Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project BUSHEHR PETROCHEMICAL COMPANY P.O. No.: 05-POR-MA-305-119 Document Title: WPS& PQR &Welder qualification record for Steam Turbine05-330-C-1-TRev.: 01 Document No.: BU-05-VD-305-TI-REP-0000-009 Page1 of 37 WPS& PQR &Welder qualification record for Steam Turbine05-330-C-1-TEQUIPMENT NAME: Steam Turbine Code1 (Approved ) No comment and the document is released for Manufacturing Code2 (Approved with comments) Vendor shall correct, revise and resubmit the document The document is released for manufacturing Code3 (Commented) : Vendor shall correct / revise & resubmit document Code4 Not Acceptable Quality (Rejected) Date: Dept: Signature: Dong Taining Zhou Liming Xielong Tang Qingwei Chen Qianbao Zhang Jianyue IFA 2015-3-10 01 Dong Taining Zhou Liming Xielong Tang Qingwei Chen Qianbao Zhang Jianyue IFA 2015-2-14 00 AUT’D APP’D CHC’D PRE’D Purpose of Issue Status Date Rev.

BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Embed Size (px)

Citation preview

Page 1: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page1 of 37

WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)

EQUIPMENT NAME: Steam Turbine

Code1 □ (Approved ) No comment and the document isreleased for Manufacturing

Code2 □ (Approved with comments) Vendor shallcorrect, revise and resubmit the documentThe document is released for manufacturing

Code3 □(Commented) : Vendor shall correct / revise &resubmit document

Code4 □ Not Acceptable Quality (Rejected)

Date:Dept:Signature:

Dong TainingZhou Liming

XielongTang Qingwei

Chen QianbaoZhang Jianyue

IFA2015-3-1001

Dong TainingZhou Liming

XielongTang Qingwei

Chen QianbaoZhang JianyueIFA2015-2-1400

AUT’DAPP’DCHC’DPRE’DPurpose of IssueStatusDateRev.

Bayrampour-S
Text Box
Owner; After 3 days of sending to client send to vendor please.
Saki-M
Text Box
(1) Pages 15, 17, 19 and 21 shall be replaced. (2) All comments regarding DIN17245 are still applicable. As new rev. of this standard is DIN10213 and it has mentioned in this standard that "it has been completely revised" so requirements of new standard shall be followed and document of "Appendix1" shall be revised accordingly.
Saki-M
Accepted
Saki-M
Text Box
04 April 2015 MA M.S. CODE 3
Page 2: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page2 of 37

Revision Index

Rev. 00 01 02 03 04 05 06 07 Rev. 00 01 02 03 04 05 06 07Sheet Sheet

1 X X2 X X3 X X4 X X5 X X6 X X7 X X8 X X9 X X10 X X11 X X12 X X13 X X14 X X15 X X16 X X17 X X18 X X19 X X20 X X21 X X22 X X23 X X24 X X25 X X26 X X27 X X28 X X29 X X30 X X31 X X32 X X33 X X34 X X35 X X36 X X37 X X

Page 3: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page3 of 37

ContentPage

1. Welding Map for butt welding between outer casing and trip valve casing 42. WPS for butt welding between outer casing and trip valve casing

(Including welder Qualification) 53. WPS for welding repair of the casting (Including welder Qualification) 84. PQR 22

Welding Detail焊接详图

Page 4: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page4 of 37

1. Welding Map for butt welding between outer casing and trip valve casingJoint Identification Card焊缝识别卡(JIC)

JIC NA识别卡名称

Joint Identification Cardof Casting Blank

汽缸毛坯焊缝标识

Page 1of 1第 1页共 1页

焊缝编号目录JIONT IDENTIFICATION CARD CONTENT

焊缝编号Joint No.

焊接方法WeldingProcess

WPS编号/版本号WPS No./Rev. No.

PQR编号PQR No.

