    Prepared by Sunil Kumar

    Corrtech Energy Ltd.

    [email protected]

  • 8/3/2019 Biomass Power Project -2

    2/18

    Contentsy Project Descriptiony Market & Growth Drivers

    y Potential of Bagasse based power generation

    y Bagasse based power plant policies

    yWhy Gujarat

    y Technology /Processes

    y

    Suggested projecty Project cost

  • 8/3/2019 Biomass Power Project -2

    3/18

    Continuey Funding

    y Returns

    y

    Parties Involvedy Risk & Risk Mitigation

    y Progress

    y Players in the market

  • 8/3/2019 Biomass Power Project -2

    4/18

    Project Descriptiony The proposed project is to set up bagasse based highefficient grid connected cogeneration power plant atexisting sugar mill

    y

    Private or cooperative sugar plants has accepted theimportance of cogeneration power plant for exportingsurplus power

    y Gujarat as one of the leading sugar producers has greatpotential for cogen plant

    y The plant will generate required steam for the plantand electricity for the plant and for exporting to thegrid

  • 8/3/2019 Biomass Power Project -2

    5/18

    Market & Growth Driversy Increasing price of petroleum crude and other fossil

    fuels world over and in India in the last two decades,has forced us to cheaper, renewable source of energy

    y Present energy deficit..

    y In Gujarat..

    y 10% of total power generation must come fromRenewable Energy

    y Government policies to promote Renewable Energy

    y CDM benefits

  • 8/3/2019 Biomass Power Project -2

    6/18

    Potential of Bagasse based power

    plantsy Gujarat has 17 sugar plants in operation with crushing

    capability of more than 10 million MT per year

    y Bagasse production is 30% of total crushing of sugarwhich creates a potential of 250-300 MW powergeneration

    y So far only two sugar plants of all have gone for

    execution of cogeneration power plant, rest are waitingfor capable partners

  • 8/3/2019 Biomass Power Project -2

    7/18

    Bagasse based power plant

    policiesy Supply of biomass, In principal agreement

    y Subsidy

    y Gridy PPA/ Tariff

    y Transmission/ Wheeling.

    y Tax benefits.

    y CDM.

    y Other benefits

  • 8/3/2019 Biomass Power Project -2

    8/18

    Technology/ Processes

  • 8/3/2019 Biomass Power Project -2

    9/18

    Suggested projecty Mahua Sugar Plant

    y Capacity: 4000 TCD

    y

    Bagasse generated(28%): 1120 Tons/ Dayy Self consumption of bagasse in the process and

    running turbines for 6 MW power generation: 1000Tons/ Day

    y Days of operation: 190

    yAmount of bagasse required to generate 1Kwe=2.2Kg

    y Possible power project from 1000 Tons per day bagasse:27.4 MW

  • 8/3/2019 Biomass Power Project -2

    10/18

    Continuey Power plant proposed: 21 MW

    y Total energy generation in a year: 156.37 MU

    y

    Net energy available for billing: 94.61 MUy Price of biomass: Rs.750 per ton, in case of buying from the

    mill Rs. 250 per ton (special rate)

    y Mills additional benefit from selling biomass to us atspecial rate is Rs. 2.87 Crore a year

    y Mills will give us land and water at free of cost and bagasseat special rate

    y The cogeneration power plant will be completely owned bysugar mills after 15 years of it operation

  • 8/3/2019 Biomass Power Project -2

    11/18

    Project Costy Project cost: Rs. 88 Crore

  • 8/3/2019 Biomass Power Project -2

    12/18

    Fundingy Loan: 70 % of the project

    y Subsidy: Up to 15% of the project

    y Equity partners: Axis Bank, CORRTECH & NeoGeoy Net investment of CORRTEC: Rs. 14 crore over a

    period of 18 months

  • 8/3/2019 Biomass Power Project -2

    13/18

    Financials (without CDM

    benefits)Particulars Year 1 Year 2 Year 3 Year 4 Year 5

    Energyavailable forsale

    94.61 MU 94.61 MU 94.61 MU 94.61 MU 94.61 MU

    Revenue @Rs. 3 perunit

    2838.2 lacs 2838.2 lacs 2838.2 lacs 2838.2 lacs 2838.2 lacs

    Fuel, O&M,

    Insurance,Interest,Depr.

    2160.5 lacs 2068.1 lacs 2065.0 lacs 2033.0 lacs 2003.6 lacs

    PAT 677.7 lacs 770.1 lacs 773.2 lacs 805.2 lacs 834.6 lacs

  • 8/3/2019 Biomass Power Project -2

    14/18

    Returns: without CDM

    benefitsy ROE: 31.3% (10 years average)

    y IRR: 31.2%

    y Repayment of Loan: 10 yearsy DSCR: More than 3.0

  • 8/3/2019 Biomass Power Project -2

    15/18

    Parties Involvedy Ministry of Non Conventional Energy

    y Gujarat Energy Development Agency (GEDA)

    y Gujarat Electricity Regulatory Commissiony Sugar Factory Co-operative society

    y Other biomass suppliers

    y Bank

    y Equity partners

  • 8/3/2019 Biomass Power Project -2

    16/18

    Risk & Risk Mitigationy Funding

    y Fuel Supply & Prices fluctuation

    y Location disadvantagesy Government policies

  • 8/3/2019 Biomass Power Project -2

    17/18

    Progressy Meetings with Sugar Factories

    y Meetings with regulatory bodies

    y Discussion with equipment suppliers

  • 8/3/2019 Biomass Power Project -2

    18/18

    Players in the markety Kalpataru Power Transmission Ltd.

    y Surya Chamble Power Ltd.

    yAmrit Envi. Tech Pvt. Ltd.y Birla Corporation Ltd.

    y Transend Green Power Ltd.

    y Sambhav Energy Ltd.

    yJ K Laxmi Cement Ltd.

    y Satyam Power Ltd.

    y Star Biomass Power Pvt. Ltd.