Cluster 1cluster

Embed Size (px)

Citation preview

  • 7/27/2019 Cluster 1cluster

    1/17

    CLUSTER HOUSING

    Cluster zoning is an alternative concept for residential development.Development is grouped, involving several adjacent parcels, leaving larger

    blocks of open space and preserving both rural character and the naturalenvironment.

    With cluster zoning, land is used more efficiently. Development occurs on themost buildable portion of land, taking into consideration surrounding naturalfeatures and, due to their compact nature, reducing sprawl and high servicingcosts.

    Cluster housing may have a range of densities, from small lots to townhouse

    developments.Conventional Model Conservation (or Cluster Model)

    An equestrian facility as an open space use beside clustered homeExample of clustered housing

    Sources:Hodge, Gerald. Planning Canadian Communities: An Introduction to the Principles, Practice, and ParticipantsMetropolitan Council. http://www.metrocounci l.org/planning/stcroixvalley/rural_dev.htmGreener Prospects. http://www.greenerprospects.com/ordrev.htmlDelaware County Regional Planning Commission. http://www.dcrpc.org/files/Conservationsub2.pdf

  • 7/27/2019 Cluster 1cluster

    2/17

  • 7/27/2019 Cluster 1cluster

    3/17

    Landscaped Buffers and Rights-of-Way Improves interface with major roads and highways

    Provides pedestrian and bicycle linkages Provides green buffers around the neighbourhood to minimize noise impact of major arterial

    roads

    Integrates Hydro and/or gas corridors into greenway system to connect neighbourhoodamenities

    Incorporate principles of Crime Prevention Through Environmental Design to minimizeopportunity for crime

    Maximize potential for tree retention

    Buffers and Greenways

  • 7/27/2019 Cluster 1cluster

    4/17

    Neighbourhood Parks Provide opportunities to retain trees and significant vegetation, and for replanting

    Accommodate a variety of activities, ages and abilities Provide opportunities to encourage active lifestyles

    Provide a focus for each neighbourhood

    Scale of park geared to families with children

    Huntington & Bridlewood GreenwayActive Living

    Neighbourhood Parks

  • 7/27/2019 Cluster 1cluster

    5/17

    Seniors Housing

    Seniors Housing Provide housing options for seniors

    Maximize efficiency of services Facilitate independent living for seniors

    Concentration of seniors allows for provision of age-specific amenities

    Minimal effect on traffic and vehicle congestion

    Use design to maximize tree retention and development of open space

    Amenity Building

  • 7/27/2019 Cluster 1cluster

    6/17

    Special Residential (Live/Work)

  • 7/27/2019 Cluster 1cluster

    7/17

    Industrial Development

    Parking Area Landscaping

    High standard of design Includes light impact industrial uses,

    High technology industry, Research and development activity, and Warehouse offices and service uses as part of a comprehensive design

    Business Park

  • 7/27/2019 Cluster 1cluster

    8/17

  • 7/27/2019 Cluster 1cluster

    9/17

    Low Density ResidentialCorner lots with coach houses to increase diversity, provide unity to the streetscape andincrease eyes on the street.

    Garages and anncilliary unitsaccessed via a rear lane

    Parking pockets provided on the

    street to increase parkingavailability and act as trafficcalming device

    Low Density Residential

  • 7/27/2019 Cluster 1cluster

    10/17

    Medium Density Residential

    Strongly defined frontentry that relates to thestreet

    Duplex (Fourplex) design to reinforcethe character of single family areas andcontribute to a unified streetscape

    Clear relationship to the streetgarages are not part of thestreetscape but, rather areaccessed via rear lanes.

  • 7/27/2019 Cluster 1cluster

    11/17

    Small Lots Single Family Can provide transition from Single Family Residential zones to higher densities

    Maximizes efficiency of services

    Friendly Streets

    Small lots with lane access

    A variety of building densities

    SMALL LOTS

    Small Lots With Lanes Access from lane encourages a safer and pedestrian-friendly environment on streets

    Reduce front yards setbacks to improve surveillance of street activities

    Promote active use of street

    Use of porches to animate street facades

    Deeper Lots

  • 7/27/2019 Cluster 1cluster

    12/17

    Townhouses Increase open space and amenity potential (parks, pedestrian linkages, green spaces)

    through higher total amenity contribution

    Internal road system minimizes impact on neighbourhood roads

    Cluster development to maximize open space to retain and introduce trees

    Limit opportunities for secondary suites

    Maximize efficiency of services

    Provide high quality common open space and amenities

    20 upa

    6 upa

    9 upa

    22 upa

    9 upa

    6 upa

    9 upa

    Townhouses

  • 7/27/2019 Cluster 1cluster

    13/17

    Community Input Received to Date

    There have been many ideas and suggestions brought forward

    through the planning process to date. Some of these ideas andsuggestions are ..

