8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
1/16
Revision Date:10/05/2008
ESTIMATION
Messrs : Sankyu - Thai Co.,Ltd.
Wellgrow Industrial Estate Ph III
90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong
Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287
Attn. : Mr. Surathep Lertsara
Manager
CC. :
Project: New Injection Machine Installation
Locatio: Wellgrow Industial Estate
Title of works : Sub Panel For New Injection 12
Job No.: SKT 080923
Revisio: 1
EIR ENGINEERING CO.,LTD.
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
228/94 5 . . . . 10270
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
2/16
Revision Date:10/05/2008
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
3/16
Revision Date:10/05/2008
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
4/16
Revision Date:10/05/2008
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
5/16Page 5 of 16 EIR Engineering Co.,Ltd.
EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 102
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .co
QUOTATION
Quotation: SKT 080923
Messrs. : Sankyu - Thai Co.,Ltd. Date : 30 July 2008
: Wellgrow Industrial Estate Ph III Validity of Quotation :
: 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,Preparing Period :
: .A.Bangpakong Chachoengsao 24180 Delivery :
Tel. : Tel 038-522280 - 7 Fax. 038-522288 Revised : 1
Attn. : Mr. Surathep LertsaraP/O No.
:
: Manager
1) Price ( Baht ### Excluded Vat 7%
2) Project New Injection Machine Installation
3) Title of work Sub Panel For New Injection 12
4) Term of Payment Within 30 days
Item Description uantitUnit Amount
1 DIRECT COST 1 LOT 90,900.00
2 INDIRECT COST 1 LOT 2,200.00
3 EXPENSE & PROFIT 1 LOT 13,965.00
TOTAL 107,065.00VAT 7% 7,494.55
FINAL AMOUNT 114,559.55
We hope that our confirmation will meet with your requirement and look forward to receiving your val
Your Faithfully,
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
6/16Page 6 of 16 EIR Engineering Co.,Ltd.
Sukhon Thewaran
Manager
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
7/16Page 7 of 16 EIR Engineering Co.,Ltd.
0
uable order in due course
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
8/16Page 8 of 16 EIR Engineering Co.,Ltd.
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
9/16
EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakar
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @
SUMMARY OF QUOTATION
Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080923
Client : Sankyu - Thai Co.,Ltd. Date : 30 July 2008
Project : New Injection Machine InstallationRevision No. : 1
Title of : Sub Panel For New Injection 12
ItemDescription Q'ty UnitUnit Cost Total Amount
1 Direct Cost
A Sub-Panel For New Injection Machine No.1 1 lot 50,500.00 50,500.00
B Wire And Cable For Sub-MDB Panel No.12 1 lot 40,400.00 40,400.00
Subtotal 1 90,900.00
2 Indirect Cost
2.1 Site Staff and Supervisor 1 lot
2.2 Transportation 1 lot 1,200.00
2.3 Tool and consumption 1 lot 1,000.00
2.4 Site Expense 1 lot
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2 2,200.00
3 Expense & Profit 13,965.00
GRAND TOTAL ###
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
10/16
10270
gmail .com
COST Different
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
11/16
8453282.xlsBOQ Page 11 of16 EIR Engineering Co.,Ltd.
