Equipment Manufacturer
350-2001
Ella-vated
Equipment Manufacturer
350-2001
Ella-vated
0.5 1.0
05'
Meters2.0 3.0
10'
TRANSFER
STATION
W/ STEP
36"
0,92M
48"
1,22M
60"
1,53M
60"
1,53M
31'
[9.46M]
41'
[12.51M]
6'-3"
[1.91M]
6'-3"
[1.90M]
6'-3"
[1.91M]
6'-3"
[1.91M]
6'-2"
[1.88M]
6'-2"
[1.87M]
6'-1"
[1.86M]
7'-1"
[2.16M]
SPIRAL
LADDER
W/ ACCESS
LADDER
HOPSCOTCH
CLIMBER
RUMBLE
SEAT
SLIDE
ACTIVITY PANEL
W/ A-MAZE-ING
INSERT (deck)
ADA BELL
PANEL
ground)
ADA
STAIR
THE
GRID
LEG
LIFT
ADA
STAIR
SILO
CLIMBER
ZIG-ZAG
SLIDE
PLAYCUBE
W/ TRANSITION
CLIMBER
GEO
VERTICAL
CLIMBER
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 8
4
8
3
3
3
3
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
ELLA
-VA
TED
CA
TA
LO
G P
RE
-D
ES
IG
N
350-2001 1/4"=1'-0"
M. MERTZ
09-JAN-20
28'6" x 18'6" x 9'6"8,69M x 5,64M x 2,9M
41'0" x 31'0"12,51M x 9,46M
1,025 SqFt.95,22 SqM.
119'11"36,55M
8 Ft.2,44M
43 5-12
11
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
48"
1,22M
60"
1,53M
60"
1,53M
31'
[9.46M]
41'
[12.51M]
6'-3"
[1.91M]
6'-3"
[1.90M]
6'-3"
[1.91M]
6'-3"
[1.91M]
6'-2"
[1.88M]
6'-2"
[1.87M]
6'-1"
[1.86M]
7'-1"
[2.16M]
9
10
11
12
14
15
16
17
18
19
20
21
22
23
24
25
25
13
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 8
4
8
3
3
3
3
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
ELLA
-VA
TED
CA
TA
LO
G P
RE
-D
ES
IG
N
350-2001 1/4"=1'-0"
M. MERTZ
09-JAN-20
28'6" x 18'6" x 9'6"8,69M x 5,64M x 2,9M
41'0" x 31'0"12,51M x 9,46M
1,025 SqFt.95,22 SqM.
119'11"36,55M
8 Ft.2,44M
43 5-12
11
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
1
3
6
"
1
3
6
"
1
3
6
"
1
3
6
"
1
3
6
"
1
3
6
"
1
4
8
"
1
4
8
"
1
3
6
"
1
3
6
"
1
4
8
"
1
4
8
"
1
4
8
"
1
2
4
"
1
2
4
"
G
Z
1
4
8
"
72"
100"
9" 17" 9"
26"
24"
6"
32"
16" 41"
36"36" 15" 36"36" 15"
69"
18"
19"
16"
18"
87"
26"
5"
20"
8"
75"
26"
11"
36"
36"
36"
48"
36"
36"
189"
173"
91"
163"
TRANSFER
STATION
W/ STEP
SPIRAL
LADDER
W/ ACCESS
LADDER
HOPSCOTCH
CLIMBER
RUMBLE
SEAT
SLIDE
ADA
STAIR
THE
GRID
ADA
STAIR
SILO
CLIMBER
ZIG-ZAG
SLIDE
PLAYCUBE
W/ TRANSITION
CLIMBER
131"
199"
6"
35" 35"
7"
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
ELLA
-VA
TED
CA
TA
LO
G P
RE
-D
ES
IG
N
350-2001 1/4"=1'-0"
M. MERTZ
09-JAN-20
Posts
ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP
ZZCH0028 82 3.5in OD x 136in STEEL POST W/ RIVETED CAP
ZZCH0038 53 3.5in OD x 148in STEEL POST W/ RIVETED CAP
ZZCH0038GZ 14 3.5in OD x 148in GROUND ZERO POST
Decks & Kick Plates
ZZCH0616 25 SQUARE COATED DECK ASSEMBLY
ZZCH0617 16 TRIANGULAR COATED DECK ASSEMBLY
ZZCH0636 17 DOUBLE SLIDE COATED DECK ASSEMBLY
ZZUN2290 18 COATED DECK TO DECK CONNECTION KIT
ADA Items
ZZCH2007 19 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 110 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH2737 111 RUMBLE SEAT (60in DECK)
ZZCH3236 112 ZIGZAG SLIDE (60in DECK)
Activity Panels
ZZCH4671 113 CH PANEL FRAME- DECK LEVEL
ZZUN4673 114 A-MAZE-ING INSERT
Climbers
ZZCH6997 115 GEO VERTICAL CLIMBER (60in DK)
ZZCH7956 116 SILO CLIMBER (60in DECK)
ZZCH8260 117 HOPSCOTCH CLIMBER (48in DECK)
ZZCH8939 118 TRANSITION CLIMBER- CHALLENGER
ZZUN8727 119 PLAYCUBE- GROUND LEVEL
Ground Zer0 Climbers
ZZCH8408 120 THE GRID
Overhead Events
ZZCH5770 121 LEG LIFT
ZZCH5880 122 6ft HORIZONTAL SPIRAL LADDER
ZZCH5970 123 OVERHEAD EVENT ACCESS LADDER (36in DECK)
Audible Activities
ZZCH4409 124 ACCESSIBLE BELL PANEL
