Camperdown Game estate for rob Kirby
In response to a request from Rob Kirby
we submit the following prospective and
innovation document for the game estate
developments proposed by the developer.
We understand that KV3 may already have
completed some work on the initial project
stage. In respect to KV3 we request that their
work be reimbursed (if a different engineer
is employed) or that they are kept on the
professional team. This recommendation is
made, by us, in line with our core value of
respect.
We enjoy a good working relationship with
Rob Kirby so offer this document, freely, as a
building step for your projects.
Dominic Collett
26 May 2010
Regency House,3 Douglas Crowe Dr
Ballito Business ParkBallito, 4420
Tel: +27 (0) 32 9463848Fax: +27 (0) 32 5860007
Tel (Direct): +27 (0) 82 3206256Mobile: +27 (0) 82 3206256Email: [email protected]
www.ssi-dhv.com
PO Box 6340Zimbali, 4418South Africa
ExEcutivE SuMMARy
RESPECT, INNOVATION AND FREEDOM
Providing a world class estate is a team effort. From the
planning and design of the living environment, opportunities
exist to build relationships, to empower communities and to
create a better quality of life.
The spark that transforms a project into a winning project is
INNOVATION. The ability to look at a problem and to see
opportunities is what is needed now more than ever before.
SSI Engineers and Environmental Consultants has established
a culture of innovation, which has been of real benefit to
“whole life thinking”.
All this is embodied in our core values of
RESPECT, INNOVATION AND FREEDOMRESPECT, INNOVATION AND FREEDOM
introduction
SSI have developed a specialised section
for the planning, design and construction
management of prestige residential
developments. This experience has been
obtained over many years and has focused
on the requirements of clients determined
to provide to their customers where the
engineering is of the highest quality.
Inherent in this process is sensitivity to
the environment and the development of
a low maintenance infrastructure. This is
particularly important in the management
of stormwater, and SSI have developed
innovative ways in which the realities of
high rainfall in geotechnically sensitive
areas may be addressed without resorting
to hard engineering solutions, which may
detract from the visual appearance of the
development.
La Lucia Ridge, The Gardens, Ilala Ridge
and Kindlewood are all residential projects
in umhlanga. The sensitive Berea Red
and windblown cohesionless sands in
these areas required careful consideration.
In response to this, SSI developed a
stormwater master plan which provides
for underground stormwater attenuation
as site level through to attenuation in dams
in a conservation zone which controls the
stormwater outflow to pre-development
levels.
One of the more important aspects of
stormwater control is consideration of the
house construction phase, during which
the site is stripped of much of its natural
vegetation and the system is vulnerable
to increased runoff and erosion of the
valuable topsoils. The installation of the
underground attenuation system prior to
any construction, controls the runoff and
traps the eroded soil before it leaves the
site.
Where the development takes place
adjacent to wetlands, the attenuation
system is adapted by the addition of an
infiltration system to return the low flow
stormwater to the ground, recharging the
natural groundwater and further reducing
the site runoff.
Where the valley bottom becomes
overstressed as a result of the
development, additional measures need
to be taken to ensure that the stormwater
carrying capacity of the soil/ vegetation
interface is not exceeded.
In many instances the reaction to potential
erosion is to opt for a traditional engineering
solution. This can both be expensive
and an overlay conservative reaction.
There are interim measures which can
be implemented and SSI has been at
STORMWATER CONTROL A N D A T T E N U A T I O N
Geo Step - textile soil reinforcement
Concrete lip withY12 central reinforcement
200m
m
600mm
clay fill
Vetivergrass
1. roll out fabricand fill with clay
2 . cover withfabric and secureleading edge
Constructionprocess
Grass lined drain - no fall
The lowest step isextended to a2000mm length
Fencing standards at500mm intervals
GEO STEP | TEXTILE SOIL REINFORCEMENT
the forefront of the development of such
measures as GeoStep and GeoRoll soil
reinforcement, which are economical and
environmentally acceptable.
With the requirements of current legislation
imposing onerous requirements on
developers, it is necessary to address these
issues properly and competently. SSI has a
reputation for doing just that and we have
been professional team for many of the
most successful projects in recent years.
GeoRoll - Check Weir Construction
Water flow
Final ProfileOriginal Ground
GeoRoll to be constructedusing Geo Container fabric byKaytech. Generally 600mm in
height filled with localnon-erodable material
For additional protection, sprayexposed fabric surfaces with bitumen
emulsion (cover the bitumen withlocal sand while still tacky for a
natural appearance)
Fabric extended for a nominal 3 metre apronheld in place with dry packed handstone
0% grade to the top of the next GeoRoll
Grass lined drain
Grass lined drain
Geo Container fabric
Geo Container fabric
Bond the leading edge of the fabricusing "Dam Seal" bitumen emulsion
Tapered end of GeoRoll to bestitched and buried - Alternatively
"Dam Seal" may be used.Vetiver grass
GEO ROLL | CHECK WEIR CONSTRUCTION
road CONSTRuCTIONSSI have been in the forefront of concrete road
construction as a means of controlling stormwater
drainage and providing access. The use of concrete strips
on flatter terrain allows for a more aesthetically soft
approach as apposed to the use of conventional wide
premixed road construction. Gravel roads have its place
within an estate but needs to be carefully identified in
terms of functionality and appearance.
Concrete strip construction has limitations in terms of
application on steep grades where a more substantial
construction is required to combat soil erosion. The use of
concrete on steep grades allows for the stormwater runoff
to be controlled within the road surface and discharged at
low points and intervals along the drainage line.
The road geometry is critical to the successful control of
stormwater drainage. The use of pipes and kerbs can be
eliminated if the natural slope of the terrain is followed.
We have also had very good results using permeable
paving blocks. This construction offers the opportunity
to attenuate stormwater runoff to pre-development
flows by collecting the a volume of water within the road
layerworks structure. On a recent project this eliminated
all conventional stormwater drainage.
This system allows for the reloading of the aquifers and
offers a environmentally sensitive approach to hardened
areas.
ELECTRICITYSSI have completed a number of large scale solar panel and hot water installations. This technology can be designed to meet the estate’s requirements.
SANITATIONSSI have one of the largest Research and
Development budgets in the consulting
engineer field. This research and development
is mainly around Water and Waste Water
Treatment. We have patented a number of
processes. A sanitation solution is dependent
on a number of criteria that need to be
identified before proposing a specific solution.
Water reuse is our core sanitation approach
which has been successfully implemented
throughout the country in answer to our
limited water resource.
ConclusionEach project has unique features for consideration, and requires new specific innovation ideas.
We look forward in assisting your team on this exciting project.