8
DAFTAR ACUAN [1] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1. [2] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 2 [3] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 1 [4] Imam Soeharto., Manajemen Proyek, Dari Konseptual Sampai Operasional, Jilid 2, Edisi Kedua (Jakarta : Erlangga, 2001) hal. 368 [5] Nazarkhan Yasin, Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006), hal.7 [6] Biro Pusat Statistik, Statistik Konstruksi , (Jakarta : BPS, 2004), hal. xvii [7] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 2 [8] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 5-9 [9] Soegeng D., Manajemen Konstruksi, (Yogyakarta : Biro Penerbit KMTS FT UGM, 2005), hal. 31-32 [10] Daryatno, Manajemen Konstruksi, Trend Teknik Sipil Era Millenium (Jakarta : John Hi-Tech Idetama, 2001), hal. 175 [11] Daryatno, Manajemen Konstruksi, Trend Teknik Sipil Era Millenium (Jakarta : John Hi-Tech Idetama, 2001), hal. 176 [12] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1 [13] Wideman, R.E., and R.H. Myer, Project and Program Risk Management. A Guide to Managing Project Rick and Oppotunities, (Pennysylvania : Project Management Institute, 1992). [14] Vincent G. Bush, Manajemen Konstruksi, (Jakarta : PT. Pustaka Binaman Pressindo dan IPPM, Seri Manajemen No. 74, 1991), hal. 101-102. [15] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1 Pengelolaan risiko..., Budi Suanda, FT UI, 2008

DAFTAR ACUAN - Universitas Indonesia Librarylontar.ui.ac.id/file?file=digital/119260-T 25240-Pengelolaan risiko... · [16] Hamid S., Langkah Memperkecil Risiko Dalam Pembangunan,

  • Upload
    hakiet

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

DAFTAR ACUAN

[1] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1. [2] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 2 [3] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 1 [4] Imam Soeharto., Manajemen Proyek, Dari Konseptual Sampai Operasional, Jilid 2, Edisi Kedua (Jakarta : Erlangga, 2001) hal. 368 [5] Nazarkhan Yasin, Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006), hal.7 [6] Biro Pusat Statistik, Statistik Konstruksi , (Jakarta : BPS, 2004), hal. xvii [7] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 2 [8] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal. 5-9 [9] Soegeng D., Manajemen Konstruksi, (Yogyakarta : Biro Penerbit KMTS FT UGM, 2005), hal. 31-32 [10] Daryatno, Manajemen Konstruksi, Trend Teknik Sipil Era Millenium (Jakarta : John Hi-Tech Idetama, 2001), hal. 175 [11] Daryatno, Manajemen Konstruksi, Trend Teknik Sipil Era Millenium (Jakarta : John Hi-Tech Idetama, 2001), hal. 176 [12] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1 [13] Wideman, R.E., and R.H. Myer, Project and Program Risk Management. A Guide to Managing Project Rick and Oppotunities, (Pennysylvania : Project Management Institute, 1992). [14] Vincent G. Bush, Manajemen Konstruksi, (Jakarta : PT. Pustaka Binaman Pressindo dan IPPM, Seri Manajemen No. 74, 1991), hal. 101-102. [15] Richard H. Clough, Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

