Belgian Agency for Radioactive Waste and Enriched Fissile Materials
Country presentation BELGIUM
NIRAS/ONDRAF
IAEA workshop on Safe Disposal of Low Level Radioactive Waste
Paris, 3 – 5 February, 2015
P. De Preter, W. Wacquier, W. Cool, R. Bosselaers
2
NIRAS/ONDRAF • The Belgian Agency for Radioactive Waste and Enriched Fissile Materials • Responsible for the management of all radioactive waste in Belgium • Four basic missions:
Inventory Management Decommissioning Enriched System Fissile Materials
3
NIRAS/ONDRAF Management System
Prevention Sorting
Identification
Volume reduction
Stabilization and
encapsulation
Interim storage
Long-term management
4
Hig
h le
vel
Med
ium
level
Lo
w le
vel
Short half-life A A C
Long half-life B B C
Disposal of category A waste
5
1985
Disposal
concept +
scientific and
technical
knowledge
but no site
4 integrated disposal projects
including site
1998
Policy
Decision
on disposal
2006
Policy
Decision
on surface
disposal &
site
Exploratory studies Preliminary Design
Disposal programme since 1985
Prelicensing FANC – NIRAS/ONDRAF
6
Council of Ministers - January 1998
•Policy decision for DISPOSAL - Final solution - Reversible - Stepwise and flexible - Either surface or geological disposal facility
•Siting to focus on existing nuclear sites and interested municipalities
•Co-operate with local actors to integrate disposal in local socio-economic structure
Public participation in decision-making processes through the creation of local partnerships
7
Preliminary design phase (1998 – 2006) • NIRAS/ONDRAF in collaboration with local partnerships
- STOLA, Dessel
- MONA, Mol
- (PaLoFF, Fleurus-Farciennes)
Safety and feasibility studies of surface disposal and deep disposal
Local positive decisions in Dessel & Mol
• In 2006, the federal government decision : NIRAS/ONDRAF to develop an integrated surface disposal project in Dessel as a long-term solution for Belgian category A waste.
– In “co-design” with STORA and MONA
– Formal interaction with safety authorities
• Need for a regulatory framework “disposal” (licensing procedure & regulatory requirements & regulatory guidance)
8
1985
Disposal
concept +
scientific and
technical
knowledge
but no site
4 integrated disposal projects
including site
1998
Policy
Decision
on disposal
2006
Policy
Decision
on surface
disposal &
site
Exploratory studies Preliminary Design
Disposal programme since 1985
Prelicensing FANC – NIRAS/ONDRAF
9
2006
Realisation of the cAt
project
Transition from active to passive
management
Design
Future phases
License Application … Construction Operation Closure
Jan. 2013
2018 ??
At least 2050
Waste
disposal
activities and
active
management
Main License
Construction &
Operation
10
Repository design
Caisson factory
Storage/
processing
Installation for
the production of
monoliths (IPM)
Transport
by rail
Disposal module
11
Pre-licensing 1998 - 2013
- Intensive process between FANC & NIRAS/ONDRAF
- No third party supervision or follow-up
- Parallel development of (1) disposal system + safety case by NIRAS/ONDRAF and (2) regulatory framework by FANC
- No direct involvement of stakeholders (partnerships) in the pre-licensing process and limited transparency
- Difficult convergence on the interpretation & application of main safety principles (Defense-in-depth, optimisation, …)
12
Pre-licensing 1998 - 2013
- Incomplete regulatory framework at the moment of license application(January 2013)
- No binding specific regulatory requirements for disposal (i.e. long-term safety)
- Guidances issued at FANC level
- Heavy reliance on international safety standards and international recommendations (IAEA, ICRP)
- A long pre-licensing and licensing process is faced with evolving application of standards and evolving « good or best international practices »
13
Conclusions
• Planning the development of a disposal facility is a major challenge – Policy decisions (1998 & 2006) – Participative model and societal dimension (siting e.g.) – Pre-licensing and licensing process
Pre-licensing process of about 15 years
Duration of licensing step not defined in regulation
• Disposal program requires - Solid and stable foundations at all levels
- Policy decisions - constrains technical and societal process
- Regulatory framework disposal (early parallel development and issuance)
- Stakeholder involvement
- Financial framework
- Forward looking, adaptive & fair decisional process