CCEB QM/FM CCEB QM/FM Production Production Status Status TIM CERN May.09 TIM CERN May.09 Gert Viertel, Ulf Roeser, Andreas Sabellek IEKP - Universität Karlsruhe (TH)

CCEB QM/FM Production Status TIM CERN May.09

  • Upload
    mariko

  • View
    38

  • Download
    2

Embed Size (px)

DESCRIPTION

CCEB QM/FM Production Status TIM CERN May.09. Gert Viertel, Ulf Roeser, Andreas Sabellek IEKP - Universität Karlsruhe (TH). Cryocooler Electronics System Overview. 4 Cryocoolers. Zenith Radiators PT1000 Temperature sensors. HEAT. 120 VDC in. 4 x VAC out. from PDS. CCEB. - PowerPoint PPT Presentation

Citation preview

Page 1: CCEB QM/FM Production  Status TIM CERN May.09

CCEB QM/FMCCEB QM/FMProduction Production StatusStatus

TIM CERN May.09TIM CERN May.09

Gert Viertel, Ulf Roeser, Andreas Sabellek

IEKP - Universität Karlsruhe (TH)

Page 2: CCEB QM/FM Production  Status TIM CERN May.09

2009-05-10 TIM May09, CERN IEKP,Andreas Sabellek p.2

Univ. of Univ. of KarlsruheKarlsruhe

Cryocooler Electronics Cryocooler Electronics System OverviewSystem Overview

4 Cryocoolers

120 VDC infrom PDS

CAN BusJMDC

4 x VAC out

Cernox Cryogenic temperature sensors

Dallas temperature sensors

Zenith RadiatorsPT1000 Temperature sensors

3D Hall probes

HEAT

CCEB

USCM task program by A.Lebedevautonomously regulatespower to Cryocoolers

Page 3: CCEB QM/FM Production  Status TIM CERN May.09

2009-05-10 TIM May09, CERN IEKP,Andreas Sabellek p.3

Univ. of Univ. of KarlsruheKarlsruhe

3

Cryocooler Electronics BoxCryocooler Electronics BoxUniversal SlowControl Module

Interface Board

Monitor & Oscillator

3D Hall Probeand PTS readout

CryoCooler PowerAmplifier Module

DC/DCConverter board

USCMUSCM

CCBT 0CCBT 1

CCIF 0 A/BCCIF 1 A/BCCIF 2 A/BCCIF 3 A/B

CCMO 0CCMO 1

CCPA 0 A/BCCPA 1 A/BCCPA 2 A/BCCPA 3 A/BCCDC A/B

ControlSide

PowerSide

CCEB CratesEM1: ETHZEM2: CERN (forCC operation)QM: in prod.FM: in prod.

Page 4: CCEB QM/FM Production  Status TIM CERN May.09

2009-05-10 TIM May09, CERN IEKP,Andreas Sabellek p.4

Univ. of Univ. of KarlsruheKarlsruhe

FM/QM Board StatusFM/QM Board Status• Status: All boards were assembled and delivered by Contraves company Zürich by April, 30th

• Currently last board level test are performed at ETH Zürich and final coating/assembly is prepared

Board type Number needed (1xFM, 1xQM CCEB)

Now available for Crate assembly

Status Expected date to be available

USCM 4 4 now

CCBT 4 - coating done; to be retested 25. May 09

CCIF 8 10 now

CCMO 4 6 now

CCBP 2+2 - PCA done; boards under test and coating 25. May 09

CCPA 8 10 coating done 12. May 09

CCDC 2 - PCA done; boards under test and coating 25. May 09

CCEB Crate

ready for assembly (from CSIST)

Page 5: CCEB QM/FM Production  Status TIM CERN May.09

2009-05-10 TIM May09, CERN IEKP,Andreas Sabellek p.5

Univ. of Univ. of KarlsruheKarlsruhe

CCPA Board Level TestCCPA Board Level Testquantity:4 FM, 2 FS, 4 QM

before coating:- check of output voltage puls shape- load test- adjustment of HW current limit (max power 150W/CC @126V)- calibration of voltage*current readout- relais check (launch lock)- full functional test

10 x CCPA

• all failures could be repaired and defective parts were replaced

boards before final mechanical assembly

Page 6: CCEB QM/FM Production  Status TIM CERN May.09

2009-05-10 TIM May09, CERN IEKP,Andreas Sabellek p.6

Univ. of Univ. of KarlsruheKarlsruhe

Production ScheduleProduction Schedule

Dates QM&FM :

May 25 – June 5 CCEB Crate Assembly (CERN)

June 8 – July 3 CCEB ESS/TVT at SERMS (Terni)(U. Roeser / A. Sabellek / J. Schneider / [M. Droege])

by G. Viertel

Page 7: CCEB QM/FM Production  Status TIM CERN May.09

2009-05-10 TIM May09, CERN IEKP,Andreas Sabellek p.7

Univ. of Univ. of KarlsruheKarlsruhe

SummarySummary

• all CCEB boards are delivered and show no major problem; last boards on the way for final coating

• CCEB 1 x QM and 1 x FM assembly end May

• preparation for ESS and TVT qualification/acceptance test at SERMS in Terni in June board level testing at ETH Zürich