ERECTION - PT& DM Projection Dated 09.08.12

Embed Size (px)

Citation preview

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    1/14

    Page 1 of

    SL.NO.

    I PREVIOUSQTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(projectio

    n)

    1.00.00 Pre-Treatment Plant

    1.01.00 Nos 2 402,625.00 805250.00 1.60 0.40 2.00 644200.00 161050.00

    1.02.00 Nos 2 25,000.00 50000.00 2.00 0.00 2.00 50000.00 0.00

    1.03.00 Nos 1 400,000.00 400000.00 1.00 0.00 1.00 400000.00 0.00

    1.04.00 Nos 3 270,000.00 810000.00 2.70 0.00 2.70 729000.00 0.00

    1.05.00 Nos 2 15,000.00 30000.00 2.00 0.00 2.00 30000.00 0.001.06.00 Nos 2 12,500.00 25000.00 2.00 0.00 2.00 25000.00 0.00

    1.07.00 Nos 3 8,000.00 24000.00 3.00 0.00 3.00 24000.00 0.00

    1.08.00 Nos. 2 15,000.00 30000.00 2.00 0.00 2.00 30000.00 0.00

    1.09.00 Nos 2 15,000.00 30000.00 2.00 0.00 2.00 30000.00 0.00

    1.10.00 Nos. 2 10,000.00 20000.00 0.00 2.00 2.00 0.00 20000.00

    1.11.00 Nos. 2 17,500.00 35000.00 0.00 2.00 2.00 0.00 35000.00

    1.12.00 Nos 6 5,000.00 30000.00 6.00 0.00 6.00 30000.00 0.00

    1.13.00 Nos 6 18,000.00 108000.00 6.00 0.00 6.00 108000.00 0.00

    1.14.00 Nos 6 15,000.00 90000.00 0.00 6.00 6.00 0.00 90000.00

    1.15.00 Nos 8 500.00 4000.00 0.00 0.00 0.00 0.00 0.001.16.00 VALVES :

    1.16.01 Lot 1 20,000.00 20000.00 1.00 0.00 1.00 20000.00 0.00

    1.16.02 Lot 1 10,000.00 10000.00 1.00 0.00 1.00 10000.00 0.00

    1.16.03 Lot 1 25,000.00 25000.00 1.00 0.00 1.00 25000.00 0.00

    1.16.04.01 Nos 2 10,000.00 20000.00 0.00 0.00 0.00 0.00 0.00

    1.16.05 Lot 1 10,000.00 10000.00 0.00 1.00 1.00 0.00 10000.00

    1.16.06 Lot 1 5,000.00 5000.00 1.00 0.00 1.00 5000.00 0.00

    1.16.07.01 Nos 6 1,000.00 6000.00 1.00 5.00 6.00 1000.00 5000.00

    1.16.08 Lot 1 10,000.00 10000.00 1.00 0.00 1.00 10000.00 0.00

    PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA

    CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED

    Knife Gate Valve (Manual)

    Butterfly Valve (Manual)

    Butterfly Valve (Motor) 350 NB

    Diaphragm Valve (Manual)

    Globe Valve

    Plug Valve - 80 NB

    Check Valve

    Clariflocculator Mechanism with Telescopic Device

    Flash Mixer Agitator Assembly

    Thickener Mechanism

    Centrifuge

    Gate Valve (Manual)

    Sludge Transfer PumpFiltrate Water Tr. Pump

    Thickened Sludge Tr. Pump

    Alum Dosing Tank Agitator Assembly

    Lime Dosing Tank Agitator Assembly

    Alum Dosing Pump

    Lime Dosing Pump

    Polyelectrolyte Dosing Tank (MSRL)

    Polyelectrolyte Dosing Tank Agitator Assembly

    Poly Dosing Pumps

    Alum Dosing Tank

    ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12

    Total Lumpsum, Exworks Price for Erection of Main Equipment

    PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010

    MBE PROJECT NO.: W016

    EXECUTED AMOUNItem/DescriptionUnit Qty.

