    Active Capital Projects Report

    Small Capital Projects Report

    Completed Projects

    Opening and Closing Report

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    2/15

    2

    ActiveCapital Projects

    Northeast LibraryDesign-Build Renovations Contacts Progress

    Councilmember Tommy Wells

    Design work is complete

    Contract approved by DC Council

    Selective demolition work is complete

    Project is fully funded

    Ward 6 202.724.8072

    ArchitectBell/Vines

    Architects

    David Bell

    Victor Vines

    Project

    ManagerChris Wright

    202.727.4913

    Design-Builder Whiting-Turner

    Andrew Easter

    West End LibraryMixed Use Development Contacts Progress

    Councilmember Jack Evans

    New ground floor library will be part of mixed use

    development

    Library designs are in design development phase

    Project hasreceived preliminary PUD approval

    from DC Zoning Commission on February 13,

    2012

    Ward 2 202.724.8058

    Architect Ten Arquitectos

    Erik Lang

    Project

    ManagerKim Fuller

    202.442.6069

    Developer EastBanc

    Gareth Eckmann

    202.737.1000

    This project is a major interior renovation of the 1930s era

    library. Renovations will create a 21st

    Century library while

    maintaining the historic integrity of the buildings interior.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    3/15

    3

    West End Interim Library Contacts Progress

    Councilmember Jack Evans

    DC Department of General Services (DGS) is in

    lease negotiations on a potential storefront space

    Librarys design-build team has started the design

    process on interim space

    Schedule pending final execution of lease

    Ward 2 202.724.8058

    Architect Franck and Lohsen

    Art Lohsen

    Project

    ManagerChris Wright

    202.727.4792

    Contractor GCS/Sigal

    Taryn Morgan

    202-944-6634

    Woodridge LibraryDesign Contacts Progress

    Councilmember Kenyen McDuffie

    CFA approved conceptual plan

    Mentor-Protg Construction Manager selected:

    Coakley-Williams and Blue Skye

    Initial pricing is underway

    Ward 5 (202) 724-8028

    Architect Wiencek + Assoc

    Bing Thom Arch

    Project

    ManagerKim Fuller

    202.442.6069

    Contractor Coakley-Williams

    Terrance Caulfield

    301.693.5000

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    4/15

    4

    Woodridge Modular Library Contacts Progress

    Councilmember Kenyen McDuffie

    Modular Units will be utilized at 18th

    Street and

    Douglass Avenue NE (District controlled parcel)

    MOU signed between Library and DGS

    Three proposals were received on March 4, 2013

    Ward 5 (202) 724-8028

    Architect

    Project

    ManagerChris Wright

    202.727.4913

    Contractor

    MLK Jr. LibraryRenovations to Great Hall & Digital Commons Contacts Progress

    Councilmember

    Designed approved by HPRB, October 2012

    Contract approved by DC Counsel December 20,

    2012

    Asbestos abatement work complete

    Construction of reconfigured space commenced on

    January 14, 2012

    Above ceiling work complete March 15, 2013

    Ward 2 Jack Evans

    202.724.8058

    Architect The Freelon Group

    Derek Jones

    919-941-9790

    Project

    ManagerKim Fuller

    202-442-6069

    Contractor MCN Build

    Joseph Kourney

    202.333.3424Improvements and upgrades to west reading room. Entire

    first floor is under the Historic Landmark Designation. The

    MLK Design Guidelines will be utilized.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    5/15

    5

    Proj.

    No.Location Project Description Estimate Cost Actual Cost Status

    1 Chevy Chase New Cooling Tower 60,000.00$ 59,520.00$Funding needs to be identified. PO source to be

    identified. Will be entered into PASS week of 2/25/13.

    2 Cleveland Park Chiller Replacment 85,100.00$ Funding needs to be identifi ed.

    3 Takoma Park Foundation Walls 155,000.00$

    Report from Sillman to be reviewed to help define

    scope. Storm sewer work to be completed before

    project begins.

    4 Lamond Riggs West Lower Roof Replacement 30,000.00$Scope of work developed (Capcon file ). Prepare

    package for short solicitation.

