Palm Harbor HomesPlant City, FL

Michael Lombard,Continuous Improvement Manager

Creating a Lean Infrastructure

Page 3: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Palm Harbor Plant 06 Started: 1981 Location: Plant City, FL Home type(s): Modular Price point: Moderate to

high-end Design: Substantial

customization

Production: 4 floors/day Market area: Southeastern

US

Page 4: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Challenges Employee turnover Lack of standard

work procedures Instability on the

shop-floor Poor work

environment Unstructured

improvement process

Page 5: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Strategy: Build a Foundation for Lean

Integrate lean into the plant culture

Establish a well defined infrastructure for kaizen (continuous improvement)

Page 6: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Lean Culture

Training for managers› Weekly “book club”

meetings› Hands-on simulations,

gemba observations, etc.› Online learning

component

Training for shop floor associates› “Five S”› Standardized work› One-piece flow and pull

systems

Page 7: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Kaizen Infrastructure Lean Executive Team

› Champions improvement projects

› Appoints and supports project captains

› Provides resources and guidance

“Five S” Workplace› Providing a positive

workplace› Use visual control› Encompass entire facility

Idea Development Process› Harness employee creativity› Available to all› Plan-Do-Check-Adjust

Page 8: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Idea Process Results

Ideas generated: 200+ Ideas implemented: 78 Total estimated savings

to date: $108,000

Page 9: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Frame Shop

Unnecessary moving frame in and out of floor department

Frame moves directly into frame department

Then Now Floor crew stopped

work while frame moved through

Floor crew works without interruption

Page 10: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Results

Cost less than $1,000

Floor department works uninterrupted

Eliminated waiting time

Eliminated 4 floor moves

Throughput time reduced

Labor savings $36,000 per year

Page 11: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Paint Booth

Doors painted in open area subject to dust and interference

Dedicated paint boothThen Now

No fixtures Doors painted far from point of use on the line

Fixtures for holding and flipping doors

Doors painted close to point of use

Page 12: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Results

Cost less than $2,000

Doors closer to point of use

Defects from 25% to 5% of doors

Painting time reduced by two-thirds

Total labor savings = $31,500 per year

Page 13: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Highlights

Getting buy-in critical to make improvement ideas work

Basic understanding of lean critical to management buy-in

Action over planning

Page 14: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Going Forward

Continue Management Training

Develop Shop-Floor Training

Expand Idea Development Process

Evolve “Five S” Workplace

Page 15: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Lean Symposium

Page 16: Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Manufactured Housing Research AllianceJordan Dentz

(212) 496-0900 [email protected]

www.mhrahome.org

Factory Building Symposium on Lean

Production