    UNIT RATE

    (RS.)Erection

    EXECUTED QUANTITY

    Erection of Plant & Equipment

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    2/14

    Page 2 of

    SL.NO.

    I PREVIOUSQTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(projectio

    n)

    PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA

    CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED

    ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12

    Total Lumpsum, Exworks Price for Erection of Main Equipment

    PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010

    MBE PROJECT NO.: W016

    EXECUTED AMOUNItem/DescriptionUnit Qty.

    UNIT RATE

    (RS.)Erection

    EXECUTED QUANTITY

    Erection of Plant & Equipment

    1.17.00 PIPE

    1.17.01 Lot 1 100,000.00 100000.00 0.00 0.50 0.50 0.00 50000.00

    1.17.02 Lot 1 5,500.00 5500.00 0.00 0.00 0.00 0.00 0.00

    2.00.00 Lot 1 900,000.00 900000.00 0.00 0.00 0.00 0.00 0.00

    3.00.00 Lot 1 900,000.00 900000.00 0.00 0.00 0.00 0.00 0.00

    4.00.00 Effluent Treatment Plant4.01.00 Nos 22 9,000.00 198000.00 2.00 2.00 4.00 18000.00 18000.00

    4.02.00 Nos 2 10,000.00 20000.00 0.00 2.00 2.00 0.00 20000.00

    4.03.00 Set 1 75,000.00 75000.00 1.00 0.00 1.00 75000.00 0.00

    4.04.00 Nos 1 7,500.00 7500.00 0.00 0.00 0.00 0.00 0.00

    4.05.00 Nos 1 7,500.00 7500.00 0.00 0.00 0.00 0.00 0.00

    4.06.00 No 1 12,000.00 12000.00 1.00 0.00 1.00 12000.00 0.00

    4.07.00 No 1 2,500.00 2500.00 0.00 1.00 1.00 0.00 2500.00

    4.08.00 No 1 2,500.00 2500.00 0.00 1.00 1.00 0.00 2500.00

    4.09.00 Sets 2 11,000.00 22000.00 0.00 0.00 0.00 0.00 0.00

    4.10.00 Sets 2 15,000.00 30000.00 0.00 0.00 0.00 0.00 0.004.11.00 Sets 2 9,000.00 18000.00 0.00 2.00 2.00 0.00 18000.00

    4.12.00 nos 1 1,000.00 1000.00 0.00 1.00 1.00 0.00 1000.00

    4.13.00 PIPE

    4.13.01 Lot 1 22,000.00 22000.00 0.00 0.50 0.50 0.00 11000.00

    4.13.02 Lot 1 2,500.00 2500.00 0.00 0.00 0.00 0.00 0.00

    4.14.00 VALVE 0.00

    4.14.01 Lot 1 18,000.00 18000.00 0.00 0.00 0.00 0.00 0.00

    4.14.02 Lot 1 25,000.00 25000.00 0.00 0.00 0.00 0.00 0.00

    4.14.03 Lot 1 40,000.00 40000.00 0.00 0.00 0.00 0.00 0.00

    4.14.04 Lot 1 150,000.00 150000.00 0.00 0.00 0.00 0.00 0.00

    PVC Pipe

    Gate Valve (Manual)

    Check Valve

    Butterfly Valve

    Diaphragm Valve (Manual)

    MS Pipe

    Treated Water Transfer Pumps

    Flash mixer,flocculator& lamella clarifier

    Agitator for flocculator(lamella clarifier)

    Agitator for flash(lamella clarifier)

    TPI with all accessories

    Acid dosing tank

    NaOH dosing tank

    Polyelectrolyte dosing tank

    Polyelectrolyte dosing tank agitator assemblyPolyelectrolyte dosing pump

    Agitator for NaOH dosing tank

    Vertical Centrifugal Pumps

    MS Pipe

    PVC Pipe

    RW & CW Chlorination with all accessories.

