Better Acute Care in LothianBetter Acute Care in Lothian
St. John’s Hospital
Welcome to the Project Launch of the Short Stay Elective Surgical Centre
Better Acute Care in LothianBetter Acute Care in Lothian
SSESC Project LaunchAgenda:
• Clinical drivers (Didi Welsh)• Project Infrastructure (Gordon
Reid)• Project delivery (Doug Keillor,
BAM)
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
Mrs Didi Welsh Project Sponsor
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
Day Case PathwayGP
OPDHospital Doctor
Pre AdmissionAdmission
Theatre Recovery
Discharge
Home
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
Total Day Case Elective Admission Cases April 2007/March 2008
(RIE/WGH/St John’s)
51485 (61% overall elective activity)
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
Future Service:
– 1 entry point– Pre assessment for
all patients– Universal streamline
pathway– Robust
administration system based on PFB
– Reduction of DNA rate– Improved Theatre
utilisation – 3 Session
Days/weekends– Flexibility – Extended Roles
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
Head and Neck
General Surgery
Women & ChildrenMusculoskeletal
Respiratory Physicians
SSESC
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
By Providing a redesigned /new SSECS
–Optimise pre op assessment–Optimise Bed numbers–Optimise Theatre Utilisation–Optimise Recovery Room
Better Acute Care in LothianBetter Acute Care in Lothian
Current Layout – Wards 5 6 & 7
Better Acute Care in LothianBetter Acute Care in Lothian
Proposed Plan in More Detail
Better Acute Care in LothianBetter Acute Care in Lothian
Better Acute Care in LothianBetter Acute Care in Lothian
Short Stay Elective Surgical Centre
Anticipated New Cases 3000
Specialty From WGH From RIE TotalGeneral Surgery 200 200 400Gynaecology 800 800Orthopaedics 1,000 1,000Urology 800 800Totals 1,000 2,000 3,000
Better Acute Care in LothianBetter Acute Care in Lothian
ST JOHNS: SHORT STAY ELECTIVE SURGICAL CENTRE & THEATRES
UPGRADE
PROJECT LAUNCH
GORDON REID, PROJECT DIRECTOR
Better Acute Care in LothianBetter Acute Care in Lothian
SSESC PROJECT LAUNCH
• Ward 25
• Ward 19a
• Residencies
• Wards 5, 6 & 7
• Theatres
Communicating With St Johns
NHS Lothian Weekly Liaison
Phasing Plans
Daily Liaison
Progress Meetings
Phasing and Segregation
Compound And Work Area
Heras Fencing
Access Route
Phase 1 Contractor’s Work Area
Phase 2 Contractor’s Work Area
Pedestrian Barriers Temporary Disabled Parking
Ward 25 Compound
Existing Dry RiserEmergency Access to Dry Riser + Staff Fire Escape RoutesPhase of future car parking
Site Set Up – 22nd March 2010
Start Works – 12th April
Completed - 13th Dec 2010
Overall Duration 38 weeks
Delivering Your Programme
Ground Floor Phase 1
Ward 2 Patients Move to Residents Block
Ward 2 Move to Residents Block
12th April
Construction Works Zone
Ground Floor Phase 1 – Ward 7 + Ward 6
Construction Works Zone Perimeter Scaffold
Bridging ScaffoldAccess Routes
Electric Hoist Access Stair
Existing Partitions to be Sealed
Temporary Sealed Partition
Start: 12th AprilDuration: 35 weeks Complete:
13th December
Lower Ground Floor Phase 1- Ward 2 Works
Start: 12th AprilDuration: 11 weeksComplete: 28th June
Access Routes Existing Partitions to be SealedConstruction Works Zone Temporary Sealed Partition
Start: 12th AprilDuration: 11 WeeksComplete: 28th June
First Floor Phase 1- Ward 15 Works
Construction Works Zone
Lower Ground Floor Phase 1 - Ward 2 Upgrade Works
Ward 2 Upgrade WorksStart:7th JuneComplete: 28th JuneDuration: 3 Weeks
Construction Works Zone
Lower Ground FloorPhase 1
Existing Ward 1 Moves into Existing Ward 2
Ward One Moves Into Ward Two Ward One Moves Into Ward Two
Ward 1 moves to Ward 2 5th – 12th July
Delivering Your Programme