备注Remarks

X1 GTAW/SMAW WD-03/Rev.A PD-03/Rev.A焊缝返修使用相同的

WPS、WPQThe WPS/PQR is alsoapplied to welding joint

repair

Page 5: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page5 of 37

2. WPS for butt welding between outer casing and trip valve casing (Including welderQualification)

Page 6: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page6 of 37

Page 7: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page7 of 37

Page 8: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page8 of 37

3. WPS for welding repair of the casting (Including welder Qualification)Welding Procedure Specification 焊接工艺规程(WPS)

Hangzhou Steam Turbine Casting& Forging Co., Ltd杭州汽轮铸锻有限公司

WPS No/Rev编号/版本号 WD-06/ Rev. B

Page 1 of 2第 1页共 2页

Welding Process(es)焊接方法

SMAW Type(s)自动化等级

Manual手工

Supporting PQR No/Rev

依据的 PQR 编号PD-01/Rev. A

JOINTS接头(QW-402)Joint Design接头型式 Groove 坡口焊Backing(Yes or No)衬垫(有或无): Yes有Backing Material(Type)衬垫材料(型式): Base Metals母材Weld Metal Thickness of each Pass每层焊道的熔敷金属厚度: ≤13mmWelding Detail焊接详图

BASE MATALS 母材(QW-403)P-No.类别号 Group No.组别号 To和 P-No.类别号 Group No.组别号 or或者Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-17CrMoV511 To和Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-17CrMoV511 Welding焊接BASE MATALS Thickness Range母材厚度范围:Groove坡口焊 5mm≤T≤200mm Fillet角焊 ALLPipe Diameter Range管子直径范围:Groove坡口焊 None(无) Fillet角焊 None(无)Other其他:FILLER METALS填充金属(QW-404)Welding process(es)焊接方法 SMAWAWS specification 标准号: GB/T 5118(国标 GB)AWS Classification分类号: E6215-G(国标 GB)Brand焊材商标: THR317B20Filler Metal F-No:Weld Metal Analysis A-No: 3Size of Filler Metals填充金属尺寸: Φ4.0、Φ5.0Weld Metal Thickness Range熔敷焊缝金属厚度范围 t≤200mmElectrode-flux(class) 焊丝-焊剂(分类号: None(无)Flux Trade Name焊剂商标名称: None(无)Consumable Insert 可熔合嵌条: None(无)Other其他:POSITION焊接位置(QW-405)Position of Groove坡口位置: 1GWeld Progression (up or down)焊接方向: None(无)

Position of Fillet角焊缝位置:None(无)Other其他:

PREHEAT预热(QW-406)Preheat Temp Min 最小预热温度: 200℃Inter-pass Temp Max 最大层间温度: 450℃Preheat Maintenance预热的保持方式: 火焰

Bayrampour-S
Call Out
(3) Please specify applicability of this material in this project
Page 9: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page9 of 37

POSTWELD HEAT TREATMENT 焊后热处理(QW-407)Temperature Range温度范围:(710±10)℃Time Range时间范围: ≥10h

ELECTRICAL CHARACTERISTICS 电特性(QW-409)Current AC or DC 电流 AC或 DC see below(见下表)Polarity 极性: see below(见下表)Amps(Range)安培 see below(见下表)Volts(range)伏特 see below(见下表)Tungsten Electrode Size and Type 钨极尺寸和类型:None(无)Mode of Metal Transfer For GMAW 金属过渡方式:None(无)

GAS气体(QW-408)Percent Composition百分比组成

Gas(es)气体 Mixture混合比 Flow Rate流量Shielding保护气 None(无) None(无) None(无)Trailing尾部保护气 None(无) None(无) None(无)Backing背面保护气 None(无) None(无) None(无)