    CW Treatment System with all accessories.

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    3/14

    Page 3 of

    SL.NO.

    I PREVIOUSQTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(projectio

    n)

    PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA

    CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED

    ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12

    Total Lumpsum, Exworks Price for Erection of Main Equipment

    PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010

    MBE PROJECT NO.: W016

    EXECUTED AMOUNItem/DescriptionUnit Qty.

    UNIT RATE

    (RS.)Erection

    EXECUTED QUANTITY

    Erection of Plant & Equipment

    5.00.00 SEWAGE TREATMENT PLANT 0.00

    5.01.00 Nos 10 7,500.00 75000.00 0.00 0.00 0.00 0.00 0.00

    5.02.00 Nos 2 8,000.00 16000.00 0.00 0.00 0.00 0.00 0.00

    5.03.00 No 1 10,000.00 10000.00 0.00 0.00 0.00 0.00 0.00

    5.04.00 No 1 3,750.00 3750.00 0.00 0.00 0.00 0.00 0.00

    5.05.00 No 1 3,000.00 3000.00 0.00 0.00 0.00 0.00 0.005.06.00 Nos 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00

    5.07.00 Polymer Dosing System (HDPE Dosing Tank + Agitator + Dosing Pump) 0.00

    5.07.01 No 1 3,000.00 3000.00 0.00 0.00 0.00 0.00 0.00

    5.07.02 No 1 4,000.00 4000.00 0.00 0.00 0.00 0.00 0.00

    5.07.03 No 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00

    5.08.00 Alum Dosing System (MSEP Dosing Tank + Agitator + Dosing Pump) 0.00

    5.08.01 No 1 3,000.00 3000.00 0.00 0.00 0.00 0.00 0.00

    5.08.02 No 1 4,000.00 4000.00 0.00 0.00 0.00 0.00 0.00

    5.08.03 No 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00

    5.09.00 NaOCL Dosing System (MSEP Dosing Tank + Dosing Pump) 0.005.09.01 No 1 2,000.00 2000.00 0.00 0.00 0.00 0.00 0.00

    5.09.02 No 2 4,000.00 8000.00 0.00 0.00 0.00 0.00 0.00

    5.10.00 PIPE

    5.10.01 Lot 1 15,000.00 15000.00 0.00 0.00 0.00 0.00 0.00

    5.10.02 Lot 1 2,000.00 2000.00 0.00 0.00 0.00 0.00 0.00

    5.11.00 VALVES

    5.11.01 Lot 1 20,000.00 20000.00 0.00 0.00 0.00 0.00 0.00

    5.11.02 Lot 1 4,000.00 4000.00 0.00 0.00 0.00 0.00 0.00

    5.11.03 Lot 1 5,000.00 5000.00 0.00 0.00 0.00 0.00 0.00

    6.00.00 Lot 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00Mandatory Spares

    Dosing Pump

    MS Pipe

    PVC Pipe

    Gate Valve (Manual)

    Check Valve

    Butterfly Valve

    Agitator for Poly Dosing Tank

    Poly Dosing Pump

    MSRL Dosing Tank

    Agitator for Alum Dosing Tank

    Alum Dosing Pump

    MSRL Dosing Tank

    HDPE Dosing Tank

    Sewage Lift Pump

    Air Blower

    Tube Settler + Flocculator(MSEP)

    Agitator for Flocculation Tank

    MS Clear Water TankClear Water Disposal Pump

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    4/14

    Page 4 o

    SL.NO.

    I PREVIOUSQTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(projectio

    n)

    PACKAGE: Clubbed Water System Packages for 2X363.3 MW CCPP for OTPC,TRIPURA

    CLIENT : NTPC-BHEL POWER PROJECTS PRIVATE LIMITED

    ERECTION BBU - CLUBBED WATER SYSTEM - Aug'12

    Total Lumpsum, Exworks Price for Erection of Main Equipment

    PO NO.: NBPPL/CMP/PALT/WSP/P-1040/10 Dated-08.04.2010

    MBE PROJECT NO.: W016

    EXECUTED AMOUNItem/DescriptionUnit Qty.