[16] Hamid S., Langkah Memperkecil Risiko Dalam Pembangunan, (Jakarta : Djambatan, 1996) [17] Nazarkhan Yasin, Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006), hal. 85 [18] Nazarkhan Yasin, Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006), hal. 14-15 [19] Marks, R.J, & Jackson, R.E, Aspects of Civil Engineering Contract Procedure, 4rd Edition, (Oxford : Pergamon Press, 1985), hal.2 [20] Nazarkhan Yasin, Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006), hal. 19-79 [21] Nunally S.W.,Construction Method and Management, (New Jersey : Upper Saddle River, 1998) [22] Nazarkhan Yasin, Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006), hal. 198 [23] PT. PP (Persero), Buku Referensi Untuk Kontraktor, Bangunan Gedung dan Sipil (Jakarta : Gramedia, 2003), hal. 41-42. [24] D.M.S., Ronny Kontur, Manajemen Risiko, (Jakarta : Penerbit Abdi Tandur, 2006), hal. 5 [25] Asiyanto, Manajemen Produksi untuk Jasa Konstruksi, (Jakarta, Pradnya Paramita, 2005), hal. 186 [26] PMBOK, (USA : PMI, 2000), hal. 127 [27] Harold K., Project Management, A System Approach to Planning, Schedulling, and Controlling, (New York, 1995), hal. 873 [28] Clifford F.G. and Erik W.L., Manajemen Proyek : Proses Manajerial ,terj. Dwi Prabantini (Yogyakarta: Andi, 2006) hal. 190 [29] PT. PP (Persero), Buku Referensi Untuk Kontraktor, Bangunan Gedung dan Sipil, (Jakarta : Gramedia, 2003), hal. 29 [30] Flanagan, R.,Norman G., Risk Management and Construction, (London : Blackwell Scientific Publication, 1993) hal. 27 [31] Imam Soeharto., Manajemen Proyek Dari Konseptual Sampai Operasional, (Jakarta : Erlangga, 2001) hal. 368

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

[32] Murdoch J.,& Hughes W.,Construction Contracts:Law and Management, (London : E&FN Spon, 1992), hal.13 [33] Triastuti, Latief, “Ketimpangan Perjanjian Kerja Pelaksanaan Proyek Konstruksi di Indonesia”, Jurnal Teknologi, Edisi No.4 Tahun XV, (Desember, 2001) [34] Firdaus Jufri., “Kesetaraan Kedudukan antara Penyedia Jasa dan Pengguna Jasa di dalam Kontrak Konstruksi serta Implikasinya”,Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2004 [35] Sofyan M.,”Pengaruh Risiko Pada Kontrak Kerja Konstruksi Terhadap Biaya Pekerjaan Konstruksi”, Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2003 [36] Sofyan M.,”Pengaruh Risiko Pada Kontrak Kerja Konstruksi Terhadap Biaya Pekerjaan Konstruksi”, Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2003 [37] Ernst & Young, Construction Risk, Construction Risk Forum, 2002 [38] DKH. Chua, D. Li, Journal of Construction Engineering & Management, 2000 [39] Harold K., Project Management, A System Approach to Planning, Schedulling, and Controlling, (New York, 1995), hal. 873 [40] Flanagan R.,Norman G., Risk Management and Construction, (London : Blackwell Scientific Publications, 1993), hal. 188 [41] Kerzner H, Project Management, A System Approach to Planning, Schedulling, and Controlling, (New York, 1995), hal. 797 [42] Sofyan M.,”Pengaruh Risiko Pada Kontrak Kerja Konstruksi Terhadap Biaya Pekerjaan Konstruksi”, Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2003 [43] Soekirno, et.al, “Sengketa Konstruksi dan Alternatif Penyelesaiannya”,Proceeding ICIC 1st, 2006 [44] Harold K., Project Management, A System Approach to Planning, Schedulling, and Controlling, (New York, 1995), hal. 797 [45] Ahuja, H.N, Succesfull Construction Cost Control, (Canada : Wiley & Sons, 1980)