    5 Palisades Re-Pave Parking Lot 62,000.00$

    Met with consultant 2/21 to determine scope. Report

    will be generated from meeting. Need to determine

    long term (10 yr, $62,000 ) vs. short term(2 yr, $25,000)

    design.

    6 Southwest Re-Pave Parking Lot 31,000.00$Met with consultant 2/21. Report will be generated from

    meeting. Estimate for mill/repave - 2.5"

    6 Shepherd Park Additional Roof and Masonary Repairs 25,000.00$Scope of work under development. Report from Struct.

    Eng. May be available."Laundry list" devel oped.

    7 Palisades New Air Handler 108,880.00$Project will be handled as a modification to existing RSC

    contract.

    8 Georgetown Replacement of Aeraway Drains 25,000.00$

    Pending. Currently under review to determine if issue

    has been resolved.

    9 ANA, BEN, TNL, SHAW EMS Software ModificationPrepared scope to be provided; Adjustment to scope to

    be made and implimented

    10 Georgetown IT Room VentiliationNeed Estimated Cost. Cost Estimate due week of

    3/11/13. Meeting with RSC 3/8/13.

    11 Shepherd Park New Roof Top A/C UnitsProject will be handled as a modification to existing RSC

    contract. Funding source to be identified.

    12 Southeast Foundation Wall Issues

    13 Takoma ParkReplace Boiler with existing boiler from Northeast;

    stored at Southwest.30,460.00$

    Project will be handled as a modification to existing RSC

    contract. Project to be performed after heating season.

    Boiler currently located at Southwest.

    14 MLK

    REPLACE/OVERHAUL MAIN ELECTRICAL TRANSFORMER

    FOR BUILDING LOCATED ON M LEVEL IN ELECTRICAL

    VAULT

    Need Estimated Cost

    15 Benning Replace Chiller Need Estimated Cost16 Southeast Staff Workroom - LL Renovation Need Estimated Cost

    17 Petworth Leaking Basement Need to investigate/ Cost Estimate

    18 Takoma Park Drainage Issues 68,000.00$ 65,000.00$

    PO450049 was issued. Docs for permits being

    developed. Plans submitted to DC Water 3/1/13. Plans

    submitted to DDOT 2/27/13. Ensure downspouts are tied

    into storm system. Approx. projected permitting time -

    4 weeks.

    19 Benning Interim Site Site Restoration for NPS 175,000.00$ 107,000.00$Plans being developed for permitting. Proj . completion

    5/1/13. NPS has requested upgrade to Sod ~ $9900

    20 Tenley Installation of Historical Letters 15,000.00$ 14,730.00$ Project Complete. Final billing being confirmed.

    21 Chevy Chase ADA Restroom Improvments 24,500.00$ 26,150.00$Projected completion 2/8/13. Final billing being

    confirmed

    22 MLK Replace Bearings on AHU No. 2 23,000.00$ 23,000.00$ Work has been completed

    23 MLK & Neighborhoods Misc window replacements 60,000.00$ 60,000.00$ Work is completed "as needed"

    Total Overall Cost of Small Capital Improvments 753,500.00$ 579,840.00$

    SmallCapital Projects

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    6/15

    6

    Completed Capital ProjectsAnacostia LibraryNew Building Construction Contacts Progress

    Councilmember

    Opened to the public - April 26, 2010

    Ward 7 YvetteAlexander

    202.724.8068

    Architect Freelon Group

    Philip Freelon919.941.9790

    Project

    ManagerDedric Boyd

    202.727.1127

    ContractorForrester

    Construction

    Tom Willerton

    301.816.1700

    DCPL PM

    Firm Hill International

    Benning LibraryNew Building Design Contacts Progress

    Councilmember

    Opened to the public - April 5, 2010

    Ward 7 YvetteAlexander

    202.724.8068

    ArchitectDavis, Brody,

    Bond &Aedas

    Peter Cook

    202.449.1190

    Project

    ManagerKim Fuller

    202.442.6069

    Contractor Forrester

    Jon McGee

    301.255.1750

    DCPL PM

    FirmA-1 Consulting

    New State of the Art Library on Good Hope Road SE is open.