    UNIT RATE

    (RS.)Erection

    EXECUTED QUANTITY

    Erection of Plant & Equipment

    7.00.00 ELECTRICAL & INSTRUMENTATION

    7.01.00 Instrumentation for PT

    7.01.01 Nos 13 1,000.00 13000.00 0.00 0.00 0.00 0.00 0.00

    7.01.02 Nos 20 600.00 12000.00 0.00 0.00 0.00 0.00 0.00

    7.01.03 Nos 17 500.00 8500.00 0.00 0.00 0.00 0.00 0.00

    7.01.04 Nos 2 500.00 1000.00 0.00 0.00 0.00 0.00 0.007.01.05 nos 18 500.00 9000.00 0.00 0.00 0.00 0.00 0.00

    7.02.00 Instrumentation for ETP

    7.02.01 Nos 15 1,400.00 21000.00 0.00 0.00 0.00 0.00 0.00

    7.02.02 Nos 5 1,200.00 6000.00 0.00 0.00 0.00 0.00 0.00

    7.02.03 Nos 20 1,000.00 20000.00 0.00 0.00 0.00 0.00 0.00

    7.02.04 Nos 10 1,000.00 10000.00 0.00 0.00 0.00 0.00 0.00

    7.02.05 No 1 500.00 500.00 0.00 0.00 0.00 0.00 0.00

    7.02.06 No 1 500.00 500.00 0.00 0.00 0.00 0.00 0.00

    7.02.07 No 1 9,000.00 9000.00 0.00 0.00 0.00 0.00 0.00

    7.02.08 No 1 9,000.00 9000.00 0.00 0.00 0.00 0.00 0.007.03.00 Instrumentation for STP

    7.03.01 Nos 7 1,500.00 10500.00 0.00 0.00 0.00 0.00 0.00

    7.03.02 Nos 3 1,000.00 3000.00 0.00 0.00 0.00 0.00 0.00

    7.03.03 Nos 18 500.00 9000.00 0.00 0.00 0.00 0.00 0.00

    5500000.00 2276200.00 444050.00

    PH Analyser

    RCA Analyser

    Level Switch

    Level Switch

    Level Gauge

    Pressure Switch

    Flow TransmitterPressure Gauge

    Level Gauge

    Pressure Gauge

    TOTAL

    Level Switch

    Level Gauge

    Pressure Gauge

    Pressure Switch

    Flow Indicator

    Temprature Indicator

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    5/14

    Page 5 o

    CUMULATIVE

    AMOUNT

    805250.00

    50000.00

    400000.00

    729000.00

    30000.0025000.00

    24000.00

    30000.00

    30000.00

    20000.00

    35000.00

    30000.00

    108000.00

    90000.00

    0.00

    20000.00

    10000.00

    25000.00

    0.00

    10000.00

    5000.00

    6000.00

    10000.00

    (Rs.)

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    6/14

    Page 6 o

    CUMULATIVE

    AMOUNT

    (Rs.)

    50000.00

    0.00

    0.00

    0.00

    36000.00

    20000.00

    75000.00

    0.00

    0.00

    12000.00

    2500.00

    2500.00

    0.00

    0.0018000.00

    1000.00

    11000.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    7/14

    Page 7

    CUMULATIVE

    AMOUNT

    (Rs.)

    0.00

    0.00

    0.00

    0.00

    0.000.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    8/14

    Page 8

    CUMULATIVE

    AMOUNT

    (Rs.)