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

[46] Russel A.D. and Fayek A., “Automated Corrective Action Selection Assistant”, Journal of Construction Engineering & Management, vol 120 no.1, (March, 1994) [47] Flanagan R., Norman G., Risk Management and Construction ( London: Blackwell Scientific Publication, 1993) hal. 61-65 [48] Al-Bahar, J.F, & Crandall, K.C, “Systematic Risk Management Approach for Construction Project”, Journal of Construction Engineering and Management, ASCE, Vol. 116, No 3, September 1990, hal.533 [49] Trauner, T.J, Managing The Construction Project : A Practical Guide for The Project Manager, (Canada : John Wiley & Sons Inc.,1993), hal.55 [50] Richard H. Clough., Construction Contracting, Fifth Edition, (USA : John Wiley & Sons Inc, 1986), hal.1 [51] Firdaus Jufri., “Kesetaraan Kedudukan antara Penyedia Jasa dan Pengguna Jasa di dalam Kontrak Konstruksi serta Implikasinya”,Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2004 [52] Hamid S., Aspek Hukum Dalam Sengketa Bidang Konstruksi, (Jakarta : Djambatan, 1996) [53] Medley Larry G.,”The Life Cycle Perspective Managing Cost Before It Occure”, Journal Cost Engineering, (Oktober, 1996), hal. 35-36 [54] Ritz George J., Total Construction Project Management, (Singapore : McGraw Hill, Inc, 1994), hal. 181 [55] Woolsey Rory, Estimating Fundamental, (Washington : Bellingham, 2002) hal. 87 [56] Ford David N, “Archieving Multiple Project Objectives Through Contigency Management”, Journal of Construction Engineering & Management, Vol 128 No.1, (February,2002) [57] Kim, Yea, Sang, Ki, “Organizational Assesment for Construction Productivity Improvement”, AACE Transaction, 1983, hal. R.1.5 [58] Humpreys K.K.,Jeles, Cost and Optimizing Engineering, (Singapore: McGraw Hill, Inc, 1991) [59] Carr Robert I., “Cost, Schedule, and Time Variances and Integration”, ASCE Journals of Construction Engineering and Management, vol 119 No 2,(Juni 1993), hal. 250-251

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

[60] Halpin, Construction Management, (USA : John Wiley and Sons, Inc, 1998), hal. 251-283 [61] Kaming Peter F, Olomolaiye Paul O, Holt Gary D, Harris Frank C, “Factor Influencing Construction Time and Cost Overrun on High Rise Project in Indonesia”, Journal Construction Management and Economics.

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

DAFTAR REFERENSI

Ahuja, H.N, Succesfull Construction Cost Control, (Canada : Wiley & Sons, 1980)

Al-Bahar, J.F, & Crandall, K.C, “Systematic Risk Management Approach for Construction Project”, Journal of Construction Engineering and Management, ASCE, Vol. 116, No 3, September 1990.

Asiyanto, Manajemen Produksi untuk Jasa Konstruksi, (Jakarta, Pradnya Paramita, 2005).

Australian/New Zealand Standard, “Risk Management”, Third Edition Terj., AS/NZS 4360:2004

Biro Pusat Statistik, Statistik Konstruksi , (Jakarta : BPS, 2004).

Bonenehu, F.,” Analisis Klausa Kontrak Kerja Konstruksi Dengan Pendekatan Standar Kontrak FIDIC 1999 dan UUJK RI NO.18 THN 1999 Studi Kasus Kontrak Kerja Konstruksi Antara Pemilik Dengan Kontraktor Utama Proyek The Capital Residence”, Skripsi, Departemen Teknik Sipil, Fakultas Teknik Universitas Indonesia, Depok, 2008.

Carr Robert I., “Cost, Schedule, and Time Variances and Integration”, ASCE Journals of Construction Engineering and Management, vol 119 No 2,(Juni 1993).

Clifford F.G. and Erik W.L., Manajemen Proyek : Proses Manajerial ,terj. Dwi Prabantini (Yogyakarta: Andi, 2006).

Clough, Richard H., Construction Contracting , Fifth Edition, (USA : John Wiley & Sons Inc, 1986).

Daryatno, Manajemen Konstruksi, Trend Teknik Sipil Era Millenium (Jakarta : John Hi-Tech Idetama, 2001).

Djojowirono S., Manajemen Konstruksi, (Yogyakarta : Biro Penerbit KMTS FT UGM, 2005).

DKH. Chua, D. Li, Journal of Construction Engineering & Management, 2000

D.M.S., Ronny Kontur, Manajemen Risiko, (Jakarta : Penerbit Abdi Tandur, 2006).

Ernst & Young, Construction Risk, Construction Risk Forum, 2002

Flanagan R.,Norman G., Risk Management and Construction, (London : Blackwell Scientific Publications, 1993), hal. 188

Ford David N, “Archieving Multiple Project Objectives Through Contigency Management”, Journal of Construction Engineering & Management, Vol 128 No.1, (February,2002)

Halpin, Construction Management, (USA : John Wiley and Sons, Inc, 1998).

