are there on roadsides, in the entrance to the villages. As a religious belief, the Hanuman God saves the villagers from entry of evil spirits, demons, thieves etc. In case of acquisition, replacement of these idols needs to be done by Project Authorities.

In Bhadrakh – Anandpur corridor, one Pond near Bonth Girls High School will be acquired partially. Discussion with the local community revealed that, the pond is used for religious purpose. The local deity goes on a boat ride in the pond once in a year and huge gathering takes place on this occasion. The villagers during community consultation demanded that the pond should be acquired as little as possible, but rest of the portions should be renovated and developed Project authorities.

Similarly, in Berhampur – Bangi Jn., one of the important tourist places of south Orissa i.e. Taptapani temple and hot water spring is located. The boundary wall and gate of this temple will be acquired for the project.

Burial grounds and crematoriums are important Common Property Resources and acquisition of these will have significant impact on the community. In Berhampur – Bangi Jn corridor one developed crematorium of village Ambagadia of Dakhinpur Gram Panchayat (chainage 2.208 km) will be acquired. Similarly, in Bhawanipatna – Khariar corridor, burial ground of Ranipur village at chainage 67.600 km will be acquired. In the same corridor at chainage 69.350 km one Kabarstan and at 68.700 km Crematorium of Khariar NAC is located. These two CPRs will not be acquired, but located very close to the road corridor.

Page 118: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 100

Crematorium of Ambagada village at 2.208 km of Berhampur – Bangi Jn. corridor

Even though the acquisition of CPRs under OSRP is very less as compared to other road projects, these are to be replaced in totality by Project Authorities. Otherwise this will have a significant impact on living pattern of community residing in the project area.

Table 49 Corrider wise numbers of potentially affected Common Property Resources Corridor: Bhadrakh – Chandbali

Type of CPRs Not Affected Partially Affected Fully Affected Total Open Well 0 0 3 3 Drinking water tap 1 0 12 13 Tube well 10 0 29 39 Pond 13 14 5 32 Water bodies 3 14 0 17 Community toilet/bathrooms 1 0 1 2 Giant tree & Mandap 0 0 14 14 Mandap 1 0 13 14 Temple/Hindu Shrine/Satsang Vihar 13 7 28 48 Muslim Shrine/Masjid 2 0 1 3 School 12 17 0 29 College 2 1 0 3 Hospital 3 1 0 4 Waiting room at Bus stops 4 0 13 17 Statues 1 0 5 6 Community Hall 1 0 0 1 Youth Club 2 0 1 3 Play Ground 2 5 0 7 Total 71 59 125 255

Page 119: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 101

Corridor: Bhadrakh – Anandpur

Type of CPRs Not Affected Partially Affected Fully Affected Total Open Well 3 0 3 6 Drinking water tap 2 0 24 26 Tube well 18 0 34 52 Pond 14 13 3 30 Water bodies 0 1 0 1 Giant tree & Mandap 1 0 9 10 Mandap 7 0 6 13 Temple/Hindu Shrine/Satsang Vihar 10 1 17 28 Ashram/Math 1 0 0 1 School 12 15 0 27 School Hostel 1 0 0 1 College 1 3 0 4 Hospital 0 3 0 3 Waiting room at Bus stops 3 0 14 17 Statues 5 0 3 8 Stadium 1 0 0 1 Total 79 36 113 228 Corridor: Bhawanipatna – Khariar

Type of CPRs Not Affected Partially Affected Fully Affected Total Open Well 24 0 4 28 Drinking water tap 5 0 12 17 Tube well 17 0 54 71 Pond 26 7 1 34 Water bodies 0 3 0 3 Community toilet/bathrooms 0 0 3 3 Giant tree & Mandap 0 0 4 4 Mandap 3 0 5 8 Temple/Hindu Shrine/Satsang Vihar 7 2 3 12 Ashram/Math 1 0 0 1 School 14 8 0 22 College 2 0 0 2 ANM Center 3 1 0 4 Hospital 3 1 0 4 Waiting room at Bus stops 5 0 14 19 Youth Club/SHG 0 0 3 3 Play Ground of schools 0 2 0 2 Crematorium/Kabarstan/Burial Ground 2 0 1 3 Total 112 24 104 240

Page 120: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 102

Corridor: Berhampur – Bangi Jn. Type of CPRs Not Affected Partially Affected Fully Affected Total

Open Well 58 0 32 90 Drinking water tap 11 0 42 53 Tube well 45 0 131 176 Pond 20 26 2 48 Water bodies 8 8 3 19 Check Dams (WHS) 0 0 1 1 Community toilet 1 0 3 4 Giant tree & Mandap 2 0 11 13 Mandap 10 0 24 34 Temple 11 11 21 43 Ashram 1 1 0 2 Church 5 3 0 8 Library 2 0 0 2 School 26 18 0 44 School Hostel 0 2 0 2 College 2 0 0 2 Anganwadi 0 1 0 1 ANM Center 0 2 0 2 Hospital 5 2 0 7 Waiting room at Bus stops 15 0 65 80 Statues 1 0 2 3 Community Hall 1 0 1 2 Youth Club 1 0 0 1 Market Yard 0 1 0 1 Crematorium/Burial Ground 0 0 2 2 Total 226 75 339 640 Corridor: Bangi Jn. – JK Pur Type of CPRs Not Affected Partially Affected Fully Affected Total Open Well 1 0 4 5 Drinking water tap 0 0 12 12 Tube well 1 0 16 17 Pond 0 1 0 1 Water bodies 0 2 0 2 Community toilet/bathrooms 0 0 2 2 Giant tree & Mandap 0 0 6 6 Mandap 1 0 0 1 Temple 4 0 5 9 School 4 4 0 8 College 1 0 0 1 Hospital 1 1 0 2 Waiting room at Bus stops 4 0 10 14 Market Yard 1 2 0 3 Total 16 9 57 82 NB: Partially affected structures under temple, school, hostels, ashram, church, hospital, ANM center, Anganwadi, colleges category are boundary walls and gates

Page 121: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 103

D. Impact on water resources Impacts of road construction will have significant impact on the surface water. However the impact on the ground water resources will be minimum. The impacts include:

• Loss of water bodies, drinking water sources • Siltation due to earth moving activities; • Erosion of soil into the water bodies due to removal of trees and vegetation; • Contamination by fuel and lubricants by spills from machineries; • Contamination may also occur due to improper sanitation and disposal of wastes at

the construction camps; • Leachates from the solid waste may have a wider impact on the ground water;

Due to the widening of the road, a good number of water sources like tube wells, open wells, tank/ponds and other water bodies will be affected. A detailed account of these is presented in table 30 of Chapter VI. The local community is totally dependent on tube well and open well for drinking water purpose. Similarly, the ponds are used for bathing and cattle rearing purpose. During dry spells, pond and water bodies of the project area act as a source of irrigation to save the crop. In Berhampur – Bangi corridor, one check dam (Water Harvesting Structure) used for irrigation purpose will be acquired at chainage 88.500 km. During construction of road, due to earthwork, siltation to nearby water bodies may occur. Similarly, erosion of soil into the water bodies may occur due to removal of trees and vegetation. This will be severe in sloping lands and places where road level is raised high. Though this sort of impact will be very less during construction period, attempt is to be taken by field engineers to prevent such impact. The slopes during construction of road need to be adequately protected with different protection measures. Drainage and water logging is another issue on project roads during the construction period, because the road embankment, diversions, excavation of the pavement, stock piling of construction materials, release of the sewage and waste water from habitations impacted by the displacement and demolition will result in the blockade and stagnation of drainage system. Roads can act as dams, impeding free run off along the sloping terrain. It would be necessary to place adequate number of culverts with carefully designed capacities to avoid adverse impacts on water resources. It is also necessary to note that accumulation water on side of the road damages the road structures. All cross drainage structures and roadside drains should have adequate capacity to discharge the run off from probable highest rainfall in 24 hours.

To prevent accumulation of water by the road side, adequate cross drainage (CD) structures in the form of culverts with adequate discharge capacity need to be constructed. During reconstruction of old cross drainage structures and construction of new ones, diversion is required to aid uninterrupted movement of traffic. Material will not be put in the drainage to avoid blockage and prevent the erosion. This will help in protecting the aquatic ecology. No permanent impact is anticipated on water quality due to the project. Construction activities may temporarily deteriorate surface water quality in terms of increased turbidity and as well as oil and grease. The mitigation measures include proper disposal of water and

Page 122: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 104

other liquid wastes arising from construction. Stream courses and drains will be kept free from dumping of solid wastes and earth material. The water bodies and surface water sources like, canals, nala, springs, ponds, help in balancing the ecosystem. Many of the systems might be more important for the users for their consumption as potable drinking water and bathing sources. The location of camps of construction workers near water bodies affects water sources. E. Impact on Noise levels The impacts of noise level during the construction phase relates to the features like:

• Noise produced during crushing and manufacturing of asphalt; • Noise at borrow and quarry sites during loading of construction materials • Movement of heavy vehicles during the construction period for procurement of

construction material also produce a large amount of noise; • Generation of noise during site preparation, surface preparation and asphalting.

The impacts of noise on environment during pre construction and construction is due to construction vehicle movements, construction machinery operation, running of DG sets at site, etc. Temporary impacts in the immediate vicinity of the project may occur due to construction. The magnitude of impact will depend upon the specific types of equipment used and on the construction methods employed. Care should be taken to reduce such impacts.

Exposure to high decibels of noise levels affects more to the expectant mothers, infants, patients etc. This can lead to health hazards of people/animals close to the corridor. The National Ambient Noise standards for industrial, commercial, residential and silent zone have been prescribed by the CPCB. Effective step need to be taken to minimize the temporary generation of noise from afore mentioned sources for avoiding stress and health hazard as well as impact on wild life.

The construction equipment with high noise levels, loading and transportation of material near the borrow areas will also affect the construction personnel and other humans in the area. The sensitive receptors to noise are “Hospitals, ANM Centers and Anganwadi, Schools, Hostels and Colleges (at 179 locations in all the five corridors)”. The chainage points of these sensitive locations have been indicated in the list of common property resources annexed in the report (Annexure II A – E). F. IMPACT ON AIR QUALITY: The air quality along the project road stretch will have some impact during the construction period. During the construction period of the road stretch the impacts that are associated with the air quality are:

• Generation of dust due to procurement of construction materials from the quarries and burrow sites;

Page 123: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 105

• Generation of pollutants and dusts due to operation of heavy vehicles and movement of machineries and equipment for material handling, earth moving, laying of sands, metal, stones, asphalt etc.

• Generation of toxic exhaust gases as a result of asphalt manufacturing and hot mix plants is a matter of serious concern.

• Loading/uploading of construction materials and their transportation, particularly through the unpaved or unmetalled sections of the road may lead to a rise in the ambient SPM and RPM levels. Material handling, spillage may occur during the transportation of construction materials

G. Impact on Biological Environment As discussed earlier in section 5.13, a total number of 25989 trees (Table 27) of different species will be cut for widening of the project road. Attempt has been made to save majority of the trees and green tunnels during finalization of design. The important species in these avenue plantations include Anogeissus latifolia, Azadirachta indica (Neem), Buchanania lanjan (Chiranji), Butea monosperma (Palas), Careya arborea, Cassia fistula, Dalbergia Latifolia (Sishu), Diospyros melanoxylon (Kendu), Madhuca Indica (Mohua), Phyllanthus emblica (Amli), Scleichera oleosa (Kusum), Samecarpus anacardium (Bhalia), Semaruba glauca, Shorea robusta (Sal), Syzygium Cummini (Jamum), Tectona grandis, Terminalia arjuna (Arjun), Terminalia belerica (Bahera), Terminalia chebula, Wrightia arborea, Zizyphus Oenoplia. A detailed discussion about these tree cutting has been made in “Biodiversity Assessment and Management Plan” prepared separately for OSRP. One of the interesting finding of the discussion with local community in Khariar-Bhawanipatna corridor is that, local people store paddy straw for future uses like feeding of cattle etc on the branches of the trees. This has two advantages; one is avoidance of damage by termites and another damage by stray cattle. The villagers during discussion expressed that cutting down of trees will affect this safe storing practices of surplus paddy straw.

Page 124: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 106

Storage of Paddy straw on branches of trees (Bhawanipatna-Khariar)

Storage of Paddy straw on branches of trees (Bhawanipatna-Khariar)

In addition to tree cutting there will be temporary impact on local flora during construction stage. Transportation of construction material in haul roads in uncovered manner may lead to dust pollution and affecting flora on the roadsides.

Page 125: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 107

This impact is purely temporary in nature and can be avoided if the loaded tucks are covered with tarpaulins etc. Likewise pollution of water bodies on roadsides due to contamination by fuel and lubricants by spills from machineries and also due to improper sanitation and disposal of wastes at the construction camps may affect aquatic fauna of the project area. This needs to be taken care during preparation of EMAP.

Increasing sediment load to the recipient water bodies i.e. ponds and rivers will restrict the penetration of solar energy in the water body. This will affect photosynthesis of the aquatic flora, which in turn will have adverse impacts on the aquatic fauna. Since, most of the water bodies remain dry during the non-monsoon months, this impact will be negligible. Similarly, survey on wildlife, biodiversity and available plantation in and around PIA has been conducted. Data on wildlife crossings, biodiversity, flora and fauna collected and impacts due to implementation of proposed Orissa State road Projects assessed. The “Biodiversity Assessment and Management Plan” covers all these issues in detail. However, a summary of the potential impacts of the project on wildlife and perceived threats to biodiversity of the PIA is presented in below mentioned paragraphs. Potential Impacts on Wildlife: Due to the construction work roadside trees will be removed along with camouflage cover of bushes and grasses; beds of nalas, canals, streams, rivers will be digged and lot of earths will either be put in or digged out. All this will disturb the natural landscape and create hindrance for movement of wild animals.

The casting job of culvert and bridge slabs, road compacting and laying of grades, WBM layers and asphalt layers, movement of heavy machineries and work force etc. will affect the tranquility of the wild habitat more than enough. This may prompt the animals; birds, amphibians and reptiles to run away into the interiors of the forest, or get killed or injured while in distress to cross the road.

During maximum stress period for the wild life in search of food and water i.e. in winter and summer the road will become a formidable barrier agog with construction activity or movement during day and night. The animals will suffer most at least for a period of 3 to 4 years because of such activity. The existing scenario or environment may not return in post construction period due to crash barriers, other obstructions and transformation of the landscape, which will puzzle the wildlife for venturing on to the road. The increased traffic and speed shall also create problem for wild animals.

The operation of quarry and crusher units and haulage of quarry materials shall have negative impact on movement of wild fauna within and away from the road corridors.

Among the wild animals in Orissa, elephants do move over long distances for foraging, as their food requirement is very high and with the depletion of forests, vegetation and fragmentation of their habitat they have to cover long distance to meet their food requirement. Hence they migrate crossing roads, rivers, hillocks and cultivated land. They tend to create havoc if their corridor is obstructed. The proposed road development may isolate small herds, thereby causing inbreeding with ultimate result of decimation of the population. Hence even after improvement of road corridors the movement of these large mammals should not be obstructed across the road.

Page 126: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 108

Table 50 Evaluation of threat perception on biodiversity along road corridors

Wild flora likely to be affected

Wild fauna likely to be affected

Threat perceptions

Berhampur – Bangi Jn. Link Bangi Jn. to Raygada Avenue plants, Green tunnels of many established trees, micro habitats developed over years containing conglomeration of several plants of medicinal value and ecological importance. Loss of landmark trees and vegetation.

The aviary, rodents and amphibian fauna, reptiles dwelling on the avenues and along the avenues. The micro habitats developed over years, corridors of wildlife movement in search of food and water getting fragmented and disrupted putting old, young, pregnant and infant wildlife at risk of pursuers and predators, blockade of elephant, bear, ungulates path as camouflage disappears along the road wildlife is precariously prevented from moving and grazing in the vicinity.

Loss of forests in RF & PF, within impact zone of 10 km. loss of breeding, nesting, perching and scavenging habitat loss of biodiversity in mini and micro climax zones along the corridor leading to destruction of several organisms and plants beneficial for agriculture and environment as they were the hosts to beneficial insects, rodents, birds, amphibians, reptiles. Fragmentation of habitat leading to starvation or falling an easy pray to carnivore or human beings, serious pollution, soil erosion, alteration in the physical features of the habitat puzzling the wildlife. Plants at the risk of adaptation rise in weed growth of toxic types and rise in temperature affecting procreation. Bears, elephants, snakes, frogs and birds are to be worst hit. Soil erosion, land slides, silting up of the water bodies, pollution of aquifers.

Chandbali – Bhadrakh Avenue trees, aquatic plants and medicinal herbs, micro habitat of several conglomerate of interdependent plants, fruit bearing and land mark trees, green tunnels will be lost. Heritage trees more than 100 year old shall be lost.

Intertidal wetland and breeding area of aquatic life and associate fauna will be seriously at risk. The aviary and aquatic fish and amphibian will be deprived of their source of sustenance and destroyed.

Total loss of marine/ estuarine fish and shrimp production as aquatic life forms breeding and nesting habitat will be lost. The aquatic plants and insects breeding on these will be threatened to extinction; the estuarine habitat of Bhitarkanika WLS will be upset due to decrease in population of various fish, crab, shrimp mollusks on account of effluents and soil erosion. There will be silting up and flooding, loss of agricultural production and fish catch. Traditional occupation of local inhabitants will be seriously affected. Many endangered turtles, fish, Shrimp, crabs, mollusks, beetles, and birds, will perish never to be seen again in the area. Rise in summer temperature. Loss of cyclone preventing shelter belt

Bhadrakh – Anandpur (Up to Bypass) Avenue trees, green tunnels, landmark trees, fruit bearing trees micro climax conglomeration of medicinal, aromatic and geoclimetic plants colony will be lost.

The aviary, the amphibian and reptilian flora, the aquatic fish, crustacean, beetles will perish or affected locally and down stream. The food chain will be seriously threatened.

Increase in summer temperature, loss of food source for aviary. Nesting, resting and perches will be lost. The wetland life down below the chain will be at risk of depletion. Comes within the impact zone of Hadagarh WL 3 to 7 kms, soil erosion plugging of drainage channels during and after road improvement causing drainage problem, loss of cyclone shelter belt.

Bhawanipatna – Khariar The loss of avenue and green tunnels for the ROW will lead to loss of trees and damage to the micro climax vegetation along the corridor. Many

There are no forests worth the name along the corridor. The loss of avenue trees will disadvantage the aviary and rodents due to loss

There are no RF/PF or P.A. Aviary, rodent and amphibian species will be at risk of starvation stress and devoid of nesting and breeding area. The ground moving species will be killed and exposed by road expansion and destructions of habitat. The complex ecological balance of the

Page 127: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 109

Wild flora likely to be affected

Wild fauna likely to be affected

Threat perceptions

medicinal, aromatic and beneficial plants will be destroyed; land mark giant trees will be sacrificed. Food chain will be lost.

of nesting perching and foraging facility. The micro fauna residing along the road within the micro climax vegetation will be lost. Wildlife will be devoid of camouflage cover to some extent as land is mostly avoid of natural forests either side like hayena, jackal, mongoose, birds, rodents, amhibians, reptiles will be more stressed.

area will be lost as all most all bridges and culverts except the Tel and sunder river bridge all others will be either demolished or rehabilitated afresh along with digging out the road base at many places for new formation heritage and giant trees will be removed from the corridor.

H. Impact on Sanitation, Waste disposal and other impacts Sewage and domestic solid waste is generated at the construction workers colony. Improper management of these solid wastes may lead to health and hygiene related problems. During the construction period the dust released around the construction sites may lead to a number of respiratory and skin diseases. Excessive production of noise during construction may lead to psychological problems among the residents living in the nearby areas if exposed for a very long period. The disposal of solid wastes along the road side and water bodies would lead to a number of endemic diseases like typhoid, cholera, dysentery, gastroenteritis etc. in the nearby localities. The tar-coated drums should be properly stored in the site area and can be used for demarcating the diversions during construction phase with proper fluorescent markers. The drums can be used for storing water for construction purposes. Under no circumstances uncleaned drums should be used for storing drinking water. Another short-term impact associated with this project during the construction phase will be traffic diversion and management. Suitable traffic management system needs to be devised and finalized with the concurrence of the Police Department. Assistance of the local Police would be necessary to regulate traffic. It has been observed in many development projects that after construction work is over the labourers developed squatter colonies by encroaching government land or community used land and permanently resides in the area. This bears a serious impact as they share natural resources with local community for fuel wood, fodder, water etc. Hence, it is necessary to ensure that the persons after completion of construction works return back to their homes and do not set up squatter colonies. These impacts are short-term impacts and may happen only during the construction phase with very less to marginal magnitude and can be mitigated by following good construction camp practices.

Page 128: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 110

I. Impact on Human Use Values

(a) Socio-economics, Land Acquisition and Resettlements Impacts and mitigation measures associated with social environment in the Project Influence Area (PIA), land acquisition and resettlement of Project-Affected Persons (PAP) have been dealt in Social Impact Assessment report prepared separately for OSRP.

(b) Accident, Health and Safety Construction activities will cause hindrance to the existing traffic flow. Thus, short-term impact in terms of accident is anticipated during construction phase of the widening project.

(c) Aesthetic and Landscape The proposed widening of the existing single lane road will require partial removal of roadside plantation, which will deteriorate the corridor’s aesthetic values temporarily. But the proposed plantation all along in long run will improve the aesthetic and landscaping of the corridor. Disfiguration of the landscape is also anticipated due to opening of borrow pits and can be mitigated through appropriate management practices. J. Impact due to water logging, submergence and soil erosion Locations prone to flooding and submergence in the road corridor have been identified on the basis of local consultations, discussion with local units of OWD. Rivers close to project route drain the project influence area. Slope of project influence area is towards the near by river.

Table 51: Locations Prone to Flooding and Submergence

Corridor Locations Prone to Flooding and Submergence Chandbali – Bhadrakh Km 15.300 to 18.500, 18.700 to 23.500 Bhadrakh-Anandpur Km 50 to 51, 56 to 57, 57.200 to 58 Bhawanipatna - Khariar Km 23.100 to 23.300, 22.300 to 22.400, 22.100 to 22.200, 21.300 to 21.400

Berhampur-Bangi Jn

Scattered patches of submerges at chainage Km 6.550 to 7.700, 8.050 to 9.180, 9.805, 13.450, 19.100, 23.300, 23.500, 28.375, 37.985, 50.050 to 53.150, 53.325, 53.600, 54.070, 55.070, 62.250,126 to 126.800, 134.200, 137.200, 142.600 to 143.400, 147 to 148 (including bridge), 150 to 150.600

Bangi Jn-JK Pur Scattered patches of submerges at chainage Km 160.650, 159.400, 158.600, 157.400, 156.300, 143.100, 138.700, 137.200, 116.400, 114.350 and 111.700

In addition to the above list of flooding and submergence areas, under the proposed improvement work, embankments will be constructed for bypasses, construction of ROBs, vehicular and animal underpasses. These may lead to flooding of the project area in the event of unprecedented rains. Soil erosion may occur due to the uneven topography and intensity of rainfall. A major problem of erosion may occur due to the removal of age-old trees along the roadside within

Page 129: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 111

RoW. The removal will result in the instability of soil binding and soil structure, as uprooting will make the soil loose. Erosion may occur due to the swift velocities of drains in monsoon. Adequate mitigation measures has been suggested in EMAP to avoid possible submergence, overtopping, water logging and soil erosion due to upgrading activity of the project road. 7.5 IMPACT DURING OPERATION PHASE The operation phase impacts mainly arise due to vehicular movements and other allied activities. The environmental parameters, which are impacted, can be grouped as follows:

A. Land Use, B. Air Quality, C. Noise level, D. Biological Resources, E. Accident Hazards and Safety F. Aesthetics

A. Impact on Land Use The land use pattern may experience some changes on the roadside in post construction period due to coming up of commercial establishments and other road induced developments. The local statutory bodies like Gram Panchayats, Tahasils in case of rural areas and NACs/Municipalities in urban pockets will strictly enforce land use control measures to regulate development of commercial, residential and industrial infrastructure, development of squatter settlements on the slopes of the embankments and on vacant areas ROW. During operation period slope stabilization is must to avoid erosion. B. Impact on Air Quality The most important aspect of pollution is either through emission of smoke, unburnt fuel, toxic gases like nitrous oxide, carbon monoxide, lead, sulphur oxide, suspended particulate matters, residual particulate matter or foul odor emitted from garbage, sludge, sewage and petrifying dumps of left materials available at the road side. The National Ambient Air Quality standards have been specified by the CPCB for comparison of the pollution level at the time of construction activity and after completion of the project during the actual road use and influx of traffic.

The ambient air quality is expected to improve in the towns and road junction because of new bypasses, smoothening of curves and free flow of traffic. However in other areas levels of carbon monoxide and SPM would marginally increase due to increase in traffic. It is difficult to predict the pollution level from vehicles, since it is not known how innovations/adoption of new technology for vehicles would proceed. It is, however, possible to assess the future pollution load on the assumption that the old technology vehicle would persist. The unit load of pollutants from different types of vehicles have been estimated under the same assumption by the Indian Institute of Petroleum, which is presented below

Page 130: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 112

Table 52 Emission factors of different vehicles (g/Km)

TYPES OF VEHICLE CO HC NOx SOx Pb TSP Two Wheeler 8.3 5.16 - 0.013 0.004 - Cars 24.03 3.57 1.57 0.053 0.0117 - Three Wheelers 12.25 7.77 - 0.029 0.009 - Buses-Urban 4.381 1.327 8.281 1.441 - 0.275 Trucks 3.425 1.327 6.475 1.127 - 0.45 Light Commercial Vehicles 1.3 0.5 2.5 0.4 - 0.1

Source: Indian Institute of Petroleum. The current load of vehicular pollutants in Kg/Km, as well as that expected in 2009, based on maximum increase in traffic on a particular road and maximum present value of TSPM and other parameters, have been estimated and given in tables below.

Table 53 Present Loads of Pollutants - 2006 (In Kg/Km)

TYPES OF VEHICLE CO HC NOx SOx Pb TSPM Two Wheeler 38.35 23.84 0 0.06 0.0185 - Cars 11.32 1.68 0.74 0.02 0.0056 - Three Wheelers 18.40 11.67 0 0.04 0.0135 - Buses-Urban 1.15 0.35 2.18 0.38 - 0.072 Trucks 1.48 0.57 2.80 0.49 - 0.194

Light Commercial Vehicles 0.47 0.18 0.90 0.14 - 0.036

Total load of Pollutants per Km. 71.17 38.29 5.72 1.13 0.0376 0.302

Table 54 Load of Pollutants, after 3 years - 2009 (In Kg/Km)

TYPES OF VEHICLE CO HC NOx SOx Pb TSPM

Two Wheeler 46.03 28.61 0 0.072 0.022 -

Cars 13.58 2.02 0.887 0.030 0.007 -

Three Wheelers 22.08 14.005 0 0.052 0.016 -

Buses-Urban 1.38 0.419 2.613 0.455 - 0.087

Trucks 1.77 0.686 3.349 0.583 - 0.233

Light Commercial Vehicles 0.56 0.217 1.083 0.173 - 0.043

Total load of Pollutants per Km. 85.4 45.957 7.932 1.192 0.045 0.363

Though there is an observable increase in the pollution load in 2009, when compared to 2006 figures, it would not contribute to significant incremental value in concentration of the ambient air quality parameters. During operation phase impact on ambient air quality is assessed due to increased traffic. The incremental concentration is estimated and superimposed on background levels and finally predicted values will be conquered with AAQ Standards.

Page 131: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 113

C. Impact on Noise level During operation phase noise impact will be mainly due to increased traffic. Increase in noise level is anticipated due to increase in traffic movement. The impacted areas are basically rural to semi urban areas and other places having an urban profile. The noise pollution after the improvement will be due to rapid commercialization or movement of heavy traffic, etc. Proper traffic management and legal measures can easily control the unwanted increase in the noise level. Avenue plantations would dampen traffic-related noise. Intermix of vegetation consisting of local shrubs and trees will be planted along sensitive receptors like hospital, schools and administrative offices. D. Impact on Biological resources The roadside plantations will enhance the aesthetics of the road and also function as a pollution arrester and also function as a soil binder. No negative impact is anticipated on flora and fauna during operation phase. E. Accident Hazards and Safety During the operation phase, accident hazards will be greatly reduced and the widened road will ensure smooth and fast flow of traffic. Improvement of traffic junctions, intersections and congested locations will reduce occurrence of accidents. The event that could pose significant environmental risk is the accident of vehicles carrying hazardous cargo. Spillage of hazardous chemicals and subsequent run off into a water body may have significant adverse environmental impact. To handle the case of accidents of hazardous cargo and spillage of hazardous chemicals an emergency response mechanism need to be developed along with the participation of police and the fire department. F. Aesthetics Roadside rest areas/bays/public amenities and parking place for long distance travelers have been provided for in the project design. The roadside plantation will also add to the visual appearance of the area. This will improve the aesthetics of road corridor in project area.