    0.00

    0.00

    0.00

    0.000.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    2720250.00

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    9/14

    Page 9 o

    Unit QTYUNIT RATE

    (RS.)Erection

    PREVIOUS

    QTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(project

    ion)

    A. VESSEL & PIPING

    1 Dual Media Filter Nos 3 114,000.00 342,000.00 3.00 0.00 3.00 342000.00 0.00

    2 Activated Carbon Filter Nos 3 110,000.00 330,000.00 3.00 0.00 3.00 330000.00 0.00

    3 Strong Acid Cation Exchanger Nos 3 85,000.00 255,000.00 3.00 0.00 3.00 255000.00 0.00

    4 Strong Base Anion Exchanger Nos 3 85,000.00 255,000.00 3.00 0.00 3.00 255000.00 0.00

    5 Mixed Bed Exchanger Nos 3 85,000.00 255,000.00 3.00 0.00 3.00 255000.00 0.00

    6 AC Filter for Alkali Solution Nos 1 45,000.00 45,000.00 1.00 0.00 1.00 45000.00 0.00

    7 Degasser Tower Nos 3 50,000.00 150,000.00 3.00 0.00 3.00 150000.00 0.00

    8 Degassed Water Storage Tank Nos 3 50,000.00 150,000.00 3.00 0.00 3.00 150000.00 0.00

    9 Bulk Acid Storage tank Nos 1 100,000.00 100,000.00 1.00 0.00 1.00 100000.00 0.00

    10 Bulk Caustic Storage Tank Nos 1 100,000.00 100,000.00 1.00 0.00 1.00 100000.00 0.00

    11 UF Feed Tank Nos 3 45,000.00 135,000.00 3.00 0.00 3.00 135000.00 0.00

    12 Caustic Dilution Tank Nos 2 27,500.00 55,000.00 2.00 0.00 2.00 55000.00 0.00

    13 Acid measuring Tank Nos 2 25,000.00 50,000.00 2.00 0.00 2.00 50000.00 0.00

    14 Alkali Preperation tank Nos 2 25,000.00 50,000.00 2.00 0.00 2.00 50000.00 0.0015 Hot Water Tank Nos 1 75,500.00 75,500.00 1.00 0.00 1.00 75500.00 0.00

    16 Filtered Water Tank Nos 1 35,000.00 35,000.00 0.00 1.00 1.00 0.00 35000.00

    17 Pipeline for Dual Media Filter Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 60000.00 0.00

    18 Pipeline for Activated Carbon Filter Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 60000.00 0.00

    19 Pipeline for Cation Exchanger Lot 1 75,000.00 75,000.00 1.00 0.00 1.00 75000.00 0.00

    20 Pipeline for Anion Exchanger Lot 1 65,000.00 65,000.00 1.00 0.00 1.00 65000.00 0.00

    21 Pipeline for Mixed Bed Exchanger Lot 1 65,000.00 65,000.00 1.00 0.00 1.00 65000.00 0.00

    22 Pipeline for Degasser Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 60000.00 0.00

    23 Pipeline for Acid & Alkali transfer Lot 1 55,000.00 55,000.00 1.00 0.00 1.00 55000.00 0.00

    24 Pipeline for DM Plant to UF Feed Tank & DM Storage Tank Lot 1 35,000.00 35,000.00 0.00 0.00 0.00 0.00 0.0025 Pipeline for DM Plant to UF Feed Tank & DM Storage Tank Lot 1 35,000.00 35,000.00 0.00 0.00 0.00 0.00 0.00

    EXECUTED AMOUN

    Billing Schedule: DM Plant - ERECTION

    PROJECT : 726.6 MW Combined Cycle Power Project

    PACKAGE : DEMINERALISION PLANT FOR 2 X 363.3 MW CCCP, Palatana, Tripura

    P.O. No. : NBPPL/CMP/PALT/DMP/P-1037/10 dated 08.04.2010

    Client :NTPC-BHEL POWER PROJECTS PRIVATE LTD

    Total Lumpsum, Exworks Price for Supply of Main Equipment Including Mandatory Spares, Commissioning spares, Maintanance Tools & Tackles etc for the

    per Scope of Supply

    SL. NO. DESCRIPTION

    AS PER BBU EXECUTED QUANTITY

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    10/14

    Page 10 of

    Unit QTYUNIT RATE

    (RS.)Erection

    PREVIOUS

    QTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(project

    ion)

