COHESION MEASUREMENTS. By Abubakar Adam (April, 2004). Outline. Introduction Cohesion metrics in the literature Classification for cohesion metrics New Metric. Introduction. - PowerPoint PPT Presentation
Citation preview
COHESION MEASUREMENTS
By
Abubakar Adam(April, 2004)
Outline• Introduction• Cohesion metrics in the literature• Classification for cohesion metrics• New Metric
Introduction• Cohesion determines the extent to
which the individual components of a module are required to perform the same task
• While cohesion addresses intra-module connectedness, coupling addresses inter-module connectedness
Introduction (Cont..)
Subsystem2
Subsystem1
System
Introduction• A cohesive module:
– Has all its components tailored towards one functionality
– Does not rely on other modules– Is easy to maintain
• Cohesion should be maximized• Coupling should be minimized
Cohesion metrics
Let P be the pairs of methods without shared instance variables, and Q be the pairs of methods with shared instance variables. Then
LCOM2 =
otherwiseQPifQP
,0|||||,|||
m
mAa
a
ij
1
)(11
# Metric
1 LCOM1
2 LCOM2
3 LCOM3
4 LCOM4
5 Co
6 LCOM5
7 LCC
8 TCC
9 RCI
10 CCM
11 ECCM
12 CBMC
13 OCC
14 PCC
LCOM1• LCOM1 is the number of pairs of methods with no
common attributes references • From the example given Below, LCOM1 = 2
m 1
A 1 A 2 A 3 A 4
m 2 m 3
C
LCOM2• Consider a class C with methods M1, M2,….., Mn. Let {Ii} = set of
instance variables used by method Mi. There are n such sets, i.e., {1i}, {I2},….., {In}. Let P = { (Ii, Ij ) | Ii Ij = } and Q = {(Ii, Ij ) | Ii Ij }. If all n sets {1i}, {I2},….., {In} are then let P = .
otherwise
QPifQP
,0
|||||,|||
LCOM2 =
P = 2 and Q = 1 thus LCOM2 = 1
m 1
A 1 A 2 A 3 A 4
m 2 m 3
C
LCOM3• Consider an undirected graph G where the vertices
are the methods of a class, and there is an edge between two vertices if the corresponding methods share at least one instance variable.
• LCOM3=|connected components of G|
G xm 1
m 2
Cm 1
A 1 A 2 A 3 A 4
m 2 m 3
m 3
LCOM3 = 2
LCOM4• Like LCOM3, where graph G additionally has
an edge between vertices representing methods Mi and Mj, if Mi invokes Mj or vice versa.
m 1
m 2
C M e th o d in v o c a tio nm 1
A 1 A 2 A 3 A 4
m 2 m 3
G x
m 3
LCOM4 = 1
The Connectivity Metric
)2|).(|1|(|)1|(|||
2
cc
cc
VVVE
Co(C) =
m 1
m 2
C M e th o d in v o c a tio nm 1
A 1 A 2 A 3 A 4
m 2 m 3
G x
m 3
From the example given above, we have Ec = 2 and Vc = 3. Hence, Co(C) = 0
The TCC and LCC Metrics
)()()(
CNPCNDCCTCC
)()()()(
CNPCNICCNDCCLCC
m 1
A 1 A 2 A 3 A 4
m 2 m 3
NDC(C) = 2, NIC(C) = 1 and NP(C) = 3,
Thus,
TCC = 2/3 and LCC = 1
2)1(* NN
NP(C) =
The LCOM5 Metric
m
mAa
a
jj
1
)(11
LCOM5 =
Cm 1
A 1
( ) = 1A 1 ( ) = 2A 1 ( ) = 2A 1
A 2 A 3
m 2 M i
A j
m 3
From the example, we have: m = 3 and a = 3,
Thus,
LCOM5 = 2/3
The RCI Metric
|)(||)(|)(
CMaxCClCRCI
CI means cohesive interactions = the set of all DD- and DM-interactions present in the class C
Max(C) = the set of all possible DD- and DM-interactions that can be established in class C
m 1
A 1 A 2 A 3 A 4 A 5
m 2 m 3 m 4
CFrom the example we have, |CI(C)| = 8
|Max(C)| = 30
Hence,
RCI = 8/30 = 4/15
The CBMC Metrc))((1))(())(())(()(
1
CGCBMCn
CGFCGFCGFCCBMC ir
n
ircrsrc
|)(||)(|
))((rn
rgrc GM
GMCGF
)(1))((1
ir
n
irs GCBMC
nCGF
Mg = the set of glue methods
Mn = the set normal methods
Glue methods are the minimum number of methods without which the reference graph will be divided into sub-graphs.
