  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    1/16

    Revision Date:10/05/2008

    ESTIMATION

    Messrs : Sankyu - Thai Co.,Ltd.

    Wellgrow Industrial Estate Ph III

    90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong

    Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

    Attn. : Mr. Surathep Lertsara

    Manager

    CC. :

    Project: New Injection Machine Installation

    Locatio: Wellgrow Industial Estate

    Title of works : Sub Panel For New Injection 12

    Job No.: SKT 080923

    Revisio: 1

    EIR ENGINEERING CO.,LTD.

    228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

    228/94 5 . . . . 10270

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    2/16

    Revision Date:10/05/2008

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    3/16

    Revision Date:10/05/2008

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    4/16

    Revision Date:10/05/2008

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    5/16Page 5 of 16 EIR Engineering Co.,Ltd.

    EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 102

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .co

    QUOTATION

    Quotation: SKT 080923

    Messrs. : Sankyu - Thai Co.,Ltd. Date : 30 July 2008

    : Wellgrow Industrial Estate Ph III Validity of Quotation :

    : 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,Preparing Period :

    : .A.Bangpakong Chachoengsao 24180 Delivery :

    Tel. : Tel 038-522280 - 7 Fax. 038-522288 Revised : 1

    Attn. : Mr. Surathep LertsaraP/O No.

    :

    : Manager

    1) Price ( Baht ### Excluded Vat 7%

    2) Project New Injection Machine Installation

    3) Title of work Sub Panel For New Injection 12

    4) Term of Payment Within 30 days

    Item Description uantitUnit Amount

    1 DIRECT COST 1 LOT 90,900.00

    2 INDIRECT COST 1 LOT 2,200.00

    3 EXPENSE & PROFIT 1 LOT 13,965.00

    TOTAL 107,065.00VAT 7% 7,494.55

    FINAL AMOUNT 114,559.55

    We hope that our confirmation will meet with your requirement and look forward to receiving your val

    Your Faithfully,

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    6/16Page 6 of 16 EIR Engineering Co.,Ltd.

    Sukhon Thewaran

    Manager

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    7/16Page 7 of 16 EIR Engineering Co.,Ltd.

    0

    uable order in due course

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    8/16Page 8 of 16 EIR Engineering Co.,Ltd.

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    9/16

    EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakar

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @

    SUMMARY OF QUOTATION

    Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080923

    Client : Sankyu - Thai Co.,Ltd. Date : 30 July 2008

    Project : New Injection Machine InstallationRevision No. : 1

    Title of : Sub Panel For New Injection 12

    ItemDescription Q'ty UnitUnit Cost Total Amount

    1 Direct Cost

    A Sub-Panel For New Injection Machine No.1 1 lot 50,500.00 50,500.00

    B Wire And Cable For Sub-MDB Panel No.12 1 lot 40,400.00 40,400.00

    Subtotal 1 90,900.00

    2 Indirect Cost

    2.1 Site Staff and Supervisor 1 lot

    2.2 Transportation 1 lot 1,200.00

    2.3 Tool and consumption 1 lot 1,000.00

    2.4 Site Expense 1 lot

    1 Temporary Facilities

    2 Small Construction Supplies

    3 Utility Supply Costs

    Subtotal 2 2,200.00

    3 Expense & Profit 13,965.00

    GRAND TOTAL ###

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    10/16

    10270

    gmail .com

    COST Different

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    11/16

    8453282.xlsBOQ Page 11 of16 EIR Engineering Co.,Ltd.