    EXECUTED AMOUN

    Billing Schedule: DM Plant - ERECTION

    PROJECT : 726.6 MW Combined Cycle Power Project

    PACKAGE : DEMINERALISION PLANT FOR 2 X 363.3 MW CCCP, Palatana, Tripura

    P.O. No. : NBPPL/CMP/PALT/DMP/P-1037/10 dated 08.04.2010

    Client :NTPC-BHEL POWER PROJECTS PRIVATE LTD

    Total Lumpsum, Exworks Price for Supply of Main Equipment Including Mandatory Spares, Commissioning spares, Maintanance Tools & Tackles etc for the

    per Scope of Supply

    SL. NO. DESCRIPTION

    AS PER BBU EXECUTED QUANTITY

    B. PUMP & BLOWERS 0.00

    1 Air Blower for Dual Media Filter with Motors Nos 2 29,000.00 58,000.00 2.00 0.00 2.00 58000.00 0.00

    2 Air Blower for Mixed Bed with Motors Nos 2 29,000.00 58,000.00 2.00 0.00 2.00 58000.00 0.00

    3 Air Blower for Degasser with Motors Nos 6 27,500.00 165,000.00 6.00 0.00 6.00 165000.00 0.00

    4 Degassed Water Transfer Pump with Motors Nos 6 21,000.00 126,000.00 1.80 0.00 1.80 37800.00 0.00

    5 Acid Unloading Pump with Motors Nos 2 10,000.00 20,000.00 2.00 0.00 2.00 20000.00 0.00

    6 Caustic Unloading Pump with Motors Nos 2 10,000.00 20,000.00 2.00 0.00 2.00 20000.00 0.00

    7 Effluent disposal Pump with Motors Nos 2 20,000.00 40,000.00 1.00 0.00 1.00 20000.00 0.00

    8 Regeneration Pump with Motors Nos 2 10,000.00 20,000.00 0.00 0.00 0.00 0.00 0.00

    9 Alkali transfer Pump with Motors Nos 2 10,000.00 20,000.00 2.00 0.00 2.00 20000.00 0.00

    C. INSTRUMENT 0.00

    1 Pressure Gauge Nos 75 400.00 30,000.00 29.00 0.00 29.00 11600.00 0.00

    2 Differential Pressure Indicator Nos 7 2,000.00 14,000.00 0.00 0.00 0.00 0.00 0.00

    3 Differential Pressure Switch Nos 7 2,500.00 17,500.00 6.00 0.00 6.00 15000.00 0.00

    4 Flow Indicator Nos 23 1,000.00 23,000.00 15.00 0.00 15.00 15000.00 0.005 Flow Transmitter with Orifice Nos 9 9,000.00 81,000.00 0.00 0.00 0.00 0.00 0.00

    6 Conductivity Transmitter Nos 6 4,000.00 24,000.00 0.00 0.00 0.00 0.00 0.00

    7 pH Transmitter Nos 4 4,000.00 16,000.00 0.00 0.00 0.00 0.00 0.00

    8 3-channel Sodium Analyzer Nos 1 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00

    9 3-channel Silica Analyzer Nos 1 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00

    10 1-channel Silica Analyzer Nos 1 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00

    11 Conductivity Comparator Nos 3 11,000.00 33,000.00 0.00 0.00 0.00 0.00 0.00

    12 Level Indicator Nos 20 1,000.00 20,000.00 6.00 0.00 6.00 6000.00 0.00

    13 Level Switch Nos 20 600.00 12,000.00 0.00 0.00 0.00 0.00 0.00

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    11/14

    Page 11 of 14

    Unit QTYUNIT RATE

    (RS.)Erection

    PREVIOUS

    QTY

    IN THIS BILL

    QTY

    CUMULATIVE

    QTY

    PREVIOUS

    AMOUNT

    aug'12(project

    ion)