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

Hidayat, T., Bahan Training Administrasi Kontrak, PT. PP (Persero), 2008

Humpreys K.K.,Jeles, Cost and Optimizing Engineering, (Singapore: McGraw Hill, Inc, 1991)

Jufri, F., “Kesetaraan Kedudukan antara Penyedia Jasa dan Pengguna Jasa di dalam Kontrak Konstruksi serta Implikasinya”,Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2004

Kaming Peter F, Olomolaiye Paul O, Holt Gary D, Harris Frank C, “Factor Influencing Construction Time and Cost Overrun on High Rise Project in Indonesia”, Journal Construction Management and Economics.

Kerzner H, Project Management, A System Approach to Planning, Schedulling, and Controlling, (New York, 1995).

Kim, Yea, Sang, Ki, “Organizational Assesment for Construction Productivity Improvement”, AACE Transaction, 1983.

Marks, R.J, & Jackson, R.E, Aspects of Civil Engineering Contract Procedure, 4rd Edition, (Oxford : Pergamon Press, 1985).

Medley Larry G.,”The Life Cycle Perspective Managing Cost Before It Occure”, Journal Cost Engineering, (Oktober, 1996).

Murdoch J.,& Hughes W.,Construction Contracts:Law and Management, (London : E&FN Spon, 1992).

Nunally S.W.,Construction Method and Management, (New Jersey : Upper Saddle River, 1998)

PMBOK, (USA : PMI, 2000).

PT. PP (Persero), Buku Referensi Untuk Kontraktor, Bangunan Gedung dan Sipil (Jakarta : Gramedia, 2003).

Ritz George J., Total Construction Project Management, (Singapore : McGraw Hill, Inc, 1994).

Rompas, L.M.,”Kajian Tentang Penerapan Kontrak FIDIC Pada Perusahaan PT. Adhi Karya”, Tesis, Program Pasca Sarjana Fakultas Teknik UI, Salemba, 2007

Russel A.D. and Fayek A., “Automated Corrective Action Selection Assistant”, Journal of Construction Engineering & Management, vol 120 no.1, (March, 1994)

Sarwono, H.,Ariono, A., Masaru, T., Strategi Klaim Konstruksi Berdasarkan FIDIC Condition of Contract, (Jakarta, 2006)

Shahab, H., Aspek Hukum Dalam Sengketa Bidang Konstruksi, (Jakarta : Djambatan, 1996)

Shahab, H., Langkah Memperkecil Risiko Dalam Pembangunan, (Jakarta : Djambatan, 1996)

Pengelolaan risiko..., Budi Suanda, FT UI, 2008

Soeharto, I., Manajemen Proyek, Dari Konseptual Sampai Operasional, Jilid 2, Edisi Kedua (Jakarta : Erlangga, 2001)

Soekirno, et.al, “Sengketa Konstruksi dan Alternatif Penyelesaiannya”, Proceeding ICIC 1st, 2006

Sofyan M.,”Pengaruh Risiko Pada Kontrak Kerja Konstruksi Terhadap Biaya Pekerjaan Konstruksi”, Tesis, Program Pasca Sarjana Fakultas Teknik UI, Depok, 2003

Trauner, T.J, Managing The Construction Project : A Practical Guide for The Project Manager, (Canada : John Wiley & Sons Inc.,1993).

Triastuti, Latief, “Ketimpangan Perjanjian Kerja Pelaksanaan Proyek Konstruksi di Indonesia”, Jurnal Teknologi, Edisi No.4 Tahun XV, (Desember, 2001)

Vincent G. Bush, Manajemen Konstruksi, (Jakarta : PT. Pustaka Binaman Pressindo dan IPPM, Seri Manajemen No. 74, 1991).

Woolsey Rory, Estimating Fundamental, (Washington : Bellingham, 2002)

Wideman, R.E., and R.H. Myer, Project and Program Risk Management. A Guide to Managing Project Rick and Oppotunities, (Pennysylvania : Project Management Institute, 1992).

Woolsey Rory, Estimating Fundamental, (Washington : Bellingham, 2002)

Yasin, N., Mengenal Kontrak Konstruksi di Indonesia, (Jakarta : Gramedia, 2006)

Pengelolaan risiko..., Budi Suanda, FT UI, 2008