Page 2: ESS Technique 2016 10 EN

Ice Storage for Air conditioning and Process

New Building Renovation Site Expansion

Page 3: ESS Technique 2016 10 EN

1st Prize technological innovation

ENTECH Hanoi 2015

Page 4: ESS Technique 2016 10 EN

Shopping Mall

Hotel

Office

Factory

Residential

ICE BANKS Application

Page 5: ESS Technique 2016 10 EN

ICE BANKS for Plant Extensions

0

10

20

30

40

50

60

70

80

90

0:01

1:02

2:03

3:04

4:05

5:06

6:07

7:08

8:09

9:10

10:11

11:12

12:13

13:14

14:15

15:16

16:17

17:18

18:19

19:20

20:21

21:22

22:23

23:24

Coo

ling

Dem

and

Time

Chiller Load Ice Bank Load Overnight Charging

Page 6: ESS Technique 2016 10 EN

ICE BANKS for Cyclic Cooling Applications

Page 7: ESS Technique 2016 10 EN

ICE BANKS for Process Applications

Page 8: ESS Technique 2016 10 EN

Cooling TowerCT

CHILLER 5°C

7 °C

AHU

FCU

12 °C

Chiller circuit

Page 9: ESS Technique 2016 10 EN

Cooling TowerCT

Ice Bank

CHILLER

M

5°C

5

4

M

1

MM 3

M

2

6

L

0

50

100

7 °C

AHU

FCU

12 °C

Serial Arrangement

Page 10: ESS Technique 2016 10 EN

Cooling TowerCT

Ice Bank

CHILLER

M

5°C

5

4

M

1

MM 3

M

2

6

L

0

50

100

5 °C

7 °C AHU

FCU

12 °C

10 °C

DP

Serial Arrangement With Plates Exchanger

Page 11: ESS Technique 2016 10 EN

Cross Section of ICE BANKS

Steel tank

Insulation

Heat- exchanger

Liner

Main Headers

Insulated Cover

Page 12: ESS Technique 2016 10 EN

ICE BANKS Charging Schematic

Page 13: ESS Technique 2016 10 EN

ICE BANKS Discharging Schematic

Page 14: ESS Technique 2016 10 EN

Creating ice in ICE BANKS

Page 15: ESS Technique 2016 10 EN

Charge ICE BANKS

CHILLER

Page 16: ESS Technique 2016 10 EN

Cooling with Chiller

CHILLER

Page 17: ESS Technique 2016 10 EN

Cooling with ICE BANKS

CHILLER

Page 18: ESS Technique 2016 10 EN

Cooling with Chiller & ICE BANKS

CHILLER

Page 19: ESS Technique 2016 10 EN

Ice Inventory Command & Monitoring

ICE BANKS System

Page 20: ESS Technique 2016 10 EN

Financial view of ICE BANKS

Profit Pay back 2.7Year Profit 10 YearOperation saving US$777,37127%

-400000

-200000

0

200000

400000

600000

800000

1000000

0 1 2 3 4 5 6 7 8 9 10

PaybackProfit

Payback

Pay back 0.0 Year Profit 10 YearOperation saving 8% 310,478 US$

Extra cost: $ 200,000 Extra cost: $ 0

Page 21: ESS Technique 2016 10 EN

Financial View of ICE BANKS Chiller Chiller + Bể lạnhChiller 1600 kW Chiller 1250 kW

Bể lạnh 6800 kWh

Energy expenses per weekday

Chiller Chiller + Bể lạnhChiller + Ice Bank

Of peak 0.00 Of peak 63.00 US$

Part peak 226.80 US$ Part peak 223.51 US$

Peak 216.43 US$ Peak 75.11 US$

TOTAL 443.23 US$ TOTAL 298.62 US$

Δ Cost per Day Theo ngày 144.6 US$

Saving per Year Theo năm 26,689 US$

0 1 2 3 4 5 6 7 8 9 1011121314151617181920212223CHdirect CHchargeDischarge Iceinstore

0 1 2 3 4 5 6 7 8 9 10111213141516171819 202122 23CHdirect

Page 22: ESS Technique 2016 10 EN

Financial View of ICE BANKS

Page 23: ESS Technique 2016 10 EN

INSTALLATION PROCESS OF ICE TANK PROJECTS DONE

Page 24: ESS Technique 2016 10 EN

5 STARS HOTEL IMPERIAL VŨNG TÀU

Page 25: ESS Technique 2016 10 EN

Site Assembly of ICE BANKS

Heat exchangers and Manifold

Page 26: ESS Technique 2016 10 EN

Site Assembly of ICE BANKS

Ice Bank Insulation

Page 27: ESS Technique 2016 10 EN

Site Assembly of ICE BANKS

Ice Bank Liner

Page 28: ESS Technique 2016 10 EN

Heat Exchangers welding

Site Assembly of ICE BANKS

Page 29: ESS Technique 2016 10 EN

Outdoor Unit under construction

Covers and roof assembly

Page 30: ESS Technique 2016 10 EN

COMMERCIAL CENTER - BIG C NHA TRANG

Page 31: ESS Technique 2016 10 EN

Nha Trang Liner and Steel Structure

Site Assembly of ESS Ice Banks

Page 32: ESS Technique 2016 10 EN

Site Assembly of ICE BANKS

Nha Trang Heat-Exchangers and Manifold

Page 33: ESS Technique 2016 10 EN

COMMERCIAL CENTER - BIG C VIỆT TRÌ

Page 34: ESS Technique 2016 10 EN

Concrete ICE BANKS

Concrete Tank Outdoor Viet Tri

Page 35: ESS Technique 2016 10 EN

HONDA FACTORY HÀ NAM

Page 36: ESS Technique 2016 10 EN

Concrete ICE BANKS

Concrete ice banks and heat exchanger

Page 37: ESS Technique 2016 10 EN

ICE BANK and Chiller

Page 38: ESS Technique 2016 10 EN

Control Box

Page 39: ESS Technique 2016 10 EN

Ice Tank for Residential Building

Fan Coil Chiller

Ice Tank

Split or VRV system

Up to 50% less Electricity

Consumption =

Page 40: ESS Technique 2016 10 EN

Ice Tank for Residential Building

Central production Split or

VRVSystem

Until 50% less Operating cost

Ice Tank + Chiller Investment

cost Until 25% less

Page 41: ESS Technique 2016 10 EN

PROJECTS IN PROCESS AND DONE

Ø  Big C Long Biên Ø  Big C Thanh Hoá Ø  Big C Cần Thơ Ø  Big C Tân Phú Ø  Big C Bình Dương Ø  Big C Dĩ An Ø  Big C Việt Trì Ø  Big C Nha Trang Ø  Big C Pandora

Ø  Big C Ninh Bình Ø  Big C Vĩnh Phúc Ø  Big C Nam Định Ø  Big C Hạ Long Ø  Big C Quy Nhơn Ø  5 stars Imperial Hotel Vũng Tàu Ø  Factory Honda Việt Nam (Hà nam) Ø  Factory Canon Ø Factory Redsun

Page 42: ESS Technique 2016 10 EN

PROJECT TO STUDY

Ø  Factory Saigon beer Dak Lak Ø  Factory Sông Lam Beer Ø  Factory Olam Café Ø  5 stars Hotel Movenpick & Raddison Blue Ø  4 stars Hotel Sapa Ø  Factory Toyota Hải Phòng Ø  Factory Honda Vĩnh Phúc

Page 43: ESS Technique 2016 10 EN

THANK YOU!