Estimation SheetClient Sankyu - Thai Co.,Ltd. Date : 30 July 2008
Project New Injection Machine Installation Job Number : SKT 080923
Location Wellgrow Industial Estate Revision : 1
Title Of W Sub Panel For New Injection 12
No. Description Q'ty Unit nit Pric Total Cost Remark
1 DIRECT COST
A Sub-Panel For New Injection Machine No.12
A1 Sub-MDB Panel For New Machine No. 1 Set ### 50,500.00
- METAL PANEL 550X 1000 X200 1 set
- MAIN BUSBAR (R,S,T) 1 set
- GROUND BUSBAR (G) 1 set
- ACRYLIC BUSBAR COVER 1 set
- ABB BREAKER T3N 250AT 3P MCCB 1 set Main Breaker
- ABB BREAKER T1N 125AT 3P MCCB 1 set Chiller M/C
- ABB BREAKER T1N 80AT 3P MCCB 1 set Supply By Owner Dryer M/C
- ABB BREAKER T1N 63AT 3P MCCB 1 set Mold Temp M/C
- ABB BREAKER T1N 32AT 3P MCCB 1 set Supply By Owner Crusher M/C
- ABB BREAKER T1N 32AT 3P MCCB 1 set Supply By Owner Jet Loader M/C
- FLANGE SOCKET SLOPING 125A 3P+E IP 1 set Chiller M/C
- FLANGE SOCKET SLOPING 125A 3P+E IP 1 set Dryer M/C
- FLANGE SOCKET SLOPING 63A 3P+E IP6 1 set Mold Temp M/C
- FLANGE SOCKET SLOPING 32A 3P+E IP6 1 set Crusher M/C
- FLANGE SOCKET SLOPING 32A 3P+E IP6 1 set Jet Loader M/C
- CONNECTOR 16A 2P+E IP67 1 set Lighting
- POWER PLUGS 125A 3P+E IP67 1 set Chiller M/C
- POWER PLUGS 125A 3P+E IP67 1 set Dryer M/C
- POWER PLUGS 63A 3P+E IP67 1 set Mold Temp M/C
- POWER PLUGS 32A 3P+E IP67 1 set Crusher M/C
- POWER PLUGS 32A 3P+E IP67 1 set Jet Loader M/C
- POWER PLUGS 16A 2P+E IP67 1 set Lighting
- WIRING ACCESSORIES 1 lot
- NAMEPLATE 1 lot
- STANCHION SUPPORT H:300 1 set
TOTAL A1 50,500.00
TOTAL A 50,500.00
B Wire And Cable For Sub-MDB Panel No.12
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
12/16
8453282.xlsBOQ Page 12 of16 EIR Engineering Co.,Ltd.
- WIRE AND CABLE CV 1C-95 x3 ( R,S,T) 60 M 408.00 24,480.00
- WIRE AND CABLE THW 1C-16 ( G ) 20 M 66.00 1,320.00
- WIRING CONNECT ACCESSORIES 1 LOT 2,500.00 2,500.00
-FLEXIBLE CONDUI 2 1/2 " 6 M 350.00 2,100.00
-FLEXIBLE CONNECTOR 2 1/2" 2 SET 500.00 1,000.00
-CABLE RACK W:300 L:3000 1 LOT Existing
-CABLE RACK W:200 L:3000 1 LOT Existing
-MISCELENEOUS 1 LOT 3,000.00 3,000.00
-LABOR CHARGE 1 LOT 6,000.00 6,000.00
TOTAL B 40,400.00
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
13/16
8453282.xlsBOQ Page 13 of16 EIR Engineering Co.,Ltd.
MD Ratio
Materials 1.10
install 1.000 350.00 400.00
Material Cost Labour Cost
Q'ty Unit Unit Price Total Cost nit M/D Total M/D Unit Price labour cost
30,000.00 ### -
-
-
-
### 3,290.00 ### 365.56
### 2,115.00 ### 235.00
- -
### 1,786.00 ### 198.44
- -
- -
### 2,077.00 ### 230.78
### 2,077.00 ### 230.78
880.00 670.00 744.444 74.44
492.00 341.70 379.667 37.97
492.00 341.70 379.667 37.97
315.00 225.00 250.000 25.00
### 2,010.00 ### 223.33
### 2,010.00 ### 223.33
776.00 636.50 707.222 70.72
408.00 294.80 327.556 32.76
408.00 294.80 327.556 32.76
420.00 300.00 333.333 33.33
- -
200.00 - -
600.00 - -
Trans
### 48,469.50 ### 2,052.17
Cost /m Offer /md
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
14/16
8453282.xlsBOQ Page 14 of16 EIR Engineering Co.,Ltd.
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
15/16
8453282.xlsBOQ Page 15 of16 EIR Engineering Co.,Ltd.
Amount Different
Total Cost Cost
8/14/2019 Den So 080923 Revise-1 Sub Panel for Injection 12
16/16