Stairs and Ladders
ZZCH9168 225 12in ACCESS STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZUN1471 126 INSTALLER HARDWARE KIT
ZZUN9910 127 SURFACING WARNING LABEL KIT
ZZUN9930 128 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXXGNGUID 129 GENERAL INSTALLERS GUIDE
Part No. Description
Ella-vatedDesign Number: 350-2001 - Bill Of Material
Ref.No. Quantity
Wednesday, October 30, 2019 Page of1 1 Playworld.com
CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP
2 77.82 108 0 2.00 0.25 0
CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP
8 348.08 468 0 8.00 1.00 0
CertifiedZZCH00383 3.5in OD x 148in STEEL POST W/ RIVETED CAP
5 235.55 317 0 5.00 0.63 0
CertifiedZZCH0038GZ4 3.5in OD x 148in GROUND ZERO POST1 47.01 63 0 1.00 0.18 0
CertifiedZZCH06165 SQUARE COATED DECK ASSEMBLY 2 109.72 348 6 2.00 0.00 0
CertifiedZZCH06176 TRIANGULAR COATED DECK ASSEMBLY1 29.90 120 2 1.00 0.00 0
CertifiedZZCH06367 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0
CertifiedZZUN22908 COATED DECK TO DECK CONNECTION KIT1 0.29 4 0 0.50 0.00 0
CertifiedZZCH20079 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 148.40 310 2 2.00 0.09 0
CertifiedZZUN201910 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH273711 RUMBLE SEAT (60in DECK)1 201.86 762 4 3.00 0.06 1
CertifiedZZCH323612 ZIGZAG SLIDE (60in DECK) 1 153.73 679 2 2.00 0.03 1
CertifiedZZCH467113 CH PANEL FRAME- DECK LEVEL 1 32.87 163 0 1.00 0.00 0
CertifiedZZUN467314 A-MAZE-ING INSERT 1 14.51 198 2 0.25 0.00 1
CertifiedZZCH699715 GEO VERTICAL CLIMBER (60in DK) 1 62.16 219 2 1.00 0.00 1
CertifiedZZCH795616 SILO CLIMBER (60in DECK)1 78.25 139 1 1.50 0.06 1
CertifiedZZCH826017 HOPSCOTCH CLIMBER (48in DECK)1 68.50 144 2 2.00 0.06 1
CertifiedZZCH893918 TRANSITION CLIMBER- CHALLENGER 1 55.14 214 2 2.50 0.00 1
CertifiedZZUN872719 PLAYCUBE- GROUND LEVEL 1 151.62 429 4 1.50 0.12 1
CertifiedZZCH840820 THE GRID 1 103.67 219 3 0.75 0.00 1
CertifiedZZCH577021 LEG LIFT 1 6.76 30 1 0.50 0.00 1
CertifiedZZCH588022 6ft HORIZONTAL SPIRAL LADDER 1 63.32 151 2 1.00 0.00 1
CertifiedZZCH597023 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 25.12 71 1 1.50 0.06 0
CertifiedZZCH440924 ACCESSIBLE BELL PANEL 1 22.16 211 1 0.50 0.00 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Ella-vatedDesign Number: 350-2001 - Compliance and Technical Data Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Wednesday, October 30, 2019 Page of1 3 Playworld.com
CertifiedZZCH916825 12in ACCESS STEPPED PLATFORM (DECK TO DECK)
2 140.56 554 2 4.00 0.00 0
N/AZZUN147126 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991027 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993028 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXXGNGUID29 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Ella-vatedDesign Number: 350-2001 - Compliance and Technical Data Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
334 670 6,325 43 46.75 2.582,276.74 12Totals:
6 Metric Tons302 Kg150 Kg1,024.53 Kg 1.96 m3
Wednesday, October 30, 2019 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Ella-vatedDesign Number: 350-2001 - Compliance and Technical Data Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-2001, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Wednesday, October 30, 2019 Page of3 3 Playworld.com