Page 132: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 114

CHAPTER - VIII ANALYSIS OF ALTERNATIVES & MITIGATION MEASURES

In the preceding chapters, a detailed discussion was made on existing environment scenario in the Project Impacted Areas of five road corridors of Phase I: Year I of OSRP. In addition a detailed analysis was made in chapter VII about potential impacts that the proposed project will cause to the existing environment of the project area. It was assessed from the impact study that majority of the impacts will be caused during construction work of the project and are temporary in nature. Only some impacts like increase in traffic volume, impact on air quality etc will be caused during operation phase of the project. All these negative impacts can be mitigated through adoption of appropriate mitigation measures, alternative alignments and engineering designs. This chapter of the report discusses in detail all the suggested mitigation measures as well alternative design considerations, which if followed properly will counter adverse impacts and have beneficial impact in the project area. Details of the mitigation measures along with budget have been included in EMAP in a separate volume. 8.1. ALTERNATIVE ALIGNMENT/BYPASS: The road improvement work under OSRP requires widening of the existing RoW involving expropriation of land, demolish of Residential/Commercial structures and acquisition of CPRs. The road upgrading within the existing RoW also necessitates eviction of squatters and agricultural encroachments. This will lead to displacement of families and cause social disruption along with economic loss for asset losers and their families. Keeping this in view and also to avoid problems in the implementation of the project, steps have been taken to minimize displacement within the limitations of technical requirements and cost effectiveness. Initially, the Social-Screening exercise is conducted in the road section to identify potential social impacts, which are considered along with other issues such as environmental, financial and technical considerations. In the screening exercise, areas of concern-heavily congested market place on the sides of the road, extent of physical displacement, loss of land etc. was studied in detail. The findings have been used as inputs for engineering design to change the alignment within the technical requirements and cost effectiveness. As per the findings of screening exercise, it was observed that at Chandbali town in Bhadrakh – Chandbali corridor and at Bhawanipatna town in Bhawanipatna-Khariar corridor there is need for construction of bypasses. The new two-lane alignment will be carrying heavy traffic and to reduce the traffic and avoid demolition of residential and commercial structures, alternative alignment/bypasses were studied in the above two corridors at two locations. Construction of these two bypasses will have significant beneficial impact in terms of

Minimizing Displacement Reducing resistance to the project Minimize the impact on the existing trees/local environment. Maximum benefit in terms of road geometry, pavements, shoulders, embankments etc Uninterrupted flow of through traffic along the Project stretch Avoid future possibility of installation of speed breakers by the local

administration/public Avoid adverse impacts of the crowded areas along the project stretch Provide scope for wayside amenities

Page 133: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 115

BHAWANIPATNA TOWN BYPASS Bhawanipatna town is one of the major towns of Western Orissa. Strategically located and connected with Andhra Pradesh and Chhatisgarh by National Highways. Existing road passes through congested areas of Bhawanipatna town. About 3 km of existing road passes through the built up area of Bhawanipatna. The available ROW is about 9 m and various utilities cross this road. Having examined the existing road and traffic situation the Consultant has carried out study for feasibility to provide bypass. The comparison of the alternative alignments is given in Table 55.

Alternative 1: To follow existing alignment within municipal limit with minor geometric improvement wherever possible.

Alternative 2: To follow NH-201 from college chowk towards Keshogarh for 500 m then enter in bypass at km 142/500 and connect SH-16 at km 3/200.

Alternative 3: Entire new alignment starting at km 3/00 of SH-6 LHS encircling town, and to provide connectivity to other NH.

Table 55 Feasibility of Alternative Alignment Plan Bhawanipatna Town

Item Alternative 1 Alternative 2 Alternative 3 Description of Alternatives

To follow existing Alignment within Municipal limit with minor Geometric Improvement wherever possible

To follow NH-201 from college chak towards Bolangir for 1 km then enter in bypass at km 143/500 and connects SH-16 at km 3/200

Entire new alignment starting at km3/00 of SH-6 to km towards LHS encircling town and to provide connectivity to other NH.

Total Length (km)

-- 3 km 7 km

Extra Land Required

Not possible to acquire except in Special circumstances

About 14 ha land (mostly govt. land)

21 ha land from forest.

Quality of Land

- Barren Average

Type of Structure Affected

Not possible

-- --

Displacement No issue of displacement Less Few habitants may lose their livelihood because of land loss

Issues of Resettlement

No issues of Resettlement Very less issues of Resettlement.

Cash compensation on market value.

Cost Comparison

Less 12 crores 35 crores

Based on Future Requirement

Not desirable (Inside the city high speed vehicle should not be permitted as it may cause accident and noise to the city dwellers.

Desirable as travel time, operational cost and distance will be minimized. However connectivity to other NH to be envisaged.

The bypass will be futuristic and desirable.

Page 134: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 116

Based on preliminary examination the consultant found that alternative 2 is the most suitable alternative alignment as per requirement of the project road. Alternative 3 is best suited for future requirement. CHANDBALI TOWN BYPASS Chandbali an ancient town is situated along the banks of the Baitarani River. It is a famous tourist center near Raj Kanika. Historically the city enjoys influence over the areas for trade and commerce through sea routes. A big market is situated linearly along the road where most of the shops are encroached upon OWD land. The town also faces the problem of congestion during peak traffic hours.

Important findings of the study listed below:

• From the surveys it was found that the alignment is having very poor geometry. • The Right of Way is about 20 m (mostly encroached). • The route will have displacement of a large number of Small Business Enterprises

(SBEs) • About 1.5 km road length is within riverbed. Therefore an alternative alignment has been examined for Chandbali town. The detailed and summary of the findings of alternatives are presented in Table 56. Alternative 1: Widening and strengthening of existing road from bridge approach with high embankment along the riverbed and RCC embankment on river channel and follow existing road Alternative 2: Realignment from bridge approach with high embankment through agricultural land and joining existing road at College Chowk (km 46/700).

Table 56 Feasibility of Alternative Alignment Plan Chandbali Realignments

Item Alternative 1 Alternative 2

Description of Alternatives

Widening and strengthening of existing road from bridge approach with high embankment along the riverbed and RCC embankment on river channel and follow existing road.

Realignment from bridge approach with high embankment through agricultural land and joining existing road at College Chak (Km 46/700

Total Length (Km) 1.5 km About 3 km Extra Land Required Less of extra land is required 14 ha

Quality of Land to be acquired No land acquisition is required Agricultural land

Type of Structure Affected

Semi-permanent and permanent (SBEs) and other community facilities No structure is affected.

Displacement Large number of person will have diminishing livelihood

Large number of agricultural families will lose livelihood.

Issues of Resettlement Less issues of Resettlement Cash compensation on market value

Cost Comparison Relatively less - only embankment for 900m and RCC embankment for 500 meter. 15 crores

Based on Future Requirement

Not desirable as channel is a physical Barrier and city will grow outwardly. Very much desirable

Submergence Problem

May require earthwork. Will require 4 meter high embankment

Page 135: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 117

Based on preliminary examination it can be stated that alternative 2 is the most suitable alternative alignment as per project requirement.

8.2. REDUCING RoW WIDTH IN HABITATION AREAS The existing ROW along the project road is not uniform and lesser then the IRC recommendations. Hence, for widening of RoW, improvement of junctions, relocation, realignment etc, acquisition of land will be done. The recommended road width (or Right of Way) for different terrain classifications and land use types is given in Table 57 below.

Table 57 Recommended road land width for National & State Highways

Plain and Rolling Terrain Mountainous and steep Terrain

Open areas Built-up areas Open areas Built-up areas Normal Range Normal Range Normal Normal

45 30-60 30 30-60 24 20 But, in all the five corridors, it was observed that at some locations, habitations are close to the edge of the road. Widening of the road by RoW as per recommendations will lead to displacement of lot of people from residential and commercial structures. Further as a part of habitation area phenomena, almost all the common property resources are concentrated in these locations. The common property resources include temples, giant trees with mandaps, tube wells, ponds, and clubs, rest sheds etc. Widening of the road by RoW as per IRC norms will lead to acquisition of these resources. This will have significant social and environmental impacts and lead to large scale resistance of people for the project. Under such a situation, the Project Consultant, World Bank Mission and the PIU officials agreed upon to vary the limits set out in the IRC guidelines. Accordingly different ROW limits were adopted for different project road sections. With reference to the “Preparation Mission Aide Memoir (July 4-13, 2006), Technical Aspects Para 23 – Design and Engineering Issues, the ROW (absolute minimum corridor of impact, COI) follows, “For Berhampur-Rayagada and Bhawanipatna-Khariar road corridor will have COI in built-up areas as 15m. If land needed to be acquired then such acquisition will be done up to 16m. In non built-up sections the minimum COI (Assuming an embankment height of 2m) will be about 22m.

Similarly, for Chandbali – Bhadrakh - Anandpur road corridor will have COI in built-up areas as 17m. If land needed to be acquired then such acquisition will be done up to 18m. In non built-up sections the minimum COI (assuming an embankment height of 2m) will be about 25m.

Page 136: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 118

Mountainous Sections shall have the RoW as per the existing roadway details. For all other roads the ROW shall be as follows,

Category Proposed ROW Built-up areas where RoW is more than 15m Proposed RoW within existing RoW Built-up areas where RoW is Less than 15m Proposed RoW up to 16m Open areas where existing RoW is 20m or more Proposed RoW within existing RoW Open areas where existing RoW is less than 20m Proposed RoW up to 26m

The above strategy was followed for RoW during the finalization of design. Attempt was made to reduce the proposed RoW width in habitation/built up areas instead of recommended RoW as per IRC norms. A detailed list of these places where RoW has been reduced in five corridors is presented in Annexure IV and a concise summary in table 58. It is revealed that at about 85 locations, habitations exist on roadsides of five corridors. In these locations, RoW has been reduced. The total lengths of these locations constitute about 16.61% of total road length of five corridors.

Table 58. Corridor wise details of Habitation/built up areas where RoW width is reduced to 16 meters

Corridor Total

Length (km)

Length in kms, where RoW width is reduced to 16

meters

No of locations % to total

road length

Chandbali - Bhadrakh 49.060 14.605 16 29.77 Bhadrakh - Anandpur 56.736 18.725 23 33.00 Khariar - Bhawanipatna 66.545 12.585 21 18.91 Berhampur - Bangi Jn. 150.400 14.669 25 9.75 Bangi Jn. - J. K. Pur 42.040 - - - Total 364.781 60.584 85 16.61

This strategy followed in OSRP could save a good number of residential and commercial structures from possible demolition. Similarly, a lot of CPRs like temples, schools etc have been saved. (Table 49) 8.3. DESIGN CONSIDERATIONS A. Realignment of accident-prone locations/Geometric corrections: It was revealed from traffic survey conducted in road corridors that, traffic on the project roads is mixed traffic comprising of fast moving cars, buses, trucks, LCVs, 2 & 3 wheelers to slow moving agricultural tractors, Human Drawn Vehicles (HDVs) like bicycles and cycle rickshaws and Animal Drawn Vehicles (ADVs) like carts (table 43 & 44). In addition to these, pedestrians and farm animals are a part of the total traffic on road corridor. The project roads do not have pedestrian lane or cycle tracks to accommodate this traffic in the built up-sections.

Page 137: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 119

The existing project roads have sharp horizontal curves, bend and steep summit vertical curves, which do not provide adequate overtaking, sight and stopping distances even for 50 kmph. At some of the section, it has an average speed of just over 20 kmph. All these problems leads to frequent accidents and needs engineering interventions to correct deficiencies. Keeping these in view, detailed survey was conducted in all the five corridors and black spots that need geometric corrections for safety were identified (Table 59). As per the opinion of local people and OWD officials at these locations, accidents occur frequently due to wrong geometry of road alignment.

Table 59 Lists of Black Spots along the Project Road

Sl. No. Road Corridor Chainage Description Existing radius (m)

Corridor: Bhadrakh - Chandbali 1 Chandbali-Bhadrakh 5/750 Sharp Curve with no sufficient SSD 60 2 Chandbali-Bhadrakh 8/930 Sharp Curve with no sufficient SSD 70

Corridor: Bhadrakh - Anandpur 1 Bhadrakh-Anandpur 11/700 Sharp Curve with no sufficient SSD 80

Corridor: Bhawanipatna - Khariar

1 Bhawanipatna-Khariar 54/630 Sharp Curve with no sufficient SSD 50

2 Bhawanipatna-Khariar 58/275 Sharp Curve with no sufficient SSD 55 Corridor: Berhampur-Bangi Jn.

1 Berhampur-Bangi junction 47/925 Sharp Curve with no sufficient SSD 18 2 Berhampur-Bangi junction 48/00 Sharp Curve with no sufficient SSD 25 3 Berhampur-Bangi junction 49/050 Sharp Curve with no sufficient SSD 25 4 Berhampur-Bangi junction 49/135 Sharp Curve with no sufficient SSD 25 5 Berhampur-Bangi junction 74/300 Sharp Curve with no sufficient SSD 25 6 Berhampur-Bangi junction 75/100 Sharp Curve with no sufficient SSD 24 7 Berhampur-Bangi junction 103/300 Sharp Curve with no sufficient SSD 26

Corridor: Bangi junction-JK Pur 1 Bangi junction-JK Pur 141/950 Sharp Curve with no sufficient SSD 20 2 Bangi junction- JK Pur 141/050 Sharp Curve with no sufficient SSD 20 3 Bangi junction- JK Pur 141/125 Sharp Curve with no sufficient SSD 18 4 Bangi junction- JK Pur 141/350 Sharp Curve with no sufficient SSD 19 5 Bangi junction- JK Pur 140/800 Sharp Curve with no sufficient SSD 20 6 Bangi junction- JK Pur 132/075 Sharp Curve with no sufficient SSD 17 7 Bangi junction- JK Pur 132/200 Sharp Curve with no sufficient SSD 18 8 Bangi junction- JK Pur 132/350 Sharp Curve with no sufficient SSD 20 9 Bangi junction- JK Pur 132/550 Sharp Curve with no sufficient SSD 20 10 Bangi junction- JK Pur 130/100 Sharp Curve with no sufficient SSD 18 11 Bangi junction- JK Pur 129/900 Sharp Curve with no sufficient SSD 20 12 Bangi junction- JK Pur 129/800 Sharp Curve with no sufficient SSD 22

Page 138: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 120

At these locations, the existing road has sharp horizontal curves and insufficient vertical design standards, which do not provide adequate overtaking sight and stopping distance even for 35 kmph. Inadequate sight distance reduces driver’s perception to prepare him for necessary maneuvers. The horizontal design speed did not match with vertical design speed that surprises the drivers and affects the decision making while choosing the right speed. As a matter of fact to avoid unwarranted accident, it is necessary to provide adequate sight distance to permit the drivers enough time and distance to control their vehicles. The safe stopping sight distance, intermediate sight distance and overtaking sight distances are presented below.

Table 60 Minimum recommended Sight Distances

Speed (Km/h) Safe Stopping Sight Distance (m)

Intermediate Sight Distance (m)

Overtaking Sight Distance (m)

100 180 360 640 80 120 240 470 65 90 180 340 60 80 160 300 50 60 120 235 40 45 90 165 30 30 60 - 25 25 50 - 20 20 40 -

The safe stopping sight distance of 180m is followed in the present project. During finalization of design, in addition to the 24 black spots (table 58), 9 more curves in the five road corridors have been taken care of for geometric corrections. Thus geometric corrections in the final design have been made for a total of 33 curves in the existing road sections of five corridors. The list of such curves is presented in table 61.

Table 61 List of curves for Geometric Improvement

Sl. No. Road Corridor Chainage Existing radius Corridor: Chandbali-Bhadrakh

1. Chandbali-Bhadrakh 5/750 60.00 2. Chandbali-Bhadrakh 6/500 50.00 3. Chandbali-Bhadrakh 8/930 70.00 4. Chandbali-Bhadrakh 10/00 120.00 5. Chandbali-Bhadrakh 12/475 110.00

Corridor: Bhadrakh-Anandpur 6. Bhadrakh-Anandpur 2/00 200.00 7. Bhadrakh-Anandpur 11/700 80.00 8. Bhadrakh-Anandpur 17/650 90.00 9. Bhadrakh-Anandpur 47/00 200.00 10. Bhadrakh-Anandpur 51/00 200.00 11. Bhadrakh-Anandpur 55/00 100.00

Corridor: Khariar-Bhawanipatna 12. Bhawanipatna-Khariar 37/650 100.00

Page 139: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 121

Sl. No. Road Corridor Chainage Existing radius 13. Bhawanipatna-Khariar 54/630 50.00 14. Bhawanipatna-Khariar 58/275 55.00

Corridor: Berhampur-Bangi 15. Berhampur-Bangi 47/925 18.0 16. Berhampur-Bangi 48/00 25.0 17. Berhampur-Bangi 49/050 25.0 18. Berhampur-Bangi 49/135 25.0 19. Berhampur-Bangi 74/300 25.00 20. Berhampur-Bangi 75/100 24.00 21. Berhampur-Bangi 103/300 26.00

Corridor: Bangi –JK pur 22. Bangi -Rayagada 141/950 20.0 23. Bangi -Rayagada 141/050 20.0 24. Bangi -Rayagada 141/125 18.0 25. Bangi -Rayagada 141/350 19.0 26. Bangi -Rayagada 140/800 20.0 27. Bangi -Rayagada 132/075 17.0 28. Bangi -Rayagada 132/200 18.0 29. Bangi -Rayagada 132/350 20.0 30. Bangi -Rayagada 132/550 20.0 31. Bangi -Rayagada 130/100 18.0 32. Bangi -Rayagada 129/900 20.0 33. Bangi -Rayagada 129/800 22.0

B. Design speed and minimum radius considerations: The design speed of the project road has been done as per the design speeds given in table 62 below, finalized on the basis of different terrains in which the particular road section lies. At certain sections of the project road, lower design speed than that specified in the guidelines are considered, based on views of local OWD officials. These changes have been agreed to and finalized to minimize the corridor impact of the proposed project. Attempts have been made to restrict the road design within the existing ROW in heavy built up sections.

Table 62 Design Speed for different Terrain Classes for State/National Highways

Design Speed in kmph Plain Terrain Rolling Terrain Mountainous Terrain Steep Terrain

RDS MDS RDS MDS RDS MDS RDS MDS 100 80 80 65 50 40 40 30

RDS: Ruling Design Speed; MDS: Minimum Design Speed

Page 140: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 122

Table 63 Absolute Minimum Radius (m) for National & State Highways

Rolling Terrain Mountainous and steep Terrain Plain

Areas not affected by snow

Snow bound areas Open areas Built-up areas

Ruling minimum

Absolute minimum Ruling minimum Absolute

minimum Ruling

minimum Absolute minimum

45 30-60 30 30-60 24 20

C. Extra widening at curves

Wherever the existing radius is less than the specified minimum design speed, the transition curve, super elevation and pavement widening will be introduced. This will minimize the intrusion of vehicles on to adjacent lanes, tend to encourage uniformity of speed and increase vehicle speed at the curves.

Table 64 Radius of Curve (m) Lane Up to 20 21 to 40 41 to 60 61 to 100 101 to 300

Two Lane 1.5 1.5 1.2 0.9 0.6 Single Lane 0.9 0.6 0.6 - -

Table 65 Minimum length of Vertical Curve

Design speed (kmph) Maximum grade change (%) not requiring a vertical curve

Minimum Length of vertical curve (m)

35 1.5 15 40 1.2 20 50 1.0 30 65 0.8 40 80 0.6 50

100 0.5 60 D. Improvement of Junctions and Intersections: During road safety review, it was identified that existing poor condition of junctions/intersections is one of the major contributing factor to occurrence of accidents. Intersection areas normally carry heavier traffic than other highways sections as traffic approaches from both crossing roads. Eventually, such sections become potential black spots if not designed effectively. In the five road corridors, it was observed that

None of the junctions have been designed as per standards Majority of the junctions do not have appropriate markings to guide the merging as

well as the main road traffic Most of the intersections have no pedestrian crossing facility Junction signage are absent Most of the junctions have insufficient sight distance, turning radius etc.

Page 141: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 123

Keeping this in view, road intersections have been included for improvement during finalization of design. The list of major intersection points is presented in table 66 below.

Table 66 List of Major intersections

S1. No. Road Corridor Chainage Type of Intersections

(Cross/T/Y)

Chandbali-Bhadrakh

1 Chandbali-Bhadrakh 6/500 Y

Bhadrakh-Anandpur

2 Bhadrakh-Anandpur 43/250 T

Berhampur-Bangi Junction

3 Berhampur-Bangi Junction 24/700 CROSS

4 Berhampur-Bangi Junction 53/600 Y

5 Berhampur-Bangi Junction 55/060 T

6 Berhampur-Bangi Junction 66/220 T

7 Berhampur-Bangi Junction 80/500 T

8 Berhampur-Bangi Junction 140/200 T

9 Berhampur-Bangi Junction 142/00 Y

10 Berhampur-Bangi Junction 143/300 T

11 Berhampur-Bangi Junction 150/125 T

Bangi Junction-JK pur

12 Bangi Junction-JKpur 148/900 Y

13 Bangi Junction-Rayagada 119/00 T

E. Other design considerations Pavement and Shoulder: Wherever existing pavement is found to be sub-standard, it will be removed. These materials can be used in lower layers of the widening or in hard shoulders or used as a sub grade material, where new construction is proposed. Damaged existing pavement edges will be trimmed back to sound material. Widening of pavement should match the existing road, wherever possible existing pavement shall be widened on either LHS or RHS. In the built-up sections the concentric widening shall be considered as the cost of land acquisition will be high.

Page 142: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 124

Carriageway width: The project road shall be designed as a two-lane paved carriageway. The width of two lanes shall be 7m, giving a total roadway width of 12.00m.

Paved/Hard Shoulder: Paved shoulders shall be provided wherever proposed and shall have a width of 1.5m. In the Ghat Section the paved shoulder shall be adopted as 0.9m.

Earthen Shoulder: The earth shoulder at the extreme edge of the roadway shall be of 1.0m/2.5m width depending upon the road section.

Total Road Width: Total roadway width shall be 12.00 m. Cross Slope: Each carriageway shall have cross slope of 2.50 per cent. The

paved/hard shoulder and earthen shoulder shall have a slope of 2.5 per cent and 3.5 per cent respectively.

8.4. DRAINGE DESIGNS & SLOPE PROTECTION MEASURES It has been discussed in Chapter VII, section 7.4 (J) about areas of submergence and water logging in the five road corridors. Chainage wise details of such locations have been presented in table 51. It has been discussed that these locations need to be given priority during preparation of DPR. Similarly, the bridges and culverts are important assets of any road project to solve drainage and water logging problems of the project area. If the bridges and culverts are appropriately placed and are in good condition then these assets contributes a lot towards mitigating adverse impacts of the project. Inventory and condition of culverts and bridges In the present study, an inventory was made for of culverts and bridges along with conditions of these structures. The survey was undertaken by site visits, measurements and visual inspections. Special attention was paid to the survey of various features of culverts/bridges and hydraulic adequacy. The findings of the survey are presented below. Culverts:

The total number of culverts is 822 for a road length of 364.781 km. It means the number of culverts provided is approximately two and half numbers per kilometer. The waterways so provided in most of the cases are not only insufficient as balancing structure and much less in numbers as compared to the requirement for drainage from the up-stream side towards the outflow. The waterway adequacy has been examined with respect to the localized area of each structure and it is seen that most culverts have insufficient waterway. A large number of culverts are choked. Very few of the culverts have been provided with any protection work. The summary of the rehabilitation plan is given in Table 67

Page 143: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 125

Table 67 Summaries of Culverts in road corridors

Total Length (In km)

Existing Culverts

Do nothing case Reconstruction

Retain/ Rehabilitation

Abandoned

Bhadrakh to Chandbali 49.060 60 0 48 12 0

Bhadrakh to Anandpur 56.736 118 3 67 46 2

Bhawanipatna to Khariar 66.545 121 20 57 44 0

Berhampur to Bangi Jn. 150.400 430 14 311 98 7

Bangi Jn to JK Pur 42.040 93 7 63 23 0

Total 364.781 822 44 546 223 9

Bridges: In analytical study of the condition of bridges, following important derivations are observed:

• Approach slab has not been provided in most of the bridges. • Mastic asphalt in case of bituminous concrete wearing coat has not been provided in

most of the bridges. • The condition of the expansion joints in most of the bridges is poor. • Old brick masonry bridges have been dismantled and newly constructed. • Some of the bridges are overtopped during rainy season and to be raised. • Most of the bridges have very little protective works.

The summary of the bridge studies is presented in Table 68.

Table 68 Summary of Bridges in road corridor

Name of the Road Total length

(In km) Existing bridges

Do Nothing Case

bridges

Reconstruction bridges

Retain/ Rehabilitation

bridges Chandbali - Bhadrakh 49.06 22 - 17 5 Bhadrakh - Anandpur 56.736 11 0 7 4 Bhawanipatna - Khariar 66.545 21 0 8 13 Berhampur - Bangi Jn. 150.400 38 1 12 25 Bangi Jn. – JK Pur 42.040 3 0 1 2 Total 364.781 95 1 45 49

The performance of pavement gets seriously affected if proper drainage measures are not adopted during construction and operation/maintenance of the roadway. Some of the measures to guard against poor drainage conditions are maintenance of transverse section in

Page 144: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 126

good shape to reasonable cross fall so as to facilitate quick run-off of surface water and provision of appropriate surface drains. Recommendation of IRC: 37-2001 will be adopted fully where cultivated fields exist on both sides of the road stretch, by having bottom of sub grade level at least 1.5 m (more then 0.6m-1.0 as stated in the guidelines) above the level of water table. A 3.5% gradient in earthen shoulder and 2.5% in hard/paved shoulder have been suggested for drainage of shoulders. Very often water enters the base, sub-base or the sub grade at the junction of the verges and the bituminous surfacing. To counteract the harmful effects of this water, it is recommended that the shoulders should be well shaped and constructed of impermeable material. It is proposed to layout the drains near toe of embankment on either side of the road so that these run parallel to the road. The drains run between two adjacent culverts and discharge into the culverts. The longitudinal slope is governed by the existing ground slope, which generally ensures a minimum gradient of 1 in 1000 in favor of flow. The open land lying between the toe of the embankment and the roadside drain will be properly sloped towards the drains and maintained. The roadside drain shall be provided as per the following, The road side channel will be trapezoidal/rectangular of adequate capacity to carry 100% surface runoff of drainage area of highway RoW and will be drained to the nearest available natural water course. We propose to adopt trapezoidal section as space is a not a constraint and it is more efficient and economical. This will be kuchha to drain out in the open field or to the defined outfall points. Lined rectangular drain will be adopted in urban areas. Trapezoidal shaped stone masonry drain will be adopted in the hill section. The superstructure shall be drained with suitable drainage spouts and by means of a combination of drainage spouts and longitudinal drain supported from the superstructure and discharging through vertical drainpipes at pier locations. Suitable profiles of channels and pipe runs shall be provided at crossing with service needs and utilities to ensure that conflicts do not occur. Based on the field investigation and inspection, the entire stretch of road has been broadly classified into following three categories for design of drainage system. Roadside drains in rural area The land use in rural stretches adjoining the road is predominantly agricultural. During monsoon, the entire area adjoining the road gets significant amount of precipitation. The agricultural lands intercept such precipitation. After meeting the various losses due to interceptions, infiltration and evaporation, the excess precipitation starts moving with very

Page 145: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 127

small velocity. This type of situation is encountered for a very short period during rainy season. It is proposed to have open trapezoidal kuchha drains of adequate cross sectional area. These drains will be provided al all sections except at the built-up and the hilly sections. Roadside drains in urban area (Built-up Sections). Some stretches of the road pass through urban/semi-urban settlements where commercial/residential structures are there along the roadside. No well defined lined drains have been provided at any section of the road and the waste water along with the rain water flows over open areas without any proper outlet to drain off such water. Considering the future development of activities in the urban areas, it is proposed to provide reinforced concrete rectangular drains in the urban area. Roadside drains for Hilly areas Hill section along the project road has been proposed to be provided with trapezoidal lined drain of stone masonry/RR masonry. The drains shall be provided on both sides wherever there is a box cut. Slope protection measures: Slope protection in the form of turfing will be proposed on all the embankment slopes. Pitching will be proposed at the toe where the height of embankment is more than 3m. Chutes will be proposed to drain off water in case of high embankments. Non-browsing species like vetiver grass, lemon grass, sabai grass etc is recommended as a part of bioengineering method of protecting slopes. 8.5. CHOICE OF CONSTRUCTION MATERIALS: The suggested specifications for the different formations of the roads under upgrading appear reasonable. Nevertheless, the thickness of the different components of the road-formation would under go modifications in tune with the bearing strengths of the available materials. Since the nature of available materials would vary between regions, the total thickness of the formations is likely to vary between the locations of the project roads. Though soil with gravel (moorum) occurs extensively over nearly all parts of project routes within reasonable lead, option for use of fly ash from thermal power stations are explored in case of five road corridors of Phase I: Year I of OSRP. The fly ash can be transported easily and with less cost from power stations located in Angul-Talcher area. Out of the five corridors, only in case of below mentioned two corridors, use of fly ash is possible.