TECHNIQUE焊接技术(QW-410)String or Weave bead直进焊或横摆焊:Weave(横摆焊)Orifice or Gas cup Size嘴孔或喷嘴尺寸:None(无)Initial and Inter-pass Cleaning打底焊道和中间焊道的清理方法: Brush(刷)Method of Back Grouging背面清根方法:None(无)Oscillation横摆方法:Manual (手工)Contact Tube to Work distance导电嘴工作距离:None(无)Multiple or Single pass(Per Side)多道焊或单道焊:Multiple (多道焊)Multiple or Single Electrodes多丝焊或单丝焊:Single(单丝焊)Peening锤击有无: None(无)Other其他:

WeldLayer(s)焊层

Process焊接方法

Filler Metal填充金属 Current焊接电流 Volt Range电压范围

Other其他Class

种类Dia直径

Type Polar极性

Amp Range电流范围

Root根部

SMAW E6215-G(国标 GB) Φ4.0 DCEP

直流反接140~180A 22~26V

Others其他

SMAW E6215-G(国标 GB) Φ5.0 DCEP

直流反接170~240A 25~29V

Remark备注:

Prepared by编制:Zhang Jianyue 张健月 Certified by确认:Zhou Liming周黎明Date日期: 2015.01.28 Date日期:2015.01.28

Welding Procedure Specification焊接工艺规程(WPS)

WPS No/Rev编号/版本号 WD-06/ Rev. B

Page 2 of 2第 2页共 2页

Page 10: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page10 of 37

Welding Procedure Specification 焊接工艺规程(WPS)Hangzhou Steam Turbine Casting

& Forging Co., Ltd杭州汽轮铸锻有限公司

WPS No/Rev编号/版本号 WD-07/ Rev. B Page 1 of 2

第 1页共 2页

Welding Process(es)焊接方法

SMAW Type(s)自动化等级

Manual手工

Supporting PQR No/Rev

依据的 PQR 编号PD-04/Rev. A

JOINTS接头(QW-402)Joint Design接头型式 Groove 坡口焊Backing(Yes or No)衬垫(有或无): Yes有Backing Material(Type)衬垫材料(型式): Base Metals母材Weld Metal Thickness of each Pass每层焊道的熔敷金属厚度: ≤13mmWelding Detail焊接详图

BASE MATALS 母材(QW-403)P-No.类别号 Group No.组别号 To和 P-No.类别号 Group No.组别号 or或者Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-C25 To和Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-C25 Welding焊接BASE MATALS Thickness Range母材厚度范围:Groove坡口焊 5mm≤T≤200mm Fillet角焊 ALLPipe Diameter Range管子直径范围:Groove坡口焊 None(无) Fillet角焊 None(无)Other其他:FILLER METALS填充金属(QW-404)Welding process(es)焊接方法 SMAWAWS specification 标准号: AWSA5.1AWS Classification分类号: E7015(E5015)Brand焊材商标: THJ507Filler Metal F-No: 4Weld Metal Analysis A-No: 1Size of Filler Metals填充金属尺寸: Φ4.0、Φ5.0Weld Metal Thickness Range熔敷焊缝金属厚度范围 T≤200mmElectrode-flux(class) 焊丝-焊剂(分类号: None(无)Flux Trade Name焊剂商标名称: None(无)Consumable Insert 可熔合嵌条: None(无)Other其他:POSITION焊接位置(QW-405)Position of Groove坡口位置: 1GWeld Progression (up or down)焊接方向: None(无)

Position of Fillet角焊缝位置:None(无)Other其他:

PREHEAT预热(QW-406)Preheat Temp Min 最小预热温度: 100℃Inter-pass Temp Max 最大层间温度: 350℃Preheat Maintenance预热的保持方式: 火焰

Bayrampour-S
Call Out
(4) Please specify applicability of this material in this project
Page 11: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page11 of 37

POSTWELD HEAT TREATMENT 焊后热处理(QW-407)Temperature Range温度范围:(610±10)℃Time Range时间范围: ≥7h