It is one of the n children of Gr in the structure tree; CBMC denotes the cohesion of a component .
Example of CBMC
m1
A1 A2 A3 A4
m2 m3 m4 m5
A2
m1
A1 A2 A3 A4
m2 m3 m4 m5
A2 A3 A4
m3 m4 m5
A3 A4
m4 m5
A4
m5
m1
A1
A3
Example of CBMC (Cont..)))((1))(())(())(()(
1
CGCBMCn
CGFCGFCGFCCBMC ir
n
ircrsrc
)()(21
51)( 21 GCBMCGCBMCCCBMC
)()(
21
311
1011
101)( 2221 GCBMCGCBMCFFCCBMC SC
)()(
21
211
611
101)1
611
101)( 222221 GCBMCGCBMCFFCCBMC SC
81111
411
611
1011
411
611
101)(
SC FFCCBMC
The CCM and ECCM Metrics
NORM(C) is the number of re-implemented methods and NOIM(C) is the number of inherited methods
)()()()(
CNCCCNMPCNCCCCM
))(1()().(
)()( CtorPenaltyFacCNCCCNMP
CNCCECCM
))(1()()( CtorPenaltyFacCCCMCECCM
)()()(
CNOIMCNORMCtorPenaltyFac
CCM and ECCM Example
m1
A1 A2 A3 A4
m2 m3 m4 m5m 1 m 2
m 3
m 4m 5
NC(C) = 5, NMP(C) = 10 and NCC(C) = 1 hence CCM = 2/5
Note:ECCM = CCM because in this example no specification is given for the inherited methods
The OCC and PCC
1,0
1,1
|)(|max)( ,...,1
n
nn
miRwCOCC ni
1,0
1,1
|)(|max)( ,...,1
n
nn
miRsCPCC ni
General Examples# Metric Example1
m 1
A1 A2 A3 A4
m 2 m3 m 4 m5
Example2 m 1
A 1 A 2 A 3 A 4
m 2 m 3 m 4 m 5
Example3 m 1
A 1 A 2 A 3 A 4
m 2 m 3 m 4 m 5
Comment
1 LCOM1 6 6 0 2 LCOM2 6-3=3 6-4=2 0 3 LCOM3 2 1 1 4 LCOM4 2 1 1 5 Co N/A 0 1 6 LCOM5 13/16 = 0.81 ¾ = 0.75 7/4 = 1.75 7 LCC 0.6 1 1 8 TCC 0.3 0.4 1 9 RCI 7/30 = 0.23 8/30 = 0.27 13/30 = 0.43 10 CCM 3/20 = 0.15 4/10 = 0.4 1 11 ECCM N/A N/A N/A 12 CBMC 0 1/8 = 0.13 1 13 OCC ¾ = 0.75 4/4 = 1 4/4 = 1 14 PCC N/A N/A N/A
Classification for Cohesion Metrics• There are two types of classification criteria
– Factor– Characteristic
• Factors: these criteria identify the things that may affect the cohesiveness of a module.
• Characteristics: these criteria, as the name implies, describe the characteristics of the cohesion metric i.e the features of the metric.
Classification (Cont..)# Classification Criteria Description Source Remark 1 Underlying Approach Characteristic New 2 Cohesion Criteria Characteristic Briand 3 Coverage Completeness Characteristic New 4 Granularity Characteristic Briand 5 Soundness/Validity Characteristic New 6 Sensitivity Characteristic New 7 Ease of Impl. and use Characteristic New Similar to Briand’s objectivity criteria 8 Interpretation Characteristic New 9 Validation Characteristic Briand 10 Availability Characteristic New Similar to Braind’s usable criteria 11 Source Characteristic Briand 12 Connection Type Factor Briand 13 Special Methods Factor Briand Briand called this known problems 14 Inheritance Factor Briand 15 Indirect Connections Factor Briand 16 Connected Components Factor New In the reference graph
Evaluating The LCOM1 Metrics# Attribute Approach 1 Underlying Approach The underlying approach for the proposed metric is the notion of degree
of similarity of methods initially proposed by Bunge 2 Cohesion Criteria Attribute sharing 3 Coverage Completeness 4 Granularity Measure cohesion at class level 5 Soundness/Validity The approach does not correctly capture the cohesion of a class though it
gives an idea of how cohesive a class is. The metric is ambiguous because two classes that are, intuitively, o f different cohesion will have the same value for the measure
6 Sensitivity 7 Ease of Impl. and use Can be implemented 8 Interpretation Can be automated but difficult to interpret the measure 9 Validation Not validated 10 Availability 11 Source 12 Connection Type 13 Special Methods No consideration was given for special methods in this approach 14 Inheritance N/A 15 Indirect Connection