    New State of the Art Library located at 3935 Benning Road NE

    is open.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    7/15

    7

    William O. Lockridge Bellevue Library Contacts Progress

    Councilmember

    Library openedJune 13, 2012

    Ward 8 Marion Barry

    202.724.8045

    Architect Wiencek/Adjaye

    Scott Knudson

    301.948.6220

    Project

    ManagerLisa Deanes

    202.727.5181

    Contractor Coakley-Williams

    DCPL PM

    Firm

    Jair Lynch

    Development

    Partners

    ClevelandParkNew Ceiling and Lighting Contacts Progress

    Councilmember

    Project complete

    Ward 3 Mary Cheh

    202.724.8062

    Architect N/A

    Project

    ManagerEd Hampton

    202.442.6067

    ContractorEagle

    Construction

    Project consists of installing a new ceiling and lighting system.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    8/15

    8

    The Library has received Federal Stimulus Money for energy

    enhancements. Projects will take place at the above locations,

    focusing on window replacements, energy efficient lighting,

    and automated building heating and cooling controls

    DeanwoodNew Community Center and Library Contacts Progress

    Councilmember

    Opened to the public on June 25, 2010

    Ward 7 YvetteAlexander

    202.724.8068

    Architect EEK

    Sean ODonnell

    Project

    Manager

    Contractor

    Energy Enhancement ProjectsVarious Locations Contacts Progress

    Capitol View, Cleveland Park,

    Shepherd Park, Lamond Riggs, Palisades, Southwest, West

    End and Woodridge

    Councilmember

    Energy efficient lighting projects are completed

    Window and roof work is completed

    Various

    Architect T.B.D

    Project

    ManagerEd Hampton

    202.442.6067

    Contractor

    DCPL PM

    Firm

    Project is a partnership with the Department of Parks and

    Recreation to co-locate a 10,000 square foot library within a

    54,000 square foot aquatic center and community center.

    Library and Community Center would share such space as

    computer lab, senior rooms, tutor rooms and community

    meeting rooms. Project location is 49

    th

    and Quarles St. NE

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    9/15

    9

    Francis A. Gregory LibraryNew Library Contacts Progress

    Councilmember

    Library openedJune 19, 2012

    Ward 7 YvetteAlexander

    202.724.8068

    Architect Wiencek/Adjaye

    Scott Knudson

    301.948.6220

    Project

    ManagerLisa Deanes

    202.727.5181

    Contractor Hess Construction

    Jair Lynch

    Development

    PartnersDCPL PM

    Firm

    Francis A. Gregory LibraryInterim Library Contacts Progress

    Councilmember

    Library opened - June 10, 2010

    Ward 7 YvetteAlexander

    202.724.8068

    Architect

    Project

    ManagerLisa Deanes

    202.727.5181

    ContractorWilliam Scotsman

    Greg Bichell

    DCPL PM

    Firm

    Project consists of building a 4,200 square foot interim library

    to serve the community during construction; the interim will

    have 30 computers, books on CD as well as traditional

    collection material for all age sets

    Design of the new Francis Gregory Library will include

    community input on planning and programming phase. Project

    is fully funded.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    10/15

    10

    Georgetown LibraryBuilding Renovation Contacts Progress

    Councilmember

    Opened to the public on October 18, 2010

    Ward 2 Jack Evans

    202.724.8058

    Architect Martinez & Johnson

    Tom Johnson

    202.333.4480

    Project

    ManagerChris Wright

    202.272.4913

    Contractor N/A

    DCPL PM

    Firm

    Smoot

    Construction

    Mount PleasantInterim Library Contacts Progress

    Councilmember Jim Graham

    Opened to the public on April 26, 2010

    Re-opened to the public on May 15, 2010

    Ward 1 202.724.8181

    Architect Core Architects

    Dale Stewart

    202.466.6116Project

    ManagerDedric Boyd

    202.727.1127

    Contractor MCN Build

    Bassem Boustany

    202.333.3424

    Renovation complete and Library open to the public.