ELECTRICAL CHARACTERISTICS 电特性(QW-409)Current AC or DC 电流 AC或 DC see below(见下表)Polarity 极性: see below(见下表)Amps(Range)安培 see below(见下表)Volts(range)伏特 see below(见下表)Tungsten Electrode Size and Type 钨极尺寸和类型:None(无)Mode of Metal Transfer For GMAW 金属过渡方式:None(无)

GAS气体(QW-408)Percent Composition百分比组成

Gas(es)气体 Mixture混合比 Flow Rate流量Shielding保护气 None(无) None(无) None(无)Trailing尾部保护气 None(无) None(无) None(无)Backing背面保护气 None(无) None(无) None(无)

TECHNIQUE焊接技术(QW-410)String or Weave bead直进焊或横摆焊:Weave(横摆焊)Orifice or Gas cup Size嘴孔或喷嘴尺寸:None(无)Initial and Inter-pass Cleaning打底焊道和中间焊道的清理方法: Brush(刷)Method of Back Grouging背面清根方法:None(无)Oscillation横摆方法:Manual (手工)Contact Tube to Work distance导电嘴工作距离:None(无)Multiple or Single pass(Per Side)多道焊或单道焊:Multiple (多道焊)Multiple or Single Electrodes多丝焊或单丝焊:Single(单丝焊)Peening锤击有无: None(无)Other其他:

WeldLayer(s)焊层

Process焊接方法

Filler Metal填充金属 Current焊接电流 Volt Range电压范围

Other其他Class

种类Dia直径

Type Polar极性

Amp Range电流范围

Root根部

SMAW E7015(E5015) Φ4.0 DCEP

直流反接140~180A 22~26V

Others其他

SMAW E7015(E5015) Φ5.0 DCEP

直流反接170~240A 25~29V

Remark备注:

Prepared by编制:Zhang Jianyue张健月 Certified by确认:Zhou Liming周黎明Date日期: 2015.01.28 Date日期:2015.01.28

Welding Procedure Specification焊接工艺规程(WPS)

WPS No/Rev编号/版本号 WD-07/ Rev. B

Page 2 of 2第 2页共 2页

Page 12: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page12 of 37

Welding Procedure Specification 焊接工艺规程(WPS)Hangzhou Steam Turbine Casting

& Forging Co., Ltd杭州汽轮铸锻有限公司

WPS No/Rev编号/版本号 WD-08/ Rev.B Page 1 of 2

第 1页共 2页

Welding Process(es)焊接方法

SMAW Type(s)自动化等级

Manual手工

Supporting PQR No/Rev

依据的 PQR 编号PD-03/Rev. A

JOINTS接头(QW-402)Joint Design接头型式 Groove 坡口焊Backing(Yes or No)衬垫(有或无): Yes有Backing Material(Type)衬垫材料(型式): Base Metals母材Weld Metal Thickness of each Pass每层焊道的熔敷金属厚度: ≤13mmWelding Detail焊接详图

BASE MATALS 母材(QW-403)P-No.类别号 Group No.组别号 To和 P-No.类别号 Group No.组别号 or或者Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-22Mo4 To和Material Spec材料标准号 DIN17245 Type or Grade型号或等级 DIN GS-22Mo4 Welding焊接BASE MATALS Thickness Range母材厚度范围:Groove坡口焊 5mm≤T≤200mm Fillet角焊 ALLPipe Diameter Range管子直径范围:Groove坡口焊 None(无) Fillet角焊 None(无)Other其他:

FILLER METALS填充金属(QW-404)Welding process(es)焊接方法 SMAWAWS specification 标准号: GT/T 5118AWS Classification分类号: E5015-1M3(国标 GB)Brand焊材商标: THR107Filler Metal F-No:Weld Metal Analysis A-No: 2Size of Filler Metals填充金属尺寸: Φ4.0、Φ5.0Weld Metal Thickness Range熔敷焊缝金属厚度范围 T≤200mmElectrode-flux(class) 焊丝-焊剂(分类号: None(无)Flux Trade Name焊剂商标名称: None(无)Consumable Insert 可熔合嵌条: None(无)Other其他:POSITION焊接位置(QW-405)Position of Groove坡口位置: 1GWeld Progression (up or down)焊接方向: None(无)