    Estimation SheetClient Sankyu - Thai Co.,Ltd. Date : 30 July 2008

    Project New Injection Machine Installation Job Number : SKT 080923

    Location Wellgrow Industial Estate Revision : 1

    Title Of W Sub Panel For New Injection 12

    No. Description Q'ty Unit nit Pric Total Cost Remark

    1 DIRECT COST

    A Sub-Panel For New Injection Machine No.12

    A1 Sub-MDB Panel For New Machine No. 1 Set ### 50,500.00

    - METAL PANEL 550X 1000 X200 1 set

    - MAIN BUSBAR (R,S,T) 1 set

    - GROUND BUSBAR (G) 1 set

    - ACRYLIC BUSBAR COVER 1 set

    - ABB BREAKER T3N 250AT 3P MCCB 1 set Main Breaker

    - ABB BREAKER T1N 125AT 3P MCCB 1 set Chiller M/C

    - ABB BREAKER T1N 80AT 3P MCCB 1 set Supply By Owner Dryer M/C

    - ABB BREAKER T1N 63AT 3P MCCB 1 set Mold Temp M/C

    - ABB BREAKER T1N 32AT 3P MCCB 1 set Supply By Owner Crusher M/C

    - ABB BREAKER T1N 32AT 3P MCCB 1 set Supply By Owner Jet Loader M/C

    - FLANGE SOCKET SLOPING 125A 3P+E IP 1 set Chiller M/C

    - FLANGE SOCKET SLOPING 125A 3P+E IP 1 set Dryer M/C

    - FLANGE SOCKET SLOPING 63A 3P+E IP6 1 set Mold Temp M/C

    - FLANGE SOCKET SLOPING 32A 3P+E IP6 1 set Crusher M/C

    - FLANGE SOCKET SLOPING 32A 3P+E IP6 1 set Jet Loader M/C

    - CONNECTOR 16A 2P+E IP67 1 set Lighting

    - POWER PLUGS 125A 3P+E IP67 1 set Chiller M/C

    - POWER PLUGS 125A 3P+E IP67 1 set Dryer M/C

    - POWER PLUGS 63A 3P+E IP67 1 set Mold Temp M/C

    - POWER PLUGS 32A 3P+E IP67 1 set Crusher M/C

    - POWER PLUGS 32A 3P+E IP67 1 set Jet Loader M/C

    - POWER PLUGS 16A 2P+E IP67 1 set Lighting

    - WIRING ACCESSORIES 1 lot

    - NAMEPLATE 1 lot

    - STANCHION SUPPORT H:300 1 set

    TOTAL A1 50,500.00

    TOTAL A 50,500.00

    B Wire And Cable For Sub-MDB Panel No.12

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    12/16

    8453282.xlsBOQ Page 12 of16 EIR Engineering Co.,Ltd.

    - WIRE AND CABLE CV 1C-95 x3 ( R,S,T) 60 M 408.00 24,480.00

    - WIRE AND CABLE THW 1C-16 ( G ) 20 M 66.00 1,320.00

    - WIRING CONNECT ACCESSORIES 1 LOT 2,500.00 2,500.00

    -FLEXIBLE CONDUI 2 1/2 " 6 M 350.00 2,100.00

    -FLEXIBLE CONNECTOR 2 1/2" 2 SET 500.00 1,000.00

    -CABLE RACK W:300 L:3000 1 LOT Existing

    -CABLE RACK W:200 L:3000 1 LOT Existing

    -MISCELENEOUS 1 LOT 3,000.00 3,000.00

    -LABOR CHARGE 1 LOT 6,000.00 6,000.00

    TOTAL B 40,400.00

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    13/16

    8453282.xlsBOQ Page 13 of16 EIR Engineering Co.,Ltd.

    MD Ratio

    Materials 1.10

    install 1.000 350.00 400.00

    Material Cost Labour Cost

    Q'ty Unit Unit Price Total Cost nit M/D Total M/D Unit Price labour cost

    30,000.00 ### -

    -

    -

    -

    ### 3,290.00 ### 365.56

    ### 2,115.00 ### 235.00

    - -

    ### 1,786.00 ### 198.44

    - -

    - -

    ### 2,077.00 ### 230.78

    ### 2,077.00 ### 230.78

    880.00 670.00 744.444 74.44

    492.00 341.70 379.667 37.97

    492.00 341.70 379.667 37.97

    315.00 225.00 250.000 25.00

    ### 2,010.00 ### 223.33

    ### 2,010.00 ### 223.33

    776.00 636.50 707.222 70.72

    408.00 294.80 327.556 32.76

    408.00 294.80 327.556 32.76

    420.00 300.00 333.333 33.33

    - -

    200.00 - -

    600.00 - -

    Trans

    ### 48,469.50 ### 2,052.17

    Cost /m Offer /md

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    14/16

    8453282.xlsBOQ Page 14 of16 EIR Engineering Co.,Ltd.

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    15/16

    8453282.xlsBOQ Page 15 of16 EIR Engineering Co.,Ltd.

    Amount Different

    Total Cost Cost

  • 8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12

    16/16