1
CRAIG EDWARD GUENETTE
SUPERVISOR: CHRISTOPHER “SCOTT” JAMES BUDDY #1: RYAN ADAMS BUDDY #2: SEAN DOREY
No Diamonds Yet…
College: Wentworth Institute of Tech.Major: Mechanical Engineering Tech.Current Year: JuniorCurrent GPA: 3.648Exp. YOG: August 2010
Sub-Division: Missiles and Fire ControlLocation: Camden, ARProgram: THAAD (Terminal High Altitude Area Defense)
Position: Co-op Mechanical EngineerStart/End Date: January 12, 2009/May 8, 2009
Table of Contents
2
TABLE OF CONTENTSHISTORIC MILESTONESTHAADWEEK 1WEEK 2WEEK 3WEEK 4WEEK 5WEEK 6WEEK 7WEEK 8WEEK 9
WEEK 10WEEK 11WEEK 12WEEK 13WEEK 14WEEKS 15 - 17VALUED EXPERIENCESTHANK YOU!
3
HISTORIC MILESTONESBorn and Raised: Acushnet, MA
Home life: Loving Family of six
Age 5: Exposure to Mechanical and Electrical Systems
Age 7-18: Continuous involvement in Athletics/Sports
Age 8: Identified my career choice – ME
Age 15: Entered the Workforce
Age 18: Secured my first job as a ME Co-op –
Age 19: Optional Co-op –
Age 20: First (of Two) mandatory Co-op –
Age 21: “Here I Stand!”
Table of Contents
4
THAAD 5 Major Components
Launcher Missiles Radar Fire Control Ground Support
Endo and Exo-atmospheric
Enlarges Battle Space
Rapid Deployment
Hit-To-Kill Lethality
Missile Defense
Table of Contents
5
WEEK 1 Extensive Lockheed Martin Corporation Training
Courses Taken: 35 Courses Failed: 0
Grand Tour of the CLIC Building and my workstation
First design assignment – MRP Flip-Right “Cart”
01/12/09 – 01/18/09
Nomenclature:- Completed- In-Progress
Table of Contents
Flip-Right
6
WEEK 2 Designed MRP Flip-Right “High Mobility Caster Assembly”
Calculated, Researched, and Submitted a PR for HMCA materials
Second Design Project – MRP Hydraulic Lift “Safety Stop”
01/19/09 – 01/25/09
Table of Contents
MRP
7
WEEK 301/26/09 – 02/01/09
Designed MRP Hydraulic Lift “Height Adjustment Safety Blocks”
Located In-Stock Domex material for HASB to be delivered to CLIC
Received HMCA materials and submitted a WO for fabrication
Designed Launcher Oil Drain Protection Cover
Table of Contents
8
WEEK 402/02/09 – 02/08/09
Built MRP HASB and submitted a WO for paint
HASB tested and incorporated into MRP build-up process
HMCA fabricated, tested, and reside under the MRP Flip-Right
Supervised Launcher Integration – CAB Cable Installations (2 employees)
Table of Contents
Flip-Right
9
WEEK 502/09/09 – 02/15/09
Supervised Launcher Integration – Battery Box Installation (3 employees)
Designed MRP Gusset Location Tools – Two Options
Built Launcher Oil Drain Protection Cover
Table of Contents
Before After
10
WEEK 602/16/09 – 02/22/09
Ordered, received, and assembled suitable cart for MRP Borescope
Redesigned MRP Cart Supports (previous co-op’s design)
Designed MRP Cross Member Location Tool Supervised Launcher Integration – MUJB (3 employees)
Table of Contents
11
WEEK 702/23/09 – 03/01/09
Studied engineering/planning for TFCC SSG (ASV and CSV) integration
Designed TFCC ACU Installation Support Deck
Fabrication of MRP Cross Member Location Tool
Table of Contents
12
WEEK 803/02/09 – 03/08/09
Developed Parallel Processing for ASV Work Instructions – Pending Work Order
Fabrication of MRP Cross Member Location Tool
Fabrication of TFCC ACU Installation Support Deck
Table of Contents
13
WEEK 903/09/09 – 03/15/09
Designed Launcher CEM Drill Fixture Stands – Two Options
Selected and Built CEM Drill Fixture Stands – Option 2 (top right)
Supervised FUF 1 ASV integration (2 employees)
12’- 8”5’- 2”
Table of Contents
Before After
14
WEEK 1003/16/09 – 03/22/09
Designed Riv-nut Nose Piece Modification
Tested and Incorporated Modified Nose Piece into SSG integration
Supervised FUF 1 ASV integration (2-3 employees)
Table of Contents
15
WEEK 1103/23/09 – 03/29/09
Incorporated cumulative redlines into planning
Designed 33/64” and 12.5 mm Drill Guides for SSG construction
Supervised FUF 1 ASV integration (2-4 employees)
Table of Contents
16
WEEK 1203/30/09 – 04/05/09
Order of operations changed on the SSG integration process
Successfully supervised FUF 1 ASV integration (3-5 employees)
Table of Contents
17
WEEK 1304/06/09 – 04/12/09
Created Engineering Drawing of MRP Riv-Nut Alignment Template
Successfully Supervised FUF 1 CSV integration (3-5 employees)
Cleaned, Organized, and Prepared for THAAD Roll Out 2009
Table of Contents
18
WEEK 1404/13/09 – 04/19/09
THAAD Roll Out Ceremony
Ordered tooling for FUF 2 SSG Integration
Drastically updated ASV and CSV Planning
Table of Contents
MY BUDDY!!
19
WEEKS 15 - 1704/20/09 – 05/08/09
Table of Contents
Toured Lockheed Martin’s MFC Dallas, TX Facility
Successfully supervised FUF 2 ASV integration (3 employees)
Supervised FUF 2 CSV integration (3 employees)
20
VALUED EXPERIENCES Personally Fabricated Design Projects: 5
Personally Design Projects: 13
Average Hours Worked/Week: 58.3
Networking Opportunities: Endless
Table of Contents
+One Unforgettable Experience
My Career
21
THANK YOU!
RESERVED
FOR
APPRECIATION
Although it has been an enjoyable, rewarding, and truly paramount experience, the time has arrived where this particular southern escapade has unfortunately come to an end…
…However, I will look forward to the period in time when another extraordinary opportunity, such as this, is presented.