(i) Bhadrakh - Anandpur (ii) Bhadrakh – Chandbali

Wherever fly ash is to be used in construction of embankment there should be minimum level of sub grade of 500 mm thickness over it (IRC code SP. 20-2002, Page 222)

Page 146: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 128

Transportation of fly ash requires careful planning to avoid air pollution. Otherwise it will add to the present load of suspended particulate matter along the routes. Water need to be sprayed on loaded trucks and the truck to be covered Excavated materials from the damaged roads may also be used wherever possible. It may not be possible to reuse the bitumen-contaminated materials from excavation. Dumping of such material anywhere and everywhere is not permissible under the CPCB Rules. Hence their disposal should be made in clay-lines pits of abandoned stone quarries. All the quarries to be used for obtaining construction materials for the project roads should be licensed quarries only. If the stone crushers get located near the construction site, then adequate measures must be taken to control dust pollution and noise level. In case, new mines are to be utilized by the contractor proper clearance and licenses should be obtained from the Orissa State Pollution Control Board and the Department of Mines and Geology, Govt. of Orissa respectively. 8.6. MITIGATION MEASURES FOR ADVERSE ENVIRONMENTAL IMPACTS A. Treatment of Landscape The impacts assessed during the construction and operation period on the land environment can be mitigated through the following measures:

Landscape treatment of the project road includes planting of trees in vacant spaces and turfing of slopes, approaches to wayside amenities etc.

Choice of trees and plants along the highway shall follow a variety of schemes depending upon location. Local indigenous species that grow in that area shall be planted.

Stone pitching will be provided at the slopes near the irrigation and drainage systems in order to prevent silting of soil into these water bodies.

Adequate drainage structures like culverts and bridges will be constructed for proper drainage of rain water and avoid submergence or water logging on roadsides

Areas of submergence have been identified and in these locations height will be increased

No advertisement/hoarding shall be allowed within the right of way limits of the project road.

Visibility of any signs, signals or any other devices erected for traffic guidance and/or information shall not be obstructed by plantation.

Compaction of soil can be prevented by operating the construction vehicles on temporary roads to avoid damage to the soil

B. Rehabilitation Plan for quarries/borrow areas In section 8.5, it has been discussed that attempt will be made in two corridors to use fly ash as filling material. An estimate of requirement of construction materials has been presented in table 47 of Chapter VII. A total number of 86 quarries have been identified in all the five corridors (Table 48). All these are licensed quarries and construction materials will be collected from these quarries.

Page 147: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 129

Restoration/Rehabilitation measures is required for these borrow and quarry areas as per legal provisions in the license contract. To meet these requirements and mitigate adverse impacts of quarrying, the following measures are suggested. No new quarries will be opened. The material will be taken from existing approved licensed quarries

Contractor shall use only those borrow pits identified during the design stage. Borrow pits shall not be dug continuously in a stretch. The location, shape and size of

the designated borrow areas shall be as approved by the engineer and in accordance to the IRC-10-1961 recommended practice for Borrow pits for road embankments.

Top soil up to a depth of 0.20 m from all permanently covered area and borrow areas shall be stockpiled for productive reuse. Borrow areas will be filled with bitumen waste, waste materials from pavements and shoulders. Then these will be leveled and topped with already preserved topsoil and developed for productive usage. The topsoil can also be used for side slope, median covering for the growth of shrubs and grass.

Borrow areas shall be graded to ensure proper drainage and visual uniformity Additional borrow pits will not be opened without restoration of those areas no longer

in use. C. Shifting and relocation of public utilities Different types of existing utility service components e.g. Optical Fiber Cables (OFC), electric poles, telephone poles are to be shifted out of the proposed roadway. For widening the project road to two-lane carriageway, all the utility service components coming in the way of the widening are to be shifted/relocated.

Regional Utilities Local Utilities • Optical Fibre Cable Posts • Telephone Box • Telephone Poles • Power Lines • Power Transformers • Electric Poles

• Lamp Posts • Water pipe Lines • Water Taps • Open Wells • Tube Wells • Waiting rooms

All service providing organizations has been informed not to lay down any further utility lines in the road corridor without intimation to the Chief Engineer of OWD. Utility shifting plan has been prepared for all the road corridors and submitted to client for necessary action. D. Mitigation measures for CPRs Ponds:

In case of ponds getting fully acquired, alternate site will be fixed in consultation with local community and new pond will be constructed

Retaining walls will be constructed in case of partially affected ponds/water bodies and ponds, which are close to the RoW. This will prevent siltation of water bodies due to earth moving activities and contamination of surface water

Page 148: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 130

One small check dam (Water Harvesting Structure) affected in Berhampur – Bangi Jn. corridor will be replaced by Project Authorities

Drinking water sources:

Affected drinking water sources will be replaced by Project Authorities Fully affected ponds and wells will be filled with sand, before taking up construction

activity. In case of fully affected tube wells, the holes will be plugged with concrete mixtures,

so as to prevent contamination of ground water in future. Temples, Shrines, Giant trees & mandaps:

In case of fully affected temples and shrines, new sites will be identified in consultation will local community and new temple will be constructed by Project Authorities. Demolition of temple will take place after shifting of deity to new temple.

Affected boundary wall and gates of temples/shrines will be replaced by Project Authorities

In case of temples/shrines close to the road corridor, scope for alternate entry gate has been explored and accordingly action plan has been prepared in EMAP. Where there is no scope for alternate entry gate, construction of interception wall has been suggested. This is suggested to avoid direct exit of devotees to road and chances of accidents.

Affected Giant trees and mandaps will be replaced by Project Authorities. New Mandaps will be constructed in consultation with community away from road corridor and plant species with religious significance will be planted.

Schools, Hostels, Colleges, Hospitals, Anganwadi, ANM centers:

Buildings of none of the Schools, Hostels, Colleges, Hospitals, Anganwadi and ANM centers in road corridor will be affected except part of a building in case of Chheliapada UP School in Bhawanipatna – Khariar road.

Only boundary wall, gates, toilets, tube wells of these units will be affected in some of the cases which will be replaced by Project Authorities

In case close to the road corridor, scope for alternate entry gate has been explored and accordingly action plan has been prepared in EMAP. Where there is no scope for alternate entry gate, construction of interception wall has been suggested. This is suggested to avoid direct exit of children’s and public to road and chances of accidents.

These CPRs are sensitive receptors of noise and in case of close proximity to road corridor, noise barriers have been suggested as a part of mitigation measure.

Waiting Rooms at Bus stops, Community toilets:

Majority of the waiting rooms, toilets will be affected, which will be replaced by

Project Authorities. In case of not affected, renovation of the structure will be done to have a uniform pattern in the entire corridor.

Each of the Waiting rooms at Bus Stop need to have a display chart indicating timings of Bus services

Page 149: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 131

Designs of waiting rooms should be such that it prevents entry of stray cattle and also bicycles, two wheelers by local public

Vendors should not be allowed to permanently sell their products inside waiting rooms

One user association involving representatives from Panchayati Raj Institutions and local OWD officials should be formed to look after maintenance and sanitation aspects of Waiting rooms and Community toilets

Community Halls, Youth Clubs, SHG buildings, Library, Statues:

Affected structures of this category of CPRs will be replaced by Project Authorities.

Play Grounds/Stadium:

In Bhawanipatna – Khariar road, 2 playgrounds and in Bhadrakh – Chandbali corridor

7 playgrounds are located close to the road corridor and will be partly affected. As a part of mitigation measure, barbed wire fencing is suggested on sides of playground facing the road. This is for safety of players and viewers of game.

On left side of Bhadrakh – Anandpur road, at 43.110 km, Anandpur stadium is located close to the road corridor. The entry is also from OSRP road corridor. For safety of public an alternate entry gate is suggested from Anandpur-Ghasipura road, which is less congested. This road corridor passes adjacent to western sidewall of the stadium.

Market Yards:

Three local market yards in Bangi Jn. – JK Pur and one in Berhampur – Bangi Jn. corridor are located very close to the road. Out of 4, three will also be partly affected. In these market yards, local farmers sell their farm produces. For safety of marketers and traders, barbed wire fencing has been suggested on sides adjacent to road corridor.

Burial Grounds/Crematoriums:

In Bhawanipatna – Khariar road one small burial ground and in Berhampur – Bangi

Jn. road two burial grounds will be fully acquired. Alternate land for such purpose will be alienated in consultation with local Tahasildar by Project Authorities

Out of the two burial grounds in Berhampur-Bangi Jn. corridor, one at Ambagada village of Dakhinpur Gram Panchayat is a developed crematorium and the structure need to be replaced by Project Authorities.

E. Mitigation measures for adverse impact on water quality Construction Period:

To prevent accumulation of water by the road side, adequate cross drainage (CD) structures in the form of culverts with adequate discharge capacity will be constructed.

During reconstruction of old cross drainage structures and construction of new ones, diversion is required to aid uninterrupted movement of traffic. Material will not be put

Page 150: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 132

in the drainage to avoid blockage and prevent the erosion. This will help in protecting the aquatic ecology.

Retaining wall will be constructed in case of ponds located close to the road to prevent siltation No permanent impact is anticipated on water quality due to the project. Construction activities may temporarily deteriorate surface water quality in terms of increased turbidity and as well as oil and grease. The mitigation measures include proper disposal of water and other liquid wastes arising from construction. Stream courses and drains will be kept free from dumping of solid wastes and earth material. Construction materials containing fine particles like limestones, aggregates etc. will be stored in enclosures away from water bodies to ensure that sediment laden water does not drain into nearby water courses. All measures will be taken to prevent the wastewater produced in construction camps from entering directly into the water bodies. A minimum distance of any sewage source or toilet facilities should be 200m away from water sources. Vehicle maintenance and refueling will be confined to areas in construction camps designed to contain spilled lubricants and fuel. Waste petroleum products must be collected and disposed of at appropriate disposal sites as per GoI regulations. Operation Period:

No significant impact will be there on water quality during operation period, provided drainage channels, slope protection measures etc function properly. Only monitoring of water quality at periodic interval is suggested.

F. Mitigation measures for adverse impact on air quality Construction Period

Hot Mix Plants shall be located away from the inhabited areas, residential settlements and water bodies.

Trucks and Tippers carrying earth for filling, sand, gravel or stone will be duly covered with Tarpaulin sheets to avoid spilling.

Roads free from roadside habitations will be used for transportation of construction materials from borrow/quarry areas to construction sites

Dust level at the construction sites shall be controlled by sprinkling water. Construction material, machinery and equipment will be maintained in a good

working condition and shall be handled with due precaution and only by trained professionals.

Workers will be provided with noise masks Water shall be sprayed at the road diversion surfaces, excavation sites, lime and

earth mixing sites, asphalt mixing sites and in sub-base laying Hot mix plant and concrete batching plants shall be well sealed, and be equipped

with dust removal device Rock blasting (if any) will be carried out using small charges

Page 151: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 133

Operation Period Phasing out of old technology vehicles, regular emission checks, use of fuel-efficient engines, use of catalytic converter and land use control are the measures that are to be implemented by central and state governments to reduce pollution levels.

Enforcing the existing emission norms. Plantation on either side of the road with selected plant species capable of absorbing pollutants.

Provision of road, improvements at intersections and separate truck parking facilities to ensure smooth and uninterrupted traffic flow. All these facilities shall result in minimizing stopping and idling of vehicles and thus improving air quality. Monitoring of Air quality at periodic intervals G. Mitigation measures for adverse impact on noise quality Construction Period Construction machinery/equipment (hot-mixer, bulldozer, loader concrete mixer etc.) emits a noise ranging from 80-95 dB. Apart from this, vehicles carrying raw materials will also create noise than desired levels. The magnitude of impact shall depend upon the type of machinery being used and the standards of noise emissions for different equipments are presented in Table 69.

Table 69 Average Noise Levels (dB) of different equipments

Construction machinery/equipment Noise (dB) Dozer D8 90 Excavator 88 Grader 14G 86 Vibratory Roller 88 Compactor 87 Water tank 82 Truck 83 Asphalt paving plant 89 Air Compressor 75 Diesel Generators 79

The noise emission level generated from a source shall decrease in distance as per the following empirical formula:

SPL2 = SPL1 – 20 Log10 (r2/r1)

Where, SPL1 an SPL2 are the sound pressure levels at distance r1 and r2 respectively. Considering the noise level of different equipment and the stationery nature of the construction equipment as a point source generating 9 dB (A) at a reference distance of 2m

Page 152: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 134

computed distance require to meet the permissible limits during day time for different land use categories are given in Table 70.

Table 70: Minimum required distance from stationary sources for meeting standards

Category Permissible Limit (Day time) Distance required (M) Silence zone 50 dB (A) 200 Residential zone 55 dB (A) 113 Commercial zone 65 dB (A) 36 Industrial zone 75 dB (A) 11

Hence it is suggested that

Location of construction equipment will be at least 250m away from inhabited areas. Construction workers will be provided with protection devices like earplugs. Maintenance of equipment in good condition & proper design of engine enclosures. Construction activities shall be strictly prohibited between 10 P.M. and 6 A.M. in

residential areas. Noise barriers have been suggested at Schools, Hospitals, ANM Centers, Anganwadi

Centers, which are sensitive receptors of noise. Operation Period

Improvements at intersections, provision for bus bays and truck parking facilities will ensure smooth and uninterrupted traffic flow. All these facilities shall result in minimizing stopping and idling of vehicles and thus reducing noise quality.

Noise barriers have been suggested at Schools, Hospitals, ANM Centers, Anganwadi Centers, which are sensitive receptors of noise

Large scale avenue plantation programme and maintenance of trees Monitoring of noise quality at periodic intervals

H. Mitigation measures for adverse impact on biological environment Construction Period

To mitigate adverse impacts of the Project on roadside trees, avenue plantation programme and Compensatory afforestation programme shall be adopted to restore and further enrich the loss of vegetation. Details of such an plan has been presented in “Biodiversity Assessment and Management Plan” prepared separately for OSRP.

Similarly, impact of Project on wildlife and local fauna and the required mitigation

measures has been dealt in “Biodiversity Assessment and Management Plan”. Wildlife underpasses have been suggested at several locations. Suggestions have been formulated, which are to be followed by Contractors to reduce the impact of project on faunal population including wildlife.

For aquatic fauna it is suggested that filling up of ponds will be resorted only after

exhausting all other options.

Filling up of ponds wherever required should be done during the non-monsoon months.

Page 153: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 135

Construction of bridges and culverts shall be accomplished during the non-monsoon

periods.

The requirement of filling up of ponds shall be minimized by constructing retaining structures where the height of filling is more.

The direct discharge of oil and chemical spills to the water bodies shall be avoided. Operation Period

Maintenance of road side plantation through strict supervision and monitoring Dead trees should be gap filled annually during rainy season Regular maintenance of assets created under the project like, wildlife underpasses,

retaining walls of ponds, drainage channels etc Impact of occasional accidents and spillage of hazardous chemicals on biological

environment should be avoided or minimized by adoption of appropriate measures. Details of plan given in EMAP

I. Mitigation measures for adverse impact on Sanitation & Waste disposal Construction period

Local labourers shall be employed for the construction activities to the maximum possible number to minimize the production of domestic waste generation.

Another advantage of giving preference to local labourers is avoiding formation of squatter settlements on roadside in post construction period.

If outside labourers are engaged, then in the camps safe drinking water, adequate sanitation facilities, kerosene and all other amenities as per the prevailing labour laws will be provided.

Sewage and domestic solid waste generated at the construction workers camp will be properly disposed of to prevent health and hygiene related problems. Adequate sanitary facilities will be made available at the construction camp. Periodical health check up of construction workers will be undertaken.

Sufficient measures will be taken in construction camps i.e. provision of garbage tanks and sanitation facilities including septic tanks and soak pits. Wastes in septic tanks will be cleared periodically.

Operation period

The local statutory bodies like Gram Panchayats, Tahasils in case of rural areas and NACs/Municipalities in urban pockets will strictly enforce land use control measures to regulate development of commercial, residential and industrial infrastructure, development of squatter settlements on the slopes of the embankments and on vacant areas ROW.

Proper maintenance of Community toilets, Waiting rooms during operation period is must. Scope of forming a local user association involving representatives from Panchayatiraj Institutions and local OWD officials

Proper maintenance of drainage channels constructed in the project

Page 154: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 136

J. Solid waste Management Construction Period

Topsoil will be used for filling borrow areas for productive usages, embankment slopes for turfing, medians etc.

Bitumen waste generated will be used for soiling of embankment slopes Waste disposal and sanitation to workers in the construction camp should be properly

maintained or taken care off in order to check their entry into the water bodies like ponds, streams etc.

Garbage should be collected in tanks and disposed off daily in order to check the solid wastes entering into the ponds, streams etc.

Operation Period

During operation accidental spills will be cleaned up immediately in order to prevent contamination into the water bodies;

The embankments of the water bodies present very near to the RoW of the project road stretch should be done properly in order to check sliding of earth as sediments into the water bodies

K. Mitigation measures for adverse impact due to LA & displacement A separate report has been prepared on Social Impact Assessment & Rehabilitation Action Plan. Detailed mitigation measure has been presented in this report

8.7 IMPROVED TRAFFIC SAFETY MEASURES The safety is a very important aspect in road project. The impact on safety of road users during operation and construction phases is assessed due to OSRP project implementation.

The traffic studies have identified areas with heavy traffic intensity and acute-angle intersections, which require junction improvements and widening of roads in congested stretches. The road improvement plan has suggested improvement of junction points and improvements in the vertical profile and straightening of the road in stretches with acute curves. The details about geometric corrections and improvement of intersections and junctions has been presented in section 8.3 of this chapter. The design approach followed as per the Indian Standards and with agreement with the OWD for the two lane Project State Highways will eliminate the physical deficiencies stated here above and will significantly improve the safety of the users, vehicles and pedestrians/farm animals. Traffic safety measures have also been taken up extensively to improved safe passage of traffic and reduce the accident rates. The salient features of the design approach to safety measures are:

• Provision of two lane carriageway to increase the capacity of the road so as to allow more freedom to the drivers;

• Improvement of major and minor junction with the provision of extra lanes.

Page 155: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 137

• Provision of elephant crossing has been provided wherever required to avoid and conserve the harmony of nature and delays in traffic movement;

• Facilities to assure safe circulation of slow moving vehicles, pedestrians and farm animals:

• Provision of acceleration and deceleration lanes in the main carriageway at the Ghat sections;

• Provision of appropriate guard rails for high embankment; • To provide marker post and other safety signage at Bridge approaches; • Proper road markings and traffic signage to warn the drivers as per the IRC norms; • Adequate road side protective works like retaining walls, berms etc for the ghat

section; • Delineators: will be provided at all bridges, high embankments, metal guard

beams/crash barriers on curves intersections and traffic islands as warranted. • Bus and truck lay byes are provided along the Project Road sections; • Road Furniture

Road Signs All signs shall be placed on the left hand side of the road. Where extra emphasis is warranted, they may be duplicated on the right hand side as well as per IRC: 67-1977. The extreme edge of the sign shall be 2 m from the edge of the carriageway. Road marking

Provisions have been made for center and edge road marking with thermo-plastic paint as per IRC: 35-1970 in preference to ordinary paint as a way of better caution to the driving motorist. This would help reduce road accidents. Road Delineators Provision of road delineators has been made in the design that shall comprise roadway indicators, hazard markers and object markers. The design shall conform to the recommendation made in IRC-79. Reflective Chevron signs at bends shall also be provided for. Safety Barriers

Guardrail should be provided on approaches to bridges and high embankments. Guardrails are also to be provided on medians in Towns of specifications.

For safety of public at common property resources like Schools, Hospitals, Temples etc two provisions has been made. A detailed field survey was conducted to identify scope for alternate entry and exit points in cases where these CPRs are close to the road and present entry/exit is from project road. In cases where alternate entry/exit point is not possible, suggestion has been made to construct an interception wall in front of the gate. This will prevent sudden direct entry or exit to project road and avoid chances of accidents.

Page 156: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 138

Bus-Bays and Rest Shelters The lay out for bus bays and shelters (Waiting rooms at bus stops) will be in accordance with IRC: 80-1981. The bus shelter structure shall be structurally safe, aesthetically pleasing and functional so as to protect the waiting passengers from sun, rain and wind. Adequate drainage shall be provided at bus stops and bus bays. Truck Lay-Bys The provision of truck lay-byes shall be governed by site requirements and parking demand. Parking shall be designed in the form of a rectangular or trapezoidal area parallel and separated from the carriageway by a physical barrier. The parking lots shall have necessary facilities like repairing, eating and resting and shall be suitably landscaped. Detail location of Bus Bays and Truck lay-bys has been provided in EMAP. Safety of Pedestrians Special care has been taken to ensure the safety of the pedestrians, and farm animals. The different safety measures are incorporated in the engineering design such as

• Provision of footpath at the built up section on both sides of the Road. • Proper road markings for the pedestrian crossing at congested intersections

and market places. • Speed reduction at built up sections.

Road Safety and other Appurtenances The safety and other appurtenances includes,

Road Markings Road Signage Hectometre /Kilometre Stones Crash Barriers

Road Markings The road markings are important safety measures and convey the required information to the road users and ensure an orderly traffic flow. The road markings have been provided as per the IRC guidelines outlined in IRC: 35-1997. The following road markings are provided:

Longitudinal markings : Center Line : Edge Lines : Traffic Lines : Width Transition : Obstructions Ahead

Page 157: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 139

Intersections : Stop Lines : Word “STOP” : Pedestrian Crossing : Approach to Intersection : Direction Arrows : Continuity Lines : Traffic island

Parking : Bus Stop : Emergency Parking

The road marking material will be hot applied thermoplastic reflector. Road Signage The different types of road signs are categorized and provided are:

• Mandatory/Regulatory • Cautionary/Warning • Directional • Hazard Markers • Informatory

Mandatory Signs All the compulsory signs are indicated in a circular form. The violation of traffic or road regulations indicated buy these signs is a legal offence.

Precautionary Signs These are signs indicated in a triangular form. They are meant for the safety of the road user.

Informatory Signs These gives you information about such things as high way facilities, parking facilities etc and you can recognize them from their blue background. Retro-reflectors type signage, which are made of high intensity encapsulated lens types reflective sheets, fixed over aluminum sheeting for a better visibility at night and ensures road users safety, shall be used. Informatory signs have been provided at each of the village locations as per the standards. Overhead Signs would be provided at approaches and on both sides for all Interchanges. These are made of galvanized MS pipes and are of two types shoulder side posts with cantilever arm and gantry across the carriageway. The signboards are made of galvanized steel.

Page 158: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 140

Crash Barriers Crash barriers are absent in the present Project Road. But these are necessary for the safety of the road users, in particular at high embankments and at approaches to structures. For the Project Road, crash barriers and galvanized W shaped metal guard beams as per MOST Specifications Clause 810 are proposed as follows:

• Embankments higher than 3000 mm: guard beams at both shoulders; • Approach embankments to Bridges and Structures: 30m long guard beams for

embankment height up to 2500 mm; for higher embankments provision above shall apply;

• On all retaining walls to embankment: reinforced cement concrete crash barriers.

Page 159: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 141

CHAPTER IX ENVIRONMENT ENHANCEMENT MEASURES

In the preceding chapter, a detailed discussion was made on alternatives available to avoid the adverse impacts of the Project on environment of the Project area and also mitigation measures in cases where possible impact cannot be avoided from technical point of view. The mitigation measures, if implemented properly, will help in reducing the intensity of impact significantly during construction and operation period of the Project. In this chapter, a detailed discussion will be made on Environment Enhancement measures, which refer to additional measures to be taken during the project for the benefit of the road users and the surrounding communities. These measures will enhance the environment of the project roads and generate goodwill among the local community towards the project. 9.1. PROVISION OF TOILET BLOCK: It was observed during the field survey that, all the five road corridors under Year I of OSRP lack one of the basic needs of the road user i.e. toilets. In some of the locations it exists, but in a very much dilapidated condition. There is hardly any maintenance of these assets. There is no water, electricity and cleaning of the toilets. As a result, road user never uses it. Defecation/Urination is being done mostly on roadsides and near bus stops, creating an unhygienic environment. Keeping this in view, under the Project activities, toilet blocks has been proposed at selected locations along the road corridors. The details of the locations along with budget has been included in EMAP 9.2. PROVISION OF REST SHELTERS/WAITING ROOMS AT BUS STOPS: At present, Rest shelters/Waiting rooms at bus stops are available at almost all the major bus stops on road corridor. But majority of such assets will be affected due to widening of RoW width. Corridor wise details of affected and not-affected assets are presented in table 49 of Chapter VI. This is an important asset and needs to be developed again by Project Authorities. In case of not affected ones, renovation of the structure will be done to have a uniform pattern in the entire corridor. These waiting rooms need to have a uniform design in all the corridors. Each of the Waiting rooms at Bus Stop need to have a display chart indicating timings of Bus services. Designs of waiting rooms should be such that it prevents entry of stray cattle and also bicycles, two wheelers by local public. Vendors should not be allowed to permanently sell their products inside waiting rooms. One user association involving representatives from Panchayati Raj Institutions and local OWD officials should be formed to look after maintenance and sanitation aspects of Waiting rooms and Community toilets.

Page 160: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Consulting Engineers Group Ltd., Jaipur Environment Assessment Report

Consultancy Service for Feasibility Study and Detailed Project Preparation for Proposed Orissa State Road Project 142

9.3. PLANTATION PROGRAMMES: Avenue Plantations is one of the important activities of road development programme. The major benefit of such a programme are

Improvement in Aesthetics. Control Noise and Air pollution. Prevent soil erosion on road sides. Provide shade to road users and keep the environment cool.

Keeping this in view, under the proposed project, trees will be planted on vacant spaces of RoW. This will be in addition to Compensatory afforestation, which will be done to compensate tree cutting due to widening of the road. Tree species selected for avenue plantation should be adaptable to local climate and soil and pollution resistant etc. In addition to avenue plantation, vacant lands will be utilized for plantation. The quarry areas, which are open grounds, can be planted with tree species in order to prevent erosion of soil etc. Details of plantation programme along with species selected etc have been provided separately.