    EXECUTED AMOUN

    Billing Schedule: DM Plant - ERECTION

    PROJECT : 726.6 MW Combined Cycle Power Project

    PACKAGE : DEMINERALISION PLANT FOR 2 X 363.3 MW CCCP, Palatana, Tripura

    P.O. No. : NBPPL/CMP/PALT/DMP/P-1037/10 dated 08.04.2010

    Client :NTPC-BHEL POWER PROJECTS PRIVATE LTD

    Total Lumpsum, Exworks Price for Supply of Main Equipment Including Mandatory Spares, Commissioning spares, Maintanance Tools & Tackles etc for the

    per Scope of Supply

    SL. NO. DESCRIPTION

    AS PER BBU EXECUTED QUANTITY

    D. VALVES 0.00

    1 Butterfly Valve Lot 3 40,000.00 120,000.00 2.00 0.00 2.00 80000.00 0.00

    2 Diaphragm Valve Lot 3 40,000.00 120,000.00 2.00 0.00 2.00 80000.00 0.00

    F. RESIN FOR EXCHANGER 0.00

    1 Cation Resin Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 59800.00 0.00

    2 Anion Resin Lot 1 60,000.00 60,000.00 1.00 0.00 1.00 59800.00 0.00F. ULTRAFILTRATION SYSTEM 0.00

    1 Ultrafiltration Skid Nos 3 35,000.00 105,000.00 0.00 0.00 0.00 0.00 0.00

    2 Chemical preparation & dosing tank Nos 6 4,000.00 24,000.00 6.00 0.00 6.00 24000.00 0.00

    3 Chemical preparation tank for CIP Nos 1 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00

    4 UF Feed Pump Nos 6 8,000.00 48,000.00 6.00 0.00 6.00 48000.00 0.00

    5 UF Backwash Pump Nos 2 9,000.00 18,000.00 0.00 0.00 0.00 0.00 0.00

    6 UF Fast Flush Pump Nos 2 7,000.00 14,000.00 0.00 0.00 0.00 0.00 0.00

    7 Chemical Dosing Pump Nos 6 5,000.00 30,000.00 0.00 0.00 0.00 0.00 0.00

    8 CIP Pump Nos 2 12,500.00 25,000.00 0.00 0.00 0.00 0.00 0.00

    9 Micron Strainer Nos 3 2,000.00 6,000.00 0.00 0.00 0.00 0.00 0.00

    G. Mandatory Spares 0.00

    1 Mandatory Spares Lot 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 4,400,000.00 3585500.00 35000.00

    FOR MBECL FORNBPP

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    12/14

    Page 12 of 14

    CUMULATIVE

    AMOUNT

    342000.00

    330000.00

    255000.00

    255000.00

    255000.00

    45000.00150000.00

    150000.00

    100000.00

    100000.00

    135000.00

    55000.00

    50000.00

    50000.00

    75500.00

    35000.00

    60000.00

    60000.00

    75000.00

    65000.00

    65000.00

    60000.00

    55000.00

    0.00

    0.00

    T(Rs.)

    system as

    FOR MBECL FORNBPPL

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    13/14

    Page 13 of 14

    CUMULATIVE

    AMOUNT

    T(Rs.)

    system as

    58000.00

    58000.00

    165000.00

    37800.00

    20000.00

    20000.0020000.00

    0.00

    20000.00

    11600.00

    0.00

    15000.00

    15000.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    6000.00

    0.00

    FOR MBECL FORNBPPL

  • 7/27/2019 ERECTION - PT& DM Projection Dated 09.08.12

    14/14

    Page 14 of 14

    CUMULATIVE

    AMOUNT

    T(Rs.)

    system as

    80000.00

    80000.00

    59800.00

    59800.00

    0.00

    24000.00

    0.00

    48000.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    3620500.00

    FOR MBECL FORNBPPL