HALF MOON VENTURES, LLC 316 N. Milwaukee St., Suite 403 Milwaukee, Wisconsin 53202 COVER LETTER To: State of Rhode Island Public Utilities Commission From: Half Moon Ventures, LLC, Operator on behalf of North Smithfield Solar Power I LLC, Project Owner Date: August 15, 2017 Re: Renewable Energy Resources Eligibility Form North Smithfield Solar Power I - DG (the “Project”) In accordance with the Standard Application Form required for a Certification of Eligibility of Renewable Energy Resource, we are submitting this Renewable Energy Resources Eligibility Form for a solar array located in North Smithfield, RI. This package includes: The Project was selected to participate in the RI Renewable Energy Growth Program on January 29, 2016 and it must receive a Certification of Eligibility of Renewable Energy Resource to fulfill the terms of the contract or the project will forfeit the contracted DG rate. The attached application has two areas that need to be updated at a later date: Section 2.1 - NEPOOL GIS Identification Number Once this is provided by National Grid we will furnish the PUC with the number. Section 3.1 – Commercial Operation Date We expect that the project will achieve Commercial Operation on or around November 30, 2017. Once the COD is met, we will furnish the PUC with the actual COD date. We appreciate your consideration of this request. Please let us know if there is any additional information we need to provide. Thank you, _______________________________________ William W. Fetterley Chief Operating Officer Half Moon Ventures, LLC

COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z

HALFMOONVENTURES,LLC316N.MilwaukeeSt.,Suite403Milwaukee,Wisconsin53202

COVERLETTER

To: StateofRhodeIslandPublicUtilitiesCommission

From: HalfMoonVentures,LLC,OperatoronbehalfofNorthSmithfieldSolarPowerILLC,ProjectOwner

Date: August15,2017

Re: RenewableEnergyResourcesEligibilityForm NorthSmithfieldSolarPowerI-DG(the“Project”)InaccordancewiththeStandardApplicationFormrequiredforaCertificationofEligibilityofRenewableEnergyResource,weare submitting thisRenewableEnergyResourcesEligibilityFormforasolararraylocatedinNorthSmithfield,RI.

Thispackageincludes:

The Project was selected to participate in the RI Renewable Energy Growth Program onJanuary 29, 2016 and it must receive a Certification of Eligibility of Renewable EnergyResourcetofulfillthetermsofthecontractortheprojectwillforfeitthecontractedDGrate.

Theattachedapplicationhastwoareasthatneedtobeupdatedatalaterdate:

• Section2.1-NEPOOLGISIdentificationNumberOncethisisprovidedbyNationalGridwewillfurnishthePUCwiththenumber.

• Section3.1–CommercialOperationDateWeexpectthattheprojectwillachieveCommercialOperationonoraroundNovember30,2017.OncetheCODismet,wewillfurnishthePUCwiththeactualCODdate.

Weappreciateyourconsiderationofthisrequest.Pleaseletusknowifthereisanyadditionalinformationweneedtoprovide.

Thankyou,

_______________________________________WilliamW.FetterleyChiefOperatingOfficerHalfMoonVentures,LLC

Page 2: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 3: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 4: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 5: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 6: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 7: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 8: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 9: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z
Page 10: COVER LETTER To: State of Rhode Island Public Utilities ... · 8/15/2017  · 20170814 RI-RES cover NSS-DG Author: William Fetterley Created Date: 20170815150143Z