Page 161: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE-IA

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

1 00-01 km 0-8 m 0 0 39 10 49 0 0 24 7 318-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 39 10 49 0 0 24 7 312 01-02 km 0-8 m 0 1 21 9 31 0 0 11 3 14

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 1 21 9 31 0 0 11 3 14

3 02-03 km 0-8 m 0 2 67 8 77 0 5 71 10 868-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 67 8 77 0 5 71 10 864 03-04 km 0-8 m 0 3 62 17 82 0 0 55 13 68

8-10m 0 0 5 1 6 0 1 5 0 6Sub-Total 0 3 67 18 88 0 1 60 13 74

5 04-05 km 0-8 m 0 1 26 2 29 0 0 20 12 328-10m 0 0 0 0 0 0 3 4 0 7

Sub-Total 0 1 26 2 29 0 3 24 12 396 05-06 km 0-8 m 0 3 55 16 74 0 1 31 20 52

8-10m 0 1 2 0 3 0 0 1 0 1Sub-Total 0 4 57 16 77 0 1 32 20 53

7 06-07 km 0-8 m 0 2 38 5 45 0 5 29 9 438-10m 0 0 1 0 1 0 0 1 0 1

Sub-Total 0 2 39 5 46 0 5 30 9 448 07-08 km 0-8 m 0 1 64 10 75 0 0 5 11 16

8-10m 0 1 5 0 6 0 1 6 5 12Sub-Total 0 2 69 10 81 0 1 11 16 28

9 08-09 km 0-8 m 0 0 38 3 41 0 0 39 3 428-10m 0 0 0 0 0 0 0 9 0 9

Sub-Total 0 0 38 3 41 0 0 48 3 5110 09-10 km 0-8 m 0 0 43 14 57 0 0 42 10 52

8-10m 0 0 0 1 1 0 0 0 0 0Sub-Total 0 0 43 15 58 0 0 42 10 52

11 10-11 km 0-8 m 0 0 90 13 103 0 0 94 11 1058-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 90 13 103 0 0 94 11 10512 11-12 km 0-8 m 0 0 102 17 119 0 2 80 12 94

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 102 17 119 0 2 80 12 94

Tree Enumeration List of Corridor - Bhadrak to ChandbaliRight

Girth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

Page 162: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

13 12-13 km 0-8 m 0 0 31 4 35 0 7 45 8 608-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 31 4 35 0 7 45 8 6014 13-14 km 0-8 m 0 0 70 4 74 0 0 78 3 81

8-10m 0 0 0 0 0 0 0 0 1 1Sub-Total 0 0 70 4 74 0 0 78 4 82

15 14-15 km 0-8 m 0 0 0 2 2 0 0 2 3 58-10m 0 0 1 0 1 0 0 1 0 1

Sub-Total 0 0 1 2 3 0 0 3 3 616 15-16 km 0-8 m 0 1 4 0 5 0 4 8 2 14

8-10m 0 0 1 0 1 0 0 0 0 0Sub-Total 0 1 5 0 6 0 4 8 2 14

17 16-17 km 0-8 m 0 0 10 4 14 0 0 10 0 108-10m 0 0 2 3 5 0 0 5 1 6

Sub-Total 0 0 12 7 19 0 0 15 1 1618 17-18 km 0-8 m 0 1 9 16 26 0 0 10 12 22

8-10m 0 0 0 0 0 0 0 0 3 3Sub-Total 0 1 9 16 26 0 0 10 15 25

19 18-19 km 0-8 m 0 0 22 31 53 0 0 37 21 588-10m 0 0 0 0 0 0 0 1 1 2

Sub-Total 0 0 22 31 53 0 0 38 22 6020 19-20 km 0-8 m 0 1 19 16 36 0 1 32 9 42

8-10m 0 0 0 1 1 0 0 2 0 2Sub-Total 0 1 19 17 37 0 1 34 9 44

21 20-21 km 0-8 m 0 11 108 1 120 0 4 79 6 898-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 11 108 1 120 0 4 79 6 8922 21-22 km 0-8 m 0 2 114 5 121 0 1 59 6 66

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 114 5 121 0 1 59 6 66

23 22-23 km 0-8 m 0 0 0 156 156 0 0 69 0 698-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 156 156 0 0 69 0 6924 23-24 km 0-8 m 0 10 175 4 189 0 8 106 2 116

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 10 175 4 189 0 8 106 2 116

25 24-25 km 0-8 m 0 6 72 6 84 0 7 53 6 668-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 6 72 6 84 0 7 53 6 66

Page 163: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

26 25-27 km 0-8 m 0 1 20 17 38 0 8 17 10 358-10m 0 0 4 6 10 0 0 4 2 6

Sub-Total 0 1 24 23 48 0 8 21 12 4127 27-28 km 0-8 m 0 3 37 13 53 0 2 23 10 35

8-10m 0 0 2 0 2 0 0 2 1 3Sub-Total 0 3 39 13 55 0 2 25 11 38

28 28-29 km 0-8 m 0 1 4 4 9 0 0 13 2 158-10m 0 0 0 0 0 0 0 1 2 3

Sub-Total 0 1 4 4 9 0 0 14 4 1829 29-30 km 0-8 m 0 0 27 10 37 0 2 20 2 24

8-10m 0 0 0 2 2 0 0 0 1 1Sub-Total 0 0 27 12 39 0 2 20 3 25

30 30-31 km 0-8 m 0 4 65 13 82 0 3 13 4 208-10m 0 0 12 6 18 0 0 1 2 3

Sub-Total 0 4 77 19 100 0 3 14 6 2331 31-32 km 0-8 m 0 2 10 3 15 0 1 13 6 20

8-10m 0 0 1 2 3 0 0 0 0 0Sub-Total 0 2 11 5 18 0 1 13 6 20

32 32-33 km 0-8 m 0 3 4 0 7 0 5 4 0 98-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 3 4 0 7 0 5 4 0 933 33-34 km 0-8 m 0 0 1 0 1 0 0 1 0 1

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 1 0 1 0 0 1 0 1

34 34-35 km 0-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 035 35-36 km 0-8 m 0 0 0 0 0 0 0 0 0 0

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 0 0 0 0 0 0 0 0

36 36-37 km 0-8 m 0 2 50 3 55 0 2 22 0 248-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 50 3 55 0 2 22 0 2437 37-38 km 0-8 m 0 15 52 2 69 0 8 15 3 26

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 15 52 2 69 0 8 15 3 26

38 38-40 km 0-8 m 0 4 44 7 55 0 5 45 8 588-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 4 44 7 55 0 5 45 8 58

Page 164: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

39 40-41 km 0-8 m 0 1 63 15 79 0 2 133 19 1548-10m 0 1 9 0 10 0 0 1 5 6

Sub-Total 0 2 72 15 89 0 2 134 24 16040 41-42 km 0-8 m 0 2 55 9 66 0 5 36 9 50

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 55 9 66 0 5 36 9 50

41 42-43 km 0-8 m 0 1 96 11 108 0 0 58 10 688-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 96 11 108 0 0 58 10 6842 43-44 km 0-8 m 0 0 31 3 34 0 0 34 13 47

8-10m 0 0 1 1 2 0 0 1 4 5Sub-Total 0 0 32 4 36 0 0 35 17 52

43 44-45 km 0-8 m 0 2 125 5 132 0 1 79 15 958-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 125 5 132 0 1 79 15 9544 45-46 km 0-8 m 0 0 160 8 168 0 1 124 16 141

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 160 8 168 0 1 124 16 141

45 46-47 km 0-8 m 0 0 45 6 51 0 1 38 14 538-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 45 6 51 0 1 38 14 530-8 m 0 4 27 4 35 0 2 83 17 1028-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 4 27 4 35 0 2 83 17 1020-8 m 0 15 83 16 114 0 10 108 10 1288-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 15 83 16 114 0 10 108 10 1280-8 m 0 105 2278 522 2905 0 103 1968 367 24388-10m 0 3 46 23 72 0 5 45 28 78

Sub-Total 0 108 2324 545 2977 0 108 2013 395 2516

47

46 47-48 km

Grand Total

48-51 km

Page 165: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE - I B

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

0-8 m 0 4 0 141 145 0 0 104 0 1048-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 4 0 141 145 0 0 104 0 1040-8 m 0 7 72 7 86 0 13 74 3 908-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 7 72 7 86 0 13 74 3 900-8 m 0 15 4 6 25 0 4 45 0 498-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 15 4 6 25 0 4 45 0 490-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 00-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 1 13 38 52 0 4 23 24 51

Sub-Total 0 1 13 38 52 0 4 23 24 510-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 5 26 49 80 0 7 25 54 86

Sub-Total 0 5 26 49 80 0 7 25 54 860-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 2 7 9 18 0 1 6 13 20

Sub-Total 0 2 7 9 18 0 1 6 13 200-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 5 33 15 53 0 0 27 12 39

Sub-Total 0 5 33 15 53 0 0 27 12 390-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 00-8 m 0 0 79 15 94 0 0 68 16 848-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 79 15 94 0 0 68 16 840-8 m 0 0 64 15 79 0 0 53 16 698-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 64 15 79 0 0 53 16 690-8 m 0 4 50 1 55 0 6 54 0 608-10m 0 0 0 0 0 1 0 0 0 1

Sub-Total 0 4 50 1 55 1 6 54 0 61

11 11-12

12 12-13

9 09-10

10 10-11

7 07-08

8 08-09

5 04-05

6 05-07

3 02-03

4 03-04

1 00-01

2 01-02

Tree Enumeration List of Corridor - Bhadrak to AnandpurRight

Girth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

Page 166: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

0-8 m 0 6 44 3 53 0 6 44 3 538-10m 0 0 3 0 3 0 5 20 1 26

Sub-Total 0 6 47 3 56 0 11 64 4 790-8 m 0 9 38 0 47 0 5 28 5 388-10m 0 0 1 0 1 0 3 8 0 11

Sub-Total 0 9 39 0 48 0 8 36 5 490-8 m 0 9 84 0 93 0 10 83 4 978-10m 0 0 0 0 0 0 0 3 0 3

Sub-Total 0 9 84 0 93 0 10 86 4 1000-8 m 0 7 28 1 36 0 9 27 4 408-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 7 28 1 36 0 9 27 4 400-8 m 0 1 36 6 43 0 3 21 11 358-10m 0 0 7 3 10 0 0 5 1 6

Sub-Total 0 1 43 9 53 0 3 26 12 410-8 m 0 9 30 1 40 0 15 23 4 428-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 9 30 1 40 0 15 23 4 420-8 m 0 0 33 0 33 0 6 18 0 248-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 33 0 33 0 6 18 0 240-8 m 0 8 47 14 69 0 16 25 5 468-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 8 47 14 69 0 16 25 5 460-8 m 0 2 7 1 10 0 2 22 1 258-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 7 1 10 0 2 22 1 250-8 m 0 11 57 0 68 0 1 11 10 228-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 11 57 0 68 0 1 11 10 220-8 m 0 0 2 1 3 0 0 0 2 28-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 2 1 3 0 0 0 2 20-8 m 0 1 6 1 8 0 1 7 4 128-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 6 1 8 0 1 7 4 120-8 m 0 0 1 0 1 0 0 8 2 108-10m 0 1 2 1 4 0 0 2 0 2

Sub-Total 0 1 3 1 5 0 0 10 2 1225 25-26

23 23-24

24 24-25

21 21-22

22 22-23

19 19-20

20 20-21

17 17-18

18 18-19

15 15-16

16 16-17

13 13-14

14 14-15

Page 167: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

0-8 m 0 1 13 7 21 0 1 11 6 188-10m 0 0 2 0 2 0 0 2 0 2

Sub-Total 0 1 15 7 23 0 1 13 6 200-8 m 0 3 17 10 30 0 0 9 7 168-10m 0 0 3 0 3 0 0 0 1 1

Sub-Total 0 3 20 10 33 0 0 9 8 170-8 m 0 0 20 7 27 0 0 18 8 268-10m 0 0 7 2 9 0 0 0 0 0

Sub-Total 0 0 27 9 36 0 0 18 8 260-8 m 0 1 22 4 27 0 2 14 2 188-10m 0 1 2 0 3 0 0 2 0 2

Sub-Total 0 2 24 4 30 0 2 16 2 200-8 m 0 3 16 4 23 0 3 37 13 538-10m 0 0 1 1 2 0 0 0 0 0

Sub-Total 0 3 17 5 25 0 3 37 13 530-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 9 1 10

Sub-Total 0 0 0 0 0 0 0 9 1 100-8 m 0 22 62 18 102 0 11 72 10 938-10m 0 0 0 0 0 0 0 2 1 3

Sub-Total 0 22 62 18 102 0 11 74 11 960-8 m 0 3 59 7 69 0 6 48 11 658-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 3 59 7 69 0 6 48 11 650-8 m 0 11 68 4 83 0 14 58 14 868-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 11 68 4 83 0 14 58 14 860-8 m 0 0 16 13 29 0 21 47 5 738-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 16 13 29 0 21 47 5 730-8 m 0 11 30 1 42 0 9 28 1 388-10m 0 0 2 0 2 0 0 3 5 8

Sub-Total 0 11 32 1 44 0 9 31 6 460-8 m 0 1 15 6 22 0 2 17 0 198-10m 0 0 0 0 0 0 0 0 1 1

Sub-Total 0 1 15 6 22 0 2 17 1 200-8 m 0 2 18 4 24 0 3 28 9 408-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 18 4 24 0 3 28 9 40

37 37-38

38 38-39

35 35-36

36 36-37

33 33-34

34 34-35

31 31-32

32 32-33

29 29-30

30 30-31

27 27-28

28 28-29

26 26-27

Page 168: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

0-8 m 0 0 41 0 41 0 0 29 0 298-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 41 0 41 0 0 29 0 290-8 m 0 2 31 3 36 0 4 28 9 418-10m 0 0 0 0 0 0 0 1 1 2

Sub-Total 0 2 31 3 36 0 4 29 10 430-8 m 0 0 23 3 26 0 0 14 6 208-10m 0 0 0 3 3 0 0 6 6 12

Sub-Total 0 0 23 6 29 0 0 20 12 320-8 m 0 0 2 5 7 0 0 3 4 78-10m 0 0 0 1 1 0 0 5 3 8

Sub-Total 0 0 2 6 8 0 0 8 7 150-8 m 0 6 15 4 25 0 0 11 5 168-10m 0 0 3 1 4 0 0 2 2 4

Sub-Total 0 6 18 5 29 0 0 13 7 200-8 m 0 0 10 3 13 0 0 3 3 68-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 10 3 13 0 0 3 3 60-8 m 0 4 109 5 118 0 1 78 6 858-10m 0 1 15 0 16 0 0 19 2 21

Sub-Total 0 5 124 5 134 0 1 97 8 1060-8 m 0 4 65 7 76 0 2 51 6 598-10m 0 0 2 0 2 0 0 5 0 5

Sub-Total 0 4 67 7 78 0 2 56 6 640-8 m 0 4 42 0 46 0 0 64 6 708-10m 0 1 5 0 6 0 0 15 3 18

Sub-Total 0 5 47 0 52 0 0 79 9 880-8 m 0 1 15 1 17 0 1 33 2 368-10m 0 0 7 0 7 0 0 10 1 11

Sub-Total 0 1 22 1 24 0 1 43 3 470-8 m 0 5 119 0 124 0 7 79 0 868-10m 0 0 15 1 16 0 1 26 1 28

Sub-Total 0 5 134 1 140 0 8 105 1 1140-8 m 0 12 135 3 150 0 13 114 2 1298-10m 0 0 1 2 3 0 0 0 0 0

Sub-Total 0 12 136 5 153 0 13 114 2 1290-8 m 0 0 6 0 6 0 0 4 0 48-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 6 0 6 0 0 4 0 451 53-54

49 51-52

50 52-53

47 49-50

48 50-51

45 46-48

46 48-49

43 43-45

44 45-46

41 41-42

42 42-43

39 39-40

40 40-41

Page 169: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

0-8 m 0 5 10 1 16 0 3 14 0 178-10m 0 0 0 0 0 0 1 12 2 15

Sub-Total 0 5 10 1 16 0 4 26 2 320-8 m 0 0 38 0 38 0 0 29 0 298-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 38 0 38 0 0 29 0 290-8 m 0 2 11 0 13 0 6 14 1 218-10m 0 0 11 1 12 0 1 9 3 13

Sub-Total 0 2 22 1 25 0 7 23 4 340-8 m 0 196 1710 333 2239 0 206 1670 226 21028-10m 0 17 168 127 312 1 23 247 138 409

Sub-Total 0 213 1878 460 2551 1 229 1917 364 2511Grand Total

53 55-56

54 56-57

52 54-55

Page 170: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to 1800 >1800 mm Total

1 0-1 km 0-8 m 0 0 0 0 0 0 0 0 0 0

8-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 0

2 1-2 km 0-8 m 0 0 0 0 0 0 0 0 0 0

8-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 03 2-3 km 0-8 m 0 3 34 4 41 0 1 8 8 17

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 3 34 4 41 0 1 8 8 17

4 3-4 km 0-8 m 0 6 25 11 42 0 2 19 9 308-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 6 25 11 42 0 2 19 9 305 4-5 km 0-8 m 0 0 22 6 28 0 0 21 5 26

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 22 6 28 0 0 21 5 26

6 5-6 km 0-8 m 0 0 29 17 46 0 1 26 10 378-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 29 17 46 0 1 26 10 377 6-7 km 0-8 m 0 4 94 9 107 0 4 94 4 102

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 4 94 9 107 0 4 94 4 102

8 7-8 km 0-8 m 0 0 40 16 56 0 0 39 18 578-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 40 16 56 0 0 39 18 579 8-9 km 0-8 m 0 0 108 14 122 0 8 101 10 119

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 108 14 122 0 8 101 10 119

10 9-10 km 0-8 m 0 2 23 11 36 0 1 18 10 298-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 23 11 36 0 1 18 10 2911 10-11 km 0-8 m 0 2 5 25 32 0 9 6 29 44

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 5 25 32 0 9 6 29 44

ANNEXURE-IC

Tree Enumeration List of Corridor - Bhawanipatna to Khariar

Sl. No. Location Chainage Mtr.

Left RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)

Page 171: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to 1800 >1800 mm TotalSl. No. Location

Chainage Mtr.

Left RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)

12 11-12 km 0-8 m 0 2 0 35 37 0 1 0 32 338-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 0 35 37 0 1 0 32 3313 12-13 km 0-8 m 0 3 11 31 45 0 4 8 34 46

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 3 11 31 45 0 4 8 34 46

14 13-14 km 0-8 m 0 1 0 42 43 0 1 4 29 348-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 0 42 43 0 1 4 29 3415 14-15 km 0-8 m 0 5 10 43 58 0 2 2 36 40

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 5 10 43 58 0 2 2 36 40

16 15-16 km 0-8 m 0 0 3 33 36 0 8 5 37 508-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 3 33 36 0 8 5 37 5017 16-17 km 0-8 m 0 0 4 38 42 0 1 1 37 39

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 4 38 42 0 1 1 37 39

18 17-18 km 0-8 m 0 13 18 30 61 0 1 2 17 208-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 13 18 30 61 0 1 2 17 2019 18-19 km 0-8 m 0 1 15 37 53 0 1 10 37 48

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 1 15 37 53 0 1 10 37 48

20 19-20 km 0-8 m 0 0 34 49 83 0 0 40 58 988-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 34 49 83 0 0 40 58 9821 20-21km 0-8 m 0 5 33 31 69 0 2 34 19 55

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 5 33 31 69 0 2 34 19 55

22 21-22 km 0-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 023 22-23 km 0-8 m 0 2 15 24 41 0 2 20 26 48

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 15 24 41 0 2 20 26 48

24 23-24 km 0-8 m 0 1 43 12 56 0 0 41 15 568-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 43 12 56 0 0 41 15 56

Page 172: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to 1800 >1800 mm TotalSl. No. Location

Chainage Mtr.

Left RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)

25 24-25 km 0-8 m 0 0 8 11 19 0 1 10 7 188-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 8 11 19 0 1 10 7 1826 25-26 km 0-8 m 0 0 14 19 33 0 2 13 13 28

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 14 19 33 0 2 13 13 28

27 26-27 km 0-8 m 0 2 21 7 30 0 3 15 5 238-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 21 7 30 0 3 15 5 2328 27-28 km 0-8 m 0 0 0 0 0 0 0 0 0 0

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 0 0 0 0 0 0 0 0

29 28-29 km 0-8 m 0 0 4 4 8 0 3 6 4 138-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 4 4 8 0 3 6 4 1330 29-30km 0-8 m 0 5 6 0 11 0 6 0 0 6

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 5 6 0 11 0 6 0 0 6

31 30-31 km 0-8 m 0 5 10 2 17 0 0 0 1 18-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 5 10 2 17 0 0 0 1 132 31-32km 0-8 m 0 5 5 1 11 0 5 3 0 8

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 5 5 1 11 0 5 3 0 8

33 32-33km 0-8 m 0 2 5 1 8 0 3 3 4 108-10m 0 0 0 0 0 0 0 0 1 1

Sub-Total 0 2 5 1 8 0 3 3 5 1134 33-34km 0-8 m 0 1 1 1 3 0 4 2 5 11

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 1 1 1 3 0 4 2 5 11

35 34-35km 0-8 m 0 1 1 0 2 0 7 7 1 158-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 1 0 2 0 7 7 1 1536 35-36km 0-8 m 0 0 2 3 5 0 0 6 4 10

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 2 3 5 0 0 6 4 10

37 36-37km 0-8 m 0 0 4 2 6 0 0 3 3 68-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 4 2 6 0 0 3 3 6

Page 173: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to 1800 >1800 mm TotalSl. No. Location

Chainage Mtr.

Left RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)

38 37-38km 0-8 m 0 0 1 8 9 0 0 1 1 28-10m 0 0 0 0 0 0 0 0 1 1

Sub-Total 0 0 1 8 9 0 0 1 2 339 38-39km 0-8 m 0 0 2 10 12 0 0 2 10 12

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 2 10 12 0 0 2 10 12

40 39-40km 0-8 m 0 0 6 20 26 0 19 16 14 498-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 6 20 26 0 19 16 14 4941 40-41km 0-8 m 0 0 0 7 7 0 0 3 2 5

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 0 7 7 0 0 3 2 5

42 41-42km 0-8 m 0 2 2 0 4 0 1 0 1 28-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 2 0 4 0 1 0 1 243 42-43km 0-8 m 0 2 8 2 12 0 19 10 0 29

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 8 2 12 0 19 10 0 29

44 43-44km 0-8 m 0 18 1 4 23 0 27 14 2 438-10m 0 0 0 0 0 0 2 2 0 4

Sub-Total 0 18 1 4 23 0 29 16 2 4745 44-45km 0-8 m 0 54 19 0 73 0 37 14 1 52

8-10m 0 0 1 0 1 0 0 0 0 0Sub-Total 0 54 20 0 74 0 37 14 1 52

46 45-46km 0-8 m 0 13 3 2 18 0 12 6 4 228-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 13 3 2 18 0 12 6 4 2247 46-47km 0-8 m 0 17 18 1 36 0 6 10 1 17

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 17 18 1 36 0 6 10 1 17

48 47-48km 0-8 m 0 14 7 0 21 0 20 5 0 258-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 14 7 0 21 0 20 5 0 2549 48-49km 0-8 m 0 2 2 0 4 0 12 2 4 18

8-10m 0 3 0 0 3 0 0 0 0 0Sub-Total 0 5 2 0 7 0 12 2 4 18

50 49-50km 0-8 m 0 0 5 0 5 0 0 6 1 78-10m 0 0 0 0 0 0 2 0 0 2

Sub-Total 0 0 5 0 5 0 2 6 1 951 50-51km 0-8 m 0 0 6 4 10 0 4 3 1 8

8-10m 0 3 1 0 4 0 0 0 1 1Sub-Total 0 3 7 4 14 0 4 3 2 9

Page 174: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to 1800 >1800 mm TotalSl. No. Location

Chainage Mtr.

Left RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)

52 51-52km 0-8 m 0 9 1 1 11 0 16 3 0 198-10m 0 2 2 0 4 0 3 1 0 4

Sub-Total 0 11 3 1 15 0 19 4 0 2353 52-53km 0-8 m 0 2 1 6 9 0 5 2 2 9

8-10m 0 0 0 0 0 0 1 1 0 2Sub-Total 0 2 1 6 9 0 6 3 2 11

54 53-54km 0-8 m 0 3 0 1 4 0 3 1 3 78-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 3 0 1 4 0 3 1 3 755 54-55km 0-8 m 0 8 3 5 16 0 11 0 3 14

8-10m 0 0 0 0 0 0 5 1 0 6Sub-Total 0 8 3 5 16 0 16 1 3 20

56 55-56km 0-8 m 0 4 3 14 21 0 0 0 3 38-10m 0 0 2 2 4 0 0 0 0 0

Sub-Total 0 4 5 16 25 0 0 0 3 357 56-57km 0-8 m 0 10 39 1 50 0 15 34 4 53

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 10 39 1 50 0 15 34 4 53

58 57-58km 0-8 m 0 49 35 5 89 0 12 38 7 578-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 49 35 5 89 0 12 38 7 5759 58-59km 0-8 m 0 0 0 0 0 0 0 0 0 0

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 0 0 0 0 0 0 0 0

60 59-60km 0-8 m 0 2 7 2 11 0 0 7 2 98-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 7 2 11 0 0 7 2 961 60-61km 0-8 m 0 0 9 2 11 0 3 15 1 19

8-10m 0 0 0 0 0 0 0 1 0 1Sub-Total 0 0 9 2 11 0 3 16 1 20

62 61-62km 0-8 m 0 4 10 1 15 0 0 0 0 08-10m 0 0 2 0 2 0 0 2 0 2

Sub-Total 0 4 12 1 17 0 0 2 0 263 62-63km 0-8 m 0 3 10 2 15 0 8 8 0 16

8-10m 0 0 1 1 2 0 1 2 0 3Sub-Total 0 3 11 3 17 0 9 10 0 19

64 63-64km 0-8 m 0 0 1 1 2 0 3 4 2 98-10m 0 0 1 0 1 0 1 1 0 2

Sub-Total 0 0 2 1 3 0 4 5 2 1165 64-65km 0-8 m 0 2 16 3 21 0 8 0 1 9

8-10m 0 0 1 1 2 0 0 2 1 3Sub-Total 0 2 17 4 23 0 8 2 2 12

Page 175: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to 1800 >1800 mm TotalSl. No. Location

Chainage Mtr.

Left RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)

66 65-66km 0-8 m 0 2 7 5 14 0 0 0 1 18-10m 0 0 2 0 2 0 0 2 0 2

Sub-Total 0 2 9 5 16 0 0 2 1 367 66-67km 0-8 m 0 0 4 3 7 0 1 0 0 1

8-10m 0 0 0 0 0 0 0 1 0 1Sub-Total 0 0 4 3 7 0 1 1 0 2

68 67-68km 0-8 m 0 9 24 0 33 38 8 5 518-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 9 24 0 33 0 38 8 5 5169 68-69km 0-8 m 0 3 0 0 3 0 21 5 0 26

8-10m 0 3 1 0 4 0 0 0 0 0Sub-Total 0 6 1 0 7 0 21 5 0 26

70 69-70km 0-8 m 0 1 22 2 25 0 2 24 2 288-10m 0 0 0 0 0 0 1 1 0 2

Sub-Total 0 1 22 2 25 0 3 25 2 300-8 m 0 304 919 681 1904 0 386 808 605 17998-10m 0 11 14 4 29 0 16 17 4 37

Sub-Total 0 315 933 685 1933 0 402 825 609 1836Grand Total

Page 176: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

1 00-01 km 0-8 m 0 5 14 0 19 0 3 12 3 18

8-10m 0 0 0 1 1 0 0 0 0 0

Sub-Total 0 5 14 1 20 0 3 12 3 18

2 01-02 km 0-8 m 0 0 13 8 21 0 0 8 5 13

8-10m 0 0 2 0 2 0 0 0 0 0

Sub-Total 0 0 15 8 23 0 0 8 5 133 02-03 km 0-8 m 0 1 7 9 17 0 0 6 7 13

8-10m 0 0 0 0 0 0 0 1 0 1Sub-Total 0 1 7 9 17 0 0 7 7 14

4 03-04 km 0-8 m 0 0 10 11 21 0 1 17 3 218-10m 0 0 2 0 2 0 0 2 0 2

Sub-Total 0 0 12 11 23 0 1 19 3 235 04-05 km 0-8 m 0 0 3 4 7 0 0 11 0 11

8-10m 0 0 3 2 5 0 0 3 0 3Sub-Total 0 0 6 6 12 0 0 14 0 14

6 05-06 km 0-8 m 0 0 18 14 32 0 0 22 5 278-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 18 14 32 0 0 22 5 277 06-07 km 0-8 m 0 0 18 12 30 0 1 24 2 27

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 18 12 30 0 1 24 2 27

8 07-08 km 0-8 m 0 0 6 8 14 0 4 17 10 318-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 6 8 14 0 4 17 10 319 08-09 km 0-8 m 0 0 7 7 14 0 0 11 4 15

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 7 7 14 0 0 11 4 15

10 09-10 km 0-8 m 0 0 1 11 12 0 0 1 4 58-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 1 11 12 0 0 1 4 511 10-11 km 0-8 m 0 0 22 5 27 0 0 6 2 8

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 22 5 27 0 0 6 2 8

12 11-12 km 0-8 m 0 0 6 3 9 0 0 9 1 10

ANNEXURE-ID

Tree Enumeration List of Corridor - Berhampur to Bangi Jn.Right

Girth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

Page 177: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 6 3 9 0 0 9 1 10

13 12-13 km 0-8 m 0 0 1 4 5 0 0 10 0 108-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 1 4 5 0 0 10 0 1014 13-14 km 0-8 m 0 0 9 0 9 0 0 5 2 7

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 9 0 9 0 0 5 2 7

15 14-15 km 0-8 m 0 0 2 0 2 0 0 4 1 58-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 2 0 2 0 0 4 1 516 15-16 km 0-8 m 0 0 6 1 7 0 0 9 4 13

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 6 1 7 0 0 9 4 13

17 16-17 km 0-8 m 0 0 1 7 8 0 0 2 3 58-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 1 7 8 0 0 2 3 518 17-18 km 0-8 m 0 0 3 6 9 0 0 4 3 7

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 3 6 9 0 0 4 3 7

19 18-19 km 0-8 m 0 0 6 4 10 0 0 4 6 108-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 6 4 10 0 0 4 6 1020 19-20 km 0-8 m 0 0 1 5 6 0 0 3 5 8

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 1 5 6 0 0 3 5 8

21 21-21 km 0-8 m 0 2 8 2 12 0 0 3 2 58-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 2 8 2 12 0 0 3 2 522 21-22 km 0-8 m 0 0 1 7 8 0 0 2 8 10

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 1 7 8 0 0 2 8 10

23 22-23 km 0-8 m 0 0 5 1 6 0 0 8 1 98-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 5 1 6 0 0 8 1 924 23-24 km 0-8 m 0 0 10 1 11 0 0 10 11 21

8-10m 0 0 0 1 1 0 0 3 0 3Sub-Total 0 0 10 2 12 0 0 13 11 24

25 24-25 km 0-8 m 0 0 9 16 25 0 2 11 16 298-10m 0 0 0 0 0 0 0 0 0 0

Page 178: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

Sub-Total 0 0 9 16 25 0 2 11 16 2926 25-26 km 0-8 m 0 0 9 3 12 0 1 6 3 10

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 9 3 12 0 1 6 3 10

27 26-27 km 0-8 m 0 0 8 4 12 0 1 11 1 138-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 8 4 12 0 1 11 1 1328 27-28 km 0-8 m 0 0 7 3 10 0 0 15 3 18

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 7 3 10 0 0 15 3 18

29 28-29 km 0-8 m 0 0 14 3 17 0 0 6 5 118-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 14 3 17 0 0 6 5 1130 29-30 km 0-8 m 0 0 3 0 3 0 0 9 2 11

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 3 0 3 0 0 9 2 11

31 30-31 km 0-8 m 0 0 13 0 13 0 0 18 0 188-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 13 0 13 0 0 18 0 1832 31-32 km 0-8 m 0 0 11 9 20 0 0 9 15 24

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 11 9 20 0 0 9 15 24

33 32-33 km 0-8 m 0 0 9 17 26 0 0 25 14 398-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 9 17 26 0 0 25 14 3934 33-34 km 0-8 m 0 0 20 14 34 0 0 15 6 21