Position of Fillet角焊缝位置:None(无)Other其他:

PREHEAT预热(QW-406)Preheat Temp Min 最小预热温度: 100℃Inter-pass Temp Max 最大层间温度: 350℃Preheat Maintenance预热的保持方式: 火焰

Page 13: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page13 of 37

POSTWELD HEAT TREATMENT焊后热处理(QW-407)Temperature Range温度范围:(670±10)℃Time Range时间范围: ≥10h

ELECTRICAL CHARACTERISTICS 电 特 性 ( QW-409)Current AC or DC 电流 AC或 DC see below(见下表)Polarity 极性: see below(见下表)Amps(Range)安培 see below(见下表)Volts(range)伏特 see below(见下表)Tungsten Electrode Size and Type钨极尺寸和类型:None(无)Mode of Metal Transfer For GMAW 金属过渡方式:None(无)

GAS气体(QW-408)Percent Composition百分比组成

Gas(es)气体 Mixture混合比 Flow Rate流量Shielding保护气 None(无) None(无) None(无)Trailing尾部保护气 None(无) None(无) None(无)Backing背面保护气 None(无) None(无) None(无)

TECHNIQUE焊接技术(QW-410)String or Weave bead直进焊或横摆焊:Weave(横摆焊)Orifice or Gas cup Size嘴孔或喷嘴尺寸:None(无)Initial and Inter-pass Cleaning打底焊道和中间焊道的清理方法: Brush(刷)Method of Back Grouging背面清根方法:None(无)Oscillation横摆方法:Manual (手工)Contact Tube to Work distance导电嘴工作距离:None(无)Multiple or Single pass(Per Side)多道焊或单道焊:Multiple (多道焊)Multiple or Single Electrodes多丝焊或单丝焊:Single(单丝焊)Peening锤击有无: None(无)Other其他:

WeldLayer(s)焊层

Process焊接方法

Filler Metal填充金属 Current焊接电流 Volt Range电压范围

Other其他Class

种类Dia直径

Type Polar极性

Amp Range电流范围

Root根部

SMAW E5015-1M3(国标 GB) Φ4.0 DCEP

直流反接140~180A 22~26V

Others其他

SMAW E5015-1M3(国标 GB) Φ5.0 DCEP

直流反接170~240A 22~26V

Remark备注:

Prepared by编制:张健月 Certified by确认:周黎明Date日期: 2015.02.02 Date日期:2015.02.02

Welding Procedure Specification焊接工艺规程(WPS)

WPS No/Rev编号/版本号 WD-08/ Rev. B

Page 2 of 2第 2页共 2页

Page 14: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page14 of 37

Page 15: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page15 of 37

Page 16: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page16 of 37

Page 17: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page17 of 37

Page 18: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page18 of 37

Page 19: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page19 of 37

Page 20: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page20 of 37

Page 21: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page21 of 37

Page 22: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page22 of 37

4.PQR

Page 23: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page23 of 37

Page 24: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page24 of 37

Page 25: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page25 of 37

Page 26: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page26 of 37

Page 27: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page27 of 37

Page 28: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page28 of 37

Page 29: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page29 of 37

Page 30: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page30 of 37

Page 31: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page31 of 37

Page 32: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page32 of 37

Page 33: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page33 of 37

Page 34: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page34 of 37

Page 35: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page35 of 37

Page 36: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page36 of 37

Page 37: BU-05-VD-305-TI-REP-0000-009,01-WPS PQR Welder Qualification record for Steam Turbine 05-330-C-1-T.pdf

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project

BUSHEHRPETROCHEMICAL COMPANY

P.O. No.: 05-POR-MA-305-119

Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01

Document No.: BU-05-VD-305-TI-REP-0000-009Page37 of 37