CONCERTE JUMP FORM BUILDING CONSTRUCTION BY MARK THOMPSON & THOMAS SMITH

CONCERTE JUMP FORM BUILDING CONSTRUCTION

Embed Size (px)

Citation preview

Page 1: CONCERTE JUMP FORM BUILDING CONSTRUCTION

CONCERTE JUMP FORMBUILDING

CONSTRUCTION

BYMARK THOMPSON & THOMAS

SMITH

Page 2: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Uses of the jump form

system •Examples of Types of construction•Size of buildings•Types of systems Fly Ash Silo

Page 3: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Building Tower

Elevator Shaftor Building Core

Page 4: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Cooling Tower

ForPower Plant

Page 5: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Hoover Dam - Pat Tillman Bridge

Page 6: CONCERTE JUMP FORM BUILDING CONSTRUCTION

One type of Jump form system in use today • Benefits of the

using jump forms

• Fast construction

• Self-climbing form work

• Small work force

Page 7: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Steps of Jump Form System

• Overview of the system

• How it is set-up• How it work on

jobsite

Page 8: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Steps of Jump Form System• Continued

Page 9: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Safety feature

• How the Jump Form beam works

• Jump Form beam

• Anchor bolts• Rollers

Page 10: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Anchor System

• Anchor bolts• What they do• Why they are

important• What type are

used

Page 11: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Willow Island Cooling Tower

Jump Form System

• Circa 1978

Page 12: CONCERTE JUMP FORM BUILDING CONSTRUCTION

• Cathead Crane System• Static Line• Drum Hoist• Static line• Central Loading

Station

Elevation view of cooling tower at Willow Island

Page 13: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Plan view of cooling tower at Willow Island• Crane System• Catheads• Drum Hoist• Central

Loading Station

Page 14: CONCERTE JUMP FORM BUILDING CONSTRUCTION

Willow Island Cooling TowerApril 27, 1978 • When things

go wrong?• Concrete

failure• Modification of

Equipment.• Bolts issues• Temperatures

variations

Page 15: CONCERTE JUMP FORM BUILDING CONSTRUCTION

How this failure could have been prevent• Concrete

testing• Why it is

important• Where it

can be done

• Lab

Page 16: CONCERTE JUMP FORM BUILDING CONSTRUCTION

What are the consequences

• 51 Dead• $85,000 = $1700 per dead worker•OSHA 10 willful violation & 10 serious•Cited on 2 OHSA violations•Dept. Of Justice, case thrown out