8-10m 0 0 5 0 5 0 0 3 0 3Sub-Total 0 0 25 14 39 0 0 18 6 24

35 34-35 km 0-8 m 0 0 10 7 17 0 0 4 7 118-10m 0 0 4 0 4 0 0 6 0 6

Sub-Total 0 0 14 7 21 0 0 10 7 1736 35-36 km 0-8 m 0 0 2 20 22 0 0 8 21 29

8-10m 0 0 2 0 2 0 0 1 0 1Sub-Total 0 0 4 20 24 0 0 9 21 30

37 36-37 km 0-8 m 0 0 12 2 14 0 0 12 8 208-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 12 2 14 0 0 12 8 2038 37-38 km 0-8 m 0 0 21 5 26 0 0 16 10 26

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 21 5 26 0 0 16 10 26

Page 179: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

39 38-39 km 0-8 m 0 0 12 6 18 0 1 13 5 198-10m 0 0 7 8 15 0 0 2 4 6

Sub-Total 0 0 19 14 33 0 1 15 9 2540 39-40 km 0-8 m 0 0 18 5 23 0 1 18 11 30

8-10m 0 0 1 0 1 0 0 3 1 4Sub-Total 0 0 19 5 24 0 1 21 12 34

41 40-41 km 0-8 m 0 2 43 5 50 0 3 18 6 278-10m 0 0 9 0 9 0 0 9 0 9

Sub-Total 0 2 52 5 59 0 3 27 6 3642 41-42 km 0-8 m 0 0 22 5 27 0 0 30 5 35

8-10m 0 0 0 0 0 0 0 0 1 1Sub-Total 0 0 22 5 27 0 0 30 6 36

43 42-43 km 0-8 m 0 0 30 5 35 0 1 31 7 398-10m 0 0 0 0 0 0 0 1 1 2

Sub-Total 0 0 30 5 35 0 1 32 8 4144 43-44 km 0-8 m 0 0 35 7 42 0 0 35 9 44

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 35 7 42 0 0 35 9 44

45 44-45 km 0-8 m 0 0 19 1 20 0 0 27 13 408-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 19 1 20 0 0 27 13 4046 45-46 km 0-8 m 0 0 14 0 14 0 0 10 6 16

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 14 0 14 0 0 10 6 16

47 46-47 km 0-8 m 0 0 25 0 25 0 0 15 0 158-10m 0 0 8 0 8 0 0 7 0 7

Sub-Total 0 0 33 0 33 0 0 22 0 2248 47-48 km 0-8 m 0 0 26 0 26 0 0 13 0 13

8-10m 0 0 10 0 10 0 0 6 0 6Sub-Total 0 0 36 0 36 0 0 19 0 19

49 48-49 km 0-8 m 0 0 50 0 50 0 0 25 1 268-10m 0 0 19 0 19 0 0 15 0 15

Sub-Total 0 0 69 0 69 0 0 40 1 4150 49-50 km 0-8 m 0 0 17 0 17 0 0 21 1 22

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 17 0 17 0 0 21 1 22

51 50-51 km 0-8 m 0 0 14 0 14 0 0 5 0 58-10m 0 0 1 0 1 0 0 0 0 0

Sub-Total 0 0 15 0 15 0 0 5 0 552 51-52 km 0-8 m 0 0 3 0 3 0 0 4 1 5

Page 180: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 3 0 3 0 0 4 1 5

53 52-53 km 0-8 m 0 0 2 0 2 0 0 3 0 38-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 2 0 2 0 0 3 0 354 53-54 km 0-8 m 0 0 12 2 14 0 0 7 0 7

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 12 2 14 0 0 7 0 7

55 54-55 km 0-8 m 0 0 4 2 6 0 0 3 3 68-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 4 2 6 0 0 3 3 656 55-56 km 0-8 m 0 0 27 7 34 0 0 33 9 42

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 27 7 34 0 0 33 9 42

57 56-57 km 0-8 m 0 0 28 9 37 0 0 24 12 368-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 28 9 37 0 0 24 12 3658 57-58 km 0-8 m 0 0 38 13 51 0 0 38 7 45

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 38 13 51 0 0 38 7 45

59 58-59 km 0-8 m 0 0 19 0 19 0 0 10 5 158-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 19 0 19 0 0 10 5 1560 59-60 km 0-8 m 0 0 20 0 20 0 0 16 3 19

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 20 0 20 0 0 16 3 19

61 60-61 km 0-8 m 0 0 17 2 19 0 0 21 1 228-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 17 2 19 0 0 21 1 2262 61-62 km 0-8 m 0 0 8 1 9 0 0 12 0 12

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 8 1 9 0 0 12 0 12

63 62-63 km 0-8 m 0 0 10 0 10 0 0 7 0 78-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 10 0 10 0 0 7 0 764 63-64 km 0-8 m 0 0 18 12 30 0 0 9 4 13

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 18 12 30 0 0 9 4 13

65 64-65 km 0-8 m 0 0 23 1 24 0 0 30 3 338-10m 0 0 0 0 0 0 0 0 0 0

Page 181: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

Sub-Total 0 0 23 1 24 0 0 30 3 3366 65-66 km 0-8 m 0 0 16 4 20 0 0 36 5 41

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 16 4 20 0 0 36 5 41

67 66-67 km 0-8 m 0 0 16 3 19 0 0 19 6 258-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 16 3 19 0 0 19 6 2568 67-68 km 0-8 m 0 0 8 12 20 0 0 19 12 31

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 8 12 20 0 0 19 12 31

69 68-69 km 0-8 m 0 0 62 0 62 0 0 38 0 388-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 62 0 62 0 0 38 0 3870 69-70 km 0-8 m 0 0 26 1 27 0 0 9 1 10

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 26 1 27 0 0 9 1 10

71 70-71 km 0-8 m 0 0 1 0 1 0 0 1 1 28-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 1 0 1 0 0 1 1 272 71-72 km 0-8 m 0 0 11 1 12 0 0 11 0 11

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 11 1 12 0 0 11 0 11

73 72-73 km 0-8 m 0 0 25 0 25 0 0 30 0 308-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 25 0 25 0 0 30 0 3074 73-74 km 0-8 m 0 0 45 2 47 0 0 39 0 39

8-10m 0 0 15 0 15 0 0 8 0 8Sub-Total 0 0 60 2 62 0 0 47 0 47

75 74-75 km 0-8 m 0 0 17 0 17 0 0 22 0 228-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 17 0 17 0 0 22 0 2276 75-76 km 0-8 m 0 0 24 0 24 0 0 10 1 11

8-10m 0 0 14 0 14 0 0 6 0 6Sub-Total 0 0 38 0 38 0 0 16 1 17

77 76-77 km 0-8 m 0 0 38 4 42 0 0 38 0 388-10m 0 0 9 0 9 0 0 13 0 13

Sub-Total 0 0 47 4 51 0 0 51 0 5178 77-78 km 0-8 m 0 0 45 0 45 0 0 60 0 60

8-10m 0 0 11 0 11 0 0 17 0 17Sub-Total 0 0 56 0 56 0 0 77 0 77

Page 182: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

79 78-79 km 0-8 m 0 0 108 0 108 0 0 94 0 948-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 108 0 108 0 0 94 0 9480 79-80 km 0-8 m 0 0 28 2 30 0 0 35 0 35

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 28 2 30 0 0 35 0 35

81 80-81 km 0-8 m 0 0 10 0 10 0 0 18 0 188-10m 0 0 3 0 3 0 0 0 0 0

Sub-Total 0 0 13 0 13 0 0 18 0 1882 81-82 km 0-8 m 0 0 6 8 14 0 0 16 0 16

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 6 8 14 0 0 16 0 16

83 82-83 km 0-8 m 0 0 12 0 12 0 0 2 0 28-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 12 0 12 0 0 2 0 284 83-84 km 0-8 m 0 0 3 1 4 0 0 14 1 15

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 3 1 4 0 0 14 1 15

85 84-85 km 0-8 m 0 0 2 0 2 0 0 5 2 78-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 2 0 2 0 0 5 2 786 85-86 km 0-8 m 0 0 1 0 1 0 0 4 0 4

8-10m 0 0 4 0 4 0 0 0 0 0Sub-Total 0 0 5 0 5 0 0 4 0 4

87 86-87 km 0-8 m 0 0 6 12 18 0 0 9 13 228-10m 0 0 6 4 10 0 0 7 0 7

Sub-Total 0 0 12 16 28 0 0 16 13 2988 87-88 km 0-8 m 0 0 30 6 36 0 0 23 7 30

8-10m 0 0 8 0 8 0 0 0 0 0Sub-Total 0 0 38 6 44 0 0 23 7 30

89 88-89 km 0-8 m 0 0 3 1 4 0 0 4 0 48-10m 0 0 0 0 0 0 0 7 0 7

Sub-Total 0 0 3 1 4 0 0 11 0 1190 89-90 km 0-8 m 0 0 4 0 4 0 0 11 0 11

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 4 0 4 0 0 11 0 11

91 90-91 km 0-8 m 0 0 16 0 16 0 0 17 0 178-10m 0 0 8 0 8 0 0 4 0 4

Sub-Total 0 0 24 0 24 0 0 21 0 2192 91-92 km 0-8 m 0 0 13 9 22 0 0 5 4 9

Page 183: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

8-10m 0 0 9 0 9 0 0 6 0 6Sub-Total 0 0 22 9 31 0 0 11 4 15

93 92-93 km 0-8 m 0 0 29 2 31 0 0 13 3 168-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 29 2 31 0 0 13 3 1694 93-94 km 0-8 m 0 0 9 3 12 0 0 1 6 7

8-10m 0 0 1 0 1 0 0 0 0 0Sub-Total 0 0 10 3 13 0 0 1 6 7

95 94-95 km 0-8 m 0 0 22 0 22 0 0 17 0 178-10m 0 0 4 0 4 0 0 8 0 8

Sub-Total 0 0 26 0 26 0 0 25 0 2596 95-96 km 0-8 m 0 0 30 0 30 0 0 23 0 23

8-10m 0 0 7 0 7 0 0 11 0 11Sub-Total 0 0 37 0 37 0 0 34 0 34

97 96-97 km 0-8 m 0 0 19 0 19 0 0 1 0 18-10m 0 0 0 0 0 0 0 3 0 3

Sub-Total 0 0 19 0 19 0 0 4 0 498 97-98 km 0-8 m 0 0 19 2 21 0 0 9 5 14

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 19 2 21 0 0 9 5 14

99 98-99 km 0-8 m 0 0 19 2 21 0 0 14 6 208-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 19 2 21 0 0 14 6 20100 99-100 km 0-8 m 0 0 15 3 18 0 0 25 2 27

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 15 3 18 0 0 25 2 27

101 100-101 km 0-8 m 0 0 8 4 12 0 0 1 0 18-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 8 4 12 0 0 1 0 1102 101-102 km 0-8 m 0 0 2 3 5 0 0 12 6 18

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 2 3 5 0 0 12 6 18

103 102-103 km 0-8 m 0 0 39 6 45 0 0 12 6 188-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 39 6 45 0 0 12 6 18104 103-104 km 0-8 m 0 0 16 4 20 0 0 35 1 36

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 16 4 20 0 0 35 1 36

105 104-105 km 0-8 m 0 0 16 1 17 0 0 43 4 478-10m 0 0 0 0 0 0 0 0 0 0

Page 184: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

Sub-Total 0 0 16 1 17 0 0 43 4 47106 105-106 km 0-8 m 0 0 17 2 19 0 0 9 3 12

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 17 2 19 0 0 9 3 12

107 106-107 km 0-8 m 0 0 35 6 41 0 0 16 1 178-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 35 6 41 0 0 16 1 17108 107-108 km 0-8 m 0 0 36 6 42 0 0 23 5 28

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 36 6 42 0 0 23 5 28

109 108-109 km 0-8 m 0 0 20 4 24 0 0 15 10 258-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 20 4 24 0 0 15 10 25110 109-110 km 0-8 m 0 0 33 7 40 0 0 48 7 55

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 33 7 40 0 0 48 7 55

111 110-111 km 0-8 m 0 0 18 2 20 0 0 14 4 188-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 18 2 20 0 0 14 4 18112 111-112 km 0-8 m 0 0 40 2 42 0 0 41 2 43

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 40 2 42 0 0 41 2 43

113 112-113 km 0-8 m 0 0 25 0 25 0 0 42 2 448-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 25 0 25 0 0 42 2 44114 113-114 km 0-8 m 0 0 8 4 12 0 0 11 10 21

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 8 4 12 0 0 11 10 21

115 114-115 km 0-8 m 0 0 4 0 4 0 0 19 4 238-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 4 0 4 0 0 19 4 23116 115-116 km 0-8 m 0 1 28 4 33 0 0 33 0 33

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 1 28 4 33 0 0 33 0 33

117 116-117 km 0-8 m 0 0 1 18 6 0 0 51 3 548-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 1 18 6 0 0 51 3 54118 117-118 km 0-8 m 0 0 10 0 10 0 0 15 14 29

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 10 0 10 0 0 15 14 29

Page 185: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

119 118-119 km 0-8 m 0 0 31 0 31 0 0 15 0 158-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 31 0 31 0 0 15 0 15120 119-120 km 0-8 m 0 0 64 1 65 0 0 20 0 20

8-10m 0 0 0 0 0 0 0 2 0 2Sub-Total 0 0 64 1 65 0 0 22 0 22

121 120-121 km 0-8 m 0 0 25 0 25 0 0 20 3 238-10m 0 0 0 0 0 0 0 4 0 4

Sub-Total 0 0 25 0 25 0 0 24 3 27122 121-122 km 0-8 m 0 0 44 4 48 0 0 24 6 30

8-10m 0 0 0 0 0 0 0 6 0 6Sub-Total 0 0 44 4 48 0 0 30 6 36

123 122-123 km 0-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 0124 123-124 km 0-8 m 0 0 234 1 235 0 0 159 3 162

8-10m 0 0 0 0 0 0 0 32 0 32Sub-Total 0 0 234 1 235 0 0 191 3 194

125 124-125 km 0-8 m 0 0 182 3 185 0 0 153 2 1558-10m 0 0 0 0 0 0 0 16 0 16

Sub-Total 0 0 182 3 185 0 0 169 2 171126 125-126 km 0-8 m 0 0 26 1 27 0 0 32 5 37

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 26 1 27 0 0 32 5 37

127 126-127 km 0-8 m 0 0 123 10 133 0 0 90 6 968-10m 0 0 0 0 0 0 0 16 2 18

Sub-Total 0 0 123 10 133 0 0 106 8 114128 127-128 km 0-8 m 0 1 92 4 97 0 0 68 7 75

8-10m 0 0 0 1 1 0 0 6 0 6Sub-Total 0 1 92 5 98 0 0 74 7 81

129 128-129 km 0-8 m 0 0 115 3 118 0 1 122 1 1248-10m 0 0 2 0 2 0 0 3 1 4

Sub-Total 0 0 117 3 120 0 1 125 2 128130 129-130 km 0-8 m 0 0 61 4 65 0 0 65 6 71

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 61 4 65 0 0 65 6 71

131 130-131 km 0-8 m 0 0 18 1 19 0 0 24 1 258-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 18 1 19 0 0 24 1 25132 131-132 km 0-8 m 0 0 4 2 6 0 0 5 0 5

Page 186: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 4 2 6 0 0 5 0 5

133 132-133 km 0-8 m 0 1 69 4 74 0 1 24 4 298-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 69 4 74 0 1 24 4 29134 133-134 km 0-8 m 0 0 8 1 9 0 0 10 3 13

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 8 1 9 0 0 10 3 13

135 134-135 km 0-8 m 0 0 25 0 25 1 0 81 0 828-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 25 0 25 1 0 81 0 82136 135-136 km 0-8 m 0 2 46 2 50 0 0 37 1 38

8-10m 0 0 0 0 0 0 0 3 0 3Sub-Total 0 2 46 2 50 0 0 40 1 41

137 136-137 km 0-8 m 0 1 4 0 5 0 1 16 3 208-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 4 0 5 0 1 16 3 20138 137-138 km 0-8 m 0 0 0 0 0 0 0 0 0 0

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 0 0 0 0 0 0 0 0 0

139 138-139 km 0-8 m 0 0 40 2 42 0 2 31 1 348-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 40 2 42 0 2 31 1 34140 139-140 km 0-8 m 0 2 51 0 53 0 2 39 2 43

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 51 0 53 0 2 39 2 43

141 140-141 km 0-8 m 0 0 21 6 27 0 0 29 3 328-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 21 6 27 0 0 29 3 32142 141-142 km 0-8 m 0 0 0 0 0 0 0 10 0 10

8-10m 0 0 8 0 8 0 0 10 0 10Sub-Total 0 0 8 0 8 0 0 20 0 20

143 142-143 km 0-8 m 0 0 0 0 0 0 1 20 0 218-10m 0 6 25 0 31 0 0 0 0 0

Sub-Total 0 6 25 0 31 0 1 20 0 21144 143-144 km 0-8 m 0 2 14 0 16 0 0 15 0 15

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 2 14 0 16 0 0 15 0 15

145 144-145 km 0-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 5 23 2 30 0 8 48 0 56

Page 187: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location

Chainage Mtr.

Left

Sub-Total 0 5 23 2 30 0 8 48 0 56146 145-146 km 0-8 m 0 7 42 0 49 0 0 0 0 0

8-10m 0 0 0 0 0 0 5 35 2 42Sub-Total 0 7 42 0 49 0 5 35 2 42

147 146-147 km 0-8 m 0 0 16 80 0 0 6 56 0 628-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 16 80 0 0 6 56 0 62148 147-148 km 0-8 m 0 4 17 1 22 0 5 11 0 16

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 4 17 1 22 0 5 11 0 16

149 148-149 km 0-8 m 0 0 7 2 9 0 3 7 2 128-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 7 2 9 0 3 7 2 12150 149-150 km 0-8 m 0 3 10 2 15 0 0 8 8 16

8-10m 0 0 0 0 0 0 0 0 0 0Sub-Total 0 3 10 2 15 0 0 8 8 16

0-8 m 0 34 3286 612 3932 1 43 3208 555 38078-10m 0 11 238 27 276 0 13 338 17 368

Total 0 45 3524 639 4208 1 56 3546 572 4175Grand Total

Page 188: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

0-8 m 0 0 0 1 1 0 0 0 0 08-10m 0 0 20 0 20 0 0 0 0 0

Sub-Total 0 0 20 1 21 0 0 0 0 00-8 m 0 0 43 0 43 0 1 45 0 468-10m 0 15 58 0 73 0 0 12 0 12

Sub-Total 0 15 101 0 116 0 1 57 0 580-8 m 0 1 38 0 39 0 0 26 0 268-10m 0 29 112 0 141 0 0 83 0 83

Sub-Total 0 30 150 0 180 0 0 109 0 1090-8 m 0 0 2 0 2 0 0 0 0 08-10m 0 4 15 0 19 0 2 222 0 224

Sub-Total 0 4 17 0 21 0 2 222 0 2240-8 m 0 0 17 2 19 0 0 29 1 308-10m 0 0 25 0 25 0 0 17 0 17

Sub-Total 0 0 42 2 44 0 0 46 1 470-8 m 0 0 21 3 24 0 0 29 0 298-10m 0 2 32 2 36 0 0 39 0 39

Sub-Total 0 2 53 5 60 0 0 68 0 680-8 m 0 1 36 3 40 0 0 35 2 378-10m 0 0 22 2 24 0 0 52 1 53

Sub-Total 0 1 58 5 64 0 0 87 3 900-8 m 0 0 8 4 12 0 0 32 14 468-10m 0 2 16 0 18 0 0 17 0 17

Sub-Total 0 2 24 4 30 0 0 49 14 630-8 m 0 2 6 0 8 0 0 62 3 658-10m 0 0 37 2 39 0 0 2 0 2

Sub-Total 0 2 43 2 47 0 0 64 3 670-8 m 0 1 14 1 16 0 0 33 2 358-10m 0 0 8 3 11 0 0 18 0 18

Sub-Total 0 1 22 4 27 0 0 51 2 530-8 m 0 0 5 1 6 0 0 1 3 48-10m 0 0 5 0 5 0 0 2 2 4

Sub-Total 0 0 10 1 11 0 0 3 5 8

Tree Enumeration List of Corridor - Bangi Jn to J.K.PurRight

Girth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

1 118-119 km

2 119-120 km

3 120-121 km

4 121-122 km

5 122-123 km

6 123-124 km

7 124-125 km

8 125-126 km

9 126-127 km

10 127-128 km

11 128-129 km

ANNEXURE-IE

Page 189: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

0-8 m 0 0 8 2 10 0 0 0 0 08-10m 0 0 8 2 10 0 0 11 0 11

Sub-Total 0 0 16 4 20 0 0 11 0 110-8 m 0 0 6 3 9 0 0 15 0 158-10m 0 0 2 3 5 0 0 7 0 7

Sub-Total 0 0 8 6 14 0 0 22 0 220-8 m 0 0 7 4 11 0 0 18 2 208-10m 0 0 3 3 6 0 0 5 0 5

Sub-Total 0 0 10 7 17 0 0 23 2 250-8 m 0 0 0 0 0 0 0 3 1 48-10m 0 0 1 0 1 0 0 4 0 4

Sub-Total 0 0 1 0 1 0 0 7 1 80-8 m 0 0 1 5 6 0 0 0 2 28-10m 0 4 51 2 57 0 0 3 4 7

Sub-Total 0 4 52 7 63 0 0 3 6 90-8 m 0 0 0 8 8 0 0 0 1 18-10m 0 9 49 1 59 0 0 122 4 126

Sub-Total 0 9 49 9 67 0 0 122 5 1270-8 m 0 0 0 9 9 0 0 0 0 08-10m 0 2 26 7 35 0 0 90 16 106

Sub-Total 0 2 26 16 44 0 0 90 16 1060-8 m 0 0 0 0 0 0 0 4 4 88-10m 0 0 0 0 0 0 0 32 5 37

Sub-Total 0 0 0 0 0 0 0 36 9 450-8 m 0 0 1 1 2 0 0 3 2 58-10m 0 0 19 6 25 0 0 15 3 18

Sub-Total 0 0 20 7 27 0 0 18 5 230-8 m 0 0 2 4 6 0 0 13 1 148-10m 0 2 26 5 33 0 0 9 1 10

Sub-Total 0 2 28 9 39 0 0 22 2 240-8 m 0 0 5 5 10 0 0 16 3 198-10m 0 1 8 5 14 0 0 28 1 29

Sub-Total 0 1 13 10 24 0 0 44 4 480-8 m 0 0 4 5 9 0 0 13 6 198-10m 0 1 10 4 15 0 0 9 0 9

Sub-Total 0 1 14 9 24 0 0 22 6 28

12 129-130 km

13 130-131 km

14 131-132 km

15 132-133 km

16 133-134 km

17 134-135 km

18 135-136 km

19 136-137 km

20 137-138 km

21 138-139 km

22 139-140 km

23 140-141 km

Page 190: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

0-8 m 0 0 4 5 9 0 0 30 6 368-10m 0 0 11 4 15 0 0 0 0 0

Sub-Total 0 0 15 9 24 0 0 30 6 360-8 m 0 0 8 3 11 0 0 1 1 28-10m 0 0 1 2 3 0 0 7 6 13

Sub-Total 0 0 9 5 14 0 0 8 7 150-8 m 0 0 4 0 4 0 0 0 0 08-10m 0 4 9 10 23 0 0 10 0 10

Sub-Total 0 4 13 10 27 0 0 10 0 100-8 m 0 0 2 3 5 0 0 1 6 78-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 2 3 5 0 0 1 6 70-8 m 0 0 2 2 4 0 0 0 1 18-10m 0 0 24 3 27 0 0 9 3 12

Sub-Total 0 0 26 5 31 0 0 9 4 130-8 m 0 0 15 2 17 0 0 4 0 48-10m 0 0 0 0 0 0 0 7 4 11

Sub-Total 0 0 15 2 17 0 0 11 4 150-8 m 0 0 2 1 3 0 0 2 0 28-10m 0 0 3 1 4 0 0 6 0 6

Sub-Total 0 0 5 2 7 0 0 8 0 80-8 m 0 0 4 0 4 0 0 5 3 88-10m 0 0 5 1 6 0 0 1 4 5

Sub-Total 0 0 9 1 10 0 0 6 7 130-8 m 0 0 6 0 6 0 0 3 4 78-10m 0 0 0 0 0 0 0 17 10 27

Sub-Total 0 0 6 0 6 0 0 20 14 340-8 m 0 3 27 12 42 0 1 38 12 518-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 3 27 12 42 0 1 38 12 510-8 m 0 0 38 12 50 0 0 0 0 08-10m 0 0 0 0 0 0 0 59 3 62

Sub-Total 0 0 38 12 50 0 0 59 3 620-8 m 0 0 19 3 22 0 0 0 0 08-10m 0 0 0 0 0 0 0 69 3 72

Sub-Total 0 0 19 3 22 0 0 69 3 72

24 141-142 km

25 142-143 km

26 143-144 km

27 144-145 km

28 145-146 km

29 146-147 km

30 147-148 km

31 148-149 km

32 149-150 km

33 150-151 km

34 151-152 km

35 152-153 km

Page 191: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

<300 mm 300 to 600 600 to 1800 >1800 mm Total <300 mm 300 to 600 600 to

1800 >1800 mm Total

RightGirth at.Ht. 1.37 from G.L. (in cm) Girth at.Ht. 1.37 from G.L. (in cm)Sl. No. Location Chainage Mtr.