    Project consists of building a 3,600 square foot interim library to

    serve the community during construction; the interim will have

    30 computers, books on CD as well as traditional collection

    material for all age sets

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    11/15

    11

    Mount PleasantInteriorRestoration Contacts Progress

    Councilmember Jim Graham

    Opened to public on September 12, 2012

    Ward 1 202.724.8181

    Architect Core Architects

    Dale Stewart

    202.466.6116

    Project

    ManagerChris Wright

    202.727.4913

    Contractor T.B.D

    DCPL Project

    Management

    Smoot

    Construction

    Northeast LibraryExterior Restoration Contacts Progress

    Councilmember Tommy Wells

    Substantial completion of construction on May 15,2010

    Ward 6 202.724.8072

    Architect Bell Architects

    David Bell

    202.548.7570Project

    ManagerChris Wright

    202.727.4913

    ContractorMonarc

    Construction

    C. McDermott,

    703.201.1747Project consists of Exterior Improvements to windows,

    doors, security lighting, masonry restoration, landscaping

    and signage.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    12/15

    12

    Northwest OneNew Co-location Facility Contacts Progress

    Councilmember Tommy Wells

    Library openedon December 7, 2009 to the public

    Ward 6

    Architect HordCort Plan

    Project

    ManagerReagan Assoc

    Contractor Forrester

    Parklands-TurnerNew Storefront Library Contacts Progress

    Councilmember Marion Barry

    Ribbon cutting held on October 5, 2009 and

    opened to the public

    Ward 8 202.724.8045

    Architect Mood Nolan - DC

    Patrick Williams

    202.244.Project

    ManagerDedric Boyd

    202.727.1129

    Contractor Lexx Group

    Ken Postell

    202.393.

    Project to fit out approximately 5,000 Sq Ft of storefront space

    to replace the existing Parklands-Turner kiosk. The storefront

    library is similar in size, scope, computers, and collections to the

    Georgetown Interim and Tenley-Friendship Interim Libraries.

    Project consists of 6,500 SQ FT Library facility as part of

    Elementary School and RecreationCenter. This facility replaces

    the Sursum Corda kiosk.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    13/15

    13

    Petworth LibraryInterim Library Contacts Progress

    Councilmember

    Opened to public on January 11, 2010

    Closed February 5, 2011

    Ward 4 MurielBowser

    202.724.8052

    Architect N/A

    Project

    ManagerLisa Deanes

    202.727.5181

    Contractor Sigal Construction

    Sarah Norman

    DCPL PM

    Firm

    PetworthInterior Renovations Contacts Progress

    Councilmember

    Opened on February 28, 2011

    Councilmember MurielBowser

    Ward 4 202.724.8052

    Architect Frank and Loshen

    Fletcher Farr

    Anoyte

    Project

    ManagerChris Wright

    202.727.4913

    Contractor Sigal Construction

    Sarah Norman

    DCPL PM

    Firm

    McKissack and

    McKissack

    Project updates the interior of the Petworth Library to be a

    fully functional state of the art 21st

    Century Library, while

    still being respectful of the buildings historic character.

    Project consists of building a 4,200 square foot interim library

    to serve the community during construction; the interim will

    have 30 computers, books on CD as well as traditional

    collection material for all age sets

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    14/15

    14

    Tenley FriendshipNew Building Contacts Progress

    Councilmember

    Opened on January 24, 2011

    Ward 3 Mary Cheh

    202.724.8062

    Architect Freelon Group

    Philip Freelon

    919.941.9790

    Project

    ManagerDedric Boyd

    202.727.1113

    Contractor Forrester.

    Joe Ockershausen

    301.255.1794

    DCPL PM

    FirmHill International

    Washington HighlandsInterim Library Contacts Progress

    Councilmember

    Open to the public on December 21, 2009

    Ward 8 Marion Barry

    202.724.8045

    Architect Cooper Carry

    Project

    ManagerLisa Deanes

    202.727.5181

    Contractor MCN Build

    DCPL PM

    Firm

    Jair Lynch

    Development

    Design of the new Tenley Branch Library will include

    community input on planning and programming phase. Design

    and construction is fully funded.

    Project consists of building a 5,000 square foot interim library

    for the Washington Highlands Community; the interim will

    have 20 computers, books on CD as well as traditional

    collection material for all age sets.

  • 7/29/2019 Document #9C.1 - Capital Projects and Facilities Management Report

    15/15