    A mix of uses and densities,and a complete community tolive, work and play

    Focus on sustainabilityprinciples

    Respect the ALR

    Use buffers betweendevelopment and the ALR aswalkway, habitat and linearlinks

    Create a town center(s) - there is a needto provide local services

    Retain the character of Port Kells Villageand incorporate the rural ambience throughany increase in density

    Create a small commercial node atTynehead village

    Capitalize on Gateways and 176 Streetand 96 Avenue

    Consider commercial in the triangle

    Locate higher density residential adjaceto commercial especially in the towncentres/villages should be more mixed usdesignations

    Higher density along the southridge

    Higher residential densities withbuffers located nearindustrial/business areas

    Generally higher densitiesthroughout the area to promote

    walking and make servicing feasible

  • 7/27/2019 Cluster 1cluster

    14/17

    Incorporate bikeways, linear,natural areas, walk ways

    Equal distribution of park areas

    Keep the area green, protect

    trees and large, forested areas Concern for drainage and waterquality

    Consider business parks

    Extend industrial along Highway #east of the triangle

    Some industrial/businessdevelopment south of Highway 1

    Locate non-residential land uses orurban densities along arterial roads

    Minimize traffic through residential areas

    Buffers along all highways

    Community Input Received to Date

  • 7/27/2019 Cluster 1cluster

    15/17

    Frequently Asked Questions

    How does the City of Surrey acquire land for Parks in newNeighbourhood Plan areas?

    Provincial legislation states that at the time of subdivision, amunicipality may require 5% of the land to be dedicated to theCity for park space. If a park is not needed on that property,the City may require payment of money equal to 5% of the valueof the land. That money is held in a fund to buy parkland underthe Citys Parkland Acquisition Program.

    If more than 5% of a particular property is needed for a park,the City then uses these funds to buy the additional land at fairmarket value.

    What happened to the previous Port Kells surveys?

    Two surveys conducted in the late 1990s (one by the communityand one by the City) have been kept on file with the City andwere reviewed at the outset of this planning process. While thecommunity survey indicated that there should be no furtherindustrial development, many new issues such as the new FraserRiver Crossing have emerged since 1999. The surveys are usefulreference. The current General Land Use Plan process willconfirm community current issues.

    When will the road system and servicing plan for South PortKells be developed?

    The first step in the General Land Use Plan process is toexplore options for future land uses and densities in the Planarea. The location and design of the road network and thelocation and phasing of services such as sewer, water anddrainage can take place once a preliminary land use plan hasbeen developed and agreed to. More detailed planning of the

  • 7/27/2019 Cluster 1cluster

    16/17

    PLANNING PROCESS

    Community workshops, public meetings, stakeholder meetings, surveys, and other consultationswill be held throughout the process at these important milestones.

    Introductory Community Meeting:

    Selecting a Citizens Advisory Committee (CAC)

    Introductory Community Meeting:

    Selecting a Citizens Advisory Committee (CAC)

    Identify Issues, Concerns,

    Planning and Servicing Opportunities and Constraints

    Identify Issues, Concerns,

    Planning and Servicing Opportunities and Constraints

    Formulate Planning Objectives and Prepare Background/Issue PapersFormulate Planning Objectives and Prepare Background/Issue Papers

    Generate Land Use OptionsGenerate Land Use Options

    Review Land Use OptionsReview Land Use Options

    Finalize Land Use PlanFinalize Land Use Plan

    Review Preferred Land Use OptionReview Preferred Land Use Option

    Submit Land Use Plan to Council for ApprovalSubmit Land Use Plan to Council for ApprovalPrepare General Servicing,

    Financial and Phasing Strategies

    Prepare General Servicing,

    Financial and Phasing Strategies

    Finalize General, Servicing, Financial and Phasing StrategyFinalize General, Servicing, Financial and Phasing Strategy

    Submit Final Land Use Plan, General Servicing Financial

    and Phasing Strategy to Council for Final Approval

    Submit Final Land Use Plan, General Servicing Financial

    and Phasing Strategy to Council for Final Approval

    November 2003

    March May 2004

    June 2004

    July September 2004

    October 2004

    November 2004

    December 2004

    February 2005

    May 2004

  • 7/27/2019 Cluster 1cluster

    17/17