Left

0-8 m 0 0 5 0 5 0 0 6 0 68-10m 0 0 8 3 11 0 0 1 3 4

Sub-Total 0 0 13 3 16 0 0 7 3 100-8 m 0 0 3 4 7 0 0 6 3 98-10m 0 0 0 1 1 0 0 1 2 3

Sub-Total 0 0 3 5 8 0 0 7 5 120-8 m 0 1 10 3 14 0 1 15 8 248-10m 0 2 17 1 20 0 0 0 0 0

Sub-Total 0 3 27 4 34 0 1 15 8 240-8 m 0 0 0 0 0 0 0 0 0 08-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 0 0 0 0 0 0 0 0 00-8 m 0 0 27 11 38 0 0 43 12 558-10m 0 0 6 3 9 0 0 5 0 5

Sub-Total 0 0 33 14 47 0 0 48 12 600-8 m 0 0 23 5 28 0 0 15 16 318-10m 0 0 8 1 9 0 0 0 0 0

Sub-Total 0 0 31 6 37 0 0 15 16 310-8 m 0 0 0 0 0 0 0 22 1 238-10m 0 0 60 2 62 0 0 18 4 22

Sub-Total 0 0 60 2 62 0 0 40 5 450-8 m 0 1 32 3 36 0 8 36 1 458-10m 0 0 0 0 0 0 0 0 0 0

Sub-Total 0 1 32 3 36 0 8 36 1 450-8 m 0 10 455 130 595 0 11 604 121 7368-10m 0 77 705 79 861 0 2 1009 79 1090

Total 0 87 1160 209 1456 0 13 1613 200 1826

36 153-154 km

40 157-158 km

37 154-155 km

38 155-156 km

Grand Total

43 160-161 km

41 158-159 km

42 159-160 km

39 156-157 km

Page 192: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE-IIA

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

0.005 Waiting Room at Bus Stop 11.00 Not Affected 0.060 Shiva Temple, Chandabali Chhak 11.00 Not Affected0.030 Hanuman Temple, Chandabali Chhak -

(Boundary Wall)8.00 Partially Affected 0.150 Salandi U.P School 11.00 Not Affected

0.050 Tubewell 6.40 Fully Affected 0.245 Play Ground, Chandbali 8.00 Not Affected0.210 Tubewell 8.50 Fully Affected 0.600 Pani Panchayat Office 24.00 Not Affected0.250 Water Body 20.00 Not Affected 1.000 Water Body 10.00 Partially Affected0.350 Giant Tree with Mandap 6.50 Fully Affected 1.050 Royal Institute of Allied Medical Science

College50.00 Not Affected

0.800 Trinath Temple, Chandabali (Near Bhadrak Rural Police Station) - (Boundary Wall)

7.50 Partially Affected 1.050 Water Body 5.00 Partially Affected

1.050 Water Body 5.00 Partially Affected 1.800 Water Body 30.00 Not Affected1.870 Water Body 8.00 Partially Affected 2.800 Nathsahi U.P School, Mirzapur - (Hedge

Boundary)6.00 Partially Affected

1.900 Muslim Park, Sarkarnagar (Muslim Shrine)

20.00 Not Affected 3.900 Temple 6.00 Fully Affected

2.200 Water Body 7.00 Partially Affected 4.800 Tubewell 4.90 Fully Affected3.050 Hindu Shrine 4.00 Fully Affected 5.000 Carmel School, Bhadrak 18.00 Not Affected3.150 Tubewell 8.00 Fully Affected 6.500 Berhampur High School - (Gate) 15.00 Partially Affected3.200 Tubewell 7.00 Fully Affected 6.600 Berhampur Girls High School - (Gate) 12.00 Partially Affected3.250 Water Body 5.00 Partially Affected 6.700 Waiting Room at Bus Stop 5.00 Fully Affected4.200 Tubewell 4.00 Fully Affected 6.900 Community Toilet 15.00 Not Affected5.200 Tubewell 5.00 Fully Affected 9.600 Giant Tree with Temple 3.00 Fully Affected5.600 Temple 2.75 Fully Affected 9.800 Tubewell 5.00 Fully Affected5.780 Tubewell 5.50 Fully Affected 9.900 Temple 6.00 Fully Affected5.950 Play Ground, Ichhapur 50.00 Not Affected 9.970 Hanuman Statue 6.00 Fully Affected6.600 Gram Panchayat Office, Godown,

Berhampur15.00 Not Affected 11.200 Play Ground, Ali Nagar 8.00 Partially Affected

6.600 Anchalika Seva Sangha Hospital 18.00 Not Affected 11.220 Temple 4.20 Fully Affected6.680 Shiva Temple 9.30 Fully Affected 11.300 Tubewell, Alinagar 18.00 Not Affected6.720 Giant Tree with Mandap 5.00 Fully Affected 11.430 Tarini Temple, Ranipur 35.00 Not Affected7.000 Water Body 8.00 Partially Affected 11.540 Kali Temple 5.00 Fully Affected8.190 Balunkeswar Temple, Balibili 14.50 Not Affected 11.620 Bimala Temple, Tihidi 7.30 Fully Affected8.200 UP School, Balibili 14.50 Not Affected 11.900 Tubewell 7.80 Fully Affected8.210 Ambedkar Memorial Club, Balibili 16.00 Not Affected 12.100 Tubewell 7.20 Fully Affected8.250 Pond, Ichhapur 13.00 Not Affected 12.400 Masjid 18.20 Not Affected9.200 Water Body 7.00 Partially Affected 12.600 Statue 8.20 Fully Affected9.650 Mangala Temple, Dolasahi 7.00 Partially Affected 12.620 Tubewell 6.8 Fully Affected

Common Property Resources (CPRs) Along Road Corridor - Bhadrak to ChandabaliLeft Right

Page 193: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

10.200 Waiting Room at Bus Stop, Dolasahi 5.80 Fully Affected 12.750 Play Ground, Nandapur 10.00 Partially Affected11.490 Pond, Alinagar 12.00 Not Affected 12.900 Durga Mandap, Nandapur 12.00 Partially Affected12.500 Pond, Alinagar 10.00 Not Affected 13.100 Hanuman Statue & Temple 5.45 Partially Affected12.650 BNMA College Gate, Paliabindha 6.80 Not Affected 13.250 Pond, Nandapur 20.00 Not Affected12.660 Waiting Room at Bus Stop, Allinagar 7.50 Not Affected 14.050 Openwell 6.75 Fully Affected12.680 Primary Health Center, Allinagar 25.00 Not Affected 14.065 Tubewell 3.35 Fully Affected12.700 Pond 15.00 Not Affected 14.165 Tubewell 5.00 Fully Affected12.700 Water Body 8.00 Partially Affected 15.300 Satsang Vihar, Tihidi 9.00 Partially Affected12.800 Haldhar Bindha U.P. School, Budang 8.50 Not Affected 16.205 Waiting Room at Bus Stop 3.00 Fully Affected12.840 Mandap, Nandapur 10.00 Fully Affected 16.300 Govt Girls High School, Tihidi -

(Boundary Wall)30.00 Partially Affected

13.150 Shiva Temple & Mandap 9.30 Fully Affected 16.500 Tulasi Choura 7.00 Fully Affected13.155 Tubewell 9.30 Fully Affected 17.070 Shiva Temple 5.84 Fully Affected13.190 Ranipur UP School - (Boundary Wall) 9.40 Partially Affected 17.115 Tubewell, Nandapur 9.00 Not Affected14.060 Nandapur ME School 14.00 Not Affected 17.150 Waiting Room at Bus Stop 6.00 Not Affected14.100 Tulsi Chaura 7.00 Fully Affected 17.158 Tubewell 5.00 Not Affected14.150 Waiting Room at Bus Stop, Nandapur 6.00 Fully Affected 17.250 Tubewell, Nandapur 9.00 Not Affected14.160 Hanuman Statue 6.50 Fully Affected 17.550 Water Body 10.00 Not Affected16.200 Tap 4.00 Fully Affected 18.400 Tubewell, Tihidi 9.00 Not Affected16.245 Muslim Shrine - Sayad Jamal Saa Baba 8.10 Fully Affected 18.510 Tulasi Choura 4.00 Fully Affected16.250 UP School, Mirzapur - (Hedge

Boundary)7.60 Partially Affected 19.300 Tarini Temple 4.80 Fully Affected

16.280 Tulasi Choura 6.20 Fully Affected 20.200 Pond, Kolha 18.00 Not Affected16.550 Tap 7.20 Fully Affected 20.600 Pond, Kolha 10.00 Partially Affected16.590 Chandrasekhar Ratnakar Sahayoga High

School, Tihidi11.20 Not Affected 21.960 Durga Temple 6.00 Fully Affected

16.620 Tap 5.00 Fully Affected 22.600 Mandap 3.50 Fully Affected17.050 Tap 4.65 Fully Affected 22.700 Maa Kali Temple, Satpura 20.00 Not Affected17.076 Tubewell 4.00 Fully Affected 22.760 Fakir Mohan UP & ME School 8.00 Partially Affected17.130 Tihidi Primary Health Center -

(Boundary Wall & Gate)10.40 Partially Affected 23.400 Hanuman Temple 9.00 Fully Affected

17.280 Tap 3.60 Fully Affected 23.505 Tubewell 1.00 Fully Affected17.400 Durga Mandap, Tihidi 8.00 Not Affected 23.500 Pond, Satpura 25.00 Not Affected17.430 Tubewell 6.00 Fully Affected 23.630 Mandap 7.00 Fully Affected17.480 Tap 5.50 Fully Affected 23.880 Mandap 9.90 Fully Affected18.440 Pond, Tihidi 11.00 Not Affected 24.300 Giant Tree with Mandap 5.30 Fully Affected19.100 Durga Mandap 8.00 Fully Affected 24.350 Waiting Room at Bus Stop 8.20 Fully Affected19.100 Binapani Yuba Parisada (Club) Building 8.60 Fully Affected 24.580 Tubewell 6.70 Fully Affected

Page 194: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

19.320 Tubewell 10.30 Fully Affected 24.710 Tarini Mandap 6.15 Fully Affected20.960 Dibya Bhumi Ashram School, Kolha -

(Boundary Wall)6.40 Partially Affected 25.342 Mandap 5.40 Fully Affected

21.200 Devi Temple 5.00 Fully Affected 25.200 Pirahat High School 30.00 Not Affected21.250 Waiting Room at Bus Stop 5.00 Fully Affected 25.420 Temple 9.45 Fully Affected21.262 Tubewell 5.00 Fully Affected 25.900 Giant Tree with Mandap 4.00 Fully Affected22.760 Panchayat High School, Sindhol -

(Hedge Boundary)7.00 Fully Affected 26.900 Tubewell 4.50 Fully Affected

22.760 School Toilet 7.50 Fully Affected 26.950 Temple 8.00 Fully Affected24.510 Pond, Bindha 16.00 Not Affected 27.550 Pond, Pirahat 6.00 Partially Affected24.600 Mandap 5.00 Fully Affected 28.900 Pond, Samantaraipur 10.00 Partially Affected24.645 Waiting Room at Bus Stop 6.45 Fully Affected 28.960 Pond, Samantaraipur 11.00 Partially Affected24.835 Mandap 6.00 Fully Affected 29.105 Temple 4.80 Fully Affected25.100 Tubewell 12.00 Fully Affected 29.120 Pond 4.00 Fully Affected25.250 Tubewell 5.90 Fully Affected 29.300 Pond 8.00 Fully Affected25.850 Devi Temple 4.00 Fully Affected 29.500 Pond, Gadi 8.00 Partially Affected26.000 Waiting Room at Bus Stop, Pirahat 5.60 Fully Affected 29.940 Play Ground, Gadi 4.10 Partially Affected26.450 Tap 4.50 Fully Affected 30.200 Waiting Room at Bus Stop 6.00 Fully Affected26.675 Temple 3.50 Fully Affected 31.210 Water Body 5.60 Partially Affected27.400 Temple 7.00 Fully Affected 31.840 Giant Tree with Mandap 6.00 Fully Affected27.500 Pond, Pirahat 2.00 Partially Affected 32.250 Giant Tree with Mandap 3.50 Fully Affected27.560 Kanpur Seva Ashram School -

(Boundary Wall)6.20 Partially Affected 37.220 Laxmi Temple 5.75 Fully Affected

27.570 Shiva Temple, Kanpur 14.20 Not Affected 37.230 Hanuman Statue 7.20 Fully Affected27.600 Pond 20.00 Not Affected 39.200 Mangala Temple, Digachhia 20.00 Not Affected27.650 Play Ground 7.20 Partially Affected 39.250 Hanuman Temple, Digachhia 18.00 Not Affected28.200 Pond, Samantraipur 7.00 Partially Affected 39.300 Saraswoti Sishu Mandir - (Hedge

Boundary)3.00 Partially Affected

28.800 Water Body 4.50 Partially Affected 39.670 Giant Tree with Mandap 2.00 Fully Affected29.100 Pond 2.50 Fully Affected 39.750 Tap 4.00 Fully Affected29.100 Chandi Temple, Samantraipur 15.00 Not Affected 39.840 Bimala Temple 6.00 Fully Affected29.400 Pond 2.00 Fully Affected 39.860 Tubewell, Digachhia 12.00 Not Affected29.550 Shiva Temple, Samantraypur 20.00 Not Affected 39.900 Tap 5.00 Fully Affected29.950 Jemamani Nodal School, Samantraipur -

(Boundary Wall)12.00 Partially Affected 39.980 Tap 4.00 Fully Affected

29.960 Pump House, Gadi 10.00 Fully Affected 41.800 Chasakhanda Primary School 18.00 Not Affected30.000 Gadi High School 22.00 Not Affected 42.400 Subash Bose Statue 18.00 Not Affected30.100 Giant Tree with Mandap 4.75 Fully Affected 42.600 Giant Tree with Mandap 6.60 Fully Affected30.150 Tubewell 8.00 Fully Affected 42.700 Pump House 18.00 Not Affected30.300 Tubewell 5.00 Fully Affected 43.700 Jagannath Temple, Mato 15.00 Not Affected

Page 195: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

30.450 Hatakeswar Mahadev Temple, Kherang 8.90 Not Affected 43.920 Giant Tree with Mandap 3.00 Partially Affected30.450 Pond, Kherang 8.90 Not Affected 44.000 Pond, Mato 15.00 Partially Affected30.500 Tubewell 6.00 Fully Affected 44.700 Openwell 6.00 Fully Affected30.550 Pond, Gadi 6.00 Partially Affected 44.720 Giant Tree with Mandap 6.00 Fully Affected30.600 Pond, Gadi 13.00 Not Affected 45.850 Pond, Mahuleya 7.00 Partially Affected30.700 Mandap 1.80 Fully Affected 45.900 Pond 10.00 Partially Affected30.800 M.E. School, Charitaraf 22.00 Not Affected 45.930 Tubewell 20.00 Not Affected31.100 Pond, Kherang 7.10 Partially Affected 46.100 Temple 5.00 Fully Affected31.200 Water Body 3.50 Partially Affected 46.350 Pond, Kuanarsar 10.00 Partially Affected31.100 U.P. School, Baharpal 22.00 Not Affected 46.550 Tubewell, Mahuleya 20.00 Not Affected31.210 Water Body 5.60 Partially Affected 46.600 Mandap 5.20 Fully Affected31.800 Temple 6.00 Fully Affected 47.300 Chandbali College - (Gate) 8.00 Not Affected31.830 Pond 6.00 Fully Affected 47.750 Waiting Room at Bus Stop, Panchapada 13.00 Partially Affected31.850 Waiting Room at Bus Stop 4.00 Fully Affected 47.800 Panchapada M.E. School - (Boundary

Wall)10.00 Partially Affected

32.800 Pond, Kherang 20.00 Not Affected 47.830 Jagannath UP School & Panchapada High School - (Boundary Wall)

10.00 Partially Affected

32.820 Giant Tree with Mandap 4.00 Fully Affected 48.900 Bhagabata Tungi, Panchapada 12.00 Not Affected36.850 Panchapada M.E. School - (Boundary

Wall & Gate)6.00 Partially Affected

36.900 Tubewell 11.00 Fully Affected37.200 Tubewell 7.00 Fully Affected38.100 Giant Tree with Mandap 5.00 Fully Affected39.600 Matto Primary Health Center 8.00 Not Affected39.810 Waiting Room at Bus Stop 1.50 Fully Affected41.500 Raghunathrai M.E School - (Boundary

Wall)12.00 Partially Affected

41.560 Matto High School - (Boundary Wall) 12.00 Partially Affected42.000 Water Body 2.00 Partially Affected42.200 Water Body 4.00 Partially Affected43.900 Pond 4.00 Partially Affected45.800 Tubewell 15.00 Not Affected46.100 Waiting Room at Bus Stop, Kuanarsar 5.00 Fully Affected46.150 UGME School, Kuanarsar 15.00 Not Affected46.355 Durga Temple, Mahuleya 12.00 Partially Affected46.380 Openwell 12.00 Fully Affected46.500 Water Body 5.60 Partially Affected47.000 Tap 8.00 Fully Affected47.300 Temple Gate 8.00 Not Affected

Page 196: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

47.880 Temple 9.00 Fully Affected47.920 Mangala Temple, Mahuleya 20.00 Not Affected48.100 Tubewell 13.00 Not Affected48.140 Tap 6.00 Fully Affected48.190 Club, Panchapada 9.00 Not Affected48.250 Hanuman Temple 7.00 Fully Affected48.335 Waiting Room at Bus Stop 5.50 Fully Affected48.400 Mandap 5.10 Fully Affected48.610 Statue 6.00 Fully Affected48.930 Play Ground, Chandbali 10.00 Partially Affected49.550 Tap 9.00 Not Affected

Page 197: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE-IIB

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of Effect

0.100 Satsang Bihar, Bhadrak 13.00 Not Affected 0.010 Tap 7.20 Fully Affected1.200 Tubewell 25.00 Not Affected 0.070 Tubewell 9.45 Fully Affected1.750 Hanuman Statue, Chorgharia 8.00 Not Affected 1.750 Adivasi Colony UP School,

Chorgharia30.00 Not Affected

2.100 Pond, Chorgharia 2.50 Partially Affected 1.800 Pond, Chorgharia 8.00 Fully Affected3.086 Waiting Room at Bus Stop 5.80 Fully Affected 1.900 Pond, Chorgharia 10.00 Fully Affected3.300 Pond, Randia 12.00 Partially Affected 2.800 Choraghania UP School 40.00 Not Affected3.360 Pond, Randia 30.00 Not Affected 2.700 Tubewell 6.00 Fully Affected3.620 Tap 5.80 Fully Affected 3.750 Mandap 4.00 Fully Affected3.650 Openwell 11.50 Fully Affected 3.100 Pond, Randia Bazar 5.00 Partially Affected3.660 Shiva Temple 5.50 Fully Affected 3.500 Tarini Temple 4.00 Fully Affected3.700 Hanuman Temple 2.00 Fully Affected 3.550 Giant Tree with Mandap 3.00 Fully Affected3.710 Tubewell 2.00 Fully Affected 3.600 Shiva Temple 6.50 Not Affected4.100 Tubewell 16.00 Fully Affected 3.715 Giant Tree with Mandap 3.5 Fully Affected5.750 Barapada ITI, Bhadrak - (Boundary 17.50 Partially Affected 3.750 Gopalji Gaudiya Math 8.00 Not Affected6.000 Tubewell 30.00 Not Affected 5.450 Pond, Koranta Chhak 20.00 Not Affected7.000 Hanuman Statue, Barapada 25.00 Not Affected 8.180 Tubewell 15.00 Not Affected8.200 Waiting Room at Bus Stop 5.00 Fully Affected 8.100 Tulasi Choura 3.00 Fully Affected8.240 Tubewell 4.80 Fully Affected 8.250 Tarini Mandap 5.20 Not Affected8.320 Barapada Engineering College - Gate 5.50 Fully Affected 8.280 Kali Mandap 3.70 Not Affected9.120 Hasinpur U.P School 25.00 Not Affected 8.295 Mandap 3.70 Not Affected9.125 Openwell, Hasinpur 25.00 Not Affected 8.310 Tubewell 4.50 Not Affected

10.200 Pond 15.00 Partially Affected 8.350 Pond, Barapada 10.00 Partially Affected10.300 Tubewell 10.00 Fully Affected 8.400 Tubewell 8.00 Not Affected10.300 Temple 8.00 Fully Affected 8.420 Tubewell 4.00 Fully Affected11.100 Pond, Gadijanga 12.00 Not Affected 11.000 Pond 11.00 Not Affected11.120 Tubewell 12.00 Not Affected 11.670 Tubewell 4.00 Fully Affected11.130 Tarini Temple, Gadijanga 12.00 Not Affected 11.700 Pond, Gadijanga 20.00 Not Affected11.600 Hanuman Statue 12.00 Not Affected 13.120 Khageswar UP & ME School,

Chhayalsingh12.00 Not Affected

11.720 Tubewell 9.00 Not Affected 13.150 Shiva Temple, Hatadihipalsa 20.00 Not Affected11.800 Tubewell 10.00 Fully Affected 13.310 Tarini Temple 6.00 Fully Affected13.000 Hanuman Statue 4.00 Fully Affected 13.900 Pond 25.00 Not Affected13.250 Openwell, Hatadihipalsa 8.10 Fully Affected 15.100 Waiting Room at Bus Stop 8.00 Fully Affected13.280 Tubewell 6.25 Fully Affected 17.100 Rameswarya Temple 14.00 Not Affected13.600 Waiting Room at Bus Stop 4.00 Fully Affected 17.150 Talapada U.P. School 50.00 Not Affected14.200 Pond, Hatadihipalsa 25.00 Not Affected 17.400 Tubewell 9.15 Not Affected14.800 Waiting Room at Bus Stop 5.00 Fully Affected 17.480 Mandap 5.75 Not Affected15.020 Tubewell 3.85 Fully Affected 17.900 Waiting Room at Bus Stop 7.00 Fully Affected

Left RightCommon Property Resources (CPRs) Along Road Corridor - Bhadrak to Anandpur

Page 198: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

15.100 Openwell 10.00 Fully Affected 18.120 Pond, Tillo 6.00 Partially Affected16.400 Tubewell 4.00 Fully Affected 18.550 Tap 5.00 Fully Affected17.260 Tulasi chaura 9.00 Fully Affected 19.280 Pond, Tillo 16.00 Not Affected17.980 Pond 8.00 Partially Affected 19.300 Shiva Temple, Tillo 14.00 Not Affected18.000 High School, Tillo 9.00 Not Affected 19.320 Tap 5.00 Fully Affected18.050 Waiting Room at Bus Stop 4.00 Fully Affected 19.400 Tubewell 8.00 Fully Affected18.080 Primary School, Tillo 5.00 Not Affected 19.430 Waiting Room at Bus Stop, Bonta 7.20 Fully Affected18.450 Tubewell 21.00 Not Affected 19.680 Primary Health Center, Bonta -

(Boundary Wall)10.70 Partially Affected

18.480 Hanuman Statue, Tillo 7.00 Not Affected 19.680 Temple, Bonta 11.00 Fully Affected18.500 Pond, Tillo 15.00 Not Affected 19.700 Tap 3.50 Fully Affected18.520 Pond, Tillo 25.00 Not Affected 19.720 Tubewell 9.50 Not Affected18.560 Gram Panchayat Office, Tillo 25.00 Not Affected 19.730 Pond 5.00 Fully Affected18.560 Tubewell 15.00 Not Affected 19.750 Tubewell 12.00 Not Affected18.610 Waiting Room at Bus Stop 8.00 Fully Affected 19.770 Tubewell 6.00 Fully Affected19.200 Tubewell 12.00 Not Affected 19.780 Tap 18.00 Not Affected19.300 Tubewell 6.00 Fully Affected 19.800 Temple 7.80 Fully Affected19.440 Statue 6.00 Fully Affected 19.860 Pond, Tillo 10.00 Partially Affected19.550 Laxminarayan Temple, Tillo 15.00 Not Affected 19.900 Durga Mandap 13.00 Not Affected19.570 Tubewell 10.00 Not Affected 19.930 Tap 5.00 Fully Affected

19.980 Mahatab UGME School, Bonta 13.00 Not Affected19.900 Durga Temple 10.00 Fully Affected 19.990 Pond, Bonta 10.00 Partially Affected19.920 Bonta Girls High School - (Gate) 6.90 Partially Affected 20.000 Bonta High School - (Boundary

Wall & Gate)12.00 Partially Affected

19.935 Pond, Bonth 3.80 Partially Affected 24.020 Baba Nilakantheswar Temple 5.00 Fully Affected21.010 Giant Tree with Mandap 3.00 Fully Affected 26.700 Pond, Basantia 25.00 Not Affected24.100 Tubewell 10.20 Not Affected 26.800 Basantia ME School & Panchayat

High School15.00 Not Affected

24.100 Waiting Room at Bus Stop, Orali 7.00 Fully Affected 25.850 Tubewell 8.00 Fully Affected26.700 Tarini Temple 5.00 Fully Affected 27.150 Tubewell 4.00 Fully Affected26.900 Giant Tree with Mandap, Orali 6.00 Fully Affected 27.200 Tubewell 4.50 Fully Affected27.000 Batamangala Temple 8.50 Fully Affected 27.310 Pond, Mareigaon 8.00 Partially Affected27.250 Tubewell 6.00 Fully Affected 29.100 Tubewell 5.20 Fully Affected29.250 Hatadihi Dispensary - (Boundary 8.00 Partially Affected 29.130 Tubewell 5.50 Fully Affected30.010 Pond, Hatadihi 8.00 Partially Affected 29.200 Waiting Room at Bus Stop 6.10 Fully Affected30.060 Tubewell 2.00 Fully Affected 29.300 Hanuman Statue 6.40 Fully Affected30.070 Temple 1.50 Fully Affected 29.300 Hatadihi Nodal School - (Boundary

Wall & Gate)7.00 Partially Affected

30.900 Tubewell 7.00 Fully Affected 29.500 Pond, Hatadihi 12.00 Not Affected31.300 Giant Tree with Mandap 1.50 Fully Affected 30.100 Pond, Hatadihi 22.00 Not Affected

Page 199: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

32.050 Giant Tree with Mandap 2.50 Fully Affected 30.200 Hatadihi High School - Boundary Wall & Gate

7.00 Partially Affected

34.600 Giant Tree with Mandap 4.20 Fully Affected 30.300 Hatadihi Anchalika Mahavidyalaya - (Gate)

8.00 Partially Affected

34.900 Barahi High School - (Boundary 8.00 Partially Affected 31.450 Tarini Temple 1.30 Fully Affected35.400 Waiting Room at Bus Stop 5.00 Fully Affected 31.500 Waiting Room at Bus Stop,

Chhenapada5.00 Not Affected

36.050 Tubewell 3.50 Fully Affected 32.800 Trinath Temple 3.00 Not Affected36.250 Dadhibaman UGME School, 5.50 Partially Affected 32.800 Tubewell 6.00 Not Affected40.310 Tap 2.00 Fully Affected 35.200 Tubewell 7.00 Fully Affected40.500 Tap 6.00 Fully Affected 35.300 Giant Tree with Mandap 7.50 Fully Affected41.800 Fakripur Primary Health Center -

(Boundary Wall)8.00 Partially Affected 35.800 Ambagadia UP School - Boundary

Wall4.70 Partially Affected

41.830 Mandap 6.00 Fully Affected 36.320 Giant Tree with Mandap, Ambagadia

12.00 Not Affected

42.400 Mandap 13.75 Not Affected 36.500 Tubewell 8.00 Fully Affected42.570 Giant Tree with Mandap 2.00 Fully Affected 36.506 Waiting Room at Bus Stop,

Ambagadia13.00 Not Affected

42.590 Tap 4.00 Fully Affected 38.400 Water Body, Taria Chakra 8.00 Partially Affected42.630 Tubewell 15.00 Not Affected 39.900 Openwell 10.00 Not Affected43.020 Tap 4.50 Fully Affected 40.300 Mandap 4.00 Fully Affected43.080 Mandap 12.00 Not Affected 40.800 Openwell 10.00 Not Affected43.100 Anandpur Block Colony UP School 20.00 Not Affected 42.700 Anandpur College 13.00 Not Affected43.110 Anandapur Stadium 14.00 Not Affected 43.920 Tap 4.30 Fully Affected43.900 Anandpur Central UP School - 6.00 Partially Affected 44.350 Tap 4.00 Fully Affected43.800 Brajabandhu Aurobinda School - 10.00 Partially Affected 44.355 Tap 4.00 Fully Affected44.250 Temple (Newly constructed) 6.00 Fully Affected 44.360 Tap 4.00 Fully Affected44.300 Badadanda Central UP School 15.00 Not Affected 44.400 Tubewell 6.00 Fully Affected44.600 Tap 17.00 Not Affected 44.450 Tap 4.50 Fully Affected44.730 Jagannath Temple 10.00 Partially Affected 44.520 Tap 8.00 Fully Affected44.800 Shiva Temple 1.56 Fully Affected 44.540 Tubewell 8.00 Fully Affected44.810 Tap 2.00 Fully Affected 44.560 Tap 6.00 Fully Affected44.830 Tap 3.00 Fully Affected 44.630 Tap 8.00 Fully Affected44.900 Tap 2.50 Fully Affected 44.670 Tubewell 11.00 Fully Affected45.150 Govt.Girls High School - (Boundary 4.00 Partially Affected 44.700 Anandpur Girls UP School - (Gate) 12.00 Partially Affected45.150 Tubewell 5.00 Fully Affected 44.750 Laxmi Temple & Durga Mandap 12.00 Fully Affected45.200 Biju Pattanaik Statue, Anandpur 8.00 Not Affected 44.930 Tubewell 6.00 Fully Affected45.220 Durga Mandap 4.50 Fully Affected 45.100 Brahmandevi UP School -

(Boundary Wall & Gate)10.00 Partially Affected

45.200 Shiva Temple, Balabhadrapur 10.00 Not Affected 45.980 Tap 4.80 Fully Affected

Page 200: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

46.150 B.N High School Hostel, Anandpur 12.00 Not Affected 46.000 Temple 10.00 Not Affected46.200 Balabhadra Narayan High School 18.00 Not Affected 54.600 Waiting Room at Bus Stop, Kotpada

Chhak12.00 Not Affected

46.975 Nauriasahi UP School, B l bh d

18.00 Not Affected 56.180 Pond, Bhogpur 18.00 Not Affected

48.960 Tubewell 8.00 Fully Affected 56.730 Waiting Room at Bus Stop, Anandpur

8.30 Fully Affected

48.970 Waiting Room at Bus Stop, 8.00 Fully Affected49.152 Tubewell 7.00 Fully Affected49.300 U.P School, Sadangi 13.00 Not Affected54.630 Tap 3.00 Fully Affected54.650 Tap 4.20 Fully Affected54.700 Tubewell 5.10 Fully Affected56.270 Pond, Bhogpur 12.00 Partially Affected56.390 Tubewell 8.40 Not Affected56.540 Bhogapur M E School 15.00 Not Affected56.700 Mandap 5.70 Fully Affected

Page 201: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE-IIC

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

3.300 Waiting Room at Bus Stop, Kamathana

17.00 Not Affected 3.800 Giant Tree & Mandap 9.10 Fully Affected

5.900 ANM Center, Udit Narayanpur 18.50 Not Affected 5.940 Udit Narayanpur UP School 25.00 Not Affected6.003 Tubewell 5.60 Fully Affected 6.300 Waiting Room at Bus Stop, Udit

Narayanpur10.00 Not Affected

6.200 Giant Tree & Mandap 4.70 Fully Affected 6.930 Pond 30.00 Not Affected6.235 Tubewell 11.00 Fully Affected 6.980 Pond 10.00 Fully Affected6.310 Radhakrishna Temple, Udit

Narayanpur - (Boundary Wall)12.00 Partially Affected 7.010 Tubewell 12.00 Fully Affected

7.300 Kamthana UP School - (Boundary Wall)

8.00 Partially Affected 7.500 Openwell 9.00 Fully Affected

7.320 Tubewell 5.00 Fully Affected 7.520 Old T.B. Hospital (Closed) 25.00 Not Affected8.010 New T.B.Hospital, Kamthana 30.00 Not Affected 7.545 Tubewell 6.00 Fully Affected8.050 Waiting Room at Bus Stop,

Sankhairamala9.00 Not Affected 7.600 Waiting Room at Bus Stop, Kamathana 6.50 Fully Affected

8.900 Sankhairamala UP School 25.00 Not Affected 7.650 Tubewell 5.00 Fully Affected9.000 School Toilet 5.00 Fully Affected 8.010 Pump House, Sanakhairamala 30.00 Not Affected9.000 School Tubewell 6.00 Fully Affected 8.900 Pond, Sanakhairamala by World Vision 10.00 Partially Affected

14.200 Tubewell 15.00 Not Affected 12.250 Tubewell 15.00 Not Affected14.280 Tubewell 8.00 Fully Affected 12.400 Tubewell 60.00 Not Affected15.200 Tubewell 9.25 Fully Affected 12.780 Sanakhairamal High School 80.00 Not Affected15.200 Community Bath Room & Toilet 9.20 Fully Affected 12.800 Puja Mandap 40.00 Not Affected15.350 Pond, Postapada 12.00 Partially Affected 12.800 Waiting Room at Bus Stop 6.00 Fully Affected18.350 Tubewell 6.00 Fully Affected 14.280 Tubewell 8.00 Fully Affected18.400 Pond, Madingpur 35.00 Not Affected 17.100 Openwell 30.00 Not Affected20.000 Tubewell 3.00 Fully Affected 17.150 Mahima Alekha Ashram 30.00 Not Affected20.300 Co-operative Society, Karlapada 12.00 Not Affected 17.250 Mauli Temple 15.00 Not Affected20.320 Artificial Insemination Centre,

