2
ECOLOGY – CREATE A SUSTAINABLE LIFE Geyser - Class-1, MFV placing at the time of packing This is the Multi function valve Put Separate in the Thermocol as shown in picture. At the time of product installation assemble the Multi Function Valve in Inlet Pipe without any Changes in Multi Function Valve. MFV in Plastic body at the time of Packing MFV in Metal body at the time of Packing This is The MFV

Geyser - Class-1, MFV placing at the time of packing

  • Upload
    duman

  • View
    70

  • Download
    0

Embed Size (px)

DESCRIPTION

Geyser - Class-1, MFV placing at the time of packing. This is the Multi function valve Put Separate in the Thermocol as shown in picture. MFV in Plastic body at the time of Packing. This is The MFV. MFV in Metal body at the time of Packing. - PowerPoint PPT Presentation

Citation preview

Page 1: Geyser -  Class-1,  MFV placing at the time of packing

ECOLOGY – CREATE A SUSTAINABLE LIFE

Geyser - Class-1, MFV placing at the time of packing

This is the Multi function valvePut Separate in the Thermocol as shown in picture.

At the time of product installation assemble the Multi Function Valve in Inlet Pipe without any Changes in Multi Function Valve.

MFV in Plastic body at the time of Packing

MFV in Metal body at the time of Packing

This isThe MFV

Page 2: Geyser -  Class-1,  MFV placing at the time of packing

ECOLOGY – CREATE A SUSTAINABLE LIFE

Geyser - Class-1, Draining Procedure

Screw

Procedure to Drain the water from tank to prevent the Scaling in Element & Tank.

Before After

Before Draining the water remove the Screw from MFV by screw Driver thenopen the Lever as shown in Picture 2.

After finish the Draining it is must again tighten the screw in MFV properly as shown in Pic. 1.

Lever

Pic. 1 Pic. 2