Karlapada18.00 Not Affected 18.300 Waiting Room at Bus Stop (Defunct) 9.00 Fully Affected

20.350 Gram Panchayat Office, Karlapada 12.00 Not Affected 18.450 Pond, Madingpur 70.00 Not Affected20.550 Karlapada U.P School - School Gate 15.00 Partially Affected 20.300 Health Center, Karlapada - (Boundary

Wall)10.00 Partially Affected

20.750 Mandap 8.00 Fully Affected 20.320 Waiting Room at Bus Stop, Karlapada 3.50 Fully Affected

22.400 Tubewell 5.00 Fully Affected22.680 Panchayat Samiti College, Karlapada 15.00 Not Affected 20.420 Bimbadhar Nodal School, Karlapada -

(Boundary Wall)9.00 Partially Affected

Common Property Resources (CPRs) Along Road Corridor - Bhawanipatna to KhariarLeft Right

Page 202: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

23.200 Openwell 12.00 Fully Affected 20.420 Tubewell 6.75 Fully Affected24.320 Tubewell 15.00 Not Affected 20.770 Tubewell 4.00 Fully Affected24.360 Tubewell 30.00 Not Affected 22.150 Saraswati Sishu Vidya Mandir,

Karlapada100.00 Not Affected

24.600 Tubewell 28.00 Not Affected 22.700 Waiting Room at Bus Stop 8.00 Fully Affected25.780 Pond, Sainpur 30.00 Not Affected 22.800 Degree College, Karlapada - (Boundary

Wall & Gate)25.00 Partially Affected

26.300 Bandhapada UP School 15.00 Not Affected 24.630 Narayan Temple 20.00 Not Affected26.310 School Tubewell 18.00 Not Affected 25.640 Tubewell 9.00 Fully Affected26.500 Gram Panchayat Office, Chahagaon 20.00 Not Affected 26.400 Pond, Bontapada 9.00 Partially Affected26.650 Openwell 40.00 Not Affected 26.470 Tubewell 4.00 Fully Affected27.350 Tubewell 5.75 Fully Affected 27.150 Shiva Temple 15.00 Not Affected30.430 Tubewell 9.00 Fully Affected 27.150 Waiting Room at Bus Stop 5.00 Fully Affected31.800 Pond, Bontapada 80.00 Not Affected 27.160 Turkel Project UP School 30.00 Not Affected33.000 Shiva Prasad High School 20.00 Not Affected 27.500 Haraseni Temple-I 9.00 Fully Affected33.103 School Tubewell 15.00 Not Affected 27.505 Haraseni Temple-II 9.40 Fully Affected33.300 Water Body, Salepada 4.00 Partially Affected 30.000 Seinpur UP School 20.00 Not Affected35.900 Tubewell 5.00 Fully Affected 30.100 School Tubewell 18.00 Not Affected36.300 Waiting Room at Bus Stop, Salepada 8.00 Fully Affected 30.400 Tubewell 8.300 Fully Affected39.900 Tubewell 20.00 Not Affected 30.420 Waiting Room at Bus Stop, Seinapur 8.00 Fully Affected42.600 Pond 16.00 Not Affected 31.050 Pond, Bontapada 8.00 Partially Affected43.410 Tubewell 4.80 Fully Affected 33.000 Borabhata School Play Ground 5.00 Partially Affected43.502 Openwell 8.50 Fully Affected 33.075 Mandap 4.40 Fully Affected43.540 Sri Jagannath High School & UP

School, Kursud9.00 Not Affected 33.075 Tubewell 18.00 Not Affected

43.550 Tubewell 7.40 Fully Affected 33.175 Borabhata UP School & CRC Centre 20.00 Not Affected43.600 Health Sub Centre, Kursud & Vikas

Kutir18.00 Not Affected 33.200 Borabhata Veterinary Stockman Centre 20.00 Not Affected

43.850 Pond, Kursuda 30.00 Not Affected 35.100 Village Pond, Borbhata 50.00 Not Affected45.900 Water Body, Tutumara 10.00 Partially Affected 35.500 Salepada UP School 15.00 Not Affected46.750 Tutumara Primary School 20.00 Not Affected 35.502 School Tubewell 12.00 Fully Affected46.850 Tubewell 15.00 Not Affected 36.100 Tubewell 2.00 Fully Affected46.950 Pond, Tutumara 25.00 Not Affected 36.180 Tubewell 20.00 Not Affected46.980 Devi Temple, Tutumara 30.00 Not Affected 36.630 Tubewell 8.50 Fully Affected46.980 Tubewell 7.20 Fully Affected 36.810 Pond, Salepada 50.00 Not Affected47.150 Tap 8.90 Fully Affected 39.910 Waiting Room at Bus Stop 8.00 Fully Affected47.400 Kotamara UP School - (Boundary Wall

& Play Ground)11.00 Partially Affected 41.000 Pond, Kursud 9.00 Partially Affected

47.500 School Tubewell & Toilet 8.00 Fully Affected 43.400 Bhagabati Temple, Kursud 10.00 Not Affected48.870 Pond, Kotamara 40.00 Not Affected 43.425 Waiting Room at Bus Stop 8.20 Fully Affected

Page 203: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

48.950 Pond, Kotamara 60.00 Not Affected 43.500 Community Toilet 13.00 Fully Affected49.400 Tubewell 8.00 Fully Affected 43.620 Tubewell 8.80 Fully Affected49.500 Old Temple, Gandharla (Not used) 25.00 Not Affected 43.660 Openwell 12.00 Not Affected49.980 Mandap 4.30 Fully Affected 43.800 Kursud Anganwadi & ANM Centre 15.00 Not Affected50.025 Kalyan Swoyam Sahayak Gosthi

(SHG) Building, Gandharla5.50 Fully Affected 43.825 Openwell 20.00 Not Affected

50.130 Openwell 25.00 Not Affected 43.900 Openwell 30.00 Not Affected50.250 Tubewell 15.00 Not Affected 45.900 Water Body, Tutumara 10.00 Partially Affected50.300 Tubewell 6.80 Fully Affected 46.350 Tubewell 8.30 Fully Affected50.370 Bharat Janani Swoyam Sahayak

Sanstha Building, Gandharla6.50 Fully Affected 46.420 Tubewell 5.20 Fully Affected

50.900 Sundhimuda Nodal School - (Boundary Wall)

7.60 Partially Affected 47.200 Pond, Chandatara 15.00 Not Affected

50.920 School Tubewell 11.00 Not Affected 47.250 Waiting Room at Bus Stop, Chandatara 10.90 Not Affected

52.100 Openwell 7.80 Fully Affected 47.450 Pond, Chandatara 10.00 Partially Affected54.495 Tubewell 10.90 Fully Affected 48.200 Tap 8.00 Fully Affected54.500 Waiting Room at Bus Stop,

Jamakhunta9.40 Fully Affected 49.300 Pond, Gandharla 100.00 Not Affected

56.015 Waiting Room at Bus Stop 6.30 Fully Affected 49.400 Openwell 20.00 Not Affected56.800 Dohelpada UP School & Anganwadi 9.20 Not Affected 49.700 Openwell 21.00 Not Affected56.950 Tubewell 4.20 Fully Affected 49.750 Tap 4.70 Fully Affected57.750 Temple 5.20 Fully Affected 49.800 Tap 4.40 Fully Affected57.800 Tubewell 5.90 Fully Affected 49.800 Waiting Room at Bus Stop, Gandharla 5.50 Fully Affected

59.200 Pond, Dohelpada 50.00 Not Affected 50.100 S.H.G. & Club Building 5.80 Fully Affected60.250 Pond, Tukula 60.00 Not Affected 50.015 Tap 6.60 Fully Affected60.480 Openwell 14.00 Not Affected 50.075 Tap 7.60 Fully Affected60.680 Tubewell 7.00 Fully Affected 50.100 Tubewell 6.50 Fully Affected61.670 Openwell 15.00 Not Affected 50.110 Mandap 6.70 Fully Affected61.760 Tubewell 8.70 Fully Affected 50.200 Tubewell 8.40 Fully Affected61.900 Tubewell 12.00 Fully Affected 50.570 Pond, Gandharla 15.00 Not Affected62.470 Openwell 15.00 Not Affected 50.900 Openwell 30.00 Not Affected62.520 Tap 18.00 Not Affected 52.150 Tubewell 4.70 Fully Affected62.800 Tap 10.00 Not Affected 52.380 Tubewell 6.50 Fully Affected62.980 Risigaon UP School 11.00 Not Affected 53.400 Openwell 22.00 Not Affected63.350 Pond, Risigaon 13.00 Not Affected 53.700 Pond 100.00 Not Affected64.500 Pond, Risigaon 60.00 Not Affected 53.800 Tubewell 10.00 Fully Affected64.600 Tubewell 8.00 Fully Affected 55.450 Pond, Dohelpada 15.00 Not Affected65.200 Openwell 15.00 Not Affected 56.030 Tubewell 3.50 Fully Affected

Page 204: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

65.920 Tubewell 4.60 Fully Affected 56.400 Openwell 16.00 Not Affected65.995 Openwell 30.00 Not Affected 56.650 Tubewell 10.90 Fully Affected67.000 Waiting Room at Bus Stop, Lachapalli 6.00 Fully Affected 56.830 Ashram Temple, Dohelpada - (Gate &

Small Mandap)9.00 Partially Affected

67.650 Pond, Lachhapalli 30.00 Not Affected 56.880 Mandap with Giant Tree 4.90 Fully Affected68.100 Tubewell 11.00 Fully Affected 57.100 High School, Tukula 40.00 Not Affected68.700 Khariar NAC Crematorium, Chelipada 20.00 Not Affected 57.550 Pond, Tukula 50.00 Not Affected

69.320 Tubewell 4.00 Fully Affected 57.750 Openwell 25.00 Not Affected69.330 Chelipada ANM Center 12.00 Not Affected 59.900 Giant Tree & Mandap 6.00 Fully Affected69.335 Tap 18.00 Not Affected 60.310 Tap 5.50 Fully Affected69.360 Tap 7.90 Fully Affected 60.420 Tubewell 7.30 Fully Affected69.350 Kabarstan 9.20 Not Affected 60.530 Tap 7.20 Fully Affected

60.600 Openwell 15.00 Not Affected60.630 Tap 6.50 Fully Affected60.750 Pond, Tukela 30.00 Not Affected60.810 Tubewell 11.20 Not Affected60.930 Tap 20.00 Not Affected61.330 Tap 10.25 Not Affected61.380 Tubewell 11.00 Not Affected61.400 Mandap 9.75 Not Affected61.720 Tap 7.80 Fully Affected61.950 Openwell 15.00 Not Affected62.350 Openwell 15.00 Not Affected62.670 Nilakantheswar Temple, Risigaon 15.00 Not Affected63.200 Waiting Room at Bus Stop,

Dokrapathar15.00 Not Affected

63.210 Maa Thakurani Mandap, Risigaon 16.00 Not Affected64.900 Pond, Risigaon 9.00 Partially Affected65.400 Openwell 20.00 Not Affected65.700 Tubewell 6.60 Fully Affected65.810 Openwell 15.00 Not Affected65.850 Openwell 20.00 Not Affected65.880 Pond, Gobardhanpur 70.00 Not Affected65.940 Openwell 20.00 Not Affected66.410 Lachapara UP School - (Boundary

Wall)8.10 Partially Affected

66.410 Lachhpura Anganwadi Centre - (Boundary Wall)

10.50 Partially Affected

66.419 School Tubewell 10.50 Fully Affected

Page 205: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of AssetDistance

(mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L Type of Effect

Left Right

66.500 Pond, Gobardhanpur 30.00 Not Affected67.600 Burial Ground, Ranipur 4.00 Fully Affected67.900 Ranipur U.P School - (Boundary Wall) 10.90 Partially Affected

69.300 Mandap 3.00 Fully Affected69.535 School Tubewell 7.40 Fully Affected69.540 Chhelipada UP School (Building) 6.75 Partially Affected69.945 Tap 3.2 Fully Affected

Page 206: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE-IID

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of Effect

0.017 Openwell 15.00 Not Affected 0.015 Statue 4.00 Fully Affected0.033 Tap 8.00 Fully Affected 0.025 Waiting Room at Bus Stop 5.00 Fully Affected0.440 Tap 4.00 Fully Affected 0.030 Shramika Kalyan Vidya Vihar 12.00 Not Affected0.544 Tap 4.00 Fully Affected 0.037 Sri Sri Batakalua temple & Giant Tree

with Mandap5.00 Fully Affected

0.655 Giant Tree with Mandap 5.00 Fully Affected 1.080 Giant Tree with Mandap 6.050 Fully Affected0.862 Tap 6.00 Fully Affected 1.800 Water Body 9.000 Partially Affected0.970 Giant Tree with Mandap 5.00 Fully Affected 2.208 Crematorium- Ambagadia,

Dhakhinapur G.P.13.550 Fully Affected

1.700 Tap 14.15 Not Affected 3.180 Tubewell 4.25 Fully Affected2.850 Openwell 12.30 Fully Affected 3.280 Openwell 10.95 Not Affected3.090 Tap 3.50 Fully Affected 3.350 Waiting Room at Bus Stop 6.65 Fully Affected3.150 Tubewell 7.65 Fully Affected 3.510 Dakhinipur UP School - (Boundary

Wall, Toilet & Gate)5.05 Fully Affected

3.230 Trinath Temple 6.95 Fully Affected 4.440 Openwell 2.00 Fully Affected3.315 Openwell 12.40 Fully Affected 4.470 Openwell 9.25 Not Affected3.655 Tubewell 6.00 Fully Affected 4.510 Community Building Lanjiya 4.55 Fully Affected3.680 Giant Tree with Mandap 5.60 Fully Affected 4.560 Tubewell 6.05 Fully Affected4.450 Tubewell 3.75 Fully Affected 4.620 Tubewell 8.05 Fully Affected4.725 Radhakrushna Temple, Lanjiya 12.55 Not Affected 4.625 Kothaghar with temple 6.05 Fully Affected4.760 Radhakrushna Pathagara 14.55 Not Affected 4.640 Pond 20.00 Not Affected4.770 Openwell, Lanjiya 15.00 Not Affected 4.680 Waiting Room at Bus Stop 7.35 Fully Affected4.780 Openwell 14.45 Not Affected 4.740 Pond 15.00 Not Affected4.800 U.P. School, Lanjiya 17.70 Not Affected 5.040 Tubewell 17.05 Not Affected4.900 Openwell 7.55 Fully Affected 5.100 Pond 10.00 Not Affected4.975 Tubewell 7.45 Fully Affected 6.310 Tarini Temple 13.20 Not Affected5.070 Pond, Balakrisnapur 9.35 Partially Affected 7.110 Trinath Temple 6.30 Fully Affected5.180 Tubewell 8.45 Fully Affected 7.210 Openwell 17.55 Fully Affected5.240 Openwell 13.45 Not Affected 7.305 Waiting Room at Bus Stop 12.25 Fully Affected5.380 Mandap, Balakrishnapur 8.35 Fully Affected 7.375 Pond 8.00 Partially Affected5.600 Waiting Room at Bus Stop 4.00 Fully Affected 7.800 Baghajhari U.P. School - (Boundary

Wall & Gate)7.15 Fully Affected

6.200 Pond, Balakrisnapur 7.50 Partially Affected 7.830 Tubewell 6.25 Fully Affected6.470 Pond, Balakrisnapur 7.85 Partially Affected 7.880 Tubewell 5.05 Fully Affected7.090 Tubewell 8.45 Fully Affected 7.900 Openwell 9.95 Fully Affected7.200 Mangala Temple, Padarbali 13.25 Not Affected 8.038 Patitapaban Mandap 8.30 Fully Affected7.350 Pond, Padarbali 7.00 Not Affected 8.810 Waiting Room at Bus Stop 9.75 Fully Affected

Left RightCommon Property Resources (CPRs) Along Road Corridor - Berhampur to Bangi Jn

Page 207: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

7.850 Pond, Bageswari 50.00 Not Affected 10.200 Tap 8.00 Fully Affected8.020 Openwell, Baiganabadi 17.25 Not Affected 10.220 Tubewell 12.00 Not Affected8.200 Tubewell, Baiganabadi 9.25 Not Affected 10.245 Balipada Primary Health Center 10.00 Not Affected8.275 Pond 5.00 Fully Affected 10.280 Tubewell 3.00 Fully Affected9.220 Openwell, Baiganabadi 15.65 Not Affected 10.310 Waiting Room at Bus Stop 3.50 Fully Affected9.305 Openwell, Balipada 30.00 Not Affected 10.515 Openwell 13.20 Not Affected9.800 Tap, Balipada 8.25 Fully Affected 10.520 Tubewell 8.65 Fully Affected

10.045 Tubewell 6.65 Fully Affected 10.570 Tap 5.10 Fully Affected10.110 Ghatapari High School 14.00 Not Affected 10.595 Mandap 15.45 Not Affected10.180 Mahurikalia College, Balipada 15.00 Not Affected 10.620 Tubewell 6.75 Fully Affected10.190 Tubewell 5.80 Fully Affected 10.638 Tubewell 5.25 Fully Affected10.260 Saraswati Sishu Mandir, Balipada -

(Boundary Wall)9.15 Fully Affected 10.645 Mandap 7.00 Fully Affected

10.364 Pond 7.05 Partially Affected 10.700 Tap 5.85 Fully Affected10.400 Pond, Balipada 10.55 Not Affected 10.900 Openwell 50.00 Not Affected10.940 Openwell 7.55 Fully Affected 11.120 Waiting Room at Bus Stop 15.00 Not Affected11.230 Openwell, Dengapadar 14.00 Not Affected 11.170 Tubewell 13.35 Fully Affected11.320 Tubewell 7.00 Fully Affected 12.100 Waiting Room at Bus Stop 6.50 Fully Affected11.710 Pond 8.00 Fully Affected 13.070 Shiva Temple - (Boundary Wall) 9.35 Partially Affected12.150 Tubewell, Dengapadar 15.00 Not Affected 13.280 Tubewell 14.00 Not Affected13.200 Tubewell 14.25 Fully Affected 13.300 Tubewell 9.85 Fully Affected13.375 Mandap 15.00 Not Affected 13.320 Tubewell 3.75 Fully Affected13.430 Tap, Narayanpur 11.00 Not Affected 13.400 Mandap 5.75 Fully Affected13.600 Openwell 6.00 Fully Affected 13.510 Waiting Room at Bus Stop 8.00 Fully Affected13.750 Mandap 7.50 Fully Affected 13.700 Radhakrushna Temple - (Boundary

Wall) 6.00 Fully Affected

13.900 Narayanpur U.P. School - (Boundary Wall & Gate)

8.00 Partially Affected 14.350 Waiting Room at Bus Stop 9.35 Fully Affected

14.810 Maa Kureisuni Temple - (Boundary Wall & Building)

9.32 Fully Affected 15.800 Kureisuni Mandap 11.40 Partially Affected

15.280 Waiting Room at Bus Stop 9.25 Fully Affected 15.950 Waiting Room at Bus Stop 8.40 Partially Affected16.520 Bankabihari Sanskrit Vidyalaya 15.50 Not Affected 17.210 Tubewell 4.50 Fully Affected16.600 Banka Bihari U.P. School 14.00 Not Affected 17.400 Waiting Room at Bus Stop 6.80 Fully Affected17.100 Pond, Pitambarpur 8.00 Partially Affected 18.080 Radhakrushna Temple 9.65 Partially Affected17.350 Pitambarpur U.P. School 13.00 Not Affected 18.130 Tubewell 7.35 Fully Affected17.900 Openwell 7.00 Fully Affected 18.250 Tubewell 6.25 Fully Affected18.095 Mandap 7.00 Partially Affected 18.320 Tap 5.35 Fully Affected18.100 Shiv Temple, Gokarnapur-

(Boundary Wall)10.50 Fully Affected 18.410 Tubewell 6.45 Fully Affected

18.380 Waiting Room at Bus Stop 15.00 Not Affected 18.495 Waiting Room at Bus Stop 8.55 Partially Affected

Page 208: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

18.610 Pond 20.00 Partially Affected 18.690 Openwell 10.00 Not Affected18.630 Bankeswari Temple 28.00 Not Affected 18.715 Tubewell 4.25 Fully Affected18.800 Pond 20.00 Partially Affected 18.735 Tubewell 6.55 Fully Affected18.905 Shiva Temple 8.75 Partially Affected 18.810 Tubewell 6.50 Fully Affected20.100 Openwell 6.15 Fully Affected 18.825 Openwell 15.10 Not Affected20.180 Tubewell 16.00 Not Affected 19.015 Tubewell 9.75 Fully Affected20.940 Pond 21.00 Not Affected 19.185 Tubewell 8.25 Fully Affected21.500 Pond 18.00 Partially Affected 19.195 Narayan Temple & Ashram 12.00 Partially Affected22.300 Tubewell 5.55 Fully Affected 19.200 Water Body 15.00 Not Affected22.330 Water Body 9.15 Partially Affected 19.850 Pond 20.00 Not Affected22.402 Pond 15.00 Partially Affected 20.250 Openwell 25.00 Not Affected22.875 Tap 5.60 Fully Affected 20.315 Mandap 8.00 Fully Affected22.920 Tubewell 5.90 Fully Affected 20.800 Angangapur U.P.School - (Gate) 8.25 Partially Affected23.100 Water Body 7.00 Partially Affected 20.825 Angangapur Trinath Temple 8.75 Fully Affected23.110 Tubewell 4.75 Fully Affected 20.880 Tubewell 5.55 Fully Affected23.195 Tubewell 8.20 Fully Affected 20.905 Tubewell 8.25 Fully Affected23.220 Pond 15.00 Not Affected 22.455 Openwell 30.00 Not Affected23.320 Tubewell 5.45 Fully Affected 23.280 Tubewell 9.45 Fully Affected23.450 Tubewell 6.60 Fully Affected 23.340 Pond 25.00 Not Affected23.515 Tap 11.80 Not Affected 23.870 Shiva Temple - (Boundary Wall) 7.00 Partially Affected23.600 Hanuman Temple - (Boundary

Wall)8.00 Partially Affected 24.495 Cinema Hall 15.00 Not Affected

23.625 Openwell 11.00 Not Affected 25.720 Pond 11.00 Partially Affected23.650 Giant Tree with Mandap 9.15 Partially Affected 27.110 Waiting Room at Bus Stop 6.80 Fully Affected23.710 Waiting Room at Bus Stop 8.80 Not Affected 28.435 Waiting Room at Bus Stop 9.20 Not Affected23.784 Tubewell 8.40 Fully Affected 28.480 Temple 4.20 Fully Affected23.815 Tubewell 8.80 Fully Affected 28.550 Tubewell 7.10 Fully Affected23.918 Tubewell 7.00 Fully Affected 29.500 Pond 25.00 Not Affected24.200 Openwell 11.00 Not Affected 29.625 Waiting Room at Bus Stop 11.00 Partially Affected24.275 Ashram 9.50 Partially Affected 29.800 Waiting Room at Bus Stop 10.00 Fully Affected24.320 Tubewell 6.85 Fully Affected 30.810 Water Body 8.00 Partially Affected24.400 Pond 8.00 Partially Affected 30.900 Mangala Temple - (Boundary Wall) 13.00 Partially Affected24.520 Tubewell 8.95 Fully Affected 30.950 Pond 12.20 Partially Affected24.830 Pond 13.00 Not Affected 32.305 Tap 4.70 Fully Affected25.790 Pond 10.00 Partially Affected 32.490 Waiting Room at Bus Stop 5.30 Fully Affected26.200 Waiting Room at Bus Stop 9.00 Fully Affected 32.500 Temple with Mandap & Giant Tree 6.50 Fully Affected27.100 Pond 7.45 Partially Affected 32.585 Pond 16.00 Not Affected27.280 Tubewell 10.40 Fully Affected 33.240 Pond 13.50 Not Affected28.150 Tap 9.20 Fully Affected 33.295 Waiting Room at Bus Stop 6.00 Fully Affected28.300 Tubewell 8.65 Fully Affected 33.350 Mandap 5.00 Fully Affected

Page 209: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

28.340 Tubewell 7.20 Fully Affected 34.125 Openwell 12.00 Not Affected28.390 Hanuman Statue 7.10 Partially Affected 34.190 Tubewell 10.00 Fully Affected28.630 Openwell 10.35 Fully Affected 34.215 Waiting Room at Bus Stop 6.20 Fully Affected28.850 Pond 28.00 Not Affected 34.285 Tubewell 9.00 Not Affected30.750 Pond 10.00 Partially Affected 34.350 Sanatan U.P. School 15.10 Not Affected30.885 Tap 4.00 Fully Affected 34.790 Openwell 6.60 Fully Affected32.130 Mandap 12.00 Fully Affected 34.815 Tubewell 5.40 Fully Affected32.750 Bramhakumari Temple, Mandap &

Giant Tree8.25 Partially Affected 34.835 Waiting Room at Bus Stop 6.30 Fully Affected

32.820 Waiting Room at Bus Stop 14.30 Not Affected 34.850 Smasan Mandap 6.30 Fully Affected32.905 Tap 5.70 Fully Affected 34.890 Toilet 10.10 Fully Affected33.415 Temple 8.00 Fully Affected 34.915 Tubewell 5.85 Fully Affected33.505 Tap 7.50 Fully Affected 34.921 Tubewell 6.50 Fully Affected33.590 Radhakrushna Pathagara 14.10 Not Affected 34.940 Tubewell 12.00 Fully Affected33.740 Tap 6.90 Fully Affected 34.956 Waiting Room at Bus Stop 12.80 Not Affected34.110 Hanuman Temple - (Boundary

Wall)7.00 Partially Affected 34.972 Tubewell 3.60 Fully Affected

34.240 Pond 20.00 Not Affected 35.100 Mandap 9.00 Fully Affected34.308 Giant Tree with Mandap 6.45 Fully Affected 35.180 Waiting Room at Bus Stop 6.35 Fully Affected34.400 Tubewell 6.50 Fully Affected 35.830 Tubewell 3.60 Fully Affected34.480 Openwell 16.05 Not Affected 36.100 Pond 4.00 Partially Affected34.560 Community Building 16.50 Not Affected 36.230 Tubewell 6.40 Fully Affected34.625 Openwell 16.40 Not Affected 36.570 Openwell 9.15 Fully Affected34.750 Pond 5.00 Partially Affected 36.650 Temple 6.25 Fully Affected34.765 Tubewell 5.10 Fully Affected 36.720 Openwell 7.10 Fully Affected34.800 Kali Temple 4.95 Fully Affected 36.765 Waiting Room at Bus Stop 5.25 Fully Affected34.850 Pond 7.00 Partially Affected 36.905 Pond 12.00 Not Affected34.900 Kansamari U.P. School -

(Boundary Wall & Gate)11.00 Partially Affected 40.280 Water Body 10.00 Partially Affected

34.905 Mandap 4.70 Fully Affected 45.215 Gobindapur M.E. School 50.00 Not Affected34.928 Tubewell 11.60 Fully Affected 45.390 Tubewell 30.00 Not Affected34.930 Waiting Room at Bus Stop 10.20 Fully Affected 45.515 Gobindapur U.P. School - (Boundary

Wall)8.95 Partially Affected

34.935 Openwell 16.00 Not Affected 45.660 Tap 4.85 Fully Affected34.950 Pond 10.00 Partially Affected 45.900 Tap 5.15 Fully Affected34.965 Dharmapur U.P. School -

(Boundary Wall)12.35 Partially Affected 47.530 Waiting Room at Bus Stop 5.00 Fully Affected

34.980 Pond 12.70 Partially Affected 48.600 Taptapani Deer Park 12.00 Partially Affected34.990 Tubewell 8.10 Fully Affected 49.420 Tubewell 7.25 Fully Affected

Page 210: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

35.290 Tubewell 8.10 Fully Affected 49.750 Taptapani UP School Boundary Wall 6.00 Partially Affected

36.020 Sani Temple 4.00 Fully Affected 49.900 Taptapani School Hostel - (Boundary Wall)

6.00 Partially Affected

36.085 Tap 4.30 Fully Affected 49.800 Openwell 6.00 Fully Affected36.150 Waiting Room at Bus Stop 6.80 Fully Affected 50.400 Tubewell 9.30 Fully Affected36.195 Maa Kali Temple 7.00 Fully Affected 53.450 Mandap 5.50 Fully Affected36.285 Toilet 6.85 Fully Affected 53.800 Tubewell 10.00 Fully Affected36.335 Temple 7.95 Fully Affected 54.100 Temple 7.00 Fully Affected36.400 Tubewell 5.00 Fully Affected 54.900 Tap 6.50 Fully Affected36.500 Podamari U.P. School - (Boundary

Wall & Gate)6.20 Partially Affected 55.220 Tap 7.65 Fully Affected

36.830 Openwell 7.25 Fully Affected 61.320 Waiting Room at Bus Stop 9.35 Fully Affected37.105 Tubewell 10.05 Fully Affected 61.460 Tubewell 7.95 Fully Affected37.715 Tubewell 5.15 Fully Affected 61.900 Waiting Room at Bus Stop 20.00 Not Affected38.100 Waiting Room at Bus Stop 6.45 Fully Affected 62.406 Openwell 20.00 Fully Affected38.150 Rajanpalli U.P. School 17.00 Not Affected 62.550 Tubewell 16.00 Fully Affected38.810 Tubewell 5.00 Fully Affected 62.715 Openwell 20.00 Not Affected41.950 Waiting Room at Bus Stop 8.00 Fully Affected 63.250 Liligada U.P. School 30.00 Not Affected43.350 Waiting Room at Bus Stop 9.55 Fully Affected 63.405 Waiting Room at Bus Stop 8.00 Fully Affected43.735 Tubewell 9.55 Fully Affected 63.435 Tubewell 9.60 Fully Affected45.100 Tubewell 7.45 Fully Affected 67.175 TRW Hostel, Mohana - (Boundary

Wall) 5.00 Partially Affected

45.600 Anganwadi Center (Boundary Wall)

7.95 Partially Affected 67.300 Maharaja Gajapati Statue 15.00 Not Affected

45.720 ANM Building - (Boundary Wall) 7.30 Partially Affected 67.370 Mandap 3.85 Fully Affected

45.805 Waiting Room at Bus Stop 8.15 Fully Affected 67.420 Mohana U.P. School 6.75 Not Affected46.300 Waiting Room at Bus Stop 6.00 Fully Affected 67.500 Tubewell 5.35 Fully Affected49.150 Tubewell 5.00 Fully Affected 67.637 Tap 5.25 Fully Affected49.580 Taptapani Temple - (Boundary

Wall)8.00 Partially Affected 67.700 Tap 4.85 Fully Affected

49.600 Taptapani Temple - (Gate) 8.00 Fully Affected 67.770 Tap 5.50 Fully Affected49.730 Waiting Room at Bus Stop 7.70 Fully Affected 67.908 Tap 6.75 Fully Affected49.770 Waiting Room at Bus Stop 7.30 Fully Affected 68.155 Mandap 6.30 Fully Affected50.270 Tubewell 9.20 Fully Affected 68.280 Maharaja Gajapati High School 8.20 Not Affected50.780 Waiting Room at Bus Stop 7.40 Fully Affected 68.320 Tubewell 10.50 Not Affected51.460 Waiting Room at Bus Stop 5.42 Fully Affected 68.400 Tubewell 12.00 Fully Affected53.300 Hospital - (Boundary Wall) 8.70 Partially Affected 68.630 Mandap 5.20 Fully Affected53.600 Waiting Room at Bus Stop 4.30 Fully Affected 68.930 Mandap 13.00 Not Affected

Page 211: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

54.050 Adivasi High School 12.00 Not Affected 69.200 Openwell 13.30 Not Affected54.110 Adivasi High School Hostel -

(Boundary Wall)15.00 Not Affected 69.250 M.K.C.G. School - (Gate) 8.10 Not Affected

54.400 Waiting Room at Bus Stop 7.50 Fully Affected 69.370 Tubewell 11.00 Fully Affected54.720 Tap 12.00 Not Affected 69.510 Tubewell 12.00 Fully Affected54.820 Tubewell 13.00 Fully Affected 69.900 Waiting Room at Bus Stop 9.80 Fully Affected55.440 Tubewell 5.00 Fully Affected 73.500 Tubewell 10.70 Not Affected55.630 Tap 8.00 Fully Affected 74.240 Waiting Room at Bus Stop 6.00 Not Affected56.110 Waiting Room at Bus Stop 12.00 Fully Affected 74.915 Waiting Room at Bus Stop 9.00 Not Affected56.160 Openwell 7.00 Fully Affected 76.510 Waiting Room at Bus Stop 12.20 Not Affected57.580 Tubewell 7.90 Fully Affected 77.550 Tubewell 20.00 Not Affected57.960 Waiting Room at Bus Stop 6.20 Fully Affected 80.175 Tap 9.30 Fully Affected58.120 Mandap 3.40 Fully Affected 80.220 Giant Tree with Mandap 5.70 Fully Affected58.250 Waiting Room at Bus Stop ,

Merapalli8.00 Fully Affected 80.300 Adaba U.P. School 12.00 Not Affected

58.410 Tubewell 15.00 Fully Affected 80.340 Community Toilet, Adaba 12.00 Not Affected59.170 Tubewell 11.50 Fully Affected 81.100 Pond 10.00 Partially Affected59.480 Waiting Room at Bus Stop 7.35 Fully Affected 81.450 Openwell 9.90 Not Affected63.205 Openwell 20.00 Not Affected 81.675 Tubewell 9.80 Fully Affected63.500 Openwell 40.00 Not Affected 82.425 Openwell 9.50 Fully Affected63.908 Tubewell 25.00 Not Affected 82.500 Pond 12.00 Partially Affected66.150 Mandap 8.00 Fully Affected 82.810 Openwell 10.00 Fully Affected66.120 Tap 10.00 Not Affected 82.905 Waiting Room at Bus Stop 6.36 Fully Affected66.150 Mohana College 10.50 Not Affected 83.200 Haravangi Reaserver area 10.35 Not Affected66.280 Tap 10.00 Fully Affected 84.230 Pond 13.00 Not Affected66.340 Tubewell 25.00 Not Affected 85.450 Openwell 20.00 Not Affected66.490 Tarini Temple 12.00 Fully Affected 86.900 Water Body 20.00 Not Affected66.950 Tap 8.00 Fully Affected 89.200 Pond 18.00 Not Affected67.080 Tap 5.00 Fully Affected 89.370 Tubewell 9.00 Fully Affected67.100 Toilet 9.60 Fully Affected 89.600 Tap 4.00 Fully Affected67.200 Mohana Primary Health Center 10.00 Not Affected 89.670 Openwell 20.00 Not Affected67.330 Tubewell 6.00 Fully Affected 89.700 Vivekananda High School 50.00 Not Affected67.395 Waiting Room at Bus Stop 6.00 Fully Affected 89.750 Tap 10.00 Fully Affected67.650 Tap 5.50 Fully Affected 89.840 Openwell 7.50 Not Affected68.000 Mohana T.R.W. High School

Hostel14.80 Not Affected 89.990 Tap 7.00 Not Affected

68.100 Tubewell 9.00 Fully Affected 90.100 Tap 4.60 Not Affected68.200 Giant Tree with Mandap 6.45 Fully Affected 90.190 Openwell 12.00 Not Affected68.610 Tubewell 12.00 Not Affected 90.385 Tubewell 9.00 Fully Affected68.700 Tubewell 14.00 Not Affected 90.482 Openwell 5.20 Fully Affected

Page 212: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

69.120 Tubewell 14.00 Not Affected 90.495 Pond 10.00 Partially Affected71.110 Tubewell 15.00 Fully Affected 90.515 Temple 15.80 Not Affected71.200 Waiting Room at Bus Stop 6.00 Fully Affected 90.550 Mandap 8.60 Fully Affected80.100 Tap 5.60 Fully Affected 90.635 Tap 6.00 Fully Affected80.320 Tap 6.50 Fully Affected 90.790 Tubewell 8.00 Fully Affected80.352 Waiting Room at Bus Stop 6.40 Fully Affected 90.945 Mandap 30.00 Not Affected80.410 Tubewell 15.00 Fully Affected 93.270 Tubewell 8.40 Fully Affected80.450 Tubewell 7.00 Fully Affected 93.725 Openwell 15.00 Fully Affected80.505 Tubewell 9.70 Fully Affected 94.285 Tubewell 5.30 Not Affected80.530 Tubewell 7.60 Fully Affected 94.400 Openwell 17.00 Not Affected80.580 Tap 7.00 Fully Affected 94.615 Waiting Room at Bus Stop 20.00 Not Affected80.610 Shiva Temple - (Boundary Wall 11.00 Partially Affected 95.510 Tubewell 15.00 Not Affected80.700 Mandap 12.30 Not Affected 96.120 Waiting Room at Bus Stop 8.00 Fully Affected80.760 Tubewell 7.00 Fully Affected 96.800 Tubewell 6.60 Fully Affected80.850 Church 15.00 Not Affected 100.600 Church 15.00 Not Affected81.040 Pudagam Harijan Sahi U.P. School

- (Boundary Wall & Gate)9.75 Partially Affected 101.120 Openwell 10.90 Fully Affected

81.060 Tubewell 8.00 Fully Affected 101.800 Tubewell 50.00 Not Affected82.150 Tubewell 16.00 Not Affected 103.470 Tubewell 17.00 Not Affected82.330 Pudagam U.P. School 15.00 Not Affected 105.150 Church 70.00 Not Affected82.732 Tubewell 9.40 Fully Affected 105.200 Openwell 14.00 Fully Affected83.150 Mandap 11.00 Not Affected 105.300 Jangudi UP School 17.50 Not Affected83.210 Water Body 11.20 Not Affected 105.900 Water Body 17.10 Not Affected84.320 Tubewell 10.00 Fully Affected 106.410 Tubewell 5.80 Fully Affected84.900 Odupanka UP School 50.00 Not Affected 107.600 Mandap 10.00 Fully Affected84.900 Tubewell 50.00 Not Affected 108.050 Temple 8.00 Fully Affected84.950 Tubewell 6.50 Fully Affected 108.070 Tubewell 8.00 Fully Affected85.525 Waiting Room at Bus Stop 12.00 Not Affected 108.100 Waiting Room at Bus Stop 8.40 Fully Affected85.600 Pond 14.00 Not Affected 108.400 Tubewell 4.00 Fully Affected86.300 Water Body 5.00 Partially Affected 108.800 Tubewell 10.00 Fully Affected86.350 Waiting Room at Bus Stop 9.00 Fully Affected 110.525 Waiting Room at Bus Stop 10.40 Not Affected87.810 Waiting Room at Bus Stop 4.00 Fully Affected 113.050 Dabarkana UP School Hostel -

(Boundary Wall & Gate)8.35 Partially Affected

88.500 Water Check Dam 6.00 Fully Affected 113.200 Dabarkana U.P. School - (Boundary Wall)

13.80 Partially Affected

88.900 Durga Temple 9.00 Fully Affected 113.230 Church 13.00 Partially Affected88.900 Tubewell 9.00 Fully Affected 113.470 Openwell 13.00 Not Affected89.800 Primary Health Center, Birikote 12.00 Not Affected 113.525 Gunupur Market 12.00 Partially Affected89.870 Tap 8.00 Not Affected 113.550 Tubewell 9.30 Fully Affected

Page 213: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

89.890 Giant Tree with Mandap 10.00 Not Affected 114.620 Tribal Rural Welfare Boys Hostel - (Boundary Wall)

12.00 Fully Affected

89.900 Openwell 28.00 Not Affected 116.580 Church 6.80 Fully Affected89.920 Openwell 8.00 Not Affected 117.150 Shiva Temple 6.10 Fully Affected89.980 Church - (Boundary Wall) 10.00 Partially Affected 117.530 Tubewell 10.00 Fully Affected90.338 Tubewell 3.00 Fully Affected 122.380 Tubewell 20.00 Not Affected90.400 Openwell 16.00 Not Affected 124.100 Tubewell 12.50 Fully Affected90.440 Pond 12.30 Partially Affected 124.140 Tubewell 16.00 Not Affected90.670 Tubewell 5.50 Fully Affected 124.150 Kenduguda U.P. School - (Boundary

Wall)15.00 Partially Affected

90.695 Openwell 20.00 Not Affected 124.580 Kenduguda Primary Health Center 40.00 Not Affected90.740 Mandap 18.00 Not Affected 124.890 Temple 6.00 Fully Affected90.810 Openwell 8.50 Fully Affected 125.210 Openwell 30.00 Not Affected90.900 Openwell 50.00 Not Affected 125.345 Openwell 7.95 Not Affected93.300 Waiting Room at Bus Stop 10.80 Fully Affected 125.400 Waiting Room at Bus Stop 8.00 Fully Affected93.860 Tubewell 12.00 Fully Affected 125.450 Tubewell 8.85 Fully Affected94.200 Tubewell 10.00 Fully Affected 125.650 Water Body 5.10 Fully Affected94.340 Tubewell 5.45 Fully Affected 125.710 Openwell 8.95 Not Affected96.160 Khariguda U.P. School 12.00 Not Affected 125.950 Openwell 30.00 Not Affected98.520 Waiting Room at Bus Stop 7.10 Fully Affected 126.100 Kambariguda High School - (Boundary

Wall)9.95 Fully Affected

101.180 Tubewell 14.00 Not Affected 127.480 Openwell 50.00 Not Affected101.200 Mandimari U.P. School 20.00 Not Affected 128.100 Openwell 30.00 Not Affected101.310 Openwell 18.60 Not Affected 129.205 Tubewell 25.00 Not Affected106.500 Openwell 20.00 Not Affected 129.300 Mangala Temple 25.00 Not Affected108.130 Tubewell 8.70 Fully Affected 130.900 Water Body 6.50 Fully Affected108.150 Raipanka Nodal School -

(Boundary Wall & Gate)8.30 Fully Affected 131.210 Akhusingi UP School 18.50 Not Affected

108.200 Openwell 15.50 Not Affected 131.300 Mandap 8.00 Fully Affected108.570 Church 32.00 Not Affected 131.420 Tubewell 9.10 Fully Affected113.250 Tubewell 40.00 Not Affected 131.650 Bapuji High School 15.00 Not Affected113.335 Tubewell 55.00 Not Affected 131.730 Pond 4.00 Partially Affected113.420 Openwell 15.00 Not Affected 131.940 Openwell 10.00 Fully Affected113.500 Openwell 60.00 Not Affected 132.070 Water Body 5.00 Fully Affected113.580 Waiting Room at Bus Stop 10.70 Fully Affected 132.100 Openwell 15.00 Not Affected113.660 Tubewell 13.00 Not Affected 132.405 Openwell 50.00 Not Affected114.100 Waiting Room at Bus Stop 10.70 Fully Affected 132.540 Durga Temple 25.00 Not Affected114.600 Church - (Boundary Wall) 25.00 Not Affected 132.620 Shiva Temple 12.70 Not Affected114.900 Nuagada Govt. UP School - (Gate) 15.00 Partially Affected 133.100 Tubewell 5.40 Fully Affected

Page 214: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

114.940 Waiting Room at Bus Stop 7.70 Fully Affected 133.180 Openwell 7.95 Fully Affected117.100 Tubewell 9.10 Fully Affected 134.630 Water Body 15.00 Not Affected117.500 Goibandha U.P. School -

(Boundary Wall)5.00 Partially Affected 135.300 Water Body 7.40 Partially Affected

117.630 Anganwadi Center - (Boundary Wall)

8.00 Partially Affected 135.900 Tubewell 16.00 Not Affected

117.680 Tubewell 9.00 Fully Affected 139.900 Water Body 6.00 Not Affected117.700 Tubewell 8.30 Fully Affected 139.980 Waiting Room at Bus Stop 18.00 Not Affected117.750 Mandap 10.40 Fully Affected 140.100 Antrajuli Ashram 16.00 Not Affected119.400 Tubewell 15.00 Fully Affected 140.247 Openwell 20.00 Not Affected119.680 Waiting Room at Bus Stop 11.00 Fully Affected 140.585 Antrajuli Primary Health Center 20.00 Not Affected120.500 Tubewell 25.00 Not Affected 140.715 Mandap 25.00 Not Affected120.620 Mandap 23.00 Not Affected 140.900 Tubewell 40.00 Not Affected122.145 Tubewell 25.00 Not Affected 140.985 Tubewell 80.00 Not Affected123.320 Tubewell 13.00 Fully Affected 148.515 Trinath Temple 15.00 Not Affected124.200 Openwell 40.00 Not Affected 148.710 Waiting Room at Bus Stop 8.60 Fully Affected124.710 Tubewell 16.00 Not Affected 148.910 Openwell 14.00 Not Affected125.150 Kenduguda Nodal School -

(Boundary Wall)10.75 Not Affected

125.610 Tubewell 4.25 Fully Affected125.800 Openwell 50.00 Fully Affected125.900 Vikalmani Youth Club 8.00 Not Affected126.370 Tap 7.90 Fully Affected126.400 Tap 35.00 Not Affected126.500 Waiting Room at Bus Stop 8.30 Fully Affected126.610 Tubewell 20.00 Not Affected126.750 Openwell 50.00 Not Affected127.640 Tubewell 20.00 Not Affected127.900 Openwell 20.00 Not Affected128.220 Tubewell 18.00 Not Affected128.300 Tubewell 22.00 Not Affected131.050 Mandap 20.00 Not Affected131.130 Tap 8.30 Fully Affected131.240 Tap 20.00 Not Affected131.350 Waiting Room at Bus Stop 6.00 Fully Affected131.500 Tubewell 16.00 Not Affected131.620 Tap 50.00 Not Affected131.780 Openwell 6.00 Fully Affected132.180 Openwell 50.00 Not Affected133.900 Water Body 12.00 Not Affected

Page 215: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L

Type of Effect Chainage Type of Asset Distance (mts) from EC/L

Type of EffectLeft Right

135.200 Openwell 9.60 Fully Affected135.425 Openwell 10.60 Fully Affected135.489 Waiting Room at Bus Stop 11.00 Fully Affected137.050 Muskipadra Gramadebati Temple 30.00 Not Affected

137.098 Tubewell 25.00 Not Affected137.215 Giant Tree with Mandap 11.00 Fully Affected137.305 Tap 10.50 Fully Affected137.600 Water Body 5.05 Partially Affected137.708 Mandap 8.50 Fully Affected137.910 Tubewell 6.30 Fully Affected139.950 Waiting Room at Bus Stop 15.00 Not Affected140.180 Tubewell 21.00 Not Affected140.780 Batamangala Temple 5.60 Fully Affected140.810 Openwell 25.00 Not Affected140.850 Giant Tree with Mandap 15.00 Not Affected140.930 Tap 12.00 Not Affected141.450 Tap 4.80 Fully Affected141.595 Tubewell 9.10 Fully Affected141.825 Tubewell 8.50 Fully Affected142.015 Tubewell 7.15 Fully Affected142.420 Tubewell 25.00 Not Affected146.885 Tubewell 15.00 Not Affected148.630 Tubewell 20.00 Not Affected148.800 Shiva Temple 20.00 Not Affected150.250 Waiting Room at Bus Stop 6.00 Fully Affected150.400 Tubewell 5.70 Fully Affected

Page 216: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

ANNEXURE-IIE

Chainage Type of Asset Distance (mts) from EC/L Type of Effect Chainage Type of Asset Distance (mts)

from EC/L Type of Effect

119.300 Giant Tree with Mandap 6.00 Fully Affected 118.600 Temple 10.00 Fully Affected119.450 Koteswar Temple 12.00 Not Affected 118.980 Tubewell 6.00 Fully Affected122.250 Tap 6.00 Fully Affected 119.000 Tap 6.00 Fully Affected122.380 Tap 8.00 Fully Affected 119.190 Tubewell 8.00 Fully Affected122.900 Giant Tree with Mandap 8.70 Fully Affected 119.198 Waiting Room at Bus Stop 6.00 Fully Affected123.100 Tubewell 8.00 Fully Affected 119.200 Tap 6.00 Fully Affected126.100 Tubewell 6.00 Fully Affected 119.320 Ganesh Temple 9.00 Fully Affected130.800 Waiting Room at Bus Stop 7.00 Fully Affected 119.400 Tap 6.00 Fully Affected137.000 Tubewell 10.00 Fully Affected 119.500 Giant Tree with Mandap 8.00 Fully Affected137.100 Openwell 10.00 Fully Affected 119.510 Tap 8.00 Fully Affected137.200 Shiv Temple 50.00 Not Affected 119.600 Tap 7.00 Fully Affected137.350 Waiting Room at Bus Stop 10.00 Fully Affected 121.200 Bhujabal Engineering College 20.00 Not Affected137.400 Tubewell 10.00 Fully Affected 122.370 Kolnara Girl's Sevashram UP School 13.80 Not Affected

137.400 Bath Room 10.00 Fully Affected 122.380 Waiting Room at Bus Stop 13.00 Partially Affected138.850 Hatikhumba UP School -(Boundary

Wall)12.00 Partially Affected 122.400 Majhi Gouri Temple 9.00 Fully Affected

122.450 ITDA School, Kolnara 9.00 Not Affected143.850 Openwell 12.00 Fully Affected 122.450 ITDA School - (Boundary Wall) 9.00 Fully Affected145.300 Waiting Room at Bus Stop 10.80 Not Affected 122.500 ITDA School Gate 11.00 Fully Affected146.300 Meenajhola Additional Primary Health

Center - (Boundary Wall)10.00 Partially Affected 122.900 Tubewell 11.00 Fully Affected

146.580 Bath Room 9.00 Fully Affected 126.970 Goudabadi Sevashram UP School - (Boundary Wall)

9.50 Partially Affected

146.580 Openwell 9.00 Fully Affected 135.980 Waiting Room at Bus Stop 13.00 Not Affected136.200 Tubewell 11.00 Not Affected

148.990 Tubewell 6.00 Fully Affected 136.700 Kailash Pur High School 12.00 Not Affected150.000 Waiting Room at Bus Stop 6.70 Fully Affected 136.850 Gouri Temple 9.00 Fully Affected151.900 Giant Tree with Mandap 4.60 Fully Affected 137.300 Tubewell 12.00 Fully Affected154.100 Waiting Room at Bus Stop 11.00 Partially Affected 138.950 Waiting Room at Bus Stop 8.00 Fully Affected154.900 Waiting Room at Bus Stop 10.00 Fully Affected 139.000 Tareni Temple 20.00 Not Affected155.680 Mangala Temple 25.00 Not Affected 143.500 Badachampei UP School -

(Boundary Wall & Gate)12.00 Fully Affected

155.870 Tubewell 6.00 Fully Affected 145.350 Giant Tree with Mandap 4.80 Fully Affected155.900 Tubewell 5.00 Fully Affected 146.585 Meenajhola Weekly Market Yard 12.00 Partially Affected155.910 Tap 6.00 Fully Affected 146.590 Giant Tree with Mandap 5.00 Fully Affected156.100 Tap 5.00 Fully Affected 146.600 Tubewell 10.00 Fully Affected156.200 Openwell 10.00 Fully Affected 150.000 Market 12.60 Not Affected

Common Property Resources (CPRs) Along Road Corridor - Bangi to J.K. PurLeft Right

Page 217: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Chainage Type of Asset Distance (mts) from EC/L Type of Effect Chainage Type of Asset Distance (mts)

from EC/L Type of Effect

Left Right

156.300 Waiting Room at Bus Stop 10.00 Fully Affected 151.900 Waiting Room at Bus Stop 6.00 Fully Affected156.350 Tap 6.00 Fully Affected 152.000 Kandhajam Ashram School -

(Boundary Wall & Gate)8.00 Partially Affected

156.400 Pond 9.00 Partially Affected 156.000 Tubewell 10.00 Fully Affected156.810 Tubewell 6.00 Fully Affected 156.800 Tap 4.00 Fully Affected157.090 Mandap 20.00 Not Affected 157.400 Ramanguda Primary Health Center 15.00 Not Affected

157.100 Tamparuguda UP School 20.00 Not Affected 157.420 Openwell 9.78 Not Affected157.200 Tap 6.00 Fully Affected 157.450 Tubewell 4.00 Fully Affected157.380 Tarini Temple 9.00 Fully Affected 158.750 Waiting Room at Bus Stop 9.70 Fully Affected158.750 Market Land 9.00 Partially Affected 159.200 Water Body 12.00 Partially Affected158.900 Water Body 6.20 Partially Affected 159.200 Tubewell 11.5 Fully Affected

159.500 Waiting Room at Bus Stop 15.00 Not Affected

Page 218: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 219: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 220: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 221: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 222: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 223: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 224: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 225: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 226: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 227: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 228: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 229: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 230: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 231: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 232: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 233: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 234: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati
Page 235: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Annexure - IV List of Habitation/Built up areas where RoW width is reduced to 16 meters Corridor: Bhadrak – Chandbali

Chainages Sl. No. Village/Habitations

From To Total Distance (km)

1 Bhadrak Town 0.000 1.200 1.200

2 Barik Chaka 5.600 5.880 0.280

3 Ichhapur 6.400 6.600 0.200

4 Dolasahi 9.600 10.200 0.600

5 Ali Nagar 11.500 12.800 1.300

6 Nandapur 13.950 14.300 0.350

7 Mirzapur 16.150 18.500 2.350

8 Kolha 21.200 21.600 0.400

9 Ranipur 24.375 24.700 0.325

10 Pirhat Bazar 25.700 27.100 1.400

11 Gadi 30.350 31.400 1.050

12 Kanpur 32.900 33.200 0.300

13 Digachhia Bazar 37.050 37.300 0.250

14 Motto 39.100 40.400 1.300

15 Mahuleya 44.600 45.100 0.500

16 Chandbali 48.000 50.800 2.800

Total 14.605

29.77% of total road length of 49.060 km

Page 236: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Corridor: Bhadrak - Anandpur Chainages

Sl. No. Village/Habitations From To

Total Distance (km)

1 Bagurai 2.275 2.750 0.475

2 Randia 2.900 3.750 0.850

3 Barpada 7.425 8.675 1.250

4 Gajijang 11.425 11.850 0.425

5 Hatadihipalsa 13.250 13.825 0.575

6 Tillo 16.600 18.900 2.300

7 Bonth 18.900 20.800 1.900

8 Orali Chakka 24.050 24.400 0.350

9 Basantiya 25.450 26.125 0.675

10 Mareigaon 27.125 28.000 0.875

11 Hatadihi 28.000 30.500 2.500

12 Chhenapadi 30.950 32.100 1.150

13 Chorgharia 32.800 33.075 0.275

14 Poncha Jn 33.700 34.100 0.400

15 Ambagaria 35.050 35.550 0.500

16 Chalavanthi 39.900 40.100 0.200

17 Fakirpur 40.400 42.300 1.900

18 Anandpur 44.700 45.000 0.300

19 Prison 45.200 45.625 0.425

20 Padampur 46.850 47.150 0.300

21 Sadangi 48.150 48.550 0.400

22 Kodapada 53.950 54.400 0.450

23 Bhogpur 56.350 56.600 0.250

Total 18.725

33.00% of total road length of 56.736 km

Page 237: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Corridor: Bhawanipatna - Khariar Chainages

Sl. No. Village/Habitations From To

Total Distance (km)

1 Udit Narayanpur 5.950 6.250 0.300

2 Kamthana 7.150 8.250 1.100

3 Sankhairamal 8.750 9.200 0.450

4 Pastipada 14.950 15.200 0.250

5 Karlapada 20.550 20.950 0.400

6 Bonthpada 26.050 26.450 0.400

7 Turkel 27.015 27.450 0.435

8 Seinpur 29.850 30.350 0.500

9 Borebhata 32.950 33.250 0.300

10 Salepada 35.850 36.300 0.450

11 Borda Junction 39.800 40.100 0.300

12 Kursud 43.300 44.050 0.750

13 Kotamara 46.600 47.000 0.400

14 Chandatora 47.150 47.350 0.200

15 Gandharla 49.900 51.150 1.250

16 Turkela 53.000 53.300 0.300

17 Dohelpada 56.850 57.900 1.050

18 Tukla 60.050 61.550 1.500

19 Risigaon 62.350 62.900 0.550

20 Lachhipur 65.150 66.000 0.850

21 Khariar 69.150 70.000 0.850

Total 12.585

18.91% of total road length of 66.545km

Page 238: GOVERNMENT OF ORISSA WORKS DEPARTMENT ORISSA STATE ROAD PROJECT - O.S… · 2019-11-25 · b a r a g a r h b o l a n g i r kalahandi sambalpur malkangiri koraput rayagada gajapati

Corridor: Berhampur - Bangi Jn

Chainages Sl. No. Village/Habitations

From To Total Distance (km)

1 Berhampur Town 0.000 0.840 0.840

2 Dakhinipur 2.929 3.502 0.573

3 Lanjiya 4.400 5.488 1.088

4 Bagiswari 7.720 7.953 0.233

5 Bainganabadi 8.186 8.352 0.165

6 Balipada 9.828 10.668 0.840

7 Dengapadar 11.627 11.920 0.293

8 Narayanpur 12.697 12.893 0.196

9 Narayanpur 13.087 13.701 0.615

10 Gokarnapur 18.212 19.120 0.908

11 Angapur 20.505 20.991 0.486

12 Digapahandi 22.820 25.125 2.304

13 Malabhanja 28.189 28.465 0.276

14 Dengaosta 32.243 33.354 1.111

15 Kansamari 34.084 34.671 0.587

16 Pudamari 36.325 36.459 0.134

17 Pudamari 36.925 37.224 0.299

18 Gobindpur 45.630 45.825 0.195

19 Taptapani 49.530 49.850 0.320

20 Luhagudi 54.600 54.765 0.165

21 Mohana 66.775 67.585 0.810

22 Mohana 67.735 68.345 0.610

23 Adava 80.900 81.600 0.700

24 Ashirapur 88.880 89.675 0.795

25 Bhaliapada 93.135 93.260 0.125

Total 14.669

9.75